Interrogatory responses
Answers to questions 782
Files3
OCC-782_Final.pdf
PDF · 121 KB · 2 pagesText searchable
Download OCC-782_Final.pdfRead the text of OCC-782_Final.pdf
OCC-782 Attachment 1 .pdf
PDF · 6.9 MB · 616 pagesText searchable
Download OCC-782 Attachment 1 .pdfRead the text of OCC-782 Attachment 1 .pdf
OCC-782 Attachment 1 .xlsx
Excel · 1.1 MBText searchable
Download OCC-782 Attachment 1 .xlsxRead the text of OCC-782 Attachment 1 .xlsx
Page 116 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80181658 80181669 80181676 80181681 80181689 80181695 80181707 80181709 80181710 80181723 80181744 80181750 80181752 80181775 80181779 80181798 80181825 80181833 80181854 80181860 80181940 80182114 80182118 80182147 80182162 80182179 80182180 80182182 80182183 80182187 80182193 80182194 80182209 80182217 80182232 80182233 80182241 80182251 80182258 80182278 Accounting Work Order Descript 3/15: 20 NORTH ST, STM/ NEEDS PRIMA MF - 3/15 VOLUNTOWN (98) RD PAWCATU 3/15/22 25 SANDSTROM RD NEW PRESTO 3/15- 12 CROWLEY DRIVE, OLD SAYBROO TT TC 138 DUNN AVE, STM/ INSTALLED MV - 3/15 BRANDON LN STONINGTON CR- NOD RD SIMSBURY POLE 3468, REPL 3/14 P#2337 RPL OH CAP BANK ELLINGT HEL: KTI 3/16/22 330 BERKSHIRE RD 3/16/22 213 BRUSHY HILL RD DANBURY CXL'D SEE WO 8631013 FWO 80196217 / ASP JTR, 16 SHADOW LN, CROMWELL, Re REPLACE OH SVC WITH 1/0 734 E MAIN MATERIAL 3/16/22 1 JAMS DR DANBURY 3/16/22 8 SWEETBRIAR LN NEWTOWN 3/16/22 41 CANDLEWOOD VISTA NEW M 3/16/22 BLACK ROCK TPKE REDDING 3/16/22 37 MIDDLE RIVER RD DANBURY 3/16/22 15 SHELTER ROCK LN DANBURY 3/16/22 10 GREAT RING RD SANDY HOOK MAR - POST CONST>3/12: TOWN HILL ( MCB - 03.11.22 - 45 LITTLE RIVER DR JFC - TURNOVER - Westwood Rd #2, Sh RSO--03/16/22--REPLACED 10' XARM PO KD-EVENT #4712392 REPLC XFMR BANK S ALL WORK COMPLETE CEDAR HILL RD, GU DG P#60 RIVERSIDE RD THOMPSON RPLC 3/16: 72 MARY LN, RIVERSIDE/ REPLAC GC - 3/16 ROUTE 2 (197) PRESTON JTR, 20 GILBERT AVE, ROCKY HILL CT 2768 MAIN ST, GLASTONBURY CT - XARM JTR, 593 Pondview Dr, Cromwell, rp 3/16 P#2106 WALES RD, STAFFORD 3/16/22 23 EQUESTRIAN RIDGE RD NEW 3/17/22 43 DOWLING DR RIDGEFIELD MF - 3/16 QUARRY (6) RD MYSTIC 3/17/22 133 HOOP POLE HILL RD WOOD CLAY ( 70) ST FL 1 -- H233, THOMAST MM 120 Kinne Rd Canterbury P#1965 i TL - BOSTON POST RD, #163 OLD LYME Asset Location 1066 : CN : STAMFORD : 1066 1177 : CN : STONINGTON : 1177 1140 : CN : WASHINGTON : 1140 1098 : CN : OLD SAYBROOK : 1098 1066 : CN : STAMFORD : 1066 1177 : CN : STONINGTON : 1177 1942 : CN : SIMSBURY : 1942 1115 : CN : SOUTH WINDSOR : 1115 1013 : CN : NEWTOWN : 1013 1008 : CN : DANBURY : 1008 1022 : CN : WOODBURY : 1022 1031 : CN : CROMWELL : 1031 1102 : CN : BRANFORD : 1102 1008 : CN : DANBURY : 1008 1013 : CN : NEWTOWN : 1013 1135 : CN : NEW MILFORD : 1135 1053 : CN : REDDING : 1053 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1013 : CN : NEWTOWN : 1013 1071 : CN : PLYMOUTH : 1071 1003 : CN : NAUGATUCK : 1003 1137 : CN : SHARON : 1137 1159 : CN : GLASTONBURY : 1159 1032 : CN : MERIDEN : 1032 1103 : CN : GUILFORD : 1103 1084 : CN : THOMPSON : 1084 1065 : CN : GREENWICH : 1065 1173 : CN : PRESTON : 1173 1941 : CN : ROCKY HILL : 1941 1159 : CN : GLASTONBURY : 1159 1031 : CN : CROMWELL : 1031 1116 : CN : STAFFORD : 1116 1013 : CN : NEWTOWN : 1013 1054 : CN : RIDGEFIELD : 1054 1177 : CN : STONINGTON : 1177 1022 : CN : WOODBURY : 1022 1019 : CN : THOMASTON : 1019 1076 : CN : CANTERBURY : 1076 1097 : CN : OLD LYME : 1097 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 116 of 616 Month Number Amount 202203 $1,577.21 202203 $503.66 202203 $947.30 202203 $488.18 202203 $145.62 202203 $104.72 202203 $7,422.63 202203 $37,511.95 202203 $179.28 202203 $72.79 202203 $837.76 202203 $869.11 202203 $1,124.86 202203 $209.49 202203 $73.50 202203 $182.21 202203 $8,878.36 202203 $523.05 202203 $488.71 202203 $1,283.08 202203 $478.01 202203 $310.25 202203 $477.26 202203 $1,066.01 202203 $2,854.95 202203 $1,760.37 202203 $269.23 202203 $1,661.99 202203 $145.78 202203 $413.04 202203 $266.29 202203 $6,055.36 202203 $9,326.85 202203 $213.74 202203 $349.07 202203 $47.32 202203 $425.56 202203 $139.63 202203 $418.72 202203 $104.72Page 117 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80182462 80182468 80182530 80182535 80182537 80182616 80182626 80182636 80182647 80182655 80182728 80182752 80182835 80182841 80182852 80182855 80182862 80182883 80182887 80182888 80182893 80182895 80182904 80182906 80182910 80182954 80182960 80183113 80183475 80183570 80184093 80184103 80184117 80184240 80184406 80184438 80184667 80186657 80186666 80186698 Accounting Work Order Descript JTR, 205 GARDEN ST, HARTFORD - REPL 3/17: 61 WOODSIDE DR, GRN/ TREE VS MR; ***WRITTEN***ALL WORK COMPLETED P-674 REPLACE CAN AND POLE TOP. 93 P-112 SHIFT TO FTR 40/2, REMOVE TRE MATERIAL MCB - 03.15.22 - 21 INMAN TT TC 113 & 117 HOUSTON TER, STM; P * JAM - 188 FOREST DR, NEWINGTON Y-26306-2022 OLD BLACK HILL RD, PLA Brooklyn 30Y-Replace Failed 1X LTC 3/18/22 DONNA ( 19) DR -- 9114, SD; 