Interrogatories
To CL&P, questions 141 thru 141
Files1
26-05-10 Interrogatories_set 1.pdf
PDF · 528 KB · 16 pagesText searchable
Download 26-05-10 Interrogatories_set 1.pdfRead the text of 26-05-10 Interrogatories_set 1.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
RE: APPLICATION OF THE
CONNECTICUT LIGHT AND POWER
COMPANY d/b/a EVERSOURCE
ENERGY TO AMEND ITS RATE
SCHEDULES
:
:
:
:
DOCKET NO. 26-05-10
:
JULY 28, 2026
THE OFFICE OF CONSUMER COUNSEL’S
FIRST SET OF INTERROGATORIES
The Office of Consumer Counsel (“OCC”) hereby requests responses from the Connecticut
Light and Power Company d/b/a Eversource Energy to the following interrogatories in the abovecaptioned proceeding by August 11, 2026. If there are objections to any questions, or if providing
responses to certain questions would be unduly burdensome, please contact the undersigned
counsel as soon as possible.
I. INSTRUCTIONS
The responses to these interrogatories and production requests must be submitted in the following
manner:
A.
B.
C.
D.
E.
Documents provided shall be complete and, unless privileged, unredacted, submitted as
found in the responding party’s files (e.g., documents that in their original condition were
stapled, clipped or otherwise fastened together or maintained in separate file folders shall
be produced in such form). The responding party may submit photocopies (with color
photocopies where necessary to accurately reproduce the document), in lieu of original
documents, provided that such copies are true, correct and complete copies of the original
documents.
Documents submitted shall be produced in the order in which they appear in the responding
party’s files and shall not be shuffled or otherwise rearranged. Mark each page with
identification and consecutive document control numbers.
Data must be produced in the data format in which it is typically used and maintained.
Moreover, to the extent a responsive document has been electronically scanned (for any
purpose), that document must be produced in a readable and accessible electronic format,
with the opportunity provided to review the original document.
Provide English translations of all responsive documents that exist in a language other than
English.
Documents to be produced include all documents in the possession, custody or control of
the responding party, wherever located, including documents in the possession, custody or
control of the responding party’s directors, officers, employees, representatives or agents.
Without limitation on the term “control,” a document is deemed to be in a responding
party’s control if it has the right to secure that document or a copy thereof from another
person.
CLAIMS OF PRIVILEGE
If you contend that any answer to any interrogatory or any document demanded by these
interrogatories is privileged in whole or in part, file with your response to these Interrogatories a
statement in writing and under oath and in such statement: (1) identify each such interrogatory
answer or document; (2) state its general subject matter; and (3) state in detail the basis for each
claim of privilege made with respect to it. If a claim of privilege is made to only a part of a
document, then in addition to the statement required herein, produce a public copy of such
document from which the alleged privileged portion has been redacted, noting where in the
document such redactions have been made.
SCOPE
If subsequent to your initial compliance with these interrogatories and production request you
discover additional or new material or information responsive to any interrogatory or request for
production, or you discover that any response you provide herein was totally or partially incorrect
or, though correction was made, is no longer true, you must promptly (a) file any additional
responsive documents that come into your possession, custody or control or (b) file supplemented,
corrected, and sworn responses. You are specifically directed to supplement, modify or correct
your responses to each of these interrogatories and production throughout until a final decision in
adopted by the Authority in this Docket.
II. INTERROGATORIES
Interrogatories OCC-41 through OCC-141 are directed to the Connecticut Light & Power
Company d/b/a Eversource Energy (“Eversource” or “Company”):
OCC-41.
(Expenses) Please refer to PURA’s Final Decision in the Yankee rate case, Docket No.
