Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 116, 117, 118, 119, 121, 124, 125

Files17

Search terms highlighted
Eversource rate increase is on 4 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
3 pages match
Words on different pages
Words on different pages

Text of NECTA-117_Final.pdf

Extracted from the file · 1 page · 1,566 characters

Text of NECTA-117 Attachment 1.pdf

Extracted from the file · 1 page · 619 characters

Text of NECTA-117 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118_Final.pdf

Extracted from the file · 2 pages · 4,116 characters

Words on different pagesRead the text of NECTA-118_Final.pdf

Text of NECTA-118 Attachment 1.pdf

Extracted from the file · 1 page · 7,949 characters

Text of NECTA-118 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118 Attachment 2 .pdf

Extracted from the file · 1 page · 592 characters

Text of NECTA-118 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-119_Final.pdf

Extracted from the file · 2 pages · 6,071 characters

Words on different pagesRead the text of NECTA-119_Final.pdf
Words on different pages
  1. Page 31 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 31 of 104 Work Order Number Description 80256505 CAR VS POLE APPROVED 4/16 80256524 * COMP* 9A CAR VS POLE/TURNOVER1 TO 80256535 WTG FOR PD RPT 8/20/25 (TH) 9A - CA 80256554 JMS- BLOOMFIELD, 40R JUNIPER RD 80256563 9A- TRUCK VS POLE- APPROVED 11/14 80256578 9A - LD - 58 COOK RD, PROSPECT - (F 80256603 *ASP* CD02444 Pole Integrity Replac 80256628 MANCHESTER, 75 BUCKLAND, Pole#7, Re 80256670 *ASP* CD02444 Pole Integrity Replac 80256685 AE/TC 27 PERKINS RD, GRN: P#84237 I 80256700 *D&D*Frontier Inspection Pole Shift 80256709 *D&D*Frontier Inspection Pole Shift 80256715 *ASP* Frontier Inspection Pole Shif 80256719 *ASP* Frontier Inspection Pole Shif 80256722 *D&D* BD - Conv. 1662299 - Make Rea 80256723 *ASP* CD02444 Pole Integrity Replac 80256726 *ASP* CD02444 Pole Integrity Replac 80256810 *D&D* Frontier Pole Inspection Pole 80256815 *D&D* Frontier Pole Inspection Pole 80256826 NONBILLABLE (TH) 9A - CAR VS POLE 4 80256829 JLB 410 HOLLOW TREE RIDGE RD DARIEN 80256831 02/08/25 Gallup Hill (95) Rd Ledyar 80256839 2/8 GREEN (20) LN 2933, NORTH WIN 80256843 mcb - WTG FOR PD RPT 2/12/25 (TH) 2 80256918 *RSO*DL; Infrared Survey Emergency 80256954 *D&D* FA - Conv. 1657254 - Make Rea 80256955 *D&D* FA - Conv. 1657254 - Make Rea 80256995 *ASP* Frontier Inspection Pole Shif 80257055 P LEBANON, GATES, 160, SHANE BISHOP 80257066 *EH AWC* CD02444 Pole Integrity Rep 80257076 *ASP* Frontier Inspection Pole Shif 80257079 AP- 1 Veterans Dr, New Britain- P# 80257085 *EH AWC* CD02444 Pole Integrity Rep 80257109 *D&D* Frontier Pole Inspection Pole 80257124 AMM-Alling St BER P48650 - 9a Post 80257128 *TOR*CD02444 Pole Integrity Replace 80257184 FCOMP 1.9 Needs be written all work 80257408 DJM. 48 TREADWELL AVE WESTPORT. OH 80257426 ORDER PD REP 9A CAR VS POLE/TURNOVE 80257429 *D&D*Frontier Pole Inspection Pole 80257454 *ASP* Frontier Inspection Pole Shif 80257468 *ASP* Frontier Pole Inspection Pole 80257470 (cp) ZK - HTFD (Broken Pole) - 74 M 80257496 *D&D*Frontier Pole Inspection Pole 80257503 *NL AWC* CD02444 Pole Integrity Rep 80257512 *EH AWC* CD02444 Pole Integrity Rep 80257514 *NL AWC* CD02444 Pole Integrity Rep 80257518 *ASP* Frontier Pole Inspection Pole 80257519 *ASP* Frontier Pole Inspection Pole 80257539 *D&D*Frontier Pole Inspection Pole 80257675 STORRS, VALLEY VIEW DRIVE, 8, repla 80257693 MG-P#635-TOLERATION ROAD SCOTLAND-R 80257713 15dd 4/24 *MLC* AP- 1 Veterans Dr, 80257725 JFM-*POST CNSTR* 9A 02/09/25 -676 S 80257738 *ASP* Frontier Inspection Pole Shif 80257764 *ASP* Frontier Inspection Pole Shif 80257789 *ASP* Frontier Inspection Pole Shif 80257797 *D&D* Frontier Pole Inspection Pole 80257798 *NL AWC* CD02444 Pole Integrity Rep 80257814 CD02444 Pole Integrity Replacement 80257824 *TOR*CD02444 Pole Integrity Replace 80257828 CD02444 Pole Integrity Replacement 80257836 *NL AWC* CD02444 Pole Integrity Rep 80257837 *NL AWC* CD02444 Pole Integrity Rep 80257894 6/6 (23) written POND WAY WINDHAM 80257920 DJM. 19 CRESCENT RD WESTPORT. OH TO 80258089 PD-42 FOG PLAIN RD WTFD/UPGRADE OH 80258111 CD02444 Pole Integrity Replacement 80258116 *EH AWC* CD02444 Pole Integrity Rep 80258117 *ASP* Frontier Pole Inspection Pole 80258119 *NL AWC* CD02444 Pole Integrity Rep 80258121 *NL AWC* CD02444 Pole Integrity Rep 80258125 *COMP* Frontier Pole Inspection Pol 80258127 CD02444 Pole Integrity Replacement 80258138 CD02444 Pole Integrity Replacement 80258142 *D&D*Frontier Pole Inspection Pole 80258169 CD02444 Pole Integrity Replacement 80258177 *D&D*Frontier Pole Inspection Pole 80258178 *ASP* Frontier Inspection Pole Shif 80258182 *NL AWC* CD02444 Pole Integrity Rep 80258191 *D&D* KG Conv#1670183-RegularMakeRe 80258193 RM, 108 GODFREY RD W -WESTON !! CU 80258206 MM pole #783 River Rd Lisbon Fronti 80258488 *ASP* Frontier Inspection Pole Shif 80258489 *D&D* Frontier Pole Inspection Pole 80258519 *D&D*Frontier Pole Inspection Pole 80258526 *ASP* Frontier Inspection Pole Shif 80258530 *EH AWC* CD02444 Pole Integrity Rep 80258544 *TOR*CD02444 Pole Integrity Replace 80258551 TL - JOHNNY CAKE HILL RD, #43 OLD L 80258581 CD02444 Pole Integrity Replacement 80258583 *NL AWC* CD02444 Pole Integrity Rep 80258592 *NL AWC* CD02444 Pole Integrity Rep 80258593 *TOR*CD02444 Pole Integrity Replace 80258656 *D&D*Frontier Pole Inspection Pole 80258692 LD- 2 OAKRIDGE RD, BRISTOL - P761580258730 NM; RIVERBANK RD, STAMFORD; P#16872 80258800 JRP - 186 Aircraft Rd SOG Set 35' X 80258889 MAT-ASP-6/6/22 17 LEWIS RD BRISTOL 80258902 LEBANON, pic BABCOCK HILL, 250, Wil 80258909 9A - 2/12 - RSO - lefebvre - CHURCH 80258915 MCB -9A TURNOVER REIDVILLE ( 106) D 80258923 9A - LD - 48 MIDWOOD AVE, WOLCOTT 80258940 9A - CAR VS POLE 1294 80258971 MPB; 310 ROXBURY RD, SOUTHBURY - ES in-service date work order type 2/26/2025 11 Damage Claims OH 3/13/2025 11 Damage Claims OH 8/26/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 7/7/2025 11 Damage Claims OH 3/3/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 8/7/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 5/29/2025 11 Corrective Maint UG Svc 3/20/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 10/13/2025 11 Dist Capital or Expense 12/3/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 3/23/2025 11 Dist Capital or Expense 7/18/2025 11 Dist Capital or Expense 3/7/2025 11 Damage Claims OH 2/14/2025 11 Dist Capital or Expense 3/6/2025 11 Dist Capital or Expense 3/10/2025 11 Elect Annual Proj - DESG CT 2/14/2025 11 Dist Capital or Expense 2/24/2025 11 Dist Capital or Expense 11/28/2025 11 Dist Capital or Expense 11/28/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 4/10/2025 11 Elect Annual Proj - DESG CT 10/29/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 4/21/2025 11 Dist Capital or Expense 11/14/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 3/18/2025 11 Damage Claims OH 6/17/2025 11 Dist Capital or Expense 11/4/2022 11 Damage Claims OH 12/5/2022 11 Asset Mgmt - Specific DESG CT 3/13/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 8/27/2025 11 Dist Capital or Expense 8/13/2025 11 Elect Annual Proj - DESG CT 3/17/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 5/7/2025 11 Corrective Maint UG Svc 6/10/2025 11 Dist Capital or Expense 4/9/2025 11 Temporary Work DESG CT 2/14/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 7/9/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 8/14/2025 11 Elect Annual Proj - DESG CT 9/29/2025 11 Dist Capital or Expense 8/6/2025 11 Elect Annual Proj - DESG CT 8/26/2025 11 Dist Capital or Expense 2/17/2023 11 Elect Annual Proj - DESG CT 10/11/2022 11 Asset Mgmt - Specific DESG CT 6/29/2022 11 Elect Annual Proj - DESG CT 9/30/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 8/7/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 8/6/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 8/25/2025 11 Dist Capital or Expense 4/7/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 8/14/2025 11 Elect Annual Proj - DESG CT 10/13/2025 11 Dist Capital or Expense 3/11/2025 11 Dist Capital or Expense 11/14/2022 11 Elect Annual Proj - DESG CT 5/13/2025 11 Dist Capital or Expense 2/26/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 8/29/2025 11 Dist Capital or Expense 8/11/2025 11 Dist Capital or Expense 5/7/2025 11 Corrective Maint UG Svc 11/4/2025 11 Dist Capital or Expense 9/5/2025 11 Dist Capital or Expense 8/6/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 2/25/2025 11 Elect Annual Proj - DESG CT 12/14/2022 11 Elect Annual Proj - DESG CT 11/21/2022 11 Asset Mgmt - Specific DESG CT 5/12/2023 11 Elect Annual Proj - DESG CT 1/2/2024 11 Elect Annual Proj - DESG CT 3/17/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 2/21/2025 11 Dist Capital or Expense 2/26/2025 11 Damage Claims OH 4/25/2025 11 Dist Capital or Expense Subsequent Close Date 8/26/2026 2/13/2026 1/22/2026 9/16/2026 1/22/2026 9/16/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 7/17/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 7/17/2026 1/22/2026 364310 Poles and Appurtenance 36,175 10,317 7,496 2,106 3,035 335 4,554 480 7,435 (177) 302 43 1,844 845 (935) 6,447 2,891 1,291 698 4,064 1,455 85 8,691 2,447 464 8,818 274 3,481 948 4,992 865 4,415 9,196 548 12,803 4,002 793 1,938 13,896 740 1,443 1,102 1,152 362 6,191 7,019 5,610 1,778 605 74 2,915 2,997 (549) 1,349 319 899 1,804 1,786 4,712 7,138 5,293 8,663 6,045 3,925 (195) 3,289 1,336 6,090 8,782 2,378 2,948 2,891 78 3,225 7,803 892 4,120 1,277 186 6,479 (731) 916 982 851 3,011 593 223 5,661 3,934 1,358 4,135 4,209 3,738 163 106 459 1,782 1,602 4,813 5,277 11,809 12,317 977 3,133 10,041 365000 Overhead Conductors, Device 5,008 3,209 5,094 1,270 779 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 193 2,630 2,438 2,874 1,445 (13) 2,187 119 259 92 (2,406) 1,632 13,149 16 324 107 7,849 572 (66) 785 1,926 892 168 1,945 204 711 1,192 1,045 70 447 2,060 2,641 2,406 555 840 545 1,919 967 283 231 78 180 120 646 1,363 2,613 3,069 1,271 146 1,098 1,031 1,765 1,685 3,483 84 99 589 (388) 235 1,222 1,959 195 700 3,146 553 (60) (67) 93 179 807 1,490 2,135 1,342 5,110 1,070 322 5,373 204 1,242 242 146 3,843 1,160 1,351 4,904 (501) 74 1,214 1,024 2,110 1,707 797 202 456 133 368 2,470 1,879 61 185 351 1,463 72 3,642 1,637 1,297 13,105 1,227 538 32 147,278 275 18,191 535 50 1,280 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 41,183 13,720 12,590 19,494 3,814 335 7,099 11,775 8,880 (256) 2,488 162 2,103 937 (3,341) 8,864 2,891 1,291 2,829 4,957 1,623 2,030 8,691 3,158 1,656 10,121 344 3,928 3,008 7,633 3,391 4,970 10,037 1,093 14,722 4,969 1,076 2,815 13,896 3,374 4,202 4,171 1,152 1,460 7,222 8,784 7,295 5,261 689 74 3,568 3,586 (1,063) 1,583 1,541 2,951 1,999 2,665 7,858 7,138 6,100 10,153 8,179 5,267 4,914 4,358 1,336 6,412 14,155 2,582 4,190 2,891 320 3,225 7,803 1,037 7,963 2,437 1,538 11,383 (1,231) 990 2,936 1,875 5,576 2,434 1,020 5,661 3,934 2,033 4,135 6,680 5,617 225 292 810 168,714 2,208 4,813 10,249 13,447 13,614 14,082 3,133 11,269
  2. Page 32 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 32 of 104 Work Order Number Description 80258990 *NL AWC* CD02444 Pole Integrity Rep 80258996 CD02444 Pole Integrity Replacement 80259075 15 DAY DUE 10/24 Jpt-29 Main St Far 80259146 JDB 9A - POVERTY HOLLOW RD, 2424, 80259148 2/27/25-NON-BILLABLE 9A - WHIPSTIC 80259156 *TOR*CD02444 Pole Integrity Replace 80259162 *NL AWC* CD02444 Pole Integrity Rep 80259177 CD02444 Pole Integrity Replacement 80259186 *NL AWC* CD02444 Pole Integrity Rep 80259189 CD02444 Pole Integrity Replacement 80259195 CD02444 Pole Integrity Replacement 80259199 *NL AWC* CD02444 Pole Integrity Rep 80259203 JD; 179 HUNTING RIDGE RD STAMFORD; 80259204 *NL AWC* CD02444 Pole Integrity Rep 80259217 CD02444 Pole Integrity Replacement 80259221 *NL AWC* CD02444 Pole Integrity Rep 80259228 CD02444 Pole Integrity Replacement 80259231 *D&D*Frontier Pole Inspection Pole 80259233 CD02444 Pole Integrity Replacement 80259252 *NL AWC* CD02444 Pole Integrity Rep 80259269 *D&D*Frontier Pole Inspection Pole 80259289 *NL AWC* CD02444 Pole Integrity Rep 80259290 WO 19869545, DG UPGRADE FOR PAWCATU 80259310 NORTH STONINGTON, REUTEMANN, 54, Em 80259313 *NL AWC* CD02444 Pole Integrity Rep 80259319 78 RIPLEY HILL RD., COVENTRY (HIGH 80259329 *TOR*CD02444 Pole Integrity Replace 80259355 DG P#2564 WILSONVILLE RD THOMPSON F 80259373 PD REPORT UPLOADED ON 6/27/2022 JDB 80259506 SERV COMPLETED CP-175 Case st CTN, 80259533 CD02444 Pole Integrity Replacement 80259566 *NL AWC* CD02444 Pole Integrity Rep 80259579 CD02444 Pole Integrity Replacement 80259612 *NL AWC* CD02444 Pole Integrity Rep 80259620 *NL AWC* CD02444 Pole Integrity Rep 80259657 HOLD FOR PAD 6/27 JFC - SHARON, VAN 80259693 MATERIAL *D&D* HIGHLAND AVE, BETHEL 80259723 6/8 all work completed by asplundh 80259909 9A - CAR VS POLE - APPROVED 10/31/2 80259948 *POST CONST* AP- 123 Old Mountain R 80259962 *NL AWC* CD02444 Pole Integrity Rep 80259970 *NL AWC* CD02444 Pole Integrity Rep 80259972 9A - CAR VS POLE - APPROVED 12/9 80259979 *D&D* ML - Conv. 1739846 - Make Rea 80260006 written broken pole 06/09 *TURNOVER 80260018 BRANFORD, 101 n branford rd/3ph ban 80260060 MATERIAL *D&D*DODGINGTOWN RD, BETHE 80260099 SC-392 STARKWEATHER RD PLAINFIELD I 