Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-782 Page 1 of 2 Date Filed: October 06, 2026 Witness: David L. Gladey, Leanne M. Landry and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: Exhibit CLP-ADDITIONS-12 at p. 121 attributes the decrease in planned 2023 Basic Business expenditures to “unusually high emergent work ($34M) in 2022.” Identify the work comprising that $34 million by project or work order, and for each event provide date, location, asset class, failure cause and cost, and whether the asset had previously been assessed as deficient. State the criteria the Company applies to classify work as emergent rather than planned, and provide the written standard in effect in 2022. Response: CLP-ADDITIONS-12 provides the annual capital investment plan from 2017 through 2025 at the CT Electric Operations organizational level. The referenced $34 million is the variance between 2022 actual ($85 million) and 2023 budget ($51 million). Please refer to OCC-782, Attachment 1, for a listing of 2022 work order details comprising the $85 million. Please refer to the Company’s response to OCC-568 i, and note that emergent work “includes items identified through routine inspections and maintenance as well as emergent/emergency equipment replacements in a substation or on the overhead and underground distribution system.” Prior Referenced Response: i OCC-568 Question: In Exhibit CLP-TSP-3, Page 42, Eversource provides a table with investment categories by year. Please clarify how the following categories are mutually exclusive: a. b. c. d. Reliability Capacity Emergent Asset Health OCC-568 Response: Projects and programs shown in Exhibit CLP-TSP-3, at 42, are placed into a category by the main driver for the scope of work, although the project and/or programs may resolve multiple system concerns. For example the identified need to begin project or program development could be identified as capacity, however, a secondary driver could be asset health. In this instance the investment would be placed in the capacity category corresponding to the main driver of
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-782 Page 2 of 2 the work, although it resolves multiple system concerns such as asset health. The project and program investments in each of the categories are only accounted for in that category and are not included in additional categories. Exhibit CLP-TSP-3, pages 45 through 95 give additional information to describe the categories noted. a. Reliability projects are work on the system associated with improving or maintaining SAIDI and SAIFI metrics. Projects in this category could also include double pole removals and the smart switch program. b. Capacity projects are created to prevent equipment damage due to thermal overloads which could result in customer outages, while also providing operational flexibility to enable outages to be isolated and restored through alternate sources based on Eversource design criteria. They address peak load and capacity needs across the distribution system. c. Emergent project work includes items identified through routine inspections and maintenance as well as emergent/emergency equipment replacements in a substation or on the overhead and underground distribution system. d. Asset Health includes the replacement of aging or obsolete equipment that has reached the end of its useful life in order to maintain safe and reliable system performance. Within this scope, key asset types include transformers, switchgear, poles, PILC, conductor, cables, breakers, batteries, reclosers, station service transformers, protective relays, gas monitors, and switches for example. The need for replacement is determined based on inspections, testing, equipment age, safety considerations, operating performance, changes in standards, equipment obsolescence, and spare parts availability.

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)