Interrogatory responses
Answers to questions 190
Files8
OCC-190_final.pdf
PDF · 184 KB · 4 pagesText searchable
Download OCC-190_final.pdfRead the text of OCC-190_final.pdf
OCC-190 Attachment 1.pdf
PDF · 117 KB · 8 pagesText searchable
Download OCC-190 Attachment 1.pdfRead the text of OCC-190 Attachment 1.pdf
OCC-190 Attachment 1.xlsx
Excel · 45 KBText searchable
Download OCC-190 Attachment 1.xlsxRead the text of OCC-190 Attachment 1.xlsx
OCC-190 Attachment 2.pdf
PDF · 4.9 MB · 25 pagesText searchable
Download OCC-190 Attachment 2.pdfRead the text of OCC-190 Attachment 2.pdf
OCC-190 Attachment 2(a).xlsx
Excel · 504 KBText searchable
Download OCC-190 Attachment 2(a).xlsxRead the text of OCC-190 Attachment 2(a).xlsx
OCC-190 Attachment 3.pdf
PDF · 4.7 MB · 21 pagesText searchable
Download OCC-190 Attachment 3.pdfRead the text of OCC-190 Attachment 3.pdf
OCC-190 Attachment 4.pdf
PDF · 1.7 MB · 18 pagesText searchable
Download OCC-190 Attachment 4.pdfRead the text of OCC-190 Attachment 4.pdf
OCC-190 Attachment 5.pdf
PDF · 2.1 MB · 4 pagesText searchable
Download OCC-190 Attachment 5.pdfRead the text of OCC-190 Attachment 5.pdf
Page 16 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 16 of 25 February 18, 2025 Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 19-01-52RE01, PURA Investigation of Developments in the Third Party Pole Attachment Process – Make Ready – Order No. 5 Compliance. Dear Mr. Gaudiosi: The Connecticut Light and Power Company dba Eversource Energy (the “Company”) hereby submits the following filing in compliance with Order No. 5 of the May 11, 2022 Decision of the Public Utilities Regulatory Authority (the “Authority”) in the above-referenced matter. More specifically, Order No. 5 provides: For new applications submitted on or after the issuance of this Decision, the SPAs shall track and keep records of the performance of all applicable pole owners and pole attachers in the meeting the Engineering Phase timelines described in Section II.B.1. Engineering Phase Timelines. Records shall be retained for 10 years and made available to the Authority upon request, but at minimum through a compliance filing submitted annually on or before February 15 detailing data for the previous calendar year. In areas where SPAs do not operate, such as in municipalities that are outside of the service territories of the EDCs, the ILEC-pole owner shall track the above information in place of the SPA. Accordingly, the Company submits the following attachment: Order No. 5 ES Attachment #19-01-52RE01 02-18-2025 The data provided in the attachment reflects the tracking and performance in meeting Engineering Phase timelines for traditional third-party pole attachment applications received between January 1, 2024, and December 31, 2024. During the reporting period, the applicant category volumes were as follows: Applicant Category <300 poles 300 – 3,000 poles >3,000 poles # of Applications 124 150 357 Total Poles Additional Information 1509 9606 29093 Order No. 5 Compliance is due February 15, 2025. February 15th is a Saturday. PURA's rules state that if a deadline falls on a weekend, then it is automatically extended to the next business day on which PURA's offices are open, which is Tuesday, February 18, 2025. See R.C.S.A. Section 16-1-5.Page 17 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 17 of 25 A summary of the performance tracking provided in the Attachment for each Engineering Phase timeline is as follows: Process Step Timeframe allowed (Days) Review for Completeness 10 Engineering Phase and 45 Application Review on 60 Merits 200 Make-Ready 14 Development Average Time Additional Comments 1 SPA Review Approximately 75% year-over-year increase in number of poles in >3,000 poles category. 214 33 This document has been prepared in good faith and in accordance with the compliance requirement of Order No. 5. I hereby certify service of this filing upon all parties and intervenors of record in this proceeding. Please contact Mrs. Ann Marie Lallier at [phone removed] if you have any questions concerning this filing. Very truly yours, Vincent P Pace Assistant General Counsel As Agent for Eversource Energy cc: Service List Attachments Order No. 5 Compliance is due February 15, 2025. February 15th is a Saturday. PURA's rules state that if a deadline falls on a weekend, then it is automatically extended to the next business day on which PURA's offices are open, which is Tuesday, February 18, 2025. See R.C.S.A. Section 16-1-5.Page 18 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 18 of 25 Connecticut Light and Power dba Eversource Energy Docket No. 19-01-52RE01 Feburary 15, 2023 Compliance Order No. 5, Attachment Page 1 of 4 Proposed Attacher (Company Name) COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC COMCAST - CT FIBERTECH NETWORKS INC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT Date Proposed Attacher Sent Application SPA Acknowledgement (Date) 1/2/2024 3/13/2024 1/2/2024 3/13/2024 12/19/2023 12/19/2023 12/19/2023 12/19/2023 3/13/2024 3/13/2024 3/13/2024 1/2/2024 3/13/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 3/13/2024 3/13/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/5/2024 1/5/2024 1/5/2024 1/5/2024 1/5/2024 1/5/2024 1/5/2024 1/9/2024 1/9/2024 1/9/2024 1/9/2024 1/10/2024 1/10/2024 1/10/2024 1/10/2024 1/10/2024 11/11/2023 11/14/2023 12/13/2023 2/5/2024 12/13/2023 12/13/2023 12/14/2023 12/14/2023 12/14/2023 12/14/2023 12/15/2023 2/5/2024 2/5/2024 11/27/2023 2/5/2024 2/5/2024 2/5/2024 2/5/2024 12/6/2023 12/6/2023 2/5/2024 12/15/2023 2/5/2024 11/30/2023 11/30/2023 12/15/2023 2/6/2024 12/19/2023 12/19/2023 2/6/2024 12/19/2023 2/6/2024 2/6/2024 2/6/2024 1/2/2024 1/2/2024 1/2/2024 1/2/2024 1/11/2024 1/11/2024 1/12/2024 1/11/2024 1/11/2024 1/12/2024 1/12/2024 1/12/2024 1/12/2024 1/12/2024 1/15/2024 1/15/2024 1/15/2024 1/16/2024 1/16/2024 1/17/2024 1/17/2024 1/22/2024 1/22/2024 1/22/2024 1/22/2024 1/22/2024 1/25/2024 1/25/2024 1/25/2024 2/6/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/26/2024 1/26/2024 1/26/2024 1/26/2024 1/26/2024 1/26/2024 1/26/2024 1/26/2024 1/29/2024 1/31/2024 1/29/2024 1/29/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 2/2/2024 11/27/2023 12/4/2023 12/4/2023 12/4/2023 12/4/2023 5/8/2024 5/9/2024 11/30/2023 11/20/2023 11/20/2023 11/27/2023 5/9/2024 2/2/2024 2/6/2024 1/3/2024 3/14/2024 1/3/2024 3/14/2024 12/19/2023 12/19/2023 12/19/2023 12/19/2023 3/14/2024 3/14/2024 3/14/2024 1/3/2024 3/14/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/2/2024 1/3/2024 1/3/2024 1/3/2024 1/2/2024 1/2/2024 1/2/2024 3/15/2024 3/15/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/10/2024 1/10/2024 1/10/2024 1/17/2024 1/16/2024 1/16/2024 1/16/2024 1/16/2024 1/10/2024 11/13/2023 11/15/2023 12/14/2023 2/6/2024 12/14/2023 12/14/2023 12/14/2023 12/14/2023 12/14/2023 12/14/2023 12/18/2023 2/6/2024 2/6/2024 11/28/2023 2/6/2024 2/6/2024 2/6/2024 2/6/2024 12/7/2023 12/6/2023 2/6/2024 12/18/2023 2/6/2024 12/1/2023 11/30/2023 12/18/2023 2/7/2024 12/19/2023 12/19/2023 2/7/2024 12/19/2023 2/7/2024 2/7/2024 2/7/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/16/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/12/2024 1/12/2024 1/12/2024 1/12/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/19/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 2/7/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/30/2024 1/31/2024 1/30/2024 1/30/2024 2/6/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 11/28/2023 12/6/2023 12/6/2023 12/6/2023 12/6/2023 5/9/2024 5/10/2024 12/1/2023 11/21/2023 11/21/2023 11/28/2023 5/10/2024 2/7/2024 2/7/2024 Submission Complete Y or N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y If Submission Not Complete Date Attacher Notified by SPA 1/30/2024 Date Attacher Resubmits 45322 Date SPA Acknowledges Submission for Completeness Time Taken To Review by SPA # of Days Allowed for Completeness Review Did SPA Meet Compliance for Completeness Review Y/N 0 1 0 1 0 0 0 0 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 1 1 0 0 0 0 1 1 1 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 15 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y (Invoice is generated) 1/3/2024 3/14/2024 1/3/2024 3/14/2024 12/19/2023 12/19/2023 12/19/2023 12/19/2023 3/14/2024 3/14/2024 3/14/2024 1/3/2024 3/14/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/2/2024 1/3/2024 1/3/2024 1/3/2024 1/2/2024 1/2/2024 1/2/2024 3/15/2024 3/15/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/8/2024 1/10/2024 1/10/2024 1/10/2024 1/17/2024 1/16/2024 1/16/2024 1/16/2024 1/16/2024 1/10/2024 11/13/2023 11/15/2023 12/14/2023 2/6/2024 12/14/2023 12/14/2023 12/14/2023 12/14/2023 12/14/2023 12/14/2023 12/18/2023 2/6/2024 2/6/2024 11/28/2023 2/6/2024 2/6/2024 2/6/2024 2/6/2024 12/7/2023 12/6/2023 2/6/2024 12/18/2023 2/6/2024 12/1/2023 11/30/2023 12/18/2023 2/7/2024 12/19/2023 12/19/2023 2/7/2024 12/19/2023 2/7/2024 2/7/2024 2/7/2024 1/3/2024 1/3/2024 1/3/2024 1/3/2024 1/16/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/12/2024 1/12/2024 1/12/2024 1/12/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/17/2024 1/19/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 2/7/2024 1/25/2024 1/25/2024 1/25/2024 1/25/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/29/2024 1/30/2024 2/6/2024 1/30/2024 1/30/2024 2/6/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 2/7/2024 11/28/2023 12/6/2023 12/6/2023 12/6/2023 12/6/2023 5/9/2024 5/10/2024 12/1/2023 11/21/2023 11/21/2023 11/28/2023 5/10/2024 2/7/2024 2/7/2024 Application Fee Received Y Application Fee Received or N (Within Reporting Date Timeframe) Y 2/19/2024 Y 3/20/2024 Y 2/20/2024 Y 3/20/2024 Y 2/1/2024 Y 2/1/2024 Y 2/7/2024 Y 1/31/2024 Y 3/20/2024 Y 3/20/2024 Y 3/20/2024 Y 2/19/2024 Y 3/20/2024 Y 2/1/2024 Y 2/1/2024 Y 2/1/2024 Y 2/7/2024 Y 2/1/2024 Y 2/7/2024 Y 2/1/2024 Y 2/7/2024 Y 2/1/2024 Y 2/7/2024 Y 2/1/2024 Y 2/1/2024 Y 2/1/2024 Y 3/20/2024 Y 3/20/2024 Y 2/19/2024 Y 1/8/2024 Y 2/20/2024 Y 2/19/2024 Y 2/7/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/22/2024 Y 1/31/2024 Y 1/31/2024 Y 2/1/2024 Y 2/19/2024 Y 2/1/2024 Y 2/1/2024 Y 2/1/2024 Y 2/1/2024 Y 2/1/2024 Y 1/2/2024 Y 1/2/2024 Y 1/31/2024 Y 2/22/2024 Y 1/31/2024 Y 1/31/2024 Y 2/1/2024 Y 1/31/2024 Y 2/1/2024 Y 2/1/2024 Y 2/7/2024 Y 2/22/2024 Y 2/22/2024 Y 1/8/2024 Y 2/22/2024 Y 2/22/2024 Y 2/22/2024 Y 2/22/2024 Y 1/8/2024 Y 1/8/2024 Y 2/22/2024 Y 2/1/2024 Y 2/22/2024 Y 1/2/2024 Y 1/2/2024 Y 2/1/2024 Y 2/22/2024 Y 2/1/2024 Y 2/1/2024 Y 2/22/2024 Y 2/7/2024 Y 2/22/2024 Y 2/22/2024 Y 2/22/2024 Y 2/19/2024 Y 2/19/2024 Y 2/19/2024 Y 2/19/2024 Y 2/19/2024 Y 2/19/2024 Y 2/19/2024 Y 2/19/2024 Y 2/19/2024 Y 2/19/2024 Y 2/1/2024 Y 2/1/2024 Y 2/1/2024 Y 2/1/2024 Y 2/19/2024 Y 2/19/2024 Y 2/20/2024 Y 2/19/2024 Y 2/15/2024 Y 2/19/2024 Y 2/15/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/15/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/22/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 2/26/2024 Y 4/24/2024 Y 2/26/2024 Y 4/24/2024 Y 4/24/2024 Y 4/24/2024 Y 4/24/2024 Y 4/24/2024 Y 4/11/2024 Y 2/22/2024 Y 4/24/2024 Y 2/22/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 3/7/2024 Y 1/8/2024 Y 1/4/2024 Y 1/4/2024 Y 1/4/2024 Y 1/4/2024 Y 6/19/2024 Y 6/19/2024 Y 1/8/2024 Y 1/2/2024 Y 1/2/2024 Y 1/8/2024 Y 6/19/2024 Y 3/7/2024 Y 3/7/2024 Conversation # # of poles Applicant Category <300, 300-3,000 or >3,000 Engineering Start Date (application fee received date) Power Field Survey Complete Date Telco Field Survey Complete Date 1629927 1629947 1630154 1630307 1630472 1630474 1630505 1630506 1630604 1630822 1630923 1630933 1631076 1631079 1631137 1631150 1631417 1631436 1632029 1632032 1632033 1632041 1632375 1632381 1632387 1632397 1632493 1632829 1633455 1633819 1633849 1633853 1633980 1634754 1634836 1634872 1635233 1635247 1635427 1635428 1635971 1636278 1636284 1636297 1636374 1636406 1636928 1636956 1637002 1603211 1605616 1617866 1617934 1617992 1618239 1618288 1618304 1618361 1618434 1618681 1620216 1620863 1620881 1621062 1621882 1622682 1622932 1623167 1623186 1623191 1623337 1623350 1623679 1623681 1625242 1626598 1626768 1626902 1627759 1628066 1628076 1628139 1628187 1629083 1629370 1629523 1629581 1637063 1637413 1638188 1638199 1638202 1638235 1638539 1638563 1638604 1638652 1639285 1639297 1639308 1639807 1639881 1639917 1640351 1640638 1640677 1641626 1641628 1641629 1642356 1642432 1642444 1642515 1642530 1643027 1643102 1643248 1643429 1643431 1643483 1643518 1643561 1643868 1643913 1643924 1643973 1644709 1644823 1644886 1644955 1645748 1645793 1645826 1645885 1646430 1646482 1646731 1647319 1647323 1647355 1647391 1647397 1647497 1647499 1613096 1613190 1613521 1614039 1615306 1615796 1616075 1616378 1616412 1616438 1616454 1616776 1647502 1647858 75 194 75 196 75 64 47 30 197 198 198 80 197 76 76 76 75 75 80 77 76 78 75 75 76 79 209 97 1 2 71 73 75 77 77 75 75 77 19 2 75 76 76 48 78 77 78 71 78 58 48 78 183 76 67 77 77 74 77 75 185 198 73 210 191 200 197 72 25 204 82 199 71 56 76 194 75 75 202 26 196 214 208 78 81 75 80 76 80 79 76 75 57 76 76 77 76 76 79 80 28 63 53 78 77 75 73 10 68 76 77 75 82 76 75 73 75 75 76 79 76 75 78 76 75 81 16 14 74 5 75 77 75 75 77 82 79 76 76 75 75 78 74 74 66 194 189 201 203 75 75 69 57 49 40 76 75 76 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 <300 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 >3000 >3000 >3000 >3000 300-3000 >3000 >3000 2/19/2024 3/20/2024 2/20/2024 3/20/2024 2/1/2024 2/1/2024 2/7/2024 1/31/2024 3/20/2024 3/20/2024 3/20/2024 2/19/2024 3/20/2024 2/1/2024 2/1/2024 2/1/2024 2/7/2024 2/1/2024 2/7/2024 2/1/2024 2/7/2024 2/1/2024 2/7/2024 2/1/2024 2/1/2024 2/1/2024 3/20/2024 3/20/2024 2/19/2024 1/8/2024 2/20/2024 2/19/2024 2/7/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 2/22/2024 1/31/2024 1/31/2024 2/1/2024 2/19/2024 2/1/2024 2/1/2024 2/1/2024 2/1/2024 2/1/2024 1/2/2024 1/2/2024 1/31/2024 2/22/2024 1/31/2024 1/31/2024 2/1/2024 1/31/2024 2/1/2024 2/1/2024 2/7/2024 2/22/2024 2/22/2024 1/8/2024 2/22/2024 2/22/2024 2/22/2024 2/22/2024 1/8/2024 1/8/2024 2/22/2024 2/1/2024 2/22/2024 1/2/2024 1/2/2024 2/1/2024 2/22/2024 2/1/2024 2/1/2024 2/22/2024 2/7/2024 2/22/2024 2/22/2024 2/22/2024 2/19/2024 2/19/2024 2/19/2024 2/19/2024 2/19/2024 2/19/2024 2/19/2024 2/19/2024 2/19/2024 2/19/2024 2/1/2024 2/1/2024 2/1/2024 2/1/2024 2/19/2024 2/19/2024 2/20/2024 2/19/2024 2/15/2024 2/19/2024 2/15/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 2/15/2024 2/26/2024 2/26/2024 2/26/2024 2/22/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 2/26/2024 4/24/2024 2/26/2024 4/24/2024 4/24/2024 4/24/2024 4/24/2024 4/24/2024 4/11/2024 2/22/2024 4/24/2024 2/22/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 3/7/2024 1/8/2024 1/4/2024 1/4/2024 1/4/2024 1/4/2024 6/19/2024 6/19/2024 1/8/2024 1/2/2024 1/2/2024 1/8/2024 6/19/2024 3/7/2024 3/7/2024 4/12/2024 10/15/2024 8/27/2024 6/26/2024 8/26/2024 8/26/2024 8/26/2024 7/24/2024 5/23/2024 6/3/2024 5/15/2024 6/5/2024 5/23/2024 8/28/2024 8/15/2024 8/13/2024 8/30/2024 8/14/2024 8/30/2024 8/16/2024 8/29/2024 8/21/2024 8/28/2024 8/6/2024 8/26/2024 8/20/2024 5/15/2024 6/26/2024 4/26/2024 1/30/2024 8/27/2024 6/5/2024 8/27/2024 8/30/2024 8/28/2024 8/30/2024 8/29/2024 8/29/2024 8/30/2024 4/5/2024 8/1/2024 8/2/2024 8/13/2024 4/11/2024 8/16/2024 8/8/2024 8/16/2024 8/7/2024 8/14/2024 5/23/2024 4/29/2024 8/2/2024 5/15/2024 7/31/2024 8/9/2024 8/7/2024 8/5/2024 8/8/2024 8/22/2024 8/27/2024 5/23/2024 5/23/2024 7/17/2024 4/25/2024 6/3/2024 5/15/2024 5/23/2024 7/10/2024 6/28/2024 5/23/2024 8/26/2024 5/23/2024 5/23/2024 6/7/2024 8/23/2024 6/14/2024 8/9/2024 8/26/2024 10/2/2024 7/7/2024 8/28/2024 6/26/2024 10/24/2024 8/27/2024 6/5/2024 5/8/2024 6/5/2024 6/6/2024 