Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 116, 117, 118, 119, 121, 124, 125

Files17

Search terms highlighted
Eversource rate increase is on 4 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
3 pages match
Words on different pages
Words on different pages

Text of NECTA-117_Final.pdf

Extracted from the file · 1 page · 1,566 characters

Text of NECTA-117 Attachment 1.pdf

Extracted from the file · 1 page · 619 characters

Text of NECTA-117 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118_Final.pdf

Extracted from the file · 2 pages · 4,116 characters

Words on different pagesRead the text of NECTA-118_Final.pdf

Text of NECTA-118 Attachment 1.pdf

Extracted from the file · 1 page · 7,949 characters

Text of NECTA-118 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118 Attachment 2 .pdf

Extracted from the file · 1 page · 592 characters

Text of NECTA-118 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-119_Final.pdf

Extracted from the file · 2 pages · 6,071 characters

Words on different pagesRead the text of NECTA-119_Final.pdf
Words on different pages
  1. Page 25 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 25 of 104 Work Order Number Description 80239054 *SYS PROJ* CD02444 Pole Integrity R 80239057 CD02444 Pole Integrity Replacement 80239060 PRINT CRP-10 Dew Rd BK, new crossov 80239074 TL - SHORE DR, #107 LYME // UPGRADE 80239217 * JAM - 461 Alling St. Berlin - Rem 80239243 W 80239279 POST CONSTRUCTION - 9A CAR VS FRONT 80239290 *SYS PROJ* CD02444 Pole Integrity R 80239309 *SYS PROJ* CD02444 Pole Integrity R 80239343 (BCW MATERIAL) *D&D*CD02444 Pole In 80239351 *D&D*CD02444 Pole Integrity Replace 80239400 TL - ROGERS LAKE TRL, OLD LYME // S 80239577 *SYS PROJ* CD02444 Pole Integrity R 80239579 CD02444 Pole Integrity Replacement 80239581 *SYS PROJ* CD02444 Pole Integrity R 80239583 *D&D*CD02444 Pole Integrity Replace 80239604 WTG FOR 9A TO CLOSE 2/7/25 (TH) 9A 80239608 9A - CAR VS POLE 78 - APPROVED 3/7/ 80239636 JMS- 9A- WEST HARTFORD 66 SAMPSON S 80239638 9A, 1/12/25, RSO, JK>POLE 3839--CAR 80239648 EVW - 9A CAR VS POLE 1/11 - [MALLOD 80239674 POLE LINE RELOCATION - MERRYALL RD 80239796 *SYS PROJ* CD02444 Pole Integrity R 80239803 WO 19831549-INT-103150-DG UPGRADE F 80239841 *SYS PROJ* CD02444 Pole Integrity R 80239855 *POST CONSTRUCTION* 9A CAR VS POLE 80239899 *SYS PROJ* CD02444 Pole Integrity R 80239928 *D&D* Frontier Pole Inspection Pole 80239940 *D&D* Frontier Pole Inspection Pole 80239942 *SYS PROJ* CD02444 Pole Integrity R 80239948 9A - 166 WATERBURY RD, P 615-S, PRO 80239950 MDB - 01/7 ELLEN KAY:DR:WATERTOWN:C 80239965 *SYS PROJ* CD02444 Pole Integrity R 80239987 PRINT CRP-105 forest ave WIN, shift 80240012 *SYS PROJ* CD02444 Pole Integrity R 80240013 *SYS PROJ* CD02444 Pole Integrity R 80240023 *SYS PROJ* CD02444 Pole Integrity R 80240027 *SYS PROJ* CD02444 Pole Integrity R 80240064 CD02444 Pole Integrity Replacement 80240077 *SYS PROJ* CD02444 Pole Integrity R 80240096 (BCW MATERIAL) *D&D*CD02444 Pole In 80240098 *SYS PROJ* CD02444 Pole Integrity R 80240191 DONE 9A - 1/13 NORTH( 109) ST -- 21 80240254 JDB 134 FLORIDA HILL RD, RIDGEFIELD 80240524 EVW - (9A) MUSIC MOUNTAIN ( 55) R 80240552 WC-CHASE RIVER RD WATERBURY. RELOCA 80240590 DONE PRINT BJQ, GOSHEN, P-1377 (331 80240607 DONE PRINT CRP-75 Barbourtown Rd CT 80240613 *SYS PROJ* CD02444 Pole Integrity R 80240635 *SYS PROJ* CD02444 Pole Integrity R 80240636 *D&D*CD02444 Pole Integrity Replace 80240641 *SYS PROJ* CD02444 Pole Integrity R 80240646 DONE PRINT BJQ, LTCH, P #27 (401) E 80240647 *D&D* Frontier Inspection Pole Shif 80240661 MM 470 Green Hollow Rd Plainfield P 80240673 *SYS PROJ* CD02444 Pole Integrity R 80240676 (BCW MATERIAL) *D&D*CD02444 Pole In 80240753 JDB 15 BRENNER RD NORWALK,REPL P186 80240754 5/9/22 *9A* CLAPBOARD RIDGE ( 10 80240766 *D&D*Leaning pole 2330 Gildersleeve 80240783 Windham_Jordan Ln_Reliability Impro 80240791 *D&D* Leaning Pole 1871 Wright rd C 80240799 *D&D*Leaning pole 2086 Barbourtown 80240803 *D&D* RELIABILITY-IMPROVEMENT-OH-SP 80240966 *ASP* CD02444 Pole Integrity Replac 80240988 DG P#1035 32 NEW RD THOMPSON DIST G 80240992 *D&D* Frontier Pole Inspection Pole 80241000 PRINT EVW - 441 River Rd (Rte 7), S 80241030 MPB; 175 Quaker Farms Rd Southbury 80241035 *D&D*Frontier Pole Inspection Pole 80241041 *SYS PROJ* CD02444 Pole Integrity R 80241043 MM 654 ekonk hill rd Sterling pole 80241076 DONE-BJQ - 1/8 - DAMAGED XFRMR - PO 80241090 *D&D*CD02444 Pole Integrity Replace 80241105 zWETH--12/28/24--1298 Silas Deane H 80241132 RA CD01917-01 Reconductor River Rd, 80241144 ASP 8/17 CR-221B W MAIN ST. AVON, N 80241145 DJM. 5 IVY KNOLL WESTPORT. 400A SVC 80241167 WRITTEN NEEDS TO BE DONE 05/10 *TUR 80241195 PR 5/814N3 - Grantville Rd. Norfolk 80241203 NORWICH written -HARTFORD/TRUMBULL 80241240 Abel -556 Browns Rd, Mansfield, RPL 80241316 DG P#1408 1139 RT 171 WOODSTOCK FRN 80241479 *D&D* Frontier Inspection Pole Shif 80241495 CD01872 - CDOT L087-003 - Rubber Av 80241498 CD01872 - CDOT L087-003 - Rubber Av 80241513 15 DD BY 9/12/22 RR; SOUTHBURY, PUR 80241536 HEL KTI WM; NEW PRESTON, KINNEY HIL 80241803 *D&D* Frontier Pole Inspection Pole 80241831 *D&D* CD CD02449 Frontier Inspectio 80241838 JD; 98 WIND MILL CIR STAMFORD; SHIF 80241840 *ASP* CD02444 Pole Integrity Replac 80241841 PRINT EVW - 27 W Shore Pl, Salisbur 80241858 *SYS PROJ* CD02444 Pole Integrity R 80241859 AE/JD; 651 ROCK RIMMON RD; SHIFT 3P 80241884 MG-P#199-HANOVER- MAIN (451) ST-INS 80241951 LD- 912 STAFFORD AVE BRISTOL - P113 80241965 *D&D* Frontier Inspection Pole Shif 80241971 *SYS PROJ* CD02444 Pole Integrity R 80242005 *D&D Frontier Inspection Pole Shift 80242006 D/W 19843730: JRP - 310 W Queen St 80242009 *ASP* CD02444 Pole Integrity Replac 80242023 AC/MPB-81 CHRISTIAN ST OXFORD-RELOC 80242025 TL - TOWN WOODS RD, #16 OLD LYME // 80242027 CD02444 Pole Integrity Replacement in-service date work order type 12/9/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 8/4/2022 11 Elect Annual Proj - DESG CT 8/16/2023 11 Asset Mgmt - Specific DESG CT 5/15/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 8/18/2022 11 Elect Annual Proj - DESG CT 3/20/2025 11 Dist Capital or Expense 5/21/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 2/14/2025 11 Damage Claims OH 2/14/2025 11 Damage Claims OH 4/4/2025 11 Damage Claims OH 1/31/2025 11 Dist Capital or Expense 2/3/2025 11 Dist Capital or Expense 6/4/2025 11 Elect Annual Proj - DESG CT 9/4/2025 11 Dist Capital or Expense 2/12/2025 11 Elect Annual Proj - DESG CT 9/4/2025 11 Dist Capital or Expense 3/13/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 7/22/2025 11 Damage Claims OH 2/14/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 1/30/2025 11 Elect Annual Proj - DESG CT 7/7/2025 11 Dist Capital or Expense 7/7/2025 11 Elect Annual Proj - DESG CT 8/19/2025 11 Elect Annual Proj - DESG CT 8/19/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 8/5/2025 11 Dist Capital or Expense 1/14/2025 11 Dist Capital or Expense 1/14/2025 11 Elect Annual Proj - DESG CT 5/19/2022 11 Damage Claims OH 7/28/2022 11 Corrective Maint OH Svc 1/24/2025 11 Dist Capital or Expense 1/28/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/24/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 10/29/2025 11 Dist Capital or Expense 4/1/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 3/23/2023 11 Asset Mgmt - Specific DESG CT 6/10/2022 11 Damage Claims OH 9/16/2022 11 Asset Mgmt - Specific DESG CT 5/11/2023 11 Elect Annual Proj - DESG CT 9/22/2022 11 Asset Mgmt - Specific DESG CT 9/16/2022 11 Asset Mgmt - Specific DESG CT 2/15/2023 11 Asset Mgmt - Specific DESG CT 6/3/2025 11 Dist Capital or Expense 1/28/2025 11 Elect Annual Proj - DESG CT 7/9/2025 11 Dist Capital or Expense 10/29/2025 11 Corrective Maint UG Svc 4/22/2025 11 Dist Capital or Expense 1/30/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 1/15/2025 11 Elect Annual Proj - DESG CT 1/15/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 3/27/2025 11 Private Work - No Co Asset 12/16/2022 11 Asset Mgmt - Specific DESG CT 9/8/2022 11 Elect Annual Proj - DESG CT 2/6/2023 11 Asset Mgmt - Specific DESG CT 7/25/2022 11 Elect Annual Proj - DESG CT 5/9/2023 11 Elect Annual Proj - DESG CT 7/25/2022 11 Elect Annual Proj - DESG CT 3/1/2023 11 Elect Annual Proj - DESG CT 7/1/2022 11 Elect Annual Proj - DESG CT 7/9/2025 11 Dist Capital or Expense 10/24/2024 11 Dist Capital or Expense 10/24/2024 11 Asset Mgmt - Specific DESG CT 8/29/2022 11 Elect Annual Proj - DESG CT 9/8/2023 11 Elect Annual Proj - DESG CT 2/13/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 2/26/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 9/30/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 3/14/2025 11 Dist Capital or Expense 7/1/2025 11 Dist Capital or Expense 2/24/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 4/3/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 3/5/2025 11 Corrective Maint OH Svc 5/29/2025 11 Temporary Work DESG CT 5/14/2025 11 Dist Capital or Expense Subsequent Close Date 4/20/2026 1/22/2026 9/16/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 3/23/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 7/17/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 364310 Poles and Appurtenance 12,686 5,399 1,650 3,740 13,853 7,100 55 3,707 7,057 4,546 4,483 3,103 4,714 3,429 2,544 3,858 7,423 15,970 5,286 11,135 1,146 1,524 4,021 3,141 4,523 4,903 7,925 3,558 919 11,746 5,029 1,893 6,607 829 6,995 13,394 12,703 7,194 7,637 6,926 6,167 5,937 1,890 1,136 1,481 (124) 240 62 6,006 4,288 9,089 9,784 842 2,699 7,068 2,750 5,992 2,759 2,055 4,184 2,180 3,951 6,883 3,775 2,231 (141) 1,482 2,405 7,421 86 9,633 1,260 65 6,180 295 106,442 3,865 2,675 3,791 67,624 8 2,852 474 882 9,197 287,862 772 5,936 190 83 519 9,219 2,012 1,236 2,390 1,713 3,619 632 3,972 330 957 2,456 32,011 2,058 5,106 365000 Overhead Conductors, Device 6,488 2,082 1,676 507 1,787 888 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 1,904 368330 Equipment Overhead 437 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 5,507 29,011 36 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 594 33 1,301 185 1,629 1,725 9,691 2,137 555 1,253 43 241 992 439 7,874 2,392 2,736 5,292 165 8,155 737 1,070 776 989 4,810 97 746 265 44 420 365 927 2,247 2,949 2,943 979 142 850 3,689 536 804 4,146 2,180 261 32 3,281 (508) 143 1,872 637 3,696 2,256 266 1,292 (298) 293 825 114 240 6,251 444 713 1,375 733 681 13,394 1,416 2,674 (267) 2,545 669 1,504 631 2,372 174 140 820 373 112,018 3,845 1,160 54 75,472 536 1,682 591 537 (20) 91 2,078 336 121 74 331 18,837 34 617 102 603 1,453 315 387 778 344 34,865 457,698 1,084 120 384 419 9,210 2,520 1,600 230 1,733 1,096 5,283 414 1,426 34 1,646 (47) 201 1,319 751 128 6,628 189 763 103 47 456 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 21,514 7,481 9,427 4,465 47,618 7,988 55 5,432 16,748 6,683 5,038 4,399 4,714 3,670 3,536 4,297 16,044 18,362 8,022 16,692 1,311 9,679 4,757 4,255 5,298 4,903 9,335 8,733 1,017 11,746 5,029 2,821 8,854 3,920 9,938 14,373 13,553 10,883 8,173 7,730 14,008 10,373 2,152 1,168 6,320 (930) 383 1,935 6,643 4,581 9,089 11,053 956 2,940 13,319 2,750 6,706 4,671 4,470 4,865 15,574 5,958 10,094 3,775 2,231 (427) 4,027 3,501 8,925 717 14,204 1,434 280 7,000 804 220,012 28,000 4,150 3,846 143,483 8 4,014 474 1,226 44,481 754,770 4,376 7,657 190 313 2,252 9,219 8,805 1,236 3,816 3,393 3,571 833 5,290 1,082 1,188 2,456 38,686 2,703 5,869
