Interrogatory responses
Answers to questions 600
Filed by Connecticut Light and Power Company dba Eversource Energy1 file
Part of docket 26-05-10Files1
OCC-600_Final.pdf
PDF · 84 KB · 1 pageText searchable
Download OCC-600_Final.pdfRead the text of OCC-600_Final.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-15 Date Issued September 09, 2026 OCC-600 Page 1 of 1 Date Filed: September 23, 2026 Witness: Lavelle A. Freeman and Juan F. Martinez Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-3, at 24. Define “stranded load” as used on page 24, including its unit of measurement and the conditions under which load is classified as stranded. Response: Stranded load is defined as mega-watts (MW) of load that is at risk of not being restored following a single failure or emergency event until extensive repairs are completed. Customer load will be classified as stranded when a substation’s forecasted load exceeds its emergency rating, also referred to as Load Carrying Capacity “LCC”. Exhibit CLP-TSP-3, page 24, and this definition, are limited in scope to substation planning.
As listed on the current system
Question(s) Answered 600 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/23/2026