4/21/2024 4/30/2024 4/24/2024 5/20/2024 6/5/2024 8/9/2024 8/7/2024 8/15/2024 7/30/2024 5/9/2024 4/29/2024 5/3/2024 6/5/2024 5/15/2024 4/26/2024 2/22/2024 9/4/2024 9/7/2024 9/6/2024 9/6/2024 3/27/2024 9/7/2024 9/10/2024 9/7/2024 10/24/2024 9/7/2024 9/11/2024 9/4/2024 9/7/2024 9/6/2024 9/7/2024 10/1/2024 9/7/2024 9/13/2024 10/4/2024 9/13/2024 10/3/2024 10/2/2024 9/10/2024 10/24/2024 10/4/2024 5/15/2024 9/10/2024 9/11/2024 9/15/2024 9/19/2024 9/17/2024 9/13/2024 9/17/2024 9/19/2024 9/13/2024 9/7/2024 9/7/2024 9/13/2024 9/13/2024 9/20/2024 6/25/2024 4/15/2024 4/15/2024 6/14/2024 4/2/2024 11/7/2024 11/13/2024 6/11/2024 5/29/2024 5/30/2024 7/17/2024 11/13/2024 9/10/2024 9/11/2024 5/23/2024 4/10/2024 5/23/2024 4/10/2024 7/1/2024 3/18/2024 4/10/2024 8/1/2024 4/10/2024 4/10/2024 4/10/2024 4/10/2024 4/10/2024 3/18/2024 7/1/2024 7/1/2024 3/18/2024 8/1/2024 4/10/2024 7/1/2024 4/10/2024 7/1/2024 4/10/2024 3/18/2024 3/18/2024 7/1/2024 4/10/2024 4/10/2024 4/10/2024 2/8/2024 5/23/2024 5/23/2024 4/10/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 4/10/2024 4/10/2024 4/10/2024 3/6/2024 3/6/2024 2/29/2024 4/10/2024 3/18/2024 2/29/2024 5/23/2024 3/18/2024 3/18/2024 3/18/2024 2/12/2024 3/6/2024 3/6/2024 3/6/2024 3/6/2024 3/18/2024 3/18/2024 3/6/2024 5/23/2024 3/6/2024 3/18/2024 3/18/2024 2/12/2024 3/6/2024 3/18/2024 3/18/2024 3/18/2024 2/8/2024 2/8/2024 3/18/2024 3/6/2024 3/18/2024 2/21/2024 2/21/2024 4/10/2024 3/18/2024 3/6/2024 7/1/2024 3/18/2024 3/18/2024 3/18/2024 3/18/2024 3/18/2024 4/10/2024 5/23/2024 4/10/2024 4/10/2024 4/10/2024 4/10/2024 5/23/2024 4/10/2024 4/10/2024 4/10/2024 2/28/2024 3/18/2024 2/29/2024 2/20/2024 3/18/2024 4/10/2024 5/23/2024 4/10/2024 3/18/2024 4/10/2024 4/10/2024 5/23/2024 5/23/2024 5/23/2024 4/10/2024 4/10/2024 5/23/2024 5/23/2024 5/23/2024 3/18/2024 5/23/2024 4/10/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 7/1/2024 5/23/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 5/23/2024 4/10/2024 7/1/2024 3/18/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 2/8/2024 2/12/2024 2/12/2024 1/11/2024 2/12/2024 2/8/2024 2/21/2024 2/21/2024 2/12/2024 5/23/2024 5/23/2024 Date Power Requested Concurrence 8/8/2024 10/31/2024 10/30/2024 12/30/2024 9/18/2024 11/14/2024 12/16/2024 12/5/2024 12/20/2024 11/20/2024 12/5/2024 11/18/2024 11/14/2024 9/11/2024 10/2/2024 12/2/2024 11/11/2024 11/5/2024 10/15/2024 12/11/2024 12/17/2024 9/24/2024 12/23/2024 10/11/2024 9/30/2024 9/25/2024 10/16/2024 11/17/2024 5/6/2024 2/8/2024 1/6/2025 11/11/2024 12/30/2024 10/17/2024 12/17/2024 11/12/2024 12/17/2024 8/29/2024 9/4/2024 9/6/2024 11/12/2024 5/13/2024 9/4/2024 12/9/2024 9/6/2024 9/10/2024 9/19/2024 7/12/2024 7/17/2024 9/5/2024 7/26/2024 8/22/2024 8/29/2024 11/15/2024 10/25/2024 9/11/2024 9/24/2024 12/18/2024 7/19/2024 10/8/2024 8/21/2024 9/24/2024 10/25/2024 11/21/2024 11/6/2024 8/20/2024 7/26/2024 10/16/2024 9/13/2024 12/5/2024 10/17/2024 6/19/2024 11/25/2024 11/8/2024 9/20/2024 10/1/2024 11/20/2024 10/1/2024 12/19/2024 11/12/2024 12/2/2024 9/11/2024 10/21/2024 8/19/2024 5/20/2024 10/9/2024 9/4/2024 5/28/2024 7/2/2024 9/19/2024 9/9/2024 12/2/2024 11/12/2024 6/19/2024 5/3/2024 7/24/2024 12/16/2024 7/17/2024 5/8/2024 11/18/2024 12/30/2024 5/23/2024 12/19/2024 12/18/2024 10/18/2024 10/17/2024 11/29/2024 10/15/2024 11/18/2024 Date Telco Requested Concurrence Date Concurrence Agreed # of days for Engineering Phase Upon and Application Review on Merits Did Engineering Phase meet mandated timeframes (Y/N) 6/13/2024 4/11/2024 6/3/2024 4/11/2024 9/18/2024 11/14/2024 12/16/2024 11/8/2024 12/4/2024 11/12/2024 1/14/2025 9/19/2024 11/19/2024 12/19/2024 263 259 266 300 231 292 316 NO NO NO NO NO NO NO 4/11/2024 4/11/2024 4/11/2024 6/17/2024 4/15/2024 9/11/2024 10/2/2024 12/2/2024 11/11/2024 11/5/2024 10/15/2024 12/11/2024 12/17/2024 9/24/2024 1/15/2025 12/4/2024 1/2/2025 12/31/2024 12/5/2024 9/12/2024 11/11/2024 12/3/2024 11/18/2024 12/9/2024 10/29/2024 12/18/2024 12/19/2024 9/24/2024 301 259 288 316 260 224 284 306 285 312 265 321 316 236 NO NO NO NO NO NO NO NO NO NO NO NO NO NO 10/11/2024 9/30/2024 9/25/2024 4/17/2024 4/16/2024 4/25/2024 2/8/2024 5/21/2024 7/11/2024 11/8/2024 10/14/2024 9/30/2024 12/5/2024 12/3/2024 5/6/2024 4/9/2024 281 256 242 260 258 77 92 NO NO NO NO NO NO NO 12/30/2024 10/17/2024 12/17/2024 12/30/2024 11/5/2024 12/19/2024 308 253 297 NO NO NO 12/17/2024 8/29/2024 9/4/2024 9/6/2024 11/12/2024 5/1/2024 9/4/2024 12/9/2024 9/6/2024 9/10/2024 9/24/2024 12/18/2024 8/29/2024 9/17/2024 9/19/2024 11/19/2024 6/10/2024 9/4/2024 12/11/2024 9/10/2024 9/19/2024 10/1/2024 296 189 230 232 292 112 216 314 222 231 243 NO NO NO NO NO NO NO NO NO NO NO 4/3/2024 9/5/2024 3/5/2024 8/26/2024 8/29/2024 11/15/2024 10/25/2024 9/11/2024 9/24/2024 7/17/2024 9/9/2024 1/2/2025 9/5/2024 9/16/2024 11/19/2024 11/18/2024 9/20/2024 11/12/2024 197 222 315 218 229 292 292 232 285 NO NO NO NO NO NO NO NO NO 3/5/2024 3/12/2024 8/21/2024 3/12/2024 3/5/2024 3/19/2024 3/12/2024 8/20/2024 7/25/2024 3/12/2024 9/13/2024 3/26/2024 4/4/2024 4/4/2024 11/25/2024 3/20/2024 9/20/2024 10/1/2024 3/19/2024 10/1/2024 3/20/2024 3/19/2024 3/20/2024 6/24/2024 6/27/2024 5/14/2024 7/3/2024 5/1/2024 5/20/2024 5/16/2024 5/7/2024 5/28/2024 5/8/2024 9/19/2024 9/9/2024 12/2/2024 11/12/2024 5/20/2024 5/20/2024 5/23/2024 5/8/2024 5/9/2024 5/15/2024 5/20/2024 11/27/2024 12/5/2024 9/16/2024 9/26/2024 12/11/2024 12/23/2024 11/26/2024 9/4/2024 8/19/2024 1/23/2025 9/30/2024 12/19/2024 12/23/2024 11/21/2024 12/2/2024 279 287 252 217 293 305 278 240 224 336 242 301 356 324 305 NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO 9/30/2024 10/2/2024 12/19/2024 10/7/2024 242 244 301 243 NO NO NO NO 1/16/2025 12/30/2024 11/1/2024 329 312 256 NO NO NO 10/30/2024 254 NO 10/9/2024 1/7/2025 11/6/2024 9/20/2024 10/29/2024 12/4/2024 10/21/2024 9/9/2024 12/2/2024 11/19/2024 8/14/2024 8/8/2024 233 323 261 214 253 289 263 221 305 292 177 171 NO NO NO NO NO NO NO NO NO NO NO NO 12/17/2024 10/29/2024 302 257 NO NO 5/21/2024 96 NO 11/18/2024 11/11/2024 1/7/2025 5/22/2024 12/19/2024 12/18/2024 11/18/2024 266 NO 5/24/2024 12/27/2024 12/19/2024 99 305 297 3/12/2024 12/31/2024 10/17/2024 11/29/2024 10/15/2024 12/19/2024 11/18/2024 11/12/2024 11/5/2024 12/2/2024 10/29/2024 Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) # of days for Power Design/MR Development 12/9/2024 31 12/9/2024 81 12/17/2024 28 12/25/2024 20 12/17/2024 14 12/10/2024 22 11/26/2024 12/2/2024 43 63 5/7/2024 4/17/2024 1 8 10/1/2024 12/27/2024 33 101 12/10/2024 9/18/2024 21 100 11/12/2024 69 12/10/2024 11/13/2024 11/7/2024 91 55 37 9/10/2024 12/17/2024 55 99 12/17/2024 103 12/20/2024 95 12/20/2024 32 12/16/2024 34 12/10/2024 10/9/2024 85 13 12/25/2024 29 10/2/2024 9/20/2024 28 32 11/19/2024 12/27/2024 11/14/2024 # of days for Telco Design/MR Development 50 4 12/30/2024 39 12/9/2024 12/2/2024 70 61 11/6/2024 30 12/30/2024 11/13/2024 13 59 35 11/14/2024 55 12/10/2024 12/31/2024 42 27 10/7/2024 28 12/17/2024 12/10/2024 10/4/2024 12/3/2024 15 21 51 117 9/18/2024 120 NO NO NO 9/19/2024 118 264 NO 11/25/2024 13 253 280 246 NO NO NO 12/4/2024 282 NO 12/31/2024 63 11/14/2024 12/6/2024 12/6/2024 12/9/2024 229 NO 12/8/2024 12/9/2024 12/8/2024 12/9/2024 12/11/2024 12/11/2024 231 231 NO NO 12/5/2024 11/12/2024 3/19/2024 12/5/2024 4/1/2024 12/5/2024 225 NO 11/18/2024 11/20/2024 258 NO 1/23/2024 2/7/2024 2/7/2024 2/7/2024 11/12/2024 9/19/2024 10/18/2024 4/8/2024 3/19/2024 8/7/2024 9/23/2024 1/2/2025 11/12/2024 10/3/2024 8/20/2024 364 313 273 229 NO NO NO NO 1/14/2025 12/9/2024 12/2/2024 12/4/2024 11/14/2024 209 336 335 337 311 NO NO NO NO NO 1/9/2025 1/14/2025 11/18/2024 8/8/2024 10/11/2024 10/18/2024 7/31/2024 7/19/2024 1/13/2025 10/18/2024 7/3/2024 7/1/2024 7/31/2024 1/7/2024 12/5/2024 23 11/12/2024 40 9/11/2024 22 12/27/2024 12/10/2024 12/23/2024 11/25/2024 18 8 19 11 12/31/2024 27Page 19 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 19 of 25 Connecticut Light and Power dba Eversource Energy Docket No. 19-01-52RE01 Feburary 15, 2023 Compliance Order No. 5, Attachment Page 2 of 4 Proposed Attacher (Company Name) COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT CHARTER COMMUNICATIONS COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC COMCAST - CT TELEPORT COMMUNICATIONS AMERICA, LLC TELEPORT COMMUNICATIONS AMERICA, LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS NETSPEED LLC NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC NETSPEED LLC NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT CHARTER COMMUNICATIONS NETSPEED LLC COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT NETSPEED LLC FIBERTECH NETWORKS INC MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT COMCAST - CT NETSPEED LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS COX COMMUNICATIONS COMCAST - CT COMCAST - CT COX COMMUNICATIONS MCIMETRO ACCESS TRANSMISSION SYSTEMS COX COMMUNICATIONS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS TELEPORT COMMUNICATIONS AMERICA, LLC TELEPORT COMMUNICATIONS AMERICA, LLC FIBERTECH NETWORKS INC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC FIBERTECH NETWORKS INC NETSPEED LLC NETSPEED LLC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC COMCAST - CT COMCAST - CT FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC TOWN OF SOUTH WINDSOR, CT COMCAST - CT FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC COMCAST - CT FIBERTECH NETWORKS INC COMCAST - CT NETSPEED LLC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC TELEPORT COMMUNICATIONS AMERICA, LLC TELEPORT COMMUNICATIONS AMERICA, LLC FIBERTECH NETWORKS INC COMCAST - CT NETSPEED LLC NETSPEED LLC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC NETSPEED LLC NETSPEED LLC NETSPEED LLC NETSPEED LLC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC NETSPEED LLC NETSPEED LLC CITY OF BRISTOL, CT NETSPEED LLC COMCAST - CT COMCAST - CT Date Proposed Attacher Sent Application SPA Acknowledgement (Date) 2/6/2024 2/6/2024 2/6/2024 2/6/2024 2/5/2024 2/5/2024 2/5/2024 2/6/2024 2/6/2024 2/6/2024 2/6/2024 2/7/2024 2/6/2024 2/7/2024 2/7/2024 2/9/2024 2/9/2024 2/9/2024 2/9/2024 2/9/2024 2/9/2024 2/9/2024 2/9/2024 2/9/2024 2/9/2024 9/6/2024 2/12/2024 9/6/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 9/6/2024 2/12/2024 9/6/2024 2/13/2024 2/12/2024 2/12/2024 2/13/2024 2/13/2024 2/13/2024 2/13/2024 2/16/2024 2/16/2024 9/6/2024 2/16/2024 9/26/2024 9/26/2024 9/26/2024 2/16/2024 2/16/2024 2/16/2024 2/16/2024 2/16/2024 9/26/2024 3/26/2024 9/26/2024 9/26/2024 9/26/2024 9/26/2024 2/21/2024 2/21/2024 9/26/2024 2/21/2024 9/26/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 2/27/2024 2/27/2024 7/1/2024 7/1/2024 2/27/2024 2/27/2024 2/26/2024 7/1/2024 2/27/2024 2/27/2024 7/1/2024 7/1/2024 7/1/2024 7/5/2024 7/10/2024 7/10/2024 7/10/2024 7/15/2024 7/17/2024 7/19/2024 7/19/2024 7/23/2024 7/25/2024 7/26/2024 7/26/2024 7/26/2024 7/30/2024 8/3/2024 8/4/2024 8/6/2024 8/6/2024 8/7/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/14/2024 8/15/2024 9/27/2024 9/27/2024 8/15/2024 9/27/2024 8/16/2024 8/19/2024 8/19/2024 8/20/2024 8/20/2024 8/20/2024 8/20/2024 8/20/2024 8/20/2024 8/21/2024 8/21/2024 8/21/2024 8/21/2024 8/21/2024 8/22/2024 8/27/2024 8/30/2024 9/3/2024 9/4/2024 9/4/2024 9/4/2024 9/5/2024 9/5/2024 9/6/2024 9/6/2024 9/12/2024 9/13/2024 9/13/2024 9/13/2024 9/16/2024 9/16/2024 9/20/2024 9/18/2024 9/18/2024 9/20/2024 9/20/2024 9/23/2024 9/25/2024 9/25/2024 9/25/2024 9/26/2024 2/8/2024 2/8/2024 2/8/2024 2/8/2024 2/6/2024 2/6/2024 2/6/2024 2/8/2024 2/8/2024 2/8/2024 2/8/2024 2/8/2024 2/7/2024 2/8/2024 2/8/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 9/6/2024 2/13/2024 9/6/2024 2/13/2024 2/13/2024 2/13/2024 2/13/2024 9/6/2024 2/13/2024 9/6/2024 2/15/2024 2/13/2024 2/15/2024 2/15/2024 2/15/2024 2/15/2024 2/15/2024 2/22/2024 2/22/2024 9/6/2024 2/22/2024 9/27/2024 9/27/2024 9/27/2024 2/22/2024 2/22/2024 2/22/2024 2/22/2024 2/22/2024 9/27/2024 3/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 2/22/2024 2/22/2024 9/27/2024 2/22/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 2/28/2024 2/28/2024 7/1/2024 7/1/2024 2/28/2024 2/28/2024 2/27/2024 7/1/2024 2/28/2024 2/28/2024 7/1/2024 7/1/2024 7/2/2024 7/8/2024 7/10/2024 7/10/2024 7/12/2024 7/15/2024 7/19/2024 7/22/2024 7/22/2024 7/24/2024 7/26/2024 7/26/2024 7/29/2024 7/29/2024 7/31/2024 8/5/2024 8/5/2024 8/7/2024 8/7/2024 8/7/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/19/2024 8/19/2024 9/27/2024 9/27/2024 8/19/2024 9/27/2024 8/19/2024 8/20/2024 8/20/2024 8/20/2024 8/20/2024 8/20/2024 8/23/2024 8/21/2024 8/21/2024 8/21/2024 8/21/2024 8/23/2024 8/23/2024 8/23/2024 8/23/2024 8/27/2024 8/30/2024 9/5/2024 9/5/2024 9/5/2024 9/5/2024 9/5/2024 9/5/2024 9/9/2024 9/9/2024 9/13/2024 9/13/2024 9/13/2024 9/16/2024 9/18/2024 9/18/2024 9/23/2024 9/18/2024 9/18/2024 9/20/2024 9/23/2024 9/25/2024 9/25/2024 9/25/2024 9/25/2024 9/27/2024 Submission Complete Y or N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y If Submission Not Complete Date Attacher Notified by SPA Date Attacher Resubmits Date SPA Acknowledges Submission for Completeness Time Taken To Review by SPA # of Days Allowed for Completeness Review Did SPA Meet Compliance for Completeness Review Y/N 1 1 1 1 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y (Invoice is generated) 2/8/2024 2/8/2024 2/8/2024 2/8/2024 2/6/2024 2/6/2024 2/6/2024 2/8/2024 2/8/2024 2/8/2024 2/8/2024 2/8/2024 2/7/2024 2/8/2024 2/8/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 2/12/2024 9/6/2024 2/13/2024 9/6/2024 2/13/2024 2/13/2024 2/13/2024 2/13/2024 9/6/2024 2/13/2024 9/6/2024 2/15/2024 2/13/2024 2/16/2024 2/15/2024 2/15/2024 2/15/2024 2/15/2024 2/22/2024 2/22/2024 9/6/2024 2/22/2024 9/27/2024 9/27/2024 9/27/2024 2/22/2024 2/22/2024 2/22/2024 2/22/2024 2/22/2024 9/27/2024 3/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 2/22/2024 2/22/2024 9/27/2024 2/22/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 2/28/2024 2/28/2024 7/1/2024 7/1/2024 2/28/2024 2/28/2024 2/27/2024 7/1/2024 2/28/2024 2/28/2024 7/1/2024 7/1/2024 7/2/2024 7/8/2024 7/10/2024 7/10/2024 7/12/2024 7/15/2024 7/19/2024 7/22/2024 7/22/2024 7/24/2024 7/26/2024 7/26/2024 7/29/2024 7/29/2024 7/31/2024 8/5/2024 8/5/2024 8/7/2024 8/7/2024 8/7/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/12/2024 8/19/2024 8/19/2024 9/27/2024 9/27/2024 8/19/2024 9/27/2024 8/19/2024 8/20/2024 8/20/2024 8/20/2024 8/20/2024 8/20/2024 8/23/2024 8/21/2024 8/21/2024 8/21/2024 8/21/2024 8/23/2024 8/23/2024 8/23/2024 8/23/2024 8/27/2024 8/30/2024 9/5/2024 9/5/2024 9/5/2024 9/5/2024 9/5/2024 9/5/2024 9/9/2024 9/9/2024 9/13/2024 9/13/2024 9/13/2024 9/16/2024 9/18/2024 9/18/2024 9/23/2024 9/18/2024 9/18/2024 9/20/2024 9/23/2024 9/25/2024 9/25/2024 9/25/2024 9/25/2024 9/27/2024 Application Fee Received Y Application Fee Received or N (Within Reporting Date Timeframe) Y 3/7/2024 Y 3/7/2024 Y 2/22/2024 Y 3/7/2024 Y 2/22/2024 Y 2/22/2024 Y 2/22/2024 Y 3/7/2024 Y 3/21/2024 Y 2/22/2024 Y 2/22/2024 Y 3/28/2024 Y 3/7/2024 Y 4/11/2024 Y 5/15/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 3/21/2024 Y 3/28/2024 Y 9/18/2024 Y 3/28/2024 Y 9/18/2024 Y 3/28/2024 Y 3/28/2024 Y 3/21/2024 Y 3/28/2024 Y 9/18/2024 Y 3/28/2024 Y 9/18/2024 Y 3/28/2024 Y 2/27/2024 Y 2/27/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 3/28/2024 Y 9/18/2024 Y 3/21/2024 Y 10/10/2024 Y 10/10/2024 Y 10/10/2024 Y 3/28/2024 Y 3/26/2024 Y 3/21/2024 Y 3/21/2024 Y 3/21/2024 Y 10/10/2024 Y 5/15/2024 Y 10/10/2024 Y 10/10/2024 Y 10/10/2024 Y 10/10/2024 Y 3/26/2024 Y 3/26/2024 Y 10/10/2024 Y 3/26/2024 Y 10/10/2024 Y 10/10/2024 Y 10/10/2024 Y 10/10/2024 Y 10/10/2024 Y 10/10/2024 Y 10/10/2024 Y 3/26/2024 Y 3/26/2024 Y 7/10/2024 Y 7/10/2024 Y 3/26/2024 Y 3/26/2024 Y 3/11/2024 Y 7/10/2024 Y 3/26/2024 Y 3/26/2024 Y 7/10/2024 Y 7/10/2024 Y 7/10/2024 Y 8/21/2024 