  2. Page 26 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 26 of 104 Work Order Number Description 80242036 73 - 87 MILLER RD., S. WINDSOR - NE 80242040 *SYS PROJ* CD02444 Pole Integrity R 80242042 CD02444 Pole Integrity Replacement 80242110 MM 69 Franklin Dr Brklyn P#1341 rep 80242268 *****ALL WORK COMPLETE*****1/7/25-80242274 CD02444 Pole Integrity Replacement 80242289 *SYS PROJ* CD02444 Pole Integrity R 80242292 P8605 red badge Colman St, New Lond 80242312 *SYS PROJ* CD02444 Pole Integrity R 80242321 *D&D*CD02444 Pole Integrity Replace 80242322 *D&D* Frontier Inspection Pole Shif 80242346 *SYS PROJ* CD02444 Pole Integrity R 80242347 JTR,919 BURNSIDE AVE, EAST HARTFOR 80242352 *D&D Frontier Inspection Pole Shift 80242432 Priority Pole P#1840 replace with 4 80242453 SC-P#3754 HUNTINGTON DR PLAINFIELD 80242523 *D&D* Frontier Pole Inspection Pole 80242545 *D&D*Frontier Pole Inspection Pole 80242551 *D&D* JS - Conv. 1701920 - Make Rea 80242554 *D&D* JS - Conv. 1701920 - Make Rea 80242555 *D&D* JS - Conv. 1701920 - Make Rea 80242558 *D&D*CD02444 Pole Integrity Replace 80242601 CD02444 Pole Integrity Replacement 80242603 CD02444 Pole Integrity Replacement 80242704 MG-P#2609/P#3523-KILLINGLY, NORTH ( 80242974 MRP - New Load - 21P Reconfiguratio 80242986 APPRENTICES MPB; 578 BERKSHIRE RD, 80243001 *SYS PROJ* CD02444 Pole Integrity R 80243004 Jpt-186 Terryville Rd Bristol (Frnt 80243053 *ASP* CD02444 Pole Integrity Replac 80243060 *SYS PROJ* CD02444 Pole Integrity R 80243367 *SYS PROJ* CD02444 Pole Integrity R 80243372 (BCW MATERIAL) *D&D*CD02444 Pole In 80243378 *ASP* CD02444 Pole Integrity Replac 80243418 *SYS PROJ* CD02444 Pole Integrity R 80243429 (BCW MATERIAL) *D&D*CD02444 Pole In 80243430 *SYS PROJ* CD02444 Pole Integrity R 80243439 *SYS PROJ* CD02444 Pole Integrity R 80243445 *SYS PROJ* CD02444 Pole Integrity R 80243468 1/16 - RSO - [PLOURJG]: MARLBOROUGH 80243472 *SYS PROJ* CD02444 Pole Integrity R 80243480 *SYS PROJ* CD02444 Pole Integrity R 80243487 CD02444 Pole Integrity Replacement 80243504 CD02444 Pole Integrity Replacement 80243508 *SYS PROJ* CD02444 Pole Integrity R 80243514 *SYS PROJ* CD02444 Pole Integrity R 80243517 REWRITE-*SYS PROJ* CD02444 Pole Int 80243518 Appr Grp - WATERFALL RD 120, ASHFOR 80243525 CD02444 Pole Integrity Replacement 80243528 AE/RL:21 HUNT TER: GRN VERIZON TO R 80243545 (BCW MATERIAL) *D&D*CD02444 Pole In 80243551 *D&D* Frontier Inspection Pole Shif 80243558 *SYS PROJ* CD02444 Pole Integrity R 80243601 Jpt-Robert Jackson Way - Buck Fever 80243602 ALL WORK FIEld COMPLETED- NEed town 80243669 TW - CD01225 (AIMS Seg 02, Part 1 o 80243774 *SYS PROJ* CD02444 Pole Integrity R 80243801 (BCW MATERIAL) *D&D*CD02444 Pole In 80243806 *SYS PROJ* CD02444 Pole Integrity R 80243819 *SYS PROJ* CD02444 Pole Integrity R 80243822 *SYS PROJ* CD02444 Pole Integrity R 80243823 CD02444 Pole Integrity Replacement 80243832 ESSEX, N MAIN ST/SHIFT TO FTR POLES 80243931 MAR - 200amp Upgrade,Upgrd Xfmr - 6 80243993 PD-33 GOSHEN RD WTFD/INSTALL NEW ST 80244035 *D&D* Frontier Pole Inspection Pole 80244046 DJM. 5 REBEL RD WESTPORT. NEW 200A 80244060 *SYS PROJ* CD02444 Pole Integrity R 80244075 *D&D*CD02444 Pole Integrity Replace 80244080 CD02444 Pole Integrity Replacement 80244112 *SYS PROJ* CD02444 Pole Integrity R 80244118 JMS- WEST HARTFORD, 1700 ASYLUM AVE 80244124 (BCW MATERIAL) *D&D*CD02444 Pole In 80244147 CD02444 Pole Integrity Replacement 80244159 (BCW MATERIAL) *D&D*CD02444 Pole In 80244166 *SYS PROJ* CD02444 Pole Integrity R 80244176 *SYS PROJ* CD02444 Pole Integrity R 80244185 CHESTER, OLD COUNTY RD//RPL XARMS P 80244187 *SYS PROJ* CD02444 Pole Integrity R 80244229 (BCW MATERIAL) *D&D*CD02444 Pole In 80244231 DONE PRINT BJQ, LTCH, P #164 (85) W 80244237 *ASP* CD02444 Pole Integrity Replac 80244262 *EH AWC* CD02444 Pole Integrity Rep 80244275 *ASP* CD02444 Pole Integrity Replac 80244294 *SYS PROJ* CD02444 Pole Integrity R 80244301 *EH AWC* CD02444 Pole Integrity Rep 80244322 Appr Grp - Waterfall Rd 224, Ashfor 80244325 *EH AWC* CD02444 Pole Integrity Rep 80244343 *EH AWC* CD02444 Pole Integrity Rep 80244347 *SYS PROJ* CD02444 Pole Integrity R 80244352 *EH AWC* CD02444 Pole Integrity Rep 80244356 *SYS PROJ* CD02444 Pole Integrity R 80244358 *EH AWC* CD02444 Pole Integrity Rep 80244373 JMS- BLOOMFIELD, 1404 BLUE HILLS AV 80244443 9A car vs pole - APPROVED 3/6/2026 80244447 *ASP* BC - Conv. 1777020 - Make Rea 80244451 LD- 9A- 624 MULBERRY ST, PLNTVILLE80244461 9A CAR VS POLE - APPROVED 2/22 80244463 9A, RSO, JK>POLE 2101--CAR V ESE P 80244469 LD- 9A-81 CHURCH AVE, BRISTOL - P93 80244477 1.17.25 100 STILL RIVER RD, NEW MIL 80244479 9A - CAR VS POLE 2185 - APPROVED 4/ 80244491 1/19/25, RSO/AWC, JK>POLE 2672--REP 80244498 CAR VS POLE - FOIA SENT 5/1/26: FOI 80244502 ZK - BLOOMFIELD (9a) - 2729 TERRY P in-service date work order type 9/8/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 9/1/2022 11 Elect Annual Proj - DESG CT 2/11/2025 11 Elect Annual Proj - DESG CT 4/29/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 4/23/2025 11 Elect Annual Proj - DESG CT 9/17/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 1/21/2025 11 Damage Claims OH 3/11/2025 11 Dist Capital or Expense 8/18/2022 11 Elect Annual Proj - DESG CT 9/13/2022 11 Elect Annual Proj - DESG CT 7/9/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 5/15/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 11/13/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 5/2/2025 11 Corrective Maint OH Svc 6/3/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 4/25/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 10/23/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 2/24/2025 11 Damage Claims OH 4/22/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 5/21/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 8/19/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 4/24/2025 11 Elect Annual Proj - DESG CT 5/21/2025 11 Dist Capital or Expense 3/26/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 3/28/2023 11 Elect Annual Proj - DESG CT 2/20/2024 11 Asset Mgmt - Specific DESG CT 11/4/2025 11 Dist Capital or Expense 7/24/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 7/7/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 6/9/2025 11 Elect Annual Proj - DESG CT 5/31/2022 11 Elect Annual Proj - DESG CT 8/1/2022 11 Elect Annual Proj - DESG CT 2/13/2025 11 Dist Capital or Expense 3/28/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 5/21/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 4/24/2025 11 Temporary Work DESG CT 4/22/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 7/7/2025 11 Elect Annual Proj - DESG CT 3/12/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 4/22/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 5/15/2025 11 Elect Annual Proj - DESG CT 6/3/2025 11 Dist Capital or Expense 8/5/2025 11 Dist Capital or Expense 5/20/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 5/19/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 5/20/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 5/12/2025 11 Elect Annual Proj - DESG CT 5/30/2025 11 Elect Annual Proj - DESG CT 4/21/2025 11 Damage Claims OH 4/25/2025 11 Dist Capital or Expense 1/24/2025 11 Damage Claims OH 4/2/2025 11 Damage Claims OH 2/6/2025 11 Damage Claims OH 1/24/2025 11 Damage Claims OH 1/31/2025 11 Elect Annual Proj - DESG CT 3/25/2025 11 Damage Claims OH 2/7/2025 11 Dist Capital or Expense 2/12/2025 11 Damage Claims OH 1/31/2025 11 Damage Claims OH Subsequent Close Date 2/13/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 2/13/2026 5/15/2026 2/13/2026 2/13/2026 2/13/2026 1/22/2026 7/17/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 3/16/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/14/2026 2/13/2026 7/17/2026 2/14/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 6/26/2026 2/13/2026 6/26/2026 1/22/2026 364310 Poles and Appurtenance 231 4,044 7,046 1,742 826 3,085 4,629 14,614 4,490 5,461 852 11,327 7,269 222 3,161 712 2,250 285 77 808 412 1,729 4,450 6,011 2,709 34,685 755 3,792 2,646 1,977 7,444 6,185 5,916 6,811 3,280 5,191 7,403 2,800 1,141 18,688 1,143 14,391 10,774 3,121 3,673 9,330 4,556 754 2,728 1,117 6,001 1,352 7,824 658 8,637 67,615 8,270 12,841 4,393 6,488 6,679 8,640 5,726 1,760 1,826 75 4,747 2,273 6,133 3,562 5,495 389 4,542 7,508 4,913 16,698 5,219 983 4,437 4,553 204 4,575 6,422 4,826 4,329 2,892 3,241 3,860 3,105 6,376 4,582 5,266 3,805 8,211 11,651 515 14,881 5,825 6,704 11,523 9,048 7,086 5,384 1,112 4,836 365000 Overhead Conductors, Device 527 1,665 2,657 863 1,134 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 2,553 368330 Equipment Overhead 72 49 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 6,304 288 2,672 453 886 1,597 229 869 850 2,852 388 254 92 35 265 48 519 2,175 453 172 35,523 478 249 82 397 50 585 1,493 2,768 933 1,095 2,969 1,803 4,494 108 410 934 4,286 328 1,388 1,765 406 1,356 229 2,725 658 997 59,741 4,033 1,243 803 1,969 386 683 63 314 1,786 299 77 122 658 1,423 427 335 237 209 73 989 850 170 720 1,069 778 7,854 3,025 158 1,232 12 53 1,676 78 629 1,397 168 1,552 335 2,564 1,866 579 1,421 214 3,983 582 551 2,811 210 498 407 100 800 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 9,686 5,709 9,703 2,942 1,959 3,085 4,629 17,286 4,944 6,347 2,449 12,033 8,138 1,321 6,013 1,182 2,505 378 112 1,520 460 2,248 6,625 6,465 3,465 71,700 755 3,792 6,347 1,977 8,539 9,154 5,916 6,811 3,280 7,102 11,897 2,800 1,141 19,099 1,143 15,326 15,389 3,121 3,673 10,718 4,556 2,896 2,728 3,308 7,733 1,581 10,670 1,975 11,056 127,356 12,303 14,084 4,393 6,488 7,482 11,036 6,112 3,014 1,826 283 6,052 2,273 6,133 4,551 6,345 624 5,262 8,578 5,691 24,552 8,244 1,142 4,437 6,229 282 4,575 6,422 5,456 4,329 4,289 3,409 5,412 3,441 8,940 6,449 5,846 3,805 10,533 11,865 515 18,864 6,407 7,255 11,523 11,859 7,296 5,882 1,112 5,243
  3. Page 27 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 27 of 104 Work Order Number Description 80244503 TURNOVER-M 9A 2038 Glasgo Rd Griswo 80244510 P-1985 REPLACE PRIORITY REJECT WITH 80244512 P-1632 REPLACE PRIORITY REJECT WITH 80244553 LD- PR ORD- 9A - 1108 NEW HAVEN RD, 80244554 *EH AWC* CD02444 Pole Integrity Rep 80244562 DONE PRINT BJQ, LTCH, P #1187 & 119 80244564 WRTN - DM - 1/19 BUTTONBALL (436) L 80244566 *SYS PROJ* CD02444 Pole Integrity R 80244567 RM, 10 SINGING WOODS RD - NORWALK, 80244571 CRP - DONE 9A 1/19 WHITBECK(160) RD 80244583 *SYS PROJ* CD02444 Pole Integrity R 80244619 POST CONSTRUCTION WTG FOR PD RPT 2/ 80244682 *EH AWC* CD02444 Pole Integrity Rep 80244721 *SYS PROJ* CD02444 Pole Integrity R 80244726 *SYS PROJ* CD02444 Pole Integrity R 80244734 MG-P#530-CHERRY HILL( 168) RD -BROO 80244735 9A EVENT 5577004 1.19.25 - 375 WILL 80244747 *SYS PROJ* CD02444 Pole Integrity R 80244762 PRINT EVW - 25 Mt. Riga Rd, Salisbu 80244766 *SYS PROJ* CD02444 Pole Integrity R 80244769 *SYS PROJ* CD02444 Pole Integrity R 80244967 DG P#1702 QUINEBAUG RD THOMPSON CLP 80244991 DONE EVW - 31 Robin Hill Ln, Salisb 80245008 MR; ***NEED EARLY POLE SET- 45/2*** 80245028 PR 6/9 JFC - 9A TURNOVER) 503 NEW 80245033 *D&D*Conv#1253385-MakeReadyNonReimb 80245073 MG-P#343-N BEAR HILL( 120) RD- CHAP 80245079 *SYS PROJ* CD02444 Pole Integrity R 80245084 CAR VS POLE- NO PR FOUND: NON-BILLA 80245113 PRINT JSG/Harwinton--Bogue Rd. 491 80245127 PRINT JSG/Torrington-Bogue Rd.1089 80245138 *EH AWC* CD02444 Pole Integrity Rep 80245173 CRP - 9A)TURNOVER MAIN ( 377) S 80245307 JDB 89 WILLIAM ST NORWALK,REPL 1423 80245384 SOMERS, PINE KNOB, 67, Matthew Burz 80245395 (MJ Dock Work)15 DAY DUE 11/1 - 120 80245509 *ASP* CD02444 Pole Integrity Replac 80245528 *SYS PROJ* CD02444 Pole Integrity R 80245552 *SYS PROJ* CD02444 Pole Integrity 4 80245560 *SYS PROJ* CD02444 Pole Integrity 4 80245562 *D&D*CD02444 Pole Integrity Replace 80245595 *ASP* CD02444 Pole Integrity Replac 80245602 *ASP* CD02444 Pole Integrity Replac 80245608 *SYS PROJ* CD02444 Pole Integrity R 80245611 *SYS PROJ* CD02444 Pole Integrity R 80245614 *ASP* CD02444 Pole Integrity Replac 80245692 CAR VS POLE- APPROVED 2/20/26 80245704 *SYS PROJ* CD02444 Pole Integrity 5 80245732 *SYS PROJ* CD02444 Pole Integrity R 80245746 JDB 14 APPLETREE LN NORWALK, 5715 E 80245762 *SYS PROJ* CD02444 Pole Integrity 5 80245787 *Do with WO#8817147* MAR - 3ph Prim 80245947 *ASP* CD02444 Pole Integrity 5788 W 80245969 *SYS PROJ* CD02444 Pole Integrity 80245974 DG P#986 LOT 5 BALLARD RD THOMPSON 80245981 *SYS PROJ* CD02444 Pole Integrity 6 80245995 *SYS PROJ* CD02444 Pole Integrity 6 80246008 MAR - 4 Hazel Ave, Naugatuck CT // 80246014 *SYS PROJ* CD02444 Pole Integrity R 80246019 MM - 11 GRUMMAN HILL RD, WILTON - 3 80246030 *SYS PROJ* CD02444 Pole Integrity 6 80246159 TL - GRASSY HILL RD, #101 OLD LYME 80246192 DG P#119 21 CENTER ST PUTNAM CLP TO 80246225 MJG 05-17-22 9A EVENT 4754431 pole 80246276 DONE appt 6/28 EVW - 98 S Canaan Rd 80246278 *ASP*CD02444 Pole Integrity 6870 Wa 80246287 *SYS PROJ* CD02444 Pole Integrity 6 80246302 9A - LD - 1016 FLANDERS RD, SOUTHIN 80246304 *SYS PROJ* CD02444 Pole Integrity 7 80246311 *SYS PROJ* CD02444 Pole Integrity 7 80246323 *SYS PROJ* CD02444 Pole Integrity 7 80246336 *SYS PROJ* CD02444 Pole Integrity 7 80246350 *SYS PROJ* CD02444 Pole Integrity 7 80246363 *SYS PROJ* CD02444 Pole Integrity R 80246366 *SYS PROJ* CD02444 Pole Integrity 8 80246479 *SYS PROJ* CD02444 Pole Integrity R 80246483 CD02444 Pole Integrity Replacement 80246487 *SYS PROJ* CD02444 Pole Integrity R 80246547 TL - SALEM RD, #28 LYME // INST TEM 80246569 POST CONSTR Quarry Rd., 1 section i 80246603 5/15 9A (13) ORCUTTVILLE RD, STAFF 80246701 *SYS PROJ* CD02444 Pole Integrity R 80246719 *SYS PROJ* CD02444 Pole Integrity R 80246737 CD02444 Pole Integrity Replacement 80246738 *SYS PROJ* CD02444 Pole Integrity R 80246771 TO STORES-2/21/25-MG-P#642- TOLERAT 80246782 LD- 147 SCOTT RD, PROSPECT-9A (no i 80247050 DONE PRINT BJQ, BETH, P#B55 (275) W 80247086 MATERIAL -15D 4/3 JFM-21 RIVERVIEW 80247148 *EH AWC* CD02444 Pole Integrity Rep 80247170 MADISON - REM OH / INST RISER SVC , 80247316 SC-94 BROWN RD VOLUNTOWN I-40/2 ,25 80247357 15 DAY DUE 11/28/22; JV; 2 pic COLC 80247360 9A - CAR VS POLE 80247373 MCB -. 5/13 (9A) HUNTINGDON ( 237) 80247412 JFC - (9A) 837 CHARLES ST TORRIN 80247455 CD02444 Pole Integrity Replacement 80247457 MM - INT-102985 - 21 THUNDER LAKE R 80247486 COWLES / BUSSE RD, WILLINGTON - FU 80247516 *SYS PROJ* CD02444 Pole Integrity R 80247529 *SYS PROJ* CD02444 Pole Integrity R 80247539 *SYS PROJ* CD02444 Pole Integrity R 80247578 E.P.