3/18/22 / FRANCIS KEALLY RD WAS DONE NYPERT I PAD EVW - 188 TACONIC DG P#385 SPRAGUE HILL RD EASTFORD S ALL WORK COMPLETE W SHORE DR OLD S new GC - 3/18 QUEEN ELEANOR DR LEDY ALL WORK COMPLETE 3/19 SILVER SPRIN 3/21 1850::OLD SPRINGFIELD:RD::STAF PD - 3/19 WATERFORD PKWY N WATERFOR CRP - 3/18/22 STAGECOACH RD, BURLIN WC-03.18.22 - 2060 S MAIN ST, WATER MM yellow tag Cap Bank p#73 Day St JDB 3/18: NEW CANAAN AVE, NORWALK/ ALL WORK COMPLETE 3/19 GATES WAY HA COMP (ASP) JUNIPER ( 43) LN -- S614 new TT TC 52 BON AIR AVE, STM/ REPLACED YA; 12 HILLCREST LN; FRONTIER REPLA DG P#335/334 RIVERSIDE DR THOMPSON GC - 10/6/21 (RSO- PUNZALAN) MATTS POST CNST 3/23 ALBANY AVE HARTFORD 03.19.22 - 9 OLD TURNPIKE RD, SOUTH DG P#2633 PROSPECT ST WOODSTOCK RPL EVW - CAREY ( 127A) AVE -- 4044, WI MAR - POST CONST>03.23.22 - PINE ME UG Dept. 32 South St, Bristol. Repl MATERIAL JES;100 GREENLEY RD, NEW C 3/24: NORTH ST, GRN/ LOCKOUT / BAD MCB - 3/22 P#5680 BALDWIN AVE, WATE 3/24/2 CROSS BOW ( 27) LN -- PA Asset Location 1113 : CN : HARTFORD : 1113 1065 : CN : GREENWICH : 1065 1033 : CN : MIDDLETOWN : 1033 1090 : CN : CHESTER : 1090 1101 : CN : WESTBROOK : 1101 1002 : CN : WATERBURY : 1002 1066 : CN : STAMFORD : 1066 1043 : CN : NEWINGTON : 1043 1080 : CN : PLAINFIELD : 1080 J30Y : CL&P BROOKLYN SUBSTATION BROOKLYN : 1075 1134 : CN : NEW FAIRFIELD : 1134 1140 : CN : WASHINGTON : 1140 1928 : CN : SALISBURY : 1928 1077 : CN : EASTFORD : 1077 1098 : CN : OLD SAYBROOK : 1098 1164 : CN : LEDYARD : 1164 1094 : CN : HADDAM : 1094 1116 : CN : STAFFORD : 1116 1100 : CN : WATERFORD : 1100 1191 : CN : BURLINGTON : 1191 1002 : CN : WATERBURY : 1002 1075 : CN : BROOKLYN : 1075 1052 : CN : NORWALK : 1052 1094 : CN : HADDAM : 1094 1943 : CN : WEST HARTFORD : 1943 1033 : CN : MIDDLETOWN : 1033 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1084 : CN : THOMPSON : 1084 1164 : CN : LEDYARD : 1164 1113 : CN : HARTFORD : 1113 1034 : CN : SOUTHINGTON : 1034 1085 : CN : WOODSTOCK : 1085 1195 : CN : WINCHESTER : 1195 1070 : CN : BRISTOL : 1070 1070 : CN : BRISTOL : 1070 1051 : CN : NEW CANAAN : 1051 1065 : CN : GREENWICH : 1065 1002 : CN : WATERBURY : 1002 1012 : CN : MONROE : 1012 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 117 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202203 $300.47 Emergent Equipment Failures - Line 202203 $7,967.81 Emergent Equipment Failures - Line 202203 $8,184.03 Emergent Equipment Failures - Line 202203 $139.15 Emergent Equipment Failures - Line 202203 $279.27 Emergent Equipment Failures - Line 202203 $15,240.14 Emergent Equipment Failures - Line 202203 $255.09 Emergent Equipment Failures - Line 202203 $715.60 Emergent Equipment Failures - Line 202203 $4,346.07 Emergent Equipment Failures - Substation 202203 $223.97 Emergent Equipment Failures - Line 202203 $244.08 Emergent Equipment Failures - Line 202203 $2,371.15 Emergent Equipment Failures - Line 202203 $139.63 Emergent Equipment Failures - Line 202203 $1,931.47 Emergent Equipment Failures - Line 202203 $2,199.61 Emergent Equipment Failures - Line 202203 $1,699.80 Emergent Equipment Failures - Line 202203 $5,132.58 Emergent Equipment Failures - Line 202203 $1,326.53 Emergent Equipment Failures - Line 202203 $789.54 202203 $383.99 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202203 $3,048.98 Emergent Equipment Failures - Line 202203 $1,670.37 Emergent Equipment Failures - Line 202203 $3,297.96 Emergent Equipment Failures - Line 202203 $2,137.40 Emergent Equipment Failures - Line 202203 $174.54 Emergent Equipment Failures - Line 202203 $164.00 Emergent Equipment Failures - Line 202203 $3,098.34 Emergent Equipment Failures - Line 202203 $186.43 Emergent Equipment Failures - Line 202203 $187.15 Emergent Equipment Failures - Line 202203 $2,287.83 Emergent Equipment Failures - Line 202203 $4,832.09 Emergent Equipment Failures - Line 202203 $111.49 Emergent Equipment Failures - Line 202203 $222.91 Emergent Equipment Failures - Line 202203 $536.12 Emergent Equipment Failures - Line 202203 $279.28 Emergent Equipment Failures - Line 202203 $1,179.11 Emergent Equipment Failures - Line 202203 $165.28 Emergent Equipment Failures - Line 202203 $17,577.49 Emergent Equipment Failures - Line 202203 $468.74 Emergent Equipment Failures - Line 202203 $2,947.15Page 118 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80187026 80196409 80201656 80201737 80205612 1B030140 1B030450 1B030560 1B030563 1B030621 1B031106 1B031135 1B031169 1B031262 1B031266 1B031318 1B031622 1B031730 1B031813 1B031923 1B032030 1B032097 1B032177 1B032226 1B032331 1B032348 1B032366 1B032513 1B032532 1B032552 1B032557 1B032597 1B032627 1B032656 1B032872 1B032923 1B032932 1B033007 1B033242 1B130033 Accounting Work Order Descript Todd 30L-Replace 30L-91T-2 Breaker POST CONSTRUCTION. ELLLA GRASSO BL RF:100 HOPE ST, STAMFORD TT :PAD TX 3/29: 42 TOILSOME AVE, NORWALK/ REP 3/29: 103 LLEWELLYN DR, NEW CANAAN/ 107 TRIANGLE ST DANBURY, ROTTED/BRK KD-144R SKOKORAT ST SEYMOUR; REPLC S BRITAIN RD Elec Maint