Y 7/17/2024 Y 7/17/2024 Y 7/31/2024 Y 8/21/2024 Y 8/21/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 9/4/2024 Y 9/4/2024 Y 7/31/2024 Y 8/7/2024 Y 9/25/2024 Y 8/21/2024 Y 8/21/2024 Y 8/21/2024 Y 8/21/2024 Y 8/21/2024 Y 9/24/2024 Y 9/24/2024 Y 9/23/2024 Y 9/24/2024 Y 9/24/2024 Y 9/23/2024 Y 9/24/2024 Y 9/11/2024 Y 9/11/2024 Y 9/4/2024 Y 10/10/2024 Y 10/10/2024 Y 9/4/2024 Y 10/10/2024 Y 9/4/2024 Y 9/4/2024 Y 9/4/2024 Y 9/4/2024 Y 9/23/2024 Y 9/23/2024 Y 9/4/2024 Y 9/4/2024 Y 9/4/2024 Y 9/11/2024 Y 9/24/2024 Y 9/4/2024 Y 9/4/2024 Y 9/23/2024 Y 9/4/2024 Y 9/23/2024 Y 9/11/2024 Y 9/11/2024 Y 9/11/2024 Y 9/11/2024 Y 10/16/2024 Y 9/18/2024 Y 9/23/2024 Y 9/18/2024 Y 9/18/2024 Y 9/25/2024 Y 9/25/2024 Y 9/25/2024 Y 9/25/2024 Y 10/9/2024 Y 10/9/2024 Y 10/9/2024 Y 9/25/2024 Y 9/25/2024 Y 10/2/2024 Y 10/9/2024 Y 10/10/2024 Y 10/9/2024 Y 10/9/2024 Y 10/22/2024 Y 10/22/2024 Conversation # # of poles Applicant Category <300, 300-3,000 or >3,000 Engineering Start Date (application fee received date) Power Field Survey Complete Date Telco Field Survey Complete Date 1647876 1647901 1647949 1647953 1647976 1647978 1648035 1648555 1648675 1648704 1648706 1648793 1648815 1649130 1649240 1649331 1649377 1649667 1649684 1649703 1649768 1650217 1650257 1650260 1650325 1650379 1650707 1650708 1650716 1650727 1650755 1650756 1650758 1650762 1650853 1650920 1650940 1650956 1651182 1651188 1651227 1651291 1651623 1651632 1651769 1652050 1652595 1652930 1653273 1653315 1653318 1653320 1653321 1653322 1653431 1653475 1653491 1653709 1654175 1654214 1654754 1654848 1654885 1654909 1655446 1655515 1655642 1655732 1655805 1655918 1655954 1656573 1656625 1656634 1657013 1657165 1657216 1657246 1657266 1657274 1657303 1657352 1657399 1657482 1715074 1717249 1719365 1719498 1720960 1722058 1722962 1722977 1723787 1726017 1726018 1726540 1726554 1727238 1729194 1729219 1729979 1730033 1730482 1731449 1731454 1731464 1731877 1731878 1731879 1731880 1731894 1733480 1733730 1733828 1733877 1733882 1734139 1734148 1734643 1734716 1734929 1734936 1734938 1734984 1735137 1735171 1735336 1735441 1735469 1735486 1735550 1735935 1737715 1738515 1739443 1739852 1739920 1739959 1740689 1740708 1741169 1741170 1744055 1744283 1744292 1744337 1745053 1745071 1745114 1746273 1746316 1747765 1747811 1748454 1748677 1749350 1749369 1749784 76 77 32 76 183 9 197 76 77 129 40 76 76 75 1 75 77 77 80 75 83 75 81 73 75 202 80 199 75 78 78 1 197 76 194 77 33 17 80 78 76 81 75 78 125 81 200 199 192 79 1 70 1 78 200 91 197 197 56 202 80 97 204 76 209 196 34 200 197 199 31 86 77 189 196 79 75 2 199 84 82 170 194 186 1 4 7 1 1 1 17 1 4 1 1 8 1 1 26 15 67 22 8 76 77 76 77 3 70 4 1 1 2 149 180 1 174 36 1 26 21 2 1 1 1 1 18 1 18 1 1 1 1 64 9 2 200 31 1 1 196 4 2 1 1 1 2 8 11 85 54 1 2 3 9 2 1 2 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 <300 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 >3000 300-3000 >3000 >3000 >3000 >3000 300-3000 >3000 300-3000 >3000 <300 <300 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 300-3000 >3000 >3000 <300 300-3000 >3000 >3000 300-3000 300-3000 300-3000 >3000 300-3000 <300 <300 >3000 >3000 300-3000 <300 <300 300-3000 300-3000 <300 <300 <300 <300 <300 <300 <300 <300 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 <300 <300 <300 >3000 >3000 <300 >3000 <300 <300 <300 <300 300-3000 300-3000 <300 <300 <300 <300 300-3000 <300 <300 300-3000 <300 300-3000 <300 <300 <300 <300 <300 <300 300-3000 300-3000 300-3000 <300 <300 <300 300-3000 300-3000 300-3000 300-3000 <300 <300 <300 300-3000 >3000 <300 300-3000 300-3000 300-3000 3/7/2024 3/7/2024 2/22/2024 3/7/2024 2/22/2024 2/22/2024 2/22/2024 3/7/2024 3/21/2024 2/22/2024 2/22/2024 3/28/2024 3/7/2024 4/11/2024 5/15/2024 3/28/2024 3/28/2024 3/28/2024 3/28/2024 3/28/2024 3/28/2024 3/28/2024 3/28/2024 3/21/2024 3/28/2024 9/18/2024 3/28/2024 9/18/2024 3/28/2024 3/28/2024 3/21/2024 3/28/2024 9/18/2024 3/28/2024 9/18/2024 3/28/2024 2/27/2024 2/27/2024 3/28/2024 3/28/2024 3/28/2024 3/28/2024 3/28/2024 3/28/2024 9/18/2024 3/21/2024 10/10/2024 10/10/2024 10/10/2024 3/28/2024 3/26/2024 3/21/2024 3/21/2024 3/21/2024 10/10/2024 5/15/2024 10/10/2024 10/10/2024 10/10/2024 10/10/2024 3/26/2024 3/26/2024 10/10/2024 3/26/2024 10/10/2024 10/10/2024 10/10/2024 10/10/2024 10/10/2024 10/10/2024 10/10/2024 3/26/2024 3/26/2024 7/10/2024 7/10/2024 3/26/2024 3/26/2024 3/11/2024 7/10/2024 3/26/2024 3/26/2024 7/10/2024 7/10/2024 7/10/2024 8/21/2024 7/17/2024 7/17/2024 7/31/2024 8/21/2024 8/21/2024 7/31/2024 7/31/2024 7/31/2024 9/4/2024 9/4/2024 7/31/2024 8/7/2024 9/25/2024 8/21/2024 8/21/2024 8/21/2024 8/21/2024 8/21/2024 9/24/2024 9/24/2024 9/23/2024 9/24/2024 9/24/2024 9/23/2024 9/24/2024 9/11/2024 9/11/2024 9/4/2024 10/10/2024 10/10/2024 9/4/2024 10/10/2024 9/4/2024 9/4/2024 9/4/2024 9/4/2024 9/23/2024 9/23/2024 9/4/2024 9/4/2024 9/4/2024 9/11/2024 9/24/2024 9/4/2024 9/4/2024 9/23/2024 9/4/2024 9/23/2024 9/11/2024 9/11/2024 9/11/2024 9/11/2024 10/16/2024 9/18/2024 9/23/2024 9/18/2024 9/18/2024 9/25/2024 9/25/2024 9/25/2024 9/25/2024 10/9/2024 10/9/2024 10/9/2024 9/25/2024 9/25/2024 10/2/2024 10/9/2024 10/10/2024 10/9/2024 10/9/2024 10/22/2024 10/22/2024 9/13/2024 9/13/2024 4/25/2024 9/17/2024 5/15/2024 5/15/2024 5/15/2024 9/19/2024 12/3/2024 8/8/2024 9/12/2024 6/11/2024 9/19/2024 9/20/2024 6/4/2024 12/12/2024 7/19/2024 6/13/2024 6/21/2024 7/1/2024 9/30/2024 10/8/2024 7/12/2024 10/24/2024 10/22/2024 10/10/2024 10/29/2024 12/10/2024 9/24/2024 10/15/2024 10/2/2024 6/12/2024 12/10/2024 9/18/2024 10/10/2024 10/29/2024 3/14/2024 3/14/2024 12/3/2024 10/29/2024 5/23/2024 5/23/2024 3/18/2024 5/23/2024 3/18/2024 3/18/2024 3/18/2024 5/23/2024 7/1/2024 3/18/2024 3/18/2024 7/1/2024 5/23/2024 7/1/2024 8/1/2024 8/1/2024 5/23/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 10/29/2024 10/29/2024 8/1/2024 7/1/2024 Date Power Requested Concurrence 6/26/2024 8/26/2024 11/12/2024 8/22/2024 12/2/2024 11/20/2024 9/13/2024 11/4/2024 11/15/2024 12/10/2024 12/12/2024 1/7/2025 12/5/2024 5/23/2024 7/1/2024 7/1/2024 7/1/2024 5/23/2024 1/9/2025 11/8/2024 11/12/2024 1/15/2025 1/14/2024 3/5/2024 3/5/2024 3/5/2024 3/14/2024 12/31/2024 5/28/2024 3/19/2024 3/26/2024 6/20/2024 1/6/2025 8/5/2024 6/27/2024 6/24/2024 7/9/2024 6/24/2024 7/11/2024 9/4/2024 7/22/2024 6/24/2024 10/22/2024 6/10/2024 10/22/2024 6/24/2024 6/27/2024 7/8/2024 7/22/2024 10/21/2024 Date Concurrence Agreed # of days for Engineering Phase Upon and Application Review on Merits Did Engineering Phase meet mandated timeframes (Y/N) Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) # of days for Power Design/MR Development 7/1/2024 130 NO 8/7/2024 37 9/23/2024 214 NO 10/9/2024 16 10/21/2024 242 NO 10/30/2024 9 12/3/2024 12/22/2024 9/19/2024 11/4/2024 257 304 210 221 NO NO NO NO 10/2/2024 12/19/2024 13 45 11/20/2024 237 NO 12/18/2024 28 12/31/2024 278 NO 11/19/2024 236 NO 11/19/2024 236 NO 7/15/2024 7/8/2024 139 132 NO NO 8/6/2024 8/6/2024 12/16/2024 11/13/2024 263 232 NO NO 12/31/2024 9/9/2024 172 NO 9/10/2024 11/18/2024 11/21/2024 237 240 NO NO 12/10/2024 259 NO 12/30/2024 12/19/2024 1/14/2025 11/22/2024 11/14/2024 12/11/2024 1/31/2025 279 268 188 135 233 260 326 NO NO NO NO NO NO NO 1/14/2025 10/22/2024 12/10/2024 11/21/2024 1/14/2025 294 210 153 134 188 NO NO NO NO NO 10/31/2024 12/10/2024 106 146 NO NO 12/4/2024 126 NO 12/10/2024 # of days for Telco Design/MR Development 21 7/1/2024 12/4/2024 5/23/2024 11/21/2024 11/21/2024 5/23/2024 5/23/2024 8/1/2024 7/1/2024 7/1/2024 5/23/2024 10/21/2024 6/11/2024 4/16/2024 4/16/2024 10/31/2024 7/1/2024 12/30/2024 7/2/2024 6/12/2024 7/15/2024 6/12/2024 10/31/2024 5/23/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 8/19/2024 8/1/2024 9/9/2024 8/30/2024 7/1/2024 7/1/2024 10/14/2024 10/11/2024 8/27/2024 7/1/2024 12/5/2024 8/27/2024 12/3/2024 9/19/2024 10/24/2024 9/20/2024 9/26/2024 3/19/2024 8/28/2024 10/9/2024 9/17/2024 8/28/2024 8/21/2024 8/8/2024 9/24/2024 9/19/2024 8/30/2024 11/20/2024 9/25/2024 9/24/2024 9/19/2024 11/15/2024 8/29/2024 10/1/2024 10/1/2024 8/29/2024 11/20/2024 10/15/2024 9/27/2024 9/20/2024 9/25/2024 9/17/2024 9/17/2024 11/13/2024 11/18/2024 12/2/2024 11/25/2024 7/1/2024 7/1/2024 8/1/2024 8/1/2024 7/1/2024 7/1/2024 7/1/2024 8/1/2024 7/1/2024 7/1/2024 8/1/2024 8/1/2024 12/24/2024 12/11/2024 11/27/2024 11/18/2024 10/29/2024 12/9/2024 1/23/2025 8/1/2024 11/21/2024 10/23/2024 12/9/2024 12/5/2024 11/12/2024 1/7/2024 9/9/2024 1/10/2025 10/22/2024 11/19/2024 10/25/2024 11/20/2024 6/10/2024 5/30/2024 6/12/2024 7/17/2024 6/20/2024 7/1/2024 10/21/2024 6/4/2024 11/12/2024 11/12/2024 11/12/2024 6/4/2024 5/28/2024 5/30/2024 5/28/2024 7/17/2024 11/13/2024 6/27/2024 11/13/2024 11/13/2024 10/22/2024 11/13/2024 6/27/2024 6/27/2024 11/12/2024 6/3/2024 10/29/2024 11/13/2024 10/22/2024 11/13/2024 11/13/2024 11/13/2024 10/22/2024 6/27/2024 7/1/2024 7/30/2024 8/1/2024 6/27/2024 6/27/2024 1/31/2025 7/30/2024 6/27/2024 7/2/2024 8/1/2024 8/1/2024 Canceled 8/1/2024 22 29 12/4/2024 48 21 1 12/23/2024 35 12/25/2024 12/10/2024 33 26 11/4/2024 13 12/13/2024 22 11/20/2024 12/17/2024 20 7 1/8/2025 1/9/2025 12/31/2024 10/31/2024 Canceled 1/8/2025 12/31/2024 27 12/30/2024 26 12/5/2024 12/5/2024 12/5/2024 12/9/2024 11/19/2024 11/18/2024 11/18/2024 12/9/2024 10/1/2024 10/4/2024 9/19/2024 Date Telco Requested Concurrence 12/31/2024 12/4/2024 10/23/2024 12/5/2024 1/8/2025 12/5/2024 12/11/2024 77 NO 12/4/2024 11/19/2024 11/18/2024 11/19/2024 12/9/2024 12/5/2024 1/2/2025 1/8/2025 12/12/2024 1/16/2025 12/12/2024 12/16/2024 117 NO 12/4/2024 105 NO 12/4/2024 9/19/2024 11/13/2024 11/13/2024 12/11/2024 10/25/2024 91 51 NO NO 12/27/2024 12/4/2024 12/31/2024 16 40 20 12/11/2024 12/31/2024 1 20 9/4/2024 11/21/2024 Canceled 11/13/2024 9/19/2024 Canceled Canceled Canceled Canceled 12/31/2024 1/7/2025 12/11/2024 Canceled 1/2/2025 12/11/2024 Canceled 1/7/2025 12/11/2024 Canceled 106 79 Canceled NO NO Canceled 12/26/2024 12/3/2024 1/14/2025 12/3/2024 12/10/2024 97 NO 9/19/2024 9/25/2024 10/1/2024 9/24/2024 11/13/2024 10/1/2024 10/1/2024 9/26/2024 12/1/2024 9/25/2024 9/26/2024 12/1/2024 10/1/2024 12/11/2024 9/19/2024 9/24/2024 9/26/2024 10/4/2024 10/22/2024 10/15/2024 12/13/2024 10/10/2024 9/26/2024 10/15/2024 12/17/2024 11/7/2024 11/12/2024 12/11/2024 9/25/2024 1/6/2025 117 NO 11/11/2024 12/10/2024 10/21/2024 10/21/2024 11/22/2024 65 NO 12/26/2024 12/4/2024 12/13/2024 10/16/2024 10/17/2024 12/18/2024 12/13/2024 12/9/2024 10/18/2024 10/30/2024 10/30/2024 12/23/2024 10/22/2024 11/13/2024 11/13/2024 11/13/2024 12/4/2024 12 12/23/2024 12/23/2024 12/23/2024 11/13/2024 12/23/2024 82 NO 12/23/2024 1 12/8/2024 12/8/2024 12/9/2024 61 NO 12/23/2024 14Page 20 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 20 of 25 Connecticut Light and Power dba Eversource Energy Docket No. 19-01-52RE01 Feburary 15, 2023 Compliance Order No. 5, Attachment Page 3 of 4 Proposed Attacher (Company Name) NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC TELEPORT COMMUNICATIONS AMERICA, LLC FIBERTECH NETWORKS INC NETSPEED LLC NETSPEED LLC COMCAST - CT COX COMMUNICATIONS NETSPEED LLC FIBERTECH NETWORKS INC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT FIBERTECH NETWORKS INC COX COMMUNICATIONS COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COX COMMUNICATIONS COX COMMUNICATIONS NETSPEED LLC NETSPEED LLC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC COX COMMUNICATIONS NETSPEED LLC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC FIBERTECH NETWORKS INC COX COMMUNICATIONS NETSPEED LLC COX COMMUNICATIONS COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC FIBERTECH NETWORKS INC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COX COMMUNICATIONS COMCAST - CT COMCAST - CT FIBERTECH NETWORKS INC LEVEL 3 COMMUNICATIONS LEVEL 3 COMMUNICATIONS LEVEL 3 COMMUNICATIONS LEVEL 3 COMMUNICATIONS LEVEL 3 COMMUNICATIONS Date Proposed Attacher Sent Application SPA Acknowledgement (Date) 9/26/2024 9/26/2024 9/26/2024 9/26/2024 9/26/2024 9/26/2024 9/27/2024 10/1/2024 10/2/2024 10/3/2024 10/4/2024 10/4/2024 10/9/2024 10/8/2024 10/8/2024 10/8/2024 10/8/2024 10/10/2024 10/10/2024 10/15/2024 10/10/2024 10/11/2024 10/14/2024 10/18/2024 10/18/2024 10/24/2024 10/28/2024 10/28/2024 10/30/2024 10/30/2024 11/4/2024 11/4/2024 11/4/2024 11/4/2024 11/8/2024 11/11/2024 11/11/2024 11/12/2024 11/13/2024 11/15/2024 11/15/2024 11/15/2024 11/21/2024 11/22/2024 12/12/2024 2/27/2024 2/28/2024 2/28/2024 2/27/2024 2/29/2024 2/29/2024 2/29/2024 3/1/2024 3/1/2024 3/1/2024 3/1/2024 3/1/2024 3/14/2024 3/14/2024 3/14/2024 3/14/2024 3/14/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/8/2024 3/13/2024 3/13/2024 3/13/2024 3/12/2024 3/12/2024 3/12/2024 3/13/2024 3/13/2024 3/13/2024 3/13/2024 3/13/2024 3/13/2024 3/13/2024 3/13/2024 3/13/2024 3/13/2024 3/13/2024 3/18/2024 3/13/2024 3/13/2024 3/18/2024 3/18/2024 3/18/2024 3/18/2024 3/18/2024 3/20/2024 3/20/2024 3/20/2024 3/15/2024 3/18/2024 3/18/2024 3/19/2024 3/20/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/26/2024 4/2/2024 4/2/2024 4/2/2024 4/2/2024 4/2/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/8/2024 4/8/2024 4/8/2024 4/8/2024 4/8/2024 4/4/2024 4/5/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/19/2024 4/19/2024 4/19/2024 4/19/2024 4/19/2024 4/11/2024 4/19/2024 4/23/2024 4/12/2024 4/12/2024 4/12/2024 4/29/2024 4/12/2024 4/29/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 10/2/2024 10/3/2024 10/3/2024 10/4/2024 10/7/2024 10/10/2024 10/10/2024 10/10/2024 10/10/2024 10/10/2024 10/11/2024 10/11/2024 10/16/2024 10/11/2024 10/15/2024 10/15/2024 10/18/2024 10/18/2024 10/24/2024 10/28/2024 10/28/2024 10/31/2024 10/31/2024 11/4/2024 11/4/2024 11/4/2024 11/4/2024 11/12/2024 11/12/2024 11/12/2024 11/13/2024 11/13/2024 11/18/2024 11/18/2024 11/18/2024 11/21/2024 11/22/2024 12/12/2024 2/28/2024 2/28/2024 2/28/2024 2/28/2024 2/29/2024 2/29/2024 2/29/2024 3/4/2024 3/4/2024 3/4/2024 3/4/2024 3/4/2024 3/15/2024 3/15/2024 3/15/2024 3/15/2024 3/15/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/8/2024 3/13/2024 3/13/2024 3/15/2024 3/12/2024 3/12/2024 3/13/2024 3/15/2024 3/15/2024 3/13/2024 3/13/2024 3/13/2024 3/14/2024 3/14/2024 3/14/2024 3/14/2024 3/15/2024 3/15/2024 3/18/2024 3/15/2024 3/15/2024 3/18/2024 3/18/2024 3/18/2024 3/18/2024 3/18/2024 3/20/2024 3/20/2024 3/20/2024 3/18/2024 3/18/2024 3/18/2024 3/19/2024 3/20/2024 3/27/2024 3/27/2024 3/27/2024 3/27/2024 3/27/2024 3/27/2024 3/27/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/21/2024 3/27/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/8/2024 4/8/2024 4/8/2024 4/8/2024 4/8/2024 4/5/2024 4/5/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/11/2024 4/22/2024 4/24/2024 4/12/2024 4/15/2024 4/15/2024 4/29/2024 4/15/2024 4/29/2024 Submission Complete Y or N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y If Submission Not Complete Date Attacher Notified by SPA Date Attacher Resubmits Date SPA Acknowledges Submission for Completeness Time Taken To Review by SPA # of Days Allowed for Completeness Review Did SPA Meet Compliance for Completeness Review Y/N 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y (Invoice is generated) 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 9/27/2024 10/2/2024 10/3/2024 10/3/2024 10/4/2024 10/7/2024 10/10/2024 10/10/2024 10/10/2024 10/10/2024 10/10/2024 10/11/2024 10/11/2024 10/16/2024 10/11/2024 10/15/2024 10/15/2024 10/18/2024 10/18/2024 10/24/2024 10/28/2024 10/28/2024 10/31/2024 10/31/2024 11/4/2024 11/4/2024 11/4/2024 11/4/2024 11/12/2024 11/12/2024 11/12/2024 11/13/2024 11/13/2024 11/18/2024 11/18/2024 11/18/2024 11/21/2024 11/25/2024 12/12/2024 2/28/2024 2/28/2024 2/28/2024 2/28/2024 2/29/2024 2/29/2024 2/29/2024 3/4/2024 3/4/2024 3/4/2024 3/4/2024 3/4/2024 3/15/2024 3/15/2024 3/15/2024 3/15/2024 3/15/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/12/2024 