Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 116, 117, 118, 119, 121, 124, 125

Files17

Search terms highlighted
Eversource rate increase is on 4 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
3 pages match
Words on different pages
Words on different pages

Text of NECTA-117_Final.pdf

Extracted from the file · 1 page · 1,566 characters

Text of NECTA-117 Attachment 1.pdf

Extracted from the file · 1 page · 619 characters

Text of NECTA-117 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118_Final.pdf

Extracted from the file · 2 pages · 4,116 characters

Words on different pagesRead the text of NECTA-118_Final.pdf

Text of NECTA-118 Attachment 1.pdf

Extracted from the file · 1 page · 7,949 characters

Text of NECTA-118 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-118 Attachment 2 .pdf

Extracted from the file · 1 page · 592 characters

Text of NECTA-118 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-119_Final.pdf

Extracted from the file · 2 pages · 6,071 characters

Words on different pagesRead the text of NECTA-119_Final.pdf
Words on different pages
  1. Page 6 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 6 of 104 Work Order Number Description 80081938 PD 2 JORDAN COVE CIRCL WTFD/UPGRAD 80081963 15DD 12/9 DMD - 2300 BERLIN TPKE 80082029 MV-SALEM, 200 FORSYTH RD, INST PRI 80082038 *D&D* 141 MARCIA DRIVE, BRISTOL - D 80082127 DONE PRINT CRP - 09/09 RSO (SANTAM) 80082216 9A KD-EVENT #4528969/4529093 CAR V 80082420 WRTN - DM - 21H15 PORTLAND - LOAD B 80082465 GC / 12 MAINE COURT 80082515 LD 60 WILTON RD WESTPORT INS DB PRI 80082539 PD-334 ROPE FERRY RD WATERFORD/NEW 80082593 MISSING CIVARDI TIME 9A CAR V P SOU 80082602 WO 18646870, INT-98103, DG UPGRADE 80082603 (MJ Dock Crew) EVENT #4528062 REPL 80082656 **HOLD** POST CONTRUCTPM-Critical Y 80082769 ASH SWAMP RD 80083407 MK - Litchfield CD01242--DG Solar E 80083409 DONE EVW - 39 Cobble Rd, Salisbur 80083431 JMS- WINDSOR 812 BLOOMFIELD AVE 80083479 MCB - E MAIN ST, MERIDEN, CAR VS PO 80083623 CR-BUSHY HILL RD, SIMS, CAR VS P# 2 80083891 APPT Wed 7/14/21 9am---INSP--zBLOOM 80083896 6/9 9a KING ( 1675) ST -- 56, ENFIE 80084160 6/9 - 9A - Tolland, Old Cathole Rd 80084446 * COMP MJ MAR - P#86079 E. Summer S 80084656 EVW - WTG FOR PD RPT 10/15/24 (VR) 80084690 AMM 199 PLAINVILLE AVE,FARM - 9A P# 80084693 AMM 382 MEADOW RD,FARM. FRONTIER PO 80084720 9A KD-EVENT #4533295 CAR V P 2837 C 80084833 *** MJP/Davenport Ridge Rd/STM/CD00 80084834 ***MJP/Davenport Ridge Rd/NW-CAN/CD 80084880 *COMP MJ MAR - P#86175 Burwell - PO 80084994 CR-160 COUNTRY CLUB RD. AVON, REMOV 80085162 RA CD01246-01 ROW 13B21/13B27 ROW 80085169 DG P#3787 1678 RT 169 WOODSTOCK FRN 80085285 PD-200 GREAT NECK RD WATERFORD/4-LO 80085552 JLB 9A- 241 BELDEN HILL RD, WILTON/ 80085574 2.28 SECOND REQ PR MM 9A pole #1636 80085577 SC-P#889 FISK ST HAMPTON INST 45/2 80085580 PLANNED RC POLE 1202 REPLACE CAP BA 80085635 MCB - 06.10.21 - STRAWBERRY HL, DUR 80085810 WRTN - DM- 2 PORTLAND RD MARLBOROUG 80085878 MK - Litchfield CD01242--DG Solar E 80086077 MR Abel-PCC - 10 AVERY SHORES RD., 80086206 ZN Conv#1040107-MakeReadyNonReimb-T 80086210 prechecked REPLACE-OH-ANNUAL-DESG 80086236 (9A) 06.12.21 - 378 SOUTH ST, NEW B 80086573 ZN Conv#1040107-MakeReadyNonReimb-T 80086650 DONE 3/28 EVW - 60 Selleck Hill Rd, 80086852 ASP - PL:REPL JNCTN P#61386 & P# 61 80087553 MADISON, BOSTON POST, 634, 80087906 (9A) 06.19.21 - 682 QUEEN ST, SOUTH 80087982 GUILFORD, SHEEP PASTURE, 55 , Mark 80088035 Shift 2 frontier poles and replace 80088045 Ratley Rd 1250, Suffield. 10/15-RSO 80088113 *D&D*ontier Pole Inspection Pole Sh 80088145 JFC - 9A VEHICLE ACCIDENT, 6/20 EAS 80088182 *D&D*Frontier Pole Inspection Pole 80088204 JRP - 1395 Meriden Rd WOLCOTT Repl 80088383 DB-Bailey Cir, New London, cust. co 80088417 9A KD-EVENT #4538881 TRUCK V P 1341 80088499 ALL WORK COMPLETE 6/22 TURNOVER EAS 80088632 WEBSTER RD., ELLINGTON - SHIFT TO R 80088788 TL - HALLS RD, #90 OLD LYME // NEW 80088798 (9A) 06.22.21 - 70 SUNNYSIDE AVE, W 80088806 MM 9A #208 S Burnham Hwy Lisbon Ev 80088852 PD-107 MONTAUK AVE N. LONDON/RPLC P 80088862 (Prentice balance material) MRP 80089026 PL: (TEMP SVC) 850 MURDOCK AVE, MER 80089081 F.COMPL. *9A-10/16-RSO-[WINIAMF]-W 80089102 MM 71 Hyde Rd Brooklyn shift pole # 80089340 GC -06-21 MARA- - RPLC ROTTEN FRONT 80089422 MATERIAL DJM. 44 CLINTON AVE WESTPO 80089783 MK - Litchfield CD01242--DG Solar E 80089814 MAP KEEPING OPEN 80089817 SC-COLBRIDGE RD PLAINFIELD INST NEW 80090102 complete- PMV - CD00744-02 Install 80090162 ALL WORK COMPLETE RSO TURNOVER 9A 6 80090184 6/26 9A BLUE HILLS ( 1168) AVE -- 5 80090190 PD-31 WILLETTS AVE N. LONDON/RPLC 80090236 JV; 9A 6/26 BROWNING ( 24) RDcomp 80090249 COMPLETED CUST APPT 7/27 BM; SOUTHB 80090587 MK - Litchfield CD01242--DG Solar E 80090599 JMS-W HTFD ONE PARK RD - NEW APT CO 80090620 E HTFD, 249 SILVER ST - OH TO UG PR 80090889 C 80090978 MV - Elm St Stonington 80091000 DG P#11 27 COUNTY HOME RD THOMPSON 80091035 DG P#3676 72 CHANDLER SCHOOL RD WOO 80091469 MV - STONINGTON, 877 STONINGTON RD, 80091496 WAITING MUNI 6/2/22 OH WORK COMP CR 80091520 EVW - SELLECK HILL RD, SALISBURY P1 80091569 PD-116 SHORE RD WATERFORD/RPLC OH W 80091827 FLETCHER RD 120, ENFIELD - NEW 400A 80091920 DG P#227 RIVERSIDE DR THOMPSON FRNT 80092096 AMM 58 FARMINGTON AVE, FARMINGTON. 80092097 YA; 10 HILLSIDE RD; INST 2 POLES, 3 80092221 PRE245 NEED MATERIAL 1.28.22 9A CAR 80092254 RC REPLACE POLE 1360. 80092299 ALL WORK COMPLETE 7/1/21 (RSO - LEA 80092318 MK - Litchfield CD01242--DG Solar E 80092377 (E) W HTFD 31 BAINBRIDGE RD -- S243 80092409 9A KD-EVENT #4549664 CAR V P 9568 T 80092459 9A CAR VS POLE/pending possible add 80092481 7/2/21 9A HIRAM HILL RD MONROE - Fr 80092581 COPIED FROM WO# 4895888 Replace bro in-service date work order type 6/30/2021 11 Elect Annual Proj - DESG CT 11/22/2024 11 Elect Annual Proj - DESG CT 9/27/2022 11 Elect Annual Proj - DESG CT 2/14/2023 11 Elect Annual Proj - DESG CT 11/25/2024 11 Elect Annual Proj - DESG CT 7/14/2021 11 Damage Claims OH 5/1/2025 11 Elect Annual Proj - DESG CT 11/16/2021 11 Elect Annual Proj - DESG CT 4/18/2022 11 Elect Annual Proj - DESG CT 4/21/2025 11 Corrective Maint UG Svc 6/15/2021 11 Damage Claims OH 3/13/2025 11 Elect Annual Proj - DESG CT 10/31/2022 11 Elect Annual Proj - DESG CT 10/29/2024 11 Elect Annual Proj - DESG CT 12/8/2025 11 Dist Capital or Expense 1/20/2023 11 Asset Mgmt - Specific DESG CT 8/31/2021 11 Street Light - DESG CT 11/12/2021 11 Damage Claims OH 6/23/2021 11 Damage Claims OH 6/24/2021 11 Damage Claims UG 10/5/2022 11 Elect Annual Proj - DESG CT 6/17/2021 11 Damage Claims OH 6/15/2021 11 Damage Claims OH 6/30/2021 11 Elect Annual Proj - DESG CT 11/13/2024 11 Dist Capital or Expense 11/5/2025 11 Dist Capital or Expense 10/15/2025 11 Dist Capital or Expense 7/2/2021 11 Damage Claims OH 3/10/2023 11 Asset Mgmt - Specific DESG CT 3/10/2023 11 Asset Mgmt - Specific DESG CT 6/30/2021 11 Elect Annual Proj - DESG CT 11/4/2021 11 SV Exist OH/UG NOND ST2 CT 10/11/2023 11 Asset Mgmt - Specific DESG CT 9/10/2021 11 Elect Annual Proj - DESG CT 12/17/2021 11 Elect Annual Proj - DESG CT 5/6/2023 11 Damage Claims OH 6/23/2021 11 Damage Claims OH 8/26/2021 11 Elect Annual Proj - DESG CT 6/9/2022 11 Dist Capital or Expense 6/28/2021 11 Repair/Obsol OH ST2 CT 8/7/2025 11 Dist Capital or Expense 1/20/2023 11 Asset Mgmt - Specific DESG CT 2/28/2022 11 Asset Mgmt - Specific DESG CT 11/6/2023 11 Elect Project - DESG CT 6/8/2022 11 Elect Annual Proj - DESG CT 6/28/2021 11 Damage Claims OH 9/26/2023 11 Elect Project - DESG CT 4/13/2022 11 Elect Annual Proj - DESG CT 1/26/2022 11 Corrective Maint OH Lines 10/14/2021 11 Elect Annual Proj - DESG CT 10/7/2021 11 Damage Claims OH 12/21/2021 11 Elect Annual Proj - DESG CT 8/5/2021 11 Corrective Maint OH Lines 10/22/2024 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 8/3/2021 11 Damage Claims OH 10/5/2022 11 Elect Annual Proj - DESG CT 3/10/2022 11 Elect Annual Proj - DESG CT 7/26/2021 11 Elect Annual Proj - DESG CT 8/3/2021 11 Damage Claims OH 6/30/2021 11 Damage Claims OH 4/7/2025 11 Elect Annual Proj - DESG CT 10/18/2021 11 Elect Annual Proj - DESG CT 9/14/2021 11 Damage Claims OH 6/29/2021 11 Damage Claims OH 7/27/2021 11 Repair/Obsol OH ST2 CT 12/30/2025 11 Dist Capital or Expense 9/22/2025 11 Temporary Work DESG CT 12/19/2024 11 Damage Claims OH 9/17/2021 11 Elect Annual Proj - DESG CT 9/3/2021 11 Dist Capital or Expense 12/31/2024 11 Corrective Maint UG Svc 1/20/2023 11 Asset Mgmt - Specific DESG CT 4/2/2025 11 Damage Claims OH 10/21/2021 11 Elect Annual Proj - DESG CT 2/15/2023 11 Dist Capital or Expense 6/30/2021 11 Damage Claims OH 7/20/2021 11 Damage Claims OH 9/10/2021 11 Corrective Maint OH Lines 7/15/2021 11 Damage Claims OH 10/25/2024 11 Asset Mgmt - Specific DESG CT 11/7/2023 11 Asset Mgmt - Specific DESG CT 1/5/2023 11 Elect Annual Proj - DESG CT 8/24/2023 11 Asset Mgmt - Specific DESG CT 10/30/2024 11 Damage Claims OH 7/16/2021 11 Repair/Obsol OH ST2 CT 10/28/2025 11 Dist Capital or Expense 2/9/2024 11 Elect Annual Proj - DESG CT 12/20/2021 11 Elect Annual Proj - DESG CT 3/12/2024 11 Elect Annual Proj - DESG CT 7/27/2021 11 Repair/Obsol OH ST2 CT 8/17/2021 11 Asset Mgmt - Specific DESG CT 8/6/2025 11 Elect Annual Proj - DESG CT 7/21/2021 11 Damage Claims OH 12/20/2021 11 Elect Annual Proj - DESG CT 11/2/2021 11 Elect Annual Proj - DESG CT 11/3/2021 11 Damage Claims OH 12/4/2024 11 Street Light - DESG CT 8/24/2021 11 Dist Capital or Expense 11/7/2023 11 Asset Mgmt - Specific DESG CT 5/19/2023 11 Elect Annual Proj - DESG CT 8/20/2021 11 Damage Claims OH 12/3/2021 11 Damage Claims OH 7/29/2021 11 Damage Claims OH 7/28/2021 11 Repair/Obsol OH ST2 CT Subsequent Close Date 6/26/2026 9/16/2026 2/13/2026 9/16/2026 9/16/2026 5/15/2026 4/20/2026 4/20/2026 364310 Poles and Appurtenance 1,272 980 2,302 2,699 701 964 4,142 (128) 951 1,854 4,204 1,716 17,256 3,022 182 (308,604) 8,421 10,233 10,631 1,484 8,205 12,173 24,858 533 959 1,470 320 7,053 (0) 170 4,771 5,097 781,138 528 8,515 1,894 9,161 1,947 433 152 2,589 (11,621) 9,371 5,640 2,395 899 1,690 430 (321) 2,062 2,734 7,461 68 374 1,660 1,350 84 (1,153) 8,121 5,608 2,976 469 3,167 843 2,860 749 6,858 820 48 42 46 5,953 (2,685) 4,821 21,782 2,613 1,101 12,436 2,112 9,166 657 (1,409) 2,255 282 7,135 2,003 1,645 303 7,684 (20) 2,273 361 4,727 1,581 7,112 3,127 1,385 221 151 120 (116) 2,120 443 3,451 3,290 365000 Overhead Conductors, Device 387 3,001 944 789 817 2,245 (128) 1,123 1,161 112 600 4,854 94,329 1,338 (370,506) 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 2,185 5,701 96 9,010 2,183 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 118 32 339 238 204 7,513 (396) 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 274 391 363 (69,677) 1,075 7,055 204 2,329 6,767 2,115 205 1,251 1,518 661 1,660 413 1,672 9,511 29,552 109 1,788,004 1,495 8,706 1,438 2,228 13,030 1,873 479 1,690 (11,693) 2,690 1,611 12 381 3,981 1,415 26,549 84 314 (102) 703 114 115 493 2,023 (321) 1,819 1,197 3,846 20 179 841 184 588 (178) 8,646 1,189 2,644 920 269 288 1,030 21,282 466 11,547 331 119 (116) 97,759 814 682 404 2,377 76 378 126 1,638 (307) 461 (290) 80 214 44,961 72,859 26 225 632 (2,370) 11,031 17,144 56,308 1,730 2,698 280 388 3,261 (10,625) 1,912 1,234 5,903 2,617 5,876 860 9,581 (36) 446 53 1,797 3,469 5,764 1,469 114 761 21,607 1,109 57 1,301 31 2,033 459 22 365 41,003 5,067 2,988 5,108 93 62 219 255 1,857 365 326 566 (348) 350 848 100 7,633 5,999 621 120 (116) 120 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 1,933 4,438 11,164 3,488 701 1,781 6,387 (255) 11,419 5,199 4,316 2,911 22,110 97,351 9,396 (749,184) 8,421 11,308 17,686 1,688 10,534 19,602 28,634 737 2,209 3,400 320 8,725 9,511 29,734 4,771 5,205 2,569,142 3,165 42,808 3,332 11,388 16,392 28,855 715 4,594 (23,416) 13,446 7,366 2,395 1,014 2,183 5,234 (643) 15,882 3,931 13,071 87 553 2,501 1,534 671 (1,927) 17,228 6,797 5,619 1,469 3,649 1,131 3,891 749 145,960 1,311 48 1,434 46 7,885 (5,055) 15,852 41,450 58,944 2,831 15,134 2,392 9,554 7,272 (12,034) 52,135 6,676 13,038 5,047 7,521 1,707 18,086 (404) 2,719 764 7,472 5,051 21,129 10,595 1,499 221 482 478 (347) 99,879 443 4,265 3,290
  2. Page 7 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 7 of 104 Work Order Number Description 80092632 9A CAR VS POLE BRANFORD 80092701 CRP - replace reject pole 233 Steel 80093089 9A 07/02 81 ADAMS ST MANCHESTER POL 80093165 7/5 - 9A - Southbury, River Rd - ca 80093181 9A KD-EVENT #4552730 CAR V P 613 S 80093509 JES; 238 W.ROCKS RD. NORWALK, REPLA 80093525 EB; 7/6 SMITH RD EAST HADDAM 80093541 EVW - 9A 417 Newfield Rd, Torringt 80093626 DG P#3615 RT 197 WOODSTOCK FRNTR RP 80093672 KD- EVENT #4553497 REPLACE P 10663 80093969 DG P#4446 RT 171 WOODSTOCK FRNTR RP 80094038 7/8/21 44 PINE ROCK RD SOUTHBURY RD 80094056 7/7/21 WHEATON RD NEW MILFORD 80094218 PL: INST POLE #13595, REPL POLE #46 80094251 JDB 11/18/24 PD REPORT ENTERED (RR) 80094275 LAURELWOOD LN., VERNON - NEW 16-LOT 80094480 ***FCOMP***----zHAR OH 9A 10/16 - 1 80094682 CON40 MJGw - CDOT 82-321 Bridge No. 80096316 JLB 88 OLD HILL RD, WESTPORT MULTI 80096401 MAR - 119 Lincoln St, Naugatuck CT 80096561 ALL WORK COMPLETE RSO TURNOVER 7/12 80096673 *D&D*ZN Conv#1126340-MakeReadyNonRe 80096725 DR-LITCHFIELD CD01242- DG Solar Exp 80097011 *D&D*ZN Conv#1126340-MakeReadyNonRe 80097020 BRANFORD, COMMERCIAL, 131, Babbidge 80097038 print 12/21 EVW - 50 Tower Hill Rd, 80097049 9A CAR VS POLE # 1567 80097122 *D&D*ZN Conv#1126340-MakeReadyNonRe 80097225 DG P#525 CRYSTAL POND RD EASTFORD F 80097258 MJ-MAR - Pole Replacement done(More 80097274 *D&D*ZN Conv#1126340-MakeReadyNonRe 80097540 CR-141 WEST ST. SIMS, P# 2715, NEW 80097647 MR; ***ALL WORK COMPLETED*** 07-06 80097708 7/15 - Oxford, E Hill Rd - Replace 80097793 MAR - POST CONST> 7/14/21 NEED TT W 80098069 MCB - 07.04.21 - 1081 WATERTOWN AVE 80098084 BC - CD02567 - Town of Union - Inst 80098220 WRTN--JK/DM>P-1386--FTR TO SET POLE 80098549 (9A) 07.18.21 - 301 CLOUGH RD, WATE 80098559 9A -ADAMS (81) ST -- 1903, MANCHEST 80098669 ZN Conv#1074417-MakeReadyNonReimb-M 80098732 (9A) SD 251 OREGON RD, MERIDEN / EV 80098770 DG P#577 421 BROOKLYN RD POMFRET CL 80098855 MAR - Replace leaning/rotten pole # 80099151 *D&D*JS - Conv. 1635940 - Make Read 80099158 KD-EVENT #4571273 REPLC P 7741 EAGL 80099256 PD-22 PARK DRIVE WATERFORD/RPLC OH 80099264 MDB-HICKORY HILL RD., PHASE #2 80099389 DG P#819 BABBITT HILL RD POMFRET 2 80099655 ASP - Jpt-1275 (Rear) Wolcott Rd W 80099663 D&D TPA NetSpeed LLC Convo # 112630 80099733 JRP - 504 Wolcott Rd WOLCOTT Inst 1 