Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 580, 583, 589

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

Text of OCC-589_Final.pdf

Extracted from the file · 2 pages · 4,393 characters

Text of OCC-589 Attachment 1.pdf

Extracted from the file · 4 pages · 2,258 characters

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: 4a] Annual year-over-year forecasted electric vehicle adoption from 2027-2036 Year | Annual CT EV Adoption The Company's EV forecast did not disaggregate adoption below state-level [Sheet: 4b] Forecasted impact on peak from electric vehicle adoption from 2027-2036, by region Year | Central CT EV Peak Impact [MW] | Eastern CT EV Peak Impact [MW] | Western CT EV Peak Impact [MW] Peak load assumed at 6pm [Sheet: 4c] Forecasted impact on peak from energy efficiency from 2027-2036, by region Year | Central CT EE Peak Impact [MW] | Eastern CT EE Peak Impact [MW] | Western CT EE Peak Impact [MW] The Company's EE forecast extends to 2035 [Sheet: 4d] Forecasted impact on peak from solar adoption from 2027-2037, by region Year | Central CT Solar Peak Load [MW] | Eastern CT Solar Peak Load [MW] | Western CT Solar Peak Load [MW] Peak load assumed at 6pm

As listed on the current system

Question(s) Answered 580, 583, 589 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026

This filing on the current system (opens in a new tab)