Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 234, 244, 245, 246

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy5 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files5

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-03 Date Issued August 07, 2026 OCC-234 Page 1 of 1 Date Filed: August 21, 2026 Witness: Ned W. Allis Request from: Office of Consumer Counsel Question: (Life Span Method) Referring to Exhibit CLP-Depreciation-3, page 124 and Exhibit CLP Depreciation-4, page 2. Why did the Company use the life span method instead of an IOWA curve? Response: The assets reflected in the analysis presented on page VII-70 of Exhibit CLP-DEPRECIATION-3 include an interim retirement component that incorporates the 20-S0 Iowa Survivor Curve. However, as the Company transitions to smarter meter technology, these assets are expected to be retired by the end of the year 2030 consistent with the probable retirement date of 12-2030 as presented in Exhibit CLP-DEPRECIATION-4. For this reason, the life span method using this date is most appropriate for the assets in this account.

Text of OCC-246 Attachment 1.pdf

Extracted from the file · 1 page · 265 characters

As listed on the current system

Question(s) Answered 234, 244, 245, 246 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/21/2026

This filing on the current system (opens in a new tab)