Interrogatory responses

Answers to questions 253

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy1 file
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files1

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-03 Date Issued August 07, 2026 OCC-253 Page 1 of 2 Date Filed: August 21, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (VMP-Branches) Referring to Exhibit CLP-VMP-1, page 7 and 9. Based on the Company’s statement that hazard trees cause 76% of customer outages: a. Please provide all research and/or justification for focusing on trimming branches that are encroaching into conductors and removing overhanging branches. b. Would a greater focus on hazard trees instead of trimming branches produce better grid reliability? Please provide all research the Company has conducted on this subject. Response: The Company does not state that hazard trees cause 76% of customer outages. Rather, the Company’s statement is that hazard trees are responsible for 76% of tree-failure related customer outages. Please refer to exhibit CLP-VMP-1, at page 7 at lines 11-15: Hazard trees are a major focus of the VMP because hazard trees constitute only a small percent of the overall Connecticut tree population but are responsible for approximately 76% of tree failure-related customer outages experienced across the operating year. Please refer to the response to OCC-244 i and CLP-VMP-2, at page 7. Tree-failure related interruptions are approximately 56% (686/1,229 outages investigations) of the tree-related customer outages on blue sky or non-storm days. The remaining 44% of tree-related outages are comprised of: • • • • • Inside Zone Limb Grow-in (5%) Inside Zone Broken Limb Fall-in (1%) Inside Zone Overhang Limb Fall-in (10%) Outside Zone Broken Limb Fall-in (14%) Outside Zoen Overhang Limb Fall-in (14%) Please refer to CLP-VMP-2, at pages 18-20 for the justification of how each proposed program (e.g. Scheduled Maintenance Trimming, Reliability Tree Work, and Reliability Tree Removals) may prevent tree-related outages and the associated percentage of tree-related outages that may be attributed to each program.
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-03 Date Issued August 07, 2026 OCC-253 Page 2 of 2 A greater focus on hazard and risk trees instead of trimming would not produce better reliability. The relatively low proportion of Inside Zone Limb Grow-in outages (5%) is due to the Company maintaining the approximately 16,000-mile roadside distribution system through tree trimming programs on a targeted four-year cycle. Please refer to CLP-VMP-2 at page 14. The terrestrial LiDAR pilot results highlight Connecticut’s roadside forest exposure and demonstrate that by year three of the cycle, post-maintenance, 74.92% of the segments had vegetation encroachment within the trim zone and 70.55% of the segments had vegetation overhang. The company cannot solely focus on hazard and risk tree removals because over time a reduction in trimming would result in more outages as vegetation grows into contact with the distribution system and would become more expensive to remediate on a reactive “trim as needed” basis. Rather, the Company needs to trim every mile on the four-year cycle with a reinstituted mid-cycle program to proactively maintain the safety and reliability of the distribution system. Prior Referenced Response: OCC-244 Question: (VMP) Referring to Exhibit CLP-VMP-1, page 7. Provide support for the claim hazard trees are responsible for approximately 76% of tree failure-related customer outages experienced across the operating year. i OCC-244 Response: From January 6, 2023 through April 20, 2026, the Company’s Connecticut licensed and trained Arborists performed 1,229 outage investigations pertaining to customer interruptions on blue sky or non-storm days. Of the 1,229 outage investigations, 686 were caused by whole-tree failure and, of that number, a total of 522 (76%) of these instances were determined to be caused by hazard trees.

As listed on the current system

Question(s) Answered 253 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/21/2026