Interrogatory responses
Answers to questions 592, 596, 597, 599, 601
Files7
OCC-592_Final.pdf
PDF · 85 KB · 1 pageText searchable
Download OCC-592_Final.pdfRead the text of OCC-592_Final.pdf
OCC-596_Final.pdf
PDF · 152 KB · 3 pagesText searchable
Download OCC-596_Final.pdfRead the text of OCC-596_Final.pdf
OCC-596 Attachment 3.pdf
PDF · 2.6 MB · 53 pagesText searchable
Download OCC-596 Attachment 3.pdfRead the text of OCC-596 Attachment 3.pdf
OCC-597_Final.pdf
PDF · 102 KB · 3 pagesText searchable
Download OCC-597_Final.pdfRead the text of OCC-597_Final.pdf
OCC-599_Final.pdf
PDF · 126 KB · 3 pagesText searchable
Download OCC-599_Final.pdfRead the text of OCC-599_Final.pdf
OCC-599 Attachment 1 REDACTED.pdf
PDF · 55 KB · 1 pageNo text in this file
OCC-601_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download OCC-601_Final.pdfRead the text of OCC-601_Final.pdf
Text of OCC-597_Final.pdf
Extracted from the file · 3 pages · 7,645 characters
Text of OCC-599_Final.pdf
Extracted from the file · 3 pages · 6,494 characters
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-601 Page 1 of 1 Date Filed: September 23, 2026 Witness: Lavelle A. Freeman and Juan F. Martinez Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at 24. For each year from 2022 through 2026, provide the actual stranded load experienced on the system. For each event, identify the substation, date, stranded MW or MVA, duration, cause, and number of customers whose service could not be restored. If no actual stranded load occurred in a year, please report zero. Response: The chart on Exhibit CLP-TSP-3, at 24, refers to a modeled evaluation of the system based on substation load that would not be restored during an N-1 event even after pre-contingent load transfers. In the years identified, there has not been a substation N-1 event that has resulted in stranded load because the substations are designed to handle the event with customers experiencing either no outage or at worst limited to momentary outages during switching or restoration activities. This exhibit highlights, that for the substation in which this risk has been identified it is highly likely that customers will experience an outage related to a transformer failure. The Company’s response to information request OCC-603, with an anticipated filing date of September 30, 2026, will provide more detailed information regarding the substation of concern.
As listed on the current system
Question(s) Answered 592, 596, 597, 599, 601 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026