Interrogatory responses

Answers to questions 780, 781, 783, 787

Files11

Text of OCC-781_Final.pdf

Extracted from the file · 2 pages · 4,345 characters

Text of OCC-781 Attachment 1.pdf

Extracted from the file · 6 pages · 17,148 characters

Text of OCC-781 Attachment 2.pdf

Extracted from the file

[Sheet: Sheet1] CL&P Distribution 2025 Capital Project Deferrals PROJECT_NUMBER | PROJECT_TYPE | PROGRAM | PROJECT_DESCRIPTION | 2025 Deferral Amount ($ Millions) | Year Deferred To/Planned In-Service Date CD02226 | UG CABLE & EQUIPMNT REPLACEMNT | Network Reliability | NW Hartford 2N07 PILC Cable Replacement Rank 3 | 1 | 2026 CD01132 | UG CABLE & EQUIPMNT REPLACEMNT | Network Reliability | Triangle Switchgear 11A52/53 | 0.8 | 2026 CD01451 | OVERLOADS-SPECIFIC PROJECTS | Distribution Line Capacity | 22N4 Contingency Ovld | 6.2 | 2026 CD02329 | UNDERGROUND STRUCTURE ISSUE | Network Reliability | Central Energy Release MHs - 2025 | 0.6 | 2026 CD02332 | UNDERGROUND STRUCTURE ISSUE | Network Reliability | Tresser Blvd Duct Bank | 1 | 2026 CD02201 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | Large Customer Zones - RWO - Central-13Z-24R | 1.1 | 2026 CD02398 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | Enfield ROW 27H3: Powder Hill to Post Office Rd | 2.2 | 2031 CD02542 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 Cheshire AWC SS 1-100 CI 4Z 7R | 0.8 | 2026 CD02213 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 12Y9 WPC Reliability Improvement | 0.7 | 2026 CD02475 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 Large Customer Zones 900-999 RWO Western | 1.6 | 2027 CD02377 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | 2025 Eastern ROW Priority 3 poles | 1.1 | 2026 CD01703 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | 11J43 ROW Removal | 0.5 | 2033 CD02215 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 35L9 WPC Reliability Improvement | 0.5 | 2026 CD02594 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 East Hampton CI Rank 1 - 100 | 0.9 | 2027 CD02207 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 11C14 WPC Reliability Improvement | 0.8 | 2026 CD02208 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 15L68 15L69 WPC Reliability Improvement | 1.6 | 2026 CD01687 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | ROW 032 - 4A10 | 8.8 | 2027 CD01720 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | ROW 006 - 24J3 | 3.3 | 2026 CD01817 | RELIABILITY IMPROVE SPEC PROJ | Distribution Line Reliability | Ringed S/C: 13H2-2 (Platt & Tudor) | 1 | 2027 CD02007 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | SSRK1160.21-2B5-70S-1604-COND.6 | 1.4 | 2026 CD02107 | UG Network Automation | Network Reliability | Man to Auto - East Main Street | 0.7 | 2027 CD02116 | RELIABILITY IMPROVE SPEC PROJ | Distribution Line Reliability | Ringed S/C: 21K2 & 21K3 Roxbury Rd | 2.7 | 2026 CD02160 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 48C7 & 48C8 Smart Switch Project RWO.9 | 1.1 | 2027 CD02193 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 12J4 WPC Reliability Improvement | 0.8 | 2026 CD02211 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | 13K57, 13K49 ROW Removal | 3.6 | 2027 CD02228 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | SSRK715.23-1B08-70S->2097-RWO.10 | 1.4 | 2027 CD02233 | UG CABLE & EQUIPMNT REPLACEMNT | Network Reliability | SW Hartford 47N7 PILC Cable Replacement Rank 34 | 2.6 | 2027 CD02257 | UG CABLE & EQUIPMNT REPLACEMNT | Network Reliability | Wiliams St 9L03 PILC Cable Replacement Rank 63 | 1.5 | 2027 CD02327 | UNDERGROUND STRUCTURE ISSUE | Network Reliability | 2025 Western Energy Release MHs | 0.5 | 2027 CD02340 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | Trip Savers - 2024 | 11.8 | 2030 CD02439 | DB CABLE REPLACE-SPECIFIC PROJ | URD/DB Cable Improvements | Woodridge Lake Automation | 0.9 | 2028 CD02474 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 Eastern 900-999 Custs RWO SS Project | 1.2 | 2027 CD02476 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | Central 900-999 Custs RWO SS Project | 3.8 | 2027 CD02533 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 Torrington SS Rank 1-100 CI | 0.7 | 2027 CD02376 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | 2025 Central ROW Priority 3 Poles | 3.1 | 2026 CS00189 | SWITCHGEAR | Substation Reliability | Triangle 11A Switchgear Installation | 8.4 | 2027 CS00245 | ENVIRONMENTAL - SUBSTATION | Environmental | S. Meadow 1A OCB Repalcement & Bus Rehab PH 3 | 6 | 2028 CS00258 | SWITCHGEAR | Substation Reliability | SW Hartford 47N | 1.5 | 2029 CS00392 | SUBSTATION OVERLOADS-SPEC PROJ | Substation Capacity | Beacon Falls 11N Transformer Replacement | 1.3 | 2028 CS00412 | GENERAL MODERNIZATION | Substation Reliability | Newtown 12M Station Modernization | 2 | 2029 CS00422 | ENVIRONMENTAL - SUBSTATION | Environmental | NW Hartford 2N Phase 2 Bus Rehab Release | 1 | 2028 CS00491 | SWITCHGEAR | Substation Reliability | Chippen Hill 15U Switchgear Replacement | 4.8 | 2028 CS00503 | SWITCHGEAR | Substation Reliability | East Meriden 21P Switchgear Replacement | 3.8 | 2029 23768 | BUILDING | Facilities | New London Area Work Center Renovation | 2 | 2026 CTEDVH25 | CAPITALIZED VEHICLES | Capitalized Vehicles | CT Electric Distribution Fleet Capital Vehicles | 8 | 2026 DOT25 | ENHANCED TREE REMOVAL | System Resiliency/Expanded Reliability | CT DOT Cooperative Tree Removal | 2 | 2026 ETTCF25 | CUSTOMER FOCUSED TRIMMING | System Resiliency/Expanded Reliability | Customer Focused Trimming | 1.2 | 2026

Text of OCC-783_Final.pdf

Extracted from the file

Text of OCC-787_Final.pdf

Extracted from the file

Text of OCC-787 Attachment 1.pdf

Extracted from the file

Text of OCC-787 Attachment 1.xlsx

Extracted from the file

As listed on the current system

Question(s) Answered 780, 781, 783, 787 (The Connecticut Light and Power Company) Date Filed: 10/05/2026