- 66 LIBRARY ST, GROTON, CT-P. 80247756 JDB CDOT 102-366 W. CEDAR ST NORWAL 80247763 9A-1/23-RSO-[CHANND]-W MAIN( 4 in-service date work order type 1/23/2025 11 Damage Claims OH 6/2/2022 11 Elect Annual Proj - DESG CT 8/18/2022 11 Elect Annual Proj - DESG CT 2/6/2025 11 Dist Capital or Expense 5/19/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 1/24/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 5/21/2025 11 Dist Capital or Expense 1/21/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 2/10/2025 11 Dist Capital or Expense 5/20/2025 11 Dist Capital or Expense 7/7/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 1/27/2025 11 Damage Claims OH 2/26/2025 11 Damage Claims OH 7/7/2025 11 Dist Capital or Expense 5/28/2025 11 Corrective Maint OH Svc 9/25/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 5/16/2022 11 Damage Claims OH 10/31/2022 11 Asset Mgmt - Specific DESG CT 5/24/2023 11 Elect Annual Proj - DESG CT 6/21/2022 11 Damage Claims OH 6/27/2023 11 Elect Project - DESG CT 5/27/2025 11 Dist Capital or Expense 7/7/2025 11 Elect Annual Proj - DESG CT 2/3/2025 11 Damage Claims OH 4/23/2025 11 Elect Annual Proj - DESG CT 4/23/2025 11 Elect Annual Proj - DESG CT 5/20/2025 11 Dist Capital or Expense 5/19/2022 11 Damage Claims OH 6/21/2022 11 Elect Annual Proj - DESG CT 1/27/2023 11 Elect Annual Proj - DESG CT 11/17/2022 11 Elect Annual Proj - DESG CT 6/3/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 1/24/2025 11 Damage Claims OH 8/19/2025 11 Elect Annual Proj - DESG CT 8/5/2025 11 Dist Capital or Expense 10/13/2022 11 Elect Annual Proj - DESG CT 8/19/2025 11 Elect Annual Proj - DESG CT 6/27/2022 11 Elect Annual Proj - DESG CT 6/3/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 11/1/2022 11 Elect Annual Proj - DESG CT 9/17/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 6/11/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Elect Annual Proj - DESG CT 11/17/2025 11 Dist Capital or Expense 6/16/2022 11 Elect Annual Proj - DESG CT 7/21/2022 11 Elect Annual Proj - DESG CT 5/23/2022 11 Damage Claims OH 8/16/2023 11 Elect Annual Proj - DESG CT 7/14/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 2/28/2025 11 Damage Claims OH 8/19/2025 11 Elect Annual Proj - DESG CT 10/7/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 8/18/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 3/27/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/30/2022 11 Temporary Work DESG CT 6/15/2022 11 Damage Claims OH 5/24/2022 11 Damage Claims OH 8/5/2025 11 Dist Capital or Expense 7/10/2025 11 Elect Annual Proj - DESG CT 5/21/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 2/12/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 3/28/2025 11 Dist Capital or Expense 5/20/2025 11 Dist Capital or Expense 3/27/2025 11 Corrective Maint UG Svc 8/2/2022 11 Elect Annual Proj - DESG CT 11/21/2022 11 Elect Annual Proj - DESG CT 12/7/2022 11 Damage Claims OH 3/15/2023 11 Damage Claims OH 7/14/2022 11 Damage Claims OH 5/15/2025 11 Dist Capital or Expense 3/13/2025 11 Elect Annual Proj - DESG CT 10/6/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 8/1/2022 11 Elect Annual Proj - DESG CT 9/8/2025 11 Dist Capital or Expense 3/3/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 8/26/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 2/13/2026 5/15/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 9,309 2,349 4,567 1,253 6,987 2,068 6,056 2,389 70 10,665 5,062 14,873 1,601 4,951 6,504 6,743 8,823 5,026 1,296 8,310 2,509 9,231 13,194 2,059 691 (377) 1,475 7,190 1,259 3,793 835 2,496 11,504 3,259 26,682 7,518 4,362 4,036 3,332 5,661 3,271 4,845 5,651 3,944 3,795 6,236 16,704 9,110 3,870 434 4,967 16,087 6,522 3,408 371 9,344 5,984 1,367 4,410 56,791 4,571 4,319 14,395 1,255 1,845 2,261 7,396 16,455 4,390 4,756 4,052 4,971 4,830 3,859 5,725 4,618 5,964 3,288 333 7,532 455 3,039 10,921 5,388 13,162 3,299 1,520 599 9,063 5,250 412 7,569 1,829 720 2,937 1,630 3,197 3,990 1,787 5,355 6,058 6,501 138 4,793 7,098 365000 Overhead Conductors, Device 2,816 1,574 78 3,485 835 210 654 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 166 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 359 2,031 1,144 1,483 633 10,608 3,348 864 2,924 190 1,903 401 7,570 441 960 3,795 6,397 159 86 68 3,254 6,003 2,670 77 (377) 1,379 2,473 1,273 369 90 231 154 444 1,712 83 2,614 (377) 97 214 130 2,544 1,149 24,040 12,150 1,739 995 424 201 659 1,320 771 900 626 1,802 1,860 2,782 1,464 1,954 1,972 17,429 220 (19) 1,279 1,487 1,738 1,634 1,010 1,801 122,594 609 118 1,073 834 112 1,119 739 242 333 9,733 163 2,365 1,397 4,615 247 491 2,459 3,733 2,139 4,399 779 2,300 26 1,605 166 18 (2) 8,161 1,224 1,790 272 745 163 4,732 10,498 273 47 189 422 1,141 3,075 167 1,823 350 210 1,536 3,108 974 698 2,041 8,508 369 5 1,151 544 350 106 77 1,214 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 12,292 3,923 4,645 4,738 8,180 2,278 8,740 2,389 2,615 12,148 5,695 35,673 1,601 8,299 7,369 9,826 9,013 7,014 1,996 15,880 2,509 12,639 21,352 7,426 768 (1,132) 3,165 9,663 2,663 4,162 925 2,496 14,249 4,408 50,722 21,647 6,101 5,031 3,755 5,661 3,271 5,615 6,552 4,569 3,795 8,038 18,564 11,891 5,334 4,580 4,967 34,106 6,522 4,686 3,049 11,082 7,618 3,950 6,323 180,747 4,571 4,652 25,525 1,417 4,701 2,261 7,396 21,318 4,390 7,215 7,784 7,110 9,229 3,859 6,504 4,618 8,264 3,288 378 9,135 622 3,039 29,580 6,886 14,952 3,570 2,265 762 14,030 5,672 1,553 12,164 2,896 2,542 3,288 1,840 3,197 5,632 4,896 5,355 6,058 7,475 913 8,049 15,607
  4. Page 28 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 28 of 104 Work Order Number Description 80247764 9A CAR VS POLE- APPROVED 10/9 80247768 *WTBY AWC*SD - MIDDLEBURY, PORTER, 80247822 9A - CAR VS FRONTIER POLE #149 - AP 80247937 KTI SD; 2022 PCB OH XFMR REPLACE P. 80248101 15D 8/12 MAR - 318 Maple Hill Rd, N 80248153 *SYS PROJ* CD02444 Pole Integrity R 80248167 *SYS PROJ* CD02444 Pole Integrity R 80248170 MG-BROOKLYN, ALLEN HILL(253)- OH LI 80248206 Asplundh - SOMERS, NINTH DISTRICT, 80248323 SC: 1120 WESTOVER RD, STAM - POLE S 80248333 TL - LYME ST, #74 OLD LYME // INST 80248337 CD02444 Pole Integrity Replacement 80248357 *ASP* CD02444 Pole Integrity Replac 80248360 AP- 1600 New Britain Ave, Farmingto 80248371 PRINT EVW - 53 Jewett Hill Rd, Shar 80248375 MADISON - SCOTLAND AVE (92) - INST 80248383 *SYS PROJ* CD02444 Pole Integrity R 80248392 DG P#3057 THOMPSON HILL RD THOMPSON 80248409 *SYS PROJ* CD02444 Pole Integrity R 80248423 *SYS PROJ* CD02444 Pole Integrity R 80248599 ok to close9A-01/26-RSO-[KINNEY]-St 80248623 TL - CHESTERFIELD RD, EAST LYME // 80248638 NEW-JD-10/11/24--NORTH STONINGTON, 80248644 DMD- 69 MARLB. ST (12 PERRY AVE) 80248660 STONINGTON, MAIN, 381, Manor House 80248662 9A - CAR VS. FRONTIER POLE #539 - A 80248702 9A CAR VS POLE - APPROVED 10/9 80248724 NS AE/TC 148 E ELM ST, GRN: P#67955 80248736 LD - 9A - (FRNT) P782 - POST CONST80248792 TL - BEAVER BROOK RD, #277 LYME // 80248798 SC: 15 WINDSOR LN GRN, REPLACE ROTT 80248802 AMM-143 Olive st MER (Frnt)P1528 80248804 RC REPLACE 2 FTR POLES PEPPERIDGE R 80248806 MPB; 343 SPRING HILL RD, MONROE (LO 80248852 15DD 2/19 PM-925 DEMING RD BERLIN-O 80248853 Apprentice Group, AC-8 CALUMET RD, 80248860 *D&D* FA - Conv. 1657220 - Make Rea 80248879 MM Prospect St Plainfield Poles #29 80248945 Old Post Rd, Tolland. Reconductor P 80248957 WRTN - DM - 01/07/25 South Main St 80249005 *ASP* EA-Conv#1709131-MakeReadyNonR 80249064 NEW GC OAKDALE, FIRE, 631, Kyle Cha 80249086 5/21 P#5434 ROSEMONT ST, HARTFORD 80249111 DG P#148 630 RT 171 WOODSTOCK CLP P 80249144 DG P#673 THOMPSON HILL RD THOMPSON 80249172 5/30 ASPLUNDH MDB - KENT, RICHARDS 80249246 BRANFORD, PLEASANT POINT, 230/New F 80249348 JTR, 450 Lovely St, Avon - Shift Re 80249405 APPT 2/10 JFM-17 BECKWITH DR (P#195 80249457 TL - HICKORY ST, LYME // SUPPORT WO 80249551 *HAWK*EA-Conv#1263259-MakeReadyNonR 80249620 9A-Ok to close RSO-[KELLEHER]-WARNE 80249662 CC; NEWTOWN, PLUMTREES, 29, GIL STE 80249686 CHE *AWC* CD02444 Pole Integrity Re 80249690 SOUTH WINDHAM, WINDHAM, 1145-S, Bri 80249691 *SYS PROJ* CD02444 Pole Integrity R 80249699 WRTN - DM - 1/13 JONES HOLLOW RD MA 80249718 *SYS PROJ* CD02444 Pole Integrity R 80249720 * *AWC* CD02444 Pole Integrity Rep 80249734 CD02444 Pole Integrity Replacement 80249743 *ASP* CD02444 Pole Integrity Replac 80249749 CHE CD02444 Pole Integrity Replacem 80249758 PD-60 LAMPHERE RD WTFD/NEW UG SVC. 80249768 CHE*AWC* CD02444 Pole Integrity Rep 80249773 CHE *AWC* CD02444 Pole Integrity Re 80249792 CD02444 Pole Integrity Replacement 80249816 PALMER ST - NEW GC 32P5 - Install 6 80249824 AMSTON, OLD COLCHESTER, 619, DAWN I 80249838 SC-122 SEASIDE AVE GUILFORD R-35/4. 80249999 *HAWK*JA-Conv#1253388-MakeReadyNonR 80250309 I/R P# 6516 40/2-Rmv OH srv Instl O 80250486 CAR VS POLE-FOIA RESPONSE: NO REPOR 80250498 9A -5 HUBBELL MOUNTAIN RD, SHERMAN80250506 1/28/25 *TURNOVER* ROXBURY (406) RD 80250507 MM75 Exley Rd Plainfield P#3529 Fro 80250586 AE/JLB 9 MANSFIELD PL DARIEN EXT PR 80250587 9/24 JRP - CD01938 -141 Middlefield 80250599 AE/JD; 111 JORDAN LN STAMFORD; STRA 80250620 LD- 2 OAKRIDGE RD, BRISTOL - P10924 80250669 *SYS PROJ* CD02444 Pole Integrity R 80250677 Asplundh - CON40 CDOT47-119 Rt 140 80250678 Asplundh - Shift to 13 Frontier pol 80250797 ASP 8/16 JMS-969 HOPMEADOW ST. SIMS 80250881 5/23 (PETERCL) MORRISON ST, VERNON 80250903 *** TURNOVER 1/28/2025 E# 5580044 2 80250907 CD02444 Pole Integrity Replacement 80250930 *AWC* CD02444 Pole Integrity Replac 80250962 *SYS PROJ* CD02444 Pole Integrity R 80250966 9A- CAR VS POLE - APPROVED 3/26/26 80251020 *D&D* - 111 Taconic Rd, Salisbury P 80251072 *AWC* CD02444 Pole Integrity Replac 80251104 PR 9/9 ASPLUNDH CRP = (9A)..PLYMOUT 80251140 0 STRAITS TPKE, MIDDLEBURY - INST O 80251247 AE/JD; 22 ROBERT CT STAMFORD; EXTEN 80251252 CHE *AWC* CD02444 Pole Integrity Re 80251264 CD02444 Pole Integrity Replacement 80251268 * *AWC* CD02444 Pole Integrity Rep 80251270 DONE PRINT BJQ, GSHN, P#881 (416) O 80251280 *SYS PROJ* CD02444 Pole Integrity R 80251284 CHE*AWC* CD02444 Pole Integrity Rep 80251291 15DD 2/19 MCB - 1200 WOLCOTT ST WTB 80251307 * *AWC* CD02444 Pole Integrity Rep 80251312 CHE *AWC* CD02444 Pole Integrity Re 80251316 CD02444 Pole Integrity Replacement 80251325 CHE *AWC* CD02444 Pole Integrity Re in-service date work order type 2/10/2025 11 Damage Claims OH 7/28/2025 11 Dist Capital or Expense 2/11/2025 11 Damage Claims OH 8/4/2023 11 Asset Mgmt - Specific DESG CT 8/11/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 4/22/2025 11 Elect Annual Proj - DESG CT 10/23/2025 11 Dist Capital or Expense 1/5/2023 11 Elect Annual Proj - DESG CT 2/28/2025 11 Dist Capital or Expense 2/25/2025 11 Temporary Work DESG CT 4/29/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 9/10/2025 11 Dist Capital or Expense 7/24/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 1/27/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 4/14/2025 11 Dist Capital or Expense 2/3/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 7/22/2025 11 Dist Capital or Expense 2/20/2025 11 Temporary Work DESG CT 4/22/2025 11 Dist Capital or Expense 2/14/2025 11 Damage Claims OH 9/15/2025 11 Damage Claims OH 4/15/2025 11 Elect Annual Proj - DESG CT 2/13/2025 11 Dist Capital or Expense 4/10/2025 11 Corrective Maint OH Svc 1/29/2025 11 Dist Capital or Expense 3/18/2025 11 Dist Capital or Expense 4/1/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 2/5/2025 11 Corrective Maint OH Svc 9/12/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 5/29/2025 11 Elect Annual Proj - DESG CT 6/3/2025 11 Elect Annual Proj - DESG CT 2/11/2025 11 Dist Capital or Expense 6/10/2025 11 Dist Capital or Expense 9/22/2022 11 Elect Annual Proj - DESG CT 6/14/2022 11 Elect Annual Proj - DESG CT 7/11/2022 11 Elect Annual Proj - DESG CT 6/17/2022 11 Damage Claims OH 6/14/2022 11 Elect Annual Proj - DESG CT 12/29/2022 11 Elect Annual Proj - DESG CT 2/20/2025 11 Damage Claims OH 7/30/2025 11 Corrective Maint OH Svc 6/17/2022 11 Elect Annual Proj - DESG CT 4/11/2023 11 Elect Project - DESG CT 3/4/2025 11 Damage Claims OH 5/28/2025 11 Corrective Maint UG Svc 10/22/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 3/20/2025 11 Dist Capital or Expense 8/21/2025 11 Dist Capital or Expense 11/25/2025 11 Dist Capital or Expense 9/18/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 10/9/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 9/11/2025 11 Dist Capital or Expense 12/15/2022 11 Elect Annual Proj - DESG CT 12/13/2023 11 Elect Annual Proj - DESG CT 8/21/2023 11 Elect Annual Proj - DESG CT 4/11/2023 11 Elect Project - DESG CT 10/13/2022 11 Asset Mgmt - Specific DESG CT 4/1/2025 11 Damage Claims OH 2/14/2025 11 Damage Claims OH 2/7/2025 11 Dist Capital or Expense 7/2/2025 11 Corrective Maint UG Svc 4/10/2025 11 Dist Capital or Expense 9/24/2025 11 Dist Capital or Expense 3/6/2025 11 Elect Annual Proj - DESG CT 2/25/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 7/8/2022 11 Elect Annual Proj - DESG CT 1/5/2023 11 Elect Annual Proj - DESG CT 9/20/2022 11 Elect Annual Proj - DESG CT 1/11/2023 11 Elect Annual Proj - DESG CT 1/30/2025 11 Dist Capital or Expense 8/19/2025 11 Elect Annual Proj - DESG CT 11/19/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 5/1/2025 11 Damage Claims OH 9/22/2022 11 Asset Mgmt - Specific DESG CT 11/13/2025 11 Dist Capital or Expense 10/3/2022 11 Damage Claims OH 7/21/2022 11 Elect Annual Proj - DESG CT 10/7/2025 11 Dist Capital or Expense 11/17/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 