80260128 JRP - Lavender Ln SOG Line Extensio 80260219 *NL AWC* CD02444 Pole Integrity Rep 80260243 WRTN - DM - 20 E HIGH ST - EHAMP 80260247 *NL AWC* CD02444 Pole Integrity Rep 80260263 JFM-57 OLD WATERBURY RD (P#606) DG 80260265 *NL AWC* CD02444 Pole Integrity Rep 80260266 TURNOVER*** MIDDLE RIVER( 1 80260296 *NL AWC* CD02444 Pole Integrity Rep 80260376 PD-303 COSSADUCK HILL RD N. STON/NE 80260432 *NL AWC* CD02444 Pole Integrity Rep 80260435 CRP -11/09-AWC-CENTER HILL( 6) RD F 80260448 37 CAMPBELL AVE., VERNON - NEW DOT 80260508 OLD SAYBROOK, BOSTON POST, 336/DB P 80260516 CD02444 Pole Integrity Replacement 80260519 P297 Palmertown Rd, Montville - Rep 80260526 DONE PRINT CRP-44 Scoville Hill rd 80260541 CD02444 Pole Integrity Replacement 80260545 01/30/25, RSO, JK>POLE 886--TREE V 80260550 2/13/25 CAR VS POLE- APPROVED 4/23/ 80260560 RC INSTALL NEW POLE 38100 & REPLACE 80260569 CD02444 Pole Integrity Replacement 80260573 CD02444 Pole Integrity Replacement 80260599 *ASP* ML - Conv. 1730511 - Make Rea 80260659 OAKDALE, ROUTE 163, 1580, Mike Dani 80260664 DONE PRINT BJQ, LTCH, P #531 (84) C 80260667 JMS- WEST HARTFORD, 1700 ASYLUM AVE 80260742 2/14/25 TURNOVER E # 5588056- ROOSE 80260752 * LD- 833 BEE ST, MERIDEN - (FRNT) 80260760 CD02444 Pole Integrity Replacement 80260786 AMM-639 Reservoir Rd CHE (Frnt)P359 80260796 CD02444 Pole Integrity Replacement 80260797 WO 19828408, DG UPGRADE FOR GALES F 80260869 CD02444 Pole Integrity Replacement 80260896 DONE PRINT CRP - 11/24 [BEACHJE] 80260954 WRTN - DM - RAYMOND RD GLASTONBURY 80260978 *TOR*CD02444 Pole Integrity Replace 80260980 *TORRINGTON AWC*CD02444 Pole Integr 80261001 Higgins Highway 32, Mansfield. INT80261032 (RR) 2/14/25 9A TURNOVER STILLSON ( 80261038 MAR - 2/15/25 TURNOVER/9A CAR VS FR 80261042 9A - CAR VS POLE 5866 - APPROVED 4/ 80261046 JMS-FCOMP 02/26 - 9A - 2/16 - RSO 80261049 (RN) WTG PD RPT / 2/16/25 9A W KIN 80261053 DGP#D121 THOMPSON HILL RD THOMPSON 80261056 02/15/25 - 9A - COLONEL LEDYARD (39 80261057 9A - Car vs Frontier pole- APPROVED 80261070 9A - Car vs Pole - 07/28 still wait 80261114 253 BAYBERRY LN, WESTPORT CT 80261116 CAR VS POLE 1359S- APPROVED 8/4/26 80261118 *TOR*CD02444 Pole Integrity Replace 80261119 *TOR*CD02444 Pole Integrity Replace 80261120 *TOR*CD02444 Pole Integrity Replace 80261124 *TOR*CD02444 Pole Integrity Replace 80261138 NEEDS MATERLIAL CHARGED-- WEST RD S 80261151 02/17/25, RSO, JK>POLE 1016-1018--T 80261243 written (complete??) 6/12 - TURNOVE 80261276 TL - W MYSTIC AVE, #27B MYSTIC [GRO in-service date work order type 8/19/2025 11 Elect Annual Proj - DESG CT 9/10/2025 11 Dist Capital or Expense 10/13/2022 11 Asset Mgmt - Specific DESG CT 7/22/2025 11 Damage Claims OH 2/28/2025 11 Damage Claims OH 9/8/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 11/21/2025 11 Dist Capital or Expense 7/30/2025 11 Dist Capital or Expense 8/18/2025 11 Elect Annual Proj - DESG CT 9/17/2025 11 Dist Capital or Expense 8/29/2025 11 Dist Capital or Expense 4/22/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 9/4/2025 11 Dist Capital or Expense 8/15/2025 11 Elect Annual Proj - DESG CT 11/19/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 11/29/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 3/12/2025 11 Dist Capital or Expense 8/7/2025 11 Dist Capital or Expense 4/8/2025 11 Elect Annual Proj - DESG CT 7/31/2025 11 Dist Capital or Expense 10/23/2025 11 Dist Capital or Expense 10/21/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 10/21/2022 11 Elect Annual Proj - DESG CT 8/2/2022 11 Damage Claims OH 9/5/2023 11 Asset Mgmt - Specific DESG CT 10/10/2025 11 Dist Capital or Expense 8/12/2025 11 Dist Capital or Expense 9/8/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 7/29/2025 11 Dist Capital or Expense 2/14/2023 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 7/15/2022 11 Elect Annual Proj - DESG CT 2/21/2025 11 Damage Claims OH 3/18/2025 11 Dist Capital or Expense 6/11/2025 11 Elect Annual Proj - DESG CT 8/5/2025 11 Dist Capital or Expense 8/19/2025 11 Damage Claims OH 10/28/2025 11 Dist Capital or Expense 6/22/2022 11 Elect Annual Proj - DESG CT 11/16/2022 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 9/21/2022 11 Elect Annual Proj - DESG CT 4/27/2023 11 Elect Annual Proj - DESG CT 6/11/2025 11 Elect Annual Proj - DESG CT 7/31/2025 11 Corrective Maint UG Svc 6/26/2025 11 Elect Annual Proj - DESG CT 9/23/2025 11 Dist Capital or Expense 6/26/2025 11 Elect Annual Proj - DESG CT 3/4/2025 11 Dist Capital or Expense 8/12/2025 11 Elect Annual Proj - DESG CT 2/2/2023 11 Elect Annual Proj - DESG CT 8/25/2025 11 Dist Capital or Expense 2/14/2025 11 Dist Capital or Expense 12/29/2025 11 Dist Capital or Expense 10/1/2025 11 Dist Capital or Expense 10/3/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 10/3/2025 11 Dist Capital or Expense 2/24/2025 11 Elect Annual Proj - DESG CT 3/17/2025 11 Damage Claims OH 4/29/2025 11 Elect Annual Proj - DESG CT 10/1/2025 11 Dist Capital or Expense 9/30/2025 11 Dist Capital or Expense 11/28/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 5/1/2025 11 Temporary Work DESG CT 2/21/2025 11 Elect Annual Proj - DESG CT 3/4/2025 11 Dist Capital or Expense 9/22/2025 11 Dist Capital or Expense 3/18/2025 11 Damage Claims OH 9/15/2025 11 Dist Capital or Expense 3/20/2025 11 Elect Annual Proj - DESG CT 10/24/2025 11 Dist Capital or Expense 2/24/2025 11 Dist Capital or Expense 10/24/2025 11 Dist Capital or Expense 8/29/2025 11 Dist Capital or Expense 6/6/2025 11 Dist Capital or Expense 8/15/2025 11 Elect Annual Proj - DESG CT 2/20/2025 11 Damage Claims OH 2/26/2025 11 Damage Claims OH 2/24/2025 11 Damage Claims OH 3/1/2025 11 Damage Claims OH 2/20/2025 11 Damage Claims OH 2/27/2025 11 Damage Claims OH 3/13/2025 11 Damage Claims OH 2/19/2025 11 Damage Claims OH 8/19/2025 11 Dist Capital or Expense 7/2/2025 11 Dist Capital or Expense 3/20/2025 11 Damage Claims OH 6/17/2025 11 Elect Annual Proj - DESG CT 8/19/2025 11 Dist Capital or Expense 8/19/2025 11 Dist Capital or Expense 7/28/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 2/28/2025 11 Dist Capital or Expense 6/17/2022 11 Damage Claims OH 11/25/2022 11 Elect Annual Proj - DESG CT Subsequent Close Date 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 3/4/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 2/13/2026 8/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 5/15/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 5,483 3,422 130 7,921 1,833 2,545 5,065 4,008 5,203 2,474 3,868 5,337 580 3,721 6,421 4,242 1,469 489 3,299 4,906 195 2,677 2,458 951 9,980 1,239 1,966 527 252 510 3,955 21,158 3,254 4,136 3,757 1,995 3,408 9 10,276 5,467 7,054 6,140 8,957 637 1,373 1,168 3,764 963 3,776 2,388 2,726 8,183 635 10,355 2,507 6,434 3,781 3,898 7,690 758 1,100 10,022 1,039 894 5,041 1,340 3,213 1,543 8,578 3,882 1,049 7,948 277 (739) 26,358 896 4,685 3,491 3,038 1,090 9,591 235 440 2,340 2,761 4,716 3,567 3,173 1,931 6,320 755 14,064 4,694 2,340 1,649 474 974 224 3,707 2,936 2,810 933 568 526 153 365000 Overhead Conductors, Device 727 533 186 1,381 197 970 1,120 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 292 1,907 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 21 429 295 434 2,574 3,507 2,611 92 2,420 1,150 188 1,275 935 7,947 2,723 2,079 331 453 659 8,536 1,146 105 1,936 1,062 42 731 6,772 1,672 1,776 1,774 1,462 1,026 58 2,392 674 10,246 1,607 5,582 319 605 649 1,151 2,212 1,139 3,149 444 5 112 195 4,232 2,900 1,651 1,017 607 3,794 6,306 292 102 332 (526) 405 1,399 914 1,914 2,039 2,249 112 1,284 3,091 88 3,254 1,721 2,697 3,342 3,763 1,805 165 (316) 3,735 389 1,380 12,322 648 430 6,748 226 725 1,872 1,262 4,258 180 905 2,223 3,523 1,388 845 106 382 994 4,012 14,728 1,266 270 632 1,868 332 111 6,022 112 591 (23) (215) 145 399 65 103 458 188 78 32 853 1,398 6,975 6 245 175 527 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 6,209 4,247 2,244 9,301 2,030 3,516 6,185 4,437 5,933 2,474 6,442 5,337 580 7,228 6,421 6,854 1,561 2,909 3,299 6,057 383 3,952 3,723 9,351 13,362 16,066 1,966 1,715 357 3,178 3,955 29,704 4,926 5,912 3,757 14,147 4,434 72 12,668 6,141 7,054 8,352 14,539 956 1,373 1,929 4,915 3,977 12,941 2,388 12,223 9,936 1,984 10,355 1,981 6,839 6,828 3,898 8,603 6,954 21,360 12,271 1,152 2,178 8,132 1,428 6,799 3,376 11,275 7,225 10,834 10,456 442 (1,293) 30,093 1,284 6,065 15,813 3,686 1,666 16,738 461 1,230 2,340 2,761 6,690 4,829 7,431 1,931 6,499 1,661 16,287 8,675 3,916 2,571 580 974 256 4,560 4,334 2,810 7,908 573 771 855
  3. Page 33 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 33 of 104 Work Order Number Description 80261410 Alden ONe Pending #HTFD, HAMILTON S 80261533 GDK FCOMP HAR OH TURNOVER - 2/18 80261587 Sheep Pasture Rd, Madison- Ins Step 80261617 Rplc P 4479, Rplc XFMR, Ins 4/0 AL, 80261629 Abel - GRANBY, HARTLAND, 306, MARIO 80261711 GP - ALL WORK COMPLETE - HAYDEN HIL 80261714 Work Complete 2/16/25-- 120 HOPYAR 80261724 2/17/25-- 16 LYNN DR PRESTON- POLE 80261738 *D&D*Frontier Pole Inspection Pole 80261783 *TOR*CD02444 Pole Integrity Replace 80262015 MAR - Rplc Pole with 40'cl2 & Insta 80262114 MJ -Jpt-151 S Riverside Ave Plymth 80262311 Hebron, Deepwood Dr, shift Frontier 80262470 AMM 924 WEST MAIN, NEW BRITAIN. IN 80262592 IN PROGRESS 2/19/25 - 9A - 91 FLAND 80262603 LD - 107 SUMMER ST, SOUTHINGTON 80262709 AE/DL; 9 INDIAN ROCK LN; GREENWICH; 80262857 TC 107 MYRTLE AVE, STM; P#18156 INS 80262996 *APPRENTICES COMPLETED*2022 Pole In 80263086 *ESCALATED/URGENT* Gilead Rd, Water 80263099 written P2730 Pond Road, Franklin 80263119 DONE PRINT BJQ, LTCH, P #4088 (112) 80263132 DONE PRINT BJQ, GSHN, P #1545 EAST 80263143 DONE PRINT BJQ, LTCH, P #3244 (37) 80263205 DL; 143 SOUND BEACH AVE; NEW 800AMP 80263291 work comp in field - 9A-02/18-RSO-[ 80263295 Preston - install line sensors in v 80263336 BWG-Defect pole replacement P#4428, 80263363 CD02444 Pole Integrity Replacement 80263387 *AWC* CD02444 Pole Integrity Replac 80263414 MG-CALVIN BURNHAM ROAD HAMPTON- POL 80263447 CAR V POLE- NEED PR 2.24.25 80263454 *NL AWC* CD02444 Pole Integrity Rep 80263462 MM 9A 262 Ekonk Hill Rd Sterling P 80263517 *DISTRICT*COMPLETED HEL 2022 Pole I 80263547 *DISTRICT HEL *KTI COMPLETED 2022 P 80263556 *D&D*COMPLETED KTI 2022 Pole Inspec 80263557 *DISTRICT HEL COMPLETED*KTI 2022 Po 80263598 *DISTRICT*KTI 2022 Pole Inspection 80263636 WRTN--JK>POLE 2056--FTR TO REPLACE 80263701 *HAWKEYE* MF P-1378 REPLACE WITH 40 80263737 WRTN NEEDS LINE FOREST( 31) ST -- 4 80263776 DG P#1395 LOT 13A RT 131 THOMPSON C 80263778 CHESHIRE 89 LARCHMONT AVE WTBY - P 80263927 APPT-8/9-GRANBY, SALMON BROOK, 563, 80264014 CHE*AWC* CD02444 Pole Integrity Rep 80264020 CD02444 Pole Integrity Replacement 80264040 9A CAR VS POLE-APPROVED 12/9/25 80264071 *ESCALATED/URGENT* Rep Xarms and in 80264100 *AWC* CD02444 Pole Integrity Replac 80264105 *AWC* LD - 1259 NOTCH RD, CHESHIRE 80264109 CD02444 Pole Integrity Replacement 80264151 CAR VS POLE - NRFN- NONE BILLABLE 80264152 WRTN NEEDS LINE P2322 Amston Road, 80264171 NEW GC STONINGTON, MEADOW, 25, MUIR 80264225 WRTN--JK>REF POLE 1925--INSTALL 45/ 80264340 SC-P#1183 NORTH RD KILLINGLY REPALC 80264344 CRP - TURNOVER - BREEZY HILL RD, C 80264439 *AWC* FA - Conv. 1754790 - Make Rea 80264470 BM, MEADOWBROOK RD,NTN,SHIFT STUB G 80264472 MCB - 126 HOTCHKISS ST WTBY - P 629 80264484 GCC / 25 MEADOW AVE, STONINGTON 80264628 9A - CAR VS POLE 5354 - APPROVED 8/ 80264667 PRINT MDB - WATERTOWN, BUCKINGHAM, 80264706 *AWC* CD02444 Pole Integrity Replac 80264707 DONE PRINT BJQ, MRRS, P #1105 (54) 80264726 9A TRUCK VS WIRES 2/18 - AWC TURNOV 80264733 bm,6/28/24 STORM WORK 34X / MS24G01 80264758 FCOMP (cp) ZK - W HTFD (Resag Pri) 80264830 JMS- WEST HARTFORD POLE 4031 SHIFT 80264831 alden one - Campbell Ave 22, Vernon 80264893 9A - CAR VS POLE - APPROVED 10/9 80264901 Jpt-1730 Perkins St Bristol (Frnt)P 80265050 REPLACE POLE 5341 & REMOVE OPEN WIR 80265078 *D&D* CD02449 Frontier Pole Inspect 80265084 TL - HAMBURG RD, LYME // ***ALL WOR 80265114 *D&D* CDCD02449 Frontier Pole Inspe 80265116 *D&D*Frontier Pole Inspection Pole 80265122 *ASP* CD02449 Frontier Reject Repla 80265128 *D&D*Frontier Pole Inspection Pole 80265132 *D&D*Frontier Pole Inspection Pole 80265153 *D&D*Frontier Inspection Pole Shift 80265175 RM, 6 RICHARDS AVE - NORWALK!! CU 80265182 *D&D* CD02449 Frontier Pole Inspect 80265183 2/24/25- MATHEWSON MILL RD LEDYARD80265191 *D&D* CD02449 Frontier Pole Inspect 80265214 *D&D*Frontier Inspection Pole Shift 80265215 *ASP* CD02449 Frontier Reject Repla 80265228 *D&D* CD02449 Frontier Pole Inspect 80265231 *D&D*Frontier Inspection Pole Shift 80265257 *ASP* CD02449 Frontier Reject Repla 80265459 DONE PRINT BJQ, LTCH, P #1715 (217) 80265461 AE/DL; URBAN ST ; STAMFORD; BROKEN 80265495 Done 2.25.25 CTHP W/# REQ - VR--EVW 80265504 DONE CRP - 2/22 - TORAWC TURNOVER 80265526 CRP - 2/21/25 E3:BEACH:DR:HARWINTON 80265537 RM, CP , 7 Wakerobin Rd -NORWALK 80265586 DG P#1634 30 WALAS RD PLAINFIELD CL 80265628 ACC KTI RC 9A REPLACE POLE A2590. 