80099962 MG; PRI CABLE FAULT; RPL CBL FROM P 80100249 MJ 12/10 -224 KUKAS LN, WATERBURY 80100382 MR; ***ALL WORK COMPLETED***9A 7/23 80100422 (9A) 07.22.21 - 76 JEFFREY LN, NEWI 80100487 DONE CRP - CASE ( 5) ST -- 275, 80100581 CD01244 Cranberry Bog Rd DG ( OLD S 80100582 CR-353 LOVELY ST AVON SHIFT POLE 40 80100822 OH COMP - METER PREQ ASPLUNDH 12/1 80100867 2.28 SECOND REQ PR MM 9A pole #475 80100917 9A HIGHLAND ( 341) ST -- 4914, MAN 80100960 MRP - POLE 16301S - CHRISTIAN RD MI 80101019 2/23 BYPASS MUNI DISCONNECT/RECONNE 80101040 GC - 7/25 CHURCH ( 21) LN -- , UN 80101141 CD01633 - White St Danbury Road Wi 80101144 (9A) 07.24.21 - 1453 NEW HAVEN RD, 80101330 23 RIVERSIDE DRIVE, PAWCATUCK 80101487 SD 218 JACKSON HILL RD, MIDDLEFIELD 80101617 Jpt-466 Willis St Bristol (Frnt)P41 80101637 Run 1/0 TW from 1326 to new FTR P-1 80101897 MR; ***ALL WORK COMPLETED***9A 7/27 80101939 40 ASHWORTH AVENUE 80102186 PD-450 PROV-N.L. TPKE N. STONINGTON 80102359 KD-EVENT #4579059 LOW SVC P 1120 Ol 80102443 07/28 MANCHESTER, 400 TOLLAND TPKER 80102513 * AMM 120 NEWINGTON AVE, NEW BRITAI 80102633 JDB 111 ROWAYTON AVE NWLK SHIFT P35 80102748 appt 1/4 EVW - 84 Railroad St, 80102759 MR; ***ALL WORK COMPLETED***Replace 80102820 MM 20 CREASEY RD BRKLYN P# 1084 rep 80102874 * WORK COMPLETE (9A) 1837 STANLEY S 80102890 07/29 ORCHARD RD EAST HADDAM POLE 2 80103004 PL: ELEC TO CUT & KICK POLE FOR TEL 80103197 7/30 - 9A - ENFIELD, ABBE RD - P-14 80103217 9A KD-EVENT #4581579 CAR V P 4067 T 80103321 JFC - WESTSIDE ( 199) RD -- , GOSH 80103434 CD01789 - Lateral Reliability - 2A4 80103439 CD01789 - Lateral Reliability - 3B1 80103454 PROJ CD01789 - Lateral Reliability 80103478 CD01789 - Lateral Reliability - 15U 80103502 CD01789 - Lateral Reliability - 1C0 80103527 *CD01789 - Lateral Reliability - 11 80103537 *CD01789 - Lateral Reliability - 7L 80103555 CD01789 - Lateral Reliability - 13H 80103725 CD01789 - Lateral Reliability - 13K 80103831 briggs CD01789 - Lateral Reliabilit 80103837 CD01789 - Lateral Reliability - 11M 80104227 KD-EVENT #4580652 SHIFT P 4870 S Ke 80104254 POLE 4574 INSTALL CV SERVICE APPREN 80104264 10/18/24 - 9A - LIBERTY ST, PAWCATU 80104286 RL: 1 SMITH RD. 1200 AMP 3 PHASE; 3 80104291 JMS- 08/03 PROSPECT AVE WEST HARTFO 80104412 TL - JOSHUATOWN RD, #100-5 LYME // 80104723 9A 08/05 HARTFORD RD MANCHESTER in-service date work order type 8/3/2021 11 Damage Claims OH 1/6/2022 11 Elect Annual Proj - DESG CT 7/14/2021 11 Damage Claims OH 7/29/2021 11 Damage Claims OH 8/12/2021 11 Damage Claims OH 4/20/2023 11 Elect Annual Proj - DESG CT 8/7/2021 11 Corrective Maint OH Lines 8/31/2021 11 Damage Claims OH 7/29/2021 11 Repair/Obsol OH ST2 CT 10/18/2021 11 Elect Annual Proj - DESG CT 7/29/2021 11 Repair/Obsol OH ST2 CT 9/23/2021 11 Corrective Maint OH Lines 8/8/2021 11 Corrective Maint OH Lines 10/22/2021 11 Elect Annual Proj - DESG CT 12/3/2024 11 Damage Claims OH 11/9/2023 11 Elect Annual Proj - DESG CT 10/29/2024 11 Dist Capital or Expense 4/18/2023 11 Elect Annual Proj - DESG CT 10/20/2022 11 Elect Annual Proj - DESG CT 3/28/2025 11 Dist Capital or Expense 8/24/2021 11 Corrective Maint OH Lines 4/1/2024 11 Elect Project - DESG CT 1/20/2023 11 Asset Mgmt - Specific DESG CT 3/21/2024 11 Elect Project - DESG CT 12/1/2021 11 Elect Annual Proj - DESG CT 2/1/2023 11 Asset Mgmt - Specific DESG CT 8/25/2021 11 Damage Claims OH 2/9/2024 11 Elect Project - DESG CT 5/18/2023 11 Elect Annual Proj - DESG CT 5/2/2023 11 Elect Annual Proj - DESG CT 2/9/2024 11 Elect Project - DESG CT 8/30/2021 11 Elect Annual Proj - DESG CT 9/10/2021 11 Damage Claims OH 8/8/2021 11 Corrective Maint OH Lines 8/17/2021 11 Corrective Maint OH Lines 8/2/2021 11 Repair/Obsol OH ST2 CT 7/3/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 7/23/2021 11 Damage Claims OH 7/30/2021 11 Damage Claims OH 3/10/2023 11 Elect Project - DESG CT 7/30/2021 11 Damage Claims OH 1/12/2022 11 Elect Annual Proj - DESG CT 4/7/2022 11 Elect Annual Proj - DESG CT 5/16/2025 11 Dist Capital or Expense 8/12/2021 11 Corrective Maint OH Lines 1/22/2025 11 Asset Mgmt - Specific DESG CT 3/31/2022 11 Elect Annual Proj - DESG CT 3/2/2022 11 Elect Annual Proj - DESG CT 7/24/2023 11 Elect Annual Proj - DESG CT 5/4/2023 11 Elect Project - DESG CT 1/12/2022 11 Elect Annual Proj - DESG CT 6/5/2025 11 Dist Capital or Expense 12/21/2021 11 Elect Annual Proj - DESG CT 8/4/2021 11 Damage Claims OH 8/31/2021 11 Damage Claims OH 7/7/2022 11 Damage Claims OH 3/30/2023 11 Dist Capital or Expense 9/21/2021 11 Damage Claims OH 7/13/2022 11 Elect Annual Proj - DESG CT 7/27/2021 11 Damage Claims OH 8/4/2021 11 Damage Claims OH 9/13/2021 11 Corrective Maint OH Lines 2/24/2022 11 Elect Annual Proj - DESG CT 9/8/2021 11 Corrective Maint OH Lines 8/13/2024 11 Asset Mgmt - Specific DESG CT 8/27/2021 11 Damage Claims OH 8/19/2021 11 Corrective Maint OH Lines 9/22/2021 11 Corrective Maint OH Lines 8/31/2021 11 Damage Claims OH 7/15/2024 11 Elect Annual Proj - DESG CT 8/7/2021 11 Damage Claims OH 9/7/2021 11 Elect Annual Proj - DESG CT 5/7/2024 11 Asset Mgmt - Specific DESG CT 12/5/2023 11 Elect Annual Proj - DESG CT 8/16/2021 11 Corrective Maint UG Lines 7/28/2022 11 Elect Annual Proj - DESG CT 8/19/2022 11 Elect Annual Proj - DESG CT 12/10/2021 11 Asset Mgmt - Specific DESG CT 8/7/2021 11 Elect Annual Proj - DESG CT 10/21/2021 11 Corrective Maint OH Lines 8/30/2021 11 Damage Claims OH 9/9/2021 11 Dist Capital or Expense 9/15/2021 11 Dist Capital or Expense 8/5/2021 11 Damage Claims OH 8/20/2021 11 Damage Claims OH 8/14/2021 11 Damage Claims OH 10/16/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 10/16/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/29/2025 11 Dist Capital or Expense 9/15/2025 11 Dist Capital or Expense 4/21/2023 11 Asset Mgmt - Specific DESG CT 9/18/2025 11 Dist Capital or Expense 12/22/2021 11 Elect Annual Proj - DESG CT 2/14/2022 11 Asset Mgmt - Specific DESG CT 3/10/2025 11 Damage Claims OH 7/19/2023 11 Elect Annual Proj - DESG CT 12/30/2021 11 Elect Annual Proj - DESG CT 5/26/2022 11 Elect Annual Proj - DESG CT 1/4/2022 11 Damage Claims OH Subsequent Close Date 1/22/2026 9/16/2026 5/15/2026 2/13/2026 6/26/2026 6/26/2026 1/22/2026 9/16/2026 364310 Poles and Appurtenance 651 (242) 2,269 7,753 2,224 2,495 662 13 3,399 (115) 184 707 1,127 7,902 7,978 338 1,256 428 8,152 118 2,017 16,051 (3,264) 16,381 3,048 703 3,202 4,639 109 3,276 10,292 641 779 6,852 952 1,533 4,561 957 4,888 949 7,550 1,247 1,335 8,549 6,878 10,372 163 820 1,316 7,588 6,255 90 998 7,050 1,948 306 2,948 39,359 1,406 1,106 4,570 6,910 1,713 2,779 4,692 135,635 6,211 3,086 7,875 82 240 5,167 11,118 38,214 1,251 1,701 2,844 2,204 6,772 4,923 619 2,483 177 14,937 14,991 2,604 2,250 12 11 9 18 19 12 16 9 49 14 131 1,528 463 33,014 21,413 (103) 10,689 3,796 365000 Overhead Conductors, Device 250 (242) 79 4,320 194 1,281 265 35 316 (115) 536 102 1,747 180 1,724 148 2,436 1,132 154 42 14,408 (6,150) 6,645 4,862 1,112 832 1,027 10 1,120 5,187 957 183 1,107 382 224,853 2,621 162 637 10,829 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 6,052 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 344 369720 DB/UG Conductors and Devices 370470 Meter Equipment 672 (115) 935 12,160 15,724 51 88 (1) (16) 89 66,135 7,528 3,986 834 426 176 306 122 198 81 87 212 1,039 6,216 1,095 131 672 3,487 (1,989) 384 395 40 1,141 555 1,428 2,230 4,783 7,166 2,953 155 6,172 17,343 715 180 1,583 185,595 109 6,101 165 2,794 2,451 208,516 761 4,156 7,718 1,994 11,072 350 435 66,354 21,541 178 47 4,307 888 90 54 1,139 270 359 262 22,122 15,923 994 95,733 429 4,891 97,741 24,259 1,287 856 1,302 1,285 282 3,916 195 224 4,719 1,946 1,421 234,065 42 6,941 1,603 1,626 10,267 1,329 308 140 16 2,693 18,220 139 699 352 279 730 639 414 276 344 207 1,121 358 3,135 1,944 14,811 283 81 471 290 85 52,495 188 6,019 8,088 2,988 (2) 1,569 878 555 823 253 46 12,735 777 172 630 1,407 757 94,236 (103) 2,715 2,628 35,459 5,742 (103) 16,036 30,518 2,274 334 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 901 (484) 2,349 12,073 2,418 10,844 927 48 3,715 (344) 720 809 1,127 10,584 8,158 29,946 1,404 2,864 9,284 323 2,060 30,547 (9,431) 23,115 85,558 3,075 4,209 5,666 119 4,702 15,601 1,877 962 8,046 1,546 1,533 229,415 11,228 5,049 1,586 18,379 2,472 2,603 13,178 4,889 10,756 1,591 12,941 6,146 31,021 9,648 734 73,525 47,074 2,664 755 4,890 271,597 1,515 24,416 4,735 6,910 1,713 9,445 13,310 541,541 6,973 7,437 7,875 305 19,770 7,867 12,911 324,859 1,481 14,660 14,979 7,372 18,114 6,299 927 2,623 194 19,038 46,118 2,743 2,949 365 290 739 657 433 288 360 216 1,170 373 3,266 3,472 1,870 33,771 156,850 (309) 60,291 8,698
  3. Page 8 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 8 of 104 Work Order Number Description 80104877 *D&D* JS - Conv. 1156473 - Make Rea 80105201 9A - Car vs. Pole - Waiting on Poli 80105217 MPB; 614 REDDING RD, REDDING - FTR 80105337 CP- 64 Wickett ST NH, replace pole/ 80105454 DG P#155 BARBER ST PUTNAM CLP POLE 80105661 CB; WESTBROOK, MEADOW POINT, 41, DA 80105664 9A CAR VS POLE 245 CANTERBURY RD PL 80105708 8/7 - 9A - Newtown, 153 Sugar St 80105715 8/7 - 9A - Enfield, Enfield St - Fr 80105721 MM 9A FRTR P#609 RIVER RD LISBON 40 80105733 MPB; 279 GREENWOOD AVE BETHEL; REPL 80105861 MCB - 8/6/21 FARMWOOD ( 151) RD -80106155 KD-EVENT #4517222 REPLC P 1282 BRIN 80106222 9A HARTFORD PIKE, KILLINGLY, CT 80106265 SC-449 ROODE RD GRISWOLD INST NEW 2 80106486 APPRENTICES BM; Southbury, Strongto 80106527 PRINT EVW - 24 Emerson Rd, Norfolk 80106671 7/21 NO MUNI10/4 JFC - CORNWALL, B 80106677 *POST CONSTRUCTION* 8/10/21 TURNOVE 80106692 PL: INST 45' CROSS OVER POLE (SLACK 80106704 (9A) TARIFFVILLE ( 102) RD -- 1313 80106720 PRINT EVW - 510 Wells Hill Rd, Sal 80106740 8/10/21 9A STANLEY ( 1164) ST -- 56 80106827 MV; Windham_S Windham Rd_P 1909_Mul 80106837 8/10/21 9A 1427 CHAMBERLAIN HWY BER 80107180 CR-102 SIMSBURY RD. AVON, P# 842, S 80107230 DG P#155 SOMERS TPKE WOODSTOCK CLP 80107262 ZN Conv#1131766-MakeReadyNonReimb-M 80107268 *D&D*Conv. 1626535 - Make Ready Non 80107548 10/18/24- 9 OAK ST STONINGTON- POLE 80107642 TL - E HADDAM RD, P#1070-S SALEM // 80107789 MCB - 9A : 08.12.21 - 10 GREENWOOD 80108097 GC - GALES FERRY, WHALEHEAD, 149 80108161 ALL WORK COMPLETE 8/13 BOKUM (30) R 80108185 9A - 200 HARTFORD AVE, NEWINGTON / 80108220 (9A) 08.14.21 - 184 DIANA RD, SOUTH 80108247 LD 285 MAIN AVE, NORWALK 9A REPLACE 80108268 MAR - Upgrade Xfmr/Fntr to rplc pol 80108272 WEST HARTFORD, 702 OAKWOOD XFMR STA 80108368 ALL WORK COMPLETE 8/16 9A POKORNY ( 80108456 TL - 8/12 BEAVER BROOK RD LYME // * 80108503 TPA NetSpeed LLC CONVO # 1154722 PA 80108645 9A KD-EVENT #4590206/4594177 CAR V 80108785 9A - CR-517 W AVON RD, TELCO REPLAC 80108887 Jpt-10 School St Plymouth - Post Co 80108907 JS - Conv. 1153191 - Make Ready Non 80108950 JFC - CHARLES ( 15) ST -- 1139, T 80108979 MF -LEDYARD, NEW LONDON (P3378) XAR 80109024 LD LISA CT NORWALK POLE#15418 PCB T 80109173 E.P. -8/17- 67 BOULDER AVE, P.4582, 80109185 9A KD-EVENT #4591401 CAR V P 481 HE 80109517 MV-151 BOOM BRIDGE N. STONINGTON/IN 80109533 WC-710-714 E MAIN ST WATERBURY. NE 80109654 PMV - Pole C2314 NORTH ST MIDDLEBU 80109671 9A - CAR VS POLE 80110062 CON 40 L139-002 Mountain Rd Suffiel 80110185 ---RF-BOLTON,1100 BOSTON, New OH/UG 80110359 8/19 - Sherman, Big Trail - Eversou 80110360 MDB - S KENT ( 321) RD -- A 4647, 80110361 BM; 8/19/21 CHESTNUT TREE HILL RD S 80110439 GC - 8/21-2021 NATURAL TREE VS P44 80110510 152 CHASE AVE, WATERBURY NEW EV CHA 80111361 MV - NEW LONDON TPK / WHEELER RD, I 80111389 JES; 200 DANBURY RD. WILTON,NEW FE 80111694 DONE PR 3/1 CRP - ELEC. MAINT. POLE 80111848 Jpt-1155 Burlington Ave Bristol - R 80112181 JTR, COUNTRY CLUB RD, AVON CT - POL 80112207 MRP - (9A) - POLE 9 - BECKLEY MILL 80112211 JDB 207 W. NORWALK RD NORWALK, SHIF 80112248 MRP - (9A) LAKEWOOD RD - POLE 6508, 80112321 TL - S RIDGE RD, NIANTIC // 8/25/21 80112424 DG P#982 W THOMPSON RD THOMPSON CLP 80112473 9A CAR VS POLE 105 - 3659 PUTNAM P 80112500 JDB 770 CONN. AVE NWLK P23266 EXT 3 80112515 9A CAR VS POLE - APPROVED 12/9/25 80112645 9A - 102 WESTON ST HARTFORD 80112713 JTR, 9A 10/18 - MAIN ST, ROCKY HIL 80112951 9A CAR VS EVERSOURCE POLE 2709 - AP 80112975 DG P#331 FRENCH RD EASTFORD CLP POL 80113005 JDB 1 OLD TROLLEY WAY NWLK P29811 R 80113030 MV; ALL WORK COMPLETE 1535 W MAIN S 80113133 Abel- Suffield, Valley View Dr - tr 80113184 CR-LOVELY ST. AVON, CAR V POLE 369, 80113209 MRP - (9A)POST CONSTRUCTION - P928 80113246 8/27/21 (RSO-STROM/MARA) LAUREL LEA 80113274 PENDING CUST WORK; MR; **PAYMENT MA 80113319 9A KD-EVENT #4608197 CAR V P 354 BO 80113352 EB; MAPLE ( 41) AVE -- 5353REF128 80113485 APPRENTICES 15 DD BY 6/1/22 BM; NEW 80113495 DG P#1062 151 CENTRE PIKE EASTFORD 80113573 JTR*, MAIN ST WETHERSFIELD - 9A - F 80113762 DONE WTG FOR PD RPT 10/21/24 (TH) 1 80113817 GC - PRESTON, DOOLITTLE, 43 80113861 *HAWK* Conv#1133104-MakeReadyNonRei 80113879 DB-CD01534-06, State Pier, recloser 80113926 PRINT CRP-20 Ridge rd CTN, relocate 80113945 BAL-CD01650, JLO, Tripsaver 30Y10-1 80114009 JRP - Murdock Ave MERIDEN Repl 1PH 80114237 PL: CD01761 - 4.8kV TO 7.9kV CONV./ 80114278 HEL 15 DD BY 10/11/22 BM; NEWTOWN, 80114424 RL: 88 SOUTH WATER ST: 3 PHASE 1200 80114486 MRP - (9A) - POLE F8088 - CHESTNUT 80114606 MF - 9/2/21 (RSO - PUNZALAN) VALLEY 80114769 *D&D*Conv. 1633919 - Make Ready Rei 80114950 MI CAR VS EVERSOURCE P-642 in-service date work order type 2/25/2025 11 Dist Capital or Expense 8/18/2021 11 Damage Claims OH 12/9/2021 11 Asset Mgmt - Specific DESG CT 8/19/2021 11 Corrective Maint OH Lines 8/19/2021 11 Corrective Maint OH Lines 3/16/2022 11 Elect Annual Proj - DESG CT 8/11/2021 11 Damage Claims OH 8/11/2021 11 Damage Claims OH 8/19/2021 11 Damage Claims OH 8/18/2021 11 Damage Claims OH 2/16/2023 11 Dist Capital or Expense 8/24/2021 11 Corrective Maint OH Lines 9/10/2021 11 Corrective Maint OH Lines 8/25/2021 11 Damage Claims OH 10/15/2021 11 Elect Annual Proj - DESG CT 9/23/2022 11 Elect Annual Proj - DESG CT 4/28/2025 11 Corrective Maint OH Svc 11/1/2023 11 Asset Mgmt - Specific DESG CT 10/1/2021 11 Elect Annual Proj - DESG CT 7/8/2022 11 Elect Annual Proj - DESG CT 11/2/2021 11 Damage Claims OH 2/5/2025 11 Corrective Maint UG Svc 8/18/2021 11 Damage Claims OH 5/10/2023 11 Elect Annual Proj - DESG CT 8/30/2021 11 Damage Claims OH 1/5/2022 11 Elect Annual Proj - DESG CT 12/29/2021 11 Dist Capital or Expense 4/27/2022 11 Elect Project - DESG CT 4/21/2025 11 Dist Capital or Expense 1/3/2025 11 Elect Annual Proj - DESG CT 2/16/2022 11 Elect Annual Proj - DESG CT 8/17/2021 11 Damage Claims OH 9/3/2025 11 