Trouble Cal KD-EVENT #4096236 REPLC P 2004, 200 ELKINGTON FARM RD Elec Maint Replac BLACK ROCK TPKE Elec Maint Trouble KD-166 Pine HIll Rd New Fairfield; RC 27 TUTTLE RD WOODBURY; POLE 2294 KD 47 High Ridge Rd Redding; STONE KD-EVENT #4143348 CLARK RD NEW FAIR KD 50 E Lake Rd Danbury; SEC DB, NE KD-EVENT #4163209 NEED TO SET NEW P RC REPLACE POLES 97 & 98 RC REPLACE POLE S13. RC POLE 195 REPLACE TRANSFORMER. MPB; TWIN MAPLE DR, BETHEL - SHIFT JS - Adams Rd, Rdgfld, Repl 3 Poles 8/26 MIDDLETON DR NEW FAIRFIELD, NE KD-EVENT #4317027 NEED TO REP PAD # RC 216A BURR RD SOUTHBURY; REPLACE KD 251 Farmingville Rd Ridgefield; CANX WR 556 RIDGEBURY RD RIDGEFIELD KD 116 Quaker Farms Rd Oxford; NEED KD 35 George Washington Hwy Ridgefi KD-EVENT #4365658 KTI SET BRKN POLE MPB; RIDGEDALE RD BETHEL- P#2109 RE KD-EVENT #4369215/4369216/4369261 B KD-EVENT #4371317 RAN 180' #2 SVC P KD-EVENT #4373046 REP XFMR WITH CUT APPRENTICES KTI MPB; 4 OAK RIDGE RD KD-EVENT #4384200 NEED TO SHIFT P 2 CANX MPB; 5 MARILYN RD BROOKFIELDKD-EVENT #4410487 RPLCD 15KV XFMER, 79 Poverty HOLLOW NWTN Pullconduit MPB; 4 EVERGREENS DR BROOKFIELD- 2 Asset Location J30L : CL&P TODD RD SUBSTATION WOLCOTT : 1002 1043 : CN : NEWINGTON : 1043 1066 : CN : STAMFORD : 1066 1052 : CN : NORWALK : 1052 1051 : CN : NEW CANAAN : 1051 1008 : CN : DANBURY : 1008 1016 : CN : SEYMOUR : 1016 1018 : CN : SOUTHBURY : 1018 1053 : CN : REDDING : 1053 1135 : CN : NEW MILFORD : 1135 1053 : CN : REDDING : 1053 1134 : CN : NEW FAIRFIELD : 1134 1022 : CN : WOODBURY : 1022 1053 : CN : REDDING : 1053 1134 : CN : NEW FAIRFIELD : 1134 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1135 : CN : NEW MILFORD : 1135 1018 : CN : SOUTHBURY : 1018 1135 : CN : NEW MILFORD : 1135 1007 : CN : BETHEL : 1007 1054 : CN : RIDGEFIELD : 1054 1134 : CN : NEW FAIRFIELD : 1134 1013 : CN : NEWTOWN : 1013 1018 : CN : SOUTHBURY : 1018 1054 : CN : RIDGEFIELD : 1054 1054 : CN : RIDGEFIELD : 1054 1014 : CN : OXFORD : 1014 1054 : CN : RIDGEFIELD : 1054 1138 : CN : SHERMAN : 1138 1007 : CN : BETHEL : 1007 1008 : CN : DANBURY : 1008 1054 : CN : RIDGEFIELD : 1054 1018 : CN : SOUTHBURY : 1018 1007 : CN : BETHEL : 1007 1012 : CN : MONROE : 1012 1131 : CN : BROOKFIELD : 1131 1136 : CN : ROXBURY : 1136 1013 : CN : NEWTOWN : 1013 1131 : CN : BROOKFIELD : 1131 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 118 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Substation 202203 $9,985.78 Emergent Equipment Failures - Line 202203 $4,429.24 Emergent Equipment Failures - Line 202203 $23,250.85 Emergent Equipment Failures - Line 202203 $170.18 Emergent Equipment Failures - Line 202203 $296.06 Emergent Equipment Failures - Line 202203 $327.80 Emergent Equipment Failures - Line 202203 ($702.79) Emergent Equipment Failures - Line 202203 $110.35 Emergent Equipment Failures - Line 202203 ($10,505.27) Emergent Equipment Failures - Line 202203 ($404.38) Emergent Equipment Failures - Line 202203 ($1,264.97) Emergent Equipment Failures - Line 202203 $1,133.72 Emergent Equipment Failures - Line 202203 ($1,030.49) Emergent Equipment Failures - Line 202203 ($2,148.18) Emergent Equipment Failures - Line 202203 ($620.10) Emergent Equipment Failures - Line 202203 $25,762.30 Emergent Equipment Failures - Line 202203 ($199.03) Emergent Equipment Failures - Line 202203 ($6.01) Emergent Equipment Failures - Line 202203 ($2,131.15) 202203 ($131.99) Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202203 $183.81 Emergent Equipment Failures - Line 202203 ($4,141.02) Emergent Equipment Failures - Line 202203 $1,321.57 Emergent Equipment Failures - Line 202203 ($72.01) Emergent Equipment Failures - Line 202203 ($895.60) Emergent Equipment Failures - Line 202203 $35.66 Emergent Equipment Failures - Line 202203 ($109.67) Emergent Equipment Failures - Line 202203 ($1,222.50) Emergent Equipment Failures - Line 202203 ($667.28) Emergent Equipment Failures - Line 202203 ($2,217.26) Emergent Equipment Failures - Line 202203 ($64.46) Emergent Equipment Failures - Line 202203 ($1,596.71) Emergent Equipment Failures - Line 202203 ($7.14) Emergent Equipment Failures - Line 202203 ($238.83) Emergent Equipment Failures - Line 202203 $416.06 Emergent Equipment Failures - Line 202203 ($963.03) Emergent Equipment Failures - Line 202203 ($79.07) Emergent Equipment Failures - Line 202203 ($159.60) Emergent Equipment Failures - Line 202203 ($637.69) Emergent Equipment Failures - Line 202203 ($853.97)Page 119 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 1B130098 1B521069 1B521566 1B720578 1B720797 1B722511 1B822148 1B822165 1B823070 1B920935 1B921020 1B921099 1B921153 1B921614 1B921769 1B921930 1B922408 1B922568 1B922829 1B922874 1B922934 1B923036 1B923105 1B923224 1B923266 1B923474 1B923616 1B923660 1N021603 1N030013 1N030065 1N030173 1N030321 1N030505 1N030669 1N030736 1N030973 1N030979 1N030994 1N030995 Accounting Work Order Descript KD-EVENT #4399201 ANC/GUY P 21928 ESO, Foster St/Bank St/West St, DAN 1 LAKEVIEW DR Pole #2636 rotted be CJS - Forest Ave, Danb, Shift Two P BR replace two poles for low wires BM/ FRONTIER REPLACING P.S670 SHIFT KD-EVENT #3747468 5 KNOLLWOOD LN NE CM RSO 7/18/18 N LAKE SHORE DR BROO MS-Newtown-42 Parmalee Hill Rd Newt MS-94 Merrimac St Danbury-Pole# 256 BJC - 1 Tamarack Ave Danbury; Pole KD-EVENT #3883945 REPLACE POLE 2057 ANDERSON AVE, NEW MILFORD BROKEN XA BR 59 Heritage Dr Seymour Replace d CANCEL TO MAXIMO WO 11225314/FWO 80 BR LAKEVIEW AVE, SEYMOUR POLE G297 P #344 - Tree down; replaced 3 x-ar 85 SOUTH ST EVENT #3957574 REPLC S MS-Woodbury-Brushy Hill Rd.