24-12-01. Indicate if CL&P has adjusted its requested pro forma expense in the
current proceeding to follow the ratemaking treatment, calculation or methodology
utilized by PURA in the recent Yankee rate case for the following items:
Expense Item
D & O Insurance
Board of Directors/Trustees Fees
Audit Fees
Employee Cash Incentive Compensation
Officer Cash Incentive Compensation
Detail
100% Disallowed
75% Disallowed
50% Disallowed
100% Disallowed
100% Disallowed
Decision Page
130
84
84
105
105
Long Term Director Stock
100% Disallowed
105
Bank Fees
401 (K)
Supplemental Executive Retirement Plan
Uncollectibles
51% Disallowed
Disallowed 35%
Disallowed 100%
18% cut
92
119
119
85
OCC-42.
(Employees) Provide the number of FTEs by month for the years 2017-2025 and the
most current month available for CL&P and NUSCO. Include the number of positions
authorized by the Board of Directors, the number allowed by PURA in the prior rate
case, and the number of vacant positions. Also include a breakdown between union,
exempt, and non-exempt employees.
OCC-43.
(Double Time) Please explain all rationales and provide all justification for the
Company’s choice to pay external line crews and/or vegetation contractors double
time.
OCC-44.
(Contracts) For all external line crews and vegetation contractors whose costs are
reflected in the storms in this docket and for all current external line crews, please
provide all contracts and addendums thereto in effect from January 1, 2024, to the
present.
OCC-45.
(Double Time) For all contracts provided in the Response to OCC-44 above, please
indicate how many contain double time provisions.
OCC-46.
(Double Time) Are Eversource employees eligible for double time pay? If so, please
indicate each employee position that is eligible and provide all policies and procedures
governing eligibility.
OCC-47.
(Double Time) Please provide all research the Company has conducted regarding
double time pay that is the basis for the Company’s decision to include double time
pay in its vendor contracts.
OCC-48.
(Double Time) For each of the years: 2021, 2022, 2023, 2024, 2025, by year, provide
the amount of double time the Company has paid to external contractors.
OCC-49.
(Double Time) For each of the years: 2021, 2022, 2023, 2024, 2025, by year, provide
the amount of double time the Company has paid to internal employees.
OCC-50.
(Plant) Referring to Exhibit CL&P-RevReq-2 Schedule B-2.1. Provide for each year
2023-2025 a list of projects by account and the respective cost for the project closed
to plant that year. Explain how the costs were determined and provide supporting cost
documentation for each of the projects.
OCC-51.
(Payroll) Provide for each of the years 2022-2026: (i) the total overtime dollars, and;
(ii) the amount of overtime dollars that would be charged to expense in base rates and
would be comparable to the expense included in the Company’s rate relief request.
OCC-52.
(Incentive Compensation) Are union employees eligible for incentive compensation?
If yes, provide the amount included in O&M expense in each of the rate years. If no,
explain why not.
OCC-53.
(Property Tax) Provide for each year 2021-2025 the average amount of plant in service
and the amount of property tax expense reflected in the year.
OCC-54.
(O&M Expenses) Referring to Exhibit CL&P-RevReq-2 Schedule C-3.0. Provide a
schedule showing the annual amounts for each of the line items shown, for each of the
years 2022, 2023, 2024, 2025, and year to date 2026.
OCC-55.
(Storm Reserves) Referring to Exhibit CL&P-RevReq-2 Schedule C-3.0, lines 43-44.
Provide a detailed explanation why the Company is asking for increases in the rate
years for the a) storm reserve accrual and b) pre-staging reserve accrual.
OCC-56.
(Uncollectible) Referring to Exhibit CL&P-RevReq-2 Schedule C-3.0, line 47.
Explain the increase in uncollectible expense from the test year to the rate year.
OCC-57.
(Uncollectible Expense) Provide the distribution revenues, distribution write-offs, and
distribution recoveries for each year 2021, 2022, 2023, 2024, 2025 and year to date
2026.
OCC-58.
(Payment Processing Fees) Provide the total annual payment processing fees charged
to CL&P customers by type for each year: 2021, 2022, 2023, 2024, 2025 and 2026
year to date.
OCC-59.
(Payment Processing Fees) Identify the fee currently charged to CL&P customers for:
a. online debit/credit card bill payments;
b. online electronic check/bank account withdrawal payments;
c. payments made by phone (debit card, credit card, electronic check and bank
account withdrawal);
d. in person payments made at payment processing centers (debit card, credit card,
electronic check and bank account withdrawal); and
e. auto-payments.