80265636 done asplundh 8/10 MDB DOT 121-136 80265721 EVW - 36 Sharon Rd, Lakeville P#7 S 80265834 MAR - DG Upgrade Estimate - 36 Knol 80265839 NON BILLABLE 6/19/22 9A TURNOVER 1 80265948 OLD SAYBROOK, 31 MILL ROCK RD E//SH 80265967 ASBUILT BWG- Defect pole replace P# in-service date work order type 5/9/2023 11 Damage Claims OH 3/4/2025 11 Elect Annual Proj - DESG CT 8/13/2025 11 Elect Annual Proj - DESG CT 12/15/2022 11 Asset Mgmt - Specific DESG CT 9/11/2023 11 Asset Mgmt - Specific DESG CT 3/3/2025 11 Dist Capital or Expense 3/26/2025 11 Elect Annual Proj - DESG CT 3/27/2025 11 Elect Annual Proj - DESG CT 3/19/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 5/2/2023 11 Elect Annual Proj - DESG CT 9/21/2022 11 Asset Mgmt - Specific DESG CT 5/28/2025 11 Dist Capital or Expense 6/5/2023 11 Dist Capital or Expense 2/24/2025 11 Damage Claims OH 3/17/2025 11 Dist Capital or Expense 5/6/2025 11 Dist Capital or Expense 5/31/2023 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 3/3/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 2/24/2025 11 Dist Capital or Expense 3/10/2025 11 Dist Capital or Expense 6/7/2023 11 Elect Annual Proj - DESG CT 2/21/2025 11 Dist Capital or Expense 3/6/2025 11 Dist Capital or Expense 4/16/2025 11 Elect Annual Proj - DESG CT 11/21/2025 11 Dist Capital or Expense 11/13/2025 11 Dist Capital or Expense 8/13/2025 11 Dist Capital or Expense 2/21/2025 11 Dist Capital or Expense 8/5/2025 11 Dist Capital or Expense 2/21/2025 11 Dist Capital or Expense 8/25/2022 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 3/3/2023 11 Elect Annual Proj - DESG CT 5/5/2023 11 Elect Annual Proj - DESG CT 9/6/2022 11 Elect Annual Proj - DESG CT 3/14/2025 11 Dist Capital or Expense 11/24/2025 11 Dist Capital or Expense 7/23/2025 11 Elect Annual Proj - DESG CT 10/31/2022 11 Elect Annual Proj - DESG CT 10/17/2025 11 Dist Capital or Expense 11/26/2025 11 Dist Capital or Expense 11/18/2025 11 Damage Claims OH 6/10/2025 11 Dist Capital or Expense 11/21/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 11/14/2025 11 Dist Capital or Expense 3/18/2025 11 Damage Claims OH 5/15/2025 11 Dist Capital or Expense 10/18/2022 11 Elect Annual Proj - DESG CT 8/17/2022 11 Elect Annual Proj - DESG CT 7/1/2022 11 Elect Annual Proj - DESG CT 6/24/2022 11 Elect Annual Proj - DESG CT 4/3/2025 11 Elect Project - DESG CT 3/27/2025 11 Dist Capital or Expense 11/12/2025 11 Dist Capital or Expense 10/20/2022 11 Elect Annual Proj - DESG CT 7/30/2025 11 Damage Claims OH 12/31/2025 11 Dist Capital or Expense 11/29/2025 11 Dist Capital or Expense 3/12/2025 11 Dist Capital or Expense 5/7/2025 11 Damage Claims OH 3/6/2025 11 Corrective Maint OH Lines 3/18/2025 11 Elect Annual Proj - DESG CT 3/12/2025 11 Dist Capital or Expense 4/9/2025 11 Dist Capital or Expense 3/13/2025 11 Damage Claims OH 2/25/2025 11 Dist Capital or Expense 10/21/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 3/15/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 5/8/2025 11 Dist Capital or Expense 4/7/2025 11 Dist Capital or Expense 3/31/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 4/21/2025 11 Dist Capital or Expense 3/14/2025 11 Dist Capital or Expense 3/5/2025 11 Dist Capital or Expense 3/10/2025 11 Elect Annual Proj - DESG CT 3/28/2025 11 Elect Annual Proj - DESG CT 3/13/2025 11 Dist Capital or Expense 9/13/2022 11 Elect Annual Proj - DESG CT 2/15/2023 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 6/28/2022 11 Damage Claims OH 12/8/2022 11 Elect Annual Proj - DESG CT 4/27/2023 11 Damage Claims OH 4/28/2025 11 Dist Capital or Expense 4/18/2025 11 Elect Annual Proj - DESG CT Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/21/2026 9/16/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 9/16/2026 1/22/2026 5/15/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 8/26/2026 1/22/2026 364310 Poles and Appurtenance 1,472 10,849 776 2,640 1,396 969 818 1,309 373 3,869 241 23,442 851 2,914 2,292 1,984 6,223 8,336 2,134 2,060 1,575 212 292 755 (10) 1,243 432 10,840 6,143 8,941 2,613 3,129 2,779 7,936 6,816 3,906 3,304 3,835 36,334 4,397 (196) 2,656 2,110 3,494 807 3,268 6,339 788 41,691 5,963 239 1,529 3,678 7,049 (707) 8,823 1,178 12 4,038 4,146 7,570 520 8,736 14,335 2,992 1,664 232 2,142 444 460 1,087 18,162 2,586 984 559 3,360 120 279 2,953 152 1,774 112 1,647 891 78 3,389 1,128 931 391 108 4,786 360 2,284 2,126 8,071 2,086 8,006 33,939 3,695 4,845 3,417 674 8,481 2,622 6,736 365000 Overhead Conductors, Device 57 4,397 5,807 337 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 85 702 7,110 191 1,991 60 1,554 87 39 180 1,534 111 165,635 3,810 2,924 349 229 65 9,384 645 1,783 170 127 175 307 11,171 1,728 162,122 3,898 1,179 7,019 14,216 2,314 369720 DB/UG Conductors and Devices 295 18 63 49 6,950 590 16,525 1,491 26,624 3,109 137 1,055 6,586 1,859 1,069 839 149 (196) 2,627 1,498 1,408 843 233 77,346 627 212 6,054 651 212 99 559 3,929 (713) 1,074 108 650 569 (53) (307) 11 52 152 39 1,509 670 4,933 8,788 1,023 1,254 678 763 832 52 64 330 18,872 8,065 1,988 1,396 871 73 2,760 424 1,127 311 1,592 1,248 60 2,422 1,482 1,659 399 196 409 179 1,566 132 698 235 2,996 793 263 963 1,098 291 20,737 909 6,559 1,790 111 1,754 363 304 136 89 167 652 610 55 932 373390 SL- Fixtures Overhead 687 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 2,216 15,331 14,395 3,169 3,448 2,522 905 1,348 553 5,698 370 189,140 4,710 13,378 2,641 2,213 6,289 35,736 2,779 3,843 1,745 339 467 1,061 40,894 3,108 162,554 14,739 7,321 17,015 16,829 5,443 2,779 14,523 8,675 4,974 3,304 4,674 36,334 4,546 (393) 2,656 11,360 5,642 2,428 3,268 7,182 1,021 119,037 6,689 450 1,529 4,238 10,978 (1,781) 9,898 1,178 183 4,879 4,146 9,749 520 14,692 24,376 2,992 2,741 1,192 2,974 496 524 1,825 18,162 21,459 9,228 4,113 4,756 991 351 5,845 576 2,901 423 3,239 2,139 138 5,811 3,308 2,590 626 108 7,783 1,153 2,547 3,089 9,169 2,086 8,464 55,464 4,692 11,405 5,817 840 11,167 2,984 7,039
  4. Page 34 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 34 of 104 Work Order Number Description 80265988 MPB; 8 FIRE HILL RD, REDDING - SHIF 80266014 CAR VS POLE 2.13.23c WTBS 6/20 9A 80266098 2022 Circuit Patrol Finding 31C1 Wa 80266116 *D&D*Frontier Pole Inspection Pole 80266150 *D&D*Frontier Inspection Pole Shift 80266152 *D&D*Frontier Pole Inspection Pole 80266161 JFM-JJH Northwest Dr P 11875 Inst 80266163 *D&D* CD02449 Frontier Pole Inspect 80266174 *D&D*Frontier Inspection Pole Shift 80266208 DG UPGRADE 30 FOX RUN RD - NORWALK 80266214 *D&D*Frontier Inspection Pole Shift 80266231 *ASP* CD02449 Frontier Reject Repla 80266235 *D&D* CD02449 Frontier Inspection P 80266237 APPT 3/10 AP- 15 Sylvan Ave, Unionv 80266261 *D&D* CD02449 Frontier Inspection P 80266262 GDK AVON, 27 JACKSON ST, OH TO DB S 80266267 *D&D* CD02449 Frontier Reject Repla 80266284 *D&D*Frontier Pole Inspection Pole 80266286 *D&D*CD02449 Frontier Reject Replac 80266294 *D&D*Frontier Pole Inspection Pole 80266375 21 HARTFORD TPKE., VERNON (KEY HYUN 80266398 7/13 PD REPORT UPLOADED...VC - 9A 80266476 CD01814-03 - 24R Substation Recover 80266564 MM 81 Barber Rd Sterling new pole # 80266594 *D&D* CD02449 Frontier Pole Inspect 80266638 *D&D* CD02449 Frontier Pole Inspect 80266639 *D&D*Frontier Pole Inspection Pole 80266640 *D&D*Frontier Pole Inspection Pole 80266641 *D&D* CD02449 Frontier Pole Inspect 80266682 *D&D* BD - Conv. 1279578 - Make Rea 80266848 NEW-BF-8/13/24---NORTH STONINGTON, 80266851 *D&D* CD02449 Frontier Pole Inspect 80266885 WTG FOR PD RPT 2/26/25 (TH) 2/25/25 80266919 *D&D* Frontier Pole Inspection Pole 80266967 *D&D*Frontier Inspection Pole Shift 80266986 *D&D* CD02449 Frontier Inspection P 80266993 *D&D* CD02449 Frontier Inspection P 80266994 *ASP* Frontier Pole Inspection Pole 80267001 *D&D* Frontier Pole Inspection Pole 80267005 Repl Rotten Pole 5003 - Cust Conc 80267015 *D&D* CD02449 Frontier Inspection P 80267021 *ASP* Frontier Pole Inspection Pole 80267024 *ASP* Frontier Pole Inspection Pole 80267028 *D&D*Frontier Inspection Pole Shift 80267031 *ASP* Frontier Pole Inspection Pole 80267051 JD; 9A - 1538 LONG RIDGE RD-FOIA lt 80267149 BC - CD02453 - OH Temp Install for 80267315 *AWC* CD02449 Frontier Reject Repla 80267325 *ASP* Frontier Pole Inspection Pole 80267329 DONE EVW - 240 Canaan Rd, Salisbury 80267335 *D&D*Frontier Pole Inspection Pole 80267338 WRTN--JK> CD02244 - POLE 105-FTR RE 80267357 PRINT EVW - 250 Canaan Rd, Salisbur 80267390 *ASP* Frontier Inspection Pole Shif 80267393 *ASP* Frontier Pole Inspection Pole 80267611 *ASP* Frontier Inspection Pole Shif 80267634 *ASP* CD02444 Pole Integrity Replac 80267638 *ASP* Frontier Inspection Pole Shif 80267690 *ASP* Frontier Pole Inspection Pole 80267691 *ASP* Frontier Pole Inspection Pole 80267722 PRINT EVW - Long Pond Rd, Salisbury 80267749 WM; NEW MILFORD, BOXWOOD, 5, GARY C 80267759 WRTN COMPLETE 158 E HADDAM COLCHEST 80267767 2/27/25 - 9A - FARMHOLME RD STONING 80267770 *ASP* CD02449 Frontier Reject Repla 80267815 AJC 90 HARDING RD GRN INST 3 PH RIS 80268012 AP- 1577 New Britain Ave, Farmingto 80268015 *ESCALATED/URGENT* Rep Xarms and in 80268030 *ASP* Frontier Pole Inspection Pole 80268031 PRINT EVW - Main St, Salisbury P#18 80268038 INDIANTWON RD, P#2013 LEDYARD // RE 80268045 MG-P#496/496S- S CANTERBURY( 331) R 80268047 *ASP* Frontier Pole Inspection Pole 80268055 *ASP* Frontier Pole Inspection Pole 80268066 *ASP* Frontier Pole Inspection Pole 80268117 MATERIAL *D&D* HULLS HILL RD SOUTHB 80268308 WRTN COMPLETE 9A* : CHESTNUT HILL( 80268311 MAR - 126 Ward St, Naugatuck CT // 80268343 APPT 6/3 AP- 5 Lakeview Dr, Farming 80268353 Replace Pole 109 (GP) ROW_ 191 S WI 80268520 *ASP* ML - Conv. 1762450 - Make Rea 80268550 NEW GC STONINGTON, WOLCOTT, 53, SHA 80268693 1/18 *LINE WORK COMP* 15 DAY DUE 1/ 80268816 Done EVW - Lucas Rd, Sharon P#595 F 80268832 PRINT EVW - Sharon Rd, Salisbury P# 80268850 9A CAR VS POLE-APPROVED 9/16/26 80268861 MDB - 9A - 336 QUASSAPAUG RD, WOODB 80269003 Cust Appt 4/3/25 CC; NEWTOWN, ECHO 80269024 JFM-JJH Scott Swamp Rd P7270 Inst C 80269038 2/28/25-WTG FOR PD REPORT (RR) 2/27 80269060 PRINT CRP-55 Glendale AVE WIN. shif 80269169 JRP - Taunton St SOG P#92437 Repl P 80269173 AE/JLB 7 SHERRY LN DARIEN P3253 NEE 80269279 *material* RM, 15 SLUMBER CORNERS 80269490 9A CAR VS POLE 22301 - APPROVED 10/ 80269492 JFM-POST CNSTR-WTG FOR PD RPRT (RR) 80269494 *WORK COMP* MM - 109 BENEDICT HILL 80269501 REPLACE POLE 5767, BRANFORD 80269516 JSG - 3/1 RSO [BEACH] - SANDY BROOK 80269517 03/02/25 - 9A - Simpson Lane Montvi 80269539 *FIELD CHECK* 9A* 3/1 - RSO - nori 80269570 *D&D*JS - Conv. 1274094 - Make Read 80269584 Chapel St, Enfield BBA P-3229. Set 80269615 9A - 3/3 - RSO - GRANDVIEW( 111) TE 80269687 STONINGTON, STONINGTON, 829, Hardie in-service date work order type 5/30/2023 11 Elect Annual Proj - DESG CT 3/1/2023 11 Damage Claims OH 6/30/2022 11 Elect Annual Proj - DESG CT 5/12/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 4/14/2025 11 Elect Annual Proj - DESG CT 4/28/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 6/5/2025 11 Elect Annual Proj - DESG CT 4/23/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/2/2025 11 Corrective Maint OH Svc 4/28/2025 11 Dist Capital or Expense 8/7/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 5/8/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 4/25/2025 11 Elect Annual Proj - DESG CT 11/2/2022 11 Elect Annual Proj - DESG CT 7/26/2022 11 Damage Claims OH 12/17/2025 11 Dist Capital or Expense 11/15/2022 11 Elect Annual Proj - DESG CT 4/28/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 1/19/2023 11 Dist Capital or Expense 6/23/2025 11 Elect Annual Proj - DESG CT 5/8/2025 11 Dist Capital or Expense 2/27/2025 11 Dist Capital or Expense 4/21/2025 11 Dist Capital or Expense 5/8/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 4/30/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 7/10/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 2/28/2025 11 Damage Claims OH 3/18/2025 11 Asset Mgmt - Specific DESG CT 10/17/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 4/11/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 9/18/2025 11 Private Work - No Co Asset 3/4/2025 11 Dist Capital or Expense 3/21/2025 11 Dist Capital or Expense 7/10/2025 11 Dist Capital or Expense 3/13/2025 11 Dist Capital or Expense 6/6/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 3/3/2025 11 Dist Capital or Expense 3/18/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 5/15/2024 11 Elect Annual Proj - DESG CT 3/25/2025 11 Dist Capital or Expense 6/10/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 4/2/2025 11 Dist Capital or Expense 3/3/2025 11 Dist Capital or Expense 3/31/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 10/5/2022 11 Elect Annual Proj - DESG CT 3/4/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 6/3/2025 11 Corrective Maint UG Svc 4/17/2025 11 Dist Capital or Expense 11/28/2025 11 Dist Capital or Expense 11/9/2022 11 Elect Annual Proj - DESG CT 1/19/2023 11 Elect Annual Proj - DESG CT 4/9/2025 11 Dist Capital or Expense 5/28/2025 11 Dist Capital or Expense 3/11/2025 11 Damage Claims OH 3/10/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 5/29/2025 11 Elect Annual Proj - DESG CT 3/3/2025 11 Dist Capital or Expense 6/24/2025 11 Dist Capital or Expense 3/11/2025 11 Dist Capital or Expense 3/14/2025 11 Dist Capital or Expense 7/18/2025 11 Dist Capital or Expense 3/5/2025 11 Damage Claims OH 3/8/2025 11 Dist Capital or Expense 3/24/2025 11 Elect Annual Proj - DESG CT 5/22/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 3/6/2025 11 Elect Annual Proj - DESG CT 4/11/2025 11 Dist Capital or Expense 2/25/2025 11 Dist Capital or Expense 3/29/2025 11 Damage