Corrective Maint OH Svc 8/31/2021 11 Corrective Maint OH Lines 9/8/2021 11 Damage Claims OH 8/30/2021 11 Damage Claims OH 8/24/2021 11 Damage Claims OH 2/10/2022 11 Elect Annual Proj - DESG CT 7/24/2025 11 Corrective Maint UG Svc 11/9/2021 11 Damage Claims OH 9/10/2021 11 Corrective Maint OH Lines 2/7/2022 11 Elect Project - DESG CT 9/10/2021 11 Damage Claims OH 8/31/2021 11 Damage Claims OH 8/31/2021 11 Corrective Maint OH Lines 2/9/2022 11 Elect Project - DESG CT 9/10/2021 11 Damage Claims OH 8/17/2021 11 Elect Annual Proj - DESG CT 2/11/2022 11 Asset Mgmt - Specific DESG CT 12/5/2021 11 Elect Annual Proj - DESG CT 9/10/2021 11 Damage Claims OH 8/5/2022 11 Elect Annual Proj - DESG CT 10/4/2021 11 Elect Annual Proj - DESG CT 12/22/2021 11 Elect Annual Proj - DESG CT 9/4/2021 11 Damage Claims OH 2/3/2023 11 Elect Annual Proj - DESG CT 9/23/2022 11 Dist Capital or Expense 10/4/2021 11 Corrective Maint OH Lines 8/24/2021 11 Elect Annual Proj - DESG CT 9/23/2021 11 Corrective Maint OH Lines 4/4/2022 11 Elect Annual Proj - DESG CT 1/19/2023 11 Elect Annual Proj - DESG CT 4/21/2022 11 Elect Annual Proj - DESG CT 1/25/2022 11 Elect Annual Proj - DESG CT 5/30/2023 11 Elect Annual Proj - DESG CT 9/20/2022 11 Elect Annual Proj - DESG CT 9/1/2021 11 Corrective Maint OH Lines 9/14/2021 11 Damage Claims OH 3/15/2022 11 Elect Annual Proj - DESG CT 10/6/2022 11 Damage Claims OH 11/28/2021 11 Elect Annual Proj - DESG CT 10/23/2024 11 Damage Claims OH 10/25/2024 11 Damage Claims OH 11/14/2022 11 Asset Mgmt - Specific DESG CT 9/30/2025 11 Damage Claims OH 11/2/2021 11 Elect Annual Proj - DESG CT 10/29/2024 11 Damage Claims OH 12/16/2024 11 Damage Claims OH 8/31/2021 11 Corrective Maint OH Lines 3/29/2022 11 Corrective Maint UG Svc 9/22/2021 11 Dist Capital or Expense 11/24/2021 11 Corrective Maint OH Lines 9/21/2021 11 Damage Claims OH 8/31/2021 11 Damage Claims OH 11/14/2021 11 Elect Annual Proj - DESG CT 5/5/2023 11 Elect Annual Proj - DESG CT 9/30/2021 11 Damage Claims OH 9/9/2021 11 Corrective Maint OH Lines 6/14/2022 11 Elect Annual Proj - DESG CT 9/15/2021 11 Corrective Maint OH Lines 10/24/2024 11 Dist Capital or Expense 10/24/2024 11 Dist Capital or Expense 2/7/2023 11 Elect Annual Proj - DESG CT 7/28/2023 11 Elect Project - DESG CT 2/24/2023 11 Asset Mgmt - Specific DESG CT 11/25/2025 11 Corrective Maint OH Svc 2/24/2023 11 Asset Mgmt - Specific DESG CT 5/21/2024 11 Asset Mgmt - Specific DESG CT 5/21/2024 11 Dist Capital or Expense 7/20/2023 11 Elect Annual Proj - DESG CT 8/3/2022 11 Elect Annual Proj - DESG CT 9/8/2021 11 Damage Claims OH 12/9/2021 11 Elect Annual Proj - DESG CT 3/3/2025 11 Dist Capital or Expense 9/8/2021 11 Damage Claims OH Subsequent Close Date 1/22/2026 9/16/2026 9/16/2026 5/15/2026 7/17/2026 4/20/2026 4/20/2026 1/22/2026 364310 Poles and Appurtenance (161) 2,900 149 6,636 1,992 22,851 3,008 3,081 13,295 1,587 2,457 6,093 919 1,101 3,142 2,782 169 3,192 (244) 6,256 4,091 25 2,116 10 10,263 6,077 50,211 3,720 7,185 2,431 3,209 2,018 68 531 2,042 2,838 3,063 2,590 4,248 242 1,081 5,613 2,864 1,245 14,212 4,151 1,505 1,604 5,070 647 1,106 7,570 10,472 1,898 4,669 12,759 11,155 2,436 3,386 7,538 2,333 4,326 9,777 3,259 5,846 551 4,662 6,122 994 3,545 566 14,777 594 3,078 5,182 390 12,586 13,158 1,808 342 1,123 (131) 190 4,761 1,177 6,081 1,398 1,449 2,215 551 392 4,274 8,783 2,740 5,883 2,677 69,255 140,359 (972) 12,486 655 5,227 6,113 (328) 1,575 365000 Overhead Conductors, Device (219) 60 1,185 2,110 481 1,573 65 1,072 1,958 840 1,504 1,658 1,655 1,189 2,216 1,803 264 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead (16) 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 346 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 1,046 0 1,129 712 247 70,920 6,817 193 327 235 1,269 7,824 0 340 865 4,976 8,570 446 4,564 612 1,317 2,267 6,720 5,995 1,594 326 549 35 209 300 1,132 168 608 161 277 57 95,643 1,666 3,116 623 83 272 60 373 271 115 956 6,443 9,225 247 1,165 1,654 580 1,196 1,042 283 456 90 3,047 983 4,462 1,980 4,023 7,962 51 8,418 955 33 832 2,521 207 51 27,962 1,501 599 3,276 1,364 3,813 1,965 1,775 5,189 1,393 2,251 939 813 121 8,158 11,968 3,185 475 172 4,304 1,113 971 1,031 1,515 (131) 22 111 5,783 4,541 5,952 273 214 418 73 104 345 2 6 349 1,319 3,541 103 426 221 195 2,028 379 253 2,109 1,512 175 1,684 213 296 1,051 3,726 175 91,489 382 118,525 158,714 (809) 11,056 2,113 1,649 2,624 (811) 2,791 60 4,182 18,737 505 720 4 32 587 479 687 (34) 1,080 7,074 (80) 529 368 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total (396) 2,959 2,726 8,746 2,472 25,552 3,073 4,865 15,499 2,426 81,891 8,078 2,574 2,525 14,452 4,585 774 4,057 (244) 16,345 12,661 714 2,116 947 11,580 9,776 56,931 9,884 8,779 2,431 3,209 2,018 948 752 2,319 2,895 98,706 4,629 9,411 865 1,163 5,613 2,979 2,201 21,698 13,659 1,752 2,769 7,180 647 1,195 19,068 15,762 6,360 6,855 16,833 48,579 2,486 3,986 10,814 2,333 6,075 13,591 11,639 7,622 5,740 6,128 8,478 3,597 4,360 692 37,318 12,561 6,792 5,657 784 16,889 14,271 2,974 3,779 2,891 (261) 212 4,761 3,286 9,276 1,573 1,449 5,218 907 392 5,325 36,653 2,919 97,404 3,645 188,259 299,760 (1,815) 24,622 9,761 7,404 9,104 (1,138) 1,575
  4. Page 9 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 9 of 104 Work Order Number Description 80114971 COMP REWRITE REQUIRED Cheshire 80114997 COMP REWRITES REQUIRED Cheshire 80115012 EAST HAMPTON, CONE, 0, Stan Oleksen 80115060 Cheshire CD01546 - Eliminate 20H AI 80115075 9A OK to close (STILWKD) 10/18 MOUN 80115078 MV - MYSTIC, COOGAN, 12, INST PRI R 80115094 WRTN - DM - Moodus Leesville Rd Eas 80115128 COMP REWITE REQUIRED Cheshire CD 80115484 1/12 CAR VS POLE-DISTRICT UNABLE TO 80115567 ALL WORK COMPLETE 9A (RSO - MCDERMO 80115608 MAR -9A POST CONST> 127 JACOBS ST, 80115653 9A-FTR 45'/1 jct pole 10/20-RSO-WES 80115959 PD-FEDERAL STREET N. LONDON/INST XF 80116021 *JRP - 85 Robert Porter Rd SOG Inst 80116181 9A CAR VS POLE - APPROVED 8/14 80116329 ASPLUNDH PRINTED 7/25JFC - HOERLE ( 80116414 9A DIG UP 80116434 TL - SCOTT RD, #93 EAST LYME // RE80116453 VJT - 23 BUCKINGHAM ST WATERTOWN CT 80116646 MAR - Rplc/Uprgd Svc/replc Xfmr and 80116936 NJB 237/239 LEDYARD ST HTFD RMV EXI 80116985 W HTFD 160 STEELE RD - SHIFT TELCO 80117106 JV; pic HEBRON, MAIN, 14, Jason Tin 80117155 MAR - Svc Upgrade/ Rplc Frntr Pole, 80117178 Abel - Frontier -9/10 (BURDIJA) 9A 80117222 AVON, CHEVAS, 16, Lot 2 -FRNTR POLE 80117399 TL - CHAMPION RD, #27 OLD LYME // R 80117483 12/27 JFC - MAIN ( 576) ST -- PAD 80117494 - CORNWALL BRIDGE, MANSONVILLE, 14, 80117738 * Research Pkwy, Meriden - Repl Po 80117771 RSO--09/14/21--TRUCK V FTR POLE--PO 80117795 EVW - 222 Bidwell Hill Rd, Watertow 80117807 ASP 3/20/23 CD01753-023-P3 Bolton 80117887 MTL-Jpt-410 Clark Ave Bristol P1205 80117929 (LC)RM, 644 MAIN ST -NORWALK, !!3 P 80118149 HOLD FOR FTR POLES pr 11/8 EVW 109 80118163 ftr poles EVW - P739-742 North St, 80118388 GC - 09/14/21 Stevens Ave Ledyard P 80118553 8/30/22 NEED FTR POLE CRP 9 SEAGU 80118853 749 E Main St Branford/Upgrade svc 80118864 EB; Install GOLB switch p-716 East 80118929 PD-125 PEQUOT AVE N.LONDON/9A MVA C 80118969 SD POST CONSTRUCTION 295 S CURTIS S 80119265 JMS-BLOOMFIELD 7 DUNCASTER -- SET P 80119350 15 DAY DUE 1/5/22; JV; pic COLCHEST 80119470 Abandon pole line in woods and exte 80119562 CAR VS POLE - PASSED STATUTE OF LIM 80119804 MRP - (9A) - POLE 5346 - MOUNT VERN 80119808 9/17 - 9A - Stafford, Gulf Rd - Eve 80120166 COMPLETED 5 TAYLOR RD, BETHEL - RPL 80120249 DL; 287 WASHINGTON BLVD; BLDG 2; NE 80120290 GC - 9/20/21 (RSO - LEAC) HOMESTEAD 80120382 @MAR - 35 Bridge St, Naugatuck CT ( 80120704 DONE Print 7/27 JFC -GAGARIN PLACE 80120715 ACC 15dd by 3/25 KTI WM; NEW PRESTO 80120722 CAR VS POLE 2679 - PR REORDERED 6/9 80120748 PCC-Newberry Rd 124, East Windsor. 80120765 9A 09/22 LOVELY ( 390) ST -- S400, 80120960 post const> - MAR - 9A - 12 HEMLOCK 80120973 * PL: INST SVC TO NEW POPEYE'S, PAD 80121063 *JRP - 254 Queen St SOG Repl 150KVA 80121121 COMP Cheshire CD01546- Eliminate 2 80121267 EB; EAST HAMPTON, OAKUM DOCK, 49, 80121346 *9A-10/21-RSO-[DAMICNA]-561:FEDERAL 80121386 JAM - 12 White Oak Farmington - New 80121592 COMP Cheshire CD01546- Eliminate 80121680 RR; 9.23.21 - BOGUS HILL RD, NEW FA 80121828 ns New 150 KVA XFMR for 600A 3 Ph S 80121892 MCB - (9A) 09.23.21 - 300 WOLCOTT S 80121970 12/27 EVW - 502 E Wakefield Blvd, W 80122039 CD01103 - Install VS on new pole 96 80122043 9A KD-CAR V P 18362 FLANDERS (210) 80122185 9/25 - 9A - East Granby, Turkey Hil 80122189 ASPL -*MAR - 200amp Upgrd with mete 80122197 SD POST CONSTRUCTION (9A) 12 CURTIS 80122209 SD POST CONSTRUCTION DOWNS RD, BETH 80122270 JLB 43 RIVER RD, WESTON/ TREE VS PO 80122524 CAR VS POLE P1861 - UNBILLABLE PAST 80122571 JRP - 109 Waterbury Rd PROSPECT Rep 80122613 CD01536-02 Regulator Installation a 80122701 AMM VIPER SWITCH - BURLINGTON RD, F 80122802 *D&D*ZN Conv#1126340-MakeReadyNonRe 80122886 ---* AMM 12 FENN RD, NEWINGTON. IN 80123013 COMP Cheshire CD01546- Eliminate 80123334 9A CAR V POLE 80123509 MJ-15DD 9/21 TD/WC-493 W MAIN ST, C 80123815 DG P#1234 34 WETHERBEE RD POMFRET F 80123901 GC - 9/3 SHETUCKET TPKE PRESTON 80124097 DG P#1013 PAINE RD WOODSTOCK FRNTR 80124107 9/30 9A P#700 CREAMERY HILL ( 15) 80124272 WESTBROOK, BOSTON POST, 976/SHIFT P 80124525 JFC - NORTHFIELD ( 637) RD -- 4673 80124544 RSO--10/03/21--CAR V FTR POLE, SET 80124630 DJM. SILVERBROOK RD WESTPORT/P#7333 80124661 POST CONSTRUCTION 9A - RESERVOIR RD 80124704 1/17 CP-151 Harmony Hill Rd, HW, OH 80124731 * MRP - Leaning Pole - Pole 3338 80124848 1/10 JFC - GOSHEN, BEACH, 416, 80124875 90 SCOTT RD, WATERBURY - INST ADDIT 80125096 MCB - (9A) 10.03.21 - 10 BUCKINGHAM 80125155 CD01774 - Viper Ins 37f2-30J Monroe 80125239 PD-806 HARTFORD TPKE WATERFORD/NEW 80125272 PD-82 BOSTON POST RD WTFD,UPG OH SV 80125616 ASP 1/26 JMS- W HTFD, 114 SHIELD ST 80125630 TO STORES 3/6/23--ALL WORK COMPLETE in-service date work order type 1/15/2025 11 Asset Mgmt - Specific DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 11/30/2022 11 Elect Annual Proj - DESG CT 8/12/2024 11 Asset Mgmt - Specific DESG CT 11/7/2024 11 Dist Capital or Expense 5/20/2022 11 Elect Annual Proj - DESG CT 11/19/2024 11 Dist Capital or Expense 1/15/2025 11 Asset Mgmt - Specific DESG CT 11/20/2024 11 Damage Claims OH 9/8/2021 11 Damage Claims OH 9/9/2021 11 Damage Claims OH 4/16/2025 11 Dist Capital or Expense 4/8/2022 11 Elect Annual Proj - DESG CT 2/15/2022 11 Elect Annual Proj - DESG CT 10/4/2021 11 Damage Claims OH 8/5/2022 11 Elect Annual Proj - DESG CT 3/14/2025 11 Dist Capital or Expense 11/22/2022 11 Elect Annual Proj - DESG CT 10/12/2021 11 Damage Claims OH 9/29/2021 11 Elect Annual Proj - DESG CT 1/4/2022 11 Elect Annual Proj - DESG CT 1/24/2022 11 Elect Annual Proj - DESG CT 1/27/2022 11 Elect Annual Proj - DESG CT 10/20/2021 11 Elect Annual Proj - DESG CT 2/13/2023 11 Damage Claims OH 11/10/2025 11 Dist Capital or Expense 8/30/2023 11 Elect Annual Proj - DESG CT 6/22/2022 11 Damage Claims OH 3/30/2022 11 Elect Annual Proj - DESG CT 11/19/2024 11 Elect Annual Proj - DESG CT 10/22/2021 11 Damage Claims OH 12/8/2021 11 Elect Annual Proj - DESG CT 6/19/2024 11 Asset Mgmt - Specific DESG CT 10/5/2021 11 Damage Claims OH 12/4/2025 11 Dist Capital or Expense 9/22/2025 11 Dist Capital or Expense 9/19/2025 11 Dist Capital or Expense 10/7/2021 11 Damage Claims OH 10/29/2024 11 Dist Capital or Expense 6/17/2022 11 Elect Annual Proj - DESG CT 11/9/2021 11 Elect Annual Proj - DESG CT 10/18/2021 11 Damage Claims OH 10/18/2021 11 Elect Annual Proj - DESG CT 11/9/2021 11 Elect Annual Proj - DESG CT 1/10/2022 11 Elect Annual Proj - DESG CT 5/12/2022 11 Elect Annual Proj - DESG CT 10/24/2023 11 Damage Claims OH 9/21/2021 11 Damage Claims OH 9/22/2021 11 Damage Claims OH 6/8/2022 11 Elect Annual Proj - DESG CT 1/21/2022 11 Dist Capital or Expense 5/13/2022 11 Elect Annual Proj - DESG CT 7/9/2025 11 Elect Annual Proj - DESG CT 11/15/2022 11 Elect Annual Proj - DESG CT 6/8/2022 11 Dist Capital or Expense 10/19/2021 11 Damage Claims OH 3/27/2023 11 Elect Annual Proj - DESG CT 9/24/2021 11 Damage Claims OH 11/20/2024 11 Dist Capital or Expense 1/21/2022 11 Elect Annual Proj - DESG CT 10/14/2021 11 Elect Annual Proj - DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 12/17/2021 11 Elect Annual Proj - DESG CT 11/10/2024 11 Damage Claims OH 12/21/2021 11 Elect Annual Proj - DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 11/5/2021 11 Elect Annual Proj - DESG CT 11/17/2021 11 Elect Annual Proj - DESG CT 10/5/2021 11 Damage Claims OH 8/29/2022 11 Elect Annual Proj - DESG CT 2/15/2022 11 Asset Mgmt - Specific DESG CT 11/8/2021 11 Damage Claims OH 1/28/2022 11 Damage Claims OH 11/8/2021 11 Corrective Maint OH Svc 10/5/2021 11 Damage Claims OH 10/5/2021 11 Elect Annual Proj - DESG CT 12/12/2021 11 Elect Annual Proj - DESG CT 3/31/2023 11 Damage Claims OH 12/3/2021 11 Elect Annual Proj - DESG CT 5/23/2024 11 Asset Mgmt - Specific DESG CT 8/16/2022 11 Asset Mgmt - Specific DESG CT 2/28/2024 11 Elect Project - DESG CT 9/8/2022 11 Elect Annual Proj - DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 10/24/2021 11 Damage Claims OH 9/19/2023 11 Elect Annual Proj - DESG CT 12/8/2021 11 Elect Annual Proj - DESG CT 12/21/2021 11 Elect Annual Proj - DESG CT 11/5/2021 11 Elect Annual Proj - DESG CT 10/28/2021 11 Damage Claims OH 11/18/2022 11 Corrective Maint OH Svc 12/9/2021 11 Damage Claims OH 10/26/2021 11 Damage Claims OH 11/4/2022 11 Elect Annual Proj - DESG CT 11/3/2021 11 Damage Claims OH 1/19/2022 11 Corrective Maint UG Svc 12/2/2024 11 Elect Annual Proj - DESG CT 1/20/2022 11 Corrective Maint UG Svc 1/25/2023 11 Elect Annual Proj - DESG CT 10/18/2021 11 Damage Claims OH 12/14/2023 11 Asset Mgmt - Specific DESG CT 5/20/2022 11 Elect Annual Proj - DESG CT 9/16/2025 11 Corrective Maint UG Svc 2/5/2024 11 Elect Annual Proj - DESG CT 10/20/2021 11 Elect Annual Proj - DESG CT Subsequent Close Date 4/20/2026 9/16/2026 1/22/2026 8/26/2026 8/26/2026 8/26/2026 9/16/2026 9/16/2026 364310 Poles and Appurtenance 29,504 326,944 941 33,599 102 1,628 180 25,920 2,967 371 37 7,490 7,771 1,947 3,326 11,609 7,697 87,945 3,970 1,386 624 251 1,234 927 3,870 791 1,111 36 2,314 8,820 140 1,644 121,847 2,117 13,753 2,973 6,850 3,163 399 5 470 8,574 1,333 3,962 283 1,455 1,270 2,818 3,281 1,917 2,776 9,144 13,084 4,366 8,093 1,208 1,707 1,194 357 616 948 6,028 1,336 30,151 1,974 9,143 2,378 381 1,108 4,059 1,825 2,327 6,157 4,979 2,245 371 (197) 982 2,852 37,701 1,788 19,329 1,961 6,477 10,311 976 2,120 598 310 9,626 3,190 6,506 4,969 1,789 9,234 (115) 2,884 3,109 1,391 871 1,352 263 111 12,123 1,234 365000 Overhead Conductors, Device 87,002 (54,032) 831 22,886 3,570 2,071 9,828 26,301 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 131 (287) 4,433 9,236 93 481 20,771 1,567 292 3,409 741 3,706 365 835 633 150 8 71 278 154 368350 Installations Overhead 378 795 3,166 6,561 97 207 5,869 3,615 2,291 701 368330 Equipment Overhead 156 (13) 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 1,849 672 2,012 415 881 171 265 9,391 29,690 617 1,667 162 95 10,506 3,306 1 600 4,694 96 156 99 76 81 43 65 741 53 627 12,502 287 10,718 1,999 2,091 165 15,815 566 509 1,275 808 2,484 16,978 3,571 2,222 196 1,290 9,932 2,295 345 1,537 890 2,798 14,507 510 112 1,145 1,551 3,867 87 124 374 5,461 510 67 59 414 1,109 2,180 10,209 3,810 372 9,264 1,889 305 66 3,261 903 3,878 3,585 13,397 579 1,548 14,640 4,001 923 210 7,050 9,959 1,312 23,312 49 1,558 128 54,534 30 3,611 1,731 3,272 2,138 (197) 1,107 1,137 32,781 95,086 10,688 3,511 5,239 1,003 4,381 1,786 982 1,241 4,019 1,767 829 5,247 9,887 30,338 (48) 195 103 616 331 7,543 441 569 7,363 629 889 770 253 1,363 44 13 1,645 7,053 11,587 23 93 (346) 808 (193) 469 973 95 2,029 12,999 1,295 602 106 418 291 554 453 1,508 648 55,786 2,891 79 6,651 824 287 (11) 514 3,939 1,426 360 154 444 4,246 78 11,326 4,596 3,142 35 1,142 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 116,793 272,613 15,440 57,658 3,672 9,480 10,008 59,662 2,967 468 415 13,359 11,651 16,056 4,027 11,609 8,178 140,690 5,536 1,935 15,139 993 13,097 1,457 4,780 2,245 1,454 43 3,012 9,099 294 1,644 134,349 2,404 40,852 6,756 8,941 3,328 1,207 16,996 17,448 12,655 3,666 5,303 6,991 11,984 3,689 3,163 4,885 3,654 12,143 11,324 33,759 51,911 10,013 26,035 7,807 1,499 423 11,165 1,841 10,717 15,315 30,151 11,269 33,024 2,427 9,931 1,236 4,059 56,359 2,357 9,768 8,369 5,517 2,761 (394) 2,133 4,024 73,491 96,874 37,163 17,519 11,810 11,314 18,632 8,804 1,580 1,658 13,645 4,956 7,335 10,634 1,789 9,525 953 2,884 3,922 8,419 1,963 57,138 11,996 268 34,384 2,093