-Pole# W KD-EVENT #3974067 REPLC POLE 2835 BM/ REPL FIRST SECT FROM P.2025 TO JS - Pembroke Rd, Danb, Repl Cutout KD-REPLC OW SEC AT POLES 5495-5504 RPL 333 STEP DOWN XFRMR P A8063 SAR MS-50 Burton Rd Beacon Falls -Pole RC REPLACE POLES F8764 TO F8766 &TR KD-6 North Cove Dr Sherman; REPLC P BR 153 Bowers Hill Rd Oxford Remove JES; 215 S. BALD HILL RD. NEW CANAA JDB P# 21554/249 FILLOW ST-NORWALK/ JDB 1/15: BISSELL LN NORWALK: SNET JDB 2/18: EAST AVE NORWALK: PAD 470 JDB 3/30: DAVIS HILL RD WESTON: POL LD 131 BEACHSIDE AVE WESTPORT REPLA JDB 54 OLD MILL RD WSTN REPL P17695 JDB 50 SACHEM RD, WSTN REPL P10550 JDB 9/12: STONECROP RD NORWALK: POL 9/13: RIVERSIDE AVE WESTPORT:POLE# JES; 9/16: LONGMEADOW RD WILTON: PO MJP/250 Westport Ave/NOR/Pad 1657 - Asset Location 1014 : CN : OXFORD : 1014 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1016 : CN : SEYMOUR : 1016 1018 : CN : SOUTHBURY : 1018 1134 : CN : NEW FAIRFIELD : 1134 1131 : CN : BROOKFIELD : 1131 1013 : CN : NEWTOWN : 1013 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1131 : CN : BROOKFIELD : 1131 1135 : CN : NEW MILFORD : 1135 1016 : CN : SEYMOUR : 1016 1012 : CN : MONROE : 1012 1016 : CN : SEYMOUR : 1016 1140 : CN : WASHINGTON : 1140 1007 : CN : BETHEL : 1007 1022 : CN : WOODBURY : 1022 1008 : CN : DANBURY : 1008 1131 : CN : BROOKFIELD : 1131 1008 : CN : DANBURY : 1008 1054 : CN : RIDGEFIELD : 1054 1130 : CN : BRIDGEWATER : 1130 1005 : CN : BEACON FALLS : 1005 1022 : CN : WOODBURY : 1022 1138 : CN : SHERMAN : 1138 1014 : CN : OXFORD : 1014 1051 : CN : NEW CANAAN : 1051 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1055 : CN : WESTON : 1055 1056 : CN : WESTPORT : 1056 1055 : CN : WESTON : 1055 1055 : CN : WESTON : 1055 1052 : CN : NORWALK : 1052 1056 : CN : WESTPORT : 1056 1057 : CN : WILTON : 1057 1052 : CN : NORWALK : 1052 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 119 of 616 Month Number Amount 202203 $1,043.67 202203 ($147.92) 202203 ($171.91) 202203 ($240.02) 202203 ($10.68) 202203 ($2.72) 202203 ($3,786.33) 202203 ($80.57) 202203 $31.39 202203 ($28.30) 202203 ($285.97) 202203 $0.49 202203 ($108.80) 202203 ($1,060.39) 202203 $2.70 202203 ($614.59) 202203 ($2,032.82) 202203 ($176.08) 202203 ($158.67) 202203 ($1,006.27) 202203 ($440.19) 202203 ($10,444.35) 202203 ($3,236.10) 202203 ($64.26) 202203 $2,146.54 202203 ($1,594.36) 202203 ($105.62) 202203 ($186.24) 202203 ($8.76) 202203 ($31.37) 202203 ($1,029.02) 202203 $18,539.84 202203 ($1,180.89) 202203 ($1,849.39) 202203 ($553.15) 202203 ($10.44) 202203 ($299.95) 202203 ($842.69) 202203 ($20.85) 202203 ($10.19)Page 120 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 1N031031 1N031068 1N031162 1N031188 1N031236 1N031299 1N031365 1N031497 1N130033 1N130045 1N220020 1N220562 1N522057 1N522340 1N522354 1N720137 1N720943 1N820987 1N821175 1N821658 1N920989 1S030096 1S030375 1S031223 1S031285 1S031483 1S031486 1S031571 1S031572 1S031580 1S031745 1S031785 1S031786 1S031864 1S031880 1S031881 1S031882 1S031899 1S031934 1S031964 Accounting Work Order Descript JOB COMPLETE JDB 144 STEEP HILL RD JDB 9/27: P#4770/ VALLEY FORGE RD W DM 10/17: P# 4063/KEYSLER RD WESTP DJM. 10/26: P# 33406/DEEPWOOD LN W JES: LAMBERT RD NEW CANAAN:POLE# 10 11/21: P# 7645/DUKE PL NORWALK/INS 12/6: HERITAGE LN WESTON: POLE# 168 JDB 12/13: WAYFARING RD NORWALK: P# JDB 1/10: P# 16724/HILLSIDE RD S W JES; 30 EVERGREEN AVE. WILTON. REPL AC 50 KINGS HWY S WSPT REPL 2 POLES RM 3 DEER HL RD REDDNG ATT TO SET 4 12 Roscrea Pl Weston Corrective Mai 31 Lords Hwy Weston Corr Maintenanc Corrective Maintenance DB - See Com JS 463 WHITE OAK SHADE RD,NC NEED JDB 12 HOLLOW SPRING RD NWLK P# 836 LD WILTON RD WESTPORT P# 65/BROKEN LD 111 KINGS HWY NORTH WESTPORT REP TMP - TROUBLE CALL, POLE 8557 LD NEWTOWN AVE NOR P#31506 RECONDUC RF:102 OLD KINGS HWY N:REPLACE 4 PO RF:307 COGNEWAUGH RD: REPLC POLES & MJP - Sound Beach Ave, Greenwich P# 1248/HENDRIE AVE GREENWICH/BROKE RF:20 TOWER AVE STAM:REPLACE BROKEN YA 8/24: 74 POND PL; REPLACE 4 POLE YA : LIA FAIL WAY GRN: P#82276, NEE YA JUNIPER HILL RD GRN:P#2251 NEED 9/6: CENTER DR GRN:TREE V P#1116/ S TC 42 ROCK RIDGE LN STM: REPL P#105 MJP/139 Highview Ave/STM/3459 Pole appt 12/27 MJP/18 Hoyt St/DAR/Repla RL:20 CHURCH ST:PHASES A&B ON 3PH R TC 141 FOUR BROOKS RD,STM:REPLD P# 10/16: MASON ST GRN/REPLACED CUTOU Elec Maint Replace/Renewal/Obsol OH 10/20: 50 LAFAYETTE PL GRN/UNMARKE TC 38 MCINTOSH RD STM: P# 12453 VIS AJC SOUND