OCC-60.
(Revenues) Identify the average annual residential electric charges for a CL&P
customer by month from January 2018 to the present.
OCC-61.
(Environmental Remediation) Identify all other proceedings by Company name and
docket number in which the Company requested recovery of environmental
remediation costs other than through operating expenses (e.g., regulatory asset, tracker,
etc.).
OCC-62.
(Environmental Remediation) To the extent the Company is aware, identify all other
utilities in Connecticut that recover environmental remediation costs via a regulatory
asset.
OCC-63.
(Environmental Remediation) To the extent the Company is aware, identify all other
utilities in Connecticut that recover actual financing costs instead of short-term debt
financing for deferred costs.
OCC-64.
(Social Committee Events) Provide the amount of one-off employee engagement
events or social committee events included in the test year, rate year, 2022, 2023, and
2024 years.
OCC-65.
(Entertainment/Sponsorships) Provide the amount of sporting /entertainment event
tickets, season tickets, suites, sponsorships, etc. included for recovery in the test year
and the rate year for the following years: 2022, 2023, 2024, 2025, and 2026 year to
date.
OCC-66.
(Employee Awards/Recognition) Identify the amount of employee recognition
expense (e.g., dinners, luncheons, parties, gifts, etc.) included for recovery in the test
year and the rate year for the following years: 2022, 2023, 2024, 2025, and 2026 year
to date.
OCC-67.
(Employee Cafeteria) Did the Company build, acquire, or is currently using an
Employee Cafeteria since the last rate case?
OCC-68.
(Employee Cafeteria) If the Company has an Employee Cafeteria, please indicate
where this cost is included in the application.
OCC-69.
(Employee Benefits) Provide a detailed list of all expenses included in the test year
and rate year for employee benefits by benefit type. Provide a similar listing for years
2022, 2023, 2024, 2025, and explain any variance occurring between the years
exceeding 10%.
OCC-70.
(Economic Development Fees) Identify the total amount of economic development
expenses by type included in the test year, rate year, and the following years 2022,
2023, 2024, and 2025.
OCC-71.
(Dues) Non-Industry:
a. Identify all non-industry dues and memberships payments included in the test
year and included for recovery in the rate year and identify the amount(s) into
which such amounts are charged.
b. State the purpose and objective of each organization listed.
c. State whether any of the organizations listed engage in lobbying or advocacy
activities, attempts to influence public opinion, institutional or image-building
advertising. If so, state if the Company has included the portions of dues
related to such activities in the test year and rate year.
d. Identify the benefits provided to ratepayers.
OCC-72.
(Dues) Non-Industry: Referring to Exhibit CLP-REVREQ-2-G Schedules, tab G-2.8.
State whether the costs shown are included in the rate year.
OCC-73.
(Dues) Industry Associations:
a. List all membership payment amounts made to industry associations included
in the test year and requested for recovery in the rate year and identify the
amount(s) into which such amounts are charged.
b. State the purpose and objective of each organization listed.
c. State whether any of the organizations listed engage in lobbying or advocacy
activities, attempts to influence public opinion, institutional or image-building
advertising. If so, state if the Company has included the portion of dues related
to such activities in the test year and rate year.
d. Identify the benefits provided to ratepayers.
OCC-74.
(Customer Deposits) What interest rate (if any) did the Company pay on customer
deposit balances for years 2023, 2024, 2025, and 2026?
OCC-75.
(Customer Deposits) Provide the monthly customer deposit balances for years 2023,
2024, 2025, and 2026, delineated by residential and commercial customers.
OCC-76.
(Club Dues) Provide a list of country club and golf club dues expenses included in the
test year and the rate year.
OCC-77.
(Aircraft) Does the Company own and or lease any aircraft? If yes, please describe.
OCC-78.
(Aircraft) How are corporate aircraft costs allocated to CL&P?
OCC-79.
