Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 104 thru 105

Files2

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set NECTA-03 Date Issued September 21, 2026 NECTA-104 Page 1 of 1 Date Filed: October 05, 2026 Witness: David L. Gladey and Jeffrey Richard Request from: New England Connectivity and Telecommunications Association Question: (NESC Non-Compliance – Clarification of “Attacher Name”) Referring to OCC-190, Attachment 1, which identifies communications attachers associated with NESC non-compliant poles, the town where the pole is located, relevant work order, the specific non-compliant issue, and the issue’s resolution: clarify whether the “Attacher Name” column identifies in every instance a. the existing attacher whose facilities caused or contributed to the NESC non-compliance condition (i.e., the attacher responsible for the violation), or b. the attacher that submitted the pole attachment application that led to discovery of the noncompliance, regardless of which attacher’s facilities caused the non-compliance. If the answer differs for different entries, identify which entries fall into each category. Response: a. The column designated as “Attacher Name” in OCC-190, Attachment 1, does not identify, in every instance, the existing attacher whose facilities caused or contributed to the NESC non-compliant condition. Please note that, on September 9, 2026, PURA issued a ruling on the Company’s Motion No. 044 in Docket No. 19-01-52RE01, PURA Investigation of Developments in the Third-Party Pole Attachment Process – Make Ready, granting the opening of a new docket to, among other things, investigate modifications to the current cost allocation methodologies. b. The column designated as “Attacher Name” in OCC-190, Attachment 1, identifies the attacher that submitted the pole attachment application associated with the reference work order. NESC non-compliant conditions are often identified during the engineering review of an attachment application. Accordingly, the attacher listed in Attachment 1 is the applicant whose attachment request led to the discovery and evaluation of the condition, regardless of which existing attacher’s facilities may have caused or contributed to the noncompliance. OCC-190, Attachment 1, was not intended to identify, and generally does not identify, the specific existing attacher responsible for the non-compliant condition. Because the entries reflect the applicant associated with the attachment request, all entries in the “Attacher Name” column fall within category (b).

As listed on the current system

Question(s) Answered 104 thru 105 (The Connecticut Light and Power Company) Date Filed: 10/05/2026

This filing on the current system (opens in a new tab)