3/8/2024 3/13/2024 3/13/2024 3/15/2024 3/12/2024 3/12/2024 3/13/2024 3/15/2024 3/15/2024 3/13/2024 3/13/2024 3/13/2024 3/14/2024 3/14/2024 3/14/2024 3/14/2024 3/15/2024 3/15/2024 3/18/2024 3/15/2024 3/15/2024 3/18/2024 3/18/2024 3/18/2024 3/18/2024 3/18/2024 3/20/2024 3/20/2024 3/20/2024 3/18/2024 3/18/2024 3/18/2024 3/19/2024 3/20/2024 3/27/2024 3/27/2024 3/27/2024 3/27/2024 3/27/2024 3/27/2024 3/27/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/20/2024 3/21/2024 3/27/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/5/2024 4/8/2024 4/8/2024 4/8/2024 4/8/2024 4/8/2024 4/5/2024 4/5/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/22/2024 4/11/2024 4/22/2024 4/24/2024 4/12/2024 4/15/2024 4/15/2024 4/29/2024 4/15/2024 4/29/2024 Application Fee Received Y Application Fee Received or N (Within Reporting Date Timeframe) Y 10/9/2024 Y 11/6/2024 Y 11/6/2024 Y 10/22/2024 Y 10/9/2024 Y 10/9/2024 Y 10/2/2024 Y 10/16/2024 Y 10/16/2024 Y 10/22/2024 Y 10/9/2024 Y 10/16/2024 Y 10/22/2024 Y 10/30/2024 Y 11/6/2024 Y 11/6/2024 Y 10/30/2024 Y 10/30/2024 Y 10/30/2024 Y 10/30/2024 Y 10/30/2024 Y 10/30/2024 Y 10/30/2024 Y 10/30/2024 Y 10/30/2024 Y 11/20/2024 Y 11/20/2024 Y 11/20/2024 Y 11/20/2024 Y 11/20/2024 Y 11/13/2024 Y 11/13/2024 Y 11/13/2024 Y 11/13/2024 Y 11/21/2024 Y 12/4/2024 Y 12/4/2024 Y 12/4/2024 Y 11/21/2024 Y 12/4/2024 Y 12/4/2024 Y 12/4/2024 Y 11/26/2024 Y 12/12/2024 Y 12/17/2024 Y 3/26/2024 Y 3/26/2024 Y 3/26/2024 Y 3/26/2024 Y 3/26/2024 Y 3/26/2024 Y 3/26/2024 Y 3/26/2024 Y 3/26/2024 Y 3/28/2024 Y 3/26/2024 Y 3/26/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 3/20/2024 Y 4/11/2024 Y 4/11/2024 Y 4/11/2024 Y 4/29/2024 Y 4/29/2024 Y 4/29/2024 Y 6/4/2024 Y 6/4/2024 Y 4/11/2024 Y 4/11/2024 Y 4/11/2024 Y 4/11/2024 Y 4/11/2024 Y 4/11/2024 Y 4/11/2024 Y 5/29/2024 Y 4/11/2024 Y 5/29/2024 Y 5/29/2024 Y 6/4/2024 Y 5/29/2024 Y 5/29/2024 Y 5/29/2024 Y 5/29/2024 Y 5/29/2024 Y 5/29/2024 Y 5/29/2024 Y 9/4/2024 Y 3/28/2024 Y 5/29/2024 Y 5/29/2024 Y 3/28/2024 Y 9/4/2024 Y 5/15/2024 Y 5/15/2024 Y 5/15/2024 Y 5/15/2024 Y 5/15/2024 Y 5/8/2024 Y 5/15/2024 Y 5/29/2024 Y 9/4/2024 Y 9/4/2024 Y 5/29/2024 Y 5/29/2024 Y 4/11/2024 Y 3/28/2024 Y 4/1/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/19/2024 Y 6/19/2024 Y 9/24/2024 Y 6/19/2024 Y 6/19/2024 Y 6/19/2024 Y 6/19/2024 Y 6/19/2024 Y 10/9/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/19/2024 Y 4/11/2024 Y 4/11/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 4/16/2024 Y 6/26/2024 Y 6/26/2024 Y 4/17/2024 Y 8/7/2024 Y 8/7/2024 Y 8/7/2024 Y 8/7/2024 Y 8/7/2024 Conversation # # of poles Applicant Category <300, 300-3,000 or >3,000 Engineering Start Date (application fee received date) 1749790 1749791 1749792 1749801 1749825 1749899 1750270 1750982 1752586 1752958 1753244 1753338 1753813 1754228 1754253 1754254 1754269 1755736 1755741 1755756 1755785 1756164 1756557 1758200 1758217 1760295 1761389 1761452 1762297 1762343 1764940 1764980 1764988 1765023 1766758 1766982 1766998 1767269 1767437 1770198 1770241 1770257 1772320 1773787 1780670 1657691 1657719 1657727 1657871 1658145 1658488 1658753 1658772 1658808 1659255 1659305 1659308 1659601 1659772 1660393 1661220 1661223 1661353 1661412 1661460 1661718 1662482 1662483 1662485 1662493 1663055 1663430 1663570 1663640 1663645 1663647 1663675 1663694 1663927 1663928 1663929 1663930 1663931 1663932 1663933 1663973 1664040 1664084 1664142 1664143 1664350 1664361 1664369 1664407 1664567 1664848 1664878 1664949 1664957 1665331 1665332 1665360 1665397 1665437 1665611 1665625 1665874 1665876 1665896 1666025 1666028 1666448 1666449 1666481 1666482 1666558 1666598 1669389 1670979 1670994 1671007 1671095 1671128 1671736 1671763 1671784 1671874 1671945 1672320 1672344 1672394 1672430 1672470 1672797 1672835 1672879 1673131 1674645 1674989 1675302 1675669 1675682 1675694 1675706 1675729 1676073 1676082 1676087 1676174 1676188 1676238 1676517 1676524 1676705 1676717 1676739 1676740 1676745 1 1 2 3 3 27 1 15 4 1 2 2 2 7 1 4 6 1 1 2 2 1 1 1 1 5 1 2 2 1 11 1 1 1 2 2 17 3 2 5 1 1 3 6 6 78 77 76 73 76 75 74 81 77 75 68 90 82 77 71 76 81 76 77 77 77 78 80 76 1 75 76 75 75 75 73 74 76 66 6 3 68 8 77 1 75 4 80 76 1 76 79 81 82 78 77 77 85 1 76 3 3 84 72 79 50 83 54 80 66 88 76 2 56 5 1 13 1 74 77 75 78 77 78 77 79 78 78 76 77 75 65 81 79 79 3 17 77 76 76 77 80 75 76 75 76 80 77 80 2 68 44 92 26 43 116 8 40 300-3000 <300 <300 300-3000 300-3000 <300 <300 >3000 >3000 300-3000 <300 >3000 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 >3000 >3000 >3000 >3000 300-3000 300-3000 300-3000 300-3000 300-3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 >3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 <300 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 >3000 300-3000 <300 >3000 >3000 >3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 >3000 >3000 >3000 >3000 300-3000 300-3000 300-3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 <300 >3000 >3000 <300 300-3000 300-3000 300-3000 300-3000 300-3000 10/9/2024 11/6/2024 11/6/2024 10/22/2024 10/9/2024 10/9/2024 10/2/2024 10/16/2024 10/16/2024 10/22/2024 10/9/2024 10/16/2024 10/22/2024 10/30/2024 11/6/2024 11/6/2024 10/30/2024 10/30/2024 10/30/2024 10/30/2024 10/30/2024 10/30/2024 10/30/2024 10/30/2024 10/30/2024 11/20/2024 11/20/2024 11/20/2024 11/20/2024 11/20/2024 11/13/2024 11/13/2024 11/13/2024 11/13/2024 11/21/2024 12/4/2024 12/4/2024 12/4/2024 11/21/2024 12/4/2024 12/4/2024 12/4/2024 11/26/2024 12/12/2024 12/17/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/26/2024 3/28/2024 3/26/2024 3/26/2024 4/29/2024 4/29/2024 4/29/2024 4/29/2024 4/29/2024 4/29/2024 4/29/2024 4/29/2024 4/29/2024 4/29/2024 4/29/2024 4/29/2024 3/20/2024 4/11/2024 4/11/2024 4/11/2024 4/29/2024 4/29/2024 4/29/2024 6/4/2024 6/4/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 4/11/2024 5/29/2024 4/11/2024 5/29/2024 5/29/2024 6/4/2024 5/29/2024 5/29/2024 5/29/2024 5/29/2024 5/29/2024 5/29/2024 5/29/2024 9/4/2024 3/28/2024 5/29/2024 5/29/2024 3/28/2024 9/4/2024 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/8/2024 5/15/2024 5/29/2024 9/4/2024 9/4/2024 5/29/2024 5/29/2024 4/11/2024 3/28/2024 4/1/2024 6/26/2024 6/26/2024 6/26/2024 6/19/2024 6/19/2024 9/24/2024 6/19/2024 6/19/2024 6/19/2024 6/19/2024 6/19/2024 10/9/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/19/2024 4/11/2024 4/11/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 4/16/2024 6/26/2024 6/26/2024 4/17/2024 8/7/2024 8/7/2024 8/7/2024 8/7/2024 8/7/2024 Power Field Survey Complete Date Telco Field Survey Complete Date 11/18/2024 11/18/2024 10/30/2024 10/15/2024 10/16/2024 11/7/2024 11/7/2024 10/30/2024 10/15/2024 11/7/2024 10/30/2024 11/15/2024 11/29/2024 11/29/2024 11/15/2024 11/29/2024 11/15/2024 11/29/2024 11/15/2024 11/18/2024 11/15/2024 11/15/2024 11/15/2024 12/3/2024 12/3/2024 12/3/2024 12/3/2024 12/3/2024 12/24/2024 12/3/2024 12/3/2024 Date Power Requested Concurrence Date Telco Requested Concurrence Date Concurrence Agreed # of days for Engineering Phase Upon and Application Review on Merits Did Engineering Phase meet mandated timeframes (Y/N) Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) 12/17/2024 Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) # of days for Power Design/MR Development 12/16/2024 12/16/2024 11/12/2024 12/16/2024 55 NO 12/5/2024 12/4/2024 11/13/2024 11/21/2024 12/16/2024 1/16/2025 61 92 NO NO 12/5/2024 12/5/2024 12/12/2024 11/13/2024 12/17/2024 1/8/2025 69 84 NO NO Canceled Canceled Canceled Canceled Canceled Canceled Canceled Canceled Canceled Canceled 1/24/2025 Canceled Canceled 1/24/2025 1/24/2025 Canceled Canceled Canceled Canceled Canceled Canceled Canceled Canceled 1/2/2025 8/19/2024 146 NO 9/16/2024 28 9/26/2024 11/20/2024 1/14/2025 150 205 260 NO NO NO 11/5/2024 12/31/2024 40 41 11/20/2024 11/26/2024 205 211 NO NO 1/8/2025 254 NO 1/6/2025 252 NO 12/10/2024 225 NO # of days for Telco Design/MR Development 1 12/31/2024 14 12/17/2024 12/17/2024 12/17/2024 1/24/2025 12/18/2024 12/17/2024 12/17/2024 12/17/2024 1/16/2025 1/16/2025 1/24/2025 12/30/2024 12/30/2024 12/30/2024 9/25/2024 5/6/2024 6/10/2024 6/10/2024 8/2/2024 8/2/2024 12/3/2024 7/8/2024 7/19/2024 7/19/2024 8/2/2024 9/30/2024 7/19/2024 6/10/2024 6/10/2024 6/10/2024 7/19/2024 7/19/2024 8/19/2024 6/3/2024 9/26/2024 9/20/2024 9/27/2024 7/19/2024 12/3/2024 7/19/2024 10/17/2024 10/25/2024 9/27/2024 7/7/2024 8/30/2024 9/27/2024 8/30/2024 9/25/2024 7/7/2024 10/2/2024 9/10/2024 10/4/2024 10/7/2024 7/7/2024 10/7/2024 10/9/2024 10/9/2024 10/10/2024 10/10/2024 10/9/2024 10/18/2024 9/30/2024 6/3/2024 10/3/2024 7/7/2024 6/3/2024 10/1/2024 8/15/2024 8/14/2024 8/12/2024 8/12/2024 7/19/2024 8/2/2024 8/19/2024 10/11/2024 9/26/2024 9/25/2024 10/15/2024 7/16/2024 7/23/2024 6/3/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 5/23/2024 8/1/2024 8/1/2024 7/1/2024 7/1/2024 8/1/2024 7/1/2024 7/1/2024 8/1/2024 7/1/2024 8/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 8/8/2024 8/8/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 7/1/2024 8/1/2024 5/23/2024 1/20/2025 11/19/2024 7/11/2024 6/3/2024 5/30/2024 5/30/2024 6/3/2024 6/12/2024 7/1/2024 5/30/2024 6/24/2024 6/24/2024 6/27/2024 7/16/2024 6/12/2024 7/16/2024 7/1/2024 7/9/2024 7/11/2024 7/11/2024 7/16/2024 7/8/2024 7/22/2024 7/2/2024 7/3/2024 7/30/2024 5/1/2024 12/9/2024 7/1/2024 7/30/2024 7/22/2024 8/14/2024 8/6/2024 11/14/2024 11/24/2024 10/28/2024 11/1/2024 8/29/2024 10/3/2024 12/19/2024 12/31/2024 12/9/2024 12/3/2024 12/9/2024 12/9/2024 12/3/2024 12/9/2024 12/9/2024 12/10/2024 12/9/2024 242 243 242 NO NO NO 12/30/2024 12/30/2024 12/30/2024 215 NO 12/28/2024 12/30/2024 12/28/2024 12/30/2024 12/30/2024 215 NO 12/26/2024 12/23/2024 12/26/2024 12/23/2024 12/30/2024 12/26/2024 215 211 NO NO 12/12/2024 12/23/2024 12/14/2024 12/19/2024 12/12/2024 12/23/2024 12/14/2024 12/19/2024 12/17/2024 12/23/2024 12/17/2024 12/26/2024 202 208 202 211 NO NO NO NO 11/19/2024 12/29/2024 4/11/2024 12/29/2024 12/30/2024 215 NO 11/19/2024 4/15/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 10/11/2024 12/11/2024 11/7/2024 12/16/2024 176 215 NO NO 10/29/2024 167 NO 8/8/2024 8/1/2024 10/7/2024 12/19/2024 7/12/2024 7/30/2024 7/3/2024 7/9/2024 7/3/2024 8/15/2024 8/26/2024 12/22/2024 10/29/2024 12/23/2024 167 208 NO NO 8/1/2024 8/1/2024 8/8/2024 8/8/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 4/10/2024 8/1/2024 4/10/2024 10/24/2024 12/9/2024 12/9/2024 12/31/2024 12/9/2024 1 12/10/2024 42 12/4/2024 36 12/9/2024 96 NO 12/9/2024 1 Canceled 12/9/2024 Canceled 242 Canceled NO 12/10/2024 1 Canceled Canceled Canceled 9/18/2024 8 8/1/2024 Canceled Canceled 12/9/2024 4/22/2024 Canceled 5/23/2024 5/23/2024 11/19/2024 9/5/2024 5/7/2024 5/14/2024 9/10/2024 152 NO 7/1/2024 5/16/2024 5/16/2024 6/26/2024 71 NO 8/26/2024 61 7/1/2024 5/22/2024 5/22/2024 7/3/2024 77 NO 10/11/2024 100 5/23/2024 4/10/2024 Canceled 12/9/2024 11/5/2024 11/18/2024 11/8/2024 11/5/2024 11/6/2024 10/24/2024 11/1/2024 10/31/2024 10/29/2024 10/16/2024 11/26/2024 11/21/2024 11/26/2024 10/30/2024 6/3/2024 6/3/2024 11/20/2024 11/19/2024 11/27/2024 12/4/2024 12/4/2024 11/21/2024 11/21/2024 11/18/2024 11/19/2024 11/20/2024 11/18/2024 11/18/2024 4/23/2024 11/18/2024 11/18/2024 4/24/2024 9/19/2024 9/27/2024 9/19/2024 9/19/2024 9/26/2024 22 1Page 21 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 21 of 25 Connecticut Light and Power dba Eversource Energy Docket No. 19-01-52RE01 Feburary 15, 2023 Compliance Order No. 5, Attachment Page 4 of 4 Proposed Attacher (Company Name) LEVEL 3 COMMUNICATIONS LEVEL 3 COMMUNICATIONS CHARTER COMMUNICATIONS NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT LEVEL 3 COMMUNICATIONS COMCAST - CT NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT NETSPEED LLC NETSPEED LLC NETSPEED LLC COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT TOWN OF SOUTH WINDSOR, CT MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT FIBERTECH NETWORKS INC COMCAST - CT COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS TELEPORT COMMUNICATIONS AMERICA, LLC CHARTER COMMUNICATIONS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS NEW CINGULAR WIRELESS PCS NEW CINGULAR WIRELESS PCS NEW CINGULAR WIRELESS PCS NEW CINGULAR WIRELESS PCS VERIZON WIRELESS NEW CINGULAR WIRELESS PCS NEW CINGULAR WIRELESS PCS NEW CINGULAR WIRELESS PCS NEW CINGULAR WIRELESS PCS NEW CINGULAR WIRELESS PCS NEW CINGULAR WIRELESS PCS VERIZON WIRELESS Date Proposed Attacher Sent Application SPA Acknowledgement (Date) 4/12/2024 4/12/2024 4/17/2024 4/18/2024 4/23/2024 4/23/2024 4/23/2024 4/29/2024 4/24/2024 4/29/2024 4/26/2024 4/29/2024 4/29/2024 4/29/2024 5/8/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/15/2024 5/15/2024 5/15/2024 5/8/2024 5/8/2024 5/8/2024 5/8/2024 5/8/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/15/2024 5/15/2024 5/9/2024 8/8/2023 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/14/2024 5/14/2024 5/15/2024 5/14/2024 5/16/2024 5/15/2024 5/15/2024 5/17/2024 5/17/2024 5/17/2024 5/17/2024 5/17/2024 5/23/2024 5/16/2024 5/17/2024 5/21/2024 5/17/2024 5/17/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/24/2024 5/24/2024 5/24/2024 5/24/2024 5/23/2024 5/24/2024 5/24/2024 5/24/2024 5/24/2024 5/24/2024 5/23/2024 5/23/2024 5/23/2024 5/24/2024 5/30/2024 5/30/2024 5/24/2024 5/24/2024 5/30/2024 5/30/2024 5/28/2024 5/30/2024 5/30/2024 5/29/2024 5/30/2024 5/30/2024 5/30/2024 6/5/2024 6/5/2024 6/5/2024 5/30/2024 5/30/2024 6/5/2024 6/5/2024 8/27/2024 6/5/2024 6/12/2024 6/3/2024 6/4/2024 8/27/2024 6/7/2024 6/12/2024 6/12/2024 6/11/2024 6/12/2024 6/12/2024 6/12/2024 6/12/2024 6/12/2024 6/14/2024 6/14/2024 6/14/2024 6/14/2024 6/14/2024 6/14/2024 6/14/2024 6/14/2024 6/24/2024 6/26/2024 6/28/2024 6/28/2024 6/28/2024 7/1/2024 12/20/2023 1/17/2024 2/7/2024 7/18/2024 7/24/2024 10/18/2024 10/18/2024 3/20/2024 4/10/2024 4/18/2024 4/18/2024 5/1/2024 5/1/2024 5/1/2024 5/31/2024 4/15/2024 4/15/2024 4/17/2024 4/22/2024 4/25/2024 4/25/2024 4/24/2024 4/30/2024 4/25/2024 4/30/2024 4/26/2024 4/30/2024 4/30/2024 4/30/2024 5/9/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/15/2024 5/15/2024 5/15/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/15/2024 5/15/2024 8/27/2024 8/8/2023 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/14/2024 5/15/2024 5/15/2024 5/15/2024 5/21/2024 5/15/2024 5/15/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/23/2024 8/27/2024 5/21/2024 5/23/2024 5/21/2024 5/21/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/28/2024 5/28/2024 5/28/2024 5/28/2024 5/23/2024 5/28/2024 5/28/2024 5/28/2024 5/28/2024 5/28/2024 5/23/2024 5/23/2024 5/23/2024 5/28/2024 5/31/2024 5/31/2024 5/28/2024 5/28/2024 5/31/2024 5/31/2024 5/28/2024 5/31/2024 5/31/2024 5/29/2024 5/31/2024 5/31/2024 6/3/2024 6/5/2024 6/5/2024 6/5/2024 6/4/2024 6/4/2024 6/5/2024 6/5/2024 8/27/2024 6/5/2024 6/17/2024 6/4/2024 6/5/2024 8/27/2024 6/10/2024 6/17/2024 6/17/2024 6/12/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/14/2024 6/17/2024 6/24/2024 6/27/2024 6/28/2024 6/28/2024 6/28/2024 7/2/2024 12/21/2023 1/17/2024 2/8/2024 7/18/2024 7/24/2024 10/21/2024 10/21/2024 3/22/2024 4/11/2024 4/22/2024 4/22/2024 5/1/2024 5/1/2024 5/1/2024 5/31/2024 Submission Complete Y or N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y Y Y Y If Submission Not Complete Date Attacher Notified by SPA 5/28/2024 5/28/2024 6/5/2024 7/22/2024 Date Attacher Resubmits 45457 45554 45456 45504 Date SPA Acknowledges Submission for Completeness Time Taken To Review by SPA # of Days Allowed for Completeness Review Did SPA Meet Compliance for Completeness Review Y/N 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 1 2 1 1 1 1 1 1 1 1 1 1 1 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 15 10 10 10 10 10 10 10 10 10 10 10 10 10 10 15 