Question:
Exhibit CLP-ELP-1 Please explain in detail why the Company believes its proposed treatment of
capital expenditures under the PBMRP, including the use of forecasted capital expenditures and
the F-Factor, is preferable to including capital expenditures within the Revenue Cap Formula
framework as proposed in the Docket No. 21-05-15RE01 Proposed Final Decision. In your
response,
a. Please explain why the Company believes O&M expenses are appropriately subject to an
externally indexed revenue cap, while capital expenditures require separate recovery
through an F-Factor based on a fixed annual capital investment forecast.
b. Please explain how the Company's proposed treatment of capital expenditures is expected
to produce customer cost savings or otherwise improve customer affordability relative to
including capital expenditures within a revenue cap formula.
c. Please explain how the proposed F-Factor mitigates or avoids any incentive to favor capital
expenditures over O&M solutions, including in circumstances where either a capital or
O&M solution could be used to address the same system need.
Response:
The Company appreciates OCC’s thoughtful and analytical questions on the Company’s proposed
performance based multi-year rate plan (“PBMRP”) and looks forward to further discussion on the
development of a workable PBR framework for the Company’s customers.
To cover the issues raised in the question, the Company’s response is organized as follows:
1. Review of relevant aspects of the Company’s PBMRP.
2. Considerations on the design of capital-driven revenue support.
3. Specific responses to parts (a), (b) and (c), above.
1.
Review of the Relevant Aspects of the Company’s PBMRP
Ultimately, the Company’s goal in this proceeding is to establish a sustainable, cohesive
ratemaking framework that advances electric utility service in the State of Connecticut in an
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 2 of 14
affordable manner for customers, over a long term. This is the Company’s goal because the CL&P
system needs investment for reliability, resiliency and modernization. For this investment to be
affordable for customers, a coherent ratemaking plan needs to be instituted that will consider the
interests of customers over a longer term than just the next rate case. That framework needs to
balance: (1) the reliability and performance requirements of the Company’s customers and the
broader State of Connecticut; (2) customer rate stability and affordability; (3) incentives for cost
efficiency in utility operations; and (4) implementation of a revenue support mechanism sufficient
to cover the cost of delivering these objectives to customers.
The Company’s PBMRP is designed to address these objectives in a holistic, balanced way.
To do this, the Company started with the ratemaking framework under discussion in PURA’s PBR
docket (Docket No. 21-05-15RE01), while also introducing certain new elements to remediate the
flaws that would ultimately hinder PURA’s (draft) PBR model from supporting the necessary stayout terms.
For any multi-year rate plan to be successful, it needs to be grounded in the reality of the
utility’s costs, while also incorporating features that innately push the utility to be more efficient.
That is not to say every dollar of the utility’s costs will be (or should be) recovered. Rather, the
allowed revenues need to be sufficient to afford the utility a reasonable opportunity to cover its
cost of service to customers, including a reasonable rate of return on equity (“ROE”) where the
utility is operating prudently and efficiently, as required by state law. A framework in which the
utility has no reasonable opportunity to earn its ROE, regardless of how hard it strives for
efficiency, simply becomes self-defeating because the utility will exercise its statutory rights to a
distribution rate proceeding, thereby muting the most powerful efficiency feature of a multi-year
rate plan, which is the stay-out term.
A framework that underestimates the actual cost to run the system and/or affords the utility
no reasonable chance to earn its allowed ROE, year after year, also results in under-investment
and a system that not only lacks innovation, but falls further and further behind at a significant –
albeit potentially unseen – cost to customers. As a result, a lasting, productive framework is one
that is soundly informed by – not detached from – the drivers of the utility’s real cost of service,
including its cost of capital.
In this context, the two most critical features of the Company’s PBMRP are as follows:
A going-in revenue requirement that reasonably reflects the Company’s actual operating
expenses and cost of investment in the Rate Year, so that through effective management
and prudent decision making, the Company can achieve the true efficiency gains that will
be needed to stretch the approved revenue requirement over the stay-out term. Without a
reasonable opportunity to maintain financial integrity over a stay-out period, as measured
by the authorized ROE, the utility cannot focus on innovation and efficiency gains – and
will instead file for the next rate case to make up ground. To accomplish this goal, the
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 3 of 14
overall paradigm must “hang” together, making the base revenue requirement a pivotal
element. The many components of a PBR plan, including going-in rates, as well as the
subsequent rate adjustments, must work in concert with performance objectives and the
capital investment requirements expected of the Company – for the benefit of customers,
i.e., the entire framework must work to the benefit of customers, not only in relation to the
price they will pay, but also in relation to supporting the level of service that they need and
expect.
