Interrogatory responses

Answers to questions Filed in Error, See EOE 78

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-078 Page 1 of 1 Date Filed: August 14, 2026 Witness: Jared A. Lawrence and Timothy W. McGrath Request from: Office of Education, Outreach, and Enforcement Question: (CUSTOMER SERVICE) Please provide the specific wait times, broken down by month and year, that customers encounter when being transferred from the Company’s call center to a third-party call center and/or credit and collections, since the last rate case (to present). Response: The Company does not track specific wait times for customers being transferred from the Company’s internal call center to its credit and collections call center. Please refer to EOE-078, Attachment 1, for the average speed of answer, also known as wait time, of all calls answered since the last rate case for credit and collections callers. This data has been provided in seconds. Prior to 2024, the telephony platforms utilized by the Company and the third-party call center were separate platforms. Calls were transferred using toll-free numbers between the two systems. Since January of 2024, the calls have been contained on the same telephony platform. With this change, the Company can control the pace at which transferred calls are answered. The Company accelerates the pace at which transferred calls are answered, ensuring those calls are answered ahead of calls arriving from the automated system/IVR. This gives a transferred caller a lower wait time experience than a new caller from the IVR.

As listed on the current system

Question(s) Answered Filed in Error, See EOE 78 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026