Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 780, 781, 783, 787

Files11

Search terms highlighted
Eversource rate increase is on 4 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
1 page match

Text of OCC-781_Final.pdf

Extracted from the file · 2 pages · 4,345 characters

Text of OCC-781 Attachment 1.pdf

Extracted from the file · 6 pages · 17,148 characters

Text of OCC-781 Attachment 2.pdf

Extracted from the file · 1 page · 5,338 characters

Text of OCC-781 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of OCC-783_Final.pdf

Extracted from the file · 1 page · 2,561 characters

Words on different pagesRead the text of OCC-783_Final.pdf

Text of OCC-787_Final.pdf

Extracted from the file · 1 page · 1,196 characters

Words on different pagesRead the text of OCC-787_Final.pdf

Text of OCC-787 Attachment 1.pdf

Extracted from the file · 1 page · 4,153 characters

No matches

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: Cognos_Office_Connection_Cache] [Sheet: Sheet1] CL&P Distribution Line Capacity Projects Year Delay Occurred | Total Project through 2025 | In Service Date(s) Project | Year | Actual | Budget | Actual | Authorized | Planned | Actual | Notes CD00262 Rockville/Mansfield 27.6 kV Overload | The delay in 2017 was primarily the result of the project's multi-year implementation plan and the reassignment of portions of the approved scope from Project CD00262 to Projects CD00563 and CD00643. Thirty-one of the thirty-three work orders were subsequently placed in service in 2019. CD00628 Greenwich 28F Ducts & Cables | The delay in 2019 was primarily attributable to the permitting process with the Town of Greenwich. The project required the development of plan and profile drawings for several challenging crossings, and the Town imposed stringent construction and work restrictions that extended the review and approval timeline. CD01047 Lakeview 31A Contingency Loading | The delay in 2020 was primarily caused by opposition from the Silvermine Association and the City of Norwalk regarding the proposed 9S47 aerial cable route. Concerns related to tree trimming requirements and proposed pole heights resulted in additional reviews, stakeholder coordination, and route evaluation efforts, extending the project schedule. CD01065 Mystic 13K4 OL Upon Loss of A3 Bus | The 2022 delay resulted from additional environmental permitting and construction matting requirements associated with a line extension between the 11B1 and 13K4 circuits within a transmission corridor. CD01451 Ridgefield 22N Contingency Overload | The delay in 2025 resulted from procurement and manufacturing delays for critical substation switchgear. Due to the extended equipment delivery schedule, resources were temporarily diverted to other projects. The project remains ongoing in 2026. CD01536 Falls Village 4L07-5L Express Feeder | This project began in 2022 and was coordinated with the construction of Project CD01379 on the same pole line. Resources were redirected to complete CD01379, as it was not constrained by the substation schedule. The associated substation infrastructure under Project CS00389 required a longer implementation period, delaying final feeder integration. The 4L07 feeder was placed in service on June 15, 2026, upon completion of all required substation work supporting the feeder tie-in. CD02172 Farmington 1C19 Contingency Overload | The delay in 2024 was primarily attributable to resource constraints, material procurement lead times, and unforeseen field conditions. During construction of the 1C03 circuit, deteriorated electrical conduits were identified beneath the South Road bridge over I-84 in Farmington. This unforeseen condition required additional engineering, permitting, and coordination efforts, including the development of civil design drawings, CTDOT-compliant traffic control plans, and the acquisition of required permits. The necessary CTDOT permits for the bridge crossing remain outstanding, preventing installation of the final cable segment and delaying project completion. As a result, the project schedule has been extended.

As listed on the current system

Question(s) Answered 780, 781, 783, 787 (The Connecticut Light and Power Company) Date Filed: 10/05/2026

This filing on the current system (opens in a new tab)