Revenue support for incremental capital investment to support long-term system goals.
The Company operates in a capital-intensive industry and has a substantial need to acquire
cash on a systematic basis to operate its business. As annual capital investments regularly
exceed net cash from operations (i.e. cash receipts from customers net of operating cash
outflows), the Company must look to other capital sources to fund those investments.
Those sources are the debt and equity investors supplying the cash to capital markets. This
means the Company must compete with all other entities participating in those markets to
attract capital. It is simply not possible for the Company to go to those markets and demand
cash for free, or at below-market rates relative to the investor’s risk when other entities
participating in the same capital markets offer compensation for the use of funds over time.
The Company provided extensive analysis and discussion on the cost of capital throughout
Docket No. 21-05-15RE01, including specifically as it relates to CT-Bar. PURA’s
treatment with respect to going-in revenue requirements as well as any ongoing capitaldriven revenue support mechanism, such as CT-Bar, is paramount to whether the
Company, with effective management and sound decision-making, can responsibly cede
its right to file for a rate amendment, whereas that is otherwise the only tool the utility has
to align its revenues and costs and have a reasonable chance at earning its authorized ROE,
which, over time, is necessary in order to attract the capital necessary to meet the standards
of service expected of the Company’s customers.
The lack of a valid revenue requirement component within the CT-Bar that would allow
recovery of the cost of capital associated with incremental capital investment over the term
of the PBMRP is a non-starter from a policy perspective, creating an obstacle that would
block a utility from giving up its right to file for rate modifications over the multi-year
period in question. This is particularly accurate in the present environment in which
significant increases in the level of necessary system investments are expected (and
planned). Simply put, the CT-Bar, as previously envisioned in PURA’s draft PBR
decision, fully prevented the Company from having any practical chance at staying out of
a rate case, and therefore, would never work to create a reasonable PBR framework.
The Company’s proposed PBMRP in this docket is designed to track the design of the CTBar as closely as possible, given that this was PURA’s developing framework. However,
the Company’s PBMRP addresses the two primary faults in PURA’s RE01 framework that
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 4 of 14
would prevent the implementation of a workable PBR framework, which are (1) the
deviations from ratemaking fundamentals that grossly understate the “going in” revenue
requirement; and (2) modification of the CT-Bar to reflect the revenue requirement
applicable to capital investment, which would include recovery of the cost of capital and
the cost of removal over the course of the PBMRP term. The Company’s F-Factor also
corrects for the mechanical error of deducting depreciation expense from new plant
additions, rather than from rate base.
In particular, the Company’s proposed F-Factor is designed to recover no more than the
revenue necessary to support a discrete amount of ongoing system investment, recognizing
that the cost of capital is a lawful and factual cost of service that must be incorporated into
the revenue requirement calculation for the Company, as it is for any utility.
2.
Considerations on the Design of Capital-Driven Revenue Support
CT-Bar, as defined in PURA’s Proposed Final Decision, issued in Docket No. 21-0515RE01, on July 14, 2025 (the “RE01-PFD”), had several sensible qualities that the
Company supported. However, those “sensible” qualities were overcome by certain
critically flawed concepts that would need to be modified or eliminated in order for the
Company to consider committing to a stay-out. The positive and negative CT-Bar qualities
are outlined briefly here and discussed in greater detail below, including with respect to
similarities or differences to the Company’s proposed F-Factor.
Summary of constructive features of PURA’s RE01-PFD:
1) Acknowledgement that current revenue support for ongoing investment is essential;
2) No category of capital investment was summarily or preemptively excluded from CT-Bar;
3) CT-Bar takes effect with Rate Year 1; and
4) CT-Bar aligns capital revenue support with the capital investments of the DSP.
Summary of unworkable features of PURA’s RE01-PFD:
1) Exclusion of the recognition in the CT-Bar of the cost of capital between rate cases.
2) Exclusion of cost of removal in the CT-Bar.
3) Application of depreciation expense as a reduction to plant additions rather than rate base.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 5 of 14
Constructive features of PURA’s RE01-PFD:
1)
Positive #1: Acknowledgement that current revenue support for ongoing investment
is essential to the integrity of the PBR framework.
First, that the CT-Bar even existed in PURA’s RE01-PFD is genuine acknowledgement
that some form of revenue support for rate year investment is essential to support a PBR
framework. As discussed at length in that docket, the Company anticipates significant
system investment over the next five years to advance the state’s clean energy and
reliability goals. Revenue support for ongoing system investment is crucial for any multiyear rate plan, whether in the form of the Company’s proposed PBMRP, step increases, or
any other ratemaking framework. CT-Bar’s inclusion in RE01-PFD is a clear indication
that incremental revenue support for ongoing system investments is a necessity.
2)
Positive #2: No category of capital investment was summarily or preemptively
excluded from CT-Bar.
Second, the RE01-PFD did not exclude particular categories of capital investment. For
example, capital investments in facilities, fleet and information technology are viewed as
permissible categories for revenue support in the CT-Bar framework. This is consistent
with the Company’s proposed F-Factor in this proceeding.
3)
Positive #3: CT-Bar takes effect as of Month 1 of Rate Year 1.
The Company provided extensive discussion and analysis throughout Docket No. 21-0515RE01 technical sessions and data responses regarding the “going-in” revenue
requirement and the detrimental financial consequences of limiting capital investments to
a period of time removed from the rate year. Ignoring for a moment the CT-Bar’s
deficiencies, having the mechanism take effect Month 1 of Rate Year 1 minimizes or
eliminates those detrimental timing consequences, particularly in light of the fact that
PURA has in recent years moved away from its prior practice of implementing future-test
years in base rate proceedings, instead favoring a strict historical test year practice as it
relates to plant additions.
Revenue decoupling is a factor to consider here because the revenue decoupling
mechanism (“RDM”) subsumes all sales growth to the extent that it is occurring, funneling
incremental sales revenues back to customers. RDM is supported by valid policy reasons;
however, the fact is that there are capital costs associated with adding new customers.
Historically, when consistent and steady levels in the range of ~3$ per year of annual
growth in sales and revenues was available to a utility to help offset the cost of incremental
capital additions between rate cases, the pressing need for incremental revenue support was
mitigated. Without the ability to capture that sales growth, and combined with the absence
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 6 of 14
of an ongoing revenue support mechanism such as an F Factor taking effect on Month 1 of
Rate Year 1, the Company would not be in a position to commit to a stay-out of any
duration. This is because the Company would never be in a position to cover its cost of
service (inclusive of its authorized cost of capital) because its rates would be set on a
historical level of plant additions, despite the fact that its capital expenditures are higher
than historical levels of depreciation, and because revenue decoupling ensures that even if
load growth exists (and even if such load growth is enabled by the Company’s increased
level of capital expenditures) the Company is unable to retain additional revenues
contributed by new customers, or new load.
4)
Positive #4: CT-Bar was designed to align capital revenue support with the DSP.
Ignoring its deficiencies, the CT-Bar’s connection to the Distribution System Plan (“DSP”)
constituted an essential link between ongoing system investments necessary to meet the
objectives of the DSP with the revenues necessary to support those investments.
Throughout Docket No. 21-05-15RE01, the Company advocated strongly for clearly
defined linkages across all three tracks (RE01, RE02 and RE03), including proposing what
would be the final technical session touching upon revenue requirements, in which those
linkages were discussed. The Company’s F-Factor is similarly aligned with the capital
investment forecast provided in this proceeding for the DSP. The Company’s capital
investment forecast serves as the basis for a cap on the level of investment for the F-Factor.
Unworkable Features of PURA’s RE01-PFD:
1)
Negative #1: No recovery of cost of capital in the revenue requirement for capital
investment between rate cases.
The single-most problematic feature of the CT-Bar was its intentional exclusion of the cost
of capital associated with completing capital plant additions to the benefit of customers.
Costs of capital are real costs of providing electric distribution service to customers in the
State of Connecticut (or anywhere) and are recognized in statute. Although the cost of
capital may be a more challenging cost to conceptualize, it is nonetheless as real as
vegetation management, insurance, customer service, or any other cost of service. Cash is
not free, a fact arising from its scarcity. Fundamentally, capital markets are where people,
banks, corporations and other institutions provide their surplus of cash -- which is limited,
to those entities that have cash needs -- which are generally unlimited. Consequently, and
unsurprisingly, those entities providing the cash for some period of time expect to be
compensated for providing it, thus establishing real cost to acquire capital.
The Company, operating in the capital-intensive industry of regulated utilities, is one of
those entities that needs to acquire cash to operate its business. As annual capital
investments regularly exceed its net cash from operations (i.e. cash from customers), the
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 7 of 14
Company must look to other sources to fund those investments. Those sources are the debt
and equity investors supplying the cash to capital markets. This means the Company must
compete with ALL other entities participating in those markets. It is simply not possible
for the Company to go to those markets and demand cash for free (or for below-market
rates, relative to market expectations of risk and reward) when other entities participating
in those capital markets offer adequate compensation for the use of funds over time.
Therefore, there is a real and tangible cost to acquiring that capital. Please refer to the
Company’s pre-filed cost of capital testimony for in-depth discussion of the cost of capital.
The Company provided extensive analysis and discussion on the cost of capital throughout
Docket No. 21-05-15RE01, including specifically as it relates to CT-Bar. PURA’s
treatment with respect to going-in revenue requirements as well as any ongoing capital
revenue support mechanism, such as CT-Bar, is paramount to whether the Company, with
effective management and sound decision-making, has the opportunity, but not a
guarantee, to cover its cost of service to customers, and to earn its allowed return. The
absence of the cost of capital from the CT-Bar, particularly in the present environment
where significant increases in the level of necessary system investments are expected,
prevents the Company from having any practical opportunity to commit to a stay-out to
avoid the next rate case.
As discussed in the Company’s response to OCC-435, based on the Company’s current
assessment of system investment needs in the near future, the revenue requirement
associated exclusively with the cost of capital pertaining to future capital additions
(excluding GET and Uncollectible) would amount to an incremental $15.6 million for Rate
Year 1; an incremental $32.8 million for Rate Year 2; an incremental $36.4 million for
Rate Year 3; and an incremental $39.5 million for Rate Year 4, or $124.1 million in total.
This means that -- even if 100% of those future plant additions were only partially
supported with CT-Bar revenues (i.e. revenue covering depreciation expense and property
taxes only); and even if the Company’s future cost of service otherwise was 100%
supported with rates; and even with perfect operational decision making -- the Company
would still need to find $124.1 million of annual savings by Rate Year 4 in order to offset
the loss of revenue associated with carrying costs on incremental investment over the term
of the PBMRP, which would be necessary to commit to a stay-out term.
For perspective, the total O&M expense included in the Company’s cost of service filed in
this proceeding is $547.5 million. Thus, to earn its authorized ROE, all else equal, the
Company would have to generate cost savings amounting to $124.1 million, or nearly 23%,
of its Rate Year O&M level by Year 4, to offset the impact of the accumulating carrying
costs on the incremental capital additions completed on the system after base rates are set
in this case. This is nearly 34% of operating expense, excluding vegetation management
and storm restoration costs, which is a very substantial proportion of the cost of service.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 8 of 14
For example, the amount of $124M is nearly two-thirds of the Company’s labor and laborrelated operating expense, or 60% more than the entire vegetation management program.
It simply is not possible for the Company to cut this level of O&M expense without grossly
debilitating the Company’s ability to provide service to customers. In fact, it is not
plausible to expect that the Company could generate even 10% in annual incremental O&M
savings in the face of 2-3% annual inflation and, as a result, the Company could not agree
to a stay out under circumstances where there is no recovery of the cost of capital on
incremental investment over the PBMRP term.
Moreover, even if the Company were somehow able to find such remarkable cost savings,
the going-in revenue requirement of the subsequent multi-year rate plan would capture
those cost savings. Assuming continuation of the same PBR framework and required
system investment, the Company would again be in the position of having to find an
additional 34% of O&M savings (i.e. more than 60% cumulatively from Rate Year 1) in
order to sustain itself over the next PBR term. Clearly, a framework that does not provide
revenue supporting the full cost of incremental investment over a four-year period, as well
as the next four-year period, is not a plausible or lasting framework. Thus, exclusion of
the cost of capital from a capital support mechanism in an environment in which significant
increases in capital investments are expected all but ensures the Company has no realistic
opportunity to survive the PBR term without a critical need for a rate case to realign costs
and rates. Consequently, the overall framework as outlined in the REO1-PFD had no
practical chance of sustaining the Company financially for the four-year term, nor would
the Company have been able to even agree to a stay-out.