Claims OH 10/20/2025 11 Damage Claims OH 10/22/2025 11 Corrective Maint UG Svc Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 1,732 295 12,039 633 551 193 29 656 241 462 209 2,132 849 2,531 80 705 143 73 2,040 2,418 4,084 5,603 160,267 1,093 354 157 208 882 498 (13) 1,678 301 3,918 162 1,685 78 102 200 965 1,217 112 1,175 1,208 247 985 1,091 91,259 389 3,025 604 466 6,934 1,086 463 1,341 303 8,200 635 916 2,266 2,139 9,741 214 19,670 1,335 696 5,646 11,323 2,081 568 10,660 2,122 933 1,627 195 6,307 441 1,129 2,549 16,903 14,158 6,542 4,208 808 1,233 4,011 10,571 3,942 3,902 18,918 103 1,665 1,612 3,517 9,140 149 14,169 4,722 271 5,122 871 126 15,630 1,491 3,659 365000 Overhead Conductors, Device 1,519 36 7,211 2,356 1,591 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 108 1,699 107 289 902 581 274 109 837 223 938 174 283 3,056 1,626 976 689 128,676 1,583 835 438 578 915 604 13 9,476 1,085 1,162 2,156 1,636 168 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 72 180 327 1,019 1 3,489 1,696 29 57 8,709 378 1,839 282 270 558 2,312 290 254 311 2,187 1,448 299 161 1,036 177,516 173 123 1,569 1,088 376 100,626 1,779 528 661 572 2,868 2,552 2,513 331 1,559 2,402 23 4,070 521 3,692 4,590 17,572 132 202 6,156 401 481 209 1,413 122 1,432 840 1,061 498 3,389 421 2,209 1,766 2,215 250 1,574 2,103 3,400 6,940 1,196 300 1,198 2,655 40 2,903 114 122 793 4,353 2,069 2,026 418 829 720 66 974 340 610 947 521 203 4,147 104,586 470 180 979 854 11,276 2,339 622 1,296 903 16 1,041 1,207 24,788 247 136 1 422 295 2,419 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 3,359 331 19,250 2,989 2,142 193 1,728 763 530 1,436 790 2,406 958 3,875 303 2,662 317 357 5,096 4,044 5,118 6,292 302,837 3,084 1,189 595 786 1,797 1,101 12,993 1,667 5,640 2,318 3,321 246 102 758 3,530 1,217 423 3,485 2,655 545 1,147 2,127 270,343 562 3,025 1,691 842 132,387 2,866 991 2,003 875 13,971 3,301 3,550 2,597 3,698 15,005 237 23,740 1,855 11,185 10,237 28,894 2,213 770 16,816 2,522 1,414 1,837 1,607 6,429 2,703 3,662 4,017 17,400 18,157 7,911 7,140 2,574 3,448 4,261 12,145 10,192 111,887 26,328 1,300 2,441 2,810 9,571 9,140 1,003 25,445 7,309 893 6,555 1,774 142 15,630 2,532 5,289
  5. Page 35 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 35 of 104 Work Order Number Description 80269730 CC; *BUY ALL* INT-93764 SANDY HOOK, 80269761 15D 6/20 DO W/17312586 406 BEE ST, 80269790 CAR VS POLE AW PR 9.9 80269916 MM Khourie Rd / Miller Rd 12 locati 80269971 MATERIAL COMPLETE (NONBILLABLE (TH) 80270008 2022 Circuit Patrol Finding, 18P1 80270188 MM - ST3117476 736 VALLEY RD NEW CA 80270190 AE/RL:2 DEER LN:GRN: ES TO REPLACE 80270214 Appr Grp - WO 20210424 - INT-104763 80270223 *WORK COMP* MM - 234 INDIAN ROCK RD 80270287 2022 Circuit Patrol Finding, 24A13 80270298 2022 Circuit Patrol Finding, 31A1 80270308 2022 Circuit Patrol Finding, 31A15 80270327 2022 CIRCUIT PATROL FINDINGS 21U1 / 80270329 ROUTE 85 P-286 SHIFT TO ALREADY SET 80270425 *ASP* BC - Conv. 1735378 - Make Rea 80270434 TD-941 2025 DUE 6/1 - Load Balanc 80270481 MPB; 118 S POMPERAUG AVE, WOODBURY 80270487 UPGRADE WO 20197639 FOR OAKDALE, GL 80270500 PM-2355 CHAMBERLAIN HWY BERLIN-POST 80270504 hold cust PRINT BJQ - NORTHFIELD, M 80270513 UPGRADE WO 20226730 FOR SOMERS, SUN 80270535 TL - BUSH HILL DR, REF. #21 NIANTIC 80270537 PRINT CRP - INT-102096 WO# 20101753 80270586 VERIFY ES POLE --HADDAM - CHRISTIAN 80270623 PR 9/21 (EARLY POLE SET DONE) JFC 80270738 PD-490 BROAD ST N. LONDON/EV CHARGI 80270755 ASPLUNDH JC 103 RUGG BROOK WINCH/ 80270804 WRIGHTRD CANTERBURY Replace Pole 11 80270841 2022 CIRCUIT PATROL FINDINGS, 26E8 80270900 *POST CONST*AP- 522 Church St, New 80270934 MCB - 157 EASTERN AVE WTBY - P B840 80270986 2022 CIRCUIT PATROL FINDINGS, 26E8 80271103 Field COMPLETE ASP 8/2 - 2022 Circu 80271109 2022 Circuit Patrol Findings 3R02 80271344 Joe to survey - 02/16/25 Assigned F 80271378 LD - 29 IVY LN , NEWINGTON - (FRNT) 80271404 RM, CP WORK 30 FOX RUN RD - NORWALK 80271521 SUFFIELD, CROSS, 40, JENIFER J LONG 80271552 *SYS PRJ* CD02222 2024 Pole Integri 80272123 DONE PRINT EVW - 160 Mount Pleasant 80272152 Appr Grp South Street 2301, Coventr 80272186 DAISYMAE - (855) ARBUTUS ST - MIDDL 80272256 JLB 612 SILVERMINE RD NC OH TO UG 2 80272426 WRTN - DM - 10 QUINN RD MARLBOROUGH 80272477 PD-982 VAUXHALL ST EXT WTFD/NEW UG 80272592 MCB - 56 KEEFE ST, WTBY, REPLACE 25 80272617 2022 CIRCUIT PATROL FINDINGS, 14M29 80272675 2022 CIRCUIT PATROL FINDINGS, 13B9 80272822 DONE PRINT BJQ, LTCH, P #2703 (311) 80272861 DONE PRINT BJQ, LTCH, P #164 (376) 80272886 MPB; 152 ROCKY MOUNTAIN RD, SOUTHBU 80272892 NEW-JD-1/22/25--MYSTIC, RIVER, 949, 80272912 P WO 19676553-INT-101457-DG UPGRADE 80272922 *D&D*Frontier Inspection Pole Shift 80272958 Miller Rd 344, South Windsor. Front 80272971 *ASP* Frontier Inspection Pole Shif 80273008 656 MAIN ST MONROE, SHIFT FTR P.501 80273013 OLD SAYBROOK, SHERWOOD, 45/EXTEND P 80273016 Done EVW - 86 Birdsall St, Winsted 80273123 DONE NEED TO SIGN OFF ASPLUNDH 9A C 80273152 P WILLIMANTIC, PLEASANT VIEW, 66, A 80273186 ALLL POLE WORK AND WIRE COMP NO CUS 80273200 15DD 11/19 85 TREMONT ST, MERIDEN 80273248 3/5/25-- 314 BROAD ST NEW LONDON- P 80273249 PD-9A 603 MOHEGAN AVENUE WTFD/CAR V 80273274 *ASP* Frontier Pole Inspection Pole 80273354 *D&D*Conv# 1253380-MakeReadyNonReim 80273361 CAR VS POLE - NRFN 80273385 ***FCOMP*** zReplace Pole 1834, Pr 80273411 *D&D*CD02444 Pole Integrity Replace 80273421 **ALL WORK COMP**KM POLE80 72 AMES 80273461 DG P#D1193 CANAL ST PUTNAM CUSTOMER 80273485 CD02444 Pole Integrity Replacement 80273508 JFM-36 SUNSET LN (P#4670)-REPLACE O 80273514 CD02444 Pole Integrity Replacement 80273538 Jpt-143 Grove St Bristol P2412 - In 80273623 82 High St, CL- Extend Pri to Front 80273773 9 CEDAR HILLS - WESTON !! WORK COMP 80273777 MATERIAL JDB :SILVER BROOK:RD:RIDGE 80273784 **ALL WORK COMP** KM POLES103,105,1 80273795 *COMP IN FIELD* MM - 545 SMITH RIDG 80273799 3/6 W MAIN ST WINDHAM 80273820 (LC) **MM - WO 19338245-INT-96720-D 80273836 3/6 - AWC - BRANDY(72) ST -- 646, B 80273852 *EH AWC* CD02444 Pole Integrity Rep 80273872 CD02444 Pole Integrity Replacement 80273913 KM POLE1596 16 OAK DRIVE HEBRON REP 80273923 *NL AWC* CD02444 Pole Integrity Rep 80273934 CD02444 Pole Integrity Replacement 80273941 *NL AWC* CD02444 Pole Integrity Rep 80273956 CRP - 3/6 - TREE TOOK DOWN 3-PHASES 80273968 *NL AWC*CD02444 Pole Integrity Repl 80273971 CD02444 Pole Integrity Replacement 80273983 *NL AWC* CD02444 Pole Integrity Rep 80273984 CD02444 Pole Integrity Replacement 80273987 *NL AWC* CD02444 Pole Integrity Rep 80273990 *NL AWC* CD02444 Pole Integrity Rep 80273998 *EH AWC* CD02444 Pole Integrity Rep 80274001 CD02444 Pole Integrity Replacement 80274004 CD02444 Pole Integrity Replacement 80274010 *NL AWC* CD02444 Pole Integrity Rep 80274011 *EH AWC* CD02444 Pole Integrity Rep 80274012 CD02444 Pole Integrity Replacement 80274017 CD02444 Pole Integrity Replacement in-service date work order type 11/14/2025 11 Corrective Maint UG Svc 9/8/2025 11 Dist Capital or Expense 10/25/2022 11 Damage Claims OH 2/17/2023 11 Elect Annual Proj - DESG CT 12/5/2024 11 Dist Capital or Expense 4/11/2023 11 Elect Annual Proj - DESG CT 3/26/2025 11 Dist Capital or Expense 6/17/2025 11 Corrective Maint UG Svc 6/9/2025 11 Elect Annual Proj - DESG CT 3/3/2025 11 Elect Annual Proj - DESG CT 3/2/2023 11 Elect Annual Proj - DESG CT 3/2/2023 11 Elect Annual Proj - DESG CT 10/18/2022 11 Elect Annual Proj - DESG CT 10/3/2022 11 Elect Annual Proj - DESG CT 9/7/2022 11 Elect Annual Proj - DESG CT 5/12/2025 11 Dist Capital or Expense 4/25/2025 11 Dist Capital or Expense 11/12/2025 11 Dist Capital or Expense 4/15/2025 11 Elect Annual Proj - DESG CT 3/7/2025 11 Dist Capital or Expense 9/24/2025 11 Dist Capital or Expense 4/2/2025 11 Elect Annual Proj - DESG CT 3/20/2025 11 Damage Claims OH 7/16/2025 11 Elect Annual Proj - DESG CT 8/15/2025 11 Dist Capital or Expense 10/7/2022 11 Elect Annual Proj - DESG CT 8/8/2023 11 CLP-EL EV Charging Station - Ins 7/26/2022 11 Elect Annual Proj - DESG CT 10/11/2022 11 Elect Annual Proj - DESG CT 9/30/2022 11 Elect Annual Proj - DESG CT 3/4/2025 11 Elect Annual Proj - DESG CT 8/14/2025 11 Elect Annual Proj - DESG CT 10/25/2022 11 Elect Annual Proj - DESG CT 10/3/2022 11 Elect Annual Proj - DESG CT 9/20/2022 11 Elect Annual Proj - DESG CT 3/28/2025 11 Corrective Maint OH Lines 3/10/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 7/29/2022 11 Asset Mgmt - Specific DESG CT 6/25/2024 11 Elect Annual Proj - DESG CT 12/1/2025 11 Corrective Maint OH Svc 5/1/2025 11 Dist Capital or Expense 4/3/2025 11 Dist Capital or Expense 10/17/2023 11 Asset Mgmt - Specific DESG CT 4/25/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 11/18/2022 11 Elect Annual Proj - DESG CT 9/14/2022 11 Elect Annual Proj - DESG CT 10/3/2022 11 Elect Annual Proj - DESG CT 3/19/2025 11 Dist Capital or Expense 4/2/2025 11 Dist Capital or Expense 4/16/2025 11 Dist Capital or Expense 7/15/2025 11 Dist Capital or Expense 7/24/2025 11 Elect Annual Proj - DESG CT 6/30/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 12/13/2022 11 Elect Annual Proj - DESG CT 8/25/2022 11 Elect Annual Proj - DESG CT 9/20/2023 11 Elect Annual Proj - DESG CT 7/12/2022 11 Elect Annual Proj - DESG CT 2/2/2023 11 Elect Annual Proj - DESG CT 9/3/2025 11 Corrective Maint OH Svc 11/7/2025 11 Dist Capital or Expense 4/4/2025 11 Dist Capital or Expense 4/4/2025 11 Damage Claims OH 3/25/2025 11 Dist Capital or Expense 3/21/2024 11 Elect Project - DESG CT 3/31/2025 11 Damage Claims OH 4/8/2025 11 Elect Annual Proj - DESG CT 5/8/2025 11 Elect Annual Proj - DESG CT 3/18/2025 11 Elect Annual Proj - DESG CT 8/28/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 8/6/2025 11 Elect Annual Proj - DESG CT 3/31/2025 11 Elect Annual Proj - DESG CT 4/30/2025 11 Dist Capital or Expense 4/7/2025 11 Dist Capital or Expense 3/11/2025 11 Elect Annual Proj - DESG CT 3/13/2025 11 Dist Capital or Expense 11/25/2025 11 Dist Capital or Expense 3/18/2025 11 Elect Annual Proj - DESG CT 8/14/2025 11 Elect Annual Proj - DESG CT 9/5/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 9/5/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 4/15/2025 11 Dist Capital or Expense 12/9/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 11/10/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 9/9/2025 11 Dist Capital or Expense 9/25/2025 11 Dist Capital or Expense 9/4/2025 11 Dist Capital or Expense 8/27/2025 11 Dist Capital or Expense 9/16/2025 11 Dist Capital or Expense 9/5/2025 11 Dist Capital or Expense Subsequent Close Date 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 4/20/2026 1/22/2026 1/22/2026 4/20/2026 2/13/2026 2/13/2026 1/22/2026 364310 Poles and Appurtenance 1,199 860 799 2,697 1,136 1,416 1,778 2,819 1,575 1,557 6,811 1,060 2,119 8,382 20,748 47 1,380 2,354 1,746 1,434 6,402 2,427 7,089 3,839 5,291 1,198 3,662 33,818 1,577 18,296 51,003 7,175 13,962 52,638 3,753 893 330 387 4,538 609 2,574 1,651 3,246 1,891 3,526 670 (344) 15,915 15,088 185 744 12,836 201 371 851 187 302 1,691 5,958 714 182 1,272 5,156 3,409 613 2,361 1,045 14,722 1,577 954 20,238 4,336 10,524 3,677 542 15,054 1,693 1,281 3,520 6,160 386 948 572 7,211 55 6,232 2,506 476 4,460 2,234 4,039 248 6,492 2,404 10,575 3,233 6,382 22,606 6,978 4,332 8,945 3,617 7,419 2,226 2,514 365000 Overhead Conductors, Device 2,895 10,365 343 6,942 196 68 1,508 914 2,008 1,123 219 20 742 835 12,481 3,000 3,499 698 338 3,634 943 387 869 8,841 74 4,850 23,553 262 5,131 7,757 2,742 713 10,552 336 96 148 290 2,001 16 1,267 1,599 350 1,605 1,155 881 (641) 704 7,519 97 126 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 3,211 1,660 100,647 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 8,231 185 67 235 369720 DB/UG Conductors and Devices 1,609 3,820 497 46 4,920 138 65 97 201 820 3,206 418 888 760 431 445 177 1,459 (73) 1,047 843 388 34 113 59 117 158 1,836 69 (136) 640 433 579 1,048 2,366 112 1,563 338 1,243 189 7,085 290 57 218 (876) (153) 845 37 1,277 3,516 483 6,570 408 2,818 845 271 2,043 127 3,451 607 2,047 4,688 5,134 511 303 87 973 230 6,391 23 2,596 1,790 567 2,805 1,405 1,013 43 3,645 105 255 8,981 77 2,403 837 1,892 375 3,992 4,189 1,784 1,934 9,031 2,504 909 1,913 224 1,012 1,206 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 8,914 125,583 1,142 9,639 1,333 1,484 3,471 4,295 3,818 2,681 7,030 1,081 2,861 9,217 33,229 47 4,380 5,853 2,490 1,772 15,094 3,436 8,237 5,237 15,666 2,269 13,177 58,764 1,838 23,427 58,760 10,760 14,675 63,190 4,089 989 478 677 7,040 660 4,016 3,250 3,595 5,490 4,681 2,259 (1,121) 16,619 22,607 282 871 13,269 2,343 1,757 3,217 1,542 302 1,880 12,013 1,849 240 1,527 6,433 11,641 1,096 8,931 1,453 17,539 2,423 1,225 22,280 4,463 13,975 3,677 1,192 17,101 6,381 11,371 4,031 6,463 473 2,176 802 22,583 77 8,828 2,506 553 6,863 3,071 5,930 623 10,708 2,404 14,764 5,017 9,328 31,638 9,482 5,241 8,945 4,183 7,419 5,032 3,919
