Interrogatory responses

Answers to questions 780, 781, 783, 787

Files11

Search terms highlighted
Eversource rate increase is on 4 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
1 page match

Text of OCC-781_Final.pdf

Extracted from the file · 2 pages · 4,345 characters

Text of OCC-781 Attachment 1.pdf

Extracted from the file · 6 pages · 17,148 characters

Text of OCC-781 Attachment 2.pdf

Extracted from the file · 1 page · 5,338 characters

No matches

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: Sheet1] CL&P Distribution 2025 Capital Project Deferrals PROJECT_NUMBER | PROJECT_TYPE | PROGRAM | PROJECT_DESCRIPTION | 2025 Deferral Amount ($ Millions) | Year Deferred To/Planned In-Service Date CD02226 | UG CABLE & EQUIPMNT REPLACEMNT | Network Reliability | NW Hartford 2N07 PILC Cable Replacement Rank 3 CD01132 | UG CABLE & EQUIPMNT REPLACEMNT | Network Reliability | Triangle Switchgear 11A52/53 CD01451 | OVERLOADS-SPECIFIC PROJECTS | Distribution Line Capacity | 22N4 Contingency Ovld CD02329 | UNDERGROUND STRUCTURE ISSUE | Network Reliability | Central Energy Release MHs - 2025 CD02332 | UNDERGROUND STRUCTURE ISSUE | Network Reliability | Tresser Blvd Duct Bank CD02201 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | Large Customer Zones - RWO - Central-13Z-24R CD02398 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | Enfield ROW 27H3: Powder Hill to Post Office Rd CD02542 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 Cheshire AWC SS 1-100 CI 4Z 7R CD02213 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 12Y9 WPC Reliability Improvement CD02475 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 Large Customer Zones 900-999 RWO Western CD02377 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | 2025 Eastern ROW Priority 3 poles CD01703 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | 11J43 ROW Removal CD02215 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 35L9 WPC Reliability Improvement CD02594 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 East Hampton CI Rank 1 - 100 CD02207 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 11C14 WPC Reliability Improvement CD02208 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 15L68 15L69 WPC Reliability Improvement CD01687 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | ROW 032 - 4A10 CD01720 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | ROW 006 - 24J3 CD01817 | RELIABILITY IMPROVE SPEC PROJ | Distribution Line Reliability | Ringed S/C: 13H2-2 (Platt & Tudor) CD02007 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | SSRK1160.21-2B5-70S-1604-COND.6 CD02107 | UG Network Automation | Network Reliability | Man to Auto - East Main Street CD02116 | RELIABILITY IMPROVE SPEC PROJ | Distribution Line Reliability | Ringed S/C: 21K2 & 21K3 Roxbury Rd CD02160 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 48C7 & 48C8 Smart Switch Project RWO.9 CD02193 | TRMSN DISTR RELIABILTY PERFRM | Regulatory Commitments-Other | 12J4 WPC Reliability Improvement CD02211 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | 13K57, 13K49 ROW Removal CD02228 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | SSRK715.23-1B08-70S->2097-RWO.10 CD02233 | UG CABLE & EQUIPMNT REPLACEMNT | Network Reliability | SW Hartford 47N7 PILC Cable Replacement Rank 34 CD02257 | UG CABLE & EQUIPMNT REPLACEMNT | Network Reliability | Wiliams St 9L03 PILC Cable Replacement Rank 63 CD02327 | UNDERGROUND STRUCTURE ISSUE | Network Reliability | 2025 Western Energy Release MHs CD02340 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | Trip Savers - 2024 CD02439 | DB CABLE REPLACE-SPECIFIC PROJ | URD/DB Cable Improvements | Woodridge Lake Automation CD02474 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 Eastern 900-999 Custs RWO SS Project CD02476 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | Central 900-999 Custs RWO SS Project CD02533 | SMART SWITCHES PROGRAM | System Resiliency/Expanded Reliability | 2025 Torrington SS Rank 1-100 CI CD02376 | RIGHT OF WAY LINES | System Resiliency/Expanded Reliability | 2025 Central ROW Priority 3 Poles CS00189 | SWITCHGEAR | Substation Reliability | Triangle 11A Switchgear Installation
  2. Part 2

    CS00245 | ENVIRONMENTAL - SUBSTATION | Environmental | S. Meadow 1A OCB Repalcement & Bus Rehab PH 3 CS00258 | SWITCHGEAR | Substation Reliability | SW Hartford 47N CS00392 | SUBSTATION OVERLOADS-SPEC PROJ | Substation Capacity | Beacon Falls 11N Transformer Replacement CS00412 | GENERAL MODERNIZATION | Substation Reliability | Newtown 12M Station Modernization CS00422 | ENVIRONMENTAL - SUBSTATION | Environmental | NW Hartford 2N Phase 2 Bus Rehab Release CS00491 | SWITCHGEAR | Substation Reliability | Chippen Hill 15U Switchgear Replacement CS00503 | SWITCHGEAR | Substation Reliability | East Meriden 21P Switchgear Replacement BUILDING | Facilities | New London Area Work Center Renovation CTEDVH25 | CAPITALIZED VEHICLES | Capitalized Vehicles | CT Electric Distribution Fleet Capital Vehicles DOT25 | ENHANCED TREE REMOVAL | System Resiliency/Expanded Reliability | CT DOT Cooperative Tree Removal ETTCF25 | CUSTOMER FOCUSED TRIMMING | System Resiliency/Expanded Reliability | Customer Focused Trimming

Text of OCC-783_Final.pdf

Extracted from the file · 1 page · 2,561 characters

Words on different pagesRead the text of OCC-783_Final.pdf

Text of OCC-787_Final.pdf

Extracted from the file · 1 page · 1,196 characters

Words on different pagesRead the text of OCC-787_Final.pdf

Text of OCC-787 Attachment 1.pdf

Extracted from the file · 1 page · 4,153 characters

Text of OCC-787 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 780, 781, 783, 787 (The Connecticut Light and Power Company) Date Filed: 10/05/2026