Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 729

Files1

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-729 Page 1 of 3 Date Filed: September 28, 2026 Witness: Amparo Nieto Request from: Office of Consumer Counsel Question: (ACOSS) Refer to Exh. CLP-ACOS-1, Exh. CLP-ACOS-2, and Exh. CLP-RATES-1. In a live, unlocked Excel format with all links and formulas intact, please provide an alternate version of the ACOSS and of Table 1 under Exh. CLP-RATES-1, for each of the following scenarios: a. In which FERC Accounts 364-368 are classified as 100% demand-related; b. In which the primary distribution portion of FERC Accounts 364-368 are classified as 100% demand-related. Response: These scenarios conflict with, and do not reflect the use of, well-established methodologies that have been applied by the Company and approved by PURA. In response to this request, the Company is providing the results of the allocations requested under each scenario, and further has replicated the process in developing Table 1 in its Application to prepare an illustrative Table 1 for each scenario. The Company does not support or endorse these cost analyses or tables provided in response to parts a. or b. a. Please refer to OCC-729, Attachment 1 CONFIDENTIAL, for the modified ACOS study with FERC Accounts 364-368 classified as 100% demand-related. The resulting unit costs are included in tab T.0 Summary Unit Costs. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-729 Page 2 of 3 Below is an illustrative Table 1 for this scenario: Table 1: Rates of Return at Current and Proposed Rates Rate Codes Rate 1 & 7 Rate 5 Rate 18 Rate 27, 27A, 30, 30A & EV-S Rate 29 Rate 35, 37 & EV-M Rate 39 Rate 40 Rate 41 Rate 55 Rate 56 & EV-L Rate 57 Rate 58 Rate 115 Rate 116 & 117 Rate 119 Total Current Rates Rate of Return Class to Total 1.2% 1.1 -0.3% -0.3 -12.4% -11.8 3.8% 3.6 -5.6% -5.3 0.9% 0.8 -4.4% -4.2 3.7% 3.5 1.9% 1.8 -1.2% -1.1 -0.1% -0.1 -2.2% -2.1 -1.1% -1.0 0.4% 0.4 -5.6% -5.3 145.0% 137.8 1.05% 1.0 Proposed Rates Rate of Return Class to Total 7.9% 1.0 6.7% 0.9 2.1% 0.3 10.6% 1.4 0.3% 0.0 7.8% 1.0 0.5% 0.1 10.5% 1.4 8.7% 1.1 5.1% 0.7 5.6% 0.7 4.0% 0.5 4.7% 0.6 6.1% 0.8 0.6% 0.1 147.2% 19.0 7.74% 1.0 b. Please refer to OCC-729, Attachment 2 CONFIDENTIAL, for the modified ACOS study with the primary distribution portion of FERC accounts 364-368 classified as 100% demand-related. The resulting unit costs are included in tab T.0 Summary Unit Costs. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-17 Date Issued September 11, 2026 OCC-729 Page 3 of 3 Below is an illustrative Table 1 for this scenario: Table 1: Rates of Return at Current and Proposed Rates Rate Codes Rate 1 & 7 Rate 5 Rate 18 Rate 27, 27A, 30, 30A & EV-S Rate 29 Rate 35, 37 & EV-M Rate 39 Rate 40 Rate 41 Rate 55 Rate 56 & EV-L Rate 57 Rate 58 Rate 115 Rate 116 & 117 Rate 119 Total Current Rates Rate of Return Class to Total 0.9% 0.9 -0.3% -0.2 -12.3% -11.7 4.2% 4.0 -5.4% -5.1 1.4% 1.3 -4.4% -4.2 4.2% 4.0 2.5% 2.3 -1.0% -0.9 0.3% 0.3 -2.1% -2.0 -0.8% -0.8 0.1% 0.1 -5.7% -5.4 145.0% 137.8 1.05% 1.0 Proposed Rates Rate of Return Class to Total 7.8% 1.0 6.8% 0.9 1.2% 0.2 10.8% 1.4 0.8% 0.1 7.9% 1.0 0.6% 0.1 10.7% 1.4 9.0% 1.2 5.4% 0.7 4.2% 0.5 4.2% 0.5 5.1% 0.7 5.6% 0.7 0.5% 0.1 147.2% 19.0 7.74% 1.0

As listed on the current system

Question(s) Answered 729 (The Connecticut Light and Power Company) Date Filed: 09/28/2026

This filing on the current system (opens in a new tab)