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 15 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 15 10 10 10 10 10 10 10 10 10 10 10 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y (Invoice is generated) 4/15/2024 4/15/2024 4/17/2024 4/22/2024 4/25/2024 4/25/2024 4/24/2024 4/30/2024 4/25/2024 4/30/2024 4/26/2024 4/30/2024 4/30/2024 4/30/2024 5/9/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/15/2024 5/15/2024 5/15/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/9/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/10/2024 5/15/2024 5/15/2024 8/27/2024 8/8/2023 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/15/2024 5/14/2024 5/15/2024 5/15/2024 5/15/2024 5/21/2024 5/15/2024 5/15/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/23/2024 8/27/2024 5/21/2024 5/23/2024 5/21/2024 5/21/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/23/2024 5/28/2024 5/28/2024 5/28/2024 5/28/2024 5/23/2024 6/14/2024 5/28/2024 5/28/2024 5/28/2024 5/28/2024 5/23/2024 5/23/2024 5/23/2024 5/28/2024 5/31/2024 5/31/2024 5/28/2024 5/28/2024 5/31/2024 5/31/2024 9/19/2024 5/31/2024 5/31/2024 5/29/2024 5/31/2024 5/31/2024 6/3/2024 6/5/2024 6/5/2024 6/5/2024 6/4/2024 6/4/2024 6/5/2024 6/5/2024 8/27/2024 6/5/2024 6/17/2024 6/4/2024 6/13/2024 8/27/2024 6/10/2024 6/17/2024 6/17/2024 6/12/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/17/2024 6/14/2024 6/17/2024 6/24/2024 6/27/2024 6/28/2024 6/28/2024 6/28/2024 7/2/2024 12/21/2023 1/17/2024 2/8/2024 7/31/2024 7/24/2024 10/21/2024 10/21/2024 3/22/2024 4/11/2024 4/22/2024 4/22/2024 5/1/2024 5/1/2024 5/1/2024 5/31/2024 Application Fee Received Y or N Application Fee Received Date (Within Reporting Timeframe) Y 8/7/2024 Y 10/30/2024 Y 5/1/2024 Y 4/29/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 6/26/2024 Y 5/1/2024 Y 6/26/2024 Y 5/8/2024 Y 6/26/2024 Y 6/26/2024 Y 5/8/2024 Y 6/19/2024 Y 7/31/2024 Y 6/19/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 6/19/2024 Y 6/19/2024 Y 6/19/2024 Y 6/19/2024 Y 10/30/2024 Y 6/19/2024 Y 6/19/2024 Y 7/31/2024 Y 6/19/2024 Y 7/31/2024 Y 7/31/2024 Y 6/19/2024 Y 7/31/2024 Y 6/19/2024 Y 7/31/2024 Y 7/31/2024 Y 9/23/2024 Y 1/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/30/2024 Y 7/30/2024 Y 7/31/2024 Y 7/31/2024 Y 6/5/2024 Y 8/7/2024 Y 7/31/2024 Y 6/4/2024 Y 6/5/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 9/23/2024 Y 9/23/2024 Y 7/30/2024 Y 7/30/2024 Y 7/30/2024 Y 6/26/2024 Y 8/1/2024 Y 7/30/2024 Y 7/30/2024 Y 8/1/2024 Y 7/30/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 6/19/2024 Y 8/1/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 6/5/2024 Y 6/5/2024 Y 6/5/2024 Y 7/31/2024 Y 7/30/2024 Y 7/30/2024 Y 7/31/2024 Y 7/31/2024 Y 7/31/2024 Y 7/30/2024 Y 10/9/2024 Y 7/30/2024 Y 7/30/2024 Y 6/19/2024 Y 7/30/2024 Y 7/30/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 9/23/2024 Y 8/1/2024 Y 8/7/2024 Y 6/19/2024 Y 6/26/2024 Y 9/23/2024 Y 6/19/2024 Y 8/1/2024 Y 8/1/2024 Y 6/19/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 8/1/2024 Y 7/10/2024 Y 7/10/2024 Y 8/21/2024 Y 7/10/2024 Y 7/10/2024 Y 7/24/2024 Y 1/29/2024 Y 2/1/2024 Y 3/13/2024 Y 9/4/2024 Y 7/24/2024 Y 11/6/2024 Y 11/6/2024 Y 4/1/2024 Y 4/24/2024 Y 5/8/2024 Y 5/8/2024 Y 5/8/2024 Y 5/8/2024 Y 5/8/2024 Y 7/10/2024 Conversation # # of poles Applicant Category <300, 300-3,000 or >3,000 Engineering Start Date (application fee received date) Power Field Survey Complete Date 1676746 1676751 1678175 1678289 1678948 1678952 1678970 1679726 1680566 1681181 1681225 1681579 1681583 1681844 1684642 1686003 1686015 1686041 1686066 1686166 1690463 1690893 1691375 1691435 1691466 1691469 1691484 1691485 1691487 1691490 1691491 1692211 1692212 1692214 1692215 1692226 1692228 1692229 1692230 1692231 1692285 1692322 1692405 1481303 1694002 1694052 1694063 1694092 1694536 1694741 1694780 1694876 1694908 1694918 1694983 1695011 1695045 1695567 1695680 1695706 1695748 1695821 1696153 1696155 1696160 1696218 1696492 1696493 1696503 1696565 1698859 1698865 1698919 1698946 1698993 1699311 1699404 1699421 1699434 1699560 1699860 1699867 1700050 1700322 1700370 1700375 1700406 1700441 1700443 1700563 1700580 1700602 1700694 1700696 1700731 1700733 1700734 1701150 1701185 1701191 1701300 1701708 1701734 1701752 1702134 1702136 1702146 1702171 1702184 1702310 1702311 1702412 1702415 1702421 1702422 1702426 1702755 1703206 1704261 1705119 1706067 1706093 1706198 1706374 1706378 1706686 1706712 1706714 1706756 1707153 1707161 1707174 1707311 1707594 1707684 1707685 1710222 1712336 1712959 1713196 1713197 1713696 1631267 1640292 1649428 1721926 1725448 1758229 1758231 1666795 1675664 1678671 1678676 1678677 1682655 1682657 1702520 29 34 3 2 41 79 78 75 4 75 35 75 24 2 81 77 78 75 76 82 77 76 78 81 75 75 52 17 73 67 2 66 12 77 1 74 79 1 70 8 78 52 1 85 78 80 77 85 82 85 4 100 76 5 8 77 76 78 83 78 77 82 1 1 76 81 74 1 75 80 77 81 82 82 76 81 89 75 78 75 77 77 78 1 80 82 78 76 83 4 3 6 78 83 79 77 3 75 75 4 78 80 2 83 80 79 79 75 30 79 1 77 89 1 75 75 64 2 2 15 79 79 2 81 67 80 75 79 77 77 77 76 75 30 25 3 72 80 4 1 21 1 1 1 1 1 3 1 1 3 1 1 3 1 2 1 1 300-3000 <300 <300 <300 >3000 >3000 >3000 >3000 <300 >3000 <300 >3000 >3000 <300 300-3000 >3000 300-3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 300-3000 300-3000 300-3000 <300 300-3000 300-3000 >3000 300-3000 >3000 >3000 300-3000 >3000 300-3000 >3000 >3000 300-3000 >3000 >3000 >3000 300-3000 300-3000 >3000 >3000 300-3000 300-3000 >3000 <300 <300 >3000 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 300-3000 300-3000 300-3000 300-3000 >3000 >3000 300-3000 300-3000 >3000 300-3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 <300 >3000 >3000 >3000 >3000 >3000 <300 <300 <300 >3000 300-3000 300-3000 >3000 >3000 >3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 300-3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 300-3000 >3000 >3000 <300 <300 300-3000 <300 >3000 >3000 <300 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 >3000 <300 <300 <300 <300 <300 300-3000 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 8/7/2024 10/30/2024 5/1/2024 4/29/2024 6/26/2024 6/26/2024 6/26/2024 6/26/2024 5/1/2024 6/26/2024 5/8/2024 6/26/2024 6/26/2024 5/8/2024 6/19/2024 7/31/2024 6/19/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 6/19/2024 6/19/2024 6/19/2024 6/19/2024 10/30/2024 6/19/2024 6/19/2024 7/31/2024 6/19/2024 7/31/2024 7/31/2024 6/19/2024 7/31/2024 6/19/2024 7/31/2024 7/31/2024 9/23/2024 1/31/2024 7/31/2024 7/31/2024 7/30/2024 7/30/2024 7/31/2024 7/31/2024 6/5/2024 8/7/2024 7/31/2024 6/4/2024 6/5/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 9/23/2024 9/23/2024 7/30/2024 7/30/2024 7/30/2024 6/26/2024 8/1/2024 7/30/2024 7/30/2024 8/1/2024 7/30/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 6/19/2024 8/1/2024 7/31/2024 7/31/2024 7/31/2024 7/31/2024 6/5/2024 6/5/2024 6/5/2024 7/31/2024 7/30/2024 7/30/2024 7/31/2024 7/31/2024 7/31/2024 7/30/2024 10/9/2024 7/30/2024 7/30/2024 6/19/2024 7/30/2024 7/30/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 9/23/2024 8/1/2024 8/7/2024 6/19/2024 6/26/2024 9/23/2024 6/19/2024 8/1/2024 8/1/2024 6/19/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 7/10/2024 7/10/2024 8/21/2024 7/10/2024 7/10/2024 7/24/2024 1/29/2024 2/1/2024 3/13/2024 9/4/2024 7/24/2024 11/6/2024 11/6/2024 4/1/2024 4/24/2024 5/8/2024 5/8/2024 5/8/2024 5/8/2024 5/8/2024 7/10/2024 9/17/2024 11/18/2024 5/7/2024 8/1/2024 11/8/2024 11/8/2024 11/18/2024 11/7/2024 8/1/2024 11/7/2024 8/15/2024 11/6/2024 11/6/2024 8/15/2024 9/18/2024 10/28/2024 11/7/2024 12/6/2024 12/4/2024 11/25/2024 Date Power Requested Concurrence Date Telco Requested Concurrence 11/18/2024 11/19/2024 5/23/2024 5/23/2024 10/17/2024 5/23/2024 5/7/2024 11/4/2024 5/23/2024 11/7/2024 5/16/2024 5/23/2024 10/25/2024 5/23/2024 8/26/2024 12/9/2024 8/21/2024 12/3/2024 12/5/2024 11/18/2024 11/27/2024 Telco Field Survey Complete Date 8/6/2024 12/5/2024 12/12/2024 12/20/2024 12/27/2024 10/30/2024 12/2/2024 12/12/2024 11/21/2024 11/18/2024 Canceled 8/30/2024 8/8/2024 11/11/2024 12/4/2024 11/15/2024 11/11/2024 12/4/2024 11/15/2024 12/23/2024 12/18/2024 11/11/2024 8/26/2024 11/20/2024 7/25/2024 12/24/2024 1/20/2025 12/4/2024 11/12/2024 11/12/2024 9/24/2024 8/21/2024 9/4/2024 8/26/2024 Canceled 9/12/2024 8/12/2024 11/18/2024 8/13/2024 11/27/2024 8/13/2024 11/12/2024 8/13/2024 10/31/2024 12/11/2024 11/11/2024 11/18/2024 12/30/2024 Did Engineering Phase meet mandated timeframes (Y/N) Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) 189 NO 12/4/2024 8/8/2024 99 NO 8/8/2024 1 11/25/2024 201 NO 12/18/2024 23 12/18/2024 224 NO Canceled Canceled Canceled 11/25/2024 159 NO 12/4/2024 9 11/18/2024 152 NO 12/4/2024 16 12/18/2024 11/14/2024 86 288 NO NO 11/20/2024 6 12/16/2024 194 NO 12/17/2024 1 1/8/2025 12/3/2024 218 181 NO NO 12/25/2024 22 Date Concurrence Agreed # of days for Engineering Phase Upon and Application Review on Merits Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) # of days for Power Design/MR Development # of days for Telco Design/MR Development 30 12/23/2024 5 12/20/2024 12/26/2024 11/21/2024 7/23/2024 9/20/2024 11/21/2024 8/15/2024 8/21/2024 11/8/2024 12/16/2024 8/1/2024 8/1/2024 10/25/2024 11/5/2024 11/15/2024 11/20/2024 12/12/2024 11/27/2024 11/13/2024 12/16/2024 11/20/2024 6/12/2024 6/12/2024 11/18/2024 12/3/2024 1/2/2025 12/9/2024 11/12/2024 12/5/2024 1/13/2025 12/11/2024 12/13/2024 8/30/2024 12/16/2024 12/16/2024 12/16/2024 173 NO 12/23/2024 7 8/5/2024 9/26/2024 11/12/2024 10/22/2024 11/12/2024 11/12/2024 11/18/2024 11/13/2024 7/22/2024 8/5/2024 47 NO 10/8/2024 64 12/20/2024 198 NO 1/7/2025 216 NO 1/14/2025 167 NO 12/10/2024 174 NO 11/4/2024 138 NO 12/20/2024 12/12/2024 12/11/2024 12/11/2024 12/12/2024 8/19/2024 8/1/2024 11/18/2024 1/2/2025 8/8/2024 10/24/2024 8/1/2024 8/1/2024 8/1/2024 8/1/2024 11/18/2024 10/25/2024 11/27/2024 6/12/2024 6/12/2024 6/12/2024 12/9/2024 12/19/2024 12/12/2024 8/26/2024 1/9/2025 12/18/2024 10/18/2024 12/4/2024 12/6/2024 11/12/2024 1/8/2025 12/10/2024 12/9/2024 8/15/2024 12/27/2024 12/6/2024 12/20/2024 12/26/2024 12/20/2024 12/12/2024 12/18/2024 8/30/2024 12/26/2024 12/19/2024 1/8/2025 1/9/2025 9/24/2024 7/22/2024 8/26/2024 12/6/2024 7/2/2024 8/20/2024 8/20/2024 9/9/2024 12/11/2024 12/6/2024 32 12/23/2024 39 7/24/2024 8/26/2024 12/26/2024 9/30/2024 8/26/2024 9/9/2024 8/27/2024 9/24/2024 8/26/2024 8/19/2024 9/24/2024 2/28/2024 3/1/2024 3/26/2024 9/25/2024 7/24/2024 11/18/2024 11/18/2024 4/9/2024 4/30/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 5/21/2024 8/6/2024 1/9/2025 11/27/2024 8/21/2024 11/11/2024 10/15/2024 11/25/2024 1/2/2025 10/22/2024 11/11/2024 10/15/2024 12/24/2024 1/9/2025 161 NO 11/14/2024 127 NO 8/1/2024 3/18/2024 7/1/2024 7/1/2024 7/25/2024 5/23/2024 6/28/2024 7/5/2024 7/17/2024 8/8/2024 7/9/2024 8/8/2024 12/17/2024 4/15/2024 3/28/2024 6/10/2024 Canceled 7/24/2024 12/17/2024 4/15/2024 3/28/2024 6/10/2024 Canceled 12/17/2024 4/16/2024 6/6/2024 6/11/2024 Canceled 7/24/2024 146 78 126 90 Canceled 1 NO NO NO NO Canceled YES 12/17/2024 6/6/2024 6/6/2024 6/18/2024 8/7/2024 7/11/2024 7/10/2024 7/24/2024 7/31/2024 1 7 5/23/2024 6/25/2024 5/29/2024 5/30/2024 7/11/2024 5/30/2024 Canceled 8/20/2024 5/23/2024 6/25/2024 5/29/2024 5/30/2024 7/11/2024 5/30/2024 Canceled 8/20/2024 6/27/2024 6/25/2024 6/27/2024 6/27/2024 8/19/2024 6/27/2024 Canceled 8/20/2024 87 62 50 50 103 50 Canceled 41 NO NO NO NO NO NO Canceled YES 7/22/2024 7/11/2024 9/12/2024 9/16/2024 9/3/2024 8/26/2024 7/11/2024 8/28/2024 7/17/2024 6/28/2024 7/5/2024 8/19/2024 9/10/2024 7/9/2024 25 16 77 81 15 60 Canceled 8 20 3 8 53 22 12 9/4/2024 1 51 1 7 113 35 29 15Page 22 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 22 of 25 February 17, 2026 Jeffrey R. Gaudiosi, Esq. Executive Secretary Public Utilities Regulatory Authority 10 Franklin Square New Britain, CT 06051 Re: Docket No. 19-01-52RE01, PURA Investigation of Developments in the Third Party Pole Attachment Process – Make Ready – Order No. 5 Compliance. Dear Mr. Gaudiosi: The Connecticut Light and Power Company dba Eversource Energy (the “Company”) hereby submits the following filing in compliance with Order No. 5 of the May 11, 2022 Decision of the Public Utilities Regulatory Authority (the “Authority”) in the above-referenced matter. More specifically, Order No. 5 provides: For new applications submitted on or after the issuance of this Decision, the SPAs shall track and keep records of the performance of all applicable pole owners and pole attachers in the meeting the Engineering Phase timelines described in Section II.B.1. Engineering Phase Timelines. Records shall be retained for 10 years and made available to the Authority upon request, but at minimum through a compliance filing submitted annually on or before February 15 detailing data for the previous calendar year. In areas where SPAs do not operate, such as in municipalities that are outside of the service territories of the EDCs, the ILEC-pole owner shall track the above information in place of the SPA. Accordingly, the Company submits the following attachment: Order No. 5 ES Attachment #19-01-52RE01 02-17-2026 The data provided in the attachment reflects the tracking and performance in meeting Engineering Phase timelines for traditional third-party pole attachment applications received between January 1, 2025, and December 31, 2025. During the reporting period, the applicant category volumes were as follows: Applicant Category <300 poles 300 – 3,000 poles # of Applications 254 41 Total Poles Additional Information 2,433 1,598 A summary of the performance tracking provided in the Attachment for each Engineering Phase timeline is as follows: Order No. 5 Compliance is due February 15, 2026. February 15th is a Sunday. PURA's rules state that if a deadline falls on a weekend, then it is automatically extended to the next business day on which PURA's offices are open, which is Tuesday, February 17, 2026. See R.C.S.A. Section 16-1-5.Page 23 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 23 of 25 Process Step Timeframe allowed (Days) Review for Completeness 10 Engineering Phase and 45 Application Review on 60 Merits 200 Make-Ready 14 Development Average Time 1 Additional Comments SPA Review 70 28 This document has been prepared in good faith and in accordance with the compliance requirement of Order No. 5. I hereby certify service of this filing upon all parties and intervenors of record in this proceeding. Please contact Mrs. Ann Marie Lallier at [phone removed] if you have any questions concerning this filing. Very truly yours, Vincent P Pace Assistant General Counsel As Agent for Eversource Energy cc: Service List Attachments Order No. 5 Compliance is due February 15, 2026. February 15th is a Sunday. PURA's rules state that if a deadline falls on a weekend, then it is automatically extended to the next business day on which PURA's offices are open, which is Tuesday, February 17, 2026. See R.C.S.A. Section 16-1-5.Page 24 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 24 of 25 Connecticut Light and Power dba Eversource Energy Docket No. 19-01-52RE01 Feburary 15, 2023 Compliance Order No. 5, Attachment Page 1 of 2 Proposed Attacher (Company Name) FIBER TECHNOLOGIES NETWORKS, L.L.C. FIBER TECHNOLOGIES NETWORKS, L.L.C. COMCAST - CT COMCAST - CT FIBER TECHNOLOGIES NETWORKS, L.L.C. CHARTER COMMUNICATIONS NetSpeed LLC NetSpeed LLC NetSpeed LLC FIBER TECHNOLOGIES NETWORKS, L.L.C. MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS TELEPORT COMMUNICATIONS AMERICA, LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS COX COMMUNICATIONS NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT NetSpeed LLC COMCAST - CT COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS NetSpeed LLC NetSpeed LLC COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS FIBER TECHNOLOGIES NETWORKS, L.L.C. COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT FIBER TECHNOLOGIES NETWORKS, L.L.C. COMCAST - CT NetSpeed LLC NetSpeed LLC NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS COX COMMUNICATIONS Town of South Windsor, CT Town of South Windsor, CT Town of South Windsor, CT MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS NetSpeed LLC NetSpeed LLC NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT NetSpeed LLC NetSpeed LLC NetSpeed LLC CHARTER COMMUNICATIONS NetSpeed LLC NetSpeed LLC COMCAST - CT COMCAST - CT NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS NetSpeed LLC NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS CROWN CASTLE MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT FIBER TECHNOLOGIES NETWORKS, L.L.C. COMCAST - CT COMCAST - CT COMCAST - CT NetSpeed LLC COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS COX COMMUNICATIONS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS TELEPORT COMMUNICATIONS AMERICA, LLC TELEPORT COMMUNICATIONS AMERICA, LLC COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS FIBER TECHNOLOGIES NETWORKS, L.L.C. MCIMETRO ACCESS TRANSMISSION SYSTEMS NetSpeed LLC COMCAST - CT TELEPORT COMMUNICATIONS AMERICA, LLC FIBER TECHNOLOGIES NETWORKS, L.L.C. NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC COMCAST - CT COMCAST - CT COMCAST - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS TELEPORT COMMUNICATIONS AMERICA, LLC NetSpeed LLC COMCAST - CT NetSpeed LLC NetSpeed LLC NetSpeed LLC FIBER TECHNOLOGIES NETWORKS, L.L.C. TELEPORT COMMUNICATIONS AMERICA, LLC NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS TOWN OF GLASTONBURY COMCAST - CT NetSpeed LLC COMCAST - CT COMCAST - CT COX COMMUNICATIONS NetSpeed LLC FIBER TECHNOLOGIES NETWORKS, L.L.C. NetSpeed LLC NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS MCIMETRO ACCESS TRANSMISSION SYSTEMS COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COX COMMUNICATIONS FIBER TECHNOLOGIES NETWORKS, L.L.C. TELEPORT COMMUNICATIONS AMERICA, LLC NetSpeed LLC NetSpeed LLC FIBER TECHNOLOGIES NETWORKS, L.L.C. NetSpeed LLC Town of Plainville COMCAST - CT FIBER TECHNOLOGIES NETWORKS, L.L.C. COX COMMUNICATIONS FIBER TECHNOLOGIES NETWORKS, L.L.C. FIBER TECHNOLOGIES NETWORKS, L.L.C. NetSpeed LLC NetSpeed LLC TOWN OF GLASTONBURY NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS NetSpeed LLC VERIZON WIRELESS NetSpeed LLC FIBER TECHNOLOGIES NETWORKS, L.L.C. VERIZON WIRELESS NetSpeed LLC NetSpeed LLC Date Proposed Attacher Sent Application SPA Acknowledgement (Date) 1/2/2025 1/3/2025 1/3/2025 1/3/2025 1/3/2025 1/6/2025 1/7/2025 1/8/2025 1/8/2025 1/8/2025 1/8/2025 1/8/2025 1/8/2025 1/9/2025 1/10/2025 1/10/2025 1/10/2025 1/13/2025 1/13/2025 1/13/2025 1/14/2025 1/15/2025 1/16/2025 1/17/2025 1/21/2025 1/21/2025 1/21/2025 1/22/2025 1/22/2025 1/23/2025 1/23/2025 1/24/2025 1/24/2025 1/24/2025 1/24/2025 1/24/2025 1/24/2025 1/26/2025 1/28/2025 1/28/2025 1/30/2025 2/3/2025 2/3/2025 2/3/2025 2/3/2025 2/3/2025 2/3/2025 2/3/2025 2/3/2025 2/4/2025 2/6/2025 2/7/2025 2/7/2025 2/7/2025 2/10/2025 2/11/2025 2/11/2025 2/14/2025 2/17/2025 2/17/2025 2/19/2025 2/19/2025 2/20/2025 2/21/2025 2/24/2025 2/25/2025 2/25/2025 2/27/2025 2/27/2025 2/27/2025 2/28/2025 2/28/2025 2/28/2025 3/3/2025 3/3/2025 3/3/2025 3/3/2025 3/5/2025 3/6/2025 3/7/2025 3/7/2025 3/8/2025 3/10/2025 3/11/2025 3/13/2025 3/14/2025 3/14/2025 3/17/2025 3/17/2025 3/19/2025 3/19/2025 3/19/2025 3/19/2025 3/20/2025 3/23/2025 3/25/2025 3/26/2025 3/27/2025 3/27/2025 3/27/2025 3/28/2025 3/28/2025 3/28/2025 3/31/2025 3/31/2025 3/31/2025 4/1/2025 4/2/2025 4/3/2025 4/3/2025 4/3/2025 4/4/2025 4/8/2025 4/9/2025 4/14/2025 4/14/2025 4/14/2025 4/15/2025 4/15/2025 4/15/2025 4/15/2025 4/15/2025 4/18/2025 4/22/2025 4/23/2025 4/25/2025 4/25/2025 4/27/2025 4/29/2025 5/4/2025 5/4/2025 5/4/2025 5/5/2025 5/5/2025 5/7/2025 5/7/2025 5/8/2025 5/8/2025 5/14/2025 5/14/2025 5/16/2025 5/18/2025 5/19/2025 5/20/2025 5/20/2025 5/21/2025 5/22/2025 5/22/2025 5/23/2025 5/23/2025 5/23/2025 5/23/2025 5/23/2025 5/27/2025 5/27/2025 5/27/2025 5/28/2025 5/28/2025 1/2/2025 1/6/2025 1/6/2025 1/6/2025 1/6/2025 1/7/2025 1/7/2025 1/8/2025 1/8/2025 1/8/2025 1/8/2025 1/9/2025 1/9/2025 1/10/2025 1/10/2025 1/10/2025 1/13/2025 1/13/2025 1/13/2025 1/14/2025 1/16/2025 1/16/2025 1/16/2025 1/21/2025 1/22/2025 1/22/2025 1/22/2025 1/22/2025 1/22/2025 1/23/2025 1/24/2025 1/24/2025 1/24/2025 1/24/2025 1/24/2025 1/24/2025 1/27/2025 1/27/2025 1/28/2025 1/28/2025 1/31/2025 2/3/2025 2/3/2025 2/3/2025 2/4/2025 2/3/2025 2/3/2025 2/3/2025 2/3/2025 2/5/2025 2/10/2025 2/10/2025 2/10/2025 2/10/2025 2/11/2025 2/13/2025 2/11/2025 2/14/2025 2/18/2025 2/18/2025 2/21/2025 2/20/2025 2/21/2025 2/24/2025 2/24/2025 2/25/2025 2/25/2025 2/28/2025 2/27/2025 2/27/2025 3/3/2025 2/28/2025 3/3/2025 3/4/2025 3/3/2025 3/3/2025 3/4/2025 3/5/2025 3/6/2025 3/7/2025 3/7/2025 3/10/2025 3/10/2025 3/13/2025 3/14/2025 3/14/2025 3/17/2025 3/18/2025 3/18/2025 3/19/2025 3/21/2025 3/21/2025 3/21/2025 3/21/2025 3/25/2025 3/26/2025 3/26/2025 3/27/2025 3/27/2025 3/27/2025 3/28/2025 3/28/2025 3/31/2025 4/1/2025 4/1/2025 4/1/2025 4/1/2025 4/2/2025 4/4/2025 4/4/2025 4/4/2025 4/7/2025 4/9/2025 4/9/2025 4/14/2025 4/15/2025 4/15/2025 4/15/2025 4/24/2025 4/15/2025 4/15/2025 4/15/2025 4/18/2025 4/23/2025 4/23/2025 4/28/2025 5/8/2025 4/28/2025 4/29/2025 5/6/2025 5/6/2025 5/6/2025 5/6/2025 5/6/2025 5/7/2025 5/7/2025 5/9/2025 5/9/2025 5/15/2025 5/15/2025 5/16/2025 5/19/2025 5/19/2025 5/21/2025 5/20/2025 5/21/2025 5/23/2025 5/23/2025 5/23/2025 5/23/2025 5/23/2025 5/23/2025 5/28/2025 5/28/2025 5/28/2025 5/28/2025 5/28/2025 5/29/2025 Submission Complete Y or N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y If Submission Not Complete Date Attacher Notified by SPA Date Attacher Resubmits Date SPA Acknowledges Submission for Completeness Time Taken To Review by SPA # of Days Allowed for Completeness Review Did SPA Meet Compliance for Completeness Review Y/N 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 15 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y (Invoice is generated) 1/2/2025 1/6/2025 1/6/2025 1/6/2025 1/6/2025 1/7/2025 1/7/2025 1/8/2025 1/8/2025 1/8/2025 1/8/2025 1/9/2025 1/9/2025 1/10/2025 1/10/2025 1/10/2025 1/13/2025 1/13/2025 1/13/2025 1/14/2025 1/16/2025 1/16/2025 1/16/2025 1/21/2025 1/22/2025 1/22/2025 1/22/2025 1/22/2025 1/22/2025 1/23/2025 1/24/2025 1/24/2025 1/24/2025 1/24/2025 1/24/2025 1/24/2025 1/27/2025 1/27/2025 1/28/2025 1/28/2025 1/31/2025 2/3/2025 2/3/2025 2/3/2025 2/4/2025 2/3/2025 2/3/2025 2/3/2025 2/3/2025 2/5/2025 2/10/2025 2/10/2025 2/10/2025 2/10/2025 2/11/2025 2/13/2025 2/11/2025 2/14/2025 2/18/2025 2/18/2025 2/21/2025 2/20/2025 2/21/2025 2/24/2025 2/24/2025 2/25/2025 2/25/2025 2/28/2025 2/27/2025 2/27/2025 3/3/2025 2/28/2025 3/3/2025 3/4/2025 3/3/2025 3/3/2025 3/4/2025 3/5/2025 3/6/2025 3/7/2025 3/7/2025 3/10/2025 3/10/2025 3/13/2025 3/14/2025 3/14/2025 3/17/2025 3/18/2025 3/18/2025 3/19/2025 3/21/2025 3/21/2025 3/21/2025 3/21/2025 3/25/2025 3/26/2025 3/26/2025 3/27/2025 3/27/2025 3/27/2025 3/28/2025 3/28/2025 3/31/2025 4/1/2025 4/1/2025 4/1/2025 4/1/2025 4/2/2025 4/4/2025 4/4/2025 4/4/2025 4/7/2025 4/9/2025 4/9/2025 4/14/2025 4/15/2025 4/15/2025 4/15/2025 4/24/2025 4/15/2025 4/15/2025 4/15/2025 4/18/2025 4/23/2025 4/23/2025 4/28/2025 5/8/2025 4/28/2025 4/29/2025 5/6/2025 5/6/2025 5/6/2025 5/6/2025 5/6/2025 5/7/2025 5/7/2025 5/9/2025 5/9/2025 5/15/2025 5/15/2025 5/16/2025 5/19/2025 5/19/2025 5/21/2025 5/20/2025 5/21/2025 5/23/2025 5/23/2025 5/23/2025 5/23/2025 5/23/2025 5/23/2025 5/28/2025 5/28/2025 5/28/2025 5/28/2025 5/28/2025 5/29/2025 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Application Fee Received Y Application Fee Received or N (Within Reporting Date Timeframe) Y 1/21/2025 Y 1/21/2025 Y 2/19/2025 Y 2/19/2025 Y 1/21/2025 Y 4/22/2025 Y 1/21/2025 Y 1/21/2025 Y 1/21/2025 Y 1/21/2025 Y 2/5/2025 Y 2/19/2025 Y 1/21/2025 Y 2/19/2025 Y 1/21/2025 Y 1/21/2025 Y 2/19/2025 Y 1/21/2025 Y 1/21/2025 Y 4/9/2025 Y 2/25/2025 Y 1/29/2025 Y 2/25/2025 Y 2/25/2025 Y 2/25/2025 Y 2/25/2025 Y 2/25/2025 Y 2/5/2025 Y 2/5/2025 Y 2/25/2025 Y 2/25/2025 Y 2/5/2025 Y 2/25/2025 Y 2/25/2025 Y 2/25/2025 Y 2/25/2025 Y 2/5/2025 Y 2/25/2025 Y 2/12/2025 Y 2/12/2025 Y 2/19/2025 Y 2/25/2025 Y 3/12/2025 Y 3/12/2025 Y 2/19/2025 Y 2/25/2025 Y 2/25/2025 Y 2/25/2025 Y 4/9/2025 Y 3/12/2025 Y 3/25/2025 Y 3/12/2025 Y 2/19/2025 Y 2/19/2025 Y 2/25/2025 Y 3/26/2025 Y 3/12/2025 Y 2/25/2025 Y 3/4/2025 Y 3/4/2025 Y 6/27/2025 Y 3/4/2025 Y 3/4/2025 Y 4/29/2025 Y 4/29/2025 Y 3/12/2025 Y 3/4/2025 Y 4/9/2025 Y 3/12/2025 Y 3/12/2025 Y 5/7/2025 Y 3/12/2025 Y 5/7/2025 Y 4/29/2025 Y 3/12/2025 Y 4/29/2025 Y 4/29/2025 Y 4/29/2025 Y 3/18/2025 Y 4/29/2025 Y 3/18/2025 Y 3/26/2025 Y 4/9/2025 Y 3/18/2025 Y 4/22/2025 Y 3/25/2025 Y 4/2/2025 Y 3/19/2025 Y 3/19/2025 Y 4/29/2025 Y 4/2/2025 Y 4/2/2025 Y 4/2/2025 Y 4/2/2025 Y 5/14/2025 Y 4/2/2025 Y 4/2/2025 Y 4/9/2025 Y 4/9/2025 Y 4/9/2025 Y 4/9/2025 Y 4/9/2025 Y 4/9/2025 Y 5/14/2025 Y 5/14/2025 Y 7/17/2025 Y 4/22/2025 Y 4/9/2025 Y 4/22/2025 Y 7/17/2025 Y 4/22/2025 Y 4/22/2025 Y 4/22/2025 Y 4/22/2025 Y 4/22/2025 Y 4/22/2025 Y 4/22/2025 Y 6/18/2025 Y 7/17/2025 Y 4/22/2025 Y 7/17/2025 Y 7/17/2025 Y 4/23/2025 Y 5/7/2025 Y 5/7/2025 Y 5/7/2025 Y 5/14/2025 Y 5/7/2025 Y 5/7/2025 Y 5/21/2025 Y 5/21/2025 Y 5/21/2025 Y 5/21/2025 Y 5/7/2025 Y 5/14/2025 Y 5/14/2025 Y 5/21/2025 Y 5/21/2025 Y 6/2/2025 Y 6/2/2025 Y 6/2/2025 Y 8/22/2025 Y 6/2/2025 Y 6/4/2025 Y 6/2/2025 Y 6/4/2025 Y 6/4/2025 Y 6/4/2025 Y 6/25/2025 Y 6/4/2025 Y 7/9/2025 Y 6/4/2025 Y 7/1/2025 Y 6/4/2025 Y 6/4/2025 Y 7/1/2025 Y 6/11/2025 Y 6/11/2025 Conversation # # of poles Applicant Category <300, 300-3,000 or >3,000 Engineering Start Date (application fee received date) Power Field Survey Complete Date Telco Field Survey Complete Date 1787757 1788677 1788709 1788715 1788842 1789243 1790264 1791077 1791222 1791397 1791509 1792559 1792989 1793388 1794128 1794161 1794212 1794309 1794538 1794826 1795960 1796681 1797006 1797572 1797007 1797119 1797150 1799127 1799075 1798930 1799787 1799949 1799933 1799937 1799946 1799956 1800046 1800295 1637419 1638370 1804238 1799152 1814961 1815119 1815147 1804446 1804514 1804519 1814943 1815976 1816734 1817028 1817103 1817190 1817517 1817372 1818005 1819444 1820075 1820087 1798884 1820922 1821421 1821794 1822267 1822861 1815668 1823559 1823942 1823973 1824461 1824024 1824482 1824925 1824853 1824905 1824929 1826034 1826470 1827022 1815114 1827354 1827673 1828218 1829296 1815013 1829753 1830277 1830276 1831317 1832213 1832210 1832212 1834099 1834570 1838339 1838640 1840106 1840209 1840210 1833972 1833973 1840700 1841339 1841382 1841459 1830193 1842381 1842900 1842919 1842935 1843563 1845065 1845530 1847051 1847105 1847160 1787280 1847474 1847484 1847505 1847529 1849147 1850094 1851037 1852025 1851722 1852270 1852577 1855222 1855217 1855219 1855388 1855290 1857143 1857165 1857929 1857973 1860939 1861063 1862208 1862540 1862637 1863169 1862318 1864522 1760310 1759892 1866594 1866830 1866855 1866979 1849312 1867937 1867554 1868008 1867487 1868694 29 1 1 1 1 2 1 2 35 3 78 16 30 12 1 2 24 1 9 2 1 8 10 2 22 3 12 1 1 4 7 5 1 1 1 1 14 2 6 35 1 42 1 1 1 29 53 20 8 4 21 8 7 19 4 24 1 2 12 2 2 4 1 1 1 1 3 82 8 8 52 96 11 1 1 1 1 3 1 1 40 77 50 2 1 3 6 2 67 1 1 1 8 84 1 4 4 4 1 1 5 8 116 3 2 2 4 53 4 2 2 3 2 2 19 2 9 23 1 3 7 1 1 2 7 4 8 1 67 1 1 2 2 1 13 32 7 3 15 8 2 2 5 6 108 3 53 165 11 6 1 2 1 7 1 1 1 2 <300 <300 <300 <300 <300 <300 300-3,000 300-3,000 300-3,000 <300 <300 <300 <300 <300 <300 300-3,000 <300 <300 300-3,000 300-3,000 <300 300-3,000 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 300-3,000 <300 <300 <300 <300 <300 <300 300-3,000 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 300-3,000 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 300-3,000 300-3,000 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 1/21/2025 1/21/2025 2/19/2025 2/19/2025 1/21/2025 4/22/2025 1/21/2025 1/21/2025 1/21/2025 1/21/2025 2/5/2025 2/19/2025 1/21/2025 2/19/2025 1/21/2025 1/21/2025 2/19/2025 1/21/2025 1/21/2025 4/9/2025 2/25/2025 1/29/2025 2/25/2025 2/25/2025 2/25/2025 2/25/2025 2/25/2025 2/5/2025 2/5/2025 2/25/2025 2/25/2025 2/5/2025 2/25/2025 2/25/2025 2/25/2025 2/25/2025 2/5/2025 2/25/2025 2/12/2025 2/12/2025 2/19/2025 2/25/2025 3/12/2025 3/12/2025 2/19/2025 2/25/2025 2/25/2025 2/25/2025 4/9/2025 3/12/2025 3/25/2025 3/12/2025 2/19/2025 2/19/2025 2/25/2025 3/26/2025 3/12/2025 2/25/2025 3/4/2025 3/4/2025 6/27/2025 3/4/2025 3/4/2025 4/29/2025 4/29/2025 3/12/2025 3/4/2025 4/9/2025 3/12/2025 3/12/2025 5/7/2025 3/12/2025 5/7/2025 4/29/2025 3/12/2025 4/29/2025 4/29/2025 4/29/2025 3/18/2025 4/29/2025 3/18/2025 3/26/2025 4/9/2025 3/18/2025 4/22/2025 3/25/2025 4/2/2025 3/19/2025 3/19/2025 4/29/2025 4/2/2025 4/2/2025 4/2/2025 4/2/2025 5/14/2025 4/2/2025 4/2/2025 4/9/2025 4/9/2025 4/9/2025 4/9/2025 4/9/2025 4/9/2025 5/14/2025 5/14/2025 7/17/2025 4/22/2025 4/9/2025 4/22/2025 7/17/2025 4/22/2025 4/22/2025 4/22/2025 4/22/2025 4/22/2025 4/22/2025 4/22/2025 6/18/2025 7/17/2025 4/22/2025 7/17/2025 7/17/2025 4/23/2025 5/7/2025 5/7/2025 5/7/2025 5/14/2025 5/7/2025 5/7/2025 5/21/2025 5/21/2025 5/21/2025 5/21/2025 5/7/2025 5/14/2025 5/14/2025 5/21/2025 5/21/2025 6/2/2025 6/2/2025 6/2/2025 8/22/2025 6/2/2025 6/4/2025 6/2/2025 6/4/2025 6/4/2025 6/4/2025 6/25/2025 6/4/2025 7/9/2025 6/4/2025 7/1/2025 6/4/2025 6/4/2025 7/1/2025 6/11/2025 6/11/2025 3/5/2025 7/23/2025 3/12/2025 3/12/2025 7/24/2025 4/30/2025 3/17/2025 3/21/2025 3/21/2025 8/7/2025 4/3/2025 5/5/2025 4/3/2025 5/16/2025 8/7/2025 3/21/2025 4/21/2025 8/7/2025 3/21/2025 6/15/2025 3/11/2025 3/21/2025 3/5/2025 3/14/2025 5/12/2025 5/8/2025 5/14/2025 3/21/2025 4/14/2025 3/4/2025 4/3/2025 3/11/2025 3/14/2025 3/5/2025 4/4/2025 3/14/2025 3/14/2025 3/5/2025 4/14/2025 4/14/2025 4/14/2025 7/25/2025 3/28/2025 3/27/2025 3/14/2025 3/6/2025 3/5/2025 3/12/2025 6/10/2025 4/3/2025 4/21/2025 3/20/2025 4/14/2025 4/14/2025 4/14/2025 7/25/2025 4/25/2025 4/14/2025 4/14/2025 4/14/2025 7/21/2025 4/14/2025 4/14/2025 5/30/2025 5/28/2025 4/14/2025 3/28/2025 5/5/2025 4/14/2025 4/14/2025 5/21/2025 4/3/2025 5/23/2025 5/28/2025 4/30/2025 5/30/2025 5/30/2025 5/30/2025 4/14/2025 5/28/2025 4/17/2025 4/29/2025 4/29/2025 4/30/2025 6/12/2025 4/15/2025 5/28/2025 4/24/2025 4/24/2025 5/28/2025 5/28/2025 4/25/2025 5/27/2025 4/14/2025 5/30/2025 4/25/2025 4/25/2025 5/9/2025 5/9/2025 5/9/2025 5/9/2025 5/9/2025 5/9/2025 5/30/2025 5/30/2025 7/30/2025 5/1/2025 4/30/2025 5/9/2025 7/30/2025 5/9/2025 5/9/2025 5/9/2025 4/30/2025 5/2/2025 5/9/2025 5/23/2025 6/25/2025 7/31/2025 5/9/2025 8/1/2025 7/31/2025 5/2/2025 6/2/2025 5/28/2025 6/2/2025 6/2/2025 6/11/2025 6/9/2025 6/2/2025 6/2/2025 6/2/2025 6/2/2025 5/28/2025 6/5/2025 5/30/2025 6/2/2025 6/2/2025 6/20/2025 7/2/2025 6/24/2025 9/5/2025 7/2/2025 12/17/2025 8/1/2025 5/27/2025 7/14/2025 7/23/2025 8/19/2025 3/21/2025 4/1/2025 6/17/2025 8/4/2025 8/19/2025 10/14/2025 7/23/2025 8/1/2025 10/14/2025 7/2/2025 6/26/2025 7/10/2025 7/2/2025 7/18/2025 6/20/2025 7/18/2025 7/2/2025 7/15/2025 6/20/2025 6/24/2025 7/15/2025 7/23/2025 7/23/2025 12/5/2025 8/29/2025 8/21/2025 10/14/2025 9/23/2025 10/28/2025 11/20/2025 11/17/2025 4/25/2025 7/29/2025 4/25/2025 7/9/2025 7/2/2025 9/10/2025 8/19/2025 7/1/2025 3/18/2025 5/6/2025 7/21/2025 11/4/2025 9/24/2025 7/16/2025 7/9/2025 7/11/2025 9/24/2025 5/27/2025 7/22/2025 5/16/2025 8/6/2025 7/16/2025 7/1/2025 6/2/2025 6/19/2025 5/16/2025 9/23/2025 10/29/2025 8/1/2025 7/29/2025 5/6/2025 6/11/2025 5/15/2025 7/25/2025 6/9/2025 5/29/2025 6/11/2025 5/29/2025 9/3/2025 6/3/2025 7/23/2025 6/23/2025 5/19/2025 8/19/2025 5/30/2025 5/30/2025 12/15/2025 9/8/2025 7/28/2025 8/19/2025 7/29/2025 7/26/2025 7/23/2025 7/25/2025 10/27/2025 8/28/2025 7/14/2025 7/30/2025 6/11/2025 10/30/2025 10/29/2025 8/11/2025 7/7/2025 8/1/2025 8/4/2025 7/2/2025 6/2/2025 7/9/2025 8/19/2025 7/23/2025 11/10/2025 7/25/2025 11/14/2025 7/2/2025 10/14/2025 6/17/2025 8/11/2025 6/2/2025 7/28/2025 7/10/2025 6/10/2025 8/27/2025 11/4/2025 6/16/2025 7/11/2025 7/23/2025 7/9/2025 7/24/2025 10/15/2025 11/3/2025 8/27/2025 8/4/2025 7/25/2025 7/29/2025 8/26/2025 12/16/2025 7/24/2025 7/7/2025 9/23/2025 8/19/2025 12/30/2025 11/5/2025 7/18/2025 8/19/2025 8/27/2025 8/19/2025 8/22/2025 8/6/2025 8/29/2025 Date Power Requested Concurrence Date Telco Requested Concurrence 7/23/2025 4/3/2025 4/3/2025 6/16/2025 5/5/2025 2/25/2025 2/25/2025 5/2/2025 5/20/2025 5/1/2025 7/23/2025 6/23/2025 3/6/2025 3/11/2025 7/24/2025 4/3/2025 3/12/2025 4/4/2025 4/3/2025 9/4/2025 4/10/2025 6/19/2025 3/6/2025 4/28/2025 4/4/2025 7/2/2025 4/2/2025 4/3/2025 4/3/2025 4/8/2025 4/3/2025 3/28/2025 4/3/2025 5/12/2025 5/9/2025 5/12/2025 7/23/2025 6/11/2025 4/3/2025 4/25/2025 4/22/2025 4/8/2025 4/8/2025 5/27/2025 4/10/2025 4/18/2025 5/12/2025 5/12/2025 7/18/2025 5/5/2025 5/6/2025 5/12/2025 5/12/2025 7/25/2025 5/29/2025 6/2/2025 6/13/2025 6/13/2025 5/12/2025 4/11/2025 5/12/2025 5/12/2025 6/19/2025 4/29/2025 6/18/2025 6/13/2025 N/A 6/13/2025 6/13/2025 6/30/2025 6/2/2025 6/13/2025 6/11/2025 7/24/2025 7/25/2025 N/A 6/13/2025 5/8/2025 6/10/2025 5/5/2025 5/2/2025 6/13/2025 5/28/2025 5/5/2025 7/16/2025 5/5/2025 N/A 5/5/2025 5/5/2025 5/12/2025 5/15/2025 5/9/2025 5/15/2025 5/19/2025 6/13/2025 6/16/2025 6/16/2025 8/7/2025 7/14/2025 5/21/2025 6/4/2025 8/7/2025 5/19/2025 5/15/2025 5/27/2025 5/5/2025 5/19/2025 5/15/2025 6/10/2025 7/15/2025 N/A 5/27/2025 N/A N/A 5/6/2025 7/10/2025 6/16/2025 6/18/2025 6/18/2025 7/2/2025 7/3/2025 7/10/2025 7/11/2025 7/10/2025 7/10/2025 6/16/2025 6/10/2025 6/17/2025 6/18/2025 6/27/2025 7/8/2025 7/7/2025 6/30/2025 9/9/2025 7/7/2025 6/30/2025 8/21/2025 7/9/2025 7/31/2025 8/8/2025 7/25/2025 7/16/2025 N/A 7/14/2025 7/30/2025 7/7/2025 6/30/2025 8/1/2025 8/1/2025 8/1/2025 5/19/2025 6/10/2025 5/22/2025 6/4/2025 6/9/2025 6/17/2025 1/29/2025 1/29/2025 2/4/2025 6/10/2025 5/28/2025 5/14/2025 5/5/2025 5/14/2025 9/25/2025 2/5/2025 6/3/2025 6/10/2025 2/12/2025 7/23/2025 6/5/2025 2/18/2025 7/8/2025 6/5/2025 4/9/2025 4/9/2025 4/9/2025 2/18/2025 4/28/2025 7/8/2025 5/22/2025 6/12/2025 6/5/2025 6/5/2025 7/8/2025 6/5/2025 7/7/2025 6/5/2025 3/4/2025 3/13/2025 3/13/2025 5/6/2025 6/4/2025 6/4/2025 4/3/2025 5/7/2025 5/7/2025 5/7/2025 7/24/2025 7/8/2025 7/2/2025 6/3/2025 3/6/2025 3/6/2025 5/13/2025 7/8/2025 6/5/2025 3/13/2025 3/13/2025 3/13/2025 8/20/2025 3/13/2025 3/13/2025 7/10/2025 6/10/2025 3/24/2025 6/5/2025 5/27/2025 3/24/2025 7/24/2025 8/11/2025 7/16/2025 7/10/2025 Cancel 6/10/2025 6/10/2025 7/24/2025 3/24/2025 7/23/2025 6/12/2025 7/1/2025 8/7/2025 Cancel 7/10/2025 6/5/2025 7/15/2025 6/5/2025 7/1/2025 6/10/2025 Cancel 6/10/2025 7/8/2025 5/5/2025 Cancel 7/9/2025 7/8/2025 6/10/2025 5/7/2025 5/12/2025 6/4/2025 6/4/2025 5/5/2025 7/21/2025 7/23/2025 9/11/2025 7/21/2025 7/1/2025 5/20/2025 9/25/2025 5/19/2025 5/19/2025 5/19/2025 7/23/2025 5/29/2025 7/16/2025 9/11/2025 Cancel 5/20/2025 Cancel Cancel 6/12/2025 7/9/2025 5/20/2025 5/22/2025 6/30/2025 7/24/2025 7/10/2025 7/29/2025 7/24/2025 7/21/2025 7/10/2025 8/20/2025 7/8/2025 5/29/2025 5/29/2025 7/31/2025 6/9/2025 7/9/2025 11/3/2025 7/8/2025 9/14/2025 7/7/2025 7/24/2025 7/24/2025 7/24/2025 9/23/2025 7/21/2025 Cancel 6/19/2025 8/20/2025 6/19/2025 6/30/2025 8/8/2025 7/24/2025 6/11/2025 Date Concurrence Agreed # of days for Engineering Phase Upon and Application Review on Merits 7/23/2025 5/23/2025 6/6/2025 7/18/2025 6/17/2025 3/17/2025 3/19/2025 5/20/2025 6/3/2025 6/3/2025 7/24/2025 3/31/2025 3/19/2025 7/24/2025 6/6/2025 3/18/2025 7/8/2025 6/6/2025 9/5/2025 4/29/2025 6/23/2025 3/12/2025 4/29/2025 7/8/2025 7/22/2025 6/12/2025 6/6/2025 6/6/2025 7/8/2025 6/6/2025 7/7/2025 6/6/2025 5/16/2025 6/23/2025 5/13/2025 7/30/2025 6/11/2025 4/3/2025 5/8/2025 5/19/2025 5/8/2025 7/24/2025 7/8/2025 7/7/2025 6/3/2025 4/28/2025 5/16/2025 5/13/2025 7/21/2025 6/6/2025 5/6/2025 5/16/2025 5/13/2025 8/20/2025 6/2/2025 6/2/2025 7/10/2025 6/13/2025 5/13/2025 6/10/2025 5/29/2025 5/16/2025 7/24/2025 8/12/2025 7/17/2025 7/10/2025 N/A 6/17/2025 6/13/2025 7/24/2025 6/2/2025 7/23/2025 7/21/2025 9/4/2025 8/14/2025 N/A 7/10/2025 7/24/2025 9/4/2025 6/10/2025 7/1/2025 6/13/2025 6/11/2025 6/11/2025 7/17/2025 5/9/2025 N/A 7/9/2025 7/8/2025 6/11/2025 5/21/2025 5/9/2025 6/4/2025 5/21/2025 7/16/2025 7/23/2025 7/23/2025 9/11/2025 7/22/2025 10/14/2025 6/4/2025 9/25/2025 5/21/2025 5/21/2025 5/28/2025 7/23/2025 6/24/2025 5/30/2025 7/17/2025 9/11/2025 N/A 5/28/2025 N/A N/A 6/12/2025 7/10/2025 6/23/2025 6/23/2025 7/2/2025 7/10/2025 7/30/2025 7/24/2025 7/22/2025 7/10/2025 8/20/2025 7/22/2025 7/2/2025 7/1/2025 8/4/2025 7/10/2025 7/9/2025 11/3/2025 7/9/2025 9/17/2025 10/22/2025 7/25/2025 8/13/2025 9/2/2025 7/31/2025 8/20/2025 N/A 7/17/2025 8/21/2025 7/10/2025 7/1/2025 8/15/2025 8/5/2025 8/5/2025 183 93 107 178 56 55 57 119 118 133 155 69 57 106 101 48 133 101 192 63 118 35 83 133 147 127 101 101 133 101 152 101 93 131 83 155 91 43 72 83 72 106 118 104 83 68 86 77 117 86 70 73 70 54 90 90 72 45 62 98 78 65 78 153 71 72 49 45 86 76 85 125 162 127 79 121 155 83 104 45 70 70 106 37 98 97 63 42 30 56 42 98 70 70 56 91 188 43 70 29 29 36 92 63 38 86 85 36 50 64 47 40 56 50 70 64 62 64 98 69 42 41 63 38 37 73 37 142 51 70 90 36 77 43 51 36 27 45 55 55 Did Engineering Phase meet mandated timeframes (Y/N) NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO YES NO NO NO NO NO NO NO NO NO YES NO NO NO NO NO NO NO NO NO NO NO YES NO NO NO YES NO NO NO YES YES NO YES NO NO NO NO NO NO YES NO YES YES YES NO NO YES NO NO YES NO NO NO YES NO NO NO NO NO NO NO NO YES YES NO YES YES NO YES NO NO NO NO YES NO YES NO YES YES YES NO NO Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) 12/12/2025 7/23/2025 6/23/2025 6/9/2025 7/24/2025 6/18/2025 3/17/2025 4/2/2025 6/4/2025 8/7/2025 9/24/2025 10/28/2025 8/21/2025 9/3/2025 9/30/2025 4/2/2025 10/28/2025 8/7/2025 4/9/2025 7/24/2025 6/9/2025 4/9/2025 7/28/2025 6/23/2025 9/24/2025 6/11/2025 10/2/2025 4/9/2025 5/15/2025 7/28/2025 7/22/2025 7/2/2025 6/9/2025 6/9/2025 7/21/2025 6/9/2025 7/31/2025 6/24/2025 5/28/2025 8/6/2025 6/4/2025 12/5/2025 6/11/2025 6/30/2025 4/10/2025 5/20/2025 5/21/2025 5/20/2025 7/24/2025 7/9/2025 9/23/2025 7/3/2025 5/7/2025 6/4/2025 6/24/2025 9/23/2025 6/9/2025 5/6/2025 7/9/2025 6/4/2025 8/21/2025 9/11/2025 6/4/2025 7/10/2025 6/16/2025 5/14/2025 7/29/2025 12/18/2025 8/1/2025 5/27/2025 7/14/2025 7/23/2025 8/19/2025 3/21/2025 4/25/2025 6/17/2025 8/4/2025 10/20/2025 10/29/2025 7/23/2025 9/3/2025 10/14/2025 8/19/2025 6/23/2025 5/19/2025 10/17/2025 7 12 2 12 1 1 78 30 9 19 42 64 3 1 54 22 1 101 2 1 3 1 49 7/3/2025 7/3/2025 9/11/2025 9/26/2025 12/22/2025 7/10/2025 5/5/2025 6/26/2025 7/2/2025 7/28/2025 6/4/2025 7/23/2025 10/8/2025 11/28/2025 12/12/2025 5/2/2025 10/6/2025 9/8/2025 10/13/2025 7/31/2025 8/5/2025 6/13/2025 6/11/2025 6/11/2025 1/8/2026 9/11/2025 6/30/2025 7/23/2025 7/9/2025 6/24/2025 5/28/2025 5/9/2025 6/18/2025 6/4/2025 8/28/2025 7/23/2025 7/28/2025 9/11/2025 10/16/2025 10/24/2025 6/17/2025 9/25/2025 6/4/2025 5/28/2025 6/11/2025 7/28/2025 7/28/2025 6/11/2025 9/23/2025 9/18/2025 8/12/2025 6/4/2025 9/19/2025 8/8/2025 6/13/2025 8/19/2025 5/30/2025 12/15/2025 11/7/2025 10/17/2025 8/19/2025 35 48 49 45 158 1 7/14/2025 6/24/2025 7/9/2025 7/14/2025 12/2/2025 7/23/2025 7/31/2025 7/25/2025 7/23/2025 7/16/2025 8/27/2025 7/28/2025 7/23/2025 7/23/2025 8/13/2025 8/6/2025 7/10/2025 11/4/2025 7/23/2025 Canceled 12/2/2025 7/28/2025 9/10/2025 10/15/2025 8/5/2025 10/31/2025 7/31/2025 7/22/2025 9/18/2025 9/25/2025 7/1/2025 9/18/2025 8/13/2025 8/28/2025 # of days for Power Design/MR Development # of days for Telco Design/MR Development 1 31 3 6 1 1 14 15 9 4 38 5 63 4 37 28 113 139 79 41 50 41 2 11/20/2025 11/17/2025 4/25/2025 7/29/2025 4/25/2025 7/9/2025 7/2/2025 9/29/2025 8/19/2025 7/16/2025 3/18/2025 5/6/2025 7/21/2025 11/19/2025 9/24/2025 7/16/2025 7/9/2025 7/11/2025 9/30/2025 5/27/2025 7/22/2025 5/16/2025 12/8/2025 7/16/2025 7/1/2025 6/2/2025 6/19/2025 5/29/2025 9/23/2025 10/29/2025 8/1/2025 7/29/2025 6/24/2025 5/15/2025 9/29/2025 6/16/2025 5/29/2025 6/11/2025 5/29/2025 9/3/2025 6/4/2025 7/29/2025 8/19/2025 7/24/2025 10/27/2025 10/20/2025 7/15/2025 7/30/2025 6/16/2025 10/30/2025 10/29/2025 8/11/2025 8/19/2025 8/1/2025 8/4/2025 7/2/2025 21 1 3 22 20 17 19 43 101 28 16 20 1 20 3 3 13 3 24 18 12 44 22 128 1 9 19 4 2 1 79 85 120 88 46 39 51 35 1 1 1 175 125 37 5 38 1 26 24 112 23 6 7 13 120 104 40 1 35 85 11 29 3 131 35 25 31 21 61 113 25 56 57 2 70 10 23 26 16 14 2 40 10 6 129 82 14 144 87 92 40 46 26 1 53 67 5 6 6 121 138 25 102 7/25/2025 11/14/2025 7/8/2025 10/14/2025 6/17/2025 9/3/2025 6/16/2025 7/28/2025 8/22/2025 6/10/2025 1/21/2026 11/4/2025 14 1 13 7 1 14 14 43 1 5 1 86 10 13 1 14 7 14 5 34 12 68 7 6/16/2025 7 19 7/11/2025 1 29 7/24/2025 7/9/2025 7/24/2025 4 1 16 12 14 16 31 11/3/2025 8/27/2025 8/4/2025 7/25/2025 7/29/2025 8/26/2025 12/16/2025 7/24/2025 7/7/2025 9/23/2025 8/19/2025 12/30/2025 11/6/2025 11/19/2025 13 1 1 1 6 7 6 21 22 9 27 1 1 14 Canceled 41 3 28 43 5 72 116 28 11 3 19 6 147 22 6 50 40 174 3 133 5 28 77 1 34 8 23 33 6 40 52 167 6/2/2025 7/9/2025 8/20/2025 7/24/2025 11/10/2025 12/5/2025 8/29/2025 10/21/2025 9/23/2025 10/28/2025 8/19/2025 8/27/2025 8/19/2025 8/22/2025 1/29/2026 8/29/2025 23 27 21 24 35 35 1 110 3 31 34 19 27 105 19 5 59 11 188 54 44 35 49 54 69 24Page 25 of 25
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 30, 2026 OCC-190 Attachment 2 Page 25 of 25 Connecticut Light and Power dba Eversource Energy Docket No. 19-01-52RE01 Feburary 15, 2023 Compliance Order No. 5, Attachment Page 2 of 2 Proposed Attacher (Company Name) NetSpeed LLC NetSpeed LLC NetSpeed LLC TELEPORT COMMUNICATIONS AMERICA, LLC TELEPORT COMMUNICATIONS AMERICA, LLC COMCAST - CT New Cingular Wireless PCS FIBER TECHNOLOGIES NETWORKS, L.L.C. COX COMMUNICATIONS COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COMCAST - CT COX COMMUNICATIONS FIBER TECHNOLOGIES NETWORKS, L.L.C. COX COMMUNICATIONS NetSpeed LLC COMCAST - CT TELEPORT COMMUNICATIONS AMERICA, LLC COX COMMUNICATIONS CITY OF HARTFORD - CT MCIMETRO ACCESS TRANSMISSION SYSTEMS VERIZON WIRELESS VERIZON WIRELESS NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS FIBER TECHNOLOGIES NETWORKS, L.L.C. NetSpeed LLC NetSpeed LLC COX COMMUNICATIONS NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC CHARTER COMMUNICATIONS NetSpeed LLC NetSpeed LLC NetSpeed LLC CHARTER COMMUNICATIONS COX COMMUNICATIONS New Cingular Wireless PCS New Cingular Wireless PCS New Cingular Wireless PCS NetSpeed LLC New Cingular Wireless PCS New Cingular Wireless PCS New Cingular Wireless PCS NetSpeed LLC New Cingular Wireless PCS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS FIBER TECHNOLOGIES NETWORKS, L.L.C. VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS NetSpeed LLC NetSpeed LLC NetSpeed LLC COX COMMUNICATIONS NetSpeed LLC NetSpeed LLC VERIZON WIRELESS VERIZON WIRELESS NetSpeed LLC NetSpeed LLC COX COMMUNICATIONS NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS VERIZON WIRELESS NetSpeed LLC CHARTER COMMUNICATIONS NetSpeed LLC CHARTER COMMUNICATIONS VERIZON WIRELESS NetSpeed LLC NetSpeed LLC NetSpeed LLC FIBER TECHNOLOGIES NETWORKS, L.L.C. MCIMETRO ACCESS TRANSMISSION SYSTEMS VERIZON WIRELESS New Cingular Wireless PCS FIBER TECHNOLOGIES NETWORKS, L.L.C. VERIZON WIRELESS MCIMETRO ACCESS TRANSMISSION SYSTEMS VERIZON WIRELESS NetSpeed LLC NetSpeed LLC FIBER TECHNOLOGIES NETWORKS, L.L.C. VERIZON WIRELESS VERIZON WIRELESS NetSpeed LLC VERIZON WIRELESS NetSpeed LLC MCIMETRO ACCESS TRANSMISSION SYSTEMS NetSpeed LLC NetSpeed LLC NetSpeed LLC NetSpeed LLC VERIZON WIRELESS COX COMMUNICATIONS COX COMMUNICATIONS VERIZON WIRELESS COMCAST - CT COMCAST - CT NetSpeed LLC NetSpeed LLC COMCAST - CT COMCAST - CT NetSpeed LLC NetSpeed LLC COMCAST - CT COMCAST - CT NetSpeed LLC New Cingular Wireless PCS NetSpeed LLC NetSpeed LLC FIBER TECHNOLOGIES NETWORKS, L.L.C. Date Proposed Attacher Sent Application SPA Acknowledgement (Date) 5/29/2025 6/2/2025 6/2/2025 6/2/2025 6/3/2025 6/3/2025 6/4/2025 6/5/2025 6/6/2025 6/8/2025 6/8/2025 6/8/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/11/2025 6/12/2025 6/17/2025 6/17/2025 6/18/2025 6/19/2025 6/26/2025 6/30/2025 6/30/2025 7/2/2025 7/2/2025 7/3/2025 7/3/2025 7/7/2025 7/7/2025 7/8/2025 7/9/2025 7/14/2025 7/15/2025 7/15/2025 7/16/2025 7/16/2025 7/17/2025 7/17/2025 7/18/2025 7/18/2025 7/21/2025 7/21/2025 7/21/2025 7/21/2025 7/21/2025 7/21/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/25/2025 7/25/2025 7/25/2025 7/28/2025 7/29/2025 7/29/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 8/1/2025 8/5/2025 8/5/2025 8/8/2025 8/11/2025 8/12/2025 8/13/2025 8/13/2025 8/13/2025 8/15/2025 8/19/2025 8/19/2025 8/19/2025 8/19/2025 8/19/2025 8/19/2025 8/19/2025 8/22/2025 8/22/2025 8/26/2025 8/27/2025 8/27/2025 8/27/2025 8/27/2025 8/28/2025 9/2/2025 9/3/2025 9/3/2025 9/5/2025 9/8/2025 9/8/2025 9/9/2025 9/10/2025 9/12/2025 9/22/2025 9/22/2025 10/10/2025 10/10/2025 10/14/2025 10/14/2025 10/15/2025 10/15/2025 10/15/2025 10/15/2025 10/15/2025 10/15/2025 10/30/2025 10/30/2025 11/25/2025 5/30/2025 6/2/2025 6/3/2025 6/3/2025 6/4/2025 6/3/2025 6/4/2025 6/6/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/11/2025 6/16/2025 6/17/2025 6/18/2025 6/19/2025 6/19/2025 6/27/2025 6/30/2025 6/30/2025 7/3/2025 7/3/2025 7/8/2025 7/8/2025 7/8/2025 7/8/2025 7/15/2025 7/15/2025 7/15/2025 7/15/2025 7/16/2025 7/16/2025 7/17/2025 7/17/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/25/2025 7/25/2025 7/25/2025 7/23/2025 7/23/2025 7/25/2025 7/25/2025 7/25/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/25/2025 7/28/2025 7/28/2025 7/28/2025 7/28/2025 7/30/2025 7/29/2025 8/1/2025 8/1/2025 7/30/2025 8/1/2025 7/30/2025 7/30/2025 7/30/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/5/2025 8/5/2025 8/8/2025 8/11/2025 8/13/2025 8/15/2025 8/15/2025 8/15/2025 8/18/2025 8/19/2025 8/21/2025 8/19/2025 8/21/2025 8/21/2025 8/19/2025 8/21/2025 8/22/2025 8/22/2025 8/27/2025 9/1/2025 9/1/2025 9/1/2025 9/1/2025 9/1/2025 9/2/2025 9/4/2025 9/4/2025 9/9/2025 9/9/2025 9/9/2025 9/9/2025 9/10/2025 9/12/2025 9/24/2025 9/24/2025 10/15/2025 10/15/2025 10/17/2025 10/17/2025 10/17/2025 10/15/2025 10/17/2025 10/15/2025 10/17/2025 10/17/2025 10/30/2025 10/30/2025 11/26/2025 Submission Complete Y or N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y If Submission Not Complete Date Attacher Notified by SPA Date Attacher Resubmits Date SPA Acknowledges Submission for Completeness Time Taken To Review by SPA # of Days Allowed for Completeness Review Did SPA Meet Compliance for Completeness Review Y/N 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y (Invoice is generated) 5/30/2025 6/2/2025 6/3/2025 6/3/2025 6/4/2025 6/3/2025 6/4/2025 6/6/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/10/2025 6/11/2025 6/16/2025 6/17/2025 6/18/2025 6/19/2025 6/19/2025 6/27/2025 6/30/2025 6/30/2025 7/3/2025 7/3/2025 7/8/2025 7/8/2025 7/8/2025 7/8/2025 7/15/2025 7/15/2025 7/15/2025 7/15/2025 7/16/2025 7/16/2025 7/17/2025 7/17/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/22/2025 7/25/2025 7/25/2025 7/25/2025 7/23/2025 7/23/2025 7/25/2025 7/25/2025 7/25/2025 7/23/2025 7/23/2025 7/23/2025 7/23/2025 7/25/2025 7/28/2025 7/28/2025 7/28/2025 7/28/2025 7/30/2025 7/29/2025 8/1/2025 8/1/2025 7/30/2025 8/1/2025 7/30/2025 7/30/2025 7/30/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/1/2025 8/5/2025 8/5/2025 8/8/2025 8/11/2025 8/13/2025 8/15/2025 8/15/2025 8/15/2025 8/18/2025 8/19/2025 8/21/2025 8/19/2025 8/21/2025 8/21/2025 8/19/2025 8/21/2025 8/22/2025 8/22/2025 8/27/2025 9/1/2025 9/1/2025 9/1/2025 9/1/2025 9/1/2025 9/2/2025 9/4/2025 9/4/2025 