  6. Page 36 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 36 of 104 Work Order Number Description 80274018 *EH AWC* CD02444 Pole Integrity Rep 80274019 DL; Mayapple Rd; STAMFORD; P#9836 M 80274025 CD02444 Pole Integrity Replacement 80274028 *NL AWC* CD02444 Pole Integrity Rep 80274031 *NL AWC* CD02444 Pole Integrity Rep 80274034 CD02444 Pole Integrity Replacement 80274037 CD02444 Pole Integrity Replacement 80274040 CD02444 Pole Integrity Replacement 80274044 CD02444 Pole Integrity Replacement 80274046 CD02444 Pole Integrity Replacement 80274047 CD02444 Pole Integrity Replacement 80274052 *NL AWC* CD02444 Pole Integrity Rep 80274054 CD02444 Pole Integrity Replacement 80274055 CD02444 Pole Integrity Replacement 80274056 CD02444 Pole Integrity Replacement 80274058 *NL AWC* CD02444 Pole Integrity Rep 80274059 CD02444 Pole Integrity Replacement 80274061 CD02444 Pole Integrity Replacement 80274079 MN25M011 Storm Charge out Poles and 80274132 MCB - 3/7/25 TURNOVER 9135: HANOV 80274135 WM; WASHINGTON, LOWER CHURCH HILL, 80274145 MCB - WTG FOR PD RPT 3/11/25 (TH) 3 80274175 9A - TURNOVER 3/9 - RSO - dipace 80274182 9A CAR VS POLE- APPROVED 2/17 80274204 03/09/25 - 9A - Pequot Rd Montville 80274206 15D 8/18 MCB - 11 RAY ST WTBY - REP 80274218 DONE PRINT BJQ - 3/7 - RSO [TITO] 80274221 Kinney Hollow Rd 95, Union. Frontie 80274222 DJM. 21 LOCKWOOD CIR WESTPORT. NEW 80274229 CD02444 Pole Integrity Replacement 80274234 **ALL WORK COMP**KM POLE3295 16 BIR 80274235 AE/RL:723 LAKE AVE: GRN: VERIZON RE 80274239 Buckley Hwy 1163, Union. Frontier s 80274261 ALL WORK COMPLETE - GP - Replace Po 80274267 CD02444 Pole Integrity Replacement 80274284 *EH AWC*CD02444 Pole Integrity Repl 80274291 CD02444 Pole Integrity Replacement 80274298 3/7/25 9a car vs pole WELCH( 300) R 80274304 *ASP* CD02444 Pole Integrity Replac 80274315 *D&D*CD02444 Pole Integrity Replace 80274325 *D&D*CD02444 Pole Integrity Replace 80274327 CD02444 Pole Integrity Replacement 80274331 RM, 160 OLD REDDING RD - WESTON CT! 80274333 CD02444 Pole Integrity Replacement 80274340 *D&D*CD02444 Pole Integrity Replace 80274341 Buckley Hwy 1147, Union. Frontier s 80274346 CD02444 Pole Integrity Replacement 80274359 CD02444 Pole Integrity Replacement 80274360 *D&D*CD02444 Pole Integrity Replace 80274366 CD02444 Pole Integrity Replacement 80274369 CD02444 Pole Integrity Replacement 80274370 JSG 8A2 - MT. Pleasant Terrace Torr 80274375 Mountain Spring Rd 188, Tolland. Fr 80274377 PD REPT ORDERED 3-19-25 3/10/25 9A 80274380 CAR VS POLE - APPROVED 7/16/25 80274381 CD02444 Pole Integrity Replacement 80274384 CD02444 Pole Integrity Replacement 80274385 CD02444 Pole Integrity Replacement 80274388 CD02444 Pole Integrity Replacement 80274391 CD02444 Pole Integrity Replacement 80274395 CD02444 Pole Integrity Replacement 80274397 *D&D*CD02444 Pole Integrity Replace 80274398 CD02444 Pole Integrity Replacement 80274401 *NL AWC* CD02444 Pole Integrity Rep 80274406 *NL AWC* CD02444 Pole Integrity Rep 80274412 CD02444 Pole Integrity Replacement 80274414 9A CAR VS POLE - NFRN - NON BILLABL 80274420 TO STORES 6/9--MG-P#59, P#2785, P#2 80274423 CD02444 Pole Integrity Replacement 80274424 MG-P#2435-HUNTINGTON( 222) RD BARN 80274427 CD02444 Pole Integrity Replacement 80274429 *NL AWC* CD02444 Pole Integrrity Re 80274432 *NL AWC* CD02444 Pole Integrity Rep 80274434 CD02444 Pole Integrity Replacement 80274440 CD02444 Pole Integrity Replacement 80274481 ASP-7/2/22 9A JOHN DOWNEY( 1) DR 80274540 7/2/22 CHICORY( 56) DR -- 2903, W 80274698 done ASPLUNDH EVW - 9A - 370 Norfol 80274740 *ASP* Third Party Make Ready Non-Bi 80274755 LD CLOVER DR, WILTON POLE#9054 RPL 80274761 LD 190 SHARP HILL RD, WILTON POLE#2 80274779 CD02444 Pole Integrity Replacement 80274780 *NL AWC* CD02444 Pole Integrity Rep 80274783 *NL AWC* CD02444 Pole Integrity Rep 80274784 CD02444 Pole Integrity Replacement 80274809 CD02444 Pole Integrity Replacement 80274816 CD02444 Pole Integrity Replacement 80274828 CD02444 Pole Integrity Replacement 80274829 CD02444 Pole Integrity Replacement 80274831 *NL AWC* CD02444 Pole Integrity Rep 80274834 *NL AWC* CD02444 Pole Integrity Rep 80274840 CD02444 Pole Integrity Replacement 80275116 9A - Car vs Frontier pole- APPROVED 80275120 03/07-AWC-WESTVIEW( 14) DR -- 32176 80275141 PM-140 CHERRY HILL RD MIDDLEFIELD-P 80275147 JTR, 273 WESTLEDGE RD - W. SIMSBURY 80275163 03/07/25 Assigned Feds 03/07/25 REE 80275174 9A KM POLE4886 109B CAPITOL DR WILL 80275177 JFM-*POST CNSTR* 44 SLATER RD (P#50 80275182 *D&D*CD02444 Pole Integrity Replace 80275257 ALL WORK COMPLETE -GP- REPLACE POLE 80275285 PRINT EVW - 5L04 - Sodom Rd North C 80275298 TL - GURLEY RD, EAST LYME // ***ALL 80275300 ALL WORK COMPLETE - GP- POLE 6049, 80275396 7/3/22 PRI DB TURNOVER SOUTHWOOD TE in-service date work order type 8/15/2025 11 Elect Annual Proj - DESG CT 4/21/2025 11 Elect Annual Proj - DESG CT 8/27/2025 11 Dist Capital or Expense 10/3/2025 11 Dist Capital or Expense 9/4/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/22/2025 11 Dist Capital or Expense 8/20/2025 11 Elect Annual Proj - DESG CT 10/2/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 8/22/2025 11 Dist Capital or Expense 8/8/2025 11 Elect Annual Proj - DESG CT 8/21/2025 11 Elect Annual Proj - DESG CT 9/19/2025 11 Dist Capital or Expense 9/5/2025 11 Dist Capital or Expense 8/15/2025 11 Elect Annual Proj - DESG CT 9/30/2025 11 Dist Capital or Expense 9/18/2025 11 Dist Capital or Expense 3/11/2025 11 Elect Annual Proj - DESG CT 3/13/2025 11 Elect Annual Proj - DESG CT 10/2/2025 11 Dist Capital or Expense 3/14/2025 11 Damage Claims OH 3/14/2025 11 Dist Capital or Expense 10/27/2025 11 Damage Claims OH 3/13/2025 11 Dist Capital or Expense 9/29/2025 11 Corrective Maint OH Svc 3/25/2025 11 Dist Capital or Expense 4/11/2025 11 Dist Capital or Expense 6/20/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 3/24/2025 11 Elect Annual Proj - DESG CT 4/30/2025 11 Elect Annual Proj - DESG CT 4/11/2025 11 Elect Annual Proj - DESG CT 3/12/2025 11 Elect Annual Proj - DESG CT 11/4/2025 11 Dist Capital or Expense 9/30/2025 11 Dist Capital or Expense 10/10/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 6/3/2025 11 Dist Capital or Expense 7/18/2025 11 Elect Annual Proj - DESG CT 6/17/2025 11 Dist Capital or Expense 9/24/2025 11 Dist Capital or Expense 3/28/2025 11 Elect Annual Proj - DESG CT 10/6/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 4/11/2025 11 Dist Capital or Expense 8/25/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 4/29/2025 11 Dist Capital or Expense 4/16/2025 11 Dist Capital or Expense 4/15/2025 11 Dist Capital or Expense 6/23/2025 11 Damage Claims OH 10/7/2025 11 Dist Capital or Expense 9/30/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 9/10/2025 11 Dist Capital or Expense 10/10/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 9/30/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 10/28/2025 11 Dist Capital or Expense 9/30/2025 11 Dist Capital or Expense 3/26/2025 11 Damage Claims OH 6/6/2025 11 Corrective Maint OH Lines 10/10/2025 11 Dist Capital or Expense 3/21/2025 11 Dist Capital or Expense 8/25/2025 11 Dist Capital or Expense 9/4/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 5/10/2023 11 Damage Claims OH 1/8/2024 11 Elect Annual Proj - DESG CT 7/12/2022 11 Damage Claims OH 10/30/2025 11 Dist Capital or Expense 7/13/2022 11 Dist Capital or Expense 7/15/2022 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/24/2025 11 Dist Capital or Expense 11/24/2025 11 Dist Capital or Expense 8/20/2025 11 Elect Annual Proj - DESG CT 12/15/2025 11 Dist Capital or Expense 10/1/2025 11 Dist Capital or Expense 8/29/2025 11 Dist Capital or Expense 10/23/2025 11 Dist Capital or Expense 11/17/2025 11 Dist Capital or Expense 9/24/2025 11 Dist Capital or Expense 9/23/2025 11 Dist Capital or Expense 3/27/2025 11 Damage Claims OH 3/11/2025 11 Elect Annual Proj - DESG CT 3/12/2025 11 Dist Capital or Expense 8/11/2025 11 Elect Annual Proj - DESG CT 3/11/2025 11 Elect Annual Proj - DESG CT 3/31/2025 11 Damage Claims OH 4/11/2025 11 Dist Capital or Expense 6/17/2025 11 Dist Capital or Expense 3/24/2025 11 Elect Annual Proj - DESG CT 4/9/2025 11 Elect Annual Proj - DESG CT 3/20/2025 11 Dist Capital or Expense 3/24/2025 11 Dist Capital or Expense 4/28/2023 11 Elect Annual Proj - DESG CT Subsequent Close Date 1/22/2026 2/13/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 5/15/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 3/16/2026 2/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 2/13/2026 1/22/2026 1/22/2026 6/26/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 4/20/2026 9/16/2026 9/16/2026 2/13/2026 2/13/2026 4/20/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 1/22/2026 2/13/2026 8/26/2026 6/26/2026 1/22/2026 4/20/2026 364310 Poles and Appurtenance 5,539 3,290 5,155 4,178 1,604 4,692 2,770 2,783 4,943 2,897 5,252 5,056 6,288 3,231 7,389 5,666 4,746 7,846 5,378 929 1,179 6,974 2,206 8,870 9,865 6,576 2,735 361 4,169 5,443 15,064 1,055 510 497 4,385 8,356 3,133 1,986 5,333 7,865 6,435 3,360 956 3,885 7,257 496 5,657 1,592 6,063 1,767 8,367 10,406 180 456 3,472 7,254 4,742 8,574 5,226 5,870 4,830 5,887 8,687 4,295 12,276 5,062 4,749 7,637 5,030 133 3,515 8,911 4,328 9,102 16,938 5,674 93 783 1,454 658 1,522 1,600 4,646 15,635 5,978 7,748 6,767 4,746 6,660 5,970 5,669 2,925 1,848 135 192 5,447 746 4,818 7,548 2,662 1,850 3,321 1,187 271 55 365000 Overhead Conductors, Device 366700 DB/UG Conduits and Vaults 26,382 1,999 1,764 447 3,459 1,458 1,066 1,999 2,296 2,505 1,624 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 366 395 3,353 3,990 4,465 2,541 63,670 525 2,218 901 569 2,241 1,436 863 864 390 890 442 5,953 342 181 282 1,664 183 330 864 523 482 1,472 629 456 2,010 5,126 2,832 58 1,687 4,972 402 1,538 1,135 1,691 33 504 51 566 1,280 787 4,304 8,138 501 73 951 5,089 2,224 1,619 271 969 288 133 4,224 1,648 278 1,499 978 6,258 584 5,282 1,090 824 4,623 1,456 1,098 1,512 12,090 98 238 5,476 601 179 1,275 5,504 6,992 16,426 2,526 2,866 8,211 1,139 1,086 2,886 114 198 248 107 122 151 244 174 663 1,697 11,602 838 577 774 81,610 4,066 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 5,539 29,672 7,153 5,941 2,416 8,152 4,229 3,849 6,942 5,193 7,756 7,075 6,288 10,573 7,389 10,130 7,286 7,846 69,490 1,455 11,355 7,876 2,775 11,111 11,482 7,903 3,599 751 6,253 5,966 15,546 9,588 1,139 953 6,394 13,483 5,965 2,044 5,333 7,865 6,435 4,898 2,123 5,576 7,257 1,051 5,657 2,158 7,614 2,554 12,672 18,544 1,650 529 4,423 12,631 7,099 10,194 5,226 10,094 6,478 6,166 10,186 5,273 18,534 5,062 5,332 12,920 6,121 957 3,515 13,685 5,783 10,200 18,450 17,764 191 1,022 6,930 1,259 1,701 2,875 10,150 22,626 5,978 24,174 9,293 7,612 14,870 7,109 6,999 5,811 1,962 507 440 5,553 867 9,546 9,245 2,662 1,850 14,923 2,025 847 82,439
  7. Page 37 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 37 of 104 Work Order Number Description 80275426 JES; SCHOOL RD. WILTON. RE-CONDUCTO 80275445 ASPLUNDH EVW - 9A - 824 Winchester 80275510 DONE APPT 2/2 EVW - 220 Mountain Rd 80275565 WRTN COMPLETE INJUN HOLLOW RD HADDA 80275569 *ALL WORK COMP* -GP- TATER HILL RD, 80275588 3/8 - FORBES(1416) ST -- 193, EAST 80275594 CD02444 Pole Integrity Replacement 80275608 DONE PRINT BJQ, TORR, P #167 GOSHEN 80275622 JOB COMP STORM 3.7.25 EVENT 5615049 80275624 CD02444 Pole Integrity Replacement 80275629 WRTN - DM - 3/6 CEDAR LN MIDDLETOWN 80275755 CD02444 Pole Integrity Replacement 80275766 *AWC* (cp) ZK - GRANBY (Pole Replac 80275784 *ASP* CD02449 Frontier Reject Repla 80275797 *D&D* CD02449 Frontier Pole Inspect 80275798 *AWC COMP* MM - 37 OLD WAGON RD, WI 80275800 MM Pine Hill Rd Sterling replace C/ 80275803 CD02444 Pole Integrity Replacement 80275814 *ASP* CD02449 Frontier Reject Repla 80275821 MPB; 96 HEMLOCK RD, ROXBURY 80275855 *ASP* CD02449 Frontier Reject Repla 80275859 CD02444 Pole Integrity Replacement 80275873 MG-P#170- WINDHAM RD, HAMPTON-RPLC 80275878 CD02444 Pole Integrity Replacement 80275880 JOB COMP STORM 3.7 -- FIRE TOWER R 80275891 *ASP* CD02449 Frontier Reject Repla 80275906 JTR, 34 HATCHET HILL RD -East Gran 80275923 JOB COMP STORM 3.7 -- 3048 NEEDLE 80275929 MG-P#1418 - N CANTERBURY RD, CANTER 80275963 Abel - CON 40 50% ReimbursableCDOT4 80276140 CD02444 Pole Integrity Replacement 80276150 XL, CD02504, Seg 13. lift taps at p 80276194 CD02444 Pole Integrity Replacement 80276273 mat bal OLD SAYBROOK, BOSTON POST, 80276360 JRP - Mastrianni Pl SOG Extend 3PH 80276510 (LC) **MM - 58 PINE RIDGE RD, WILTO 80276516 JOB COMP STORM 3.6.25 EVENT 5613459 80276518 MG-P#2348- 104 CLOVERMILL RD, MANS 80276519 **ALL WORK COMP**KM POLE153 55 RAY 80276535 CAR VS POLE - APPROVED 4/2/26 80276554 JOB COMP STORM 3.7 -- 1740 SABIN 80276582 AMM 9A CAR VS POLE 673 FARMINGTON 80276602 JOB COMP STORM 3.8.25 EVENT 5625105 80276607 CD02444 Pole Integrity Replacement 80276610 3/10/25-- OLD COLCHESTER RD MONTVIL 80276612 CD02444 Pole Integrity Replacement 80276625 JOB COMP STORM 3.6 -- 2183 MASHMO 80276655 P#1769-RPLC XFMR/ P#2072-:HAPPY:LN: 80276656 CD02444 Pole Integrity Replacement 80276745 *D&D*Frontier Pole Inspection Pole 80276906 CD02444 Pole Integrity Replacement 80276916 03/10/25 - 9A - SANDY HOLLOW (48) R 80276917 CD02444 Pole Integrity Replacement 80276924 CD02444 Pole Integrity Replacement 80276927 CD02444 Pole Integrity Replacement 80276943 CD02444 Pole Integrity Replacement 80276968 *NL AWC* CD02444 Pole Integrity Rep 80277056 PCC - 07/08 9A *TURNOVER* SADDS MIL 80277111 DAISYMAE - WO 20209911 - INT-104747 80277124 DONE PRINT BJQ, GOSHEN, P #4341 (40 80277151 DONE PRINT BJQ, NORTHFIELD, P #155 80277154 *ASP* Frontier Pole Inspection Pole 80277160 *D&D* CD02449 Frontier Pole Inspect 80277163 *AWC* AP- 155 Brickyard Rd, Farming 80277173 MM - 125 