Interrogatory responses
Answers to questions 25, 27, 28, 39, 40
Files9
NECTA-025_Final.pdf
PDF · 111 KB · 1 pageText searchable
Download NECTA-025_Final.pdfRead the text of NECTA-025_Final.pdf
NECTA-025 Attachment 1.pdf
PDF · 835 KB · 1 pageText searchable
Download NECTA-025 Attachment 1.pdfRead the text of NECTA-025 Attachment 1.pdf
NECTA-025 Attachment 2 REDACTED.pdf
PDF · 1.5 MB · 4 pagesText searchable
Download NECTA-025 Attachment 2 REDACTED.pdfRead the text of NECTA-025 Attachment 2 REDACTED.pdf
NECTA-027_Final.pdf
PDF · 142 KB · 2 pagesText searchable
Download NECTA-027_Final.pdfRead the text of NECTA-027_Final.pdf
NECTA-028_Final.pdf
PDF · 123 KB · 2 pagesText searchable
Download NECTA-028_Final.pdfRead the text of NECTA-028_Final.pdf
NECTA-028 Attachment 1 REDACTED.pdf
PDF · 1.5 MB · 5 pagesText searchable
Download NECTA-028 Attachment 1 REDACTED.pdfRead the text of NECTA-028 Attachment 1 REDACTED.pdf
NECTA-028 Attachment 2 REDACTED.pdf
PDF · 2.2 MB · 20 pagesText searchable
Download NECTA-028 Attachment 2 REDACTED.pdfRead the text of NECTA-028 Attachment 2 REDACTED.pdf
NECTA-039_Final.pdf
PDF · 90 KB · 1 pageText searchable
Download NECTA-039_Final.pdfRead the text of NECTA-039_Final.pdf
NECTA-040_Final.pdf
PDF · 110 KB · 1 pageText searchable
Download NECTA-040_Final.pdfRead the text of NECTA-040_Final.pdf
Text of NECTA-027_Final.pdf
Extracted from the file · 2 pages · 4,114 characters
Text of NECTA-028_Final.pdf
Extracted from the file · 2 pages · 4,225 characters
Text of NECTA-028 Attachment 1 REDACTED.pdf
Extracted from the file · 5 pages · 8,572 characters
Text of NECTA-028 Attachment 2 REDACTED.pdf
Extracted from the file · 20 pages, 4 without text · 38,715 characters
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-039 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (Make Ready Work & Related Costs) Refer to Exhibit CLP-ADDITIONS-1 at p. 69. Provide all Company documentation, manuals, training materials, policy documents, methods and procedures, or similar documentation used to determine whether make ready work is billable or non-billable. Response: The SPA Make Ready Billable Matrix is the document used by the Company to determine whether make ready work associated with third party attachments is classified as billable or non-billable. The matrix reflects the criteria and decision-making framework applied in making such determinations. The matrix was previously provided as RRU-002, Attachment 1. Following a reasonable inquiry, the Company is not aware of any additional manuals, training materials, policy documents, methods, procedures, or similar documentation specifically addressing or governing billable versus non-billable make ready determinations. To the extent that Company personnel consult engineering standards, survey requirements, construction specifications, safety requirements, or NESC standards in evaluating field conditions, such documents provide general engineering and compliance guidance and do not independently establish whether make ready work is billable or non-billable. The Company’s billable/nonbillable determinations are governed by the attached matrix.
Text of NECTA-040_Final.pdf
Extracted from the file · 1 page · 2,347 characters
As listed on the current system
Question(s) Answered 25, 27, 28, 39, 40 (The Connecticut Light and Power Company) Date Filed: 09/23/2026