The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-12
Date Issued September 01, 2026
OCC-525
Page 1 of 2
Date Filed: September 15, 2026
Witness:
Elli Ntakou and Lavelle A. Freeman
Request from: Office of Consumer Counsel
Question:
Targeted System Performance Plan Exhibit CLP-TSP-1: Reliability PIMs
The final RE02 Performance Evaluation System identifies a potential Customer Reliability PIM
based on CEMI-5, the percentage of repeat CEMI-5 customers, CELID-6, and the percentage of
repeat CELID-6 customers. The Company instead proposes to use the average count of repeat
CEMI-5 and repeat CELID-6 customers. Please explain why the Company selected this
methodology and how it is expected to better incentivize improved reliability for customers
experiencing frequent or long-duration outages.
Response:
The Company’s proposed Customer Reliability PIM shares the same core purpose as the customer
reliability PIM in the RE02 Proposed Final Decision, which is that this PIM should encourage the
Company to reduce repeat customers that experience long-duration interruptions and/or frequent
interruptions.
As explained in Exh. CLP-TSP-1, at 81-83, the Company proposes that the customer reliability
PIM be calculated as the total number of repeat CEMI-5 customers and repeat CELID-6 customers.
This slightly deviates from the customer reliability PIM in the RE02 Proposed Final Decision to
ensure that the PIM measures performance based on factors within the Company’s control and
encourages the Company to reduce the repeat customers with long-duration interruptions and
frequent interruptions. The RE02 Proposed Final Decision contemplated Customer Reliability
PIM based on a composite of four sub-metrics: (1) total number of CEMI-5 customers; (2) the
percent of repeat CEMI-5 customers; (3) total number of CELID-6 customers; (4) and the percent
of repeat CELID-6 customers.
The Company’s Customer Reliability PIM is focused on repeat customers because the frequency
and/or duration of interruptions for CEMI-5 and/or CELID-6 customers in a particular year can be
due to one-off events without repeat in a subsequent year. In other words, while CEMI-5 and
CELID-6 represent edge cases of performance, isolated events that result in CEMI-5 or CELID-6
customers should not all be actionable as those events would drive investment to resolve largely
isolated or infrequent events. However, customers that experience long duration or frequent
service interruptions in multiple years should be addressed by the Company, since these situations
are more likely to be due to systemic issues. Accordingly, the Company has designed the PIM to
focus on repeat CEMI-5 and CELID-6 customers.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-12
Date Issued September 01, 2026
OCC-525
Page 2 of 2
In addition, the composite metric proposed in the RE02 Proposed Final Decision could have
unintended consequences due to the disproportionate scale of the submetrics. The percent of repeat
CEMI-5 and repeat CELID-6 are numerically much smaller than submetric (a) and do not
meaningfully impact the value of the composite metric. Therefore, the proposed customer
reliability PIM in the RE02 Proposed Final Decision would be driven by annual CEMI-5 and
CELID-6 customers, rather than repeat customers. The Company’s historical data shows that
annual CEMI-5 and CELID-6 customer counts are orders of magnitude higher than repeat CEMI5/CELID-6 customers, because of the isolated events discussed above.
Also, Company data shows that annual CEMI-5 and CELID-6 customers have large year-to-year
variability. Therefore, the customer PIM identified in the RE02 Proposed Final Decision could
reward the Company for CEMI-5 and/or CELID-6 reductions driven by random events rather than
driven by targeted investments to reduce repeat service interruptions, which is more tailored result
that the Company’s proposed customer reliability PIM would achieve.
As listed on the current system