Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 731, 732, 733, 734, 735, 736, 739, 740, 741

Files13

Text of OCC-733 Attachment 1.pdf

Extracted from the file · 413 pages · 2,059,510 characters

Text of OCC-733 Attachment 1.xlsx

Extracted from the file

Text of OCC-734_Final.pdf

Extracted from the file

Text of OCC-735_Final.pdf

Extracted from the file

Text of OCC-735 Attachment 1.pdf

Extracted from the file · 20 pages · 49,226 characters

Text of OCC-735 Attachment 1.xlsx

Extracted from the file

Text of OCC-736_Final.pdf

Extracted from the file

Text of OCC-739_Final.pdf

Extracted from the file

Text of OCC-740_Final.pdf

Extracted from the file

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-741 Page 1 of 2 Date Filed: September 28, 2026 Witness: Jared A. Lawrence Request from: Office of Consumer Counsel Question: (AMI) Refer to Exhibit CLP-AMI-2 regarding both quantitative and qualitative benefits. Please provide a rough estimate of how the benefits resulting from AMI meters might be classified (in terms of providing benefits that are customer-related, demand-related, or energy-related). For example, would the Company expect that approximately 50% of the benefits could be considered customer-related, 25% as energy-related, and 25% as demand-related? Please explain. Response: The table below is derived from the benefits calculations detailed in Exhibit CLP-AMI-3 and illustrates that 83% of the quantifiable benefits are “customer-related,” 11% are “energy-related,” and 6% are “demand-related.” Nominal ($M) Total AMI Benefit $2,713.7 $ Meter Reading $50.8 Customer (cost reduction) $ Avoided Meter Capital $343.9 Customer (cost reduction) $ Remote Account Connect/Disconnect $77.5 Customer (cost reduction, customer experience) $ No Trouble Found Calls Reduction $13.0 Customer (cost reduction, customer experience) $ System Costs Avoidance $393.8 Customer (cost reduction) $ Volt/VAR Optimization (VVO) $409.0 Energy & Demand Carbon Reduction $441.3 Customer (cost reduction) $ Asset Optimization $169.2 Customer (cost reduction) $ Advanced Engineering Analysis $88.5 Customer (cost reduction) $ Avoided Connectivity Survey $16.8 Customer (cost reduction) $ Improved Restoration - Significant Storms $363.2 Customer (cost reduction, customer experience) $ Improved Restoration - Blue Sky $5.7 Customer (cost reduction, customer experience) $ Reduced Bad Debt $188.7 Customer (cost reduction) $ Reduced Theft and Non-Technical Line Loss $39.6 Customer (cost reduction) $ Reduced Soft Close Loss $57.1 Customer (cost reduction) $ Time of Use /Time Varying Rates $55.4 Energy & Demand Customer Targeting for Incentives $0.0 Customer (cost reduction, customer experience) $ Improved Reliability $0.0 Customer (cost reduction, customer experience) $ Billing Accuracy and Timelines $0.0 Customer (cost reduction, customer experience) $ Customer 83% Energy Demand 11% 6% 2,249.37 $312.05 $152.30 50.82 343.93 77.55 13.01 393.78 $265.10 $143.90 441.34 169.21 88.54 16.82 363.22 5.74 188.70 39.63 57.07 $ 46.95 $ 8.40 - The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-741 Page 2 of 2 By definition, the unquantified benefits are not included in this analysis; however, they are categorized qualitatively below: • • • • • • • • Outage Restoration Notifications – Customer More Accurate Load Profiles – Customer Validate Resilience and Reliability Measures – Customer Integrating AMI Data with System Operations Center – Customer, Energy, Demand Public Safety and Downed Wires – Customer Shared AMI Systems Across Affiliates – Customer Detailed Billing Data and Notifications – Customer Load Disaggregation – Customer

As listed on the current system

Question(s) Answered 731, 732, 733, 734, 735, 736, 739, 740, 741 (The Connecticut Light and Power Company) Date Filed: 09/28/2026