(Contributions/Donations/Charity) Has the Company charged to ratepayers or is
requesting to recover from ratepayers in rates any money related to the Company’s
contributions, donations, or charity to other organizations?
OCC-80.
(Depreciation) Did the Company submit in the record the Public Utility Depreciation
Practices August 1996 manual into the record of this case?
OCC-81.
(Depreciation) Did the Company utilize the Public Utility Depreciation Practices
August 1996 manual when determining depreciation judgments made in its 2025
Depreciation Study?
OCC-82.
(IOWA Curve- ACCT 360.20 Land Rights) Referring to Exhibit CLP-Depreciation-3,
page 56. Provide an IOWA 80-R4 on the graph in red.
OCC-83.
(IOWA Curve- ACCT 360.20 Land Rights) Referring to Exhibit CLP-Depreciation-3,
page 56. Provide an IOWA 70-R3 on the graph in blue.
OCC-84.
(IOWA Curve-ACCT 361) Referring to Exhibit CLP-Depreciation-3, page 60.
Provide an IOWA 65-R1.5 on the graph in red.
OCC-85.
(IOWA Curve-ACCT 362) Referring to Exhibit CLP-Depreciation-3, page 67.
Provide an IOWA 64-R1 on the graph in red.
OCC-86.
(IOWA Curve-ACCT 363.32) Referring to Exhibit CLP-Depreciation-3, pages 80-81.
How did the Company determine an IOWA 25-S2 curve is appropriate curve if FERC
Account 363.32 Communication Equipment – Microwave had no retirements?
OCC-87.
(IOWA Curve-ACCT 363.32) Referring to Exhibit CLP-Depreciation-3, pages 80-81.
Provide a list of examples of what FERC Account 363.32 Communication Equipment
– Microwave assets would be?
OCC-88.
(IOWA Curve-ACCT 363.32) Referring to Exhibit CLP-Depreciation-3, pages 80-81.
Does the Company have any photos of FERC Account 363.32 Communication
Equipment – Microwave assets? If yes, please provide some.
OCC-89.
(IOWA Curve-ACCT 364.00) Referring to Exhibit CLP-Depreciation-3, pages 82.
Provide an IOWA 48-R0.75 on the graph in red.
OCC-90.
(IOWA Curve-ACCT 364.00) Referring to Exhibit CLP-Depreciation-3, pages 82.
Provide an IOWA 50-R1 on the graph in blue.
OCC-91.
(IOWA Curve-ACCT 364.00) Referring to Exhibit CLP-Depreciation-3, pages 82.
Provide an IOWA 52-R1 on the graph in orange.
OCC-92.
(IOWA Curve-ACCT 366.00) Referring to Exhibit CLP-Depreciation-3, pages 96.
Provide an IOWA 85-R1.5 on the graph in red.
OCC-93.
(IOWA Curve-ACCTs 370.47 and 370.48) Referring to Exhibit CLP-Depreciation-3,
pages 124. Why did the Company include two different FERC Accounts on one IOWA
Curve?
OCC-94.
(IOWA Curve-ACCTs 370.47) Referring to Exhibit CLP-Depreciation-3, pages 124.
Plot only ACCT 370.47 original curve experience placements on the graph. The black
boxes.
OCC-95.
(IOWA Curve-ACCTs 370.48) Referring to Exhibit CLP-Depreciation-3, pages 124.
Plot only ACCT 370.48 original curve experience placements on the graph. The black
boxes.
OCC-96.
(SFR) Refer to Exhibit CLP-REVREQ -2-(Schedules A,B,C,D).xlsx. Provide a
working model of ABCD SFR schedules, where each cell is unlocked and the effects
of a proposed adjustment input can be seen and affects taxes, return, flow through
effects, etc in other tabs and cells included within the ABCD exhibit/model.
OCC-97.
(SFR) Refer to Exhibit CLP-REVREQ -2-(Storms A).xlsx. Provide a working model
of ABCD SFR schedules, where each cell is unlocked and the effects of any proposed
adjustment input can be seen and affects taxes, return, flow through effects, etc in other
tabs and cells included within the exhibit.
OCC-98.