BEACH AVE GRN REPL P819 Asset Location 1055 : CN : WESTON : 1055 1055 : CN : WESTON : 1055 1056 : CN : WESTPORT : 1056 1056 : CN : WESTPORT : 1056 1051 : CN : NEW CANAAN : 1051 1052 : CN : NORWALK : 1052 1055 : CN : WESTON : 1055 1052 : CN : NORWALK : 1052 1055 : CN : WESTON : 1055 1057 : CN : WILTON : 1057 1056 : CN : WESTPORT : 1056 1053 : CN : REDDING : 1053 1055 : CN : WESTON : 1055 1055 : CN : WESTON : 1055 1055 : CN : WESTON : 1055 1051 : CN : NEW CANAAN : 1051 1052 : CN : NORWALK : 1052 1056 : CN : WESTPORT : 1056 1056 : CN : WESTPORT : 1056 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1908 : CN : DARIEN : 1908 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1066 : CN : STAMFORD : 1066 1908 : CN : DARIEN : 1908 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 120 of 616 Month Number Amount 202203 ($29.75) 202203 ($49.09) 202203 ($646.69) 202203 ($9.20) 202203 ($201.01) 202203 ($326.21) 202203 ($1,157.80) 202203 ($281.32) 202203 ($267.13) 202203 $12.57 202203 $537.49 202203 ($178.35) 202203 $1,072.82 202203 ($6,720.16) 202203 ($16.32) 202203 ($295.77) 202203 ($13.58) 202203 ($373.66) 202203 ($1,059.36) 202203 ($39.38) 202203 ($13,134.10) 202203 $20,494.74 202203 ($7,554.68) 202203 ($54.99) 202203 ($1,803.81) 202203 $273.24 202203 $1.91 202203 ($18.54) 202203 ($1.93) 202203 ($5,783.04) 202203 $46.37 202203 ($286.21) 202203 $29.23 202203 ($128.42) 202203 $69.88 202203 ($106.07) 202203 ($58.48) 202203 ($20.15) 202203 ($60.86) 202203 $168.54Page 121 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 1S032113 1S032228 1S032232 1S032253 1S032319 1S032323 1S032327 1S032328 1S130003 1S920051 1S921395 1S921411 1S921570 1S921841 1S922089 2C030144 2C030198 2C030212 2C030271 2C720088 2C720217 2C920179 2L030231 2L030313 2L030488 2L030541 2L030564 2L030621 2L030765 2L030827 2L030878 2L030885 2L030905 2L031212 2L031244 2L031272 2L031274 2L031281 2L031292 2L031301 Accounting Work Order Descript RF:18 DICKINSON RD DARIEN:REMOVE/IN RF:140 CHRISTIE HILL RD DAR:POLE #1 12/7: 37 ARCADIA RD GRN/OLD POLE F MJP/599 W Putnam Ave/GRN/Shift to V RF:16 GREAT ISLAND DR DAR:REPLACE 1 RL:1 HICKORY DR REPLACE LEANING POL RF:34 TORY HOLE RD DAR: REPLC POLE# RL: HAWTHORNE ST S :Minor shell dam RL:17 ROUND HILL CLUB RD GRN/REPL'D RL:22 Baldwin Farms S: Replace P 76 RF:16 MILTON ST; UPGRD BANK OF 25KS YA PLEASANT ST, GRN Upgrade transfo RL 97 HAMILTON AVE, GREENWICH: REPL RF:49 MERRIEBROOK LN:UPGRD TX; INST YA:Horse Island Rd, Grn replace rot NORTH CANAAN,95 MAIN ST/REMOVE A PH EVW Arnott Dr CANAAN TORNADO rep po 12/22 EVW - Meeker Town Rd NORFOLK EVW NORTH CANAAN, PROSPECT ST - P#9 4/17 RSO S CANAAN RD/P#3004/ REPLAC shift to new frontier pole 507 rmv 7/8 NORTH CANAAN, CHURCH ST POLE 11 WATERTOWN- NORTHFIELD RD / F5479 RE Canton--Sterling Dr. 711 Repl pole JC/47 SCOVILLE RD CORNWALL/ SHIFT T printed 1/26/22 JC/ LAUREL HILL TOR LITCHFIELD INN, FAULTED CABLE P#877 6/1 RSO WINCHESTER, GRISWOLD RPL'D KENT,N. MAIN ST/ KENT GREEN BLVD YE EVW Ohara Ln SALISBURY P#1596 RPLC CP-PAD #1028 -- REPLACED BAD 25KVA EVW 631 Vera Rd WINSTED P#7789 MOVE 7/30 RSO, WARREN, 276 WOODVILLE RD EVW SPENCER HL RD WINCHESTER replac NEW HARTFORD, PROSPECT ST// P# 56// NEW HARTFORD,13 MEADOW ST//P#2012// NEW HARTFORD, HIGHLAND AVE/ P#1001/ NEW HARTFORD,114 STEDMAN RD/P#1131/ NEW HARTFORD,LOOMIS HTS//P#1797//El New Hartford--Farmington River Tkpe Asset Location 1908 : CN : DARIEN : 1908 1908 : CN : DARIEN : 1908 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1908 : CN : DARIEN : 1908 1065 : CN : GREENWICH : 1065 1908 : CN : DARIEN : 1908 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1930 : CN : NORTH CANAAN : 1930 1929 : CN : CANAAN : 1929 1196 : CN : NORFOLK : 1196 1930 : CN : NORTH CANAAN : 1930 1929 : CN : CANAAN : 1929 1930 : CN : NORTH CANAAN : 1930 1930 : CN : NORTH CANAAN : 1930 1004 : CN : WATERTOWN : 1004 1933 : CN : CANTON : 1933 1132 : CN : CORNWALL : 1132 1194 : CN : TORRINGTON : 1194 1406 : CN : LITCHFIELD : 1406 1195 : CN : WINCHESTER : 1195 1133 : CN : KENT : 1133 1928 : CN : SALISBURY : 1928 1191 : CN : BURLINGTON : 1191 1195 : CN : WINCHESTER : 1195 1139 : CN : WARREN : 1139 1195 : CN : WINCHESTER : 1195 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 121 of 616 Month Number Amount 202203 ($55.87) 202203 ($26.29) 202203 ($2.56) 202203 ($869.51) 202203 ($160.77) 202203 ($51.97) 202203 ($33.28) 202203 ($0.41) 202203 ($362.97) 202203 $13,980.41 202203 $357.19 202203 ($3,102.24) 202203 $10,822.92 202203 ($3,777.83) 202203 $7,250.88 202203 $57.63 202203 ($1,051.62) 202203 $9.50 202203 ($0.98) 202203 ($38.41) 202203 ($573.11) 202203 ($71.13) 202203 ($83.48) 202203 ($1,763.09) 202203 $2.06 202203 $4,298.79 202203 ($4,402.90) 202203 ($237.25) 202203 ($350.20) 202203 ($25.94) 202203 ($551.43) 202203 $961.54 202203 ($47.45) 202203 $424.99 202203 ($1,161.20) 202203 ($381.91) 202203 ($125.65) 202203 $641.24 202203 ($1,182.58) 202203 $685.40Page 122 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 2L031309 2L031521 2L720308 