2/11/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 11/18/2025 11 Dist Capital or Expense 2/11/2025 11 Elect Annual Proj - DESG CT 11/19/2025 11 Dist Capital or Expense 11/5/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 10/17/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 8/26/2026 9/16/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 8/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 4/20/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 9/16/2026 1/22/2026 9/16/2026 2/13/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 9/16/2026 9/16/2026 1/22/2026 1/22/2026 5/15/2026 5/15/2026 4/20/2026 7/17/2026 364310 Poles and Appurtenance 6,857 7,380 2,797 2,244 422 6,724 3,685 17,566 7,968 1,201 1,294 5,390 3,477 5,055 82 7,080 2,065 5,388 2,922 8,316 958 18,353 15,451 3,076 2,557 3,619 653 9,149 791 1,424 1,089 3,866 6,682 424 1,466 6,195 (311) 3,842 15,393 3,729 12,529 3,009 5,506 3,616 5,677 11,261 430 1,385 1,593 21,936 5,210 11,017 12,297 4,505 918 5,513 1,257 3,552 4,126 6,379 4,427 6,099 4,151 600 7,578 4,241 (478) 85 735 4,290 580 10,330 9,148 10,018 284 4,725 9,572 496 3,260 4,108 19,776 80,774 7,004 5,451 9,475 9,388 4,076 3,840 14,307 7,706 1,715 250 1,648 18,268 4,767 4,158 2,510 742 4,103 3,156 2,469 3,429 3,576 2,523 4,151 365000 Overhead Conductors, Device 5,156 3,819 4,870 708 1,632 2,441 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 140 33 454 17,958 388 469 101 369720 DB/UG Conductors and Devices 370470 Meter Equipment 977 494 2,326 288 446 7,696 360 329 265 619 3,252 39,349 126 1,132 186 767 16,015 1,780 997 5,249 471 71 2,262 265 126 329 3,859 1,034 1,488 242 (1,069) 27,636 60,815 579 2,832 2,030 11,778 1,519 3,009 4,751 1,028 44,919 513 1,392 617 1,149 2,324 358 387 1,692 2,237 408 409 1,920 431 1,001 385 64 157 904 238 (31) (36) 41 37 404 2 413 928 69,897 4,966 28,250 639 376 265 42 (144) 197 81 643 454 136 1,681 3,090 593 637 545 893 1,680 1,947 (478) 774 1,728 133 665 15,326 351 685 527 1,926 1,190 701 2,385 221 3,439 106,233 1,694 1,220 27,699 66,315 7,800 2,305 4,144 5,176 389 128 19,030 88 6,584 2,267 20,786 1,567 443 2,735 453 2,367 2,342 909 380 1,755 349 13,783 1,965 2,860 450 103 1,244 4,177 2,075 251 318 1,591 412 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 12,013 12,317 7,667 2,985 3,002 9,166 3,685 35,525 10,682 1,670 1,683 5,837 3,477 55,352 955 9,101 2,330 6,007 2,922 9,448 1,144 19,120 34,175 5,264 4,033 8,868 653 13,331 1,056 1,982 1,417 8,110 7,780 3,975 1,947 6,195 (1,448) 31,478 76,209 4,308 15,401 5,480 87,181 6,065 9,099 49,867 2,099 46,304 2,346 23,184 5,210 11,634 14,170 6,829 1,730 5,513 1,393 5,234 4,126 9,602 5,019 6,736 5,361 1,492 9,258 6,188 (957) 16,535 3,675 4,290 2,507 11,520 9,849 12,403 893 8,292 134,834 2,063 5,486 5,328 47,475 155,940 38,325 7,755 13,619 15,017 4,076 6,207 16,649 8,615 2,095 2,005 2,446 32,051 6,732 7,017 2,510 845 5,346 3,156 7,309 5,505 3,893 2,523 5,742
  5. Page 29 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 29 of 104 Work Order Number Description 80251343 CD02444 Pole Integrity Replacement 80251348 * *AWC* CD02444 Pole Integrity Rep 80251360 01/27-RSO-[NURSE]-UPPER( 167) 80251363 * *AWC* CD02444 Pole Integrity Rep 80251368 *SYS PROJ* CD02444 Pole Integrity R 80251370 *TOL AWC* CD02444 Pole Integrity Re 80251378 *SYS PROJ* CD02444 Pole Integrity R 80251388 CD02444 Pole Integrity Replacement 80251394 * *AWC* CD02444 Pole Integrity Rep 80251401 * CD02444 Pole Integrity Replaceme 80251403 *SYS PROJ* CD02444 Pole Integrity R 80251404 CHE *AWC*CD02444 Pole Integrity Rep 80251408 *ASP* CD02444 Pole Integrity Replac 80251568 * *AWC* CD02444 Pole Integrity Rep 80251570 PR 9/30 WE 10/7..15 DAY DUE 10/3/22 80251653 *AWC* CD02444 Pole Integrity Replac 80251654 * CD02444 Pole Integrity Replaceme 80251655 CHE*AWC* CD02444 Pole Integrity Rep 80251696 1/29/25 YELLOW TAG KEELER RD BRIDGE 80251710 DMD - 123 N MAIN ST - MTOWN - P898 80251802 CD01912 Segment 03, LAG, Switches, 80251836 1/29/25 TURNOVER HEMLOCK (280) RD 80251929 DG P#513 FREEDLEY RD POMFRET HBV RS 80251948 DG P#1532 FOX HILL RD POMFRET RPLC' 80251950 CHE*AWC* CD02444 Pole Integrity Rep 80251961 CHE*AWC* CD02444 Pole Integrity Rep 80251967 CD02444 Pole Integrity Replacement 80251968 CHE *AWC* CD02444 Pole Integrity Re 80251976 DONE 1/29 - TREE - BROKEN POLE #125 80252002 CHE*AWC* CD02444 Pole Integrity Rep 80252006 TURNOVER 1/30/25 E# 5581651 9 HAVI 80252009 *SYS PROJ* CD02444 Pole Integrity R 80252013 EVW - DONE 1/29 - TREE - BROKEN POL 80252018 *SYS PROJ* CD02444 Pole Integrity R 80252022 01/30/25 - 9A - Boston Post Rd Wate 80252023 *SYSTEM PROJECTS* CD02444 Pole Inte 80252024 *SYS PROJ* CD02444 Pole Integrity R 80252027 APPT 4/24 LD - 151 SOUTHINGTON RD, 80252033 *ASP* CD02444 Pole Integrity Replac 80252038 *SYS PROJ* CD02444 Pole Integrity R 80252039 Alden One *TOL AWC* CD02444 Pole In 80252040 CD02444 Pole Integrity Replacement 80252057 CD02444 Pole Integrity Replacement 80252065 *ASP* CD02444 Pole Integrity Replac 80252151 GCC / SPICER HILL ROAD, LEDYARD 80252287 *AWC* CD02444 Pole Integrity Replac 80252293 LD- 944 HIGHLAND AVE , CHESHIRE 80252315 15D 6/19 JRP - 279 Queen St SOG In 80252354 150 NAUBUC AVE GLASTONBURY - SHIFT 80252363 *TOL AWC* CD02444 Pole Integrity Re 80252365 *SYS PROJ* CD02444 Pole Integrity R 80252368 Appr Grp *TOL AWC* CD02444 Pole Int 80252370 CHE*AWC* CD02444 Pole Integrity Rpl 80252371 *TOL AWC* CD02444 Pole Integrity Re 80252372 *EAST HAMPTON AWC* CD02444 Pole Int 80252396 written complete 9A - Car vs. Pole 80252425 TL - BRUSH HILL, #51 HADLYME // REP 80252562 DJM. 158 COMPO RD N WESTPORT. NEW 4 80252599 9A- CAR VS POLE - APPROVED 4/16 80252609 1/30/25 FRANKLIN ST EXT DANBURY 80252633 CD02444 Pole Integrity Replacement 80252670 *AWC* CD02444 Pole Integrity Replac 80252695 DONE PRINT BJQ, KENT, P #2217 (144) 80252728 *ASP* CD02444 Pole Integrity Replac 80252740 CD02444 Pole Integrity Replacement 80252745 CHE CD02444 Pole Integrity Replacem 80252756 CHE *AWC* CD02444 Pole Integrity Re 80252782 *SYSTEM PROJECTS* CD02444 Pole Inte 80252791 *EAST HAMPTON AWC* CD02444 Pole Int 80252793 CD02444 Pole Integrity Replacement 80252795 *EAST HAMPTON AWC* CD02444 Pole Int 80252800 *HAWKEYE* RA PROJECT CD01570 2022 P 80252804 Project CDOT 172-517 Bridge 00301 I 80252807 *EAST HAMPTON AWC* CD02444 Pole Int 80252809 CD02444 Pole Integrity Replacement 80252810 *EAST HAMPTON AWC* CD02444 Pole Int 80252813 *EAST HAMPTON AWC* CD02444 Pole Int 80252814 *AWC* CD02444 Pole Integrity Replac 80252936 TRIANGLE( 64) ST STE 1-- P270 80252943 * 15D PM-54 FOWLER AVE DURHAM-NEW 80252950 9A CAR VS EVERSOURCE P 1453 - APPRO 80252954 CAR VS POLE - APPROVED 4/9/25 80252957 JTR, 105 NEWINGTON AVE - HARTFORD, 80252961 160 MAIN ST BROAD BROOK CT 80252975 PRINT EVW - P1665 Limerock Rd Recon 80253003 TW - CD01225 (AIMS Seg 13, Part 3 o 80253080 DMD - SVT - CCLUB RD / HIGBY RD - M 80253128 *ASP* CD02444 Pole Integrity Replac 80253131 LD- 9A- 18 HORACE ST, NEW BRITAIN 80253132 *ASP* CD02444 Pole Integrity Replac 80253155 *EAST HAMPTON AWC* CD02444 Pole Int 80253156 CHE CD02444 Pole Integrity Replacem 80253162 MCB - WTG FOR PD RPT 2/3/25 (TH)2/2 80253164 *ASP* CD02444 Pole Integrity Replac 80253166 *EAST HAMPTON AWC* CD02444 Pole Int 80253171 TL - HAMBURG RD, REF. #249 LYME // 80253173 *D&D* FA - Conv. 1662282 - Make Rea 80253174 *D&D* FA - Conv. 1662282 - Make Rea 80253185 *EAST HAMPTON AWC* CD02444 Pole Int 80253192 *ASP* CD02444 Pole Integrity Replac 80253196 9A - CAR VS FRONTIER POLE 5928 - AP 80253204 *EAST HAMPTON AWC* CD02444 Pole Int 80253218 CD02444 Pole Integrity Replacement 80253222 DAISYMAE - (57) SPRING ST - PORTLAN 80253230 *EAST HAMPTON AWC* CD02444 Pole Int in-service date work order type 8/27/2025 11 Dist Capital or Expense 11/24/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 11/21/2025 11 Dist Capital or Expense 8/27/2025 11 Dist Capital or Expense 8/7/2025 11 Elect Annual Proj - DESG CT 9/11/2025 11 Dist Capital or Expense 11/7/2025 11 Dist Capital or Expense 11/19/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 9/16/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 11/20/2025 11 Dist Capital or Expense 10/21/2022 11 Elect Annual Proj - DESG CT 12/1/2025 11 Dist Capital or Expense 11/20/2025 11 Dist Capital or Expense 11/18/2025 11 Dist Capital or Expense 2/26/2025 11 Corrective Maint OH Lines 7/21/2025 11 Elect Annual Proj - DESG CT 9/13/2023 11 Asset Mgmt - Specific DESG CT 2/12/2025 11 Elect Annual Proj - DESG CT 2/11/2025 11 Damage Claims OH 2/4/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 7/12/2025 11 Dist Capital or Expense 11/19/2025 11 Dist Capital or Expense 1/31/2025 11 Elect Annual Proj - DESG CT 11/19/2025 11 Dist Capital or Expense 1/31/2025 11 Elect Annual Proj - DESG CT 8/21/2025 11 Elect Annual Proj - DESG CT 2/20/2025 11 Elect Annual Proj - DESG CT 9/9/2025 11 Dist Capital or Expense 2/27/2025 11 Damage Claims OH 10/15/2025 11 Dist Capital or Expense 9/10/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 9/18/2025 11 Dist Capital or Expense 11/12/2025 11 Dist Capital or Expense 11/11/2025 11 Dist Capital or Expense 11/25/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 6/27/2022 11 Elect Annual Proj - DESG CT 11/13/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 7/25/2025 11 Dist Capital or Expense 10/2/2025 11 Dist Capital or Expense 9/10/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 10/23/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 6/9/2025 11 Dist Capital or Expense 6/15/2022 11 Damage Claims OH 6/8/2023 11 Asset Mgmt - Specific DESG CT 6/6/2025 11 Dist Capital or Expense 8/29/2025 11 Damage Claims OH 1/31/2025 11 Dist Capital or Expense 11/11/2025 11 Dist Capital or Expense 9/24/2025 11 Dist Capital or Expense 2/13/2025 11 Dist Capital or Expense 12/17/2025 11 Dist Capital or Expense 6/25/2025 11 Dist Capital or Expense 10/17/2025 11 Dist Capital or Expense 11/24/2025 11 Dist Capital or Expense 10/8/2025 11 Dist Capital or Expense 6/20/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 6/16/2025 11 Elect Annual Proj - DESG CT 1/11/2023 11 Elect Annual Proj - DESG CT 8/1/2023 11 Elect Annual Proj - DESG CT 11/16/2025 11 Dist Capital or Expense 12/4/2025 11 Dist Capital or Expense 8/20/2025 11 Dist Capital or Expense 11/16/2025 11 Dist Capital or Expense 11/11/2025 11 Dist Capital or Expense 2/3/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 3/10/2025 11 Damage Claims OH 3/28/2025 11 Damage Claims OH 8/1/2025 11 Dist Capital or Expense 2/5/2025 11 Elect Annual Proj - DESG CT 5/15/2025 11 Elect Annual Proj - DESG CT 11/4/2025 11 Dist Capital or Expense 4/1/2025 11 Elect Annual Proj - DESG CT 12/17/2025 11 Dist Capital or Expense 2/14/2025 11 Damage Claims OH 12/17/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 2/4/2025 11 Damage Claims OH 12/16/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 12/8/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 2/4/2025 11 Damage Claims OH 11/21/2025 11 Dist Capital or Expense 7/2/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 6/9/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 4/20/2026 1/22/2026 4/20/2026 4/20/2026 2/13/2026 4/20/2026 4/20/2026 9/16/2026 9/16/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 9/16/2026 2/13/2026 9/16/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 9/16/2026 5/15/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 8/26/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 4/20/2026 5/15/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 4/20/2026 4/20/2026 1/22/2026 7/17/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 3,835 2,595 3,549 3,679 3,909 122 2,207 3,080 2,664 7,980 4,300 2,394 3,903 2,627 71 7,163 2,331 4,184 626 1,246 2,942 9,318 5,777 138 13,562 6,088 1,772 2,364 11,793 1,492 5,954 3,591 9,132 4,211 2,886 7,937 3,720 12,172 3,196 2,705 4,405 1,560 3,450 8,986 11,617 3,060 5,200 4,092 4,256 4,891 2,858 5,216 4,116 3,009 3,131 4,025 1,900 5,449 5,373 5,405 2,313 3,471 1,397 2,277 1,836 1,818 2,465 21,908 7,429 2,384 7,420 9,394 8,334 2,473 61,960 159 9,133 539 10,012 14 2,401 5,097 4,352 5,821 17,469 64,119 1,089 3,521 16,889 2,355 2,905 1,087 20,162 2,781 3,348 25,805 (77) (75) 11,463 9,904 2,029 2,280 2,267 3,410 1,694 365000 Overhead Conductors, Device 2,728 366700 DB/UG Conduits and Vaults 1,325 390 409 40 367720 DB/UG Conductors and devices 368330 Equipment Overhead 156 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 91 13 1,243 1,780 2,742 4,352 667 1,569 3,071 277 3,549 779 5,584 381 70,730 1,217 781 277 37 957 1,084 4,633 363 52 319 1,460 2,241 9,195 2,883 4,036 7,616 2,396 1,312 317 299 1,121 104 238 333 1,296 2,818 1,457 199 243 63 1,684 12,465 2,920 2,201 672 1,173 38 1,267 265 2,418 878 1,560 2,956 141 5,515 25 (0) 262 307 584 1,888 169 845 10,888 288 923 579 1,774 20,215 4,430 43 8,305 288 16,396 324 330 4,575 618 629 27,491 148,716 30 722 2,491 2,147 749 2,100 2,538 13,118 (1,958) (1,416) 2,071 792 964 943 1,274 135 296 62,478 11 20 240 93 283 3,117 2,165 2,644 2,293 3,459 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 6,719 2,595 4,965 4,069 4,318 175 2,207 4,322 4,445 11,389 8,652 2,394 5,472 5,698 348 10,712 2,331 4,963 6,209 2,027 73,672 10,534 6,558 415 13,562 6,088 2,728 3,500 16,746 1,492 7,413 5,832 18,644 7,094 7,221 15,553 6,116 13,483 3,196 3,825 4,509 1,798 3,982 10,282 14,678 4,580 5,200 7,621 16,759 7,811 5,059 5,216 4,116 4,276 3,397 6,443 6,163 12,831 5,373 5,989 2,313 5,359 1,566 3,122 1,836 1,818 2,465 32,930 8,012 3,307 7,999 11,168 91,027 2,473 66,389 213 17,438 828 26,407 598 2,731 9,672 4,970 6,450 44,960 212,928 1,120 4,526 16,889 7,963 5,052 1,087 23,076 7,525 5,885 44,675 (2,036) (1,490) 11,463 11,975 2,821 3,244 3,210 4,684 1,694