  5. Page 10 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 10 of 104 Work Order Number Description 80125660 COMP REWRITE REQUIRED Cheshire 80125697 MATERIAL JLB 152 LAMBERT RD, NEW CA 80125701 155 OSWEGATCHIE RD WATERFORD- POLE 80125706 BM; Newtown to Waterbury Demarcatio 80125735 MF - 7/16 QUAKER LN WATERFORD 80125739 WAITING 1500KVA PAD 7/19/23 JMS- BL 80125767 AMM YORKSHIRE CT, FARMINGTON. INSTA 80125796 JES. WILTON, WESTPORT, 183, 80125833 MG-P#2220-EAST KILLINGLY (1133) HAR 80125838 MV - STONINGTON, SUNRISE, 10, I/R P 80125910 POST-AP- 384 Oregon Rd, Meriden-Yel 80126134 9A KD-TURNOVER EVENT #4633305 CAR V 80126196 JFM-INT-99455- XFMR UPGD- 34 HIGGIN 80126515 BRANFORD, CHERRY HILL, 175/REMOVE P 80126614 9A.QUADDICK (273) RD -- 607, THOMPS 80126784 ***COMP*** AMM 280 HARTFORD AVE, N 80126858 MANCHESTER, 290 HARTFORD RD - H4712 80126864 12/27JFC - TORRINGTON ( 192) RD -80126869 Abel-TUNNEL RD. X ECHO DR., VERNON 80126917 JFC - 325 NORTH ST GOSHEN CT 06756 80127153 Jpt-W Center St SOG P9005 - 9a Post 80127261 DF-SHFT Ple, R/I Prmyry Rsr & Padmo 80127317 MV - PAWCATUCK, ROBINSON, 10, I/R P 80127397 1/3 JFC - TORRINGTON, SOUTH, 100, 80127502 (TH) CRP - 10/13/21 CAR VS POLE 77 80127664 COMP REWRITES complete 2/6/25 CHE 80127677 COMP REWRITE REQUIRED Cheshire 80127864 APPT 5/18 MDB - BETHLEHEM, MAIN, 34 80127889 MATERIAL JLB 13 OLD MILL RD, WESTON 80127984 MATERIAL EVW - 46 Litchfield Rd, Wa 80128141 PD-365 MONTAUK AVE N. LONDON/INST N 80128216 9A KD-TURNOVER EVENT #4635865 CAR V 80128220 9A EAST ( 1290) ST N -- 3174, S 80128239 JLB 22 HUNTERS CREEK LN NC NEW 400A 80128262 need to sign off on 6/21 JSG - WINC 80128348 JRP - 126 Waterbury Rd PROSPECT Ins 80128586 15 DAY DUE 4/21/22; EB; EAST HAMPTO 80128789 *JRP - Savage St SOG Repl/Relocate 80128942 MV-LOOP LAKE RIDGE CABLE -UG-SPECIF 80129105 SC-80 QUINEBAUG CAMP RD GRISWOLD IN 80129444 9A KD-EVENT #4637370/4637567 CAR V 80130066 PR 10/4 110 Albany TPKE, Canton CT. 80130101 10/19 - 9A - Somers, Four Bridges R 80130183 MATERIAL ACC KTI 10/20/21 PUNKUP ( 80130200 PMV - POST CONSTR. 27 COLONY HTS, 80130237 KD-EVENT #4637875 REPLC P 3115 PARK 80130578 10/20/21 LONG RIDGE RD DANBURY 80131034 COOK HILL RD, KILLINGLY CT - NEW PO 80131220 MRP - (9A) Car v Pole - Pole 29005 80131429 !!! DL; 26 ELM CT; STMFRD TRANSIT, 80131512 WESTBROOK, SEAWATCH, 25/Shift two p 80131533 POST CONST (9A) 10.24.21 - 81 CHURC 80131537 10/23 - 9A - Ellington, Sandy Beach 80131577 MDB - W MORRIS ( 424) RD -- 909, M 80131599 DB-CD01755-03, 11B61 OH work 80131673 JAM - 54 Northwood Road Farmington 80131691 COMP REWRITE REQUIRED Cheshire 80131786 DJM. 4 QUINTARD PL WESTPORT. OH TO 80131834 Car vs Frontier Pole 80132007 MDB 28P6 - Stowe Rd. Winsted - (3 o 80132030 1/10/23 ASPLUNDH JSG - CD01774:12 80132072 Abel 344 LAKE RD., ANDOVER - NEW CR 80132096 4.1 245 hpolFCOMPcg10/25/21 (RSO-HA 80132121 COMP CHESHIRE CD01546- Convert 20H 80132205 JK>CD01097--POLE 76--REPL POLE WITH 80132308 (9A) 10.25.21 - 428 WOODTICK RD, WA 80132333 (9A) COLT HWY, FARMINGTON. 80132354 COMP *MG* Cheshire CD01546 - Eli 80132390 CD01697-03 - Reconductor River St w 80132615 CD01774-03 - Viper Switch Install 1 80132651 CAR VS POLE 3988 - NEED PRE244 COMP 80132661 10/30 - 9A - Willington, River Rd 80132754 9A- S MAIN ( 349) ST -- 3011, WES 80132775 GC - 10/31 HURLBUTT ( 34) RD -- 2 80132857 TT RF:101 LONG NECK POINT RD, DARIE 80133050 15 DAY DUE 1/26/22; JV; pic WILLIMA 80133068 9A KD-EVENT #4650233 CAR V P 173 PL 80133635 TL - BISCAYNE BLVD, P#3937 // REPL 80133732 SC-80 SHELDON RD GRISWOLD 80133802 Nutmeg Rd North 595B, SW. Primary w 80133838 TC 54 CHESTNUT HILL RD, STM: P#5054 80133924 TO STORES 2/28/23-ections to Energi 80134007 MM Elliott Rd Brklyn P#770 ES to re 80134222 MJ -PMV - CD01774-03 15Q6--32J Vipe 80134293 9A - Car vs. Pole - Waiting on Poli 80134652 CD001774-03 - Viper Switch Install 80134736 print 8/10 CP-3/5 Cherry Brook rd C 80134766 (ASP) JMS- WEST HARTFORD, 179 SOUTH 80134784 JTR, 255 Pitkin St, East Hart, DB C 80134812 JFC - KNIFE SHOP ( 49) RD -- S222 80135171 (9A) 11.06.21 - 581 WOLCOTT ST, WAT 80135176 ALL WORK COMPLETED-11/5 - 9A - East 80135243 9A CAR VS POLE Waiting for COMP sta 80135247 APPT 10/11 CP-120 Turnbull rd, OH-U 80135319 9A MOUNTAIN RD FARMINGTON 80135955 MM 92 Herrick rd Brklyn P#1558 repl 80136073 PN CD01677-08 WO 1 of 3 Archer St W 80136178 DJM. 5 FRASER RD WESTPORT. NEW 400A 80136184 Extend Primary to Pad, Ins Db Svc t 80136202 9A KD-EVENT #4652815/4652805/465280 80136368 PL:INST VIPER SWITCH & GOAB REPL AN 80136460 COMP - AS BUILT REQ (20): MK-Baldw 80136783 MV - 11/10 STONINGTON ( 892) RD -80137177 11/13 - 9A - E Windsor, Prospect Hi 80137264 MR; ***WRITTEN***SHIFT TO NEW 45/2- in-service date work order type 1/15/2025 11 Asset Mgmt - Specific DESG CT 1/4/2022 11 Dist Capital or Expense 4/18/2025 11 Dist Capital or Expense 12/19/2024 11 Elect Annual Proj - DESG CT 11/27/2021 11 Elect Annual Proj - DESG CT 2/6/2024 11 Elect Annual Proj - DESG CT 11/5/2024 11 Elect Annual Proj - DESG CT 12/14/2022 11 Elect Annual Proj - DESG CT 7/21/2025 11 Dist Capital or Expense 6/11/2022 11 Elect Annual Proj - DESG CT 10/30/2024 11 Elect Annual Proj - DESG CT 10/22/2021 11 Damage Claims OH 11/13/2024 11 Elect Annual Proj - DESG CT 12/27/2021 11 SV Exist OH/UG NOND ST2 CT 11/3/2021 11 Damage Claims OH 12/2/2021 11 Elect Annual Proj - DESG CT 11/3/2022 11 Damage Claims OH 4/22/2022 11 Damage Claims OH 12/22/2021 11 Damage Claims OH 12/3/2021 11 Damage Claims OH 11/15/2021 11 Damage Claims OH 6/27/2022 11 Corrective Maint UG Svc 12/1/2021 11 Elect Annual Proj - DESG CT 4/8/2022 11 Elect Annual Proj - DESG CT 10/22/2021 11 Damage Claims UG 2/19/2025 11 Asset Mgmt - Specific DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 5/23/2022 11 Elect Annual Proj - DESG CT 12/13/2021 11 Elect Annual Proj - DESG CT 10/18/2021 11 Elect Annual Proj - DESG CT 9/21/2022 11 Asset Mgmt - Specific DESG CT 11/2/2021 11 Damage Claims OH 10/22/2021 11 Damage Claims OH 7/6/2022 11 Asset Mgmt - Specific DESG CT 6/22/2022 11 Asset Mgmt - Specific DESG CT 7/7/2022 11 Elect Annual Proj - DESG CT 7/20/2022 11 Elect Annual Proj - DESG CT 3/2/2022 11 Elect Annual Proj - DESG CT 8/28/2023 11 Asset Mgmt - Specific DESG CT 7/28/2022 11 Elect Annual Proj - DESG CT 11/12/2021 11 Damage Claims OH 11/16/2022 11 Corrective Maint OH Svc 11/5/2021 11 Damage Claims OH 3/7/2023 11 Elect Annual Proj - DESG CT 11/1/2021 11 Damage Claims OH 11/20/2024 11 Elect Annual Proj - DESG CT 11/13/2021 11 Elect Annual Proj - DESG CT 11/4/2021 11 Elect Annual Proj - DESG CT 10/25/2021 11 Damage Claims OH 5/11/2023 11 Elect Annual Proj - DESG CT 5/10/2023 11 Elect Annual Proj - DESG CT 10/27/2021 11 Damage Claims OH 11/5/2021 11 Damage Claims OH 11/30/2021 11 Damage Claims OH 10/17/2022 11 Asset Mgmt - Specific DESG CT 4/11/2023 11 Elect Annual Proj - DESG CT 1/15/2025 11 Asset Mgmt - Specific DESG CT 5/26/2022 11 Asset Mgmt - Specific DESG CT 11/15/2021 11 Damage Claims OH 12/6/2022 11 Asset Mgmt - Specific DESG CT 3/6/2023 11 Dist Capital or Expense 2/1/2022 11 Dist Capital or Expense 11/9/2021 11 Damage Claims OH 1/15/2025 11 Asset Mgmt - Specific DESG CT 6/13/2022 11 Asset Mgmt - Specific DESG CT 11/9/2021 11 Damage Claims OH 11/19/2021 11 Damage Claims OH 1/15/2025 11 Dist Capital or Expense 11/4/2022 11 Asset Mgmt - Specific DESG CT 7/6/2022 11 Asset Mgmt - Specific DESG CT 11/16/2021 11 Damage Claims OH 11/3/2021 11 Damage Claims OH 11/5/2021 11 Damage Claims OH 11/27/2021 11 Elect Annual Proj - DESG CT 11/23/2021 11 Elect Annual Proj - DESG CT 1/26/2022 11 Elect Annual Proj - DESG CT 11/12/2021 11 Damage Claims OH 12/7/2021 11 Street Light - DESG CT 11/17/2021 11 Elect Annual Proj - DESG CT 2/7/2022 11 Elect Annual Proj - DESG CT 9/12/2022 11 Elect Annual Proj - DESG CT 9/1/2022 11 Corrective Maint OH Svc 12/8/2021 11 Street Light - DESG CT 7/20/2022 11 Asset Mgmt - Specific DESG CT 5/17/2022 11 Damage Claims OH 6/21/2022 11 Asset Mgmt - Specific DESG CT 2/3/2023 11 Elect Annual Proj - DESG CT 3/24/2022 11 Elect Annual Proj - DESG CT 11/13/2021 11 Asset Mgmt - Specific DESG CT 12/9/2021 11 Damage Claims OH 12/18/2021 11 Damage Claims OH 11/12/2021 11 Damage Claims OH 12/15/2021 11 Damage Claims OH 10/12/2022 11 Asset Mgmt - Specific DESG CT 11/17/2021 11 Damage Claims OH 11/17/2021 11 Elect Annual Proj - DESG CT 11/30/2023 11 Asset Mgmt - Specific DESG CT 5/22/2023 11 Elect Annual Proj - DESG CT 12/4/2024 11 Elect Annual Proj - DESG CT 12/6/2021 11 Damage Claims OH 7/18/2022 11 Asset Mgmt - Specific DESG CT 8/20/2024 11 Asset Mgmt - Specific DESG CT 11/27/2021 11 Elect Annual Proj - DESG CT 11/18/2021 11 Damage Claims OH 12/2/2021 11 Damage Claims OH Subsequent Close Date 2/13/2026 2/13/2026 7/17/2026 364310 Poles and Appurtenance 58,424 (44) 3,409 3,032 243 9,785 311 3,384 8,115 18,763 2,877 2,377 1,092 3,678 6,095 2,774 2,332 686 14,120 126 7,081 210 3,477 3,616 1,670 44,346 15,115 979 3,164 (121) 671 860 188 3,217 (1,122) 5,487 274 4,230 2,044 13,179 6,294 232 13,424 2,847 1,742 5,488 20,470 321 5,483 3,564 5,672 5,277 6,092 908 (27) 3,531 119,876 1,865 2,122 57,245 5,892 11,267 840 11,806 1,926 1,291 4,553 9,771 21,854 3,381 7,785 782 8,534 15,863 (162) 456 749 2,824 889 3,594 588 16,902 3,954 637 7,179 1,603 6,240 2,906 9,701 483 7,577 3,794 4,487 8,239 7,070 (213) 60,261 3,601 457 22,435 8,368 5,446 6,072 1,021 132 365000 Overhead Conductors, Device 37,068 4,953 305 105,205 1,187 12,314 464 193 3,653 1,420 96,564 2,244 441 306 2,026 1,302 800 105 3,111 18,992 3,764 1,310 1,391 2,080 532 302,804 17,614 109 3,256 (121) 729 28,150 111 544 (1,122) 4,482 678 1,577 1,205 5,206 559 232 130 901 191 2,348 907 1,994 2,879 2,165 840 223 534 (130) 2,641 425,813 746 2,168 48,824 86,788 704 119 8,985 51,758 119 331 4,933 30,692 62,468 6,019 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 15,795 28,818 1,980 875 34,868 9,458 9,712 368330 Equipment Overhead 712 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 1,878 160 247 385 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 3,422 9,824 3,571 (21) (1) 2,126 618 206 140 120 269 594 30 222 3,891 776 101 120 1,206 6,538 21,284 1,034 (1) 388 64 35,139 1,991 204 (121) 183,614 406 166 348 (1,122) 632 63 346 7,165 450 346 382 347,093 13,346 1,211 232 79 205 45,448 471 2,260 327 225 2,093 725 86 1,872 1,028 597 213 32 3,741 180 604 244 3,466 (162) 1,865 64 197 413 4,798 1,053 6,477 1,473 118 7,821 1,006 31,769 985 59,395 1,025 57,343 5,701 3,345 9,701 115 6,337 5,579 356 3,923 5,988 (213) 173,449 2,933 733 2,130 116,020 13,615 26 18 28,005 14,624 9,701 728 49,829 18,837 9,701 869 303 1,851 12,848 6,832 7,739 14,304 90 339 2,820 492 233 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 96,204 54,821 3,714 108,237 1,430 70,362 12,213 14,302 14,142 21,185 99,441 4,827 1,673 3,984 8,241 4,938 3,132 791 17,231 19,147 11,068 6,186 5,358 5,881 2,202 404,778 35,753 1,291 6,421 (364) 191,958 29,010 299 4,276 (3,366) 11,051 1,361 6,535 357,507 32,942 6,853 695 13,553 3,827 1,933 5,488 22,818 1,432 7,478 54,622 8,163 6,342 6,315 1,442 (157) 7,285 550,379 3,208 4,503 106,069 92,711 15,712 959 20,971 53,684 1,410 5,081 15,721 57,344 65,849 13,804 782 8,777 20,382 (323) 8,797 813 4,296 1,007 40,148 16,218 48,671 4,939 60,032 8,204 58,946 61,770 25,958 38,804 598 13,914 9,373 4,843 15,285 14,909 (426) 253,479 15,104 15,727 24,565 124,388 19,062 6,072 1,047 149