STURGES RIDGE RD, WILTON 80277195 CD02444 Pole Integrity Replacement 80277222 *ASP* Frontier Pole Inspection Pole 80277227 *NL AWC* CD02444 Pole Integrity Rep 80277242 *EH AWC* CD02444 Pole Integrity Rep 80277247 *ASP* Frontier Pole Inspection Pole 80277264 CD02444 Pole Integrity Replacement 80277267 *ASP* Frontier Pole Inspection Pole 80277268 JOB COMP STORM 3.7.25 EVENT 5616979 80277269 03/07/25 Oxoboxo Cross Rd Montville 80277276 CD02444 Pole Integrity Replacement 80277285 *ASP* Frontier Pole Inspection Pole 80277288 *NL AWC* CD02444 Pole Integrrity Re 80277296 *NL AWC* CD02444 Pole Integrity Rep 80277297 *ASP* Frontier Pole Inspection Pole 80277301 JTR, 15 Ward St, HARTFORD, Replace 80277322 WHISPERING PINES RD 33, STAFFORD 80277339 CD02444 Pole Integrity Replacement 80277341 *D&D*Frontier Inspection Pole Shift 80277343 CD02444 Pole Integrity Replacement 80277346 CD02444 Pole Integrity Replacement 80277357 CHESHIRE 2006 STRAIGHTS TNPK MIDDLE 80277373 03/12/25-- (TURNOVER) ROSSIE PENTWA 80277374 DONE BJQ - 3/12/25 TURNOVER 452 KEN 80277379 9A - 3/10 - 2994 S MAIN ST, WEST HA 80277402 03/07/25 Assigned Feds 03-11-25 Par 80277419 9A - Car vs Frontier pole- APPROVED 80277438 *D&D*Frontier Inspection Pole Shift 80277451 *ASP* Frontier Pole Inspection Pole 80277456 *D&D* CD02449 Frontier Inspection P 80277464 *ASP* Frontier Pole Inspection Pole 80277467 *D&D* CD02449 Frontier Pole Inspect 80277472 *ASP* Frontier Pole Inspection Pole 80277492 WRTN - DM - 40 UNION ST MIDDLETOWN 80277508 *ASP* Frontier Inspection Pole Shif 80277518 *ASP* Frontier Pole Inspection Pole 80277519 DG P#2757 227 STAWICKI RD THOMPSON 80277533 WRTN - DM -37 OLD ROAD DR MIDDLETOW 80277541 *ASP* Frontier Inspection Pole Shif 80277549 *NL AWC* CD02444 Pole Integrrity Re 80277554 *D&D* Frontier Pole Inspection Pole in-service date work order type 2/18/2025 11 Dist Capital or Expense 7/21/2022 11 Damage Claims OH 2/9/2023 11 Asset Mgmt - Specific DESG CT 3/21/2025 11 Elect Annual Proj - DESG CT 3/24/2025 11 Elect Annual Proj - DESG CT 3/28/2025 11 Dist Capital or Expense 8/26/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 8/15/2025 11 Elect Annual Proj - DESG CT 3/14/2025 11 Elect Annual Proj - DESG CT 8/19/2025 11 Dist Capital or Expense 4/9/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 3/28/2025 11 Dist Capital or Expense 4/2/2025 11 Dist Capital or Expense 10/7/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 11/17/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 9/26/2025 11 Dist Capital or Expense 3/20/2025 11 Elect Annual Proj - DESG CT 9/16/2025 11 Dist Capital or Expense 3/17/2025 11 Elect Annual Proj - DESG CT 6/26/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 3/17/2025 11 Elect Annual Proj - DESG CT 3/19/2025 11 Elect Annual Proj - DESG CT 2/27/2024 11 Elect Annual Proj - DESG CT 11/4/2025 11 Dist Capital or Expense 10/30/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 12/2/2022 11 Elect Annual Proj - DESG CT 2/15/2023 11 Elect Annual Proj - DESG CT 7/23/2025 11 Corrective Maint UG Svc 3/17/2025 11 Dist Capital or Expense 3/20/2025 11 Elect Annual Proj - DESG CT 4/10/2025 11 Dist Capital or Expense 3/18/2025 11 Damage Claims OH 3/17/2025 11 Elect Annual Proj - DESG CT 3/26/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 10/10/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 4/30/2025 11 Corrective Maint OH Lines 9/26/2025 11 Dist Capital or Expense 7/20/2022 11 Elect Annual Proj - DESG CT 10/7/2025 11 Dist Capital or Expense 3/24/2025 11 Damage Claims OH 10/8/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 10/10/2025 11 Dist Capital or Expense 10/10/2025 11 Dist Capital or Expense 7/23/2025 11 Dist Capital or Expense 9/16/2022 11 Damage Claims OH 4/21/2025 11 Elect Annual Proj - DESG CT 3/19/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 9/4/2025 11 Dist Capital or Expense 4/22/2025 11 Private Work - No Co Asset 9/11/2025 11 Dist Capital or Expense 5/6/2025 11 Dist Capital or Expense 8/14/2025 11 Elect Annual Proj - DESG CT 8/26/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 10/8/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 3/17/2025 11 Dist Capital or Expense 5/1/2025 11 Dist Capital or Expense 9/16/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 8/8/2025 11 Dist Capital or Expense 7/30/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 6/16/2025 11 Dist Capital or Expense 3/27/2025 11 Dist Capital or Expense 10/24/2025 11 Dist Capital or Expense 4/24/2025 11 Dist Capital or Expense 10/6/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 7/24/2025 11 Corrective Maint OH Svc 3/18/2025 11 Elect Annual Proj - DESG CT 3/14/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 3/13/2025 11 Elect Annual Proj - DESG CT 4/15/2025 11 Damage Claims OH 4/7/2025 11 Dist Capital or Expense 5/5/2025 11 Dist Capital or Expense 4/28/2025 11 Dist Capital or Expense 5/5/2025 11 Dist Capital or Expense 7/8/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 3/14/2025 11 Elect Annual Proj - DESG CT 5/13/2025 11 Dist Capital or Expense 5/6/2025 11 Dist Capital or Expense 10/27/2025 11 Dist Capital or Expense 5/1/2025 11 Dist Capital or Expense 7/17/2025 11 Dist Capital or Expense 7/8/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense Subsequent Close Date 5/1/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 4/20/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 7/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 207,088 1,792 275 412 4,641 574 4,156 231 9,782 3,177 25 2,835 2,923 1,043 400 747 475 4,336 73 9,449 825 5,350 810 5,266 147 54 10,257 3,114 2,412 48,324 10,285 93 4,055 3,405 32,556 3,832 173 1,199 154 4,079 4,884 340 939 4,599 927 1,716 1,000 1,096 3,346 721 2,816 828 7,302 3,244 2,259 5,251 8,194 1,590 1,279 91 95 362 281 1,122 2,784 2,791 162 2,087 5,555 1,681 3,843 1,099 1,384 2,126 7,264 121 6,768 2,042 843 3,793 4,740 3,997 861 3,162 5,752 2,565 3,952 1,078 1,717 100 432 352 1,152 279 729 877 119 4,846 832 463 3,539 7,228 492 1,912 241 365000 Overhead Conductors, Device 429,833 293 242 398 483 232 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 880 111 138 3,401 981 188 54 183 907 302 816 2,639 5,960 1,868 845 104 3,458 1,180 185 2,085 1,413 342 229,196 35 220 707 232 98 56 1,239 203 103 250 282 761 29,918 802 20 408 377 1,433 59 535 112 3,147 737 715 261 1,404 85 1,319 4,433 33 175 465 1,467 943 2,393 590 401 57 1,415 2,099 (38) 54 2,775 449 27 100 382 197 3,069 1,063 441 394 4,214 886 5,537 659 1,011 1,273 292 517 125 89,274 274 1,173 697 (3) 819 291 703 414 669 998 1,102 272 1,771 430 727 3,289 71 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 636,921 2,085 1,398 810 6,216 806 4,156 369 13,372 3,177 78 2,835 2,923 1,226 1,307 1,049 1,326 6,975 73 16,336 2,692 6,195 915 8,956 1,327 239 12,440 4,583 2,754 279,316 10,285 376 4,055 4,167 62,474 5,228 193 1,199 674 4,456 6,317 340 939 7,747 1,664 1,716 1,715 1,565 4,751 806 4,135 5,726 7,302 4,711 3,202 7,643 8,194 2,180 1,706 91 152 1,876 2,380 1,466 3,035 5,567 611 2,087 5,555 4,751 3,843 2,162 1,825 2,521 11,478 1,007 12,305 2,042 843 3,793 5,399 3,997 1,872 3,162 7,025 3,554 4,469 1,203 90,991 374 1,602 352 1,970 570 1,432 877 533 5,515 1,830 1,565 7,100 9,070 922 1,912 968
  8. Page 38 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 38 of 104 Work Order Number Description 80277556 JSG - 3/11 RSO [HYATT] - PROCK HILL 80277563 *ASP* Frontier Inspection Pole Shif 80277577 *NL AWC* CD02444 Pole Integrrity Re 80277612 MM 30 Norwich Rd PLNFLD P#3082 Fron 80277616 *NL AWC* CD02444 Pole Integrrity Re 80277625 2/17/25 STORM 2MN MN25K011 ELM (644 80277629 EAST HADDAM, MORGAN LN, 80277632 WO 19231956, DG UPGRADE FOR MYSTIC, 80277640 CD02444 Pole Integrity Replacement 80277660 CD02444 Pole Integrity Replacement 80277661 CD02444 Pole Integrrity Replacment 80277679 03/13/25 -9A - Municipality - NOYES 80277691 WRTN - DM - 45 HEBRON AVE MARLBOROU 80277702 *EH AWC* CD02444 Pole Integrrity Re 80277715 EM RL:81 HUSTED LN: GRN:REPLACE ST 80277718 *AWC*Frontier Inspection Pole Shift 80277724 TL - BOSTON POST RD, OLD LYME // ** 80277729 CD02444 Pole Integrity Replacement 80277748 *D&D* Frontier Pole Inspection Pole 80277760 *NL AWC* CD02444 Pole Integrity Rep 80277762 *NL AWC* CD02444 Pole Integrity Rep 80277764 *NL AWC* CD02444 Pole Integrity Rep 80277767 CD02444 Pole Integrity Replacement 80278195 CD02444 Pole Integrity Replacement 80278196 CD02444 Pole Integrity Replacement 80278197 CD02444 Pole Integrity Replacement 80278198 CD02444 Pole Integrity Replacement 80278199 CD02444 Pole Integrity Replacement 80278200 CD02444 Pole Integrity Replacement 80278201 CD02444 Pole Integrity Replacement 80278202 CD02444 Pole Integrity Replacement 80278205 NEW JC 4/17/24-- PRESTON, BRICKYARD 80278218 DAISYMAE - FAIRGOUNDS 1/3 WO - 1359 80278224 9A CAR VS EVS P A7905 - APPROVED 5/ 80278227 TL - LIBERTY ST, #17 OLD LYME // RE 80278263 **LOW WIRES** 07/08 9A *TURNOVER* 80278265 PRINTED 8/3 JFC - CORNWALL, PINE, 2 80278302 DG P#725 243A TAFT POND RD CLP POLE 80278362 MM-DOG HILL RD KILLINGLY NEW 40 LOT 80278545 7/5/22 PRI DB TURNOVER 17 STARR RD 80278549 DJM. 10 CRANBURY RD WESTPORT. NEW 4 80278583 mcb - WTG FOR PD RPT 3/14/25 (TH) 3 80278603 3/13/25 9A CAR VS POLE SPRING( 676) 80278604 CD02444 Pole Integrity Replacement 80278619 CD02444 Pole Integrity Replacement 80278628 MG-P#159-MAIN ST & HANOVER VERSAILL 80278630 CD02444 Pole Integrity Replacement 80278645 work completed in field - 472 TOLLA 80278658 CD02444 Pole Integrity Replacement 80278680 BOLTON, 8 VILLA LOUISA, Pole#287, R 80278741 WRITTEN NEEDS TO BE DONE 5/25 9A W 80278840 *NL AWC* CD02444 Pole Integrity Rep 80278843 work completed in field - MASON RD 80278845 *EH AWC* CD02444 Pole Integrity Rep 80278860 *D&D* CD02449 Frontier Pole Inspect 80278861 *NL AWC* CD02444 Pole Integrity Rep 80278865 BEBBINGTON RD ASHFORD CT 80278873 9A- CAR VS POLE- APPROVED 5/15 80278877 CD02444 Pole Integrity Replacement 80278891 CD02444 Pole Integrity Replacement 80278898 *NL AWC* CD02444 Pole Integrity Rep 80278901 work completed in field - TOLLAND T 80278904 03/07/25 -- Route 85 Waterford - Po 80278905 *NL AWC* CD02444 Pole Integrity Rep 80278906 BELLEVUE AVE., VERNON - REPLACE BRO 80278911 03/06/25-- Yawbux Valley Rd North S 80278917 3/7/25-- NEW LONDON TPKE STONINGTON 80278923 *NL AWC* CD02444 Pole Integrity Rep 80280005 03/08/25- GARDEN (50) ST (SMITH ST) 80280009 03/08/25-- Clarks Falls Rd North St 80280013 03/07/25 GURLEY (12) RD/ PARKWAY S 80280014 JRP - Parkview Dr SOG Repl P#428 wi 80280016 Long Hill Rd , Andover. ES replaced 80280041 3/14/25-WTG FOR PD REPORT (RR) 3/14 80280051 Old Woods Rd 33, Mansfield. Replace 80280052 CD02444 Pole Integrity Replacement 80280073 03/07-AWC-11457:TORRY:RD:TOLLAND:CT 80280084 CD02444 Pole Integrity Replacement 80280090 CD02444 Pole Integrity Replacement 80280144 WESTBROOK, BOSTON POST, 176/600A SI 80280209 CD02444 Pole Integrity Replacement 80280266 2022 CIRCUIT PATROL FINDINGS, 26E9 80280296 DG P#764 1036 PHOENIXVILLE RD CHAPL 80280378 *NL AWC* CD02444 Pole Integrity Rep 80280380 *NL AWC* CD02444 Pole Integrity Rep 80280384 *ASP* Frontier Pole Inspection Pole 80280405 8/10(RSO-JOHNNY Z) SHETUCKET TPKE, 80280406 8/10(RSO- CIVARDI) PROVIDENCE NEW L 80280459 Cottage Rd 92, Enfield. Tree VS XFR 80280504 2022 Circuit Patrol Findings 2A17 80280534 GDK (ASP)2022 Circuit Patrol Findin 80280630 Westford Hill Rd 426, Ashford. Fron 80280631 JMS- WEST HARTFORD POLE 5140 RISER 80280635 Schoephoester Rd, WL. Streetlights 80280659 *ASP* Frontier Pole Inspection Pole 80280661 *ASP* Frontier Pole Inspection Pole 80280665 *ASP* Frontier Pole Inspection Pole 80280692 *ASP* Frontier Pole Inspection Pole 80280693 *ASP* Frontier Pole Inspection Pole 80280694 *ASP* Frontier Pole Inspection Pole 80280711 DG P#1090 SENEXET RD WOODSTOCK FNRT 80280746 DJM. 21 LONG LOTS LN WESTPORT. NEW 80280748 Stonehouse Rd 543, Coventry. 