2L821118 2L920485 2L920798 2L920852 2L920875 2L920878 2L921329 2L921611 2M030066 2M030116 2M030488 2M030906 2M031053 2M031352 2M031405 2M031550 2M031592 2M031663 2M031816 2M031854 2M031907 2M032225 2M032269 2M032299 2M032316 2M032397 2M032398 2M032405 2M032596 2M032605 2M032725 2M032738 2M032903 2M032965 2M032987 2M033253 2M033274 Accounting Work Order Descript New Hartford--Farmington River Tpke 32 Evergreen Dr Torrington rep 100' New Hartford--Farmington River Tpke SHARON,114 AMENIA UNION RD//REPLACE 4/13 KENT, EBERS RD POLE 8754 6/18 RSO TORRINGTON, WINSTED RD POL 6/26 WINCHESTER, NORFOLK RD POLE 15 7/3 WINCHESTER, MARSHALL ST 7/7 TORRINGTON, WEDGEWOOD DR - RSO 10/3 RSO/AWC WINCHESTER, NORFOLK RD 12/28 KENT, S MAIN ST-TO AWC TO FOL CANCEL TO MAXIMO WO 11299627/FWO 80 PL: RMV AERIAL TRESPASS TO 611 CARR EVW 25 WILD OAK DR SOUTHINGTON PAD# 3/2 HOLLYBERRY RD BRISTOL, INSTLLD ASP (50): JRP - Francis Dr WOLCOTT EVW S End Rd SOUTHINGTON RPLC POLE CANCEL-Jpt-120 Norwood Rd Bristol P (50): JRP - Chestnut St PLYMOUTH Sh JRP 11 Bernadette Ln Durham Charter Jpt-21 Lexington St. Bristol - Rplc JRP - Giles St WTBY Inst 50KVA Xfmr GOSS ST WATERBURY, REPLACE POLES & AMM BRICKYARD RD,FARM. REPLACE ARRE 6/23 VINE ST WATERBURY, INSTLLD NEW EVW CENTER DR SOUTHINGTON:P#1296 RP MJ 2/16 -MAR- Storms Rewrite- EVW R (T-TIX) 6/29 MIDDLEBURY RD MIDDLEBU 59 Bradford Dr, Chshr P#4101 FTR Ne RTM-59 Susan Ln, Mer. Replace P#P#6 AMM 51 MOUNTAIN VIEW DR,NEWINGTON. (T-TIX) E MOUTAIN RD WATERBURY:POLE 7/19: PINE ST WATERBURY: POLE# 8688 AMM 255 N MAIN ST,BRISTOL. BAD XFMR MIDDLE WAY EAST, WTBY - RPL UNSAFE 8/19 WOLCOTT RD WOLCOTT, REP XARM & Jpt-21 Murray Rd Bristol (Frnt)P298 8/24 MELISSA LN PROSPECT, INSTLLD C 9/17 - RSO - CHESHIRE, SUMMIT RD MJ 1/27 (50): Jpt-54 Haviland St Br Asset Location 1938 : CN : NEW HARTFORD : 1938 1194 : CN : TORRINGTON : 1194 1938 : CN : NEW HARTFORD : 1938 1137 : CN : SHARON : 1137 1133 : CN : KENT : 1133 1194 : CN : TORRINGTON : 1194 1195 : CN : WINCHESTER : 1195 1195 : CN : WINCHESTER : 1195 1194 : CN : TORRINGTON : 1194 1195 : CN : WINCHESTER : 1195 1133 : CN : KENT : 1133 1070 : CN : BRISTOL : 1070 1006 : CN : BETHANY : 1006 1034 : CN : SOUTHINGTON : 1034 1070 : CN : BRISTOL : 1070 1020 : CN : WOLCOTT : 1020 1034 : CN : SOUTHINGTON : 1034 1070 : CN : BRISTOL : 1070 1071 : CN : PLYMOUTH : 1071 1910 : CN : DURHAM : 1910 1070 : CN : BRISTOL : 1070 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1041 : CN : FARMINGTON : 1041 1002 : CN : WATERBURY : 1002 1034 : CN : SOUTHINGTON : 1034 1070 : CN : BRISTOL : 1070 1010 : CN : MIDDLEBURY : 1010 1030 : CN : CHESHIRE : 1030 1032 : CN : MERIDEN : 1032 1043 : CN : NEWINGTON : 1043 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1070 : CN : BRISTOL : 1070 1002 : CN : WATERBURY : 1002 1020 : CN : WOLCOTT : 1020 1070 : CN : BRISTOL : 1070 1015 : CN : PROSPECT : 1015 1030 : CN : CHESHIRE : 1030 1070 : CN : BRISTOL : 1070 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 122 of 616 Month Number Amount 202203 $259.12 202203 $3,684.78 202203 ($170.95) 202203 ($267.22) 202203 ($512.12) 202203 ($8.66) 202203 $105.59 202203 $211.19 202203 ($135.24) 202203 ($12.66) 202203 $7,690.88 202203 $11.53 202203 ($2,029.99) 202203 ($208.35) 202203 $1,833.87 202203 $173.71 202203 ($825.07) 202203 ($12.42) 202203 $49.88 202203 ($67.51) 202203 ($403.00) 202203 ($1,081.52) 202203 $5,987.32 202203 $129.79 202203 ($80.92) 202203 ($2,839.87) 202203 $13,843.30 202203 ($696.66) 202203 ($3,670.29) 202203 ($1,153.93) 202203 ($406.95) 202203 ($183.48) 202203 ($651.56) 202203 ($2,925.60) 202203 ($2,011.93) 202203 ($71.53) 202203 ($1,377.36) 202203 ($401.54) 202203 ($1,166.41) 202203 $891.08Page 123 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 2M033379 2M033467 2M033471 2M033474 2M033476 2M033477 2M033479 2M033504 2M033510 2M033609 2M033626 2M033696 2M033729 2M033802 2M033868 2M033916 2M033960 2M033980 2M034033 2M034035 2M034044 2M034063 2M034084 2M034094 2M034161 2M034167 2M034241 2M034271 2M034308 2M034442 2M034445 2M034501 2M120062 2M121746 2M130012 2M130036 2M130042 2M130064 2M130099 2M220725 Accounting Work Order Descript 9/28 E FARM ST WATERBURY, NEED TO R EJC Little Brook Dr, Newington STLT EJC Little Brook Dr, Newington STLT EJC Little Brook Dr, Newington STLT EJC Little Brook Dr, Newington STLT EJC Valley View Dr, Newington STLT EJC Valley View Dr, Newington STLT WC- 3 Brooks Edge Dr, Newington. ST WC- 10 Little Brook Dr, Newington. 