Interrogatories
To CL&P, questions 604 thru 623
Files1
26-05-10 Interrogatories__Set 16.pdf
PDF · 255 KB · 20 pagesText searchable
Download 26-05-10 Interrogatories__Set 16.pdfRead the text of 26-05-10 Interrogatories__Set 16.pdf
STATE OF CONNECTICUT
PUBLIC UTILITIES REGULATORY AUTHORITY
RE: APPLICATION OF THE
CONNECTICUT LIGHT AND POWER
COMPANY d/b/a EVERSOURCE
ENERGY TO AMEND ITS RATE
SCHEDULES
:
:
:
:
:
DOCKET NO. 26-05-10
SEPTEMBER 10, 2026
THE OFFICE OF CONSUMER COUNSEL’S
SIXTEENTH SET OF INTERROGATORIES
The Office of Consumer Counsel (“OCC”) hereby requests responses from the Connecticut
Light and Power Company d/b/a Eversource Energy to the following interrogatories in the abovecaptioned proceeding by September 24, 2026. If there are objections to any questions, or if
providing responses to certain questions would be unduly burdensome, please contact the
undersigned counsel as soon as possible.
I. INSTRUCTIONS
The responses to these interrogatories and production requests must be submitted in the following
manner:
A.
B.
C.
D.
E.
Documents provided shall be complete and, unless privileged, unredacted, submitted as
found in the responding party’s files (e.g., documents that in their original condition were
stapled, clipped or otherwise fastened together or maintained in separate file folders shall
be produced in such form). The responding party may submit photocopies (with color
photocopies where necessary to accurately reproduce the document), in lieu of original
documents, provided that such copies are true, correct and complete copies of the original
documents.
Documents submitted shall be produced in the order in which they appear in the responding
party’s files and shall not be shuffled or otherwise rearranged. Mark each page with
identification and consecutive document control numbers.
Data must be produced in the data format in which it is typically used and maintained.
Moreover, to the extent a responsive document has been electronically scanned (for any
purpose), that document must be produced in a readable and accessible electronic format,
with the opportunity provided to review the original document.
Provide English translations of all responsive documents that exist in a language other than
English.
Documents to be produced include all documents in the possession, custody or control of
the responding party, wherever located, including documents in the possession, custody or
control of the responding party’s directors, officers, employees, representatives or agents.
Without limitation on the term “control,” a document is deemed to be in a responding
party’s control if it has the right to secure that document or a copy thereof from another
person.
CLAIMS OF PRIVILEGE
If you contend that any answer to any interrogatory or any document demanded by these
interrogatories is privileged in whole or in part, file with your response to these Interrogatories a
statement in writing and under oath and in such statement: (1) identify each such interrogatory
answer or document; (2) state its general subject matter; and (3) state in detail the basis for each
claim of privilege made with respect to it. If a claim of privilege is made to only a part of a
document, then in addition to the statement required herein, produce a public copy of such
document from which the alleged privileged portion has been redacted, noting where in the
document such redactions have been made.
SCOPE
If subsequent to your initial compliance with these interrogatories and production request you
discover additional or new material or information responsive to any interrogatory or request for
production, or you discover that any response you provide herein was totally or partially incorrect
or, though correction was made, is no longer true, you must promptly (a) file any additional
responsive documents that come into your possession, custody or control or (b) file supplemented,
corrected, and sworn responses. You are specifically directed to supplement, modify or correct
your responses to each of these interrogatories and production throughout until a final decision in
adopted by the Authority in this Docket.
II. INTERROGATORIES
Interrogatories OCC-604 through OCC-710 are directed to the Connecticut Light & Power
Company d/b/a Eversource Energy (“Eversource” or “Company”):
OCC-604.
(CUSTOMER COMMUNICATIONS) Does the Company employ and/or use a
disability coordinator or the position’s equivalent to ensure communications are
accessible to all customers? If yes, please explain.
OCC-605.
(STORM OVERTIME) For the test year, please provide the amount of overtime
worked by each exempt employee by storm (i.e., do not provide a total amount
worked for the year, but the amount per employee per each storm).
OCC-606.
(CUSTOMER SERVICE) Please provide key insights from J.D. Power's external
customer research on customer perceptions of Eversource and other utility
providers. Based on the external research the Company subscribes to, how do
customer perceptions of Eversource compare to perceptions of other utility
providers across the country?
OCC-607.
(CUSTOMER SERVICE) What notable patterns in customer perceptions of
Eversource have been identified, based on the Company’s own customer perception
surveys and insights gained from external research? How has customer perception
of Eversource changed in the past 6 years? What potential reasons have been
identified for customer views changing or remaining constant?
OCC-608.
(CUSTOMER SERVICE) What pre-pandemic trends in customer perceptions of
Eversource has the Company identified? Have there been significant shifts since
the onset of the COVID-19 pandemic?
OCC-609.
(CYBERSECURITY COSTS) In an unlocked Excel spreadsheet, please identify
all costs included in the Test Yar associated with cybersecurity measures, noting
the filing/line in which that cost is contained and explaining the work associated
with that cost.
OCC-610.