9/9/2025 9/9/2025 9/9/2025 9/9/2025 9/10/2025 9/12/2025 9/24/2025 9/24/2025 10/15/2025 10/15/2025 10/17/2025 10/17/2025 10/17/2025 10/15/2025 10/17/2025 10/15/2025 10/17/2025 10/17/2025 10/30/2025 10/30/2025 11/26/2025 Application Fee Received Y or N Application Fee Received (Within Reporting Date Timeframe) Y 6/11/2025 Y 6/11/2025 Y 6/11/2025 Y 6/4/2025 Y 6/18/2025 Y 8/22/2025 Y 6/25/2025 Y 6/11/2025 Y 7/11/2025 Y 8/22/2025 Y 8/20/2025 Y 8/20/2025 Y 8/20/2025 Y 8/20/2025 Y 7/11/2025 Y 6/18/2025 Y 7/11/2025 Y 7/1/2025 Y 8/22/2025 Y 7/1/2025 Y 6/25/2025 Y 7/1/2025 Y 7/30/2025 Y 8/6/2025 Y 8/6/2025 Y 7/9/2025 Y 7/9/2025 Y 7/14/2025 Y 7/14/2025 Y 8/13/2025 Y 7/14/2025 Y 7/30/2025 Y 7/30/2025 Y 7/30/2025 Y 7/30/2025 Y 7/30/2025 Y 7/30/2025 Y 7/30/2025 Y 10/29/2025 Y 7/30/2025 Y 7/30/2025 Y 7/30/2025 Y 9/16/2025 Y 7/30/2025 Y 8/6/2025 Y 9/10/2025 Y 8/6/2025 Y 7/30/2025 Y 8/6/2025 Y 8/6/2025 Y 8/6/2025 Y 7/30/2025 Y 8/6/2025 Y 9/8/2025 Y 9/8/2025 Y 9/8/2025 Y 8/6/2025 Y 9/4/2025 Y 9/4/2025 Y 9/4/2025 Y 9/8/2025 Y 9/4/2025 Y 9/4/2025 Y 9/4/2025 Y 9/4/2025 Y 9/8/2025 Y 8/6/2025 Y 8/6/2025 Y 8/6/2025 Y 8/6/2025 Y 8/13/2025 Y 8/6/2025 Y 8/20/2025 Y 8/20/2025 Y 8/13/2025 Y 8/13/2025 Y 8/6/2025 Y 8/13/2025 Y 8/13/2025 Y 8/13/2025 Y 8/13/2025 Y 8/13/2025 Y 8/20/2025 Y 8/20/2025 Y 8/20/2025 Y 8/20/2025 Y 8/20/2025 Y 8/20/2025 Y 8/20/2025 Y 8/13/2025 Y 9/10/2025 Y 8/20/2025 Y 10/29/2025 Y 8/27/2025 Y 8/20/2025 Y 8/20/2025 Y 8/20/2025 Y 8/27/2025 Y 9/10/2025 Y 9/16/2025 Y 9/10/2025 Y 9/4/2025 Y 9/16/2025 Y 9/10/2025 Y 9/16/2025 Y 9/3/2025 Y 9/3/2025 Y 9/4/2025 Y 9/16/2025 Y 9/16/2025 Y 9/16/2025 Y 9/16/2025 Y 9/10/2025 Y 10/22/2025 Y 9/16/2025 Y 9/16/2025 Y 9/29/2025 Y 9/29/2025 Y 10/9/2025 Y 10/1/2025 Y 10/1/2025 Y 10/9/2025 Y 11/12/2025 Y 11/19/2025 Y 10/22/2025 Y 10/22/2025 Y 12/9/2025 Y 12/9/2025 Y 10/22/2025 Y 10/22/2025 Y 12/9/2025 Y 12/10/2025 Y 10/22/2025 Y 11/6/2025 Y 11/12/2025 Y 11/12/2025 Y 12/4/2025 Conversation # # of poles Applicant Category <300, 300-3,000 or >3,000 Engineering Start Date (application fee received date) Power Field Survey Complete Date 1869813 1870830 1871058 1871173 1871714 1869666 1872463 1873016 1873902 1874178 1874172 1874163 1875102 1875110 1875016 1875017 1875828 1877132 1879725 1879733 1880054 1880915 1884182 1885362 1885493 1886336 1886349 1886888 1886909 1887414 1887609 1887956 1888572 1890070 1890612 1890644 1890986 1879526 1891724 1889687 1892754 1892755 1893115 1893118 1893209 1893220 1893224 1893189 1893512 1893509 1893513 1893616 1893507 1894198 1894205 1894209 1893781 1894083 1894163 1894178 1894201 1894041 1894035 1894037 1894045 1894214 1895153 1895211 1895243 1896269 1896569 1896549 1897625 1897492 1897416 1897510 1897266 1897347 1897349 1897527 1897540 1897550 1897598 1897619 1897632 1897649 1897686 1897512 1898483 1900215 1898846 1891065 1903961 1904322 1899480 1899503 1899513 1910267 1911024 1911434 1911118 1911292 1911261 1911025 1911247 1913786 1913616 1914774 1917109 1917157 1917044 1917162 1917533 1919816 1920159 1920281 1921677 1921531 1922053 1922576 1922589 1924430 1928284 1928285 1928072 1927687 1936650 1936651 1931585 1931710 1936937 1937069 1931187 1936954 1944234 1944351 1954553 2 4 2 55 40 1 2 1 1 3 5 1 3 5 2 11 1 6 1 6 2 2 1 1 1 4 40 3 4 88 26 3 14 1 2 4 1 23 3 13 1 1 3 1 1 1 1 31 2 1 1 10 1 2 3 2 9 1 1 1 1 1 1 1 1 1 5 7 2 2 2 2 2 2 7 2 1 2 2 7 14 8 1 1 1 1 1 2 1 2 6 53 1 1 95 23 7 2 4 1 1 1 2 6 1 7 2 1 3 2 3 2 8 1 4 6 5 23 2 1 4 1 1 1 203 202 7 1 200 131 4 1 196 2 10 39 99 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 300-3,000 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 300-3,000 300-3,000 <300 300-3,000 300-3,000 300-3,000 300-3,000 <300 300-3,000 300-3,000 300-3,000 <300 <300 <300 <300 <300 300-3,000 <300 <300 <300 300-3,000 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 <300 300-3,000 <300 <300 300-3,000 300-3,000 300-3,000 <300 <300 <300 <300 <300 <300 <300 <300 300-3,000 300-3,000 <300 <300 <300 300-3,000 <300 300-3,000 <300 300-3,000 300-3,000 <300 <300 <300 <300 <300 <300 <300 <300 300-3,000 300-3,000 <300 <300 300-3,000 300-3,000 <300 <300 300-3,000 <300 300-3,000 300-3,000 <300 6/11/2025 6/11/2025 6/11/2025 6/4/2025 6/18/2025 8/22/2025 6/25/2025 6/11/2025 7/11/2025 8/22/2025 8/20/2025 8/20/2025 8/20/2025 8/20/2025 7/11/2025 6/18/2025 7/11/2025 7/1/2025 8/22/2025 7/1/2025 6/25/2025 7/1/2025 7/30/2025 8/6/2025 8/6/2025 7/9/2025 7/9/2025 7/14/2025 7/14/2025 8/13/2025 7/14/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 7/30/2025 10/29/2025 7/30/2025 7/30/2025 7/30/2025 9/16/2025 7/30/2025 8/6/2025 9/10/2025 8/6/2025 7/30/2025 8/6/2025 8/6/2025 8/6/2025 7/30/2025 8/6/2025 9/8/2025 9/8/2025 9/8/2025 8/6/2025 9/4/2025 9/4/2025 9/4/2025 9/8/2025 9/4/2025 9/4/2025 9/4/2025 9/4/2025 9/8/2025 8/6/2025 8/6/2025 8/6/2025 8/6/2025 8/13/2025 8/6/2025 8/20/2025 8/20/2025 8/13/2025 8/13/2025 8/6/2025 8/13/2025 8/13/2025 8/13/2025 8/13/2025 8/13/2025 8/20/2025 8/20/2025 8/20/2025 8/20/2025 8/20/2025 8/20/2025 8/20/2025 8/13/2025 9/10/2025 8/20/2025 10/29/2025 8/27/2025 8/20/2025 8/20/2025 8/20/2025 8/27/2025 9/10/2025 9/16/2025 9/10/2025 9/4/2025 9/16/2025 9/10/2025 9/16/2025 9/3/2025 9/3/2025 9/4/2025 9/16/2025 9/16/2025 9/16/2025 9/16/2025 9/10/2025 10/22/2025 9/16/2025 9/16/2025 9/29/2025 9/29/2025 10/9/2025 10/1/2025 10/1/2025 10/9/2025 11/12/2025 11/19/2025 10/22/2025 10/22/2025 12/9/2025 12/9/2025 10/22/2025 10/22/2025 12/9/2025 12/10/2025 10/22/2025 11/6/2025 11/12/2025 11/12/2025 12/4/2025 7/23/2025 7/23/2025 7/23/2025 6/26/2025 6/26/2025 9/5/2025 7/21/2025 6/24/2025 7/18/2025 9/5/2025 9/5/2025 9/12/2025 9/5/2025 9/5/2025 7/21/2025 6/25/2025 7/18/2025 7/10/2025 9/5/2025 7/18/2025 7/17/2025 7/18/2025 8/22/2025 8/21/2025 8/21/2025 7/23/2025 7/23/2025 8/1/2025 8/1/2025 9/10/2025 8/4/2025 8/7/2025 8/20/2025 8/22/2025 8/20/2025 8/20/2025 8/20/2025 8/20/2025 12/17/2025 8/20/2025 8/20/2025 8/20/2025 10/6/2025 8/22/2025 8/20/2025 9/19/2025 8/20/2025 8/20/2025 8/22/2025 8/22/2025 8/22/2025 8/20/2025 8/22/2025 9/19/2025 9/19/2025 9/19/2025 9/12/2025 9/17/2025 9/19/2025 9/19/2025 9/17/2025 9/17/2025 9/17/2025 9/17/2025 9/19/2025 10/1/2025 9/29/2025 10/1/2025 8/22/2025 10/1/2025 10/1/2025 9/10/2025 9/10/2025 10/1/2025 9/26/2025 8/21/2025 10/1/2025 10/1/2025 9/24/2025 10/1/2025 10/1/2025 9/11/2025 9/10/2025 9/10/2025 9/11/2025 9/17/2025 9/10/2025 10/1/2025 9/12/2025 9/26/2025 11/26/2025 9/17/2025 10/1/2025 10/1/2025 9/26/2025 9/5/2025 9/19/2025 10/6/2025 9/19/2025 9/12/2025 10/2/2025 9/19/2025 10/2/2025 10/1/2025 10/1/2025 9/12/2025 10/2/2025 10/2/2025 10/1/2025 10/2/2025 10/1/2025 11/26/2025 10/1/2025 10/1/2025 10/28/2025 10/28/2025 10/23/2025 10/23/2025 10/23/2025 11/26/2025 11/26/2025 11/14/2025 11/14/2025 12/19/2025 12/17/2025 12/2/2025 12/2/2025 12/17/2025 12/16/2025 12/2/2025 11/26/2025 12/2/2025 12/2/2025 12/18/2025 Telco Field Survey Complete Date 8/12/2025 12/30/2025 8/25/2025 11/4/2025 11/4/2025 8/25/2025 10/30/2025 12/31/2025 11/5/2025 11/5/2025 12/3/2025 10/1/2025 11/5/2025 9/25/2025 9/25/2025 9/25/2025 9/22/2025 9/25/2025 9/4/2025 10/20/2025 9/22/2025 10/2/2025 9/22/2025 9/26/2025 9/17/2025 11/12/2025 9/30/2025 10/28/2025 12/18/2025 10/3/2025 11/12/2025 12/12/2025 10/14/2025 12/1/2025 12/1/2025 10/28/2025 10/2/2025 10/2/2025 10/1/2025 8/30/2025 10/1/2025 12/4/2025 11/5/2025 11/10/2025 10/2/2025 10/24/2025 10/24/2025 10/24/2025 10/7/2025 9/30/2025 9/29/2025 10/14/2025 12/31/2025 10/21/2025 10/29/2025 9/30/2025 9/30/2025 12/31/2025 10/10/2025 10/1/2025 11/12/2025 10/20/2025 10/28/2025 11/10/2025 10/20/2025 10/6/2025 11/21/2025 10/10/2025 10/14/2025 10/1/2025 11/18/2025 12/12/2025 12/31/2025 11/10/2025 12/12/2025 12/31/2025 10/24/2025 10/28/2025 12/3/2025 11/18/2025 12/10/2025 11/6/2025 11/10/2025 11/10/2025 11/12/2025 12/31/2025 12/10/2025 Date Power Requested Concurrence Date Telco Requested Concurrence 8/1/2025 8/1/2025 8/1/2025 7/25/2025 7/24/2025 9/9/2025 N/A 6/30/2025 N/A 9/9/2025 9/9/2025 9/15/2025 9/8/2025 9/9/2025 9/2/2025 7/15/2025 N/A 7/31/2025 9/9/2025 7/28/2025 7/22/2025 7/29/2025 8/28/2025 9/30/2025 9/30/2025 7/31/2025 8/13/2025 8/8/2025 8/8/2025 9/22/2025 8/5/2025 9/10/2025 9/12/2025 8/27/2025 9/10/2025 9/24/2025 9/10/2025 9/12/2025 12/17/2025 9/12/2025 9/12/2025 9/9/2025 10/14/2025 8/28/2025 8/27/2025 N/A 8/26/2025 9/12/2025 8/29/2025 8/29/2025 8/29/2025 8/21/2025 8/29/2025 10/2/2025 10/3/2025 10/2/2025 9/15/2025 10/8/2025 9/30/2025 N/A Cancel 10/9/2025 10/1/2025 10/1/2025 10/9/2025 10/3/2025 9/23/2025 9/23/2025 9/23/2025 8/29/2025 9/18/2025 9/23/2025 9/25/2025 9/25/2025 9/25/2025 9/23/2025 8/29/2025 9/29/2025 9/18/2025 9/29/2025 9/18/2025 9/18/2025 9/19/2025 9/25/2025 9/25/2025 9/19/2025 9/25/2025 10/1/2025 9/18/2025 9/18/2025 9/29/2025 10/1/2025 N/A N/A 9/29/2025 9/25/2025 9/18/2025 9/10/2025 9/30/2025 11/6/2025 N/A 9/23/2025 10/27/2025 9/30/2025 10/27/2025 10/16/2025 10/3/2025 N/A 10/27/2025 10/27/2025 10/23/2025 10/24/2025 10/21/2025 12/5/2025 10/29/2025 10/27/2025 10/24/2025 10/28/2025 11/13/2025 N/A 11/11/2025 Cancel N/A N/A 12/23/2025 12/17/2025 Cancel N/A N/A - 6/30/2025 6/30/2025 6/30/2025 7/24/2025 9/11/2025 11/3/2025 Cancel 8/20/2025 Cancel 10/28/2025 11/17/2025 11/3/2025 11/3/2025 12/1/2025 9/25/2025 9/11/2025 Cancel 7/31/2025 11/3/2025 8/20/2025 8/20/2025 8/20/2025 9/11/2025 8/6/2025 8/7/2025 8/12/2025 Cancel 10/8/2025 9/11/2025 9/10/2025 9/16/2025 9/25/2025 9/12/2025 8/13/2025 9/12/2025 8/7/2025 12/11/2025 8/18/2025 8/20/2025 8/20/2025 11/18/2025 9/24/2025 10/7/2025 Cancel 10/7/2025 8/13/2025 10/1/2025 10/1/2025 9/25/2025 8/23/2025 9/11/2025 11/5/2025 10/15/2025 10/15/2025 9/25/2025 10/8/2025 10/15/2025 Cancel Cancel 10/15/2025 10/15/2025 10/15/2025 10/15/2025 10/15/2025 8/16/2025 8/14/2025 8/20/2025 9/24/2025 8/26/2025 8/26/2025 10/22/2025 10/15/2025 8/18/2025 8/28/2025 9/25/2025 8/20/2025 9/2/2025 8/28/2025 9/2/2025 9/2/2025 10/15/2025 10/15/2025 10/15/2025 10/15/2025 10/15/2025 10/15/2025 10/15/2025 8/26/2025 11/18/2025 8/28/2025 Cancel 8/28/2025 9/24/2025 9/2/2025 11/3/2025 12/2/2025 12/2/2025 Cancel 10/21/2025 11/5/2025 12/2/2025 12/8/2025 9/24/2025 9/24/2025 Cancel 11/5/2025 11/5/2025 9/24/2025 11/5/2025 9/25/2025 11/5/2025 9/25/2025 10/29/2025 9/30/2025 9/30/2025 11/12/2025 Cancel 12/2/2025 Cancel Cancel Cancel 11/19/2025 Cancel Cancel Cancel - Date Concurrence Agreed # of days for Engineering Phase Upon and Application Review on Merits 8/5/2025 8/5/2025 8/5/2025 8/14/2025 9/23/2025 11/3/2025 N/A 8/20/2025 N/A 10/28/2025 11/19/2025 11/3/2025 11/3/2025 12/2/2025 9/25/2025 9/29/2025 N/A 8/4/2025 11/3/2025 8/21/2025 8/20/2025 8/21/2025 9/12/2025 11/14/2025 11/13/2025 8/8/2025 8/25/2025 8/13/2025 8/19/2025 10/15/2025 9/11/2025 10/1/2025 9/17/2025 9/25/2025 9/12/2025 9/24/2025 9/13/2025 9/23/2025 12/17/2025 9/17/2025 9/22/2025 9/9/2025 11/18/2025 9/25/2025 10/7/2025 N/A 10/7/2025 9/23/2025 10/1/2025 10/1/2025 9/25/2025 8/25/2025 9/12/2025 11/5/2025 10/15/2025 10/15/2025 9/25/2025 10/8/2025 10/15/2025 N/A Cancel 10/15/2025 10/15/2025 10/15/2025 10/15/2025 10/15/2025 9/29/2025 9/25/2025 9/25/2025 9/25/2025 9/23/2025 9/29/2025 10/23/2025 10/16/2025 10/1/2025 9/25/2025 9/25/2025 9/30/2025 10/3/2025 9/29/2025 9/25/2025 9/25/2025 10/16/2025 10/15/2025 10/23/2025 10/15/2025 10/15/2025 10/16/2025 10/16/2025 10/3/2025 11/19/2025 10/7/2025 N/A N/A 10/16/2025 10/10/2025 9/25/2025 11/5/2025 12/2/2025 12/2/2025 N/A 10/21/2025 11/5/2025 12/2/2025 12/8/2025 10/17/2025 10/6/2025 N/A 11/5/2025 11/5/2025 12/1/2025 11/5/2025 10/22/2025 12/5/2025 11/5/2025 10/30/2025 10/28/2025 11/12/2025 11/13/2025 N/A Cancel N/A N/A Cancel N/A N/A - 55 55 55 71 97 73 70 67 91 75 75 104 76 103 34 73 51 56 51 44 100 99 30 47 30 36 63 59 63 49 57 44 56 45 55 49 49 54 41 63 57 62 62 55 56 56 50 26 37 58 37 37 50 34 41 Canceled 41 41 41 41 37 54 50 50 50 41 54 64 57 49 43 50 48 51 47 43 43 57 56 64 56 56 57 57 51 70 48 57 51 36 70 83 77 47 50 83 83 44 33 50 50 76 50 42 44 50 44 29 44 35 Canceled Canceled - Did Engineering Phase meet mandated timeframes (Y/N) NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO YES NO NO YES NO YES YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO YES NO YES YES NO YES YES Canceled YES YES YES YES YES NO NO NO NO YES NO NO NO NO YES NO NO NO NO YES YES NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO YES NO NO YES YES YES Canceled Canceled - Power Design/Make-Ready Development Complete Date (includes information uploaded into Alden) 8/5/2025 8/13/2025 8/13/2025 10/14/2025 9/25/2025 11/4/2025 7/29/2025 8/21/2025 8/4/2025 11/3/2025 11/19/2025 11/4/2025 11/4/2025 12/10/2025 9/25/2025 10/16/2025 8/4/2025 8/13/2025 11/4/2025 9/3/2025 9/9/2025 9/3/2025 9/12/2025 11/18/2025 11/13/2025 8/13/2025 9/10/2025 8/14/2025 8/20/2025 11/24/2025 9/24/2025 10/22/2025 9/24/2025 9/29/2025 10/1/2025 10/8/2025 10/15/2025 11/3/2025 12/18/2025 10/8/2025 9/22/2025 9/11/2025 11/24/2025 9/29/2025 10/10/2025 10/27/2025 10/10/2025 10/3/2025 10/6/2025 10/6/2025 9/30/2025 9/3/2025 10/3/2025 11/7/2025 11/3/2025 11/3/2025 10/1/2025 10/22/2025 10/22/2025 10/27/2025 11/3/2025 10/27/2025 11/3/2025 10/22/2025 11/3/2025 10/8/2025 10/1/2025 10/3/2025 9/30/2025 10/8/2025 10/8/2025 11/3/2025 11/3/2025 10/8/2025 9/26/2025 9/25/2025 1/7/2026 10/8/2025 10/8/2025 10/3/2025 10/3/2025 11/3/2025 11/3/2025 11/3/2025 10/27/2025 10/22/2025 11/3/2025 11/3/2025 10/3/2025 11/19/2025 1/23/2026 12/16/2025 10/6/2025 11/5/2025 11/5/2025 9/26/2025 11/6/2025 12/8/2025 12/3/2025 10/10/2025 10/21/2025 11/10/2025 12/8/2025 12/12/2025 11/5/2025 10/15/2025 10/6/2025 11/13/2025 11/7/2025 1/28/2026 11/7/2025 12/2/2025 12/16/2025 11/13/2025 11/13/2025 12/2/2025 12/3/2025 11/24/2025 11/24/2025 12/8/2025 12/11/2025 12/12/2025 12/29/2025 12/17/2025 Telco Design/Make-Ready Complete Date(includes information uploaded into Alden) # of days for Power Design/MR Development # of days for Telco Design/MR Development 8/12/2025 12/30/2025 9/23/2025 11/4/2025 11/4/2025 1 8 8 61 2 1 7 147 40 42 1 8/25/2025 1 5 10/30/2025 12/31/2025 11/6/2025 11/6/2025 12/16/2025 6 1 1 1 8 1 17 2 42 3 3 14 10/1/2025 12/12/2025 10/14/2025 12/1/2025 9 1 13 20 13 1 4 1 5 16 1 1 40 13 21 7 4 19 14 32 41 1 21 1 2 6 4 3 12/1/2025 11/13/2025 10/3/2025 10/3/2025 10/1/2025 9/26/2025 10/1/2025 12/4/2025 11/5/2025 11/10/2025 10/2/2025 10/24/2025 10/24/2025 3 10 5 5 5 9 21 2 19 19 6 14 7 11/18/2025 9/25/2025 9/25/2025 9/25/2025 9/22/2025 2/10/2026 2/10/2026 9/25/2025 10/30/2025 1/5/2026 10/17/2025 10/3/2025 9/30/2025 10/1/2025 9/17/2025 11/12/2025 9/30/2025 10/28/2025 12/19/2025 10/3/2025 11/12/2025 11/5/2025 10/7/2025 10/7/2025 9/30/2025 10/14/2025 12/31/2025 2/10/2026 10/21/2025 10/29/2025 10/1/2025 9/30/2025 12/31/2025 10/17/2025 10/7/2025 11/12/2025 10/20/2025 2/10/2026 10/28/2025 2/10/2026 11/10/2025 10/20/2025 10/17/2025 11/21/2025 11/24/2025 19 12 19 7 19 9 6 8 5 15 9 11 18 7 1 1 99 5 9 8 8 18 19 11 12 7 18 18 1 1 108 2 15 35 36 35 10 88 89 48 66 82 36 2 13 6 5 49 17 35 2 16 51 24 19 55 55 51 2 2 6 32 19 29 21 26 7 16 9 21 8 12 5 19 99 110 5 28 6 5 92 18 12 48 4 118 5 118 25 4 14 2 48 10/28/2025 10/7/2025 11/18/2025 12/12/2025 20 26 1 1 6 1 18 12 13 10 12/31/2025 11/10/2025 12/12/2025 12/31/2025 10/24/2025 10/28/2025 1 5 6 4 19 9 71 5 10 23 7 22 12/16/2025 11/18/2025 12/10/2025 11/6/2025 11/10/2025 11/10/2025 11/21/2025 12/31/2025 12/17/2025 8 2 58 2 41 11 8 14 35 21 11 15 13 5 1 11 13 9 48
Text of OCC-190 Attachment 2(a).xlsx
Sheet names, column headings and text cells; numbers left out
Text of OCC-190 Attachment 3.pdf
Extracted from the file · 21 pages · 204,206 characters
Text of OCC-190 Attachment 4.pdf
Extracted from the file · 18 pages · 32,170 characters
Text of OCC-190 Attachment 5.pdf
Extracted from the file · 4 pages · 7,902 characters
As listed on the current system
Question(s) Answered 190 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/20/2026