Interrogatory responses
Answers to questions 772, 773, 774, 775
Filed by The Connecticut Light and Power Company4 files
Part of docket 26-05-10Files4
OCC-772_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-772_Final.pdfRead the text of OCC-772_Final.pdf
OCC-773_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-773_Final.pdfRead the text of OCC-773_Final.pdf
OCC-774_Final.pdf
PDF · 75 KB · 1 pageText searchable
Download OCC-774_Final.pdfRead the text of OCC-774_Final.pdf
OCC-775_Final.pdf
PDF · 97 KB · 2 pagesText searchable
Download OCC-775_Final.pdfRead the text of OCC-775_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-19
Date Issued September 21, 2026
OCC-772
Page 1 of 1
Date Filed: October 05, 2026
Witness:
John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner
Request from: Office of Consumer Counsel
Question:
(MS24E) Please refer to Exhibit ACCT-2(CLP-5A-03)(MS24E), p. 91-93. Please clarify if this
crew performed any work or was stationed at the “Darien Yard” the entire time.
Response:
The individual referred to in Exhibit ACCT-2(CLP-5A-03)(MS24E), pages 91-93, is providing
contractor tree crew supervision and dispatching to support storm restoration. The contractor’s
supervisory personnel do not maintain records of specific crew dispatch locations during storm
events because they are not personally responding to each work site. Their role is to supervise tree
crew operations and dispatch the tree crews performing the work to locations identified through
the Company’s restoration process.
As listed on the current system
Question(s) Answered 772, 773, 774, 775 (The Connecticut Light and Power Company) Date Filed: 10/05/2026