(VARIABLE PAY) Please refer to EMPLOYEE-CLP-1, Table 8. The “Strategic
Financial Incentives and Regulatory Outcomes” are “Regulatory filings, storm cost
recovery and strategic positioning.”
a. Please explain all specific regulatory filings that factored into this metric;
b. Please confirm if “storm cost recovery” referred to Docket No. 25-12-13 and,
if so, explain how this was measured to have been met;
c. Please explain “strategic positioning” and indicate how this was measured to
have been met.
OCC-611.
(VARIABLE PAY) Please refer to EMPLOYEE-CLP-1, Table 8 and the Response
to OCC-198, Attachment 1. Each year from 2018 through 2023 had a separate table.
Please explain if Table 8 reflects 2024 metrics or 2025 metrics and provide
whichever year Table 8 does not reflect.
OCC-612.
(VARIABLE PAY) Please refer to EMPLOYEE-CLP-1, Table 8 and the Response
to OCC-196, which explains that Table 8 refers to Eversource-level goals.
a. Please identify which goals included in Table 8’s “Key Strategic Financial and
Regulatory Results” and “Key Strategic Customer and Clean Energy
Operational Results” included results from Connecticut and explain how those
goals were met.
b. Please explain how Connecticut factored into the remaining Operational
Performance goals in Table 8 (e.g., what was Connecticut’s average MBI,
SAIDI, etc…).
OCC-613.
(VARIABLE PAY) Please refer to CLP-EMPLOYEE-3.
a. Please confirm that every employee with a rating of “Improvement Needed to
be a Successful Contributor” or higher received a variable pay award in the Test
Year.
b. Please confirm that every employee with a rating of “Improvement Needed to
be a Successful Contributor” or higher received a merit raise in the Test Year.
OCC-614.
(VOLUNTARY SEPARATION) For each employee who voluntarily separated
from the Company in 2025, please indicate the employee’s position and the stated
reason for separation.
OCC-615.
(POLES) Please refer to Exhibit CLP-TSP-1, p. 27, which states that many wood
poles “do not meet current strength standards.” Please clarify:
a. Of the total number of poles, what percentage are wood poles?
b. What are the sources of the loads on the poles?
c. To the extent some loads result from communications wires, has the Company
studied the allocation of load attributable to each source (i.e., does the Company
know the amount of load associated with each type of wire on the pole)? If so,
please provide.
d. Would the poles meet current strength standards if they contained only electric
lines?
OCC-616.
(MS24E - Allocation) Please refer to the Response to EOE-13, Attachment 1.
Please explain how the Company determined how to allocate costs between MS24E
and MN24F011.
OCC-617.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 1. Please
explain the work associated with this invoice and why the work occurred more than
one month after the event.
OCC-618.
(MS24E - Standby) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 19.
Please confirm that the workers on this invoice charged for being on standby from
6 am through 10 pm on March 11, 2024, and did not perform any work associated
with this event.
OCC-619.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 20. The times
allocated in the “Work Distribution” section of the form overlap and cannot apply
to all workers. Please explain how the Company verified that all workers listed on
this form worked for 12 hours.
OCC-620.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 21. The
description of the 10 hours of work performed by 8 workers and 7 trucks is
“Transfer FTR set pole install new st light.”
a. Please explain how this work is related to the storm and why the number of
vehicles and number of workers was necessary.
b. Please explain why the workers/vehicles billed for 10 hours but the start time
was 6:30 and the end time was 11:00. If work was not performed at this location/job
for the entire 10 hours, please explain what occurred for the remaining 5 ½ hours
billed.
OCC-621.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 22-23.
a. Please explain if “Car Vs pole Frontier pole…” was considered work associated
with the storm and is included in the requested recovery.
b. Please provide the cost associated with the “Car Vs. pole Frontier pole…” entries.
OCC-622.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 22. The times
allocated in the “Work Distribution” section of the form overlap and cannot apply
to all workers. Please explain how the Company verified that all workers listed on
this form worked for 11 hours.
OCC-623.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 25.
a. The start time indicated in box 6 is 5:30 am, however, the start time indicated in
box 24 is 13:30. Further, the crew billed for 7 hours of standby and 10.5 hours of
work time (two crew members billed for 9 hours of work time). Please reconcile
the start times and the total work time.
b. Please confirm that the only work performed during the 17.5 hours billed was
the work from 17:00 to 12 am.
OCC-624.
(MS24E - Standby) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 27.
This crew billed for only standby. Where did the standby occur?
OCC-625.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 29. Please
explain why the second entry did not have a ticket.
OCC-626.
(MS24E - Timesheets) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p.
45-48. Please explain why these timesheets differ from the template and how the
Company verified the number of hours worked by each employee on each work
order.
OCC-627.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 52. Please
explain why standby work performed at the Torrington WC on March 28, 2024,
was charged to the MS24E event.
OCC-628.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 53-63. The
work associated with this invoice was performed on March 18-20, 2024. Please
explain how the Company verified the work resulted from event MS24E.
OCC-629.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 65-66. Please
confirm that this crew was on standby throughout March 11 and March 12, 2024,
performed no work, and was paid overtime.