10/9 RIDGEWOOD DR MIDDLEBURY, REPLA AMM 71 MOUNTAIN RD,NEWINGTON. TREE AMM 760 WILLARD AVE,NEWINGTON. UNA 10/20 MILLER ST NEW BRITAIN, NEED T JRP - 1119 S End Rd SOG Assit FTR C WC-11/1 HARPERS FERRY RD WATERBURY, 135 MEADOW ST,NEWINGTON. FRONTIER P 11/8: CRYSTAL TER WATERBURY:POLE# 2 PL: XFER FACILITIES OVER TO NEW POL 11/12 WILLOW ST NEW BRITAIN, REPLAC 129 JERSEY ST, WATERBURY - P#8966 S 11/13: HILLTOP DR SOUTHINGTON: INST PV - #597 Guilford Rd Durham -Elec Elec Maint Pole Reject - PRIORITY D 11/19: BRENDAN AVE WATERBURY:POLE# (50): Jpt-121 Village St Bristol P1 11/24: NEW HAVEN RD PROSPECT:POLE 8 (DF) (3) 4ph FTR Pole upgrades & ne (60): JM - HIGGANUM RD DURHAM:POLE2 JRP - Brackenridge Dr WTBY Shift to Jpt-47 Main St Plymouth (Frt)P710 JAM - 186R BEAR ROCK RD. DURHAM REP WC-12 Violet St, Waterbury. Shift t EJC Various Locations, Southington Jpt-20 Mills St Brstl (ATT) P2105 PL: CONRAD ST NAUGATUCK: place 150' 01/05: JOHNSON LN DURHAM: FRONTIER AMM 57 SONGBIRD LN,FARM. REPLACE DA P. 83178 Bad 300kvar Cap. Bank was 01/10 PLYMOUTH, RONALD RD - :Recon EJC Various Locations, NB - 23L2 Wo Asset Location 1002 : CN : WATERBURY : 1002 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1010 : CN : MIDDLEBURY : 1010 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1042 : CN : NEW BRITAIN : 1042 1034 : CN : SOUTHINGTON : 1034 1002 : CN : WATERBURY : 1002 1043 : CN : NEWINGTON : 1043 1002 : CN : WATERBURY : 1002 1003 : CN : NAUGATUCK : 1003 1042 : CN : NEW BRITAIN : 1042 1002 : CN : WATERBURY : 1002 1034 : CN : SOUTHINGTON : 1034 1910 : CN : DURHAM : 1910 1910 : CN : DURHAM : 1910 1002 : CN : WATERBURY : 1002 1070 : CN : BRISTOL : 1070 1015 : CN : PROSPECT : 1015 1037 : CN : MIDDLEFIELD : 1037 1910 : CN : DURHAM : 1910 1002 : CN : WATERBURY : 1002 1071 : CN : PLYMOUTH : 1071 1910 : CN : DURHAM : 1910 1002 : CN : WATERBURY : 1002 1034 : CN : SOUTHINGTON : 1034 1070 : CN : BRISTOL : 1070 1003 : CN : NAUGATUCK : 1003 1910 : CN : DURHAM : 1910 1041 : CN : FARMINGTON : 1041 1032 : CN : MERIDEN : 1032 1071 : CN : PLYMOUTH : 1071 1042 : CN : NEW BRITAIN : 1042 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 123 of 616 Month Number Amount 202203 ($54.27) 202203 ($156.17) 202203 ($347.08) 202203 ($173.76) 202203 ($366.96) 202203 ($346.73) 202203 ($171.85) 202203 ($729.63) 202203 ($469.56) 202203 ($142.90) 202203 ($64.44) 202203 ($12.14) 202203 ($14.66) 202203 ($378.14) 202203 ($440.64) 202203 ($2.30) 202203 ($93.71) 202203 ($403.00) 202203 ($2,281.88) 202203 ($439.16) 202203 ($15.09) 202203 ($1,500.80) 202203 ($473.68) 202203 ($0.74) 202203 $143.76 202203 ($104.62) 202203 ($697.00) 202203 ($291.67) 202203 ($619.10) 202203 ($31.28) 202203 ($19.55) 202203 ($354.09) 202203 ($6,201.05) 202203 ($1,101.75) 202203 ($4,377.43) 202203 ($465.36) 202203 ($598.83) 202203 ($542.53) 202203 $8,358.42 202203 ($1.62)Page 124 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 2M222031 2M222374 2M223102 2M321074 2M322942 2M423352 2M423366 2M423608 2M620851 2M622683 2M721860 2M723225 2M723358 2M723517 2M723847 2M724318 2M820221 2M820784 2M821018 2M823967 2M920230 2M920532 2M920966 2M921148 2M921901 2M922028 2M923095 2M923546 2M923549 2M923790 2M923915 2W121706 3H030206 3H030374 3H030639 3H030737 3H030779 3H031094 3H031104 3H031127 Accounting Work Order Descript MM- 1 Dave St Plnv- Relocate P#1132 RTM-160 Corporate Ct, Mer. T.Ticket JPT P#98964 Rockwell Ave, New Brita ELEC MAINT DIST INFRARED REPAIRS Jpt-Center St Brstl (ATT)P3710 & (A MM- 201 Andrews St SOG- Replace wee DM 133 Spring St CHES Change over P EJC 6 Center Ct, Newington P#2632 R RTM-239 Middletown Rd Ber. T.Ticke EJC 175 Maple Hill Ave, Newington P DM 15 Michael Terr WLCT Change PAD# CANCEL-RTM-245 N Hampton Ct, Mer. R PL: REPL/ASSIST (PT SET) P#3396 & # CANCEL TRANSFER TO MAXIMO WO 453498 EJC Alumni Rd, Newington P#6 Replac set to cancel to maximo work order Jpt-RSO-55 Norwood Rd (Frnt)P5198 WC-RSO-91 SALEM RD PROSPECT. Shift EJC 59 Mortimer St, Waterbury HH#38 EVW 186 N Rolling Acres Change over EJC Grand St, New Britain P#10871 R JRP - Welton St. WTBY Repl Pole Top EVW 11 AUTUMN DR, SOUTHINGTON INST EVW Trackside Ct CHES P#6039 RPLC A Jpt-13 Skyline Dr Farmington P6226 PL: REMOVE REMAINING INFRASTRUCTURE EVW 164 W Avon Rd FARM P#1280 CHANG EVW 29 Lexington Ave Waterbury P#52 CANCEL N Walnut St WTRBY - NOERA 13 CANCELLED - 5 EASTVIEW DR,FARM. REP EVW Horizon Ln BRISTOL ROW P#14658 3PH TAP POLE B9602 LEANING; NEEDS A SPENCER, MANCH - INST NEW 1200KVAR DKH - 1289 Broad St, Htfd - Stray V REF TO AWC 2/15 ROCKY HILL, BROOK S CR-NEW RD. AVON, REPLACE 15KVA W/ 2 BLOOMFIELD GOODMAN ST REMOVAL & COT Marshall Phelps Rd-Win- @ P5194,rpl E. NORMANDY DR, W.HARTFORD, OPEN W MANCHESTER, BIGELOW ST - Pole#970,R Asset Location 1044 : CN : PLAINVILLE : 1044 1032 : CN : MERIDEN : 1032 1042 : CN : NEW BRITAIN : 1042 1032 : CN : MERIDEN : 1032 1070 : CN : BRISTOL : 1070 1034 : CN : SOUTHINGTON : 1034 1030 : CN : CHESHIRE : 1030 1043 : CN : NEWINGTON : 1043 1040 : CN : BERLIN : 1040 1043 : CN : NEWINGTON : 1043 1020 : CN : WOLCOTT : 1020 1032 : CN : MERIDEN : 1032 1003 : CN : NAUGATUCK : 1003 1040 : CN : BERLIN : 1040 1043 : CN : NEWINGTON : 1043 1070 : CN : BRISTOL : 1070 1070 : CN : BRISTOL : 1070 1015 : CN : PROSPECT : 1015 1002 : CN : WATERBURY : 1002 1030 : CN : CHESHIRE : 1030 1042 : CN : NEW BRITAIN : 1042 1002 : CN : WATERBURY : 1002 1034 : CN : SOUTHINGTON : 1034 1030 : CN : CHESHIRE : 1030 1041 : CN : FARMINGTON : 1041 1010 : CN : MIDDLEBURY : 1010 1041 : CN : FARMINGTON : 1041 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1041 : CN : FARMINGTON : 1041 1070 : CN : BRISTOL : 1070 1002 : CN : WATERBURY : 1002 1937 : CN : MANCHESTER : 1937 1113 : CN : HARTFORD : 1113 1941 : CN : ROCKY HILL : 1941 1931 : CN : AVON : 1931 1932 : CN : BLOOMFIELD : 1932 1121 : CN : WINDSOR : 1121 1943 : CN : WEST HARTFORD : 1943 1937 : CN : MANCHESTER : 1937 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 124 of 616 Month Number Amount 202203 $50.19 202203 ($516.01) 202203 ($84.51) 202203 ($215.52) 202203 $44.39 202203 $97.27 202203 ($73.73) 202203 $147.18 202203 ($445.67) 202203 ($19.46) 202203 $7,488.96 202203 ($961.00) 202203 ($330.38) 202203 ($626.82) 202203 ($140.94) 202203 ($1,073.16) 202203 ($19.79) 202203 ($1,442.34) 202203 ($47.15) 202203 $80.83 202203 ($10.74) 202203 ($403.00) 202203 ($75.61) 202203 ($85.90) 202203 ($471.61) 202203 ($1,099.97) 202203 ($40.89) 202203 ($2,848.92) 202203 ($0.80) 202203 ($298.04) 202203 ($1,276.20) 202203 $176.81 202203 ($2,254.23) 202203 $44.90 202203 ($2,115.13) 202203 ($41.95) 202203 ($1,972.04) 202203 $18.23 202203 ($734.56) 202203 ($2,573.77)Page 125 of 616
CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 3H031133 3H031135 3H031271 3H031328 3H031359 3H031387 3H031424 3H031506 3H031556 3H031595 3H031621 3H031716 3H031921 3H031925 3H031931 3H031942 3H031952 3H031979 3H032022 3H032027 3H032045 3H032047 3H032054 3H032055 3H032157 3H032181 3H032189 3H032191 3H032196 3H032212 3H032237 3H032282 3H032340 3H032356 3H032378 3H032391 3H032495 3H032526 3H032530 3H032541 Accounting Work Order Descript WEST HARTFORD, E. MAXWELL DR. OPEN WEST HARTFORD, BROOKSIDE - OPEN WIR WEST HARTFORD, SOUTH ST - REPL BROK RSO 5/4 BLOOMFIELD, PARK AVE - RAGO CR-MARK TWAIN DR. HTFD, REMOVE 1200 zRH---TC---5/12---2 Lexington Ct.-CR-DRUMLIN RD. SIMSBURY, REPLACED 5 RSO 5/28 W HARTFRD, FOX CHASE LN Cancel WO - Work will be completed 06/05 htfd,weston RPL P#10086 PRI RSO AVON, TYLER CT - FIRE AT P#610 W.HTFD,NEW BRITAIN AVE, PAD3556 SWI zWETH---TC---7/2---Flower St---RSO CR-WESTVIEW CT. AVON - PADMOUNT 16 RF-Wilson St,East Hartford, Relocat ?? BLOOMFIELD Replace pole 2598 on 07/07 WEST HARTFORD, OAK RIDGE - 45 zWETH---TC---7/3---1180 Crest St.-7/10 BLOOMFIELD, HOSKINS RD - AT P3 zWETH---TC---7/13---Middletown AvezWETH---TC---7/13---Jameswell Rd -CR-66 TOWN FOREST RD. SIMS, REPLACE JTR, Coventry St, HTFD, Replace Pri JTR, Coventry St, HTFD, Replace Pri WETH---TC---7/20---Wedgewood Dr---R zCROM---TC---6/8---Bellevue Ter---A E HTFD, LONGHILL -Pole#3288 REPL AR RSO 7/23 WINDSOR, STONE RD - REPLC XL-replace defective pole 9047 @ 22 NJB 2 FRASER PL HTFD REPL OPEN WIRE cancel no work required 7/28 Bloomf CR-27 DEEPWOOD RD. SIMSBURY, REPLAC WF-106 Grande Ave-Windsor-@ pole-25 RSO E. HRFD, MAIN ST - BROKEN MH CO JTR, 15 ENFIELD ST, HTFD, RPLC OWS CR-OLD FARMS RD.AVON, ROW LINE REL/ zWETH---8/22/20---Burbank Rd---RSO FIELD VISIT RSO 8/24 WINDSOR, BLO WEST HART 60 WOODLAWN (3) poles 35/ zWETH---TC---8/25---Ridge Rd---RSO- Asset Location 1943 : CN : WEST HARTFORD : 1943 1943 : CN : WEST HARTFORD : 1943 1943 : CN : WEST HARTFORD : 1943 1932 : CN : BLOOMFIELD : 1932 1113 : CN : HARTFORD : 1113 1941 : CN : ROCKY HILL : 1941 1942 : CN : SIMSBURY : 1942 1943 : CN : WEST HARTFORD : 1943 1045 : CN : WETHERSFIELD : 1045 1113 : CN : HARTFORD : 1113 1931 : CN : AVON : 1931 1943 : CN : WEST HARTFORD : 1943 1045 : CN : WETHERSFIELD : 1045 1931 : CN : AVON : 1931 1934 : CN : EAST HARTFORD : 1934 1932 : CN : BLOOMFIELD : 1932 1943 : CN : WEST HARTFORD : 1943 1045 : CN : WETHERSFIELD : 1045 1932 : CN : BLOOMFIELD : 1932 1045 : CN : WETHERSFIELD : 1045 1045 : CN : WETHERSFIELD : 1045 1942 : CN : SIMSBURY : 1942 1113 : CN : HARTFORD : 1113 1113 : CN : HARTFORD : 1113 1045 : CN : WETHERSFIELD : 1045 1031 : CN : CROMWELL : 1031 1934 : CN : EAST HARTFORD : 1934 1121 : CN : WINDSOR : 1121 1113 : CN : HARTFORD : 1113 1113 : CN : HARTFORD : 1113 1932 : CN : BLOOMFIELD : 1932 1942 : CN : SIMSBURY : 1942 1121 : CN : WINDSOR : 1121 1934 : CN : EAST HARTFORD : 1934 1113 : CN : HARTFORD : 1113 1931 : CN : AVON : 1931 1045 : CN : WETHERSFIELD : 1045 1121 : CN : WINDSOR : 1121 1943 : CN : WEST HARTFORD : 1943 1045 : CN : WETHERSFIELD : 1045 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 125 of 616 Month Number Amount 202203 $98.02 202203 ($297.77) 202203 ($287.86) 202203 $604.04 202203 $19.91 202203 ($15.93) 202203 ($359.90) 202203 ($2,115.42) 202203 $50.44 202203 ($1.22) 202203 ($3,304.02) 202203 ($603.96) 202203 ($31.82) 202203 ($175.93) 202203 ($2,991.10) 202203 ($258.99) 202203 ($68.69) 202203 ($670.01) 202203 ($940.93) 202203 $1,837.03 202203 ($67.08) 202203 ($979.75) 202203 ($162.56) 202203 ($647.98) 202203 ($1.32) 202203 ($11.35) 202203 $270.28 202203 ($54.94) 202203 ($1,405.45) 202203 ($203.57) 202203 ($3,748.50) 202203 ($843.12) 202203 $30,457.57 202203 ($160.12) 202203 ($2,820.07) 202203 ($4,692.73) 202203 ($11.75) 202203 ($489.15) 202203 $8.88 202203 ($32.63)
As listed on the current system
Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026