To address this indelible flaw, the Company’s proposed PBMRP in this docket is designed
to produce the revenue necessary to support ongoing system investment through the FFactor, which calculates a revenue requirement inclusive of the costs of capital unlike the
CT-Bar, while preserving the customer benefits and inherent incentives of a PBR plan.
2)
Negative #2: Exclusion of cost of removal from the revenue requirement on capital
investment between rate cases.
CT-Bar excluded the cost of removal, which is a real cost for all utilities. As a simple
example, to install a new utility pole where there is an existing one that needs replacement,
the Company must first remove the existing utility pole. That cost is separate and distinct
from the cost of the utility pole itself; yet, similarly recovered (as an estimate) over the life
a utility pole. The Company’s capital investment forecast in the present docket includes
approximately $136 million of cost of removal for January 1, 2026 through June 30, 2028,
and approximately $60-70 million per year thereafter. A total of $60-70 million in annual
investment equates to pre-tax cost of capital of $6-7 million annual incremental revenue
requirement (e.g. $6 million year 1, $12 million year 2, $18 million year 3, etc.). The CTBar revenue requirement intentionally excluded this component of the capital investment
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 9 of 14
revenue requirement. The Company’s proposed F-Factor calculation properly restores this
component to the rate base computation.
3)
Negative #3: Depreciation expense is used as a reduction to plant additions rather
than to total rate base, consistent with fundamental ratemaking principles.
CT-Bar’s calculation treats depreciation expense as a net against plant additions. Although
the Company appreciated that PURA found it important to capture ongoing depreciation
expense in the annual revenue requirement calculations, the overall execution of the
computation was not correct. The Company’s F-Factor corrects for this methodological
error. Please refer to the example below outlining the mathematical problem:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
18
($ Millions)
Correct treatment of depreciation's accumulation in rate base
Rate Base
RevReq
Year 1 Year 2
Year 1 Year 2
Plant Additions
$1,000 $1,000
Cumulative Gross Plant
$1,000 $2,000
x 3.6% Depreciation
$36.0 $72.0
Accumulated Depreciation
-$300
-$600
Cumulative Rate Base
$700 $1,400
x 9.8% Cost of Capital
$68.6 $137.2
Total Revenue Requirement $104.6 $209.2
CT Bar
Plant Additions
Depreciation Expense
Net Plant Additions
Cumulative Depreciable Base
Cumulative Rate Base
Rate Base
Year 1 Year 2
$1,000 $1,000
-$300
-$300
$700
$700
$700 $1,400
$700 $1,400
RevReq
Year 1 Year 2
x 3.6% Depreciation
$25.2 $50.4
x 9.8% Cost of Capital
$68.6 $137.2
Total Revenue Requirement $93.8 $187.6
Error -$10.8 -$21.6
The table above is a simplified example of CT-Bar’s improper incorporation of ongoing
depreciation in a revenue-requirement calculation. Effectively, the CT-Bar reduces plant
additions by depreciation expense, which improperly reduces the total amount of plant to
be depreciated, thereby reducing the incremental depreciation expense to be supported by
the rate mechanism. The correct approach is to handle the plant additions separately from
accumulated depreciation (see lines 4 and 6 in the table above). Note that both methods
result in the same return on rate base, demonstrating that both calculations reflect the
reduction to return on rate base resulting from ongoing/accumulating depreciation. The
error is limited to the resulting new depreciation expense reflected in the revenue
requirement, which is understated in the above example by $10.8 million in Year 1 and
$21.6 million in Year 2 under the CT-Bar as compared to the Company’s proposal in this
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 10 of 14
proceeding, which mirrors in concept to how the Company records depreciation expense
on gross plant additions (not on net plant additions, as in the CT-Bar).
⇒
Characteristics of the Company’s Proposed F-Factor (same as CT-Bar, except
for three features).
The Company i s proposing a capital support mechanism (the “F” factor in the formula)
that tracks as close as possible to PURA’s CT-Bar, except that it addresses the three major
impairments described above, which would prevent the Company from being able to agree
to a stay-out. These three items are the exclusion of the cost of capital in the revenuerequirement computation for incremental plant additions, the cost of removal and the
mechanical deduction of depreciation expense from plant additions instead of rate base. In
the Company’s F-Factor, these first two items are included in the formula and the third
mechanical process is addressed.