OCC-630.
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-01)(MS24E) p. 67-72. The
timesheets were corrected to reflect time billed to MS24E rather than MN24F.
Please explain:
a. Who corrected the timesheets?
b. On what basis (what evidence) were the timesheets corrected to bill these crews
who incurred nothing but standby expenses on March 12 to MS24E?
OCC-631.
(MS24E) Please refer to the Response to Exhibit ACCT-2(CLP-5A-01)(MS24E)
p. 218-254.
a. Did the vendor Central Connecticut Cable Company perform any work or did
they bill for standby for the two days?
b. If they billed for work, please indicate where the work was noted on their
timesheets.
OCC-632.
(MS24E) Please refer to the Response to Exhibit ACCT-2(CLP-5A-02)(MS24E)
p. 84-85.
a. The work associated with these invoices was performed for ten days after
MS24E. Please explain how the Company verified the work resulted from
event MS24E.
b. Please refer to p. 84. Please explain how replacing a rotten pole was attributed
to MS24E.
OCC-633.
(MS24E) Please refer to the Response to Exhibit ACCT-2(CLP-5A-02)(MS24E)
p. 115, which lists in the description of work “communication line down.”
a. Did the Company reinstall/repair a communication line?
b. If yes to a, did the Company recover this cost from the communications
company?
OCC-634.
(Storm MN25K - Timesheets) Refer to Exhibit ACCT-2 (CLP-13A-16) (MN25K).
The following pertains to invoices #3634R, 3635R, 3633R, 3648R, 3646R, and
3644R (p. 30-173) and invoices #3630R, 3643R1, 3639R2, and 3636R1 (208-285):
a. Several timesheets (ex. p. 38) contain missing information within the ‘Work
Distribution’ section. Explain how the Company verified and justified the work
performed for the hours stated in box 12 (Work Time) without event
information to indicate time worked.
b. Several timesheets (ex. p. 37) contain a difference in hours worked in boxes 6
and 7 (start time and end time) compared to boxes 24 and 25 (event start time
and event end time). Explain what work occurred during the time differential
including the event details, the event start time, the event end time, and any
documentation over the work performed. Cite to the contract provision
contained in the contracts provided in Response to OCC-44 explaining that the
tasks noted should be logged as work and not standby.
OCC-635.
(Storm MN25K - Timesheet) Refer to Exhibit ACCT-2 (CLP-13A-16) (MN25K).
The following pertains to invoice #3630R (p. 208-226):
a. Per review of the work descriptions, p. 214, the last event noted ‘MTV sub
crews released with no tasks performed’. Explain how the Company gained
comfort over the total billable hours within the report given the release of the
crew prior to the end time in box 7.
b. Per review of the work descriptions, p. 215, the last event noted ‘Not completed:
crews released from job by system dispatch’. Explain how the Company
verified the total billable hours within the report given the release of the crew
prior to the end time in box 7.
OCC-636.
(Storm MN25K – Invoice) Refer to Exhibit ACCT-2 (CLP-13A-17) (MN25K). The
following pertains to invoice #EV022725R (p.186-199):
a. Per invoice, the work date period is from 2/17/2024 to 2/19/2024, however,
MN25K occurred in February of 2025, and the work performed by the crew
was from 2/17/2025 to 2/19/2025. Confirm the work period for this invoice. If
the work period was for 2024, why was the invoice considered as part of
MN25K?
b. Per inspection of the invoice and comparison to the vendor contract provided
as part of OCC-044 Attachment 2 CONFIDENTIAL, p. 5080-5103, the invoice
recorded cost per unit based on the 2024 rates within the contract (5089-5098)
instead of the 2025 rates within the contract (p. 5100-5103). If the work in this
invoice was associated with a 2025 storm, explain why this vendor charged the
2024 rates on this invoice for the work performed on MN25K instead of the
2025 rates that were listed as part of the contract and why those rates were
accepted.
OCC-637.
(Storm MN25K – Service Crew) Refer to Exhibit ACCT-2 (CLP-13A-6) (MN25K).
The following pertains to invoice #12960R1 (p. 1-27). Several timesheets (ex. p. 6)
contain a difference in hours worked based on boxes 6 and 7 (start time and end
time) and boxes 24 and 25 (event start time and event end time). Explain what work
occurred during the time differential including the event details, the event start time,
the event end time, and any documentation over the work performed. Cite to the
contract provision contained in the contracts provided in Response to OCC-44
explaining that the tasks noted should be logged as work and not standby.
OCC-638.
(Storm MN25K – Service Crew) Refer to Exhibit ACCT-2 (CLP-13A-17)
(MN25K). The following pertains to invoice #WO-13990 (p. 200-221):
a. Per inspection of the documentation, there were no Time & Work Reports that
recorded supervisor hours or the equipment utilized by the supervisors. Provide
an explanation of the hours allocated to the supervisors on the invoice and
provide the associated Time & Work Report for the hours worked.
b. The timesheets on p. 201-218 contain no approval by the Eversource
Representative. Explain the reason for the lack of approval by the representative
and how the Company validated the work without that approval.
c. Several timesheets (ex. p. 201) contain no event start time and event end time.