(SFR) Refer to Exhibit CLP-REVREQ -2-(Storms B).xlsx. Provide a working model
of ABCD SFR schedules, where each cell is unlocked and the effects of any proposed
adjustment input can be seen and affects taxes, return, flow through effects, etc in other
tabs and cells included within the exhibit.
OCC-99.
(VMP/Cost-Benefit) The University of Connecticut study, Assessing the Effects of a
Vegetation Management Standard on Distribution Grid Outage Rates (Exhibit CLPVMP-3) suggests that Enhanced Tree Trimming ("ETT") improves reliability however,
it did not find that increasing ETT consistently resulted in a greater reduction of
outages, after accounting for storm severity.
a. Has the Company evaluated whether increasing ETT beyond the currently
proposed level will continue to produce reliability benefits that justify the cost?
b. If yes to (a), provide all analyses, studies, cost-benefit evaluations, or other
documentation supporting the Company's conclusion.
c. If no such evaluation has been performed, explain how the Company
determined that the proposed level of ETT represents a cost-effective
investment for ratepayers.
OCC-100. (VMP/Other Considerations) The University of Connecticut study found in Exhibit
CLP-VMP-3 notes that urban trees provide important environmental and societal
benefits, including reducing urban temperatures, improving air quality, and enhancing
community well-being, and that coordination between utilities and municipalities is
necessary to balance these benefits with electric reliability objectives.
a. Please describe if and how the Company considered non-reliability factors of
an environmental and community nature in developing its VMP.
b. Please describe how the company sees the role of municipalities, property
owners, or other stakeholders in those decisions; and
c. Please provide all analyses the Company performs to evaluate the
environmental or community impacts of ETT.
OCC-101. (VMP/Budget) Page 12, lines 9-17 of Exhibit CLP-VMP-1 notes that the cost of the
VMP is increasing, due to inflationary impacts on labor and equipment.
a. Please provide current costs of labor associated w/ VMP and anticipated costs
of labor for the VMP over next 5 years, as aligned with the Targeted system
performance plan.
b. Please provide current costs of equipment associated w/ VMP and anticipated
costs of equipment VMP over next 5 years, as aligned with the Targeted system
performance plan.
c. Lines 14-17 note that another key driver of costs for the VMP is a PURA
notification process. Please provide actual costs spent, indicating for each cost
the docket number/required notification process.
OCC-102. (VMP/Budget)
Provide a budget breakdown, including allocation and actuals, for prior years, across
the same line items provided in the proposed program budget for 2027 as outlined in
Exhibit CLP-VMP-2 page 25 of 29 (noting that there is a VMP costs by program
component on page 26 of Exhibit CLP-VMP-1, but it does not use all the same line
items making comparison a challenge).
a. For each line item with an increase in the proposed 2027 from the actual 2025
expenditure, explain and qualify all the drivers of the proposed increase.
b. The 2027 budget breakdown, provided on Exhibit CLP-VMP-2 page 25 of 29,
totals 89.6mill, the same as the total request in the . What will the contribution
from Frontier of 13.5M be spent on?
c. Please provide the Company’s analysis demonstrating that the proposed budget
does not result in diminishing returns each year?
d. Provide any analyses comparing the benefits achieved during the initial ETT
cycle to those achieved during subsequent cycles.
OCC-103. (VMP/Removal Decisions) Page 22 identifies two methods that Eversource will use
to determine if a tree should be removed; the first is the objective Tree Risk
Assessment Environmental Systems Research Institute (ESRI) GIS tool and the
second is a subjective risk assessment based on closeness to power lines or size of
canopy. Please explain the extent to which the decision to remove a tree under the
subjective criteria is based on professional judgment or discretion. If discretion is
exercised, identify the individual(s) authorized to make the determination and describe
any review or approval process.
OCC-104. (VMP/LiDAR). The company is proposing to institute LiDAR, presented as a new
program component, which will cost $950,000 (Exhibit CLP-VMP-2 page 25 of 29).
What is the alternative to LiDAR and the cost? Provide analysis on the pros and cons
of using LiDAR.