  6. Page 30 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 30 of 104 Work Order Number Description 80253231 *AWC* CD02444 Pole Integrity Replac 80253251 *SYS PROJ* CD02444 Pole Integrity R 80253259 Appr Grp-01/26-RSO-Replace (4) pole 80253262 *ASP* CD02444 Pole Integrity Replac 80253272 CHE CD02444 Pole Integrity Replacem 80253276 PD-4 1ST AVE WATERFORD/REPLACE DEFE 80253280 SL - TD-941 - 108 McClintock St, NB 80253295 CHE CD02444 Pole Integrity Replacem 80253300 *ASP* CD02444 Pole Integrity Replac 80253305 15D 12/3 JRP - CD02353-37 Hunters L 80253326 CHE CD02444 Pole Integrity Replacem 80253334 *D&D* ML - Conv. 1657243 Make Ready 80253335 CD02444 Pole Integrity Replacement 80253344 wrttn, BM; 635 OXFORD RD (AKA 10 PE 80253369 9A- CAR VS POLE- APPROVED 4/14/26 80253375 9A-CAR VS POLE -Unable to bill _ To 80253408 9A - PLOW VS FRONTIER POLE 799 - A 80253410 MATERIAL MM - 104 OLD BOSTON RD -80253416 02/03/25 - 9A - W CENTER (145) ST 80253452 AE/JD; 54 ROSE PARK AVE STAMFORD; R 80253490 P COLUMBIA, WEST, 88, Derek Rudd 80253511 *TORRINGTON AWC* BJQ - CD02444 Pole 80253524 9A: JRP - Westfield Dr P#5983 Cut & 80253621 Project CDOT 172-517 Bridge 01444 80253657 9A RF:71 BOSTON POST RD, DARIEN:REM 80253711 EVW - (Site Visit) - 9A - 230 Coe S 80253716 *D&D*CD01570 - Class 5 Backbone Pol 80253721 *D&D*CD01570 - Class 5 Backbone Pol 80253723 *D&D*CD01570 - Class 5 Backbone Pol 80253730 *D&D*CD01570 - Class 5 Backbone Pol 80253734 *D&D*CD01570 - Class 5 Backbone Pol 80253788 *D&D*CD01570 - Class 5 Backbone Pol 80253799 *D&D*CD01570 - Class 5 Backbone Pol 80253801 *D&D*CD01570 - Class 5 Backbone Pol 80253810 EVW - 118 Mountain Rd, Winsted P#15 80253848 *D&D* CD01570 - Class 5 Backbone Po 80253854 *D&D*CD01570 - Class 5 Backbone Pol 80253871 PONS 7/6 JSG/Canton--West St. 1482 80253872 *D&D*CD01570 - Class 5 Backbone Pol 80253949 15D 10/29 AP- 710 W Main St, New Br 80253959 *ASP* CD02444 Pole Integrity Replac 80253965 *TORRINGTON AWC* CD02444 Pole Integ 80254036 DG P#5100 1003 RT 169 FRNTR POLE SE 80254039 BRANFORD, MONTOWESE, 115/NEW 3000A 80254118 *D&D* 376 S Canaan Rd, Falls Villag 80254157 *ASP* CD02444 Pole Integrity Replac 80254164 *ASP* CD02444 Pole Integrity Replac 80254196 CHE CD02444 Pole Integrity Replacem 80254197 *ASP* CD02444 Pole Integrity Replac 80254198 *ASP* CD02444 Pole Integrity Replac 80254199 CHE*AWC* CD02444 Pole Integrity Rep 80254293 WRTN COMPLETE BEEBE( 133) RD -- 3 80254301 DAISYMAE - POST CONST - P367, P368, 80254332 *Shift wires - 62 Lake Drive Madiso 80254338 ASAP DJM. 134 CROSS HWY WESTPORT. T 80254343 9A - 2/5 - RSO - burk - SILVER( 80254609 **300 LEETES ISLAND RD, BRANFORD P5 80254641 P EAST HADDAM, ORCHARD, 16,.. 80254699 JDB 95 NEW CANAAN AVE NORWALK, SHIF 80254751 CAR VS POLE 5253 - REPLACES WO 6249 80255006 KTI MPB; 801 STRONGTOWN RD, SOUTHBU 80255015 *D&D* KL - Conv. 1662265 - Make Rea 80255052 INT-104434 WO# 20051358 NEW LONDON, 80255080 AC-37 MERLIN AVE, NEW FAIRFIELD-P#4 80255112 DONE PRINT BJQ, GOSHEN, P #1378 (33 80255119 *AWC* CD02444 Pole Integrity Replac 80255121 MCB - 9A TURNOVER MEADOW ( 333) ST 80255123 CD02444 Pole Integrity Replacement 80255133 DONE 2/4 - AWC TURNOVER - TREE DOWN 80255136 *ASP* CD02444 Pole Integrity Replac 80255153 CD02444 Pole Integrity Replacement 80255170 *ASP* CD02444 Pole Integrity Replac 80255176 BRANFORD, DORR, 8/New pole,convert 80255338 CAR V POLE- NEED PR 6.16.22 80255432 IVORYTON, HICKORY LN//REPLACE CRACK 80255434 CD02444 Pole Integrity Replacement 80255464 (LC) DJM. 257 RIVERSIDE AVE WESTPOR 80255468 Appr Grp Crystal Lake Rd 98, Elling 80255504 ALL WORK COMPLETE - GP - Replace Po 80255515 DONE PRINT JSG/Colebrook-Prock Hill 80255518 P.2150 287 Litchfield Tpk Washingto 80255538 TL - ISLANDA CT, #20 EAST LYME // I 80255697 20 Northrop Rd, Bethany P#2887 FTR 80255717 APPT 8/1*WTBY AWC*45 BENEDICT ST WT 80255734 LD - 390 MYRTLE ST, BRISTOL -P13052 80255739 9A - CAR VS FRONTIER POLE - APPROVE 80255755 POST CONST> - MAR - 9A - 204 ANDREW 80255758 MPB; 6/26/23 BIRCH (14) DR -- 1495, 80255767 CC; NEWTOWN, POLE BRIDGE, FTR POLE 80255821 ALL WORK COMPLETE - GP - Replace Po 80255965 COMP CCC 12/21/22 - (9A) 05.15.22 80256148 *COMP IN FIELD* MM - 107 SHARP HILL 80256183 mcb - WTG FOR PD RPT 2/7/25 (TH) 2/ 80256283 MUNI Pending/ AldenONeJMS- APPT 3/1 80256292 DG P#1076 59 WALKER LN WOODSTOCK CL 80256410 MG-P#16- 359,361,363 SOUTH ST BROOK 80256411 ZK - E HTFD (DG Upgrade) - 6 EVANS 80256451 DGP#46 MECHANICS ST PUTNAM FRNTR PO 80256459 ASAP DJM. 122 HARBOR RD WESTPORT. L 80256462 CAR VS POLE-APPROVED 3/26/26 80256469 AC-PDNB- 9A-356 CHESTNUT LAND RD, 80256477 9A CAR VS POLE - APPROVED 3/24/2026 80256493 DG P#966 CHURCH ST THOMPSON FRNTR P 80256495 DONE PRINT CRP - 12/12 [BOISCBP] 80256498 9A - CAR VS POLE - APPROVED 3/26/26 in-service date work order type 11/18/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 4/10/2025 11 Dist Capital or Expense 12/16/2025 11 Dist Capital or Expense 10/27/2025 11 Dist Capital or Expense 4/16/2025 11 Dist Capital or Expense 4/22/2025 11 Elect Annual Proj - DESG CT 11/12/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 12/18/2025 11 Corrective Maint OH Svc 10/29/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 7/28/2025 11 Dist Capital or Expense 2/7/2025 11 Damage Claims OH 3/14/2025 11 Damage Claims OH 2/25/2025 11 Damage Claims OH 5/14/2025 11 Dist Capital or Expense 2/7/2025 11 Damage Claims OH 5/5/2025 11 Dist Capital or Expense 10/21/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 3/11/2025 11 Dist Capital or Expense 6/30/2023 11 Elect Annual Proj - DESG CT 6/1/2022 11 Damage Claims OH 6/2/2022 11 Damage Claims OH 2/21/2023 11 Elect Annual Proj - DESG CT 10/11/2022 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 9/16/2022 11 Elect Annual Proj - DESG CT 2/21/2023 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 10/5/2022 11 Elect Annual Proj - DESG CT 2/21/2023 11 Elect Annual Proj - DESG CT 6/16/2022 11 Elect Annual Proj - DESG CT 9/16/2022 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 7/7/2022 11 Elect Annual Proj - DESG CT 10/11/2022 11 Elect Annual Proj - DESG CT 10/7/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 10/12/2022 11 Elect Annual Proj - DESG CT 1/25/2024 11 Elect Annual Proj - DESG CT 10/5/2022 11 Asset Mgmt - Specific DESG CT 11/26/2025 11 Dist Capital or Expense 12/17/2025 11 Dist Capital or Expense 10/29/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 2/11/2025 11 Elect Annual Proj - DESG CT 3/3/2025 11 Dist Capital or Expense 2/27/2025 11 Dist Capital or Expense 3/17/2025 11 Private Work - No Co Asset 2/11/2025 11 Damage Claims OH 4/9/2025 11 Dist Capital or Expense 5/30/2025 11 Dist Capital or Expense 6/17/2022 11 Elect Annual Proj - DESG CT 6/2/2022 11 Damage Claims OH 2/25/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 7/7/2025 11 Elect Annual Proj - DESG CT 10/27/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 11/13/2025 11 Dist Capital or Expense 2/12/2025 11 Dist Capital or Expense 8/18/2025 11 Elect Annual Proj - DESG CT 2/27/2025 11 Elect Annual Proj - DESG CT 11/26/2025 11 Dist Capital or Expense 8/29/2025 11 Dist Capital or Expense 12/16/2025 11 Dist Capital or Expense 12/29/2022 11 Elect Annual Proj - DESG CT 6/14/2022 11 Damage Claims OH 4/30/2025 11 Corrective Maint OH Lines 11/19/2025 11 Dist Capital or Expense 9/11/2025 11 Corrective Maint UG Svc 6/13/2025 11 Dist Capital or Expense 4/2/2025 11 Damage Claims OH 2/25/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 1/30/2024 11 Elect Annual Proj - DESG CT 2/24/2025 11 Dist Capital or Expense 8/1/2025 11 Corrective Maint UG Svc 3/3/2025 11 Dist Capital or Expense 3/5/2025 11 Damage Claims OH 2/27/2025 11 Damage Claims OH 9/16/2025 11 Dist Capital or Expense 3/5/2025 11 Elect Annual Proj - DESG CT 2/12/2025 11 Elect Annual Proj - DESG CT 5/5/2023 11 Damage Claims OH 3/6/2025 11 Dist Capital or Expense 2/11/2025 11 Damage Claims OH 9/22/2025 11 Corrective Maint OH Svc 6/23/2022 11 Elect Annual Proj - DESG CT 4/28/2025 11 Dist Capital or Expense 3/18/2025 11 Elect Annual Proj - DESG CT 2/11/2025 11 Damage Claims OH 4/14/2025 11 Dist Capital or Expense 3/27/2025 11 Damage Claims OH 3/28/2025 11 Damage Claims OH 4/23/2025 11 Damage Claims OH 2/26/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 3/11/2025 11 Damage Claims OH Subsequent Close Date 1/22/2026 8/2/2026 9/16/2026 7/17/2026 1/22/2026 4/20/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 2/13/2026 8/26/2026 4/20/2026 1/22/2026 9/16/2026 1/22/2026 5/15/2026 4/20/2026 1/22/2026 4/20/2026 4/20/2026 7/17/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 9/16/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 7/17/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 7/17/2026 364310 Poles and Appurtenance 1,972 3,951 13,471 6,425 9,861 2,571 6,316 5,756 4,444 10,338 2,839 8,365 2,186 6,048 1,426 7,483 295 17,984 20,752 3,453 757 2,673 10,298 8,393 9,692 2,966 4,919 5,377 6,044 4,069 6,096 5,001 4,752 3,856 298 3,619 1,510 2,538 5,119 3,305 3,186 3,108 258 3,292 14,910 5,244 6,391 3,200 1,826 6,716 1,279 9,071 4,032 383 4,289 6,542 1,611 138 593 47 2,706 173 2,067 3,188 175 582 8,829 2,427 1,277 9,662 3,816 4,647 81 1,598 518 2,540 1,690 484 7,640 1,010 1,324 4,115 119 3,043 105 5,789 1,952 5,817 1,168 (178) 2,188 2,060 19,405 3,814 6,710 10,493 547 3,544 11,161 564 307 12,187 62 5,244 1,450 365000 Overhead Conductors, Device 824 1,513 1,062 1,939 9,729 392 47,715 761 1,155 93,573 471 1,951 7,764 8,051 2,368 1,138 8,334 1,604 3,273 792 965 48,727 4,824 934 1,146 (12) 51 1,830 1,462 (3) 1,705 587 97 524 312 189 (34) 3,337 1,867 921 606 5,607 7,130 3,974 884 2,766 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 29,523 1,084 170 685 1,236 279 420 20 1,695 4,060 76,601 (167) (0) 2 (2) (3) (0) (0) 67 108 (2) (1) 543 724 7,436 940 3,560 1,237 3,366 (16) 2,127 2,931 435 (170) 413 13,604 999 1,015 57 510 563 1,069 4,332 1,192 73 587 10,073 114 948 89 3,975 259 436 825 4,576 2,908 3,764 114 697 60 2,332 2,439 117 143 885 330 1,896 360 497 236 2,274 1,068 (28) 238 892 2,467 1,429 5,634 772 1,384 2,857 132 1,210 26 1,829 784 5,694 841 1,649 62 486 238 108 21 897 59 82 1,584 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 2,796 5,464 14,533 8,364 19,590 2,963 54,030 6,517 5,599 133,435 3,310 10,316 2,186 16,303 10,161 9,851 1,712 28,454 22,355 3,453 8,090 3,464 11,264 133,721 14,349 3,900 6,064 5,364 6,096 5,964 7,555 4,998 6,565 4,443 395 4,143 1,820 2,727 5,084 8,126 5,053 4,029 4,424 21,663 22,024 9,218 7,275 5,966 1,826 8,843 1,279 12,002 4,466 214 5,700 20,146 1,611 1,720 1,156 47 4,435 14,578 3,374 3,188 1,819 670 12,804 2,427 2,102 14,238 6,724 8,411 980 2,295 578 2,540 10,557 484 11,728 1,128 1,467 5,548 449 5,178 466 6,286 2,188 8,091 2,344 (206) 2,425 2,952 21,873 6,161 6,710 16,127 1,379 4,929 14,018 696 1,599 12,187 1,672 5,244 3,279