  6. Page 11 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 11 of 104 Work Order Number Description 80137295 RC INSTALL NEW POLE AND CV SERVICE 80137518 DG P#1279 RT 169 WOODSTOCK RMV TRE 80137535 * AMM 2530 BERLIN TPKE, NEWINGTON. 80137658 11/15 DALY RD EAST HAMPTON FRONTIER 80137708 AMM 21 SPRING LN, FARMINGTON. INST 80137810 APPT 2/23 GO APPT 9/28 PRINTED 8/4 80137857 JDB 96 EAST AVE NORWALK,REPL P34258 80137920 Install facilities to FTR poles to 80137934 MG *WRITTEN* Lebanon_Bender Rd_Devi 80138124 (RN)10/31/24 DSINPRG / 10/22/24 80138234 P-744 SHIFT TO FTR 45/2 HURD BRIDGE 80138274 90 DAYS 6/17 9A CAR V FRONTIER P24 80138409 ASP_PMV - TD941 Amity Rd Bethany In 80138635 MF - Susan Terrace, Waterford Repla 80138643 RA 9A -p850 WILSONVILLE RD Thompso 80138721 Stafford Rd, Mansfield BBA P-156. R 80138794 DJM. 33 FERRY LN E WESTPORT. OH TO 80138828 RA - 3 or more Day St, Brooklyn - A 80138900 TL - MEETING HOUSE LN, #1A OLD LYME 80138977 EVW - SHARON ( 214) RD -- S-46, LA 80139098 153 AMITY RD. BLDG #2, BETHANY - IN 80139137 * DO WITH WR#8962775 - AMM 550 CEDA 80139185 11/18/21 9A TURNOVER 68 GARDER RD M 80139239 15 DAY DUE 1/4/22; EAST HADDAM, LAK 80139512 MJGw - CD01649-02 - Reconductor Mot 80139591 11/19/21 9A S MAIN ST NEWTOWN 80139743 TO STORES 3/3/23--P-156 shift to FT 80139761 9A KD-EVENT #4657238 CAR V P 929 SQ 80139790 *COMP* PL:INST NEW POLE, 3PH RISER 80139810 TBCancelled to WO 14185697 when com 80140106 Asplundh - Early pole set completed 80140226 Pomfret Road Hampton - XARM & POLE 80140299 MCB - (9A) 11.22.21 - 1966 BALDWIN 80140308 RA Project CDOT 141-157 RT 12 Thomp 80140328 AC-460 PLAINVILLE RD, FARMINGTON-P# 80140411 READY?KTI RC POLE 9276 RECONNECT TH 80140483 (DF)UPGD 3PH DE POLE, PADMNT- 600A 80140539 MRP - (9A) - CAR V POLE - POLE 4078 80140587 JAM- 120 Kennedy Road New Britain 80140732 9A - 1136 NORTH RD, EAST KILLINGLY, 80140767 9A - CAR VS POLE 80140802 *D&D*JA-Conv#1195253-MakeReadyNonRe 80140838 JFC - WESTWOODS ( 116) RD 1 -- S22 80140847 (DF)(R/I)3PH POLE- UPGD XF; (R/I) C 80140869 JFC - GAY ( 246) ST -- 1371, SHARO 80140871 9A KD-EVENT #4664861/4664761 TURNOV 80140943 MR; ***WRITTEN***MIDDLETOWN, SAYBRO 80140983 (FCOMP), # TELCO W HTFD 28 NEWPORT 80141025 MJ 2/2 0 PONDVIEW DR, NAUGATUCK - I 80141187 9A--CAR VS POLE 315-CROM--11/27/2180141188 MM Baltic-Hanover Rd Frontier P#153 80141197 CAR VS POLE 29 - EMAIL to ENG to c 80141252 CRP - 11/27/21 264 E HARTLAND RD BA 80141397 11/29 - 9A - (Durkee) Suffield, S M 80141492 ALDENONE PENDING BC - CD01866 ROW03 80141499 DB-CD01534-07 State Pier, relocate 80141677 done VIPER SWITCH CD01774 : 29J1 –P 80141712 9A KD-EVENT #4666859/4666870 CAR V 80141750 9A CAR V POLE 80141770 EVW - 9A NORTH CANAAN RD (RT 7) CAN 80141777 KD-EVENT #4665850 REPLC P 12543, 12 80141901 BC - CD01753 ROW004 - P3 Pole Repla 80141942 ?3/14 POLE JFC - LITCHFIELD, beach 80141961 SC-141 WARD AVE PLAINFIELD R-35/4 I 80142084 DG P#1541 23 LIVERY ST PUTNAM CLP 3 80142095 JLB 9A- 464 NOD HILL RD, WILTON/ BR 80142316 Replace Rubber tie 11A77 and 11A56 80142361 *D&D*Frontier Inspection Pole Shift 80142420 12/13 CP-90 Twenty Four Bumper rd H 80142528 CRP - 9A SCHOOL ( 26) ST -- H6098 80142567 12/1 - 9A - East Windsor, Trombley 80142649 Post Construction - 12/1/21 Prospec 80142674 AK-Convo#1182914-MakeReadyNonReimb80142711 15 DD 4/25 SD 59 LONG HILL ROAD MID 80142793 MV - PAWCATUCK, BRUCKER PENTWAY, 26 80142890 9A (GNESDA) N MAIN ( 0) ST UNI 80143030 JLB HERMIT LN, WESTPORT/ TREE VS PO 80143068 12/2 BETTE DR, MANCHESTER P#6689 BR 80143081 12/2 - 9A - Vernon, Dart Hill Rd 80143197 3 OR MORE DG P#1786 WOODSTOCK RD PO 80143223 SEAR 6/22/22 PRE245 9A - ALL WORK C 80143449 WAITING MUNI 10/24/22 NJB 214 PROSP 80143495 9A KD-EVENT #4669678 CAR V P 6923 C 80143654 ASP 1/4 -JRP - 273 Queen St SOG Rep 80143684 *D&D*Conv # 1195305 - Make Ready No 80143699 MATERIAL SD POST CONSTRUCTION 9A MA 80143723 DG P#1845 64 BATES AVE PUTNAM CLP P 80143765 OAK DR, WOODSTOCK CT - BROKEN POLE 80144138 12/7/21 79 TURKEY PLAIN RD BETHEL 80144149 PD-82 BOSTON POST RD WTFD,UPG OH SV 80144168 MR; ***WRITTEN***ALL WORK COMPLETED 80144204 JFC - 9A -WINSTED ( 3601) RD, TORRI 80144268 WC-TD941C 700 N WALNUT WATERBURY. 1 80144345 COMPLETE 2/7/22 RDG RDC NEW PRESTON 80144361 MATERIAL JES; 15 OAKWOOD AVE. NORWA 80144728 In Progress KTI RR; SOUTHBURY, OLD 80144761 MJ - SD 40 ROUND HILL ROAD BETHANY 80144767 MM 188 Bennett Pond Rd Canterbury P 80144869 12/7/21 81 SHORTWOODS RD NEW FAIRFI 80144871 12/6 - 9A - Coventry, Dunn Rd - Eve 80144977 (ASP)BC - CD01753 ROW002 P3 Poles 80145013 278 LAKE RD., VERNON - CHANGE FROM 80145065 60 WESTWOOD AVE, WATERBURY - INST P 80145237 VALID per flotat 11/24/24 - 10/14/2 80145274 VJT - 9A - PARK (856) RD -- M, WATE in-service date work order type 3/11/2022 11 Elect Annual Proj - DESG CT 3/3/2022 11 Elect Annual Proj - DESG CT 7/6/2022 11 Elect Annual Proj - DESG CT 12/8/2021 11 Elect Annual Proj - DESG CT 7/21/2023 11 Elect Annual Proj - DESG CT 2/24/2023 11 Elect Annual Proj - DESG CT 9/1/2022 11 Elect Annual Proj - DESG CT 3/31/2022 11 Elect Annual Proj - DESG CT 1/3/2022 11 Elect Annual Proj - DESG CT 11/8/2024 11 Damage Claims OH 2/9/2022 11 Damage Claims OH 12/2/2021 11 Damage Claims OH 8/15/2023 11 Elect Annual Proj - DESG CT 5/27/2022 11 Elect Annual Proj - DESG CT 12/9/2021 11 Damage Claims OH 2/8/2025 11 Dist Capital or Expense 11/14/2023 11 Asset Mgmt - Specific DESG CT 12/30/2021 11 Elect Annual Proj - DESG CT 5/2/2025 11 Dist Capital or Expense 12/1/2021 11 Damage Claims OH 2/8/2022 11 Asset Mgmt - Specific DESG CT 9/25/2024 11 Elect Annual Proj - DESG CT 11/26/2021 11 Damage Claims OH 7/20/2022 11 Elect Annual Proj - DESG CT 5/20/2022 11 Asset Mgmt - Specific DESG CT 12/8/2021 11 Damage Claims OH 3/30/2022 11 Elect Annual Proj - DESG CT 2/15/2022 11 Damage Claims OH 9/8/2022 11 Elect Annual Proj - DESG CT 9/19/2025 11 Dist Capital or Expense 7/25/2022 11 Elect Annual Proj - DESG CT 11/29/2021 11 Elect Annual Proj - DESG CT 11/29/2021 11 Damage Claims OH 11/8/2024 11 Elect Annual Proj - DESG CT 10/29/2024 11 Dist Capital or Expense 4/5/2022 11 Street Light - DESG CT 10/18/2022 11 Elect Annual Proj - DESG CT 11/26/2021 11 Damage Claims OH 5/20/2022 11 Elect Annual Proj - DESG CT 12/8/2021 11 Damage Claims OH 12/13/2021 11 Damage Claims OH 11/6/2023 11 Elect Project - DESG CT 12/14/2021 11 Damage Claims OH 3/1/2022 11 Corrective Maint UG Svc 12/8/2021 11 Damage Claims OH 12/20/2021 11 Damage Claims OH 7/20/2022 11 Elect Annual Proj - DESG CT 5/29/2023 11 Elect Annual Proj - DESG CT 2/16/2022 11 Elect Annual Proj - DESG CT 12/9/2021 11 Damage Claims OH 11/30/2021 11 Elect Annual Proj - DESG CT 12/14/2021 11 Damage Claims OH 12/1/2021 11 Elect Annual Proj - DESG CT 11/30/2021 11 Damage Claims OH 3/14/2023 11 Asset Mgmt - Specific DESG CT 2/23/2023 11 Elect Annual Proj - DESG CT 6/21/2022 11 Asset Mgmt - Specific DESG CT 12/20/2021 11 Damage Claims OH 12/8/2021 11 Damage Claims OH 12/13/2021 11 Damage Claims OH 6/8/2022 11 Elect Annual Proj - DESG CT 3/21/2023 11 Asset Mgmt - Specific DESG CT 3/28/2022 11 Elect Annual Proj - DESG CT 6/1/2022 11 Elect Annual Proj - DESG CT 5/28/2025 11 Elect Annual Proj - DESG CT 1/2/2022 11 Damage Claims OH 11/19/2024 11 Elect Annual Proj - DESG CT 11/15/2024 11 Elect Annual Proj - DESG CT 12/17/2021 11 Temporary Work DESG CT 12/8/2021 11 Damage Claims OH 12/2/2021 11 Damage Claims OH 12/6/2021 11 Elect Annual Proj - DESG CT 5/4/2023 11 Elect Project - DESG CT 4/12/2023 11 Elect Annual Proj - DESG CT 2/2/2022 11 Asset Mgmt - Specific DESG CT 12/18/2021 11 Damage Claims OH 4/6/2022 11 Elect Annual Proj - DESG CT 12/8/2021 11 Elect Annual Proj - DESG CT 12/3/2021 11 Damage Claims OH 1/7/2022 11 Elect Annual Proj - DESG CT 12/28/2021 11 Damage Claims OH 12/14/2022 11 Elect Annual Proj - DESG CT 12/22/2021 11 Damage Claims OH 1/26/2022 11 Elect Annual Proj - DESG CT 10/29/2023 11 Elect Project - DESG CT 12/27/2021 11 Damage Claims OH 1/7/2022 11 Elect Annual Proj - DESG CT 12/15/2021 11 Elect Annual Proj - DESG CT 12/27/2021 11 Elect Annual Proj - DESG CT 3/15/2022 11 Asset Mgmt - Specific DESG CT 12/8/2021 11 Elect Annual Proj - DESG CT 12/30/2021 11 Damage Claims OH 6/21/2022 11 Dist Capital or Expense 6/14/2022 11 Temporary Work DESG CT 3/30/2022 11 Elect Annual Proj - DESG CT 6/9/2022 11 Elect Annual Proj - DESG CT 6/22/2022 11 Dist Capital or Expense 4/29/2022 11 Elect Annual Proj - DESG CT 12/28/2021 11 Elect Annual Proj - DESG CT 12/9/2021 11 Damage Claims OH 8/26/2022 11 Asset Mgmt - Specific DESG CT 3/23/2022 11 Elect Annual Proj - DESG CT 3/15/2022 11 Elect Annual Proj - DESG CT 4/11/2025 11 Dist Capital or Expense 2/16/2022 11 Damage Claims OH Subsequent Close Date 5/15/2026 1/22/2026 6/26/2026 9/16/2026 4/20/2026 2/13/2026 364310 Poles and Appurtenance 4,950 2,086 389 3,570 349 1,989 2,783 125 15 4,709 2,012 2,676 21,196 5,595 12,240 2,024 3,915 5,497 700 2,412 4,671 3,637 294 1,267 45,474 776 418 2,283 4,763 2,301 5,857 8,448 14,139 6,099 1,124 3,893 1,490 1,692 2,775 2,429 487 3,430 2,008 5,785 2,248 5,920 5,368 46 6,248 3,548 318 5,967 1,085 4,806 35,981 44,804 3,418 1,628 2,357 1,454 19,258 88,199 1,037 3,686 10,461 10,331 2,939 1,350 223 877 19,681 16,737 (77) 2,332 7,917 2,394 17,435 12,056 7,206 4,818 3,580 2,955 12,076 13,532 15,864 6,427 (227) 27,078 3,543 2,881 676 9,861 11,130 329 5,705 4,599 1,843 2,842 1,397 9,943 20,360 1,250 4,549 (280) 11,933 365000 Overhead Conductors, Device 4,203 2,299 6,332 1,556 1,604 837 1,590 61 3,219 186 5,506 26,517 2,659 2,688 5,153 1,162 40,154 1,905 911 4,216 9,776 173 179 19,491 104 218 4,594 51 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 1,177 7,911 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 521 (703) 438 (446) 490 57 124 378 14 153 4,479 1,228 491 (24) 269 444 311 1,866 170 878 1,356 465 8,019 956 175 91,024 130 90 (30) 9,585 342 (321) 440 2,480 28 3,037 2 1,404 64 725 8,828 658 4 25,782 32,454 56,212 6,107 4,818 (77) 1,113 208 341 3,212 541 215 36,302 756 3,105 1,188 5,082 53,847 164 7,721 2,042 1,322 114 474 4,360 258 74 502 328 1,397 3,868 106 3,637 492 3,435 189 8,152 716 330 3,865 20,567 2,742 7,807 103 75 66 1,470 7,968 126 3,789 13,976 912 1,240 105 26 515 (77) (77) 87 231 8,484 1,277 1,790 434 930 3,255 102 2,422 6,789 34,236 329 3,353 120 11,958 2,244 528 5,168 960 635 997 (506) 2,177 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 406 11,668 9,176 4,154 143 15,634 1,578 1,880 3,345 2,862 1,293 2,333 642 772 847 8,657 1,038 370470 Meter Equipment 22,096 372 1,024 11,776 150 2,269 77 3 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 10,852 2,086 10,334 10,307 13,617 12,769 4,151 1,910 76 12,407 2,198 8,673 48,917 8,255 15,197 7,621 6,266 47,517 4,131 3,323 9,527 112,456 467 1,878 66,020 880 418 2,501 19,063 2,352 8,337 12,602 14,282 21,733 1,124 3,920 6,364 3,572 6,194 5,793 2,107 7,167 2,649 7,346 3,095 23,405 7,063 46 7,649 7,415 424 9,604 1,577 4,806 61,763 77,324 59,630 1,628 7,262 1,643 35,378 88,915 1,494 25,316 33,180 13,073 10,852 1,453 324 877 26,303 21,555 (306) 4,810 10,146 2,735 20,647 12,597 7,421 41,120 4,336 15,907 13,264 18,614 72,965 6,592 (227) 34,799 5,688 6,625 789 17,124 49,726 658 31,526 4,720 26,600 7,504 1,925 15,111 21,320 1,962 5,549 (786) 14,110
  7. Page 12 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 12 of 104 Work Order Number Description 80145285 *ASP* JA-Conv#1198258-MakeReadyNonR 80145403 RF-BOLTON, 160 BOSTON, Remove Idle 80145562 Holbrook Rd, widening. 0% reimbursa 80145586 **ALL WORK COMP** KM 9A POLE843 943 80145701 SD POST CONSTRUCTION *(9A) 12.09.21 80145709 (9A) JRP - 426 Wolcott Rd WTBY Repl 80145753 AldenOne Project CD01552-02 2021 Fr 80145874 MJP / 48 Union St / STM / SVC Upgra 80145892 MJ 12/28 -PMV -Taine Mountain Rd Fa 80146330 *D&D*Conv # 1195305 - Make Ready No 80146337 ASPLUNDH 12/11/21 OLD SHELTER ROCK 80146349 DG P#3675 72 CHANDLER SCHOOL RD WOO 80146368 12/11 - 9A NON BILLABLE - Mansfiel 80146388 ALL WORK COMPLETE HAYDEN HILL RD., 80146400 (9A) 12.11.21 - 390 MERIDEN RD, WAT 80146420 EVW - LOWER ( 154) RD -- H387 H691 80146439 #HTF_SS HTFD, 150 GREENFIELD ST - P 80146555 HEL KTI RR; Reconductor 600' on Jud 80146556 VALID PER FLOTAT 11/21 - PD-7 LOWER 80146602 MR; ***WRITTEN***ALL WORK COMPLETED 80146890 CAR VSPOLE NON-BILLABLE-repl xarm/r 80146967 12/13 - 9A - Coventry, Boston Tpke 80146972 OH complete (*) (cc) - JMS BLOOMFI 80147304 ASP 3/28 MCB - COLLINS ST/MORAN ST 80147461 12/07: NORTH AVE, WESTPORT/ NEW 8' 80147640 (FOLLOW UP) JDB 3 1/2 WALL ST NORWA 80147660 RSO--12/15/21--CAR V FTR POLE, POLE 80147799 DB-CD01199-01, 9L06, install 9L05-9 80147847 SC-96 EKONK HILL RD VOLUNTOWN INST 80147946 *D&D* AK-Convo#1192923-MakeReadyNon 80148088 ALL WORK COMPLETED-12/16 - 9A - Suf 80148154 CAR VS POLE - 678 rereq 7/5;wrong c 80148286 DB-CD01200-01, 9L05, install 36F6-9 80148314 CD01739 Abandon ROW 13B10 80148319 15 DD BY 11/7/22 WOODBURY, SAW PIT 80149799 OAKLAND ( 262) ST -- 253, MANCHEST 80149823 9A - CAR VS POLE 4295S - APPROVED 1 80149827 WC-12.19.21 - 1030 S MERIDEN RD, CH 80149856 9A - CAR VS POLE (MATERIAL VARIANCE 80149861 9.15.22 ftr pole not set 12/30 9A: 80150055 CAR VS POLE Main Street Chester 80150078 12/20 - 9A - Willington, River Rd 80150192 RA CD01858-01 1PH Reconductor Elmda 80150195 12/19 - 9A - Mansfield, Stafford Rd 80150296 15 DD BY 12/31/24 SD; DANBURY, STAP 80150364 CD02463 Overload Step Xfmr P1607 Ya 80150437 MCB - 3081 E MAIN ST WATERBURY, P43 80150455 REPLACE XARM AND REPAIR OH PRIMARY 80154439 FOLLOW UP ENG : 12.20.21 - BLUEBERR 80154532 MCB - (9A) 12.21.21 - 54 STONEHOLLO 80154606 WTG FOR PD RPT 8/20/25 (TH) CRP 10/ 80155390 DJM. 6 CLIFFORD LN WESTPORT. NEW 60 80155931 12/26 - 9A - [SCOTTRJ] Willington, 80155940 GC - 12/23 9A CAR V P2007 LONG COVE 80155967 APPRENTICES KTI 12/23: KELLY ( 59 80156346 JAM - 3 East Gate Road Farmington 80156355 WRTN--JK>POLE 351S--REPL STUB POLE 80156467 TO DOCK CREWS; MV-TDRP JONATHAN TRU 80156563 GC - PRESTON, KRUG, 242, 80156589 apprentices 8.14.24 OLD HAWLEYVILL 80156765 CRP - CEDAR ( 511) LN -- S1788, NE 80157201 JONATHAN TRUMBULL 80157230 POST CONST - 9A - P#10103 Replace 5 80157233 SD; 50 RESERVE RD DANBURY-ENCOMPASS 80157619 JLB 103 BRUSHY RIDGE RD, NC/FRONTIE 80157667 (9A) 01.02.22 - 26 SPRING RD, PROSP 80157756 PRINT BJQ - GOSHEN, OLD MIDDLE, 49, 80157762 CP- GEORGE WASHINGTON TPKE BUR. rep 80157871 * 10/23/24 92 SOMER DR, MERIDEN 80158118 RM, 344 WESTPORT AVE - NORWALK, !! 