Interrogatory responses
Answers to questions 580, 583, 589
Files6
OCC-580_Final.pdf
PDF · 115 KB · 1 pageText searchable
Download OCC-580_Final.pdfRead the text of OCC-580_Final.pdf
OCC-583_Final.pdf
PDF · 114 KB · 2 pagesText searchable
Download OCC-583_Final.pdfRead the text of OCC-583_Final.pdf
OCC-583 Attachment 1.pdf
PDF · 1.2 MB · 31 pagesText searchable
Download OCC-583 Attachment 1.pdfRead the text of OCC-583 Attachment 1.pdf
OCC-589_Final.pdf
PDF · 116 KB · 2 pagesText searchable
Download OCC-589_Final.pdfRead the text of OCC-589_Final.pdf
OCC-589 Attachment 1.pdf
PDF · 184 KB · 4 pagesText searchable
Download OCC-589 Attachment 1.pdfRead the text of OCC-589 Attachment 1.pdf
OCC-589 Attachment 1.xlsx
Excel · 30 KBText searchable
Download OCC-589 Attachment 1.xlsxRead the text of OCC-589 Attachment 1.xlsx
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-14 Date Issued September 08, 2026 OCC-580 Page 1 of 1 Date Filed: September 22, 2026 Witness: Lavelle A. Freeman, Juan F. Martinez and Steven C. Osuch Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 11, “DER Enablement.” a. Please confirm the “150 MW from 9 station projects” whether these projects investments the Company is currently making or is requesting approval for in this rate case. b. Please provide the following details regarding the “+110 MW from 7 additional projects.” i. Please identify the 7 projects enabling the additional +110MW of DER capacity and whether these are load driven upgrades. Response: a. The nine station projects that enable 150 MW of DER capacity are currently part of the Company’s long-range investment plan, and are in various stages of development or construction. b. The seven additional projects are capacity (load) driven upgrades. Please see the table below for details on the 7 additional projects: Substation Baldwin 13F Tracy 14M Triangle 11A Frybrook 13B Waterside 22M Flax Hill 24A Williams 9L Total Need Capacity/ Load Capacity/ Load Capacity/ Load Capacity/ Load Capacity/ Load Capacity/ Load Capacity/ Load DER Enabled (MW’s) 15.01 14.74 19.43 15.01 16.75 15.01 15.01 110.96
Text of OCC-589 Attachment 1.pdf
Extracted from the file · 4 pages · 2,258 characters
Text of OCC-589 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
As listed on the current system
Question(s) Answered 580, 583, 589 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/22/2026