  7. Page 31 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 31 of 104 Work Order Number Description 80256505 CAR VS POLE APPROVED 4/16 80256524 * COMP* 9A CAR VS POLE/TURNOVER1 TO 80256535 WTG FOR PD RPT 8/20/25 (TH) 9A - CA 80256554 JMS- BLOOMFIELD, 40R JUNIPER RD 80256563 9A- TRUCK VS POLE- APPROVED 11/14 80256578 9A - LD - 58 COOK RD, PROSPECT - (F 80256603 *ASP* CD02444 Pole Integrity Replac 80256628 MANCHESTER, 75 BUCKLAND, Pole#7, Re 80256670 *ASP* CD02444 Pole Integrity Replac 80256685 AE/TC 27 PERKINS RD, GRN: P#84237 I 80256700 *D&D*Frontier Inspection Pole Shift 80256709 *D&D*Frontier Inspection Pole Shift 80256715 *ASP* Frontier Inspection Pole Shif 80256719 *ASP* Frontier Inspection Pole Shif 80256722 *D&D* BD - Conv. 1662299 - Make Rea 80256723 *ASP* CD02444 Pole Integrity Replac 80256726 *ASP* CD02444 Pole Integrity Replac 80256810 *D&D* Frontier Pole Inspection Pole 80256815 *D&D* Frontier Pole Inspection Pole 80256826 NONBILLABLE (TH) 9A - CAR VS POLE 4 80256829 JLB 410 HOLLOW TREE RIDGE RD DARIEN 80256831 02/08/25 Gallup Hill (95) Rd Ledyar 80256839 2/8 GREEN (20) LN 2933, NORTH WIN 80256843 mcb - WTG FOR PD RPT 2/12/25 (TH) 2 80256918 *RSO*DL; Infrared Survey Emergency 80256954 *D&D* FA - Conv. 1657254 - Make Rea 80256955 *D&D* FA - Conv. 1657254 - Make Rea 80256995 *ASP* Frontier Inspection Pole Shif 80257055 P LEBANON, GATES, 160, SHANE BISHOP 80257066 *EH AWC* CD02444 Pole Integrity Rep 80257076 *ASP* Frontier Inspection Pole Shif 80257079 AP- 1 Veterans Dr, New Britain- P# 80257085 *EH AWC* CD02444 Pole Integrity Rep 80257109 *D&D* Frontier Pole Inspection Pole 80257124 AMM-Alling St BER P48650 - 9a Post 80257128 *TOR*CD02444 Pole Integrity Replace 80257184 FCOMP 1.9 Needs be written all work 80257408 DJM. 48 TREADWELL AVE WESTPORT. OH 80257426 ORDER PD REP 9A CAR VS POLE/TURNOVE 80257429 *D&D*Frontier Pole Inspection Pole 80257454 *ASP* Frontier Inspection Pole Shif 80257468 *ASP* Frontier Pole Inspection Pole 80257470 (cp) ZK - HTFD (Broken Pole) - 74 M 80257496 *D&D*Frontier Pole Inspection Pole 80257503 *NL AWC* CD02444 Pole Integrity Rep 80257512 *EH AWC* CD02444 Pole Integrity Rep 80257514 *NL AWC* CD02444 Pole Integrity Rep 80257518 *ASP* Frontier Pole Inspection Pole 80257519 *ASP* Frontier Pole Inspection Pole 80257539 *D&D*Frontier Pole Inspection Pole 80257675 STORRS, VALLEY VIEW DRIVE, 8, repla 80257693 MG-P#635-TOLERATION ROAD SCOTLAND-R 80257713 15dd 4/24 *MLC* AP- 1 Veterans Dr, 80257725 JFM-*POST CNSTR* 9A 02/09/25 -676 S 80257738 *ASP* Frontier Inspection Pole Shif 80257764 *ASP* Frontier Inspection Pole Shif 80257789 *ASP* Frontier Inspection Pole Shif 80257797 *D&D* Frontier Pole Inspection Pole 80257798 *NL AWC* CD02444 Pole Integrity Rep 80257814 CD02444 Pole Integrity Replacement 80257824 *TOR*CD02444 Pole Integrity Replace 80257828 CD02444 Pole Integrity Replacement 80257836 *NL AWC* CD02444 Pole Integrity Rep 80257837 *NL AWC* CD02444 Pole Integrity Rep 80257894 6/6 (23) written POND WAY WINDHAM 80257920 DJM. 19 CRESCENT RD WESTPORT. OH TO 80258089 PD-42 FOG PLAIN RD WTFD/UPGRADE OH 80258111 CD02444 Pole Integrity Replacement 80258116 *EH AWC* CD02444 Pole Integrity Rep 80258117 *ASP* Frontier Pole Inspection Pole 80258119 *NL AWC* CD02444 Pole Integrity Rep 80258121 *NL AWC* CD02444 Pole Integrity Rep 80258125 *COMP* Frontier Pole Inspection Pol 80258127 CD02444 Pole Integrity Replacement 80258138 CD02444 Pole Integrity Replacement 80258142 *D&D*Frontier Pole Inspection Pole 80258169 CD02444 Pole Integrity Replacement 80258177 *D&D*Frontier Pole Inspection Pole 80258178 *ASP* Frontier Inspection Pole Shif 80258182 *NL AWC* CD02444 Pole Integrity Rep 80258191 *D&D* KG Conv#1670183-RegularMakeRe 80258193 RM, 108 GODFREY RD W -WESTON !! CU 80258206 MM pole #783 River Rd Lisbon Fronti 80258488 *ASP* Frontier Inspection Pole Shif 80258489 *D&D* Frontier Pole Inspection Pole 80258519 *D&D*Frontier Pole Inspection Pole 80258526 *ASP* Frontier Inspection Pole Shif 80258530 *EH AWC* CD02444 Pole Integrity Rep 80258544 *TOR*CD02444 Pole Integrity Replace 80258551 TL - JOHNNY CAKE HILL RD, #43 OLD L 80258581 CD02444 Pole Integrity Replacement 80258583 *NL AWC* CD02444 Pole Integrity Rep 80258592 *NL AWC* CD02444 Pole Integrity Rep 80258593 *TOR*CD02444 Pole Integrity Replace 80258656 *D&D*Frontier Pole Inspection Pole 80258692 LD- 2 OAKRIDGE RD, BRISTOL - P761580258730 NM; RIVERBANK RD, STAMFORD; P#16872 80258800 JRP - 186 Aircraft Rd SOG Set 35' X 80258889 MAT-ASP-6/6/22 17 LEWIS RD BRISTOL 80258902 LEBANON, pic BABCOCK HILL, 250, Wil 80258909 9A - 2/12 - RSO - lefebvre - CHURCH 80258915 MCB -9A TURNOVER REIDVILLE ( 106) D 80258923 9A - LD - 48 MIDWOOD AVE, WOLCOTT 80258940 9A - CAR VS POLE 1294 80258971 MPB; 310 ROXBURY RD, SOUTHBURY - ES in-service date work order type 2/26/2025 11 Damage Claims OH 3/13/2025 11 Damage Claims OH 8/26/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 7/7/2025 11 Damage Claims OH 3/3/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 8/7/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 5/29/2025 11 Corrective Maint UG Svc 3/20/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 3/23/2025 11 Dist Capital or Expense 7/18/2025 11 Dist Capital or Expense 3/7/2025 11 Damage Claims OH 2/14/2025 11 Dist Capital or Expense 3/6/2025 11 Dist Capital or Expense 3/10/2025 11 Elect Annual Proj - DESG CT 2/14/2025 11 Dist Capital or Expense 2/24/2025 11 Dist Capital or Expense 11/28/2025 11 Dist Capital or Expense 11/28/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 4/10/2025 11 Elect Annual Proj - DESG CT 10/29/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 4/21/2025 11 Dist Capital or Expense 11/14/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 3/18/2025 11 Damage Claims OH 6/17/2025 11 Dist Capital or Expense 11/4/2022 11 Damage Claims OH 12/5/2022 11 Asset Mgmt - Specific DESG CT 3/13/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 8/27/2025 11 Dist Capital or Expense 8/13/2025 11 Elect Annual Proj - DESG CT 3/17/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 5/7/2025 11 Corrective Maint UG Svc 6/10/2025 11 Dist Capital or Expense 4/9/2025 11 Temporary Work DESG CT 2/14/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 8/14/2025 11 Elect Annual Proj - DESG CT 9/29/2025 11 Dist Capital or Expense 8/6/2025 11 Elect Annual Proj - DESG CT 8/26/2025 11 Dist Capital or Expense 2/17/2023 11 Elect Annual Proj - DESG CT 10/11/2022 11 Asset Mgmt - Specific DESG CT 6/29/2022 11 Elect Annual Proj - DESG CT 9/30/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 8/7/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 8/6/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 8/25/2025 11 Dist Capital or Expense 4/7/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 8/14/2025 11 Elect Annual Proj - DESG CT 10/13/2025 11 Dist Capital or Expense 3/11/2025 11 Dist Capital or Expense 11/14/2022 11 Elect Annual Proj - DESG CT 5/13/2025 11 Dist Capital or Expense 2/26/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 8/29/2025 11 Dist Capital or Expense 8/11/2025 11 Dist Capital or Expense 5/7/2025 11 Corrective Maint UG Svc 11/4/2025 11 Dist Capital or Expense 9/5/2025 11 Dist Capital or Expense 8/6/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 2/25/2025 11 Elect Annual Proj - DESG CT 12/14/2022 11 Elect Annual Proj - DESG CT 11/21/2022 11 Asset Mgmt - Specific DESG CT 5/12/2023 11 Elect Annual Proj - DESG CT 1/2/2024 11 Elect Annual Proj - DESG CT 3/17/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 2/21/2025 11 Dist Capital or Expense 2/26/2025 11 Damage Claims OH 4/25/2025 11 Dist Capital or Expense Subsequent Close Date 8/26/2026 2/13/2026 1/22/2026 9/16/2026 1/22/2026 9/16/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 7/17/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 7/17/2026 1/22/2026 364310 Poles and Appurtenance 36,175 10,317 7,496 2,106 3,035 335 4,554 480 7,435 (177) 302 43 1,844 845 (935) 6,447 2,891 1,291 698 4,064 1,455 85 8,691 2,447 464 8,818 274 3,481 948 4,992 865 4,415 9,196 548 12,803 4,002 793 1,938 13,896 740 1,443 1,102 1,152 362 6,191 7,019 5,610 1,778 605 74 2,915 2,997 (549) 1,349 319 899 1,804 1,786 4,712 7,138 5,293 8,663 6,045 3,925 (195) 3,289 1,336 6,090 8,782 2,378 2,948 2,891 78 3,225 7,803 892 4,120 1,277 186 6,479 (731) 916 982 851 3,011 593 223 5,661 3,934 1,358 4,135 4,209 3,738 163 106 459 1,782 1,602 4,813 5,277 11,809 12,317 977 3,133 10,041 365000 Overhead Conductors, Device 5,008 3,209 5,094 1,270 779 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 193 2,630 2,438 2,874 1,445 (13) 2,187 119 259 92 (2,406) 1,632 13,149 16 324 107 7,849 572 (66) 785 1,926 892 168 1,945 204 711 1,192 1,045 70 447 2,060 2,641 2,406 555 840 545 1,919 967 283 231 78 180 120 646 1,363 2,613 3,069 1,271 146 1,098 1,031 1,765 1,685 3,483 84 99 589 (388) 235 1,222 1,959 195 700 3,146 553 (60) (67) 93 179 807 1,490 2,135 1,342 5,110 1,070 322 5,373 204 1,242 242 146 3,843 1,160 1,351 4,904 (501) 74 1,214 1,024 2,110 1,707 797 202 456 133 368 2,470 1,879 61 185 351 1,463 72 3,642 1,637 1,297 13,105 1,227 538 32 147,278 275 18,191 535 50 1,280 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 41,183 13,720 12,590 19,494 3,814 335 7,099 11,775 8,880 (256) 2,488 162 2,103 937 (3,341) 8,864 2,891 1,291 2,829 4,957 1,623 2,030 8,691 3,158 1,656 10,121 344 3,928 3,008 7,633 3,391 4,970 10,037 1,093 14,722 4,969 1,076 2,815 13,896 3,374 4,202 4,171 1,152 1,460 7,222 8,784 7,295 5,261 689 74 3,568 3,586 (1,063) 1,583 1,541 2,951 1,999 2,665 7,858 7,138 6,100 10,153 8,179 5,267 4,914 4,358 1,336 6,412 14,155 2,582 4,190 2,891 320 3,225 7,803 1,037 7,963 2,437 1,538 11,383 (1,231) 990 2,936 1,875 5,576 2,434 1,020 5,661 3,934 2,033 4,135 6,680 5,617 225 292 810 168,714 2,208 4,813 10,249 13,447 13,614 14,082 3,133 11,269
  8. Page 32 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 32 of 104 Work Order Number Description 80258990 *NL AWC* CD02444 Pole Integrity Rep 80258996 CD02444 Pole Integrity Replacement 80259075 15 DAY DUE 10/24 Jpt-29 Main St Far 80259146 JDB 9A - POVERTY HOLLOW RD, 2424, 80259148 2/27/25-NON-BILLABLE 9A - WHIPSTIC 80259156 *TOR*CD02444 Pole Integrity Replace 80259162 *NL AWC* CD02444 Pole Integrity Rep 80259177 CD02444 Pole Integrity Replacement 80259186 *NL AWC* CD02444 Pole Integrity Rep 80259189 CD02444 Pole Integrity Replacement 80259195 CD02444 Pole Integrity Replacement 80259199 *NL AWC* CD02444 Pole Integrity Rep 80259203 JD; 179 HUNTING RIDGE RD STAMFORD; 80259204 *NL AWC* CD02444 Pole Integrity Rep 80259217 CD02444 Pole Integrity Replacement 80259221 *NL AWC* CD02444 Pole Integrity Rep 80259228 CD02444 Pole Integrity Replacement 80259231 *D&D*Frontier Pole Inspection Pole 80259233 CD02444 Pole Integrity Replacement 80259252 *NL AWC* CD02444 Pole Integrity Rep 80259269 *D&D*Frontier Pole Inspection Pole 80259289 *NL AWC* CD02444 Pole Integrity Rep 80259290 WO 19869545, DG UPGRADE FOR PAWCATU 80259310 NORTH STONINGTON, REUTEMANN, 54, Em 80259313 *NL AWC* CD02444 Pole Integrity Rep 80259319 78 RIPLEY HILL RD., COVENTRY (HIGH 80259329 *TOR*CD02444 Pole Integrity Replace 80259355 DG P#2564 WILSONVILLE RD THOMPSON F 80259373 PD REPORT UPLOADED ON 6/27/2022 JDB 80259506 SERV COMPLETED CP-175 Case st CTN, 80259533 CD02444 Pole Integrity Replacement 80259566 *NL AWC* CD02444 Pole Integrity Rep 80259579 CD02444 Pole Integrity Replacement 80259612 *NL AWC* CD02444 Pole Integrity Rep 80259620 *NL AWC* CD02444 Pole Integrity Rep 80259657 HOLD FOR PAD 6/27 JFC - SHARON, VAN 80259693 MATERIAL *D&D* HIGHLAND AVE, BETHEL 80259723 6/8 all work completed by asplundh 80259909 9A - CAR VS POLE - APPROVED 10/31/2 80259948 *POST CONST* AP- 123 Old Mountain R 80259962 *NL AWC* CD02444 Pole Integrity Rep 80259970 *NL AWC* CD02444 Pole Integrity Rep 80259972 9A - CAR VS POLE - APPROVED 12/9 80259979 *D&D* ML - Conv. 1739846 - Make Rea 80260006 written broken pole 06/09 *TURNOVER 80260018 BRANFORD, 101 n branford rd/3ph ban 80260060 MATERIAL *D&D*DODGINGTOWN RD, BETHE 80260099 SC-392 STARKWEATHER RD PLAINFIELD I 80260128 JRP - Lavender Ln SOG Line Extensio 80260219 *NL AWC* CD02444 Pole Integrity Rep 80260243 WRTN - DM - 20 E HIGH ST - EHAMP 80260247 *NL AWC* CD02444 Pole Integrity Rep 80260263 JFM-57 OLD WATERBURY RD (P#606) DG 80260265 *NL AWC* CD02444 Pole Integrity Rep 80260266 TURNOVER*** MIDDLE RIVER( 1 80260296 *NL AWC* CD02444 Pole Integrity Rep 80260376 PD-303 COSSADUCK HILL RD N. STON/NE 80260432 *NL AWC* CD02444 Pole Integrity Rep 80260435 CRP -11/09-AWC-CENTER HILL( 6) RD F 80260448 37 CAMPBELL AVE., VERNON - NEW DOT 80260508 OLD SAYBROOK, BOSTON POST, 336/DB P 80260516 CD02444 Pole Integrity Replacement 80260519 P297 Palmertown Rd, Montville - Rep 80260526 DONE PRINT CRP-44 Scoville Hill rd 80260541 CD02444 Pole Integrity Replacement 80260545 01/30/25, RSO, JK>POLE 886--TREE V 80260550 2/13/25 CAR VS POLE- APPROVED 4/23/ 80260560 RC INSTALL NEW POLE 38100 & REPLACE 80260569 CD02444 Pole Integrity Replacement 80260573 CD02444 Pole Integrity Replacement 80260599 *ASP* ML - Conv. 1730511 - Make Rea 80260659 OAKDALE, ROUTE 163, 1580, Mike Dani 80260664 DONE PRINT BJQ, LTCH, P #531 (84) C 80260667 JMS- WEST HARTFORD, 1700 ASYLUM AVE 80260742 2/14/25 TURNOVER E # 5588056- ROOSE 80260752 * LD- 833 BEE ST, MERIDEN - (FRNT) 80260760 CD02444 Pole Integrity Replacement 80260786 AMM-639 Reservoir Rd CHE (Frnt)P359 80260796 CD02444 Pole Integrity Replacement 80260797 WO 19828408, DG UPGRADE FOR GALES F 80260869 CD02444 Pole Integrity Replacement 80260896 DONE PRINT CRP - 11/24 [BEACHJE] 80260954 WRTN - DM - RAYMOND RD GLASTONBURY 80260978 *TOR*CD02444 Pole Integrity Replace 80260980 *TORRINGTON AWC*CD02444 Pole Integr 80261001 Higgins Highway 32, Mansfield. INT80261032 (RR) 2/14/25 9A TURNOVER STILLSON ( 80261038 MAR - 2/15/25 TURNOVER/9A CAR VS FR 80261042 9A - CAR VS POLE 5866 - APPROVED 4/ 80261046 JMS-FCOMP 02/26 - 9A - 2/16 - RSO 80261049 (RN) WTG PD RPT / 2/16/25 9A W KIN 80261053 DGP#D121 THOMPSON HILL RD THOMPSON 80261056 02/15/25 - 9A - COLONEL LEDYARD (39 80261057 9A - Car vs Frontier pole- APPROVED 80261070 9A - Car vs Pole - 07/28 still wait 80261114 253 BAYBERRY LN, WESTPORT CT 80261116 CAR VS POLE 1359S- APPROVED 8/4/26 80261118 *TOR*CD02444 Pole Integrity Replace 80261119 *TOR*CD02444 Pole Integrity Replace 80261120 *TOR*CD02444 Pole Integrity Replace 80261124 *TOR*CD02444 Pole Integrity Replace 80261138 NEEDS MATERLIAL CHARGED-- WEST RD S 80261151 02/17/25, RSO, JK>POLE 1016-1018--T 80261243 written (complete??) 