80158153 720 WOLCOTT ST, WATERBURY - RPL PAD 80158343 MTL-MRP - CAR V POLE - POLE 93305 80158772 **10/24/24 turnover 92 FLAX MILL RD 80158836 Remove 3 trees, install guying and 80158976 *MJ w - CD01753-03 2022 - ROW 140 80158987 DG P#D1442 PEAKE BROOK RD WOODSTOCK 80159037 EVW - 9A - LINDELL RD, NORTH CANAAN 80159183 SEAR 6/29/22 01/06/22mv- 9A WINDHAM 80159723 MJ 2/4 CD01753-03 YR 2022 P3 Poles 80159871 EMP- 1/10/22- HAWKS NEST RD, OLD LY 80159882 * JAM - 57 Erwin Pl New Britain (RE 80159957 **GDK INT-99321, WINDSOR, 89 EZRA S 80160021 *zRH----150 Dividend Rd--INST 3-50K 80160036 EMP -1/10/22- LAMBTOWN ROAD, LEDYAR 80160088 *as built comp 10/16/25 MB*Meriden 80160156 CAR VS POLE- AWAITING POLICE REPORT 80160645 MJ 2/15 CD01753-03 - ROW Pole Repl 80160718 SC-1459 NORTH RD KILLINGLY R-30/4 R 80160888 PR 12/28 POLE EW - 221 Spencer Hill 80160896 JSG/North Canaan--Main St. Estimate 80160969 SC-P#346 GENDRON RD PLAINFIELD INST 80161226 425 River Rd Lisbon P#127 eversourc 80161363 KTI 12Y8 - Install New Radial Reclo 80161514 GCC / MG Replace FTR P#353 Inst. Pr 80161531 DONE PR 9/26 JFC - PIE HILL RD GOSH 80161548 TL - MAMACOCK RD, NIANTIC // ***FOL 80161559 *ASP* MAR - Pole Reject P#4077 - 28 80161561 *HAWK* MAR - Pole Reject P#673 - 47 80161565 *HAWK* MAR - Pole Reject P#91467 80161586 Abel-(demo received) WEST SUFFIELD, 80161693 new GC - Kitemaug Rd Uncasville Ins 80161816 9A CAR V POLE 80161828 01/15 RED MILLS LN EAST HADDAM POLE 80161857 SD 335 N WALL ST MERIDEN, CT POLE 1 80161903 Asplundh - 1/17 - 9A - Stafford, Ha in-service date work order type 10/1/2025 11 Dist Capital or Expense 1/21/2022 11 Elect Annual Proj - DESG CT 6/3/2022 11 Elect Annual Proj - DESG CT 3/5/2025 11 Damage Claims OH 12/22/2021 11 Damage Claims OH 11/10/2022 11 Damage Claims OH 2/15/2022 11 Asset Mgmt - Specific DESG CT 2/26/2024 11 Elect Annual Proj - DESG CT 1/20/2022 11 Elect Annual Proj - DESG CT 6/5/2023 11 Elect Project - DESG CT 2/15/2022 11 Elect Annual Proj - DESG CT 12/13/2021 11 Damage Claims OH 12/16/2021 11 Damage Claims OH 12/22/2021 11 Elect Annual Proj - DESG CT 12/18/2021 11 Damage Claims OH 12/22/2021 11 Damage Claims OH 10/15/2024 11 Damage Claims OH 6/8/2022 11 Elect Annual Proj - DESG CT 4/17/2025 11 Dist Capital or Expense 12/27/2021 11 Elect Annual Proj - DESG CT 1/30/2023 11 Damage Claims UG 12/16/2021 11 Damage Claims OH 7/11/2022 11 Elect Annual Proj - DESG CT 4/28/2022 11 Street Light - DESG CT 1/2/2022 11 Elect Annual Proj - DESG CT 8/24/2022 11 Elect Annual Proj - DESG CT 12/30/2021 11 Damage Claims OH 5/16/2023 11 Asset Mgmt - Specific DESG CT 11/15/2022 11 Elect Annual Proj - DESG CT 3/13/2025 11 Dist Capital or Expense 12/30/2021 11 Damage Claims OH 12/23/2021 11 Damage Claims OH 4/26/2023 11 Asset Mgmt - Specific DESG CT 4/18/2022 11 Asset Mgmt - Specific DESG CT 10/31/2022 11 Elect Annual Proj - DESG CT 12/21/2021 11 Damage Claims OH 12/28/2021 11 Damage Claims OH 12/20/2021 11 Elect Annual Proj - DESG CT 8/5/2022 11 Damage Claims OH 4/10/2023 11 Damage Claims OH 1/19/2022 11 Damage Claims OH 12/22/2021 11 Damage Claims OH 4/27/2022 11 Asset Mgmt - Specific DESG CT 12/22/2021 11 Damage Claims OH 1/13/2025 11 Dist Capital or Expense 5/22/2025 11 Dist Capital or Expense 11/27/2023 11 Elect Annual Proj - DESG CT 1/5/2022 11 Elect Annual Proj - DESG CT 4/25/2022 11 Elect Annual Proj - DESG CT 12/30/2021 11 Damage Claims OH 8/25/2025 11 Dist Capital or Expense 3/19/2024 11 Elect Annual Proj - DESG CT 12/29/2021 11 Damage Claims OH 3/30/2022 11 Damage Claims OH 5/23/2023 11 Elect Annual Proj - DESG CT 5/25/2022 11 Elect Annual Proj - DESG CT 8/23/2023 11 Elect Annual Proj - DESG CT 2/16/2023 11 Elect Annual Proj - DESG CT 7/19/2022 11 Elect Annual Proj - DESG CT 3/3/2025 11 Elect Annual Proj - DESG CT 1/4/2022 11 Damage Claims OH 4/17/2025 11 Dist Capital or Expense 10/24/2024 11 Dist Capital or Expense 8/26/2025 11 Dist Capital or Expense 5/9/2022 11 Elect Annual Proj - DESG CT 1/6/2022 11 Damage Claims OH 9/17/2025 11 Corrective Maint UG Svc 1/28/2022 11 SV Exist OH/UG NOND ST2 CT 6/9/2025 11 Dist Capital or Expense 12/2/2024 11 Elect Annual Proj - DESG CT 8/12/2022 11 Elect Annual Proj - DESG CT 2/25/2022 11 Damage Claims OH 4/16/2025 11 Elect Annual Proj - DESG CT 2/11/2022 11 Private Work - No Co Asset 10/17/2022 11 Asset Mgmt - Specific DESG CT 3/7/2022 11 Elect Annual Proj - DESG CT 1/7/2022 11 Damage Claims OH 2/3/2022 11 Damage Claims OH 9/26/2022 11 Asset Mgmt - Specific DESG CT 2/3/2022 11 Elect Annual Proj - DESG CT 8/18/2022 11 Elect Annual Proj - DESG CT 6/5/2025 11 Elect Annual Proj - DESG CT 1/11/2022 11 Elect Annual Proj - DESG CT 2/15/2022 11 Elect Annual Proj - DESG CT 6/25/2025 11 Dist Capital or Expense 3/2/2022 11 Damage Claims OH 2/24/2022 11 Asset Mgmt - Specific DESG CT 9/16/2025 11 Corrective Maint UG Svc 3/3/2023 11 Elect Annual Proj - DESG CT 9/24/2025 11 Dist Capital or Expense 1/21/2022 11 Elect Annual Proj - DESG CT 1/28/2022 11 Elect Annual Proj - DESG CT 6/16/2023 11 Elect Annual Proj - DESG CT 3/2/2022 11 Elect Annual Proj - DESG CT 10/31/2022 11 Elect Annual Proj - DESG CT 2/16/2022 11 Elect Annual Proj - DESG CT 4/11/2022 11 Elect Annual Proj - DESG CT 6/10/2022 11 Elect Annual Proj - DESG CT 6/10/2022 11 Elect Annual Proj - DESG CT 2/2/2022 11 SV Exist OH/UG NOND ST2 CT 4/4/2022 11 Elect Annual Proj - DESG CT 7/8/2022 11 Damage Claims OH 3/26/2024 11 Elect Annual Proj - DESG CT 2/10/2022 11 Elect Annual Proj - DESG CT 1/5/2023 11 Damage Claims OH Subsequent Close Date 7/17/2026 2/13/2026 5/15/2026 1/22/2026 9/16/2026 5/15/2026 1/22/2026 1/22/2026 2/13/2026 1/22/2026 2/13/2026 4/20/2026 6/26/2026 364310 Poles and Appurtenance 1,704 1,148 30,034 4,480 23,079 2,147 703 3,698 23,878 62 5,035 1,958 6,117 2,056 18,088 3,898 212 12,655 722 2,198 512 3,309 2,259 13,936 3,318 12,413 2,529 7,128 5,066 7,238 2,227 1,428 2,205 28,673 142 1,918 2,051 28,672 10,895 1,270 656 1,343 101,112 13,360 6,867 9,866 (31) 427 8,203 11,316 1,591 5,646 28,654 463 6,946 629 3,850 81,629 479 31,140 1,084 1,984 10,773 789 966 3,295 18 (103) 1,898 10,567 226 2,213 13,615 (607) 94,985 9,070 4,944 633 32,853 994 2,263 2,658 1,936 295 8,490 10,253 373 5,569 3,352 40,451 (398) 5,472 2,012 1,701 555 531 4,871 2,810 5,041 (170) 2,563 2,797 8,973 1,123 2,607 365000 Overhead Conductors, Device 6,807 1,581 564 2,905 8,791 876 61 9,512 15,451 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 499 23,129 1,528 3,452 294 1,869 3,892 1,377 996 5,952 3,499 177 52,527 1,646 37 1,891 348 339 1,358 758 2,301 910 74 313 461 7,310 602 156,682 4,684 (482) 2,393 127 121,527 19,334 811 1,639 4,826 43 684 2,433 6,123 3,819 810 109 6,308 482 1,861 223 4,595 2,770 50,246 1,340 3,195 5,111 171 39 1,794 2,149 2,604 440 110 336 34,779 1,654 399 9 6,365 192 1,340 344 315 97 257,513 1,823 457 430 67,221 8,679 1,233 31 (103) 1,921 3,154 745 65,626 6,342 4,189 7,065 4,656 2,025 610 58 799 2,678 677 9,078 805 151 333 27,353 56 5,699 107,114 523 2,010 49 167 48,333 1,734 46 (103) 2,037 749 1,191 265 39,295 378 86 238 1,160 219 2,035 3,538 694 137 83,044 154 326 1,109 3,449 1,773 2,110 224 25 217 245 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 8,510 3,227 30,598 7,384 31,870 3,023 764 41,319 39,623 62 6,904 7,227 6,117 3,089 25,931 7,397 389 65,530 2,368 2,537 2,780 4,140 4,916 13,936 3,779 27,667 3,131 163,810 19,692 6,756 5,430 1,554 123,732 48,116 7,743 3,557 2,051 30,533 11,118 5,865 656 40,547 151,757 14,699 11,594 14,977 140 466 8,203 13,111 3,740 15,283 29,094 573 7,282 725 3,906 479,309 4,836 31,140 1,542 2,631 77,994 59,536 966 4,528 312 (309) 3,819 16,508 2,427 67,839 19,958 (607) 99,174 16,135 48,895 633 34,878 1,604 2,699 3,543 6,012 972 17,788 11,059 524 7,937 3,352 45,098 297 5,609 85,056 1,855 881 531 4,871 2,810 8,490 (170) 4,337 2,797 11,327 1,347 2,632
  8. Page 13 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 13 of 104 Work Order Number Description 80161907 CAR VS EVERSOURCE P# 2691 80161996 MM 499 Wolf Den Rd Brklyn Stub pole 80162103 RGD KTI 2022 TRIPSAVER CD01887 P.15 80162214 1/15/22 80 WOODLAWN RD MONROE, REPL 80162273 CAR VS POLE 26- APPROVED 6/10/26 80162347 Westford Rd 262, Ashford. 9A P-2149 80162463 FRONTIER POLE HEL 9A -CAR VS POLE 80162472 JLB 93 Buttery Rd NC REPL FRNTR P81 80162532 MJ 4/7 AMM (9A) 1400 NEW BRITAIN AV 80162813 CD01913 PRI DB 86 BARLOW DR REDDING 80162832 DJM. SURF RD WESTPORT. OH PRI RECON 80163047 *HAWK*BF- Conv#1226116-MakeReadyNon 80163141 Asplundh - TOBACCO PLANTATION) PINN 80163143 DG UPGRADE WO 19131849 FOR TOLLAND, 80163267 GC - PRESTON, HOLLOWELL, 78 80163289 DG P#299 CLAPP RD POMFRET CLP 2 PO 80163296 *D&D* 32 HIGHLAND RD WSPT REJECT ES 80163316 PD-113 PEQUOT AVE NEW LONDON/REPLAC 80163331 JDB 40 FULLIN RD NORWALK,RELOCATE P 80163352 *D&D* 59 OLD HILL RD WSPT REJECT PO 80163407 GCC / 25 YETTER ROAD, GROTON 80163459 10/10 ASPLUNDH PRINTED 8/3 JSG - CO 80163509 MR; ***WRITTEN***MIDDLETOWN, WASHIN 80163547 TELCO 7/2/22 (E) KD WATERVILLE (217 80163678 GCC / CHERRY STREET, STONINGTON 80163967 TL - OSWEGATCHIE HILLS RD, NIANTIC 80163972 MJ 2/15 CD01753-03 - ROW Pole Repla 80164170 AJC 120 TOMAC AVE; INSTALL 3 PHASE 80164482 9A - 110 NECK RD Car vs. Pole - Sch 80164686 GC - MONTVILLE, HARTFORD NEW LONDON 80164688 BM; 6 JET BROOK RD NEWTOWN 80164701 JLB 31 TANNERS DR. GARAGE WLTN NEW 80164761 MM 37 Squaw Rock Rd Plainfield Pol 80164781 1/26/22 9A 7 PEMBROKE RD DANBURY, Y 80164805 CAR VS POLE 80164855 Abel-Ellington Rd 591, SW. Install 80164958 APPT 3/10 3/11VJT - WATERTOWN, 197 80164972 PL: XFER PT SET POLE #1175, RMV EXI 80165057 VALID PER FLOTAT 11/21- LANTERN HIL 80165183 NEW UG FACILITIES FOR SCHOOL, ABAND 80165229 ASP -2PH 336 TW Line extension Pols 80165242 DJM. 4 BOLTON LN WESTPORT. OH TO UG 80165255 * Jpt-3 Cassidy Dr Plainville P1000 80165365 9A -10/25 - HUDSON( 4) ST FL 80165438 MJ 1/31 9A : 05.14.21 - 1686 WATERB 80165709 *D&D*Frontier Pole Inspection Pole 80165740 MCB - 86 SUMMIT RD, PROSPECT, NEW 2 80166004 PCC - 6/29 - Ashford, Union Dr - ne 80166061 *D&D* 46 WOODSIDE AVE WESTPORT REPL 80166067 *HAWKEYE* WQ-CD01570-NORMAL REJECT 80166100 *HAWKEYE* WQ-CD01570-NORMAL REJECT 80166106 EARLY POLE SET CP-98 Spring Hill rd 80166112 *ASP* AMM 370 ATWATER ST, SOUTHINGT 80166119 (ASP)CR-2022 Normal Pole Reject 80166122 POLE-REJECT-DQ-SPECIFIC-DESG 80166128 *HAWKEYE* WQ-CD01570-NORMAL REJECT 80166132 MDB, REPLACE REJECT POLE P#8952-S S 80166162 *HAWK* L: (REJECT POLE) REPL & XFER 80166173 *HAWK* PL: (REJECT POLE) REPL & XFE 80166179 *ASP* PL: (REJECT POLE) REPL & XFER 80166218 2022 Normal Pole Reject - Pole 490 80166295 JDB 173 1/2 W. ROCKS RD NORWALK,P30 80166299 *Hawkeye* 2022 Reject Pole-East St80166314 P-2285 REPLACE SVC WITH 1/0 DURHAM 80166357 ASP -3PH 336 TW Line extension Lohs 80166364 RA Project CD01753-02 ROW 199 Plain 80166441 Jpt-325 Peck Ln Bristol (Frnt)P3831 80166444 MJ 2/16 - AMM RESERVOIR RD, FARMING 80166572 out poles #151 to 45/1 and #150 to 80166784 MRP - Conversion - South St, Waterb 80166804 CP-priority pole reject 3461 Secret 80166805 POLE-REJECT-DQ-SPECIFIC-DESG 80166809 JSG/Canton--Old Albany Tpke 2607 80166816 MI SUFFIELD, U CAR, 50. 80166862 SC-P#1580 MILL ST PLAINFIELD R-35/4 80166877 EVW - Center St, Canton P#2192 RPLC 80166926 EVW - 250 Albany Tpke, Canton P#277 80167002 DG P#2665 INDIAN INN RD THOMPSON F 80167026 AMM 248 MAIN ST, FARMINGTON. INSTAL 80167093 *HAWK* Frontier Pole Inspection Pol 80167248 MATERIAL JSG/Canton--Cheryl Dr. 162 80167250 VJT - 9A LITCHFIELD ( 355) RD -- 1 80167357 TO STORES-DG P#1764 150 TECHNOLOGY 80167367 JSG/Canton--Dyer Ave. 2455 Repl def 80167675 Priority Pole reject 8751 Morgan rd 80167722 CP-Priority Pole Reject Pole 6792 W 80167730 CP-Priority Pole Replacement 6764 D 80167740 CP-Priority Pole reject 1876 Bunker 80167749 Priority Pole Reject 2094 Barbourto 80168346 (DF) (R/I) POLE,& Guy, (I) Push pra 80168575 *as built in prog 10/16/25 MB*Merid 80168748 FRONTIER POLE 9A CAR VS POLE#5317 80168846 *as built in prog 10/16/25 MB*Merid 80169339 ?3/14 POLE SET MDB - MORRIS, STODDA 80169492 MATERIAL JSG/Barkhamsted--Warner Rd 80169506 MJ - WEBSTER RD 95, UNION - NEW OH/ 80169706 3/21 REPLACE-OH-ANNUAL-DESG 80170442 JMS- completed (ASP 2/14) BLOOMFI 80170599 PCC North Eagleville Rd 164, Mansfi 80170600 9A - Car vs. Pole - Waiting on Poli 80170622 PD-200 MONTAUK AVE N. LONDON/OH RES 80170642 JSG - (50): Colebrook--Old Colebroo 80170646 RA Project CD01753-02 ROW 199 Killi 80170711 NH - REMOVE OH SVC // REMOVE POLE A 80170981 DONE asplundh printed 7/27 MDB-STIL in-service date work order type 5/17/2022 11 Damage Claims OH 6/16/2023 11 Elect Annual Proj - DESG CT 4/7/2022 11 Asset Mgmt - Specific DESG CT 5/11/2023 11 Elect Annual Proj - DESG CT 2/12/2025 11 Damage Claims OH 11/4/2024 11 Dist Capital or Expense 5/12/2023 11 Damage Claims OH 4/4/2025 11 Elect Annual Proj - DESG CT 5/6/2022 11 Damage Claims OH 3/9/2023 11 Elect Annual Proj - DESG CT 9/11/2023 11 Elect Annual Proj - DESG CT 4/11/2023 11 Elect Project - DESG CT 1/5/2023 11 Asset Mgmt - Specific DESG CT 1/13/2025 11 Elect Annual Proj - DESG CT 7/3/2023 11 Elect Annual Proj - DESG CT 2/22/2022 11 Elect Annual Proj - DESG CT 9/27/2022 11 Elect Annual Proj - DESG CT 3/3/2022 11 Elect Annual Proj - DESG CT 4/29/2022 11 Elect Annual Proj - DESG CT 9/27/2022 11 Elect Annual Proj - DESG CT 9/28/2022 11 Elect Annual Proj - DESG CT 10/12/2022 11 Elect Annual Proj - DESG CT 7/20/2022 11 Elect Annual Proj - DESG CT 7/6/2023 11 Dist Capital or Expense 3/21/2022 11 Elect Annual Proj - DESG CT 10/27/2023 11 Elect Annual Proj - DESG CT 7/27/2022 11 Asset Mgmt - Specific DESG CT 3/23/2023 11 Elect Annual Proj - DESG CT 6/30/2022 11 Damage Claims OH 11/15/2022 11 Elect Annual Proj - DESG CT 7/20/2023 11 Elect Annual Proj - DESG CT 1/10/2023 11 Elect Annual Proj - DESG CT 10/25/2024 11 Elect Annual Proj - DESG CT 5/8/2023 11 Damage Claims OH 12/28/2022 11 Damage Claims OH 5/4/2022 11 Temporary Work DESG CT 3/14/2022 11 Elect Annual Proj - DESG CT 2/23/2022 11 Asset Mgmt - Specific DESG CT 7/15/2025 11 Corrective Maint OH Lines 6/30/2025 11 Corrective Maint UG Svc 5/17/2022 11 Elect Annual Proj - DESG CT 3/1/2022 11 Asset Mgmt - Specific DESG CT 2/10/2022 11 Elect Annual Proj - DESG CT 11/1/2024 11 Damage Claims OH 2/9/2022 11 Damage Claims OH 10/5/2022 11 Elect Annual Proj - DESG CT 4/11/2022 11 Elect Annual Proj - DESG CT 3/11/2022 11 Elect Annual Proj - DESG CT 9/27/2022 11 Elect Annual Proj - DESG CT 6/8/2022 11 Elect Annual Proj - DESG CT 6/8/2022 11 Elect Annual Proj - DESG CT 10/17/2025 11 Corrective Maint UG Svc 5/17/2022 11 Elect Annual Proj - DESG CT 3/16/2022 11 Elect Annual Proj - DESG CT 3/9/2022 11 Elect Annual Proj - DESG CT 6/7/2022 11 Elect Annual Proj - DESG CT 2/18/2022 11 Elect Annual Proj - DESG CT 6/10/2022 11 Elect Annual Proj - DESG CT 6/10/2022 11 Elect Annual Proj - DESG CT 4/11/2022 11 Elect Annual Proj - DESG CT 3/16/2022 11 Elect Annual Proj - DESG CT 1/19/2023 11 Elect Annual Proj - DESG CT 6/10/2022 11 Elect Annual Proj - DESG CT 3/31/2022 11 Elect Annual Proj - DESG CT 1/5/2023 11 Elect Annual Proj - DESG CT 9/19/2022 11 Asset Mgmt - Specific DESG CT 2/4/2022 11 Damage Claims OH 3/30/2022 11 Dist Capital or Expense 3/22/2022 11 Elect Annual Proj - DESG CT 8/19/2025 11 Elect Annual Proj - DESG CT 3/3/2022 11 Elect Annual Proj - DESG CT 2/18/2022 11 Elect Annual Proj - DESG CT 2/17/2022 11 Elect Annual Proj - DESG CT 8/2/2022 11 Elect Annual Proj - DESG CT 7/7/2022 11 Elect Annual Proj - DESG CT 3/3/2022 11 Elect Annual Proj - DESG CT 4/20/2022 11 Elect Annual Proj - DESG CT 4/28/2022 11 Elect Annual Proj - DESG CT 9/15/2022 11 Elect Annual Proj - DESG CT 10/28/2022 11 Elect Annual Proj - DESG CT 2/17/2022 11 Elect Annual Proj - DESG CT 2/23/2022 11 Damage Claims OH 8/30/2023 11 Elect Annual Proj - DESG CT 2/17/2022 11 Elect Annual Proj - DESG CT 3/3/2022 11 Elect Annual Proj - DESG CT 3/18/2022 11 Elect Annual Proj - DESG CT 3/3/2022 11 Elect Annual