The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-17
Date Issued September 11, 2026
OCC-717
Page 1 of 2
Date Filed: September 28, 2026
Witness:
Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M.
Landry
Request from: Office of Consumer Counsel
Question:
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-02) (MS24E), p. 156. Box 12 indicates a total
work time of 16 hours, but boxes 24 and 25 appear to total a maximum work time of 7 hours.
a. Was this crew on standby from 6 a.m. to 8 a.m.? If yes, please explain why this time was billed
as work time and not standby time? If no, please explain what occurred in those two hours and
how Eversource is now aware of what occurred.
b. Please explain why the crew ended work at 6 p.m. but billed until 10 p.m.
c. In boxes 25 and 25, there is a three-hour gap in work time (from 2 pm until 5 p.m). Please
explain what the crew and vehicles did during that time and why it was billed as work time.
Response:
a. Based on the Company’s review of the specified timesheets, there is no significant missing
information within the “Work Distribution” section. The timesheets are not a
contemporaneous record of every minute, task or discrete activity undertaken by a crew in the
course of performing its work. Nor is the timesheet the method by which the Company
manages the crews or assures that the crew is working how and where they are supposed to
be. The timesheets are used to document the time worked and general nature of the work
performed. Timesheets are typically completed at the end of each workday, with time allotted
to the major work assignments completed that day. Given the nature of storm restoration work,
it would be impractical and inconsistent with the crews’ primary responsibility of safely and
efficiently restoring electric service to require personnel to contemporaneously record every
minute task or discrete activity performed throughout the workday.. The Company manages
the crews through the oversight of the employee dispatching the crews and the External Field
Resource Coordinator (EFRC), who is physically in the field with the crews, ensuring that the
crews are properly engaged and assigned work to restore the system from storm damage. The
linemen who are filling out the timesheets are primarily focused on ensuring that their crews
are working safely in a dynamic environment that is full of potentially lethal hazards. The
EFRC is the Company representative that is responsible for signing the timesheets and they
have personal knowledge of the work that the crews have performed and the activities they
have engaged in, particularly in relation to the hours stated in boxes 24 and 25.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-17
Date Issued September 11, 2026
OCC-717
Page 2 of 2
Importantly, the crews are in “working” status for the entire duration of their shift – from start
to finish. The Company does not compensate crews based on the specific restoration event to
which they are assigned, nor are crews expected to be actively engaged in an “event” every
minute of their shift. Time must be allocated at the start and end of each day, as well as between
restoration “events,” to complete all necessary steps to ensure safe working conditions in the
field. For the Resource Management Teams identifying the jobs and deploying crews and the
EFRC, the critical focus is to follow procedures, keep the crews safe, and keep them moving
efficiently throughout the working shift. In this context, there is no bright line that separates
one event from another and neatly segmenting the day from an “event” perspective – all
activities whether in preparation of, or “on the pole,” are proper work activities that are
undertaken during the work shift and will not be specified on the timesheet.
b. Please refer to subpart (a), above. Further, all contractor crews and non-Connecticut based
Company employees working storm restoration in Connecticut are required to be lodged in
hotel rooms. Prior to beginning their first job of the day, the crews eat a meal, conduct safety
briefings, perform U.S. Department of Transportation mandated pre-trip inspections on their
trucks, and restock their trucks as necessary with material needed for their day. This takes
time and the crews are methodical because they don’t want to get out into the field without the
right equipment or materials. The crews start the work shift by driving from their hotel rooms
to the job site and depending on the availability of hotel rooms, that can add an additional 30
minutes or more. At the end of their last job of the day, the crews are required to clean up their
job site, properly store all equipment and tools, eat a meal after performing physical labor all
day in situations where their personal safety is continually at risk and often in unforgiving
conditions; and drive back to their hotel rooms, which again, could be 30 minutes or more
away from the jobsite. Therefore, intervals of time at the start and end of the work shift and
between restoration “events” is an expected and necessary part of the work shift, for which the
crews are paid. Within a work shift, the crews do not get paid differently for different types of
work. Therefore, from a field perspective, the start and stop time is the critical datapoint for
the timesheet.
c. Please refer to subparts (a and b) above.