Interrogatory responses

Answers to questions 101, 102, 107, 108, 110, 111, 115, 119

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy15 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files15

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-01 Date Issued July 28, 2026 OCC-101 Page 1 of 1 Date Filed: August 11, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (VMP/Budget) Page 12, lines 9-17 of Exhibit CLP-VMP-1 notes that the cost of the VMP is increasing, due to inflationary impacts on labor and equipment. a. Please provide current costs of labor associated w/ VMP and anticipated costs of labor for the VMP over next 5 years, as aligned with the Targeted system performance plan. b. Please provide current costs of equipment associated w/ VMP and anticipated costs of equipment VMP over next 5 years, as aligned with the Targeted system performance plan. c. Lines 14-17 note that another key driver of costs for the VMP is a PURA notification process. Please provide actual costs spent, indicating for each cost the docket number/required notification process. Response: a. Please refer to OCC-101, Attachment 1 CONFIDENTIAL, for the Test Year (2025) and 2026 standard labor rates. In addition, the VMP includes unit price tree removals and unit price maintenance tree work. However, the labor rates are embedded in the unit price and not separated. The Company is currently under the final year of a four-year contract covering the term 2023-2026. In May 2026, the Company commenced the RFP process for the next multi-year contract for the term starting January 1, 2027, and has requested the itemization of unit prices, including labor, equipment, and documented notification costs. Vendors are currently preparing their bid submissions. The Company anticipates finalizing its VMP contract by November 2026. b. Please refer to OCC-101, Attachment 1 CONFIDENTIAL, for the Test Year (2025) and 2026 standard equipment rates. In addition, the VMP includes unit price tree removals and unit price maintenance tree work. However, the equipment rates are embedded in the unit price and not separated. c. The Scheduled Maintenance Trimming is contracted by unit price per mile per Area Work Center per year and the documented notification costs are embedded within the unit price per mile and not separated. Please refer to Exhibit CLP-VMP-1, on page 45, at line 12-15 for the estimated documented notification costs associated with PURA’s order in Docket No. 12-01-10.

As listed on the current system

Question(s) Answered 101, 102, 107, 108, 110, 111, 115, 119 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/11/2026