Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 25, 27, 28, 39, 40

Files9

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-01 Date Issued September 09, 2026 NECTA-025 Page 1 of 1 Date Filed: September 23, 2026 Witness: David L. Gladey and Steven Lamontagne Request from: New England Connectivity and Telecommunications Association Question: (Pole Management & SPA) Describe and produce all instructions, guidelines or policies related to pole setting depth. Response: The following documents provide instructions and guidelines related to pole setting depth: • NECTA-025, Attachment 1 - DTR 05.041 – Wood Pole Setting • NECTA-025, Attachment 2 CONFIDENTIAL - DTR 05.316 - Pole Selection Guide Eversource sets distribution wood poles in accordance with ANSI O5.1 recommended setting depths, generally following the guideline of approximately 10% of pole length plus 2 feet. Where design conditions warrant additional embedment, the Eversource’s Design Engineering teams will specify the required setting depth within the construction design.

Text of NECTA-028_Final.pdf

Extracted from the file · 2 pages · 4,225 characters

Text of NECTA-028 Attachment 1 REDACTED.pdf

Extracted from the file · 5 pages · 8,572 characters

Text of NECTA-028 Attachment 2 REDACTED.pdf

Extracted from the file · 20 pages, 4 without text · 38,715 characters

Text of NECTA-039_Final.pdf

Extracted from the file · 1 page · 1,644 characters

Text of NECTA-040_Final.pdf

Extracted from the file · 1 page · 2,347 characters

As listed on the current system

Question(s) Answered 25, 27, 28, 39, 40 (The Connecticut Light and Power Company) Date Filed: 09/23/2026

This filing on the current system (opens in a new tab)