Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 162 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80217975 80217985 80218004 80218007 80218059 80218077 80218116 80218893 80218908 80218912 80218920 80218921 80218974 80218977 80219001 80219003 80219012 80219015 80219099 80219151 80219177 80219189 80219202 80219203 80219237 80219254 80219263 80219274 80219286 80220070 80220084 80220098 80220102 80220104 80220119 80220121 80220133 80220137 80220254 80220474 Accounting Work Order Descript MF 4/3 REPLACE BLOWN ARRESTERS WATE CRP - TURNOVER: 300 ALBANY TPKE CAN NM: 4/01: 51 OLD KINGS HWY, OLD GRN 4/4/22 388 DANBURY RD NEW MILFORD RC; 4/4/22 ROUTE 55 ( 59) W -EM RF:385 TACONIC RD, GREENWICH:REF WRTN--JK>POLE 2672--REPLACE SVC RIS 4/4/22 FOX HILL DR , RIDGEFIELD, C PCC S MAIN ( 55) ST -- 4492, SUFFIE 4/5/22 323 CHESTNUT TREE HILL RD O FC STEEP ( 46) RD -- 3918, SOUTH BM; 4/5/22 WHEELER ( 55) RD -- 2 4/5/22 155 WHEELER RD MONROE CT 04/04 (RIVERA) DARTMOUTH ( 149) RD 04.01.22 - 10 KNOLLWOOD RD, FARMIN 4/5/22 HILLSIDE ( 4) RD -- 385 4/5/22 9 OLD NEVERSINK RD DANBURY C (NO CU ESTIMATE) 4/04: 2 KNOWALOT L 4/5/22 9A CAROLINES ( 5) WAY -4/5/22 Y-26435-2022 10 WINTON FARM MR; ***WRITTEN***359::LONG HILL:RD: 04.05.22 / Y26431-2022 / WEST ST, S JES MAIN ST RIDGEFIELD VLT#6 RPL R 4/5/22 67 DODGINGTOWN RD NEWTOWN ( 04.03.22 - 29 ALLING CT, BERLIN CANX 4/5/22 31 WYANT RD OXFORD C 4/5/22 159 EDEN DR (APT F11) DAN 4/5/22 E SHORE ( 27) RD -- 1698, P6794 REPLACE CAN WITH 50KVA 275 MI NEW MV 4/5 ROUND HILL ( 359) RD -WRITTEN COMPLETE CLARK HILL ( 166) HEL WQ 4/6/22 MAIN ( 218) ST S -4/04: TACONIC ( 355), GRN/ INSTALL WM; 4/6/22 NETTLETON HOLLOW ( 378) Lamberton Rd 99, Windsor. ROW cross BURRITT ( 150) ST UNIT 1A -- UG, P 4/6/22 OLD ZOAR ( 221) RD -- 1932, JFC - HOPKINS ( 13) RD -- 074003, TL - MAIN ST, #153-#159 NIANTIC // JTR, 104 SHARON LN (APTS) ,WETHERS, Asset Location 1177 : CN : STONINGTON : 1177 1933 : CN : CANTON : 1933 1065 : CN : GREENWICH : 1065 1135 : CN : NEW MILFORD : 1135 1138 : CN : SHERMAN : 1138 1065 : CN : GREENWICH : 1065 1159 : CN : GLASTONBURY : 1159 1054 : CN : RIDGEFIELD : 1054 1117 : CN : SUFFIELD : 1117 1014 : CN : OXFORD : 1014 1115 : CN : SOUTH WINDSOR : 1115 1012 : CN : MONROE : 1012 1012 : CN : MONROE : 1012 1937 : CN : MANCHESTER : 1937 1041 : CN : FARMINGTON : 1041 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1052 : CN : NORWALK : 1052 1135 : CN : NEW MILFORD : 1135 1013 : CN : NEWTOWN : 1013 1033 : CN : MIDDLETOWN : 1033 1034 : CN : SOUTHINGTON : 1034 1054 : CN : RIDGEFIELD : 1054 1013 : CN : NEWTOWN : 1013 1040 : CN : BERLIN : 1040 1014 : CN : OXFORD : 1014 1008 : CN : DANBURY : 1008 1140 : CN : WASHINGTON : 1140 1103 : CN : GUILFORD : 1103 1174 : CN : SALEM : 1174 1157 : CN : EAST HAMPTON : 1157 1022 : CN : WOODBURY : 1022 1065 : CN : GREENWICH : 1065 1140 : CN : WASHINGTON : 1140 1121 : CN : WINDSOR : 1121 1034 : CN : SOUTHINGTON : 1034 1012 : CN : MONROE : 1012 1405 : CN : HARWINTON : 1405 1092 : CN : EAST LYME : 1092 1045 : CN : WETHERSFIELD : 1045 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 162 of 616 Month Number Amount 202204 $484.26 202204 $138.21 202204 $577.54 202204 $255.18 202204 $3,500.06 202204 $6,472.22 202204 $51,765.00 202204 $7,725.92 202204 $3,120.46 202204 $460.69 202204 $5,390.58 202204 $32.85 202204 $1,408.23 202204 $51.14 202204 $276.72 202204 $998.80 202204 $299.37 202204 $12,618.01 202204 $627.99 202204 $9,524.42 202204 $7,615.05 202204 $51,559.31 202204 $4,515.90 202204 $22,032.98 202204 $1,813.97 202204 $1,176.09 202204 $262.35 202204 $587.39 202204 $553.50 202204 $310.98 202204 $32,966.32 202204 $345.92 202204 $11,581.96 202204 $311.31 202204 $172.95 202204 $415.10 202204 $552.88 202204 $2,937.57 202204 $2,224.23 202204 $28,357.62
  2. Page 163 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80220486 80220512 80220572 80220623 80220625 80221403 80221417 80221449 80221560 80222297 80222308 80222314 80222320 80222325 80222328 80222335 80222338 80222357 80222358 80222361 80222362 80222375 80222391 80222400 80222407 80222465 80222471 80222486 80222491 80222500 80222503 80222511 80222676 80222723 80222747 80222775 80222776 80223877 80223878 80223882 Accounting Work Order Descript FRENCH ( 24) RD -- 3099, MANCHEST Infrared hot spot (serious ) MM-11F14 patrol . Poles 1020,5218 & MAR - POST CONST> Change overloaded MATERIAL LD FILLOW ST NORWALK REPL 4/06: 10 DOGWOOD LN -- 20750, WESTO RