Interrogatory responses

Answers to questions 219, 221, 222, 224

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

Text of OCC-221_final.pdf

Extracted from the file · 1 page · 1,517 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-03 Date Issued August 07, 2026 OCC-222 Page 1 of 1 Date Filed: August 21, 2026 Witness: Ned W. Allis Request from: Office of Consumer Counsel Question: (Survivor Curve Changes) Referring to Exhibit CLP Depreciation-4, page 1. FERC Account 364.00, Distribution Plant “POLES, TOWERS AND FIXTURES”. What caused the company to propose a decreased survivor curve of 48-R0.5 compared to current survivor curve 53-R0.5? Response: First, it is important to recognize the 53-R0.5 Iowa Survivor Curve is the result of a settlement, not what was proposed in the prior Depreciation Study as of December 31, 2016, as most reflective of the expectations for these assets as of December 31, 2016. The Iowa Survivor Curve proposed in the prior Depreciation Study was the 50-R0.5. The plant activity recorded since December 31, 2016, which is reflected on pages VII-28 through VII-34 of Exhibit CLP-DEPRECIATION-3, at pages 82-88, indicates a shorter service life than in the previous study and when compared to the current 53-R0.5 estimate. The 48-R0.5 Iowa Survivor Curve, shown on page VII-28 of the Depreciation Study, provided at Exhibit CLPDEPRECIATION-3, at page 82, is a very good fit to the historical retirement activity through age 54 and reflects the expectation that a substantial portion of the future retirements recorded to assets in this Account will be made to assets of ages greater than 54 years. This estimate also incorporates increasing levels of replacements for reasons such as reliability, capacity, and pole inspections.

Text of OCC-224_final.pdf

Extracted from the file · 1 page · 1,873 characters

As listed on the current system

Question(s) Answered 219, 221, 222, 224 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/21/2026

This filing on the current system (opens in a new tab)