OCC-105. (VMP/Cost Effective) The company asserts on page 29 of Exhibit CLP-VMP-1 that,
by moving from a SMT to a four year cycle trimming program, that money would be
saved. On line 19 of the same page, the company notes “[a] summary of the
Company’s analysis is presented...”; please provide the full analysis.
OCC-106. (VMP/Cost Effective) In the summary (chart) of the analysis, found on page 30 of
Exhibit CLP-VMP-1, the costs for the SMT approach are increasing each year, as are
the number of miles covered. Please explain if the increase in cost is simply due to the
increase in miles of vegetation that needs to be trimmed. In addition, in the same chart
of the analysis, please explain the variance in annual cost under “cycle cost”.
OCC-107. (VEGETATION MANAGEMENT COSTS) Please indicate the total amount of
vegetation management costs which have been billed to communications attachers that
is currently outstanding.
a. Please provide a chart differentiating, by billed communications entity, how
long the vegetation management invoice(s) have been in arrears, the amount
currently unpaid to Eversource, and what steps Eversource has taken to recover
the unpaid amount from each provider, as appropriate.
OCC-108. (VEGETATION MANAGEMENT COSTS) Please provide a chart showing the total
amount of vegetation management costs billed annually to each communications entity,
for the years: 2021, 2022, 2023, 2024, and 2025.
OCC-109. (CUSTOMER SERVICE) Please explain what types of customer service calls are
handled by Eversource employees and what types of customer service calls are
handled by external vendors, indicating the external vendor(s) handling each type of
call.
OCC-110. (CUSTOMER SERVICE) Please provide all written policies and procedures regarding
the Company’s quality assurance or other reviews of customer calls/customer service
interactions with customers via the telephone, including reviews of internal and
external CSRs.
OCC-111. (LIDR) Please refer to Exhibits CLP-Customer-1, p.20-24, and CLP-Customer-2. Do
the recommendations in CLP-Customer-1 and the data in CLP-Customer-2 reflect the
proposed new rates? If not, please revise and resubmit CLP-Customer-2 with the
proposed new rates and indicate if that would produce any changes to CLP-Customer1, and if so, what changes.
OCC-112. (LIDR) Please refer to Exhibit CLP-Customer-2.
a. Please confirm that the Exhibit creates a LIDR that targets a 6% energy burden.
b. Please confirm that the Exhibit is an unlocked Excel file that may be modified
to reflect different variables/inputs.
c. Please confirm that to reach a 4% energy burden under the tab 5T Proposed
Strawman, the discounts would need to be modified, respectively, to 15%, 35%,
51%, 61%, and 83% (with 83% resulting in a 3.9% energy burden, but 82%
resulting in a 4.2% energy burden), and result in a total residential monthly bill
impact of $6.56.
OCC-113. (LIDR) As of the date of this interrogatory response, how many of the Company’s
residential customers heat with electricity? Please provide the number broken out by
hardship and non-hardship customers, and please also explain how the Company
identified the electric heating customers.
OCC-114. (LIDR) For each month from July 2025 to the present, please provide the following
for financial hardship customers:
a. By LIDR tier, the number of customers that failed to make any payment that
month;
b. By LIDR tier, the number of customers that made a partial payment of the
monthly required payment (not the entire arrearage, if one exists), separated by
customers on MPP, a flexible payment (“FPA”), and not on a payment
arrangement;
c. For customers indicated in subpart (b), the mean and median percentage of the
monthly required payment made, separated by customers on MPP, a flexible
payment (“FPA”), and not on a payment arrangement;
d. By LIDR tier, the number of customers that made full payments of the required
monthly payment (not the entire arrearage, if one exists), separated by
customers on MPP, a flexible payment (“FPA”), and not on a payment
arrangement;
e. By LIDR tier, the amount of total arrearages at the beginning of the month and
at the end of the month;
f. By LIDR tier, the number of customers on MPP;
g. By LIDR tier, the number of customers on a flexible payment arrangement;
h. By LIDR tier, the number of customers who had service terminated that month.