Proj - DESG CT 3/18/2022 11 Elect Annual Proj - DESG CT 2/17/2022 11 Elect Annual Proj - DESG CT 8/25/2022 11 Elect Annual Proj - DESG CT 6/25/2025 11 Dist Capital or Expense 5/5/2023 11 Damage Claims OH 6/25/2025 11 Dist Capital or Expense 4/14/2022 11 Elect Annual Proj - DESG CT 12/6/2022 11 Asset Mgmt - Specific DESG CT 9/11/2023 11 Elect Annual Proj - DESG CT 4/22/2022 11 Elect Annual Proj - DESG CT 7/12/2022 11 Damage Claims OH 4/7/2022 11 Elect Annual Proj - DESG CT 2/15/2022 11 Damage Claims OH 8/29/2023 11 Asset Mgmt - Specific DESG CT 2/6/2024 11 Elect Annual Proj - DESG CT 12/6/2022 11 Asset Mgmt - Specific DESG CT 9/26/2023 11 Asset Mgmt - Specific DESG CT 10/5/2022 11 Elect Annual Proj - DESG CT Subsequent Close Date 9/16/2026 7/17/2026 5/15/2026 4/20/2026 8/26/2026 7/17/2026 364310 Poles and Appurtenance 1,598 884 1,021 11,767 414 1,256 384 385 8,353 2,904 65,444 679 6,273 2,343 4,861 10,783 3,580 1,795 1,540 5,322 353 24,043 2,471 11,557 3,910 57,827 34,936 744 6,515 2,164 11,830 5,391 9,824 134 10,281 929 6,729 1,327 4,765 123 53,002 18,272 1,699 1,648 1,670 625 1,035 798 3,187 3,967 6,258 (942) 1,992 (120) 9,153 3,822 3,420 2,729 2,398 5,280 (250) 2,419 6,523 (1,913) 25,178 64,423 328 25,375 4,342 23,916 2,724 4,624 2,294 2,055 5,382 6,920 9,094 532 4,925 55 4,087 7,498 2,346 3,958 4,582 7,049 6,334 6,659 4,108 15,268 32,158 1,507 21,483 1,708 (465) 13,623 (196) 3,285 5,369 354 194 (1,975) 25,314 2,793 4,449 365000 Overhead Conductors, Device 189 550 10,088 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices (0) 91 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 2,700 2,693 1,364 1,677 871 3,447 61,532 265 118 1,101 3,863 4,343 61 232 146 313,911 16,470 4,969 2,418 56 632 60 329 460 574 566 7,055 17,669 2,536 1,968 1,907 49,224 253 1,627 1,738 9,887 597 1,739 18,478 65,752 879 553 298 1,784 524 47,895 3,699 1,143 548 3,634 654 1,117 5,266 1,521 64 165 (246) 476 590 386 4,814 426 74 77 5,883 1,687 10,831 3,161 669 875 546 2,577 1,431 963 46 623 691 1,179 155 262 528 2,821 550 61 29 2,510 42 62 219 221 (315) (120) 63 429 577 830 (250) 694 1,659 2,635 5,182 329 (2) 224 6,768 78,786 84,436 574 8,558 1,820 27,062 1,061 406 540 6,240 768 4,350 6,794 200 78 3,348 3,341 2,058 614 3,736 591 3,148 19,598 718 12,626 (75) 962 5,230 2,162 224 3,292 311 2,592 245 2,631 4,849 241 41,108 2,529 1,892 595 614 28 134 296 67 413 1,361 498 (465) 8,518 (196) 423 4,462 89 93 194 756 27,868 (465) 170 1,109 14 72 1,595 439 694 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 1,787 1,525 11,110 14,467 5,757 2,767 2,062 385 9,224 337,421 131,945 945 6,911 3,772 9,298 15,126 3,641 1,795 2,106 5,322 7,884 42,301 10,207 13,524 6,244 107,202 35,189 10,610 9,127 26,589 15,003 8,562 29,265 65,887 10,327 2,586 8,236 2,804 6,549 4,607 100,897 24,511 2,885 2,196 5,304 1,341 2,592 6,064 4,708 4,031 6,423 (1,503) 1,992 (240) 9,153 3,885 3,420 3,158 2,975 6,110 (500) 8,516 11,146 4,854 103,964 148,859 1,101 33,934 6,485 54,326 3,784 5,030 2,834 15,117 6,150 11,270 21,117 532 9,960 55 4,087 7,722 56,016 4,268 4,582 9,702 7,590 10,395 4,700 19,910 52,052 2,293 34,522 2,207 (1,395) 23,906 (393) 3,707 11,378 442 287 (1,975) 25,508 4,329 32,318
  9. Page 14 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 14 of 104 Work Order Number Description 80171139 *D&D*JAM - West St and Churchill St 80171188 PD-47 STATE PIER RD N. LONDON NEW U 80171239 FIELD COMPLETE HEL KTI SD; 19 PAUL 80171300 *as built comp*PUMP HOUSE Meriden C 80171549 *D&D* Conv. 1235876 - Make Ready No 80171634 TL - HATCHETT POINT RD, OLD LYME // 80171724 6/13 CP-37 Covey rd, upgrade/reloc 80174988 P-5323 INSTALL RR. NOMENCLATURE: 11 80175014 CD01753-213-P3 (2) Locations Manche 80175091 EVW - 9A WINCHESTER ( 403) RD -- 1 80175352 DJM. 26 HIGH POINT RD WESTPORT. 100 80175379 CD01028-02 GRE-29-WATERFORD-CT, Oi 80175426 *4/18 Line Work COMP* REF P 33--INS 80175446 *D&D*JA-Conv#1179679-MakeReadyNonRe 80175709 P-4341,4343,4344,4345 REPLACE AND S 80175926 RL:21 Glenville St: GRN: 300KVA 4 c 80175951 153 AMITY RD, BLDG #1, BETHANY - IN 80176417 MI PCC - 210 JARED SPARKS RD, WILLI 80176498 DG P#601 153 SEARLES RD POMFRET 3PH 80176591 RA Project CD01753-02 ROW 201 Killi 80176645 **AS BUILT REQ - CD01677-11 Elm St. 80176733 FCOMP (TH) VJT - 9A..02.25.2022 FLA 80176839 11/20/24 9A RF:14 MANSFIELD AVE, DA 80176840 RA Project CD01753-02 ROW 193 P3 Re 80177002 NS TC 310 STILLWATER AVE, STM; P#19 80177075 9A CAR VS FRONTIER P # 2162 -APPROV 80177193 *HAWK* CD01570 - Pole Replacement 80177225 10/27/24--208-1 MILE CREEK RD- OLD 80177251 CP RF:80 FIVE MILE RIVER RD, DARIEN 80177282 *ALL WORK COMP* KM POLE339 OAK RIDG 80177317 *9A-10/27-AWC-OMELIA( 68) RD 80177346 COMPLETE - 9/14/22 -MANCH, GARDNER 80177522 GP - ALL WORK COMPLETE - P#1545 OLD 80177639 YA; 71 HAVEMEYER PL; INSTALL INLINE 80177779 CAR VS POLE-APPROVED 3/26/26 80177927 @APPT 7/12 JFC - GOSHEN, HILL HOUSE 80177960 WO 19180913 DG UPGRADE FOR CANTERBU 80177972 3/2 - 9A - Enfield, Powder Hill Rd 80177983 SC-WESTON RD PLAINFIELD RMV 50K I-T 80178003 JES; 81 OENOKE LN. NEW CANAAN; SHIF 80178034 ALL WORK COMPLETE - GP - POLE 6490 80178240 MI PCC - FC 2/9 - Ellington, Tollan 80178255 9A - CAR VS P#200-COUNTRY CLUB RD , 80178305 Install #1 UG PRI to 25kVA, install 80178340 comp-10/27/24 9A CAR VS POLE/ TURNO 80178497 *D&D* AK-Convo#1179681-MakeReadyNon 80178573 S Main St 576 Windsor Locks. RSO. T 80178592 P-8,10,11, & 12 REPLACE AND SHIFT. 80178631 *D&D*JA-Conv# 1188474 -MakeReadyNon 80178743 3/28 JFC - (9A) EAST ( 319) ST, SHA 80178771 SHIFT TO FTR POLES, INSTALL 1 SETIO 80178826 (E)KD - AVON, 4 HICKORY HILL RD - R 80179218 *HAWK*- CD01753-03 - ROW Pole Repla 80179328 JDB 3/08: PRINCES PINE RD, NORWALK/ 80179417 DG P#2183 MASHAMOQUET RD POMFRET R 80179732 Jpt-Grove St Bristol - Rplc Poles E 80179750 FC 3/8 BUCKLEY HWY UNION POLE 239 80179767 JES; 46 HICKORY DR. NEW CANAAN; REP 80179848 PD-169 BOSTON POST RD WTFD /SVC UPG 80179849 CD01903 - 7L90 - New Recloser 7L9080179990 CD01903 - Install MR Recloser 7L9080180049 MATERIAL JES; ROSEBROOK RD. NEW CAN 80180092 CD01903 - Install new SR Recloser 7 80180178 JSG/Winchester--Winchester Rd. 1258 80180183 done JFC - BANTAM, GOSLEE, 39, Bria 80180199 JMS- W HTFD, 37 BUENA VISTA - PEDAL 80180210 03/10 CRESTWOOD DR MANCHESTER POLE 80180340 MAR - Rplc Pole & Install 25Kva Xfm 80180412 9A - CAR VS POLE 80180438 MJ-(9A) 827 SHUTTLE MEADOW AVE, NEW 80180486 EVW - 10/25/24 - TREE DOWN - POLES 80180487 mcb - WTG FOR P RPT 10/28/24 (TH) 1 80180535 KD-SHIFT P 836 HOLCOMB (71) ST, SIM 80180576 MJ-MAR - Replace 3 poles/ Install 1 80180629 9A KD-EVENT #4719345 CAR V P 3024 B 80180631 DUPLICATE OF WO#19201382 80180648 *HAWKEYE* WQ-CD01570-LEANING REJECT 80180914 *HAWKEYE* WQ-CD01570-LEANING REJECT 80180945 EVW - 10/26/24 - TREE DOWN - POLES 80180975 *HAWKEYE* WQ-CD01570-LEANING REJECT 80181041 9A 3/11 ADAMS ( 446) ST -- RU 10 9 80181244 WRITTEN GEER HILL RD, LYME REPLACE 80181247 CONNECTICUT BLVD, EAST HARTFORD CT 80181265 NEEDS POLE CHARGED OUT-P4785 - Unio 80181298 WRTN COMPLETE MILL HILL RD COLCHES 80181343 WAITING ON STORES 7/26/22--MM westr 80181416 CAR V POLE - NEED PR 6.6.22 80181425 *HAWKEYE* WQ-CD01570-LEANING REJECT 80181445 *HAWKEYE* WQ-CD01570-LEANING REJECT 80181472 *HAWKEYE* WQ-CD01570-LEANING REJECT 80181476 asplundh DONE EVW - 9A COLEBROOK R 80181480 *HAWKEYE* WQ-CD01570-LEANING REJECT 80181734 P-1026 SHIFT TO FTR POLE AND REPLAC 80181775 MATERIAL 3/16/22 1 JAMS DR DANBURY 80181776 POLE needs to be rplcd 9.15.22 GUNN 80181877 Jpt-Pine St Bristol - Line Work fo 80181972 *Hawkeye* PL: *** LEANING POLE *** 80181987 *ASP* PL:(LEANING POLE PROJECT) - P 80182125 244 pine orchard rd branford/hang x 80182129 (ASP) MRP - (9A) - CAR V POLE - 284 80182155 * 992 Worthington Ridge Berlin - U 80182189 Rplc P 700, Ins 3 Ph Riser, Rmv XFM 80182191 3/28 MDB - 9A - LAKE ( 266) RD -- 6 80182258 MM 120 Kinne Rd Canterbury P#1965 i 80182380 Abel - Randolph Rd 11, Enfield. Rep in-service date work order type 9/22/2022 11 Elect Annual Proj - DESG CT 7/13/2022 11 Elect Annual Proj - DESG CT 9/26/2025 11 Dist Capital or Expense 6/26/2025 11 Dist Capital or Expense 6/15/2023 11 Elect Project - DESG CT 4/26/2022 11 Elect Annual Proj - DESG CT 6/24/2022 11 Asset Mgmt - Specific DESG CT 3/21/2022 11 Asset Mgmt - Specific DESG CT 12/15/2022 11 Asset Mgmt - Specific DESG CT 2/28/2022 11 Damage Claims OH 4/26/2022 11 Elect Annual Proj - DESG CT 8/11/2022 11 Asset Mgmt - Specific DESG CT 5/4/2023 11 Elect Annual Proj - DESG CT 11/9/2022 11 Elect Project - DESG CT 6/2/2023 11 Elect Annual Proj - DESG CT 11/22/2022 11 Elect Annual Proj - DESG CT 6/29/2022 11 Asset Mgmt - Specific DESG CT 3/14/2022 11 Elect Annual Proj - DESG CT 9/20/2022 11 Dist Capital or Expense 12/30/2022 11 Asset Mgmt - Specific DESG CT 10/27/2023 11 Asset Mgmt - Specific DESG CT 3/28/2022 11 Damage Claims OH 6/12/2025 11 Damage Claims OH 11/25/2022 11 Asset Mgmt - Specific DESG CT 7/13/2022 11 Elect Annual Proj - DESG CT 10/30/2024 11 Damage Claims OH 6/9/2022 11 Elect Annual Proj - DESG CT 1/24/2025 11 Elect Annual Proj - DESG CT 10/12/2022 11 Elect Annual Proj - DESG CT 3/17/2025 11 Elect Annual Proj - DESG CT 11/4/2024 11 Damage Claims OH 9/22/2022 11 Elect Annual Proj - DESG CT 3/3/2025 11 Damage Claims OH 9/27/2023 11 Elect Annual Proj - DESG CT 1/8/2025 11 Damage Claims OH 7/12/2022 11 Asset Mgmt - Specific DESG CT 12/3/2024 11 Elect Annual Proj - DESG CT 4/15/2022 11 Damage Claims OH 4/28/2022 11 Elect Annual Proj - DESG CT 3/14/2022 11 Street Light - DESG CT 4/10/2025 11 Damage Claims OH 7/7/2022 11 Elect Annual Proj - DESG CT 11/5/2024 11 Damage Claims OH 10/31/2022 11 Elect Annual Proj - DESG CT 3/17/2025 11 Dist Capital or Expense 1/10/2023 11 Elect Project - DESG CT 3/12/2025 11 Dist Capital or Expense 8/30/2023 11 Elect Annual Proj - DESG CT 10/29/2023 11 Elect Project - DESG CT 6/22/2022 11 Damage Claims OH 8/17/2022 11 Elect Annual Proj - DESG CT 12/29/2022 11 Elect Annual Proj - DESG CT 6/16/2025 11 Elect Annual Proj - DESG CT 7/19/2022 11 Elect Annual Proj - DESG CT 3/30/2022 11 Elect Annual Proj - DESG CT 6/8/2022 11 Elect Annual Proj - DESG CT 3/10/2022 11 Elect Annual Proj - DESG CT 7/19/2022 11 Elect Annual Proj - DESG CT 9/30/2022 11 Asset Mgmt - Specific DESG CT 6/22/2022 11 Asset Mgmt - Specific DESG CT 6/22/2022 11 Asset Mgmt - Specific DESG CT 7/19/2022 11 Elect Annual Proj - DESG CT 6/14/2022 11 Asset Mgmt - Specific DESG CT 9/23/2025 11 Dist Capital or Expense 9/2/2022 11 Elect Annual Proj - DESG CT 2/21/2023 11 Elect Annual Proj - DESG CT 4/1/2022 11 Elect Annual Proj - DESG CT 4/25/2022 11 Elect Annual Proj - DESG CT 6/27/2022 11 Damage Claims OH 5/22/2023 11 Damage Claims OH 12/10/2024 11 Elect Annual Proj - DESG CT 11/4/2024 11 Damage Claims OH 4/19/2022 11 Elect Annual Proj - DESG CT 10/10/2023 11 Elect Annual Proj - DESG CT 4/19/2022 11 Damage Claims OH 4/7/2025 11 Damage Claims OH 6/9/2022 11 Elect Annual Proj - DESG CT 6/9/2022 11 Elect Annual Proj - DESG CT 12/11/2024 11 Elect Annual Proj - DESG CT 6/9/2022 11 Elect Annual Proj - DESG CT 3/18/2022 11 Damage Claims OH 7/6/2022 11 Elect Annual Proj - DESG CT 8/3/2022 11 Elect Annual Proj - DESG CT 5/5/2025 11 Dist Capital or Expense 11/26/2024 11 Elect Annual Proj - DESG CT 6/6/2022 11 Elect Annual Proj - DESG CT 5/13/2022 11 Damage Claims OH 6/8/2022 11 Elect Annual Proj - DESG CT 6/8/2022 11 Elect Annual Proj - DESG CT 6/9/2022 11 Elect Annual Proj - DESG CT 8/29/2022 11 Damage Claims OH 6/8/2022 11 Elect Annual Proj - DESG CT 6/17/2024 11 Elect Annual Proj - DESG CT 6/19/2023 11 Elect Annual Proj - DESG CT 4/12/2023 11 Damage Claims OH 4/21/2022 11 Elect Annual Proj - DESG CT 6/10/2022 11 Elect Annual Proj - DESG CT 5/4/2022 11 Elect Annual Proj - DESG CT 4/28/2022 11 Elect Annual Proj - DESG CT 4/1/2022 11 Damage Claims OH 11/16/2023 11 Elect Annual Proj - DESG CT 10/31/2022 11 Elect Annual Proj - DESG CT 5/12/2022 11 Damage Claims OH 4/25/2022 11 Elect Annual Proj - DESG CT 5/23/2023 11 Elect Annual Proj - DESG CT Subsequent Close Date 6/26/2026 9/16/2026 6/26/2026 7/17/2026 5/15/2026 2/13/2026 8/26/2026 6/26/2026 2/13/2026 2/13/2026 364310 Poles and Appurtenance 8,433 1,492 61,717 28,468 93 14,313 105 360 71,908 1,863 1,441 (2,782) 6,655 2,512 7,610 8,683 7,889 9,361 674 36,798 2,360 2,825 104 14,076 4,498 3,012 5,124 871 6,463 2,328 15,376 7,063 5,977 1,481 11,272 29 92 12,317 1,977 966 10,172 3,011 1,305 485 6,217 5,828 3,188 21,738 10,005 7,348 2,718 4,163 112,411 3,701 40 11,398 (161) 6,942 1,290 8,485 2,353 1,283 3,624 554 353 3,405 6,680 1,800 2,463 7,879 26,698 21,822 2,479 21,877 609 904 7,707 5,799 21,474 3,172 2,653 2,836 5,665 1,306 2,333 2,746 602 4,762 14,313 7,610 3,353 4,175 217 674 2,773 1,845 16,829 3,824 1,708 2,261 3,375 6,058 2,098 1,699 26,432 365000 Overhead Conductors, Device 2,204 708 41,275 44,836 84 3,930 428 77,057 1,109 251 38 (2,782) 4,824 661 3,568 2,855 7,224 7,098 8,571 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 4,281 11,029 370470 Meter Equipment 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 158 663 41 6,312 38,582 (10) 406 883 (2,782) (2,782) 1,594 9,968 160 36 18,784 136 221 38,847 131,012 527 350 289 523 1,652 18 478 1,089 149 5,422 31,751 3,839 3,335 1,897 197 2,164 2,187 181 363 3,056 48,065 503 140 334 464 4,298 279 558 879 36 27 53 1,564 724 8,426 2,003 1,060 7,914 1,261 3,492 5,692 10,307 1,348 368330 Equipment Overhead 369720 DB/UG Conductors and Devices 431 49,180 162 20,481 257 1,543 108 91 84 613 1,219 2,752 (161) 1,078 851 83,170 62,682 1,731 417 69 1,679 933 (2) 73,109 5,426 172 934 109 445 396 307 1,232 75 34 1,191 51 772 763 2,410 891 17,972 1,121 679 613 524 11,203 274 70 1,196 15,502 489 1,550 9 1,395 630 2,050 1,266 464 3,088 311 4,551 13 183 2,113 1,361 619 2,899 80,495 318 4,390 275 1 3 8 55 (7) 52 381 491 19,427 1,084 9,672 418 20,635 32,615 18,078 3,622 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 10,637 6,640 102,992 84,996 218 63,532 1,416 77,417 73,017 2,114 1,478 (11,126) 23,040 3,333 11,214 30,458 15,622 16,458 50,267 36,798 133,373 3,352 472 14,076 5,479 4,240 5,273 6,294 38,214 6,168 19,045 9,424 6,174 8,780 13,459 1,125 481 15,373 50,042 966 10,172 3,064 2,868 9,892 7,760 7,831 4,355 30,173 11,266 7,348 7,068 79,516 122,718 5,049 1,259 16,367 (321) 8,021 3,821 92,588 65,034 1,283 76,734 6,377 832 5,570 6,789 2,354 2,463 8,642 29,108 21,822 3,371 41,812 1,782 1,583 8,321 6,323 48,180 3,446 2,722 6,071 5,665 1,315 3,728 2,746 1,232 6,812 15,579 8,074 6,441 4,486 4,769 690 2,965 4,013 18,183 4,494 4,988 82,756 4,185 40,630 2,374 2,117 101,382
  10. Page 15 of 104