Explain how the Company verified and justified the work performed for the
hours stated in box 12 (Work Time) without event information to indicate time
worked.
OCC-639.
(Storm MN25K – Service Crew) Refer to Exhibit ACCT-2 (CLP-13A-17)
(MN25K). The following pertains to invoice #WO-13989R2 (p. 222-243):
a. The timesheets on p. 224-243 contain no approval by the Eversource
Representative. Explain the reason for the lack of approval by the representative
and how the Company validated the date work was performed without that
approval.
b. Several timesheets on p. 224-243 contain no event start time and no event end
time. Explain how the Company verified that the work performed by workers
for the hours stated in box 12 (Work Time) without the event start times and
end times to indicate time worked.
OCC-640.
(Storm MN25K – Tree Crews) Refer to Exhibits ACCT-2 (CLP-13A-9) (MN25K),
ACCT-2 (CLP-13A-10) (MN25K), and ACCT-2 (CLP-13A-11) (MN25K). The
following pertains to invoices from Lewis Tree Service Inc:
a. Exhibits ACCT-2 (CLP-13A-9) (MN25K), ACCT-2 (CLP-13A-10) (MN25K),
and ACCT-2 (CLP-13A-11) (MN25K) - Several invoices (ex. invoice #445493
p. 154 Exhibit ACCT-2 (CLP-13A-10) (MN25K)) note hours recorded within
the Tree Contractor Work Location report on days that were not charged per the
invoice and weekly operations summary report. How did the Company validate
the work performed by these crews and the hours charged given inconsistency
between the reports?
b. Exhibits ACCT-2 (CLP-13A-9) (MN25K) and ACCT-2 (CLP-13A-10)
(MN25K) - Several invoices (ex. invoice #445115 p. 80 on Exhibit ACCT-2
(CLP-13A-10) (MN25K)) indicated standby time for the hours charged by the
crew. Per review of the vendor contract provided as part of OCC-044
Attachment 2 CONFIDENTIAL p. 3228, “Standby Rates apply to labor
resources only”. Given this information, explain the reason for allowing
equipment to be charged for the time crews were on standby when the contract
allows for only labor. If additional information was considered at the time of
the invoice and related to the equipment hours, please provide. How did the
Company track the hours held on standby for those crews that only recorded a
portion of their time to standby?
c. Exhibit ACCT-2 (CLP-13A-11) (MN25K) – Per review of invoices (ex. invoice
#446544 p. 56), hours were charged for work performed 5-16 days after the
storm event had occurred per Exhibit CLP-STORM-IMT-3 (Event 13-MN25K).
How did the Company ensure that the hours charged, and work performed by
these crews were related to the storm event? If additional information was
provided at the time of deployment or receipt of invoice to validate the work
performed in relation to storm MN25K, please provide.
OCC-641.
(Storm MN25K – Tree Crews) Refer to Exhibit ACCT-2 (CLP-13A-8) (MN25K).
The following pertains to invoices from Distinctive Gardens & Tree Care LLC (p.
31-52):
a. Per review of the vendor contract provided as part of OCC-044 Attachment 2
CONFIDENTIAL p. 1000-1127, the contract indicates different rates for 2025
than those applied on the invoices. Provide context on whether any additional
factors or considerations were applied in calculation of the rates.
b. The hours charged per invoices did not align to the hours recorded per the Tree
Crew Time Sheet reports. Was the differential attributable to standby time or
another non-work function? Were the time sheets completely properly by the
crew/vendor? How did the Company validate the work performed by these
crews and the hours charged?
OCC-642.
(STORM MN25K – Food & Lodging) Refer to Exhibit ACCT-2 (CLP-13A-17)
(MN25K). Invoice #7690, p. 244-245, noted food for the date 2/18/24. Please
confirm if this is correct. If the date is correct, why was it included in the storm
event MN25K?
OCC-643.
(STORM MN25K – Food & Lodging) Refer to Exhibit ACCT-2 (CLP-13A-17)
(MN25K). Invoice #00401, p. 247, noted an order date of 2/18/25 and invoice date
of 2/20/25, however a payment due date of 12/31/24. Please confirm which dates
are correct. If the payment due date is correct, why was this invoice included in the
storm event MN25K?
OCC-644.
(Storm MN25K – Civil Crews) Refer to Exhibits ACCT-2 (CLP-13A-6) (MN25K)
and ACCT-2 (CLP-13A-7) (MN25K). The following pertains to invoices from
Charter Oak Utility Constructors Inc.:
a. Several invoices and Excavation Job Forms documents work performed under
work order #RPEU0011 (ex. Invoice #39513). Provide additional context and
explain how this work order relates to storm MN25K. If this work order number
does not relate to the storm event, why was this included within the storm
recovery costs?
b. Per review of invoice #39459, the Excavation Job Form was submitted on
2/18/25, however, the work was performed on 1/23/25. Explain how the work
performed within this form relates to storm MN25K given the work was
performed prior to the start of the storm event.
c. Per review of invoice #39677 and #39990, the work performed was after the
storm event. Explain and provide additional support to indicate that the work
performed per these invoices related to storm MN25K given the dates
documented per the Excavation Job Forms.
d. Per review of invoice #40098, the Excavation Job Form indicated this work was
performed under work order #RPEU0011 and was performed on 6/13/25.