OCC-115. (LIDR) For each month from July 2025 to the present, please provide the cost of the
LIDR discount associated with each LIDR tier.
OCC-116. (LIDR) Please refer to CLP-Customer-2. In each tab, row 5 indicates the number of
customers in each LIDR tier. Please confirm that the number of customers indicated
in CLP-Customer-2 is the number of customers on each tier as of the date this
interrogatory response is filed. If not, please update with the current numbers.
OCC-117. (ENERGIZE CT) Please refer to CLP-Customer-1, p. 26, in which the Company states
it is a “sponsor of Energize CT.”
a. Please describe in detail how Eversource sponsors Energize CT;
b. For the test year, please indicate the amount of costs attributed to Energize CT
that were not recovered through the Conservation and Load Management Fund.
OCC-118. (ARREARAGES) Please refer to CLP-Customer-1, p. 29. The chart at the top of the
page shows that arrearages increased significantly from August 2024 to June 2025 and
from November 2025 to August 2026. Please provide all research and/or explanation
regarding the causes.
OCC-119. (AFFORDABILITY) Please refer to CLP-Customer-1, p. 16, where the Company
cites to the US Energy Information Administration (“EIA”) website for the proposition
that Connecticut residents pay the 25th least amount per person for energy.
a. Please confirm that the information to which the Company cited in its testimony
is the total energy expenditures per capita in 2023.
b. Please confirm that the EIA website to which the testimony cites shows at
https://www.eia.gov/states/CT/rankings#series/225 that Connecticut had the
sixth highest average residential retail electric price in 2025:
OCC-120. (CONTROLLABLE AVERAGE CALL HANDLE TIME – HOLD DURATION)
Please refer to CLP-Customer-1, p. 37-38. Does the average hold duration include the
total hold time during the call (i.e., the time before the CSR begins the call and the
time a customer is placed on hold during the call)?
OCC-121. (CONTROLLABLE AVERAGE CALL HANDLE TIME) Please refer to CLPCustomer-1, p. 38.
a. Is the Company proposing that calls should last an average of 76 seconds total?
b. If yes to (a), does this include the time spent obtaining the account and contact
information from the customer?
c. If yes to (a), does this include all types of calls (i.e., the average call handle
times for all types of calls should be 76 seconds total)?
OCC-122. (POST TRANSACTION SURVEY) Please refer to CLP-Customer-1, p. 38-39.
Please explain how a customer can assess the CSR’s knowledge in the call and/or how
the customer knows if the CSR provided the correct information.
OCC-123. (STORM) Please provide all weather modeling (from DHMAS, University of
Connecticut, and/or all others) provided to the Company regarding the July 4, 2026,
storm.
OCC-124. (STORM STAFFING) Please provide an unlocked Excel spreadsheet showing for
storms from 2020 to the present: each storm, the event level, the number of outage
events, the number of customer outages, the number of external line crews retained for
the event, the number of internal line crews working on the event, the maximum
number of line crews the Event Level Matrix indicates for that level storm, the total
cost, and the average restoration time per customer.
OCC-125. (TVR) Please refer to Exhibit CLP-Rates-1, p. 12.
a. Please confirm that the Company’s proposed time-varying rates are opt-in.
b. If the Company’s currently proposed time-varying rates are opt-in, please
explain how and when the Company intends to comply with Public Act 25-173,
Section 20, which requires electric distribution companies to file an application
for opt-out time varying rates not later than October 1, 2027.
OCC-126. (CUSTOMER DISTRIBUTION) Please provide the Company’s current number of
customers and percentage distribution of customers by rate class.
OCC-127. (DATA PRIVACY) Please indicate all costs and describe all system changes
necessary if customer account information were subject to the data privacy rules of
General Statutes § 36a-701b (i.e., if utility account information were included within
the definition of “personal information” in § 36a-701b(a)).
OCC-128. (Cybersecurity) Does the company have a cybersecurity policy or framework
document that outlines priorities and standards for cybersecurity? If so, please provide
it.
