Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 563, 571

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-563 Page 1 of 1 Date Filed: September 22, 2026 Witness: Julia Frayer Request from: Office of Consumer Counsel Question: Please provide, for each EDC and each year included in LEI’s Industry TFP Study and Benchmarking Study, all data and calculations used to determine the portion of A&G expense attributed to electric distribution operations, including: a. b. c. d. e. Total reported A&G expense; Total plant in service; Electric distribution plant in service; The resulting distribution plant share used to allocate A&G expense; and The resulting amount of A&G expense included in OM&A for purposes of the TFP and benchmarking analyses. f. Please provide the underlying data, sources, and calculations in an unlocked Excel workbook with formulas intact. Response: Please refer to OCC-563, Attachment 1, which provides the requested data for each EDC and year: the total reported A&G expense, total plant in service, electric distribution plant in service, the resulting distribution plant share, and the amount of A&G allocated to electric distribution operations. As described in Section 3.2 of Exhibit CLP-PBR-2, LEI calculated each utility’s annual distribution plant share as electric distribution plant in service divided by total plant in service. LEI then applied that percentage to the utility’s total reported A&G expense for the same year to estimate the portion of A&G attributable to electric distribution operations. The resulting allocated A&G expense was added to annual O&M expense to derive OM&A used in the Industry TFP Study and Benchmarking Study.

Text of OCC-571 Attachment 1.pdf

Extracted from the file · 18 pages · 53,309 characters

Text of OCC-571 Attachment 2.pdf

Extracted from the file · 3 pages · 9,578 characters

As listed on the current system

Question(s) Answered 563, 571 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)