Provide additional context and explain how this work order relates to storm
MN25K.
e. Per review of invoice #40260, the Excavation Job Form has handwritten notes
indicating the work performed was related to storm MN25K. Provide additional
context and explain how the Eversource approver verified that the work
performed related to storm MN25K. Is there any additional information logged
that noted the delay by Cox and Frontier as to why this crew was deployed in
June to fix the pole?
OCC-645.
(Storm MN25K – Civil Crews) Refer to Exhibit ACCT-2 (CLP-13A-8) (MN25K).
The following pertains to invoices from HI Stone & Son, Inc. Per review of these
invoices, there is no submission date, work date, work completion date, signature
by the contractor, or signature by the Eversource approver. Explain how the
Company verified the invoices and work performed by these crews without
reviewing the work or having a reference date. If additional support or information
is to be considered regarding this work, please provide.
OCC-646.
(Storm MN25K - Civil Crews) Refer to Exhibit ACCT-2 (CLP-13A-8) (MN25K).
The following pertains to invoices from Henkels & McCoy Inc.
a. Per review of invoice #402951, the scope of work section of the Excavation Job
Form notes ‘2/14/25 callout for hand digging crew to expose secondary fault
2/15/25 backfill and clean up site after completed splice’ indicating that the
work performed per this form was on 2/14/25 and 2/15/25 prior to the start of
the storm. Why was the work documented on this form considered as part of
storm MN25K if the work was performed on 2/14/25 and 2/15/25?
b. Per review of invoice #414259, the scope of work section of the Excavation Job
Form notes ‘5/6/25 loam and hydroseed restoration from callout to expose
secondary fault on 2/24’. Explain how this work is related to MN25K and if not,
why was this considered part of storm MN25K?
OCC-647.
(Storm MN25K - Civil Crews) Refer to Exhibit ACCT-2 (CLP-13A-9) (MN25K).
The following pertains to invoices from KTI Utility Construction & Maintenance
LLC. Provide additional evidence indicating approval of the work by an Eversource
representative to confirm that the work was actually performed on these dates by
the crews or evidence indicating deployment of these crews. How was the Company
comfortable with the work performed per these invoices? Did the Company keep
track of the deployment of these crews and their assignments throughout the storm?
If so, would you provide that evidence?
OCC-648.
(Storm MN25K - Civil Crews) Refer to Exhibits ACCT-2 (CLP-13A-12) (MN25K)
and ACCT-2 (CLP-13A-14) (MN25K). The following pertains to invoices from
McAllen Construction Inc.
a. Per review of invoice #222025, the amount related to work order #MN25K011
was $1456.08, however, $2,548 was recorded per Exhibit ACCT-2 (CLP-13)
(MN25K) Confidential). Please help to reconcile the balance between the two
amounts and if additional support should be considered related to this invoice,
provide that support.
b. Per review of invoices #212025 and #282025, there is no work order number
that relates to storm MN25K. Explain how these invoices relate to the storm
event MN25K and if additional support should be considered related to these
invoices, provide that support.
OCC-649.
(Storm MN25K - Civil Crews) Refer to Exhibit ACCT-2 (CLP-13A-1) (MN25K).
The following pertains to invoices from AJ Penna & Son:
a. Per review of invoice #23637, a portion of the invoice was for work performed
on 2/11/25 prior to the start of the storm event. How does the Company consider
this work to be a part of the storm MN25K?
b. For invoice #23637, provide the excavation job form for the dates work was
performed. If no excavation job form, provide additional evidence indicating
the Company requested a deployment of these civil crews on the dates work
was performed. Who was responsible for the deployment of these crews for
snow plowing and how was the work tracked by the Company?
c. Per review of invoice #23687, a request was made for the work performed on
the excavation job form, however, the work was not approved by an Eversource
approver. How did the Company gain comfort over the work performed by this
civil crew?
OCC-650.
(Storm MN25K – Line Crew) The following pertains to the responses provided as
part of OCC-409 and the respective invoice #IN0001536-R3 for Atlantic Power
Constructors LLC.
a. Considering the response provided in subpart (c) of OCC-409 and invoice
#IN0001536-R3 and that the crew’s final job for the day ended at 5:00 PM,
explain the time spent traveling back to the hotel for the day and the time taken
to have the evening meal. Did the Company record this information given the
crew was released earlier than the end of the workday? How did the Company
ensure the time charged related to this timesheet and invoice was appropriately
considered work time and not standby time? Please explain how the crew had
continued use for the equipment once it arrived at the hotel location and how
those hours spent at the hotel before the end of the workday should not be
considered standby time. If the definition of work time is included within the
contract provided in OCC-44, provide reference.
b. Considering the response provided in subpart (e) of OCC-409, is breakfast,
communication and coordination with Company Dispatcher, safety briefings,
and stocking of trucks before the first assignment considered work time or
standby time? If the definition of this work is documented within the vendor
contract provided in OCC-044, provide reference. If these activities are held at
the hotel or AWC, please explain how the equipment had yet been utilized for
the day and why the time spent on these activities should not be considered
standby time.
