Interrogatory responses
Answers to questions 592, 596, 597, 599, 601
Files7
OCC-592_Final.pdf
PDF · 85 KB · 1 pageText searchable
Download OCC-592_Final.pdfRead the text of OCC-592_Final.pdf
OCC-596_Final.pdf
PDF · 152 KB · 3 pagesText searchable
Download OCC-596_Final.pdfRead the text of OCC-596_Final.pdf
OCC-596 Attachment 3.pdf
PDF · 2.6 MB · 53 pagesText searchable
Download OCC-596 Attachment 3.pdfRead the text of OCC-596 Attachment 3.pdf
OCC-597_Final.pdf
PDF · 102 KB · 3 pagesText searchable
Download OCC-597_Final.pdfRead the text of OCC-597_Final.pdf
OCC-599_Final.pdf
PDF · 126 KB · 3 pagesText searchable
Download OCC-599_Final.pdfRead the text of OCC-599_Final.pdf
OCC-599 Attachment 1 REDACTED.pdf
PDF · 55 KB · 1 pageNo text in this file
OCC-601_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download OCC-601_Final.pdfRead the text of OCC-601_Final.pdf
Text of OCC-597_Final.pdf
Extracted from the file · 3 pages · 7,645 characters
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-599 Page 1 of 3 Date Filed: September 23, 2026 Witness: David L. Gladey and Lavelle A. Freeman Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3 at 22–24. a. Provide the data underlying the headroom and constrained-area presentations on pages 22– 24. For each substation identified as constrained, provide its normal and emergency rating, five-year historical load and peak load data, available headroom, forecast first year of violation, and proposed project cost. b. For each constrained substation identified, provide the existing analysis of temporary and permanent load transfers. Identify the receiving substation or feeder, available transfer capacity, MW that could be transferred, required enabling work, estimated cost, and reason any transfer was rejected. Please confirm if no transfer analysis was performed. c. Provide a summary of each actual substation capacity violation and stranded-load event experienced from 2016 through the present. Identify the substation, date, maximum loading, applicable rating, duration, contingency, customers at risk, customers interrupted, and whether load transfer prevented or reduced an outage. Response: a. The graphic depicted in CLP-TSP-3, at 22, is derived from headroom data for substations with actual values, time series data, and ratings shown on our public maps using the, Eversource CT Grid Connection Navigator. Loads are based on our most recent summer peak year, 2025. Please refer to OCC-599, Attachment 1 CONFIDENTIAL, for project forecast violation year and the 5-year historical peak load data for each respective project. The table contains the LCC rating of each substation which is the planning criteria identified within the DSPG, please refer CLF-SC-023, Attachment 1. The following substations have projects initiated and have obtained at a minimum a conceptual level estimate: Substation West Brookfield 14H Beacon Falls 11N Franklin Drive 1B Southington 4C Berlin 6A_13.8kV Westside 7A Hopewell 22R Estimated Project Cost $16,900,000 $12,632,000 $17,986,000 $9,772,600 $23,199,000 $18,399,000 $17,518,000Page 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-599 Page 2 of 3 All other substations within the attachment have not had a comprehensive evaluation to identify possible solutions and the costs associated with those solutions. The table below depicts a high-level tabletop analysis for possible projected cost of a substation solution. These costs will be refined as these projects progress through the funding process and receive full engineering analysis for solutions and conceptual level estimates. Substations Waterside 22M Flax Hill 24A Rocky Hill 12Y Triangle 11A Middle River 28M Rockville 14W Campville 14R Baldwin 13F Tracy 14M Frybrook 13B Brooklyn 30Y High Level Estimate $600,000 $500,000 Less than $250,000 $4,800,000 $500,000 $10,000,000 $52,300,000 $20,250,000 $9,900,000 $20,000,000 Less than $250,000 Project Status Investigating Project Need Investigating Project Need Investigating Project Need – Anticipating Permanent Load Transfer from West Brookfield 14H with settings changes only Initial Funding Approved Investigating Project Need Initial Funding Approved Partial Funding Initial Funding Submitted Initial Funding Approved Initial Funding Approved Investigating Project Need – Anticipating Permanent Load Transfer from Tracy 14M or Frybrook 13B with settings changes only b. Prior to initiating a funding project, permanent load transfers are, in many cases, a preferred solution if the conditions at the constrained substation and the adjacent area support this as these are typically substantially lower cost than substation investments and have a much more rapid deployment timeline. Historically these load transfers were not explicitly tracked, and the Company does not possess historical data as it pertains to deferrals by means of permanent load transfer. As of 2024 the Company identified this opportunity to begin having a detailed record of load transfers, partly in response to increasingly constrained regional capacity. The Company is now prepared to track these transfers in the Step Load Tracker as a load transfer on the receiving substation and a negative load transfer to the originally constrained station. This tracker will not only allow the forecasted load transfer to be visible but will also allow for historical reporting of deferred major capital upgrades through completed load transfers.Page 3
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-599 Page 3 of 3 The newly identified projects are in early stages of development and have not yet completed the solution selection process yet. Therefore, these projects would not yet have any tracked load transfers or analyses completed to date. Following initial funding of these projects, all available solutions including permanent load transfers, non-wires solutions, and traditional solutions are identified and evaluated for suitability and for viability. No potential solutions have been rejected at this time from these newly identified projects. Temporary transfers are reserved for substations anticipating overload during a current planned peak event, planned or unplanned outages, or other transient system events. Temporary solutions place the system in an abnormal condition which can impact operations, protections and controls, and automations within the system and are not used as a long-term solution except where necessary to address real-time operational needs that do not have a permanent solution placed into service. c. All substation forecasted violations are mitigated by using pre-contingent load transfers to adjacent substations with remaining capacity. In accordance with planning criteria in the Distribution System Planning Guide (CLF-SC-023, Attachment 1), the Company plans and designs its system to avoid overload of major substation assets such as transformers during an N-1 event. During real-time operation, these overload scenarios are avoided through the use of monitoring technology and planned mitigation measures. However, the Company’s substation planning group recreates a normalized substation load to aid in the process of forecasting for future years.
Text of OCC-601_Final.pdf
Extracted from the file · 1 page · 1,487 characters
As listed on the current system
Question(s) Answered 592, 596, 597, 599, 601 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026