Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 327, 328, 333

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-04 Date Issued August 11, 2026 OCC-327 Page 1 of 2 Date Filed: August 28, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Payroll (new positions). For each of the new positions the Company has included in the Rate Year provide: a. Total annual compensation, benefits and payroll taxes associated for the unfilled position b. Length of time that the position has been open. c. Planned hiring dates for each position, d. Hiring dates for any of these positions that have been filled. e. Copy of the advertisement for employment. f. For each new position, state whether it will be a CL&P employee/FTE or shared service employee/FTE Response: The Company has current open positions that are being actively recruited and staffing plans are in development for the upcoming year. Specifically in this case the Company is proposing 41 new positions in the Rate Year (please refer to the Company’s response to OCC-333 i). Please refer to OCC-327, Attachment 1, for parts a, c, and f. For parts b, d and e, the Company has not yet posted for any of the 41 positions and therefore no positions are open, copies of the postings are not available, nor have any of the positions been filled. Prior Referenced Response: i OCC-333 Question: Payroll. For each of the new positions that the Company is requesting recovery of in the rate year, state whether the hiring of the positions are conditioned on their approval in this case. OCC-333 Response: The Company is providing an update for the Full Time Equivalent (“FTE”) counts included in the request for recovery in the Rate Year in this response as OCC-333 Attachment 1 (note that this is an update of Exhibit CLP-REVREQ-2, Work Paper C-3.5, page 3). The Company will update the payroll expense and other affected costs as part of its next cost of service update. The number of FTEs included in the original filing was fifty-eight (58). This number was a preliminary number and included FTEs contemplated in the Advancing the Grid plan that is above and beyond the Targeted System Plan The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-04 Date Issued August 11, 2026 OCC-327 Page 2 of 2 (“TSP”) requested for review and approval in this application. The updated number of incremental FTEs to be included in the rate year of the Company’s cost of service is forty-one (41). Included in the forty-one (41) full-time positions are twenty-one (21) in Vegetation Management, five (5) Power Quality positions, two (2) in Distribution Planning & Forecasting and one (1) Asset Health, these are contingent on PURA’s approval in this case. In addition, for Grid Modernization there are seven (7) for Control Room Operations, three (3) for Data Innovation, and two (2) for Field Communications that the Company will consider hiring based on business needs and changing requirements as necessary, but most likely not all requested. The Vegetation Management positions allow the Company the opportunity to improve the system’s reliability and improve cost-efficiency by transitioning more work in-house to restructure vegetation management performance for the benefit of our customers. While the twenty-one (21) Vegetation Management positions appear to be incremental, in reality there is only 1 incremental resource. Of the twenty-one (21), eight (8) of the FTEs are the result of 16 employees who currently split their time 50%/50% between O&M and capital work shifting to solely working on the proposed combined O&M program, if approved, results in the equivalent of 8 incremental employees working on the O&M program; twelve (12) resources would be converted from contracted resources to internal resources of which the Company’s proposed vegetation management expenses in Exhibit CLP-REVREQ-2, Work Paper C-3.31 reflect the reduction in outside contractor services; and one (1) resource would be truly incremental. The Grid Modernization positions are needed to support large-scale distributed energy resource (“DER”) integration and clean-energy advancement; develop and deploy advanced tools and analytics for integrated distribution system planning and grid modernization; and drive increased innovation and application of GenAI, LLM and machine learning capabilities. The Company is also providing as OCC-333, Attachment 2 which is a corrected Exhibit CLP-TSP-3, page 43 of 149 that has been updated with the corrected number of FTEs in the parenthesis in the text boxes on the right.

As listed on the current system

Question(s) Answered 327, 328, 333 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/28/2026

This filing on the current system (opens in a new tab)