The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-04
Date Issued August 11, 2026
OCC-327
Page 1 of 2
Date Filed: August 28, 2026
Witness:
Brendan J. O’Brien and Garrett J. Murray
Request from: Office of Consumer Counsel
Question:
Payroll (new positions). For each of the new positions the Company has included in the Rate Year
provide:
a. Total annual compensation, benefits and payroll taxes associated for the unfilled position
b. Length of time that the position has been open.
c. Planned hiring dates for each position,
d. Hiring dates for any of these positions that have been filled.
e. Copy of the advertisement for employment.
f. For each new position, state whether it will be a CL&P employee/FTE or shared service
employee/FTE
Response:
The Company has current open positions that are being actively recruited and staffing plans are in
development for the upcoming year. Specifically in this case the Company is proposing 41 new
positions in the Rate Year (please refer to the Company’s response to OCC-333 i).
Please refer to OCC-327, Attachment 1, for parts a, c, and f. For parts b, d and e, the Company
has not yet posted for any of the 41 positions and therefore no positions are open, copies of the
postings are not available, nor have any of the positions been filled.
Prior Referenced Response:
i
OCC-333 Question:
Payroll. For each of the new positions that the Company is requesting recovery of in the rate year, state whether the
hiring of the positions are conditioned on their approval in this case.
OCC-333 Response:
The Company is providing an update for the Full Time Equivalent (“FTE”) counts included in the request for recovery
in the Rate Year in this response as OCC-333 Attachment 1 (note that this is an update of Exhibit CLP-REVREQ-2,
Work Paper C-3.5, page 3). The Company will update the payroll expense and other affected costs as part of its next
cost of service update.
The number of FTEs included in the original filing was fifty-eight (58). This number was a preliminary number and
included FTEs contemplated in the Advancing the Grid plan that is above and beyond the Targeted System Plan
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-04
Date Issued August 11, 2026
OCC-327
Page 2 of 2
(“TSP”) requested for review and approval in this application. The updated number of incremental FTEs to be
included in the rate year of the Company’s cost of service is forty-one (41).
Included in the forty-one (41) full-time positions are twenty-one (21) in Vegetation Management, five (5) Power
Quality positions, two (2) in Distribution Planning & Forecasting and one (1) Asset Health, these are contingent on
PURA’s approval in this case. In addition, for Grid Modernization there are seven (7) for Control Room Operations,
three (3) for Data Innovation, and two (2) for Field Communications that the Company will consider hiring based on
business needs and changing requirements as necessary, but most likely not all requested.
The Vegetation Management positions allow the Company the opportunity to improve the system’s reliability and
improve cost-efficiency by transitioning more work in-house to restructure vegetation management performance for
the benefit of our customers. While the twenty-one (21) Vegetation Management positions appear to be incremental,
in reality there is only 1 incremental resource. Of the twenty-one (21), eight (8) of the FTEs are the result of 16
employees who currently split their time 50%/50% between O&M and capital work shifting to solely working on the
proposed combined O&M program, if approved, results in the equivalent of 8 incremental employees working on the
O&M program; twelve (12) resources would be converted from contracted resources to internal resources of which
the Company’s proposed vegetation management expenses in Exhibit CLP-REVREQ-2, Work Paper C-3.31 reflect
the reduction in outside contractor services; and one (1) resource would be truly incremental.
The Grid Modernization positions are needed to support large-scale distributed energy resource (“DER”) integration
and clean-energy advancement; develop and deploy advanced tools and analytics for integrated distribution system
planning and grid modernization; and drive increased innovation and application of GenAI, LLM and machine
learning capabilities.
The Company is also providing as OCC-333, Attachment 2 which is a corrected Exhibit CLP-TSP-3, page 43 of 149
that has been updated with the corrected number of FTEs in the parenthesis in the text boxes on the right.