6/12 - TURNOVE 80261276 TL - W MYSTIC AVE, #27B MYSTIC [GRO in-service date work order type 8/19/2025 11 Elect Annual Proj - DESG CT 9/10/2025 11 Dist Capital or Expense 10/13/2022 11 Asset Mgmt - Specific DESG CT 7/22/2025 11 Damage Claims OH 2/28/2025 11 Damage Claims OH 9/8/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 11/21/2025 11 Dist Capital or Expense 7/30/2025 11 Dist Capital or Expense 8/18/2025 11 Elect Annual Proj - DESG CT 9/17/2025 11 Dist Capital or Expense 8/29/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 9/4/2025 11 Dist Capital or Expense 8/15/2025 11 Elect Annual Proj - DESG CT 11/19/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 11/29/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 3/12/2025 11 Dist Capital or Expense 8/7/2025 11 Dist Capital or Expense 4/8/2025 11 Elect Annual Proj - DESG CT 7/31/2025 11 Dist Capital or Expense 10/23/2025 11 Dist Capital or Expense 10/21/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 10/21/2022 11 Elect Annual Proj - DESG CT 8/2/2022 11 Damage Claims OH 9/5/2023 11 Asset Mgmt - Specific DESG CT 10/10/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 9/8/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 2/14/2023 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 7/15/2022 11 Elect Annual Proj - DESG CT 2/21/2025 11 Damage Claims OH 3/18/2025 11 Dist Capital or Expense 6/11/2025 11 Elect Annual Proj - DESG CT 8/5/2025 11 Dist Capital or Expense 8/19/2025 11 Damage Claims OH 10/28/2025 11 Dist Capital or Expense 6/22/2022 11 Elect Annual Proj - DESG CT 11/16/2022 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 9/21/2022 11 Elect Annual Proj - DESG CT 4/27/2023 11 Elect Annual Proj - DESG CT 6/11/2025 11 Elect Annual Proj - DESG CT 7/31/2025 11 Corrective Maint UG Svc 6/26/2025 11 Elect Annual Proj - DESG CT 9/23/2025 11 Dist Capital or Expense 6/26/2025 11 Elect Annual Proj - DESG CT 3/4/2025 11 Dist Capital or Expense 8/12/2025 11 Elect Annual Proj - DESG CT 2/2/2023 11 Elect Annual Proj - DESG CT 8/25/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 12/29/2025 11 Dist Capital or Expense 10/1/2025 11 Dist Capital or Expense 10/3/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 10/3/2025 11 Dist Capital or Expense 2/24/2025 11 Elect Annual Proj - DESG CT 3/17/2025 11 Damage Claims OH 4/29/2025 11 Elect Annual Proj - DESG CT 10/1/2025 11 Dist Capital or Expense 9/30/2025 11 Dist Capital or Expense 11/28/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 5/1/2025 11 Temporary Work DESG CT 2/21/2025 11 Elect Annual Proj - DESG CT 3/4/2025 11 Dist Capital or Expense 9/22/2025 11 Dist Capital or Expense 3/18/2025 11 Damage Claims OH 9/15/2025 11 Dist Capital or Expense 3/20/2025 11 Elect Annual Proj - DESG CT 10/24/2025 11 Dist Capital or Expense 2/24/2025 11 Dist Capital or Expense 10/24/2025 11 Dist Capital or Expense 8/29/2025 11 Dist Capital or Expense 6/6/2025 11 Dist Capital or Expense 8/15/2025 11 Elect Annual Proj - DESG CT 2/20/2025 11 Damage Claims OH 2/26/2025 11 Damage Claims OH 2/24/2025 11 Damage Claims OH 3/1/2025 11 Damage Claims OH 2/20/2025 11 Damage Claims OH 2/27/2025 11 Damage Claims OH 3/13/2025 11 Damage Claims OH 2/19/2025 11 Damage Claims OH 8/19/2025 11 Dist Capital or Expense 7/2/2025 11 Dist Capital or Expense 3/20/2025 11 Damage Claims OH 6/17/2025 11 Elect Annual Proj - DESG CT 8/19/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 7/28/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 6/17/2022 11 Damage Claims OH 11/25/2022 11 Elect Annual Proj - DESG CT Subsequent Close Date 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 3/4/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 2/13/2026 8/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 5/15/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 5,483 3,422 130 7,921 1,833 2,545 5,065 4,008 5,203 2,474 3,868 5,337 580 3,721 6,421 4,242 1,469 489 3,299 4,906 195 2,677 2,458 951 9,980 1,239 1,966 527 252 510 3,955 21,158 3,254 4,136 3,757 1,995 3,408 9 10,276 5,467 7,054 6,140 8,957 637 1,373 1,168 3,764 963 3,776 2,388 2,726 8,183 635 10,355 2,507 6,434 3,781 3,898 7,690 758 1,100 10,022 1,039 894 5,041 1,340 3,213 1,543 8,578 3,882 1,049 7,948 277 (739) 26,358 896 4,685 3,491 3,038 1,090 9,591 235 440 2,340 2,761 4,716 3,567 3,173 1,931 6,320 755 14,064 4,694 2,340 1,649 474 974 224 3,707 2,936 2,810 933 568 526 153 365000 Overhead Conductors, Device 727 533 186 1,381 197 970 1,120 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 292 1,907 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 21 429 295 434 2,574 3,507 2,611 92 2,420 1,150 188 1,275 935 7,947 2,723 2,079 331 453 659 8,536 1,146 105 1,936 1,062 42 731 6,772 1,672 1,776 1,774 1,462 1,026 58 2,392 674 10,246 1,607 5,582 319 605 649 1,151 2,212 1,139 3,149 444 5 112 195 4,232 2,900 1,651 1,017 607 3,794 6,306 292 102 332 (526) 405 1,399 914 1,914 2,039 2,249 112 1,284 3,091 88 3,254 1,721 2,697 3,342 3,763 1,805 165 (316) 3,735 389 1,380 12,322 648 430 6,748 226 725 1,872 1,262 4,258 180 905 2,223 3,523 1,388 845 106 382 994 4,012 14,728 1,266 270 632 1,868 332 111 6,022 112 591 (23) (215) 145 399 65 103 458 188 78 32 853 1,398 6,975 6 245 175 527 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 6,209 4,247 2,244 9,301 2,030 3,516 6,185 4,437 5,933 2,474 6,442 5,337 580 7,228 6,421 6,854 1,561 2,909 3,299 6,057 383 3,952 3,723 9,351 13,362 16,066 1,966 1,715 357 3,178 3,955 29,704 4,926 5,912 3,757 14,147 4,434 72 12,668 6,141 7,054 8,352 14,539 956 1,373 1,929 4,915 3,977 12,941 2,388 12,223 9,936 1,984 10,355 1,981 6,839 6,828 3,898 8,603 6,954 21,360 12,271 1,152 2,178 8,132 1,428 6,799 3,376 11,275 7,225 10,834 10,456 442 (1,293) 30,093 1,284 6,065 15,813 3,686 1,666 16,738 461 1,230 2,340 2,761 6,690 4,829 7,431 1,931 6,499 1,661 16,287 8,675 3,916 2,571 580 974 256 4,560 4,334 2,810 7,908 573 771 855
  9. Page 33 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 33 of 104 Work Order Number Description 80261410 Alden ONe Pending #HTFD, HAMILTON S 80261533 GDK FCOMP HAR OH TURNOVER - 2/18 80261587 Sheep Pasture Rd, Madison- Ins Step 80261617 Rplc P 4479, Rplc XFMR, Ins 4/0 AL, 80261629 Abel - GRANBY, HARTLAND, 306, MARIO 80261711 GP - ALL WORK COMPLETE - HAYDEN HIL 80261714 Work Complete 2/16/25-- 120 HOPYAR 80261724 2/17/25-- 16 LYNN DR PRESTON- POLE 80261738 *D&D*Frontier Pole Inspection Pole 80261783 *TOR*CD02444 Pole Integrity Replace 80262015 MAR - Rplc Pole with 40'cl2 & Insta 80262114 MJ -Jpt-151 S Riverside Ave Plymth 80262311 Hebron, Deepwood Dr, shift Frontier 80262470 AMM 924 WEST MAIN, NEW BRITAIN. IN 80262592 IN PROGRESS 2/19/25 - 9A - 91 FLAND 80262603 LD - 107 SUMMER ST, SOUTHINGTON 80262709 AE/DL; 9 INDIAN ROCK LN; GREENWICH; 80262857 TC 107 MYRTLE AVE, STM; P#18156 INS 80262996 *APPRENTICES COMPLETED*2022 Pole In 80263086 *ESCALATED/URGENT* Gilead Rd, Water 80263099 written P2730 Pond Road, Franklin 80263119 DONE PRINT BJQ, LTCH, P #4088 (112) 80263132 DONE PRINT BJQ, GSHN, P #1545 EAST 80263143 DONE PRINT BJQ, LTCH, P #3244 (37) 80263205 DL; 143 SOUND BEACH AVE; NEW 800AMP 80263291 work comp in field - 9A-02/18-RSO-[ 80263295 Preston - install line sensors in v 80263336 BWG-Defect pole replacement P#4428, 80263363 CD02444 Pole Integrity Replacement 80263387 *AWC* CD02444 Pole Integrity Replac 80263414 MG-CALVIN BURNHAM ROAD HAMPTON- POL 80263447 CAR V POLE- NEED PR 2.24.25 80263454 *NL AWC* CD02444 Pole Integrity Rep 80263462 MM 9A 262 Ekonk Hill Rd Sterling P 80263517 *DISTRICT*COMPLETED HEL 2022 Pole I 80263547 *DISTRICT HEL *KTI COMPLETED 2022 P 80263556 *D&D*COMPLETED KTI 2022 Pole Inspec 80263557 *DISTRICT HEL COMPLETED*KTI 2022 Po 80263598 *DISTRICT*KTI 2022 Pole Inspection 80263636 WRTN--JK>POLE 2056--FTR TO REPLACE 80263701 *HAWKEYE* MF P-1378 REPLACE WITH 40 80263737 WRTN NEEDS LINE FOREST( 31) ST -- 4 80263776 DG P#1395 LOT 13A RT 131 THOMPSON C 80263778 CHESHIRE 89 LARCHMONT AVE WTBY - P 80263927 APPT-8/9-GRANBY, SALMON BROOK, 563, 80264014 CHE*AWC* CD02444 Pole Integrity Rep 80264020 CD02444 Pole Integrity Replacement 80264040 9A CAR VS POLE-APPROVED 12/9/25 80264071 *ESCALATED/URGENT* Rep Xarms and in 80264100 *AWC* CD02444 Pole Integrity Replac 80264105 *AWC* LD - 1259 NOTCH RD, CHESHIRE 80264109 CD02444 Pole Integrity Replacement 80264151 CAR VS POLE - NRFN- NONE BILLABLE 80264152 WRTN NEEDS LINE P2322 Amston Road, 80264171 NEW GC STONINGTON, MEADOW, 25, MUIR 80264225 WRTN--JK>REF POLE 1925--INSTALL 45/ 80264340 SC-P#1183 NORTH RD KILLINGLY REPALC 80264344 CRP - TURNOVER - BREEZY HILL RD, C 80264439 *AWC* FA - Conv. 1754790 - Make Rea 80264470 BM, MEADOWBROOK RD,NTN,SHIFT STUB G 80264472 MCB - 126 HOTCHKISS ST WTBY - P 629 80264484 GCC / 25 MEADOW AVE, STONINGTON 80264628 9A - CAR VS POLE 5354 - APPROVED 8/ 80264667 PRINT MDB - WATERTOWN, BUCKINGHAM, 80264706 *AWC* CD02444 Pole Integrity Replac 80264707 DONE PRINT BJQ, MRRS, P #1105 (54) 80264726 9A TRUCK VS WIRES 2/18 - AWC TURNOV 80264733 bm,6/28/24 STORM WORK 34X / MS24G01 80264758 FCOMP (cp) ZK - W HTFD (Resag Pri) 80264830 JMS- WEST HARTFORD POLE 4031 SHIFT 80264831 alden one - Campbell Ave 22, Vernon 80264893 9A - CAR VS POLE - APPROVED 10/9 80264901 Jpt-1730 Perkins St Bristol (Frnt)P 80265050 REPLACE POLE 5341 & REMOVE OPEN WIR 80265078 *D&D* CD02449 Frontier Pole Inspect 80265084 TL - HAMBURG RD, LYME // ***ALL WOR 80265114 *D&D* CDCD02449 Frontier Pole Inspe 80265116 *D&D*Frontier Pole Inspection Pole 80265122 *ASP* CD02449 Frontier Reject Repla 80265128 *D&D*Frontier Pole Inspection Pole 80265132 *D&D*Frontier Pole Inspection Pole 80265153 *D&D*Frontier Inspection Pole Shift 80265175 RM, 6 RICHARDS AVE - NORWALK!! CU 80265182 *D&D* CD02449 Frontier Pole Inspect 80265183 2/24/25- MATHEWSON MILL RD LEDYARD80265191 *D&D* CD02449 Frontier Pole Inspect 80265214 *D&D*Frontier Inspection Pole Shift 80265215 *ASP* CD02449 Frontier Reject Repla 80265228 *D&D* CD02449 Frontier Pole Inspect 80265231 *D&D*Frontier Inspection Pole Shift 80265257 *ASP* CD02449 Frontier Reject Repla 80265459 DONE PRINT BJQ, LTCH, P #1715 (217) 80265461 AE/DL; URBAN ST ; STAMFORD; BROKEN 80265495 Done 2.25.25 CTHP W/# REQ - VR--EVW 80265504 DONE CRP - 2/22 - TORAWC TURNOVER 80265526 CRP - 2/21/25 E3:BEACH:DR:HARWINTON 80265537 RM, CP , 7 Wakerobin Rd -NORWALK 80265586 DG P#1634 30 WALAS RD PLAINFIELD CL 80265628 ACC KTI RC 9A REPLACE POLE A2590. 80265636 done asplundh 8/10 MDB DOT 121-136 80265721 EVW - 36 Sharon Rd, Lakeville P#7 S 80265834 MAR - DG Upgrade Estimate - 36 Knol 80265839 NON BILLABLE 6/19/22 9A TURNOVER 1 80265948 OLD SAYBROOK, 31 MILL ROCK RD E//SH 80265967 ASBUILT BWG- Defect pole replace P# in-service date work order type 5/9/2023 11 Damage Claims OH 3/4/2025 11 Elect Annual Proj - DESG CT 8/13/2025 11 Elect Annual Proj - DESG CT 12/15/2022 11 Asset Mgmt - Specific DESG CT 9/11/2023 11 Asset Mgmt - Specific DESG CT 3/3/2025 11 Dist Capital or Expense 3/26/2025 11 Elect Annual Proj - DESG CT 3/27/2025 11 Elect Annual Proj - DESG CT 3/19/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 5/2/2023 11 Elect Annual Proj - DESG CT 9/21/2022 11 Asset Mgmt - Specific DESG CT 5/28/2025 11 Dist Capital or Expense 6/5/2023 11 Dist Capital or Expense 2/24/2025 11 Damage Claims OH 3/17/2025 11 Dist Capital or Expense 5/6/2025 11 Dist Capital or Expense 5/31/2023 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 3/3/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 2/24/2025 11 Dist Capital or Expense 3/10/2025 11 Dist Capital or Expense 6/7/2023 11 Elect Annual Proj - DESG CT 2/21/2025 11 Dist Capital or Expense 3/6/2025 11 Dist Capital or Expense 4/16/2025 11 Elect Annual Proj - DESG CT 11/21/2025 11 Dist Capital or Expense 11/13/2025 11 Dist Capital or Expense 8/13/2025 11 Dist Capital or Expense 2/21/2025 11 Dist Capital or Expense 8/5/2025 11 Dist Capital or Expense 2/21/2025 11 Dist Capital or Expense 8/25/2022 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 3/3/2023 11 Elect Annual Proj - DESG CT 5/5/2023 11 Elect Annual Proj - DESG CT 9/6/2022 11 Elect Annual Proj - DESG CT 3/14/2025 11 Dist Capital or Expense 11/24/2025 11 Dist Capital or Expense 7/23/2025 11 Elect Annual Proj - DESG CT 10/31/2022 11 Elect Annual Proj - DESG CT 10/17/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 11/18/2025 11 Damage Claims OH 6/10/2025 11 Dist Capital or Expense 11/21/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 11/14/2025 11 Dist Capital or Expense 3/18/2025 11 Damage Claims OH 5/15/2025 11 Dist Capital or Expense 10/18/2022 11 Elect Annual Proj - DESG CT 8/17/2022 11 Elect Annual Proj - DESG CT 7/1/2022 11 Elect Annual Proj - DESG CT 6/24/2022 11 Elect Annual Proj - DESG CT 4/3/2025 11 Elect Project - DESG CT 3/27/2025 11 Dist Capital or Expense 11/12/2025 11 Dist Capital or Expense 10/20/2022 11 Elect Annual Proj - DESG CT 7/30/2025 11 Damage Claims OH 12/31/2025 11 Dist Capital or Expense 11/29/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 5/7/2025 11 Damage Claims OH 3/6/2025 11 Corrective Maint OH Lines 3/18/2025 11 Elect Annual Proj - DESG CT 3/12/2025 11 Dist Capital or Expense 4/9/2025 11 Dist Capital or Expense 3/13/2025 11 Damage Claims OH 2/25/2025 11 Dist Capital or Expense 10/21/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 3/15/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 5/8/2025 11 Dist Capital or Expense 4/7/2025 11 Dist Capital or Expense 3/31/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 4/21/2025 11 Dist Capital or Expense 3/14/2025 11 Dist Capital or Expense 3/5/2025 11 Dist Capital or Expense 3/10/2025 11 Elect Annual Proj - DESG CT 3/28/2025 11 Elect Annual Proj - DESG CT 3/13/2025 11 