OCC-129. (Cybersecurity) Please provide the two questionnaires mention on page 35 of Exhibit
CLP-AMI-2 (Corporate Information Security Risk Assessment Questionnaire
(“CISRAQ”) and the due diligence questionnaire (“DDQ”)). In addition, please
provide information - including copies of any guidelines, manuals, or standards - on
how the Company assess these questionnaires once complete, and ranks or decides if
a third party's cybersecurity practices meet Company standards.
OCC-130. (Cybersecurity) Once Eversource gives customer data to a third party, does it conduct
any regularly occurring follow up or diligence to ensure that, over time, data
management standards are upheld? If yes, please provide all written policies and
procedures that govern.
OCC-131. (Cybersecurity) Please provide details on the Company’s cybersecurity monitoring
center, including staffing levels, organization chart, background of staff and their
experience in cybersecurity, documented strategies to structure the monitoring
center’s work, and guidelines for responding to alerts originating from the automated
monitoring system.
OCC-132. (Cybersecurity) The cybersecurity section of Exhibit CLP-AMI-2 on pages 34-35
considers only cybersecurity issues related to customer data and privacy. Please
provide information on if and how the company plans for and addresses cybersecurity
threats outside of the individual data collection and data privacy space, including but
not limited to operational security and assessment of third party companies.
OCC-133. (IT Capital Expenses) Exhibit CLP-ADDITIONS-1, page 66 of 81, provides one, brief
sentence describing information technology projects that are funded through capital
investment. Please provide more details, by identifying each capital project included
in the Company's information technology investment category since its last rate case.
For each project, provide:
a. A description of the project;
b. The purpose and business justification;
c. The date the project commenced and, if applicable, was placed into service;
d. The total estimated and actual project cost;
e. The amount currently included in rate base;
f. Whether the project is complete or ongoing; and
g. The benefit, including but not limited to anticipated and realized customer
benefits, operational benefits, cost savings, reliability improvements,
cybersecurity improvements, or regulatory compliance benefits.
OCC-134. (IT Capital Expenses) Please explain the criteria used by the Company to determine
whether an information technology expenditure is capitalized rather than expensed.
OCC-135. (IT) Please provide the IT strategy mentioned on page 15 of Exhibit CLP-Additions10A.
OCC-136. (COMPLAINTS) In the test year, how many and what percentage of customer
complaints were resolved in one call/contact?
OCC-137. (DER PIM) Please refer to Exhibit CLP-Customer-1, p . 35. Please list and explain
all components included in the pre-construction and post-construction milestones.
OCC-138. (AVERAGE DISCOUNT RATE ENROLLMENT PIM) Please refer to Exhibit CLPCustomer-1, p. 40. Does the PIM include the time required to move customers from
one LIDR tier to another or only the time to initially enroll customers on LIDR?
OCC-139. (FEE FREE) Please refer to Exhibit CLP-Customer-1, p. 49-51. Please provide the
current contract with all addendums in effect with the Company’s fee free vendor.
OCC-140. (FEE FREE) Please indicate for each year from 2020 through 2025 the total annual
number of fee free transactions.
OCC-141. (FEE FREE) Please explain why the Company projects an approximately $740,000
annual increase in the costs associated with the fee free program (approximately
$740,000-$98,000 normalization = $642,000).
Respectfully submitted,
STATE OF CONNECTICUT
OFFICE OF CONSUMER COUNSEL
CLAIRE E. COLEMAN
CONSUMER COUNSEL
By: /s/ Kimberly White
Kimberly White
Staff Attorney
10 Franklin Square
New Britain, CT 0605[phone removed]
CERTIFICATE OF SERVICE
I do hereby certify that on this day the foregoing document was filed with the
Public Utilities Regulatory Authority, and copies thereof were served upon each person
designated on the official service list in this proceeding in accordance with R.C.S.A. §
16-1-15.
Dated at New Britain, Connecticut this 28th day of July, 2026.
By: /s/ Kimberly White
Kimberly White
Commissioner of the Superior Court
As listed on the current system
Interrogs from OCC to CL&P 141 thru 141-Issued 07/28/2026 [26-05-10]