9A @ P 80280774 EAST HAMPTON, SPELLMAN POINT, 86, G 80280797 TURNOVER 3/16/2025 E# 5630869 CA in-service date work order type 3/27/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 9/9/2025 11 Dist Capital or Expense 3/28/2025 11 Elect Annual Proj - DESG CT 8/15/2025 11 Elect Annual Proj - DESG CT 3/13/2025 11 Elect Annual Proj - DESG CT 12/18/2025 11 Dist Capital or Expense 6/9/2025 11 Elect Annual Proj - DESG CT 10/1/2025 11 Dist Capital or Expense 10/8/2025 11 Dist Capital or Expense 9/22/2025 11 Dist Capital or Expense 3/30/2025 11 Damage Claims OH 4/1/2025 11 Dist Capital or Expense 8/14/2025 11 Elect Annual Proj - DESG CT 4/10/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 3/20/2025 11 Dist Capital or Expense 9/11/2025 11 Dist Capital or Expense 5/8/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 11/17/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 10/8/2025 11 Dist Capital or Expense 9/18/2025 11 Dist Capital or Expense 10/8/2025 11 Dist Capital or Expense 10/20/2025 11 Dist Capital or Expense 10/10/2025 11 Dist Capital or Expense 11/21/2025 11 Dist Capital or Expense 7/17/2025 11 Dist Capital or Expense 3/19/2025 11 Damage Claims OH 6/26/2025 11 Corrective Maint UG Svc 9/15/2022 11 Damage Claims OH 8/10/2022 11 Elect Annual Proj - DESG CT 9/9/2022 11 Elect Annual Proj - DESG CT 7/13/2023 11 Elect Annual Proj - DESG CT 5/8/2023 11 Elect Annual Proj - DESG CT 11/14/2022 11 Elect Annual Proj - DESG CT 3/19/2025 11 Damage Claims OH 3/19/2025 11 Dist Capital or Expense 10/10/2025 11 Dist Capital or Expense 9/18/2025 11 Dist Capital or Expense 6/5/2025 11 Dist Capital or Expense 9/18/2025 11 Dist Capital or Expense 3/24/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 8/19/2022 11 Asset Mgmt - Specific DESG CT 7/25/2022 11 Damage Claims OH 9/17/2025 11 Dist Capital or Expense 3/25/2025 11 Elect Annual Proj - DESG CT 11/4/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 3/17/2025 11 Elect Annual Proj - DESG CT 3/17/2025 11 Damage Claims OH 10/23/2025 11 Dist Capital or Expense 10/2/2025 11 Dist Capital or Expense 7/25/2025 11 Elect Annual Proj - DESG CT 3/25/2025 11 Elect Annual Proj - DESG CT 4/10/2025 11 Elect Annual Proj - DESG CT 10/20/2025 11 Dist Capital or Expense 5/22/2025 11 Corrective Maint OH Lines 4/15/2025 11 Dist Capital or Expense 4/3/2025 11 Elect Annual Proj - DESG CT 11/4/2025 11 Dist Capital or Expense 3/27/2025 11 Elect Annual Proj - DESG CT 4/7/2025 11 Elect Annual Proj - DESG CT 4/7/2025 11 Elect Annual Proj - DESG CT 3/25/2025 11 Dist Capital or Expense 3/19/2025 11 Elect Annual Proj - DESG CT 3/18/2025 11 Dist Capital or Expense 3/22/2025 11 Elect Annual Proj - DESG CT 9/26/2025 11 Dist Capital or Expense 3/28/2025 11 Corrective Maint OH Lines 9/22/2025 11 Dist Capital or Expense 9/24/2025 11 Dist Capital or Expense 12/15/2022 11 Elect Annual Proj - DESG CT 9/17/2025 11 Dist Capital or Expense 11/18/2022 11 Elect Annual Proj - DESG CT 6/7/2023 11 Elect Annual Proj - DESG CT 8/21/2025 11 Dist Capital or Expense 8/21/2025 11 Elect Annual Proj - DESG CT 5/6/2025 11 Dist Capital or Expense 3/20/2025 11 Elect Annual Proj - DESG CT 3/20/2025 11 Elect Annual Proj - DESG CT 3/15/2025 11 Elect Annual Proj - DESG CT 10/3/2022 11 Elect Annual Proj - DESG CT 11/4/2022 11 Elect Annual Proj - DESG CT 5/1/2025 11 Dist Capital or Expense 7/21/2025 11 Elect Annual Proj - DESG CT 6/3/2025 11 Street Light - DESG CT 6/26/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 3/18/2025 11 Dist Capital or Expense 5/29/2025 11 Dist Capital or Expense 3/17/2025 11 Damage Claims OH 7/30/2025 11 Elect Annual Proj - DESG CT 4/17/2025 11 Dist Capital or Expense Subsequent Close Date 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 4/20/2026 2/13/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 9/16/2026 9/16/2026 1/22/2026 5/15/2026 2/13/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 2/14/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 262 1,697 4,854 2,768 6,937 1,504 6,952 (103) 2,188 19,846 3,017 7,547 4,345 6,158 8,245 165 9,258 5,034 746 11,222 3,550 11,141 2,724 8,951 8,595 4,967 19,910 12,136 2,444 5,827 2,778 3,058 20,103 21,158 5,031 11,565 (1) 6,691 10,559 3,398 7,618 11,558 7,080 7,467 5,471 635 3,597 1,569 3,192 6,243 2,471 5,279 764 6,765 137 4,794 1,050 970 6,682 4,015 1,100 1,770 544 9,208 967 2,611 772 18,716 909 3,087 1,553 2,192 1,637 8,875 18,769 5,800 2,321 7,179 5,753 6,590 5,844 6,075 11,396 3,944 4,803 301 698 466 1,271 2,000 20,287 701 151 1,084 222 231 1,635 1,299 887 750 3,067 7,330 5,457 5,175 558 365000 Overhead Conductors, Device 602 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 442 4,496 1,322 6,711 (108) 1,062 15,575 2,647 1,672 491 17,016 20,210 140 (53) 260 2,814 2,793 4,201 1,165 1,693 1,869 8,368 185 762 1,308 1,355 20,283 1,714 1,871 4,101 713 3,987 10,839 96 245 792 287 368 862 194 92,315 561 37,132 13,716 543 2,929 1,532 2,612 721 1,886 1,532 178 1,854 124 (12) 282 82 2,339 1,453 104 1,028 383 419 582 3,099 2,054 269 837 55 5,090 1,146 1,483 16 150 23 457 257 288 573 3,366 41 3,016 1,550 3,024 4,124 8,427 16,883 1,454 11,994 326 426 269 2,174 11,802 1,678 928 3,409 90 643 2,187 941 900 354 146 420 2,776 466 (24) 294 452 592 65 28 508 2,371 21,379 1,628 180 487 1,164 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 864 1,697 5,296 7,264 8,259 1,504 51,029 (264) 3,250 35,421 5,664 9,218 4,836 6,158 8,245 165 9,518 7,848 3,539 15,423 4,715 11,141 6,286 8,951 16,962 5,152 19,910 12,136 3,205 7,135 2,778 5,301 40,630 22,872 7,558 15,666 1,574 11,432 59,073 109,429 10,547 13,090 7,080 10,079 6,180 2,803 5,210 1,748 5,046 8,705 2,471 6,731 867 7,793 519 4,794 1,485 1,552 9,781 6,069 1,520 2,631 599 14,298 2,113 4,094 772 18,716 909 3,543 1,810 2,479 2,251 12,241 21,786 7,350 2,321 10,204 9,877 32,328 5,844 7,529 24,276 3,944 4,803 301 1,023 957 1,568 4,174 32,089 2,887 3,450 25,871 312 874 3,822 1,299 1,828 1,650 3,421 9,105 5,877 9,783 1,024
  9. Page 39 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 39 of 104 Work Order Number Description 80280808 (LC) DJM. 9 OVER ROCK LN WESTPORT. 80280815 9A CAR VS POLE - APPROVED 4/29/2026 80280819 RM, 11 WILDWOOD LN - WESTON!! RPLC 80280847 PRINT 8/22 JFC - LITCHFIELD, BUELL, 80281029 Windham_Prospect St_Xfmr Overloads 80281030 DJM. 88 MORNINGSIDE DR S WESTPORT. 80281048 59 MADISON RD DURHAM POLE 150 80281128 03/07-AWC-WESTFORD( 309) RD -80281159 MANCHESTER, 192 HARTFORD, Pole#4690 80281198 *WTBY AWC*SMD - 11N86 Backbone Reli 80281291 PRINTED 7/26 JSG/CD02047 4L06 Regu 80281441 3.17.25 EVENT 5631659 P# 455 17 80281448 BWG- CD02353 MLG 991KW Photovoltaic 80281464 09/26/24 - 9A - Oswegatchie Rd / Ke 80281495 MM Pine Crest Plainfield P#2777 & P 80281500 *ASP* Frontier Inspection Pole Shif 80281517 *ASP* Frontier Pole Inspection Pole 80281538 DONE PRINT BJQ, GOSHEN, P #1383 (36 80281546 ALL WORK COMPLETE (GP) NEW POLE_ OA 80281561 Appr Grp Stonehouse Rd 236, Coventr 80281564 *ASP* Frontier Pole Inspection Pole 80281565 *ASP* Frontier Inspection Pole Shif 80281569 *ASP* Frontier Pole Inspection Pole 80281578 *ASP* Frontier Pole Inspection Pole 80281583 *ASP* Frontier Pole Inspection Pole 80281595 (em) ZK - GRANBY (Pole Replacements 80281596 JRP - Atkins Rd SOG P#540 Replace P 80281599 *ASP* Frontier Pole Inspection Pole 80281600 *ASP* Frontier Pole Inspection Pole 80281614 *ASP* Frontier Pole Inspection Pole 80281622 *ASP* Frontier Pole Inspection Pole 80281672 TW - CD01225 (AIMS Seg 08 Part 1 o 80281679 DJM. 15 MORNINGSIDE LN WESTPORT. NE 80281712 MJ-Jpt-158 Concord St Bristol P1169 80281757 WQ; 7/13/22 *9A* UPPER GRASSY HILL( 80281820 DONE HOLD FTR POLE print 8/15 EVW 80281828 PRINTED 7/26 JSG/CD02047 4L09 Regul 80281862 MM Mason Hill Rd Killingly P#3310 R 80281890 (VC) 3/17/25 9A TURNOVER BELL HILL 80281891 COMP TC 303 STANWICH RD, GRN: REPL' 80281904 MG-P#283-BROOKLYN, HYDE(15) RD-INST 80281928 15D 6/26 PM-86 COMMERCE ST BERLIN-N 80281945 9A CAR VS POLE#920 - APPROVED 4/29/ 80282110 *ASP* Frontier Inspection Pole Shif 80282115 9A CAR VS POLE- APPROVED 4/9 80282131 *ASP* Frontier Pole Inspection Pole 80282136 OK to close 45'/2 set and shifted 0 80282203 Boston Tpke 241, Coventry. Replace 80282208 *ASP* Frontier Pole Inspection Pole 80282216 9A-MG-P#1750 BUTTS BRIDGE( 194) RD 80282217 AP- 1620 Farmington Ave, Farmington 80282233 (LC) RM,23 APPLETREE LN - NORWALK,! 80282246 *ASP* Frontier Pole Inspection Pole 80282291 DG P#1496 111 STONE BRIDGE RD WOODS 80282330 DONE***WRITTEN***REPLACE 35' POLE W 80282357 DB--CD01693-01, 36F5 load relief, O 80282358 ASPLUNDH 7/21 PR 7/18 VJT-THOMASTON 80282359 DB--CD01693-01, 36F5 load relief, O 80282404 TW - CD01225 (AIMS Seg 16 Work, Par 80282536 MG-P#3257--BROOKLYN, HYDE(7) RD-INS 80282554 MAR -POST CONST> 3/11/25 MAY( 452 80282565 JLB 113 OLD KINGS HWY S DARIEN RELO 80282580 WTG ON PR 4/14/25 (VR) - 3/17/25 9A 80282582 15D AP- 305 Washington St Garage (a 80282589 *D&D* Frontier Pole Inspection Pole 80282605 *ASP* Frontier Inspection Pole Shif 80282613 TL - SILL LN, #62 OLD LYME // SHIFT 80282616 03/06/25 Assigned Feds 03-11-25 Hop 80282620 *ASP* Frontier Pole Inspection Pole 80282621 *D&D*Frontier Pole Inspection Pole 80282642 MATERIAL 7/11/22 Y-26787-2022 QUAKE 80282746 ALL WORK COMP* SHIFT WIRES (GP) 9A 80282748 9A- CAR VS POLE- approved 9/4 80282749 DG P#3240 SENEXET RD WOODSTOCK RPLC 80282778 *ASP* Frontier Pole Inspection Pole 80282802 *ASP* Frontier Pole Inspection Pole 80282807 *ASP* Frontier Pole Inspection Pole 80282874 *ASP* Frontier Pole Inspection Pole 80282899 02/17/25 (NL Line) BRUSH HILL (73) 80282905 MPB; INT-104964 WO# 20401432 DANBUR 80282931 DG P#1578 RT 198 WOODSTOCK RPLC'D 2 80282964 EM Turnover - AWC - 1130 N COLONY 80282992 SL - 177 New Haven Rd, Prospect - ( 80283004 JFM-1452 WOODTICK RD (P#85) *POST C 80283023 (DF) NEW STUB 35' POLE ANC & GUYING 80283042 work completed in field - 03/17-AWC 80283049 *ASP* Frontier Pole Inspection Pole 80283057 *ASP* Frontier Pole Inspection Pole 80283059 PRINT MJP / CD02521 / DNB / Install 80283095 WO 20416958 - INT-105051- DG UPGRAD 80283116 *ASP* Frontier Pole Inspection Pole 80283140 3/19/25 9A (RSO HERMAN-TURNOVER) EV 80283159 *ASP* Frontier Pole Inspection Pole 80283170 9A- VEHICLE VS POLE - NO RESPONSIBL 80283175 *ASP* Frontier Pole Inspection Pole 80283186 PRINT MJP / CD02521 / DNB / Install 80283196 15D 8/1 WTBY @MAR - 1347 New Haven 80283201 *ASP* Frontier Pole Inspection Pole 80283205 TW - CD01225 (AIMS Seg 07, Part 1 o 80283209 OLD SAYBROOK, NEHANTIC, 104/RPL POL 80283216 *ASP* Frontier Pole Inspection Pole 80283220 DONE PRINT BJQ - 3/16/25 P #14430:C 80283228 Old County Rd 238, WL. P-7734 strai 80283246 PRINT BJQ, LTCH, P332-S (484) S PLA 80283271 *ASP* Frontier Pole Inspection Pole in-service date work order type 12/22/2025 11 Dist Capital or Expense 4/1/2025 11 Damage Claims OH 4/29/2025 11 Dist Capital or Expense 8/30/2022 11 Temporary Work DESG CT 7/20/2023 11 Elect Annual Proj - DESG CT 5/6/2023 11 Dist Capital or Expense 10/13/2022 11 Elect Annual Proj - DESG CT 4/29/2025 11 Corrective Maint OH Lines 9/12/2025 11 Dist Capital or Expense 9/17/2025 11 Dist Capital or Expense 10/3/2022 11 Asset Mgmt - Specific DESG CT 6/5/2025 11 Dist Capital or Expense 7/16/2025 11 Asset Mgmt - Specific DESG CT 4/17/2025 11 Damage Claims OH 4/2/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 3/27/2025 11 Elect Annual Proj - DESG CT 4/23/2025 11 Dist Capital or Expense 7/17/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/21/2025 11 Corrective Maint OH Lines 3/28/2025 11 Dist Capital or Expense 7/18/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 11/4/2025 11 Dist Capital or Expense 10/26/2022 11 Elect Annual Proj - DESG CT 5/22/2023 11 Elect Annual Proj - DESG CT 8/15/2022 11 Damage Claims OH 11/3/2022 11 Corrective Maint UG Svc 10/3/2022 11 Asset Mgmt - Specific DESG CT 9/6/2022 11 Elect Annual Proj - DESG CT 3/21/2025 11 Dist Capital or Expense 3/21/2025 11 Dist Capital or Expense 7/15/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 5/19/2025 11 Damage Claims OH 6/12/2025 11 Dist Capital or Expense 5/21/2025 11 Damage Claims OH 7/18/2025 11 Dist Capital or Expense 4/8/2025 11 Elect Annual Proj - DESG CT 4/23/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 3/19/2025 11 Dist Capital or Expense 4/23/2025 11 Dist Capital or Expense 9/4/2025 11 Corrective Maint UG Svc 6/26/2025 11 Dist Capital or Expense 6/13/2025 11 Dist Capital or Expense 10/19/2022 11 Elect Annual Proj - DESG CT 2/12/2024 11 Asset Mgmt - Specific DESG CT 8/2/2022 11 Elect Annual Proj - DESG CT 2/14/2024 11 Asset Mgmt - Specific DESG CT 10/25/2025 11 Dist Capital or Expense 7/14/2025 11 Dist Capital or Expense 4/17/2025 11 Elect Annual Proj - DESG CT 5/14/2025 11 Corrective Maint OH Svc 4/17/2025 11 Dist Capital or Expense 3/28/2025 11 Dist Capital or Expense 5/12/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 5/22/2025 11 Dist Capital or Expense 4/10/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 3/7/2023 11 Elect Annual Proj - DESG CT 3/31/2025 11 Dist Capital or Expense 4/1/2025 11 Damage Claims OH 3/21/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 4/14/2025 11 Corrective Maint OH Lines 11/28/2025 11 Dist Capital or Expense 3/24/2025 11 Dist Capital or Expense 4/30/2025 11 Elect Annual Proj - DESG CT 3/24/2025 11 Elect Annual Proj - DESG CT 3/21/2025 11 Damage Claims OH 8/29/2023 11 Street Light - DESG CT 3/26/2025 11 Corrective Maint OH Lines 5/6/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 4/21/2025 11 Elect Annual Proj - DESG CT 6/26/2025 11 Dist Capital or Expense 4/5/2025 11 Damage Claims OH 5/13/2025 11 Dist Capital or Expense 8/26/2025 11 Damage Claims OH 5/13/2025 11 Dist Capital or Expense 12/1/2025 11 Dist Capital or Expense 9/5/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense 5/27/2025 11 Asset Mgmt - Specific DESG CT 5/6/2025 11 Corrective Maint OH Svc 5/13/2025 11 Dist Capital or Expense 6/4/2025 11 Dist Capital or Expense 4/9/2025 11 Dist Capital or Expense 7/22/2025 11 Dist Capital or Expense 5/13/2025 11 Dist Capital or Expense Subsequent Close Date 4/20/2026 8/26/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 9/16/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 8/26/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 2,056 21,637 6,000 843 7,624 3,053 31 468 4,723 3,353 49,676 15,272 54,564 10,526 1,896 2,298 153 301 1,661 109 273 543 1,421 419 270 3,572 2,066 1,179 1,201 557 401 13,090 4,859 7,918 445 201 147,942 4,942 15,837 6,115 651 150 8,185 722 836 381 9,083 872 583 3,431 2,509 (92) 188 3,597 1,247 23,148 1,793 13,899 12,299 4,807 413 4,220 1,106 2,577 122 561 659 1,780 366 116 1,539 11,019 9,531 1,162 819 807 1,219 260 2,142 485 2,331 4,492 1,444 2,743 7,396 940 864 1,560 (231) 1,429 198 1,311 740 1,999 266 (219) (1,221) 200 7,406 1,487 719 1,148 7,250 812 877 365000 Overhead Conductors, Device 1,313 2,224 2,120 2,857 3,802 2,632 (4) 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 486 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 1,185 160 557 203 11 2,769 221 (0) 3,491 2,387 60,909 69 128,962 7,945 640 3,772 1,087 180 6,878 (100) 1,200 4,819 1,246 1,870 635 1,247 603 22 173 457 1,003 1,948 567 1,627 754 677 1,018 4,338 328 523 969 34,210 32 240 67 17 3,568 270 328 94,356 468 16,829 658 2,905 842 1,080 2,845 4,510 1,064 260 2,319 698 451 270 (1) 1,285 (747) 95 186 287 487 2,163 3,377 1,255 163 608 126 (19) 280 508 22,219 642 8,704 149,029 1,314 256 (39) 34 652 6,471 372 5,171 1,731 725 131 217 340 1,331 232 72 1,016 331 65,645 623 877 2,237 983 969 1,931 3,176 5,157 453 3,930 359 208 1,498 657 938 662 284 123 1,037 14,474 2,032 552 634 743 14,285 (2,375) 1,502 7,813 44 111 261 (6) 186 (18) (2,401) (361) 153 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 5,039 23,861 8,280 4,257 11,628 8,686 27 468 15,092 5,740 110,485 15,340 187,231 25,140 2,558 7,489 1,240 481 1,661 566 1,276 2,491 1,988 2,046 1,024 4,281 3,324 5,517 1,528 1,080 1,438 47,300 6,161 10,740 715 912 242,483 5,410 35,317 6,773 4,811 5,140 9,265 3,692 5,345 1,445 9,343 3,191 1,281 3,882 2,779 (152) 188 3,877 1,790 52,490 2,435 28,146 161,328 7,852 670 4,945 1,237 3,360 462 1,892 2,388 1,852 1,382 447 67,185 11,642 11,065 3,399 1,801 1,777 1,219 260 2,142 3,354 5,507 9,649 1,897 7,619 7,396 1,063 1,901 1,560 14,237 3,646 749 1,945 740 1,999 1,009 14,048 (6,358) 1,702 15,220 1,684 719 1,259 7,250 1,073 877