Dist Capital or Expense 9/13/2022 11 Elect Annual Proj - DESG CT 2/15/2023 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 6/28/2022 11 Damage Claims OH 12/8/2022 11 Elect Annual Proj - DESG CT 4/27/2023 11 Damage Claims OH 4/28/2025 11 Dist Capital or Expense 4/18/2025 11 Elect Annual Proj - DESG CT Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/21/2026 9/16/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 9/16/2026 1/22/2026 5/15/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 8/26/2026 1/22/2026 364310 Poles and Appurtenance 1,472 10,849 776 2,640 1,396 969 818 1,309 373 3,869 241 23,442 851 2,914 2,292 1,984 6,223 8,336 2,134 2,060 1,575 212 292 755 (10) 1,243 432 10,840 6,143 8,941 2,613 3,129 2,779 7,936 6,816 3,906 3,304 3,835 36,334 4,397 (196) 2,656 2,110 3,494 807 3,268 6,339 788 41,691 5,963 239 1,529 3,678 7,049 (707) 8,823 1,178 12 4,038 4,146 7,570 520 8,736 14,335 2,992 1,664 232 2,142 444 460 1,087 18,162 2,586 984 559 3,360 120 279 2,953 152 1,774 112 1,647 891 78 3,389 1,128 931 391 108 4,786 360 2,284 2,126 8,071 2,086 8,006 33,939 3,695 4,845 3,417 674 8,481 2,622 6,736 365000 Overhead Conductors, Device 57 4,397 5,807 337 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 85 702 7,110 191 1,991 60 1,554 87 39 180 1,534 111 165,635 3,810 2,924 349 229 65 9,384 645 1,783 170 127 175 307 11,171 1,728 162,122 3,898 1,179 7,019 14,216 2,314 369720 DB/UG Conductors and Devices 295 18 63 49 6,950 590 16,525 1,491 26,624 3,109 137 1,055 6,586 1,859 1,069 839 149 (196) 2,627 1,498 1,408 843 233 77,346 627 212 6,054 651 212 99 559 3,929 (713) 1,074 108 650 569 (53) (307) 11 52 152 39 1,509 670 4,933 8,788 1,023 1,254 678 763 832 52 64 330 18,872 8,065 1,988 1,396 871 73 2,760 424 1,127 311 1,592 1,248 60 2,422 1,482 1,659 399 196 409 179 1,566 132 698 235 2,996 793 263 963 1,098 291 20,737 909 6,559 1,790 111 1,754 363 304 136 89 167 652 610 55 932 373390 SL- Fixtures Overhead 687 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 2,216 15,331 14,395 3,169 3,448 2,522 905 1,348 553 5,698 370 189,140 4,710 13,378 2,641 2,213 6,289 35,736 2,779 3,843 1,745 339 467 1,061 40,894 3,108 162,554 14,739 7,321 17,015 16,829 5,443 2,779 14,523 8,675 4,974 3,304 4,674 36,334 4,546 (393) 2,656 11,360 5,642 2,428 3,268 7,182 1,021 119,037 6,689 450 1,529 4,238 10,978 (1,781) 9,898 1,178 183 4,879 4,146 9,749 520 14,692 24,376 2,992 2,741 1,192 2,974 496 524 1,825 18,162 21,459 9,228 4,113 4,756 991 351 5,845 576 2,901 423 3,239 2,139 138 5,811 3,308 2,590 626 108 7,783 1,153 2,547 3,089 9,169 2,086 8,464 55,464 4,692 11,405 5,817 840 11,167 2,984 7,039
  10. Page 34 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 34 of 104 Work Order Number Description 80265988 MPB; 8 FIRE HILL RD, REDDING - SHIF 80266014 CAR VS POLE 2.13.23c WTBS 6/20 9A 80266098 2022 Circuit Patrol Finding 31C1 Wa 80266116 *D&D*Frontier Pole Inspection Pole 80266150 *D&D*Frontier Inspection Pole Shift 80266152 *D&D*Frontier Pole Inspection Pole 80266161 JFM-JJH Northwest Dr P 11875 Inst 80266163 *D&D* CD02449 Frontier Pole Inspect 80266174 *D&D*Frontier Inspection Pole Shift 80266208 DG UPGRADE 30 FOX RUN RD - NORWALK 80266214 *D&D*Frontier Inspection Pole Shift 80266231 *ASP* CD02449 Frontier Reject Repla 80266235 *D&D* CD02449 Frontier Inspection P 80266237 APPT 3/10 AP- 15 Sylvan Ave, Unionv 80266261 *D&D* CD02449 Frontier Inspection P 80266262 GDK AVON, 27 JACKSON ST, OH TO DB S 80266267 *D&D* CD02449 Frontier Reject Repla 80266284 *D&D*Frontier Pole Inspection Pole 80266286 *D&D*CD02449 Frontier Reject Replac 80266294 *D&D*Frontier Pole Inspection Pole 80266375 21 HARTFORD TPKE., VERNON (KEY HYUN 80266398 7/13 PD REPORT UPLOADED...VC - 9A 80266476 CD01814-03 - 24R Substation Recover 80266564 MM 81 Barber Rd Sterling new pole # 80266594 *D&D* CD02449 Frontier Pole Inspect 80266638 *D&D* CD02449 Frontier Pole Inspect 80266639 *D&D*Frontier Pole Inspection Pole 80266640 *D&D*Frontier Pole Inspection Pole 80266641 *D&D* CD02449 Frontier Pole Inspect 80266682 *D&D* BD - Conv. 1279578 - Make Rea 80266848 NEW-BF-8/13/24---NORTH STONINGTON, 80266851 *D&D* CD02449 Frontier Pole Inspect 80266885 WTG FOR PD RPT 2/26/25 (TH) 2/25/25 80266919 *D&D* Frontier Pole Inspection Pole 80266967 *D&D*Frontier Inspection Pole Shift 80266986 *D&D* CD02449 Frontier Inspection P 80266993 *D&D* CD02449 Frontier Inspection P 80266994 *ASP* Frontier Pole Inspection Pole 80267001 *D&D* Frontier Pole Inspection Pole 80267005 Repl Rotten Pole 5003 - Cust Conc 80267015 *D&D* CD02449 Frontier Inspection P 80267021 *ASP* Frontier Pole Inspection Pole 80267024 *ASP* Frontier Pole Inspection Pole 80267028 *D&D*Frontier Inspection Pole Shift 80267031 *ASP* Frontier Pole Inspection Pole 80267051 JD; 9A - 1538 LONG RIDGE RD-FOIA lt 80267149 BC - CD02453 - OH Temp Install for 80267315 *AWC* CD02449 Frontier Reject Repla 80267325 *ASP* Frontier Pole Inspection Pole 80267329 DONE EVW - 240 Canaan Rd, Salisbury 80267335 *D&D*Frontier Pole Inspection Pole 80267338 WRTN--JK> CD02244 - POLE 105-FTR RE 80267357 PRINT EVW - 250 Canaan Rd, Salisbur 80267390 *ASP* Frontier Inspection Pole Shif 80267393 *ASP* Frontier Pole Inspection Pole 80267611 *ASP* Frontier Inspection Pole Shif 80267634 *ASP* CD02444 Pole Integrity Replac 80267638 *ASP* Frontier Inspection Pole Shif 80267690 *ASP* Frontier Pole Inspection Pole 80267691 *ASP* Frontier Pole Inspection Pole 80267722 PRINT EVW - Long Pond Rd, Salisbury 80267749 WM; NEW MILFORD, BOXWOOD, 5, GARY C 80267759 WRTN COMPLETE 158 E HADDAM COLCHEST 80267767 2/27/25 - 9A - FARMHOLME RD STONING 80267770 *ASP* CD02449 Frontier Reject Repla 80267815 AJC 90 HARDING RD GRN INST 3 PH RIS 80268012 AP- 1577 New Britain Ave, Farmingto 80268015 *ESCALATED/URGENT* Rep Xarms and in 80268030 *ASP* Frontier Pole Inspection Pole 80268031 PRINT EVW - Main St, Salisbury P#18 80268038 INDIANTWON RD, P#2013 LEDYARD // RE 80268045 MG-P#496/496S- S CANTERBURY( 331) R 80268047 *ASP* Frontier Pole Inspection Pole 80268055 *ASP* Frontier Pole Inspection Pole 80268066 *ASP* Frontier Pole Inspection Pole 80268117 MATERIAL *D&D* HULLS HILL RD SOUTHB 80268308 WRTN COMPLETE 9A* : CHESTNUT HILL( 80268311 MAR - 126 Ward St, Naugatuck CT // 80268343 APPT 6/3 AP- 5 Lakeview Dr, Farming 80268353 Replace Pole 109 (GP) ROW_ 191 S WI 80268520 *ASP* ML - Conv. 1762450 - Make Rea 80268550 NEW GC STONINGTON, WOLCOTT, 53, SHA 80268693 1/18 *LINE WORK COMP* 15 DAY DUE 1/ 80268816 Done EVW - Lucas Rd, Sharon P#595 F 80268832 PRINT EVW - Sharon Rd, Salisbury P# 80268850 9A CAR VS POLE-APPROVED 9/16/26 80268861 MDB - 9A - 336 QUASSAPAUG RD, WOODB 80269003 Cust Appt 4/3/25 CC; NEWTOWN, ECHO 80269024 JFM-JJH Scott Swamp Rd P7270 Inst C 80269038 2/28/25-WTG FOR PD REPORT (RR) 2/27 80269060 PRINT CRP-55 Glendale AVE WIN. shif 80269169 JRP - Taunton St SOG P#92437 Repl P 80269173 AE/JLB 7 SHERRY LN DARIEN P3253 NEE 80269279 *material* RM, 15 SLUMBER CORNERS 80269490 9A CAR VS POLE 22301 - APPROVED 10/ 80269492 JFM-POST CNSTR-WTG FOR PD RPRT (RR) 80269494 *WORK COMP* MM - 109 BENEDICT HILL 80269501 REPLACE POLE 5767, BRANFORD 80269516 JSG - 3/1 RSO [BEACH] - SANDY BROOK 80269517 03/02/25 - 9A - Simpson Lane Montvi 80269539 *FIELD CHECK* 9A* 3/1 - RSO - nori 80269570 *D&D*JS - Conv. 1274094 - Make Read 80269584 Chapel St, Enfield BBA P-3229. Set 80269615 9A - 3/3 - RSO - GRANDVIEW( 111) TE 80269687 STONINGTON, STONINGTON, 829, Hardie in-service date work order type 5/30/2023 11 Elect Annual Proj - DESG CT 3/1/2023 11 Damage Claims OH 6/30/2022 11 Elect Annual Proj - DESG CT 5/12/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 4/14/2025 11 Elect Annual Proj - DESG CT 4/28/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 6/5/2025 11 Elect Annual Proj - DESG CT 4/23/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/2/2025 11 Corrective Maint OH Svc 4/28/2025 11 Dist Capital or Expense 8/7/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 5/8/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 4/25/2025 11 Elect Annual Proj - DESG CT 11/2/2022 11 Elect Annual Proj - DESG CT 7/26/2022 11 Damage Claims OH 12/17/2025 11 Dist Capital or Expense 11/15/2022 11 Elect Annual Proj - DESG CT 4/28/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 1/19/2023 11 Dist Capital or Expense 6/23/2025 11 Elect Annual Proj - DESG CT 5/8/2025 11 Dist Capital or Expense 2/27/2025 11 Dist Capital or Expense 4/21/2025 11 Dist Capital or Expense 5/8/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 4/30/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 7/10/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 2/28/2025 11 Damage Claims OH 3/18/2025 11 Asset Mgmt - Specific DESG CT 10/17/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 4/11/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 9/18/2025 11 Private Work - No Co Asset 3/4/2025 11 Dist Capital or Expense 3/21/2025 11 Dist Capital or Expense 7/10/2025 11 Dist Capital or Expense 3/13/2025 11 Dist Capital or Expense 6/6/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 3/3/2025 11 Dist Capital or Expense 3/18/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 5/15/2024 11 Elect Annual Proj - DESG CT 3/25/2025 11 Dist Capital or Expense 6/10/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 4/2/2025 11 Dist Capital or Expense 3/3/2025 11 Dist Capital or Expense 3/31/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 10/5/2022 11 Elect Annual Proj - DESG CT 3/4/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 6/3/2025 11 Corrective Maint UG Svc 4/17/2025 11 Dist Capital or Expense 11/28/2025 11 Dist Capital or Expense 11/9/2022 11 Elect Annual Proj - DESG CT 1/19/2023 11 Elect Annual Proj - DESG CT 4/9/2025 11 Dist Capital or Expense 5/28/2025 11 Dist Capital or Expense 3/11/2025 11 Damage Claims OH 3/10/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 5/29/2025 11 Elect Annual Proj - DESG CT 3/3/2025 11 Dist Capital or Expense 6/24/2025 11 Dist Capital or Expense 3/11/2025 11 Dist Capital or Expense 3/14/2025 11 Dist Capital or Expense 7/18/2025 11 Dist Capital or Expense 3/5/2025 11 Damage Claims OH 3/8/2025 11 Dist Capital or Expense 3/24/2025 11 Elect Annual Proj - DESG CT 5/22/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 3/6/2025 11 Elect Annual Proj - DESG CT 4/11/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 3/29/2025 11 Damage Claims OH 10/20/2025 11 Damage Claims OH 10/22/2025 11 Corrective Maint UG Svc Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 1,732 295 12,039 633 551 193 29 656 241 462 209 2,132 849 2,531 80 705 143 73 2,040 2,418 4,084 5,603 160,267 1,093 354 157 208 882 498 (13) 1,678 301 3,918 162 1,685 78 102 200 965 1,217 112 1,175 1,208 247 985 1,091 91,259 389 3,025 604 466 6,934 1,086 463 1,341 303 8,200 635 916 2,266 2,139 9,741 214 19,670 1,335 696 5,646 11,323 2,081 568 10,660 2,122 933 1,627 195 6,307 441 1,129 2,549 16,903 14,158 6,542 4,208 808 1,233 4,011 10,571 3,942 3,902 18,918 103 1,665 1,612 3,517 9,140 149 14,169 4,722 271 5,122 871 126 15,630 1,491 3,659 365000 Overhead Conductors, Device 1,519 36 7,211 2,356 1,591 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 108 1,699 107 289 902 581 274 109 837 223 938 174 283 3,056 1,626 976 689 128,676 1,583 835 438 578 915 604 13 9,476 1,085 1,162 2,156 1,636 168 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 72 180 327 1,019 1 3,489 1,696 29 57 8,709 378 1,839 282 270 558 2,312 290 254 311 2,187 1,448 299 161 1,036 177,516 173 123 1,569 1,088 376 100,626 1,779 528 661 572 2,868 2,552 2,513 331 1,559 2,402 23 4,070 521 3,692 4,590 17,572 132 202 6,156 401 481 209 1,413 122 1,432 840 1,061 498 3,389 421 2,209 1,766 2,215 250 1,574 2,103 3,400 6,940 1,196 300 1,198 2,655 40 2,903 114 122 793 4,353 2,069 2,026 418 829 720 66 974 340 610 947 521 203 4,147 104,586 470 180 979 854 11,276 2,339 622 1,296 903 16 1,041 1,207 24,788 247 136 1 422 295 2,419 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 3,359 331 19,250 2,989 2,142 193 1,728 763 530 1,436 790 2,406 958 3,875 303 2,662 317 357 5,096 4,044 5,118 6,292 302,837 3,084 1,189 595 786 1,797 1,101 12,993 1,667 5,640 2,318 3,321 246 102 758 3,530 1,217 423 3,485 2,655 545 1,147 2,127 270,343 562 3,025 1,691 842 132,387 2,866 991 2,003 875 13,971 3,301 3,550 2,597 3,698 15,005 237 23,740 1,855 11,185 10,237 28,894 2,213 770 16,816 2,522 1,414 1,837 1,607 6,429 2,703 3,662 4,017 17,400 18,157 7,911 7,140 2,574 3,448 4,261 12,145 10,192 111,887 26,328 1,300 2,441 2,810 9,571 9,140 1,003 25,445 7,309 893 6,555 1,774 142 15,630 2,532 5,289

Text of NECTA-119 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-121_Final.pdf

Extracted from the file · 1 page · 1,602 characters

Words on different pagesRead the text of NECTA-121_Final.pdf

Text of NECTA-124_Final.pdf

Extracted from the file · 2 pages · 2,271 characters

Words on different pagesRead the text of NECTA-124_Final.pdf

Text of NECTA-125_Final.pdf

Extracted from the file · 2 pages · 2,741 characters

Words on different pagesRead the text of NECTA-125_Final.pdf

As listed on the current system

Question(s) Answered 116, 117, 118, 119, 121, 124, 125 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)