Interrogatory responses
Answers to questions 563, 571
Files6
OCC-563_Final.pdf
PDF · 131 KB · 1 pageText searchable
Download OCC-563_Final.pdfRead the text of OCC-563_Final.pdf
OCC-563 Attachment 1.pdf
PDF · 166 KB · 12 pagesText searchable
Download OCC-563 Attachment 1.pdfRead the text of OCC-563 Attachment 1.pdf
OCC-563 Attachment 1.xlsx
Excel · 164 KBText searchable
Download OCC-563 Attachment 1.xlsxRead the text of OCC-563 Attachment 1.xlsx
OCC-571_Final.pdf
PDF · 162 KB · 2 pagesText searchable
Download OCC-571_Final.pdfRead the text of OCC-571_Final.pdf
OCC-571 Attachment 1.pdf
PDF · 1.9 MB · 18 pagesText searchable
Download OCC-571 Attachment 1.pdfRead the text of OCC-571 Attachment 1.pdf
OCC-571 Attachment 2.pdf
PDF · 872 KB · 3 pagesText searchable
Download OCC-571 Attachment 2.pdfRead the text of OCC-571 Attachment 2.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-563 Page 1 of 1 Date Filed: September 22, 2026 Witness: Julia Frayer Request from: Office of Consumer Counsel Question: Please provide, for each EDC and each year included in LEI’s Industry TFP Study and Benchmarking Study, all data and calculations used to determine the portion of A&G expense attributed to electric distribution operations, including: a. b. c. d. e. Total reported A&G expense; Total plant in service; Electric distribution plant in service; The resulting distribution plant share used to allocate A&G expense; and The resulting amount of A&G expense included in OM&A for purposes of the TFP and benchmarking analyses. f. Please provide the underlying data, sources, and calculations in an unlocked Excel workbook with formulas intact. Response: Please refer to OCC-563, Attachment 1, which provides the requested data for each EDC and year: the total reported A&G expense, total plant in service, electric distribution plant in service, the resulting distribution plant share, and the amount of A&G allocated to electric distribution operations. As described in Section 3.2 of Exhibit CLP-PBR-2, LEI calculated each utility’s annual distribution plant share as electric distribution plant in service divided by total plant in service. LEI then applied that percentage to the utility’s total reported A&G expense for the same year to estimate the portion of A&G attributable to electric distribution operations. The resulting allocated A&G expense was added to annual O&M expense to derive OM&A used in the Industry TFP Study and Benchmarking Study.
Text of OCC-571 Attachment 1.pdf
Extracted from the file · 18 pages · 53,309 characters
Text of OCC-571 Attachment 2.pdf
Extracted from the file · 3 pages · 9,578 characters
As listed on the current system
Question(s) Answered 563, 571 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026