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 2, 2026 NECTA-119 Attachment 1 Page 15 of 104 Work Order Number Description 80182383 PR7/7 JCF - (50): JC/14 5 1/2 MILE 80182435 *HAWKEYE* WQ-CD01570-LEANING REJECT 80182500 *D&D*KA - Conv. 1230459 - Make Read 80182648 MRP - 13H95-13H92 Load Swap - OH RO 80182658 MCB - 791 COLEMAN RD, 11 LOT SUB DI 80182705 *HAWKEYE* WQ-CD01570-LEANING REJECT 80182837 CD01261-(2023 AIMS Seg 08, Part 01 80182883 3/21 1850::OLD SPRINGFIELD:RD::STAF 80182884 PRI DB CABLE LEDGEWOOD DR BROOKFIEL 80182937 *HAWK* CD01570 - Leaning Pole Repla 80182959 CD01570 - Leaning Pole Replacements 80183019 TO STORES 4/6/23--WRITTEN CREEK ( 3 80183055 CD01570 - Leaning Pole Replacements 80183126 *HAWK* CD01570 - Leaning Pole Repla 80183162 *HAWK* CD01570 - Leaning Pole Repla 80183180 15 DAY DUE 6/27/22; LEBANON, pic GA 80183198 *ASP* CD01570 - Leaning Pole Replac 80183209 FRONTIER POLE / WTBS - EM PLANNER ( 80183212 *ASP* CD01570 - Leaning Pole Replac 80183226 PD-369 OCEAN AVE N. LONDON/NEW OH S 80183250 15 day due 9/14 Jpt-155 Pine St Bri 80183267 *ASP* CD01570 - Leaning Pole Replac 80183541 JO-Conv#1195271-MakeReadyNonReimb-M 80183551 MR; REPLACE VISE TOPS, ADD STUB POL 80183633 COMP (ASP) JMS- WEST HARTFORD N. MA 80183644 COMP (ASP) JMS-WEST HARTFORD NORTH 80183745 4/4 JFC - SHARON, WOODS RD 2, 106, 80184401 JDB 3/23: 9A- 23 VAN BUREN AVE, NOR 80184441 westbrook,7 pequot park rd/new 3ph 80184463 (*) TELCO TO BE SET - WINDSOR, WIND 80184604 GC - PRESTON, ROUTE 12, 54 80184629 BF-E HTFD, 56 FARM DR - REPL vault 80184631 MUNI/MTR PENDING BF-EAST HARTFORD, 80184637 FCOMP, HTF_SS BF-E HTFD, 301 MAY Rd 80184638 *ASP* MAR - Leaning Pole P#3805 - 9 80184639 MM 275 N Society Rd new pole set 50 80184693 print 2/10 JSG/Burlington--Main St. 80184719 MCB - 104 FERNWOOD DRIVE, CHESHIRE, 80184799 HOLD CUST Pr CRP-112 Weigold rd WIN 80184963 *D&D*Frontier Inspection Pole Shift 80185165 MG-P#1587-CANTERBURY, WATER (559)-I 80185173 *D&D*Frontier Inspection Pole Shift 80185233 *D&D*Conv. 1635931 - Make Ready Rei 80185298 SENT TO CHE 1-24-25 MR#1735456 P279 80185403 APPRENTICES KTI MPB; 96 ROUND LAKE 80186610 *Hawkeye* MAR - Leaning Pole P#463 80186632 *D&D* -Conv#1179679-MakeReadyNonRei 80186653 *ASP* MAR - Leaning Pole P#3205- 69 80186666 MCB - 3/22 P#5680 BALDWIN AVE, WATE 80186980 10/29/24 9A CAR VS POLE PRATT( 80187101 AE/SC: 15 VALLEY RD GRN, 200A OH TO 80187171 MM 24 Bassett Mills Rd new pole #21 80187224 CD02564 Segment 7 Minor Storm MN24A 80187241 CD02564 Segment 8 (8/18/24) (Klarid 80187271 CD02564 Segment 6 Emergency Declara 80187273 MATERIAL WTG FOR 9A TO CLOSE 1/17/ 80187276 CD02564 Segment 6 Emergency Declara 80187283 CD02564 Segment 6 Emergency Declara 80187288 CD02564 Segment 6 Emergency Declara 80187438 WTG FOR PD RPT 12/6/24 (TH) CRP 9A 80187454 PRINT JFC - BETHLEHEM, NONNEWAUG, 1 80187471 DG P#4633 EASTFORD RD WOODSTOCK FRN 80187519 DONE WTG on CUST Print JFC - MORRIS 80187575 APPT 10/08 *MLC* AP-4 HILLTOP RD, F 80187718 AE/JLB 39 HILLTOP AVE STMFD 200A OH 80187743 DG UPGRADE FOR NEWINGTON, ADRIAN, 1 80187753 RL;20 IDAR CT.GRN:REPLACE P 422 40/ 80187915 AMM 54 WOLCOTT ST, BRISTOL. REMOVE 80187917 10/31/24 - 9A - Liberty St / RUSSEL 80187927 *D&D*KG Conv#1653938-RegularMakeRea 80187977 LLYNWOOD DR., VERNON - RPLC'D BROKE 80188010 JFC - 08/24 (RSO - CROWLCJ) JACKSON 80188111 CD02465, Segment 1, SED, P.6979 Riv 80188169 BC - CD02416 Cheshire 2025 Overload 80188368 15D 8/13 JRP - 15 E Summer St SOG I 80188443 *D&D*JS - Conv. 1635828 - Make Read 80188444 *D&D*JS - Conv. 1635828 - Make Read 80188462 11/01/24--VELGOUSE RD. MONTVILLE- P 80188466 TURNOVER E# 5528369 11.02.24 BERKS 80188487 DONE PRINT CRP-122 Shore Dr, WIN, r 80188493 9A - 11/2 - RSO - [RIVERA] - VINE( 80188508 DG P#24 GROVE ST PUTNAM FRNTR POLE 80188641 BJQ - DONE 11/3/24 - ROTTEN POLE -80188678 EVW - 11/2/24 JORAY (29) RD -- S867 80188684 TL - PENNSYLVANIA AVE, #108 NIANTIC 80188687 OK to close 9A - 11/2 - RSO - [KELL 80188706 9A 11/1 (JEZOUKM) BRANDY( 21) ST -80188901 PD-8 POINT COMFORT WTFD/NEW UG SVC 80189114 11/4 9A CAR VS POLE - ROUTE 163(109 80189118 JDB 158 OLD REDDING RD REDDING, SHI 80189149 PM-367 WESTFIELD RD MERIDEN-POST CO 80189216 DONE PRINT JFC - priority reject -4 80189279 VALID--DG P#270 WOLF DEN RD POMFRET 80189312 327 Whitfield St, GF- Upgrade XFMR, 80189417 **MM - 1041 PONUS RDG, NEW CANAAN 80190911 9A - OAC-FAIRFIELD & W PRESTON HTFD 80190920 1/7 nonbillable - low wires...vVALI 80190925 9A Cypress Dr, Stm 80190929 WRTN - DM - 169 MIDDLE HADDAM RD EA 80191016 RC POLE 78 INSTALL NEW OH SERVICE a 80191137 CAR VS POLE - APPROVED 1/2/26 80191172 DL; 800 LONG RIDGE RD; 400AMP 3PH 1 80191177 DL; 800 LONG RIDGE RD; 400AMP 3PH 1 80191439 9A - CAR VS POLE 23 - APPROVED 7/16 80191440 11/06/24 - 9A - (RSO Herman, Lemieu in-service date work order type 7/14/2022 11 Elect Annual Proj - DESG CT 6/7/2022 11 Elect Annual Proj - DESG CT 2/1/2023 11 Dist Capital or Expense 6/22/2022 11 Elect Annual Proj - DESG CT 9/28/2022 11 Elect Annual Proj - DESG CT 6/7/2022 11 Elect Annual Proj - DESG CT 6/27/2025 11 Dist Capital or Expense 4/8/2022 11 Elect Annual Proj - DESG CT 7/27/2023 11 Elect Annual Proj - DESG CT 6/9/2022 11 Elect Annual Proj - DESG CT 5/11/2022 11 Elect Annual Proj - DESG CT 12/8/2022 11 Elect Annual Proj - DESG CT 5/11/2022 11 Elect Annual Proj - DESG CT 7/6/2022 11 Elect Annual Proj - DESG CT 6/9/2022 11 Elect Annual Proj - DESG CT 7/20/2022 11 Elect Annual Proj - DESG CT 4/21/2022 11 Elect Annual Proj - DESG CT 7/25/2023 11 Damage Claims OH 4/21/2022 11 Elect Annual Proj - DESG CT 8/8/2022 11 Elect Annual Proj - DESG CT 9/22/2022 11 Elect Annual Proj - DESG CT 4/21/2022 11 Elect Annual Proj - DESG CT 12/15/2022 11 Elect Project - DESG CT 7/7/2022 11 Elect Annual Proj - DESG CT 4/18/2022 11 Elect Annual Proj - DESG CT 4/18/2022 11 Elect Annual Proj - DESG CT 4/15/2022 11 Elect Annual Proj - DESG CT 8/30/2022 11 Damage Claims OH 10/7/2022 11 Elect Annual Proj - DESG CT 1/18/2024 11 Damage Claims OH 1/17/2023 11 Temporary Work DESG CT 10/26/2023 11 Elect Annual Proj - DESG CT 10/31/2024 11 Elect Annual Proj - DESG CT 8/24/2023 11 Elect Annual Proj - DESG CT 4/21/2022 11 Elect Annual Proj - DESG CT 10/20/2022 11 Elect Annual Proj - DESG CT 3/9/2023 11 Elect Annual Proj - DESG CT 6/27/2022 11 Elect Annual Proj - DESG CT 10/16/2025 11 Dist Capital or Expense 12/5/2024 11 Elect Annual Proj - DESG CT 3/13/2025 11 Corrective Maint UG Svc 12/5/2024 11 Elect Annual Proj - DESG CT 4/21/2025 11 Dist Capital or Expense 1/10/2025 11 Dist Capital or Expense 12/1/2022 11 Elect Annual Proj - DESG CT 6/23/2022 11 Elect Annual Proj - DESG CT 11/10/2022 11 Elect Project - DESG CT 4/18/2022 11 Elect Annual Proj - DESG CT 3/28/2022 11 Elect Annual Proj - DESG CT 11/8/2024 11 Damage Claims OH 3/8/2025 11 Corrective Maint UG Svc 3/11/2025 11 Dist Capital or Expense 11/12/2024 11 Asset Mgmt - Specific DESG CT 11/22/2024 11 Asset Mgmt - Specific DESG CT 10/31/2024 11 Elect Annual Proj - DESG CT 1/23/2025 11 Damage Claims OH 10/30/2024 11 Elect Annual Proj - DESG CT 10/30/2024 11 Elect Annual Proj - DESG CT 10/30/2024 11 Elect Annual Proj - DESG CT 12/12/2024 11 Dist Capital or Expense 12/4/2024 11 Elect Annual Proj - DESG CT 2/11/2025 11 Dist Capital or Expense 6/27/2025 11 Corrective Maint UG Svc 10/9/2025 11 Corrective Maint UG Svc 8/8/2025 11 Corrective Maint UG Svc 1/16/2025 11 Elect Annual Proj - DESG CT 3/24/2025 11 Elect Annual Proj - DESG CT 12/5/2024 11 Elect Annual Proj - DESG CT 11/21/2024 11 Damage Claims OH 8/21/2025 11 Dist Capital or Expense 2/4/2025 11 Elect Annual Proj - DESG CT 11/4/2024 11 Elect Annual Proj - DESG CT 12/26/2025 11 Asset Mgmt - Specific DESG CT 2/27/2025 11 Dist Capital or Expense 7/28/2025 11 Dist Capital or Expense 5/16/2025 11 Dist Capital or Expense 5/19/2025 11 Dist Capital or Expense 1/24/2025 11 Elect Annual Proj - DESG CT 11/5/2024 11 Elect Annual Proj - DESG CT 1/16/2025 11 Corrective Maint OH Svc 10/7/2025 11 Damage Claims OH 2/11/2025 11 Dist Capital or Expense 11/13/2024 11 Dist Capital or Expense 12/5/2024 11 Elect Annual Proj - DESG CT 7/8/2025 11 Dist Capital or Expense 11/25/2024 11 Damage Claims OH 4/11/2025 11 Dist Capital or Expense 2/14/2025 11 Elect Annual Proj - DESG CT 1/23/2025 11 Dist Capital or Expense 2/4/2025 11 Dist Capital or Expense 11/12/2024 11 Dist Capital or Expense 11/20/2024 11 Elect Annual Proj - DESG CT 12/9/2024 11 Elect Annual Proj - DESG CT 2/12/2025 11 Elect Annual Proj - DESG CT 6/13/2025 11 Elect Annual Proj - DESG CT 1/5/2025 11 Dist Capital or Expense 4/22/2025 11 Damage Claims OH 12/2/2024 11 Damage Claims OH 12/4/2024 11 CT Betterment 4/11/2025 11 Corrective Maint OH Svc 1/15/2025 11 Damage Claims OH 12/18/2024 11 Elect Annual Proj - DESG CT 1/17/2025 11 Temporary Work DESG CT 6/18/2025 11 Damage Claims OH 1/28/2025 11 Damage Claims OH Subsequent Close Date 7/17/2026 3/21/2026 9/16/2026 2/13/2026 2/13/2026 1/22/2026 2/13/2026 7/17/2026 6/26/2026 2/13/2026 1/22/2026 1/22/2026 1/22/2026 4/20/2026 2/13/2026 8/26/2026 2/13/2026 1/22/2026 4/20/2026 4/20/2026 1/22/2026 364310 Poles and Appurtenance 196 8,437 172 145,550 219 447 116,368 297 2,838 8,018 3,504 1,348 3,212 5,285 3,134 1,308 3,881 1,237 3,265 2,364 857 240 1,119 9,371 1,158 5,713 1,400 893 (1,626) 58 (56) 4,331 436 2,098 1,290 10,485 855 1,549 6,336 653 15 793 1,223 11,308 7,823 5,282 1,464 4,687 2,434 7,562 4,123 3,815 235,880 295,361 1,310 12,825 5,731 19,509 15,311 15,980 2,836 1,941 4,240 110 266 (224) 6,737 10,670 9,958 11,108 10,473 1,062 2,151 4 4,228 4,540 4,182 1,511 1,592 8,535 1,410 10,755 2,982 1,208 3,926 4,318 4,016 3,841 9,703 479 5,573 2,393 9,723 124 122 3,794 9,826 3,650 4,259 251 8,068 3,296 (818) 3,429 5,719 365000 Overhead Conductors, Device 834 4,403 172 34,779 1,198 170 296,534 372 2,175 2,762 489 366700 DB/UG Conduits and Vaults 367720 DB/UG Conductors and devices 368330 Equipment Overhead 368350 Installations Overhead 368750 DB/UG Installations 369320 Cond&DevicesOverhead 369720 DB/UG Conductors and Devices 370470 Meter Equipment 172 8,268 17,794 679 39 116,325 25,732 5 0 1,787 1,027 322 1,082 497 816 0 273 3,215 1,036 394 2,183 166 2,104 3,418 2,651 944 163 (446) 454 (276) 3,454 1,407 5,594 113 8,686 91 24,524 255 139 362 500 1,522 2,214 1,060 654 547 52 232 4 1,005 3,933 917 (248) (89) 9,344 3,639 13,885 (84) 1,007 332 1,532 1,333 47,042 7 2,737 427 895 (1) 259 3,264 424 914 8 60 143 1,015 61 3,524 373 2,174 103,834 11,340 70 9,119 3,710 69,368 83,850 1,656 1,321 174 1,552 223 707 (964) 3,964 17,617 4,466 1,695 89 39,623 1,659 27,310 1,349 42,043 2,141 361 684 164 52 152 (286) 164 5,675 9,628 3,695 215 905 376 (1,492) 346 200 1,138 1,058 5,185 40,304 4,158 2,906 985 2,131 882 4,477 690 1,817 290 367 9,048 4,096 452 123 2,714 1,881 665 388 1,048 5,092 1,957 777 767 2,414 2,274 190 8 49 403 211 603 286 1,790 859 77 600 661 1,031 222 1,021 258 366 404 7,352 269 1,112 4,938 594 (259) (426) 371400 Inst.Cust.-Area 373320 SL-Conductors Lighting & Device OH 373390 SL- Fixtures Overhead 373700 DB/UG Conduits and Vaults 373720 DB/UG Conductors and devices 373780 DB/UG Poles 373790 DB/UG Fixtures Grand Total 1,030 12,840 517 180,329 27,479 617 413,581 708 147,071 10,779 3,993 1,353 4,998 6,312 3,456 3,205 4,378 1,237 3,538 6,520 4,126 240 1,517 11,475 4,576 9,373 6,277 1,055 (1,403) 512 (506) 18,137 7,147 23,109 1,403 69,477 946 1,549 32,631 907 222 1,155 1,723 12,830 14,828 6,340 2,438 4,687 5,958 7,562 5,273 6,845 383,411 337,633 1,380 66,128 9,441 88,876 99,521 17,636 4,841 2,115 6,302 584 2,264 (1,474) 11,923 10,670 27,575 20,759 12,168 1,062 43,247 4,169 7,469 5,524 6,314 2,393 8,261 10,294 1,410 12,572 3,272 1,652 14,235 8,413 4,469 4,995 12,639 3,381 6,238 2,780 10,771 5,840 9,835 3,794 15,771 19,328 7,953 1,060 8,974 3,672 (2,994) 3,429 5,719

Text of NECTA-119 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of NECTA-121_Final.pdf

Extracted from the file · 1 page · 1,602 characters

Words on different pagesRead the text of NECTA-121_Final.pdf

Text of NECTA-124_Final.pdf

Extracted from the file · 2 pages · 2,271 characters

Words on different pagesRead the text of NECTA-124_Final.pdf

Text of NECTA-125_Final.pdf

Extracted from the file · 2 pages · 2,741 characters

Words on different pagesRead the text of NECTA-125_Final.pdf

As listed on the current system

Question(s) Answered 116, 117, 118, 119, 121, 124, 125 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)