Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 753, 755, 768, 769, 770, 771

Files10

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of OCC-753 Attachment 3 REDACTED.pdf

Extracted from the file · 12 pages, 2 without text · 22,907 characters

Text of OCC-753 Attachment 4.pdf

Extracted from the file · 1 page · 3,477 characters

Text of OCC-755_Final.pdf

Extracted from the file · 1 page · 638 characters

Words on different pagesRead the text of OCC-755_Final.pdf

Text of OCC-768_Final.pdf

Extracted from the file · 1 page · 2,390 characters

Words on different pagesRead the text of OCC-768_Final.pdf

Text of OCC-769_Final.pdf

Extracted from the file · 1 page · 758 characters

Words on different pagesRead the text of OCC-769_Final.pdf

Text of OCC-770_Final.pdf

Extracted from the file · 1 page · 698 characters

Words on different pagesRead the text of OCC-770_Final.pdf
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-771 Page 1 of 1 Date Filed: October 05, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 86-88. The dates on the time sheet (3/11-3/13) do not match the dates on the Tree Contractor Work Location (3/9-3/12 and 3/15). Please clarify the dates for which work is being charged or this invoice. Response: Referring to Exhibit ACCT-2(CLP-5A-03)(MS24E), pages 86-88, the work being charged to MS24E was performed on March 11-13, 2024. The contractor correctly identified the date and work location on the timesheet but did not correctly transcribe the date on the Emergency Restoration Tree Contractor Work Location report.

As listed on the current system

Question(s) Answered 753, 755, 768, 769, 770, 771 (The Connecticut Light and Power Company) Date Filed: 10/05/2026

This filing on the current system (opens in a new tab)