Beyond that, the F Factor would operate from a fixed annual capital investment level for
each year of the PBMRP, with reconciliation through PURA’s annual RAM
proceedings.
The fixed annual investment level would be set at the Company’s
capital forecast, as approved in this proceeding. As described previously, the Company
has presented different investment trajectories in the Company’s 5-Year TSP and is
proposing to establish the capital support mechanism of the PBR adjustment consistent
with the annual capital funding requirements presented in Figure 7 of Exhibit CLP-ELP1.
Consistent with the structure of the CT-Bar in the RE01-PFD, the F-Factor would
commence on July 1, 2027, coincident with new base rates, collecting an allowance
developed from the Company’s capital forecast presented in Exhibit CLP-TSP-3. In this
proceeding, the Company has proposed base rates that include capital additions through
the Rate Year. This means that the F-Factor implemented on July 1, 2027 (commensurate
with new rates in this proceeding) would be set to zero at that time, since base rates would
be set to collect the revenue requirement on capital placed into service in the rate year.
However, if PURA declines to incorporate rate-year capital additions into base rates in this
proceeding, the F-Factor taking effect on July 1, 2027, would reflect the revenue
requirement for the period July 1, 2027 through June 30, 2028 on capital additions placed
in service (or estimated to be placed in service) from the point in time where PURA cuts
off capital for inclusion in base rates and through June 30, 2028. 1 In the next year, as part
of the Company’s annual RAM compliance filing, actual plant additions placed in service
The Company is neutral to whether Rate Year capital is included as an adjustment to base rates or is
contemplated by operation of the F-Factor, as it was under the CT-Bar construct. However, for evidentiary purposes,
the Company needed to include both potential outcomes in its filing.
1
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 11 of 14
during the applicable plan year would be reconciled against the F-Factor allowance put into
rates on July 1, 2027. In that reconciliation, the Company would present its project
document for a prudence review and, based on PURA’s findings in that prudence review,
the cost of actual plant additions for calendar year 2027, less whatever PURA has already
included in rates for capital additions in 2027, would be actually incorporated into rate base
at that point. Following PURA’s determination that the Company’s actual plant additions
are prudent, used and useful, the Company’s rate base would be adjusted and associated
revenue requirement allowed for recovery that would be limited to the lesser of:
1.
The total revenue requirement for the forecasted capital approved in this
proceeding for the first implementation of the F Factor; or
2.
The total revenue requirement for the actual plant in service.
If the cost of the Company’s actual capital additions were to exceed the forecasted amount
approved in this proceeding, the Company would not be permitted to obtain recovery of
the incremental investment during the initial four-year PBMRP Term. Instead, any such
investment would remain subject to review and consideration in a subsequent base rate
proceeding or successor PBMRP Term.
This Company’s proposed capital funding mechanism sets a defined cap on capital
recovery during the plan term, providing customers with greater rate certainty and placing
the risk of excess capital spending requirements on the Company. The annual
reconciliation further protects customers by blocking recovery of investments that are
delayed, deferred, canceled, or not placed in service, since those costs would not be
reflected in the F factor, which is based on plant in service. For these reasons, the proposal
aligns cost recovery with prudent investment, promotes accurate capital forecasting, and
incentivizes efficient execution of the capital program, all while preventing customer overcollection.
III.
Specific Responses to Parts (a), (b) and (c), above.
(a)
Why are O&M expenses appropriately subject to an externally indexed revenue
cap, while capital expenditures require separate recovery through an F-Factor based
on a fixed annual capital investment forecast?
The capital investments the Company must make to provide electric service to
customers in the State of Connecticut is a “local” concept. Those investments are
driven by the circumstances and objectives of the State of Connecticut and the
history and current status of the distribution grid in Connecticut. Those
circumstances and objectives, which require long-term system planning and
appropriate capital resources, are not encapsulated by a single index. O&M, though
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 12 of 14
it is similarly influenced by local circumstances, does not change at the same rate
as capital investment. For example, the Company’s annual capital investment is
expected to increase nearly 40% from $549 million in 2025 to $758 million by
2028, or more than 11% annually, on average. In contrast, over the same timeframe
O&M (excluding storm funding and vegetation management) is projected to
increase approximately 3-4% annually. The Company’s proposed PBMRP aligns
revenues with drivers of cost while maintaining the incentive to control costs.