OCC-651.
(Storm MN25K – Line Crew) The following pertains to the responses provided as
part of OCC-411 and the respective invoice #250012 for Conexus Energy Group
LLC. Considering the response provided in subpart (a) of OCC-411, if the workday
started at 12:00 PM and the crew did not receive their first job until 2:00 PM,
wouldn’t this time be considered standby time? Explain how the 2 hours before
deployment to the first job should be considered work time. If the definition of this
time is documented within the vendor contract provided in OCC-044, provide
reference.
OCC-652.
(Storm MN25K – Line Crew) The following pertains to the responses provided as
part of OCC-412 and the respective invoice #250011 v1 for Conexus Energy Group
LLC.
a. Considering the response provided in subpart (a) of OCC-412, explain how the
time allocated to safety briefing, onboarding, and meal is considered travel and
not considered standby time and cite to all specific applicable contractual
provisions.
b. Considering the response provided in subpart (f) of OCC-412, please cite to
applicable contract provisions and explain why the crew’s time being retained
until the end of their shift without any scheduled work is considered work time
instead of standby time. If the definition of this work is documented within the
vendor contract provided in OCC-044, provide reference.
OCC-653.
(Storm MN25K – Line Crew) The following pertains to the responses provided as
part of OCC-413 and the respective invoice #J002315 for Holland Power Services
Inc. Considering the response provided in subpart (a) of OCC-413, should the
activities described be considered standby time? If the crews are performing these
tasks without the need for equipment, please explain why that should not be
considered standby time instead of work time. Please explain and cite to the
applicable contract provisions regarding whether work time begins when the crew
is assigned to the first job of the day.
OCC-654.
(Storm MN25K – Line Crew) The following pertains to the responses provided as
part of OCC-414 and the respective invoice associated with that interrogatory.
a. Considering the response provided in subpart (a) of OCC-414, provide the data
from the OMS system regarding the events the crew worked on (36 events)
compared to the events recorded on their timesheets (26 events) to validate the
work performed by these workers and to justify the hours worked on each day.
b. Considering the response provided in subpart (b) of OCC-414, provide the
Company records noted to indicate the crew worked during the entire shift
interval as noted.
OCC-655.
(Storm MN25K – Line Crew) The following pertains to the responses provided as
part of OCC-417 and the respective invoice associated with that interrogatory.
a. Considering the response provided to OCC-417, how did the Company decide
to acquire additional restoration resources from Chicago instead of locally
based resources for a quicker response to assist with the storm? If certain factors
were considered and locally based resources were fully allocated, provide
evidence to supporting the unavailability of local crews and the necessity to
bring in the crew from Chicago.
OCC-656.
(Storm MN25K – Equipment Rentals) Refer to Exhibits ACCT-2 (CLP-13A-18)
(MN25K). The following pertains to invoices from Sunbelt Rentals Inc:
a. Per review of the invoices, generators were provided per contract. Please
provide the contract with Sunbelt Rentals Inc.
b. Per review of several invoices, additional labor charges were incurred at certain
locations. Explain what additional information/factors were considered in
determining the need for additional labor at certain job sites. If additional
documentation was considered to support the labor charges, please provide.
c. Several invoices (ex. Invoice #165329892-0002, p. 57) noted a longer outage
date (3-4 days). What factors would have caused the increased outage duration
and subsequently the additional labor hours? Was the Company informed that
a particular job site was taking longer than expected and, if so, how was this
documented? If additional information was considered to support the extended
outage duration, please provide.
d. Invoice #165441789-0002 (p. 62) - The outage date period for this invoice was
1/18/2025 to 1/19/2025. Explain why this invoice is related to storm event
MN25K if the storm didn’t occur until February of 2025.
OCC-657.
Referring to OCC-89 Interrogatory Response. Why does an R0.75 IOWA Survivor
Curve not exist?
OCC-658.
Referring to OCC-89 Interrogatory Response. What is the minimum R number
value your depreciation software can plot onto an IOWA Survivor Curve?
OCC-659.
Referring to OCC-89 Interrogatory Response. What is the maximum R number
value your depreciation software can plot onto an IOWA Survivor Curve?
OCC-660.
Referring to OCC-245 Interrogatory Response. Provide a list of dates and
geographic locations were “bombogenesis” occurred in CL&P service territory.
OCC-661.
Referring to OCC-245 Interrogatory Response. Did a Hurricane impact CL&P’s
service territory during the test year or the four years prior to the test year?
OCC-662.
Referring to OCC-245 Interrogatory Response. What was the last hurricane that
had minimum sustained wind speed of 74 mph or higher inside CL&P’s service
territory?
OCC-663.
Referring to OCC-245 Interrogatory Response. Does the Company track tornadoes
that impact the Company’s assets?
OCC-664.
Referring to OCC-262 Interrogatory Response. Why does the Company consider
Eversource’s Foundation as independent?