  10. Page 40 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 40 of 104 Work Order Number Description 80283336 *ASP* Frontier Pole Inspection Pole 80283340 SD; 2 N MAIN ST. BEACON FALLS-INSTA 80283345 9A - CAR VS POLE 1612 - APPROVED 6/ 80283348 15d 7/7 LD - 120 GARFIELD ST, NEWIN 80283365 DONE PRINT JSG - 3/16/25 RIVERTON ( 80283368 9A*-03/19-RSO-[durkee, peterson, ri 80283378 WRTN,BM,350 BARN HILL ROAD,MON. OH/ 80283386 Work Complete 3/18/25-- 153 WEST RD 80283466 DAISYMAE WO 20314600-INT-105567-DG 80283512 DIG UP- NON BILLABLE DUE TO NO POLI 80283535 9A KD-EVENT #4790892 TURNOVER CAR V 80283650 PRINTED 7/25 VJT - CLAY ( 66) ST 80283670 -YA; 2 CROWN LN; RMV PROPERTY POLE 80283776 DJM. 4 COACH LN WESTPORT. NEW 400A 80283780 4/10 EVW - 181 Housatonic River Rd, 80283856 CRP - 3/7 - TREE DOWN - POLE #386 80283859 ALL WORK COMP* (GP) Replace pole 65 80283898 AE/DL King St, Stm P#71523 Ins/Rem 80283911 LD - 8 PETEMONT DR, FARMINGTON- P62 80284074 *TURNOVER* E# 5363876 3/20/25 W S 80284100 *ASP* Frontier Inspection Pole Shif 80284101 EM AE/RL DWIGHT LN GRN ROW- REPLACE 80284102 AC-8 TABER RD, SHERMAN-P#A4685-25kV 80284121 DONE-BJQ - 3/7 - LIMB ON LINES, POL 80284126 *ASP* Frontier Inspection Pole Shif 80284131 *D&D* CD02449 Frontier Pole Inspect 80284149 *ASP* Frontier Pole Inspection Pole 80284163 *ASP* Frontier Pole Inspection Pole 80284165 *ASP* Frontier Inspection Pole Shif 80284209 * LD - 210 STAGE COACH RD, DURHAM 80284246 RN) 4/15/25 NO PD RPT - NO CASE # / 80284479 MM Main st X Spruce st Srpague / Ha 80284546 DONE PRINT EVW - 40 Clayton Rd, Nor 80284555 AE/JD; 86 ECHO HILL DR STAMFORD; RE 80284558 PRINT EVW - Beebe Hill Rd, Canaan P 80284563 MG-P#27= 9A -LOW WIRES/UNKNOWN LACR 80284573 (LC) RM, 38 STEEP HILL RD - WESTON 80284608 BM, BELL HILL RD,WASHTON,REPLACE RO 80284618 03.13.23 (Maldoga) Pending Aldenone 80284697 TL - BROWNS LN, REF. #26 OLD LYME / 80284901 212 BLUEBERRY HILL RD, HARWINTON. 80284904 *ASP* Frontier Pole Inspection Pole 80284931 Appr Grp Oak Dr 6, Ashford. Frontie 80284941 *ASP* Frontier Pole Inspection Pole 80284942 CRP - 3/7 - TREE LIMB - POLE #9874 80284978 RM, 3 ALEWIVES RD - NORWALK !! SET 80285041 *ASP* Frontier Pole Inspection Pole 80285054 *ASP* Frontier Pole Inspection Pole 80285055 ZK - FCOMP - W HTFD (Pole Replaceme 80285061 Mapleton Ave 1520, Suffield. Fronti 80285062 *D&D* CD02449 Frontier Pole Inspect 80285066 GRANBY (1ph Line Ext) - 336 NORTH G 80285072 EVW - 3/8 - TREE - POLE #1449 - S S 80285082 *MATERIAL HASNT COME OVERDG FRNTR P 80285260 DG P#227 112 DUGG HILL RD WOODSTOCK 80285342 Storrs Rd, 1569, Mansfield. Damaged 80285384 CON ID#2779 DB CABLE FAILURE 101395 80285473 *WORK COMP* MM - 159 OENOKE RIDGE, 80285481 ALL WORK COMP* (GP) FOOT HILLS POLE 80285492 work comp - 9A - 3/22 - RSO - sabou 80285498 DG P#842 CHAPLIN RD EASTFORD CLP PO 80285509 15 DD BY 10/1/24 KTI BM; BEACON FA 80285538 JAM - 106 Old Hatchery Rd. Berlin 80285568 MJ--MCB - 72 GRANT RD BETHANY, SHIF 80285657 Hinkel Mae Dr 347, Coventry. Replac 80285659 ALL WORK COMP* (GP) POLE 2339 DURHA 80285662 MG-(EM)-P#1606-RPLC WITH 40/2, DG/A 80285675 Jpt-150 Lynn Rd Bristol P10923 - DG 80285695 Lindholm's Cor 3, Andover. RSO Turn 80285702 Done PRINT BJQ - 03/21 (santamaria) 80285709 165 SOUTH ST., VERNON. - INSTALL CR 80285718 IN PROGRESS 3/24/25 - 9A- 278 FLAND 80285720 MM 9A 11 Bazinet Lane P#272 ES repl 80285729 REPLACE POLE (GP) BOSTON POST( 2) R 80285730 CC; NEWTOWN, HUNTINGTOWN, 140 PUMP 80285731 9A CAR VS POLE - APPROVED 12/9/25 80285741 ALL WORK COMP* (GP) Repair Pole Top 80285758 ALL WORK COMP* (GP) POLE 2129 :HAYD 80285809 MN25P011 Storm Charge out Poles and 80285812 NS AE/TC 5 MOHAWK LN, GRN: PAD5024 80286108 CRP - 3/22 - POLE TOP BURNT - POLE 80286110 CC; BETHEL, WHIPPOORWILL RD, 52 80286138 **ALL WORK COMP** KM POLE6547&POLE6 80286139 562 FARMINGTON AVE, BRISTOL POLE#22 80286140 *ASP* Frontier Inspection Pole Shif 80286157 *ASP* Frontier Inspection Pole Shif 80286161 SD - MIDDLEBURY, BREAKNECK HILL, 82 80286165 PRINT MDB- CON-40 // PROJECT #017480286179 03/07/25 Assigned Feds 03/10/25 Win 80286183 *ASP* BC - Conv. 1787806 - Make Rea 80286185 PRINT BJQ - WARREN, RABBIT HILL, 16 80286190 DONE-BJQ - 3/17 - TREE -- POLE #402 80286191 SMD - 3/21/25 19288:DWYER:RD:MIDDL 80286313 JS - Conv. 1191980 - Make Ready Non 80286356 RM, 23 CALVIN MURPHY DR - NORWALK,! 80286456 M/L/C,BM; MONROE, MAIN, 685 , Calit 80286462 9A - CAR VS FRONTIER POLE 592 - APP 80286482 ALL WORK COMP* REPLACE POLES (GP) E 80286502 JTR, CD02426, 520 Bloomfield Ave, W 80286504 *WTBY AWC*SD - MIDDLEBURY, SOUTHFOR 80286506 DONE-BJQ - 3/24 - TORAWC TURNOVER 80286525 Ellington Rd 8, South Windsor. Junc 80286530 DAISYMAE - 223 JOBS POND ROAD - POR 80286616 NS RF:27 WESTON HILL RD, RIVERSIDE: 80286807 * JJH REMOVE 140K FUSES ON POLE#134 in-service date work order type 7/18/2025 11 Elect Annual Proj - DESG CT 6/25/2025 11 Dist Capital or Expense 6/5/2025 11 Damage Claims OH 6/16/2025 11 Elect Annual Proj - DESG CT 5/2/2025 11 Dist Capital or Expense 3/31/2025 11 Dist Capital or Expense 7/14/2025 11 Corrective Maint UG Svc 3/20/2025 11 Dist Capital or Expense 7/31/2025 11 Elect Annual Proj - DESG CT 9/9/2022 11 Damage Claims OH 10/31/2022 11 Damage Claims OH 8/26/2022 11 Elect Annual Proj - DESG CT 10/12/2023 11 Dist Capital or Expense 12/29/2022 11 Elect Annual Proj - DESG CT 7/3/2023 11 Elect Annual Proj - DESG CT 4/23/2025 11 Dist Capital or Expense 4/2/2025 11 Elect Annual Proj - DESG CT 6/2/2025 11 Elect Annual Proj - DESG CT 4/3/2025 11 Dist Capital or Expense 4/25/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 7/11/2025 11 Corrective Maint OH Lines 10/6/2025 11 Dist Capital or Expense 3/31/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 5/14/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 5/6/2025 11 Dist Capital or Expense 7/18/2025 11 Dist Capital or Expense 4/1/2025 11 Dist Capital or Expense 3/30/2025 11 Damage Claims OH 8/1/2022 11 Elect Annual Proj - DESG CT 5/28/2025 11 Dist Capital or Expense 5/7/2025 11 Dist Capital or Expense 5/22/2025 11 Dist Capital or Expense 3/26/2025 11 Damage Claims OH 12/16/2025 11 Corrective Maint OH Svc 4/29/2025 11 Dist Capital or Expense 5/12/2023 11 Elect Annual Proj - DESG CT 10/12/2022 11 Elect Annual Proj - DESG CT 4/10/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 4/10/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 4/23/2025 11 Elect Annual Proj - DESG CT 5/8/2025 11 Corrective Maint OH Svc 6/12/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 4/2/2025 11 Elect Annual Proj - DESG CT 4/5/2025 11 Elect Annual Proj - DESG CT 6/4/2025 11 Dist Capital or Expense 10/20/2025 11 Dist Capital or Expense 4/8/2025 11 Elect Annual Proj - DESG CT 4/15/2025 11 Damage Claims OH 11/16/2022 11 Elect Annual Proj - DESG CT 4/29/2025 11 Corrective Maint OH Lines 12/13/2023 11 Elect Annual Proj - DESG CT 4/23/2025 11 Elect Annual Proj - DESG CT 3/31/2025 11 Elect Annual Proj - DESG CT 3/29/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 12/9/2024 11 Elect Annual Proj - DESG CT 11/15/2022 11 Private Work - No Co Asset 9/21/2022 11 Street Light - DESG CT 3/26/2025 11 Elect Annual Proj - DESG CT 3/31/2025 11 Elect Annual Proj - DESG CT 6/9/2025 11 Dist Capital or Expense 4/8/2025 11 Elect Annual Proj - DESG CT 3/26/2025 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 3/31/2025 11 Dist Capital or Expense 3/28/2025 11 Damage Claims OH 3/31/2025 11 Damage Claims OH 4/23/2025 11 Dist Capital or Expense 10/9/2025 11 Dist Capital or Expense 8/29/2025 11 Damage Claims OH 4/1/2025 11 Dist Capital or Expense 3/31/2025 11 Elect Annual Proj - DESG CT 3/27/2025 11 Elect Annual Proj - DESG CT 7/31/2025 11 Elect Annual Proj - DESG CT 4/10/2025 11 Elect Annual Proj - DESG CT 6/20/2025 11 Dist Capital or Expense 3/31/2025 11 Elect Annual Proj - DESG CT 4/29/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 6/12/2025 11 Dist Capital or Expense 6/18/2025 11 Corrective Maint UG Svc 4/29/2025 11 Elect Annual Proj - DESG CT 5/23/2025 11 Dist Capital or Expense 7/22/2025 11 Elect Project - DESG CT 8/27/2025 11 Dist Capital or Expense 3/25/2025 11 Dist Capital or Expense 3/26/2025 11 Elect Annual Proj - DESG CT 11/9/2022 11 Elect Project - DESG CT 7/14/2025 11 Corrective Maint OH Svc 7/25/2025 11 Elect Annual Proj - DESG CT 4/1/2025 11 Damage Claims OH 3/31/2025 11 Damage Claims OH 12/17/2025 11 Asset Mgmt - Specific DESG CT 8/28/2025 11 Dist Capital or Expense 3/26/2025 11 Elect Annual Proj - DESG CT 5/28/2025 11 Dist Capital or Expense 12/16/2025 11 Dist Capital or Expense 11/16/2022 11 Elect Annual Proj - DESG CT 8/4/2025 11 Elect Annual Proj - DESG CT Subsequent Close Date 9/16/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 6/26/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 7/17/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 1/22/2026 364310 Poles and Appurtenance 1,072 3,100 6,658 1,154 5,411 2,966 262 1,313 6,985 3,549 1,958 7,535 4,262 1,056 1,994 1,134 492 427 973 351 590 3,415 1,715 236 1,327 202 274 262 163 1,013 1,510 1,373 164 2,913 473 4,718 3,711 7,747 (184) 584 901 567 395 210 3,080 4,152 926 1,864 1,216 1,160 115 1,618 717 6,564 3,925 366 23,952 2,064 752 1,376 12,080 4,945 248 4,172 5,116 1,933 4,269 1,518 157 474 3,663 15,211 3,373 11,341 595 1,047 3,079 1,754 7,514 7,691 1,495 3,227 49 7,722 2,358 269 2,548 4,412 570 1,365 655 443 706 879 2,657 5,440 866 5,207 281,860 7,025 4,322 1,809 6,083 527 1,039 365000 Overhead Conductors, Device 176 130,242 1,763 8,783 1,429 5,919 453 153 3,695 4,727 461 366700 DB/UG Conduits and Vaults 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 187 292 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 2,123 318 375 354 4 3,288 330 651 1,578 3,767 34,125 113 33 835 1,536 25 1,932 1,487 764 731 974 1,758 367720 DB/UG Conductors and devices 369720 DB/UG Conductors and Devices 0 5,924 831 332 732 125 139 488 744 1,033 150 1,098 159 64 1,234 529 251 (184) 621 1,257 800 2,579 1,554 14,711 204 1,111 52 851 330 1,723 61 1,653 576 20,016 1,535 936 1,301 4,080 4,022 43 5,282 1,098 660 2,606 997 67 2,189 222 438 375 1,611 7,630 499 463 69,840 65,026 818 117 255 2,938 382 58 216 28 2,278 510 1,038 213 70 1,703 777 494 1,944 6,441 5,690 296 209 3,415 1,748 106 119 4,339 1,309 13,285 829 30 17 4,422 575 422 2,532 166 16,576 532 277 312 6,834 338 5,275 1,419,954 2,425 1,098 1,220 150 363 30,402 6,744 918 78 15 2,624 27,956 107 1,429 151 393 1,325 136 1,276 697 27 215 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 1,248 133,342 8,608 12,352 6,840 9,203 1,089 1,466 11,034 8,276 2,423 7,535 14,305 1,843 3,515 2,712 4,746 34,551 1,087 384 590 4,250 6,277 261 3,259 1,689 1,038 993 1,137 2,772 1,510 1,532 227 2,913 1,707 4,718 4,492 7,747 (368) 1,205 2,158 1,367 3,196 1,765 17,791 4,794 2,037 1,864 1,642 2,010 446 12,583 778 8,217 5,000 829 178,834 4,416 1,806 2,677 16,414 12,286 291 9,454 6,272 2,593 7,091 2,543 224 2,663 3,663 17,489 3,883 11,341 3,619 1,824 3,573 3,817 18,293 28,804 1,821 3,227 275 11,137 8,528 375 3,123 4,833 3,102 1,531 24,893 1,052 998 1,191 2,657 16,224 1,205 10,589 1,731,336 10,877 5,813 3,029 6,930 1,132 31,442

Text of NECTA-119 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-121_Final.pdf

Extracted from the file · 1 page · 1,602 characters

Words on different pagesRead the text of NECTA-121_Final.pdf

Text of NECTA-124_Final.pdf

Extracted from the file · 2 pages · 2,271 characters

Words on different pagesRead the text of NECTA-124_Final.pdf

Text of NECTA-125_Final.pdf

Extracted from the file · 2 pages · 2,741 characters

Words on different pagesRead the text of NECTA-125_Final.pdf

As listed on the current system

Question(s) Answered 116, 117, 118, 119, 121, 124, 125 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)