In addition, under PBR theory, where capital inputs are contemplated in the indexed
formula, then the X factor is negative, implying that the annual adjustment is
inflation plus an additional factor. The testimony of London Economics in Exhibit
CLP-PBR-1 reviews the results of their total factor productivity study producing
this result. In this case, the Company elected to adhere as closely as possible to
PURA’s (draft) CT-Bar in order to remain synched with PURA’s policy direction.
(b)
How will the Company's proposed treatment of capital expenditures be expected to
produce customer cost savings or otherwise improve customer affordability relative
to including capital expenditures within a revenue cap formula.
There are three main opportunities for customer benefit in the PBR framework,
which are: (1) the opportunity to leverage the stay-out term to drive operational
efficiency and cost savings; (2) the opportunity to spread rate changes out over time
to smooth impacts for customers and employ the concept of gradualism rather than
promoting the cost and inefficiency of a traditional rate-case cycle; and (2) the
opportunity to develop a systematic investment plan that promotes operational
efficiency and cost-saving procurement strategies, while taking advantage of the
smoothing impacts of the PBR framework to mitigate cost impacts.
The Company has submitted substantial testimony and documentation in this
proceeding to provide insight into the level of capital investment that is needed on
the system to provide adequate service to customers and to support the economic
vitality of the State of Connecticut. Customers benefit directly when investment
can be undertaken on a planned, systematic and consistent basis over time because
(1) it is consistently more expensive to complete infrastructure projects tomorrow
rather than today due to price inflation and other factors; and (2) the Company’s
process inputs (i.e., primarily labor and materials) cost less when procured on a
planned and systematic basis rather than on an emergent basis.
Although difficult to define in terms of the overall cost trends, there are significant
benefits for customers in an operating approach that is consistent, systematic,
planned and carefully managed, which is an outcome that the Company is hoping
to promote with its proposals in this proceeding. Bottomline – the Company is
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 13 of 14
looking to establish a ratemaking framework that will promote efficiency of
operations for the benefit of customers and the F-Factor is the optimal mechanism
for that purpose.
Assuming that OCC’s referenced alternative for a capital-cost mechanism “within
a revenue cap formula,” means that the PBMRP would rely exclusively on an “IX” revenue cap formula, with or without X defined with a negative factor, the
Company’s experience is that it is not adequate to support necessary capital
investment, while raising issues for stakeholders. With the negative X factor, there
is no direct link between the actual cost of capital plant additions and the revenue
collection through customer rates, leaving it to be insufficient to support necessary
capital investments and unsatisfactory for stakeholders that want transparency
between the costs collected in rates and the rates that customers pay. As a result,
achieving the efficiency needed to support a cost-effective capital plan is illusory
in this model.
(c) How does the proposed F-Factor mitigate or avoid any incentive to favor capital
expenditures over O&M solutions, including in circumstances where either a
capital or O&M solution could be used to address the same system need?
In the Company’s experience, implementation of the X factor mechanism (with a
negative X factor) to cover capital investment was thought to be a mechanism that
would promote efficient solutions between capital and O&M because the revenue
allowance was not predicated on actual plant additions; rather, was simply
formulaic. In 2017, the Massachusetts Department of Public Utilities (“MDPU”)
approved a negative X factor within a revenue cap for NSTAR Electric Company
d/b/a Eversource Energy – and it remained operative for the five-year term of the
plan. However, the fact is that – during an extended stay-out period, there is no
incentive to incur any greater level of expense than is absolutely necessary to run
the business. Therefore, there is no greater impetus than would exist in any event
to make the optimal choice between expense and capitalization, where such a
choice exists. And again, with the negative X factor, the MDPU felt it had no line
of sight as to whether funds allowed to NSTAR Electric through the annual PBR
allowance were, indeed, being leveraged for system investment.
Therefore, in 2022, the MDPU instituted the K-Bar providing an allowance for
system infrastructure projects, coupled with reporting requirements on investment
levels. The MDPU maintained the I-X formula to cover the O&M portion of the
approved revenue requirement, which is what the Company is proposing in this
case.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-09
Date Issued August 20, 2026
OCC-423
Page 14 of 14
In reality, there are very few instances when system needs can be easily transitioned
between a capital-work solution or a work solution that can be expense. The
prudence review is the primary and most effective tool that regulators possess for
evaluating these situations.