OCC-665.
Referring to OCC-262 Interrogatory Response. Why is an “independent”
foundation on the Company's own website?
OCC-666.
Referring to OCC-262 Interrogatory Response. Why did the Company allow an
“independent” foundation to have the Company’s own name?
OCC-667.
Referring to OCC-262 Interrogatory Response. What is the Eversource
Foundation’s address and is that an Eversource owned or leased property?
OCC-668.
Referring to OCC-262 Interrogatory Response. Provide the names of the
Eversource Foundation’s Board of Directors members and state if any are
employees of Eversource.
OCC-669.
Referring to OCC-282 Interrogatory Response. How did the Company determine
the costs associated with flowers and sympathy donations if the Company’s
accounting software does not track this?
OCC-670.
Referring to OCC-282 Interrogatory Response. Provide invoices, receipts, or any
other supporting documentation related to the costs for flowers and collection of
sympathy donations.
OCC-671.
Rest Time. Refer to the response to OCC-046. Provide the amount of paid rest
time included for recovery in base rate payroll in the rate year.
OCC-672.
Rest Time. Refer to the response to OCC-049. Provide the amount of paid rest
time included for recovery for outside contractors (non-storm work) in the rate
year.
OCC-673.
Incentive Compensation. Refer to the response to OCC-052 which states that in
general, employees subject to a collective bargaining agreement are not eligible
for variable compensation.
a. Provide the year when the Company eliminated incentive compensation for
union employees.
b. Explain whether discontinuing incentive compensation for union employees
has had an impact on their job performance.
OCC-674.
Prestaging Costs. Refer to WP C-3-27. Provide the unescalated actual amounts for
each of the years 2021-2025.
OCC-675.
Grab and Go Costs. Refer to the response to OCC-067. Are costs associated with
the Grab and Go Self Service Area included for recovery in the rate year? If so,
provide the rate year amount by category.
OCC-676.
Customer Advances. Refer to the response to OCC-270. Has the Company ever
included customer advances as a reduction to rate base? If so, identify the PURA
precedent relied on for no longer including these as a reduction to rate base.
OCC-677.
Customer Advances. Refer to the response to OCC-270 Attachment 2. Explain
the large increase in customer advances beginning in December 2025 through
June 2026 over the prior years balances.
OCC-678.
Uncollectibles. Refer to the response to OCC-057.
a. Explain why recoveries decreased in 2025 over prior year levels.
b. Explain whether the Company has changed collection efforts or outside
vendors handing collection efforts in any of the years 2021-2025.
OCC-679.
Payment Processing Fees. Refer to the response to OCC-058. Provide the amount
of payment processing fees included for recovery in the rate year including all
supporting calculations and documents (bids, quotes, invoices, contracts).
OCC-680.
Temporary Help. Refer to the response to OCC-359 Attachment 1.
a. Explain why the rate year amount should be inflated if the Company is
requesting recovery of 41 new positions.
b. Explain why the company applied inflation in deriving the rate year amount
since the costs declined each year from 2021-2025.
OCC-681.
Refer to the response to OCC-359 explain why the rate year amount should be
escalated since the costs declined each year from 2021-2025.
OCC-682.
Environmental Remediation Expense. Refer to WP C-3.13. Provide
documentation supporting the rate year increases. (bids, quotes, contracts,
invoices)
OCC-683.
Industry Dues. Refer to the response to OCC-073. Do any of the organizations
listed engage in advertising? If so, provide the amounts related to advertising
included in the rate year.
OCC-684.
Arbor Day Celebration. Refer to the response to OCC-100. Provide the amount
of Arbor Day Celebration costs included for recovery in the rate year by category.
OCC-685.
Arbor Day Foundation. Refer to the response to OCC-100. Provide the amount
paid to the Arbor Day Foundation included for recovery in the rate year.
OCC-686.
VMP. Refer to the response to OCC-101(a). Provide the name of the contactor
used for the current contract and the prior two contracts.
OCC-687.
VMP. Refer to the response to OCC-102 Attachment 1. Provide the amounts by
category for each year 2021, 2022, 2023, 2024, 2025 and the rate year.
OCC-688.
Credit/Collections. Refer to the response to OCC-109. Provide the amount of
Alorica costs incurred for each of the years 2021, 2022, 2023, 2024, 2025 and
included for recovery in the rate year.
OCC-689.
Fee Free. Refer to the response to OCC-141
a. Provide the calculations used to derive the 9% increase in volume.
b. Provide documentation supporting the 8.5% in card processing fees. (invoice,
contract, quotes).
OCC-690.
Revenew Audits. Refer to the response to OCC-142.
a. Provide the amounts recovered related to costs in 2024 and 2025 by vendor,
broken out by storm and non-storm.
b. State how the recoveries were reflected in the rate year. If they were not
reflected explain how ratepayers will receive the benefit of the savings.
OCC-691.
Advertising. Refer to the response to OCC-261.
a. Provide all advertising expense included for recovery in the rate year by
program/category.
b. Also provide the comparable expenses for each of the years 2021, 2022, 2023,
2024, and 2025.
OCC-692.
Capital Projects. Refer to the response to OCC-267 Attachment 1. Provide
supporting documentation (bids, quotes, invoices, contracts) for each of the
projects listed.
OCC-693.
Lobbying/Advertising. Refer to the response to OCC-276 Attachment 1.
a. For each Eversource employee that serves on the committees listed, state
whether their work on the committees are done during working hours. If so,
provide the total fully loaded salary included in the rate year and the
percentage of time spent on the committees.
b. Also identify which committees have lobbying and advertising activities and
the percentage of the committees’ time spent on those activities.
OCC-694.
Incentive Compensation. Refer to the response to OCC-198 Attachment 1.
Provide the same reports for 2024 and 2025.
OCC-695.
Incentive Compensation. Refer to the response to OCC-292 Attachments 1 and 2.
a. Explain why it is reasonable for ratepayers to subsidize incentive
compensation for employees falling in the “improvement needed to be a
successful contributor” and the “Did not meet performance expectations”
categories.
b. Explain why the number of service company employees falling in the
“improvement needed to be a successful contributor” category has increased
each year from 2021 through 2025.
OCC-696.
Incentive Compensation. Refer to the response to OCC-291. The response refers
to the response to OCC-201 for the information, however, OCC-201 does not
contain 2025 information nor the total number of employees eligible each year as
requested in OCC-291. Provide the 2025 information and the number of
employees eligible for incentive compensation in each year 2021, 2022, 2023,
2024 and 2025.
OCC-697.
Incentive Compensation. Refer to the response to OCC-201 Attachment 1 pages
2, 3, 7, 7, 13, 15-19, 21 and 23. Explain why 1% of reviews were unrated.
OCC-698.
Healthcare. Refer to the response to OCC-380.
a. Provide supporting documentation (quotes, invoices, contracts) and
calculations for the medical, dental and vision escalation rates.
b. Provide the working rates for each of the years 2021, 2022, 2023, 2024, 2025
and the rate year.
OCC-699.
Insurance. Refer to the response to OCC-376 Attachment 3. Provide the premium
percentage increases for each year 2021, 2021, 2022, 2023, 2024 and
2025.Explain why accruals for uncollectible claims are included in insurance
Expense.
OCC-700.
Credit Monitoring Costs. Refer to the response to OCC-20. Provide the amount of
credit monitoring costs included for recovery in the rate year associated with this
and other attacks.
OCC-701.
Non Catastrophic Storm Costs. Refer to OCCC-383. Provide the historical
uninflated amounts.
OCC-702.
Legal Expense. Refer to the response to OCC-309. Provide an explanation of the
increase in 2025 expense over the prior years shown.
OCC-703.
Outside Services. Refer to the response to OCC-315. Provide the rate year
amount by vendor. Provide support for rate year increases (quotes, contracts,
invoices) as originally requested.
OCC-704.
Payroll. Refer to the response to OCC-319 Attachment 1.
a. Update Attachment 1 to include information for 2018, 2019 and 2020.
b. Explain why the Company’s O&M expense payroll has not reached $129.285
million authorized in Docket No. 17-10-46 each of the years 2021-2025.
OCC-705.
Payroll. Refer to the responses to OCC-322 and OCC-325. Explain why the
6/2026 CLP and EESCO FTEs have declined from 12/31/2025 amounts.
OCC-706.
Signing Bonus. Refer to the response to OCC 328. Provide the rate year signing
bonus as originally requested.
OCC-707.
Shared Service Expense. Refer to the response to OCC-355. Provide the rate year
amount as originally requested.
OCC-708.
Severance Expense. Refer to the response to OCC-357. Explain what positions
the large severance amount in 2025 relates to.
OCC-709.
ESC Capital Cost. Refer to the response to OCC- 373.
a. Was the ESC capital funding approved in the prior rate case based on the
CL&P or the weighted average ROE?
b. Provide the annual amount approved in the prior rate case for each year 2021,
2022, 2023, 2024 and 2025.
OCC-710.
ESC Capital Cost. Refer to Exhibit CLP-REVREQ-3 line 27 and Exhibit CLPREVREQ-2 line 28. Explain why the Company has forecasted an increase in the
rate year when the cost has decline from 2023-2025.
Respectfully submitted,
STATE OF CONNECTICUT OFFICE
OF CONSUMER COUNSEL
CLAIRE E. COLEMAN
CONSUMER COUNSEL
By: /s/ Andrew W. Minikowski
Andrew W. Minikowski, Esq.
Agency Legal Director
10 Franklin Square New
Britain, CT 0605[phone removed]
CERTIFICATE OF SERVICE
I do hereby certify that on this day the foregoing document was filed with the
Public Utilities Regulatory Authority, and copies thereof were served upon each person
designated on the official service list in this proceeding in accordance with R.C.S.A. § 161-15.
Dated at East Haddam, Connecticut this 10th day of September, 2026.
By: /s/ Andrew W. Minikowski
Andrew W. Minikowski, Esq.
Commissioner of the Superior Court
As listed on the current system
Interrogs from OCC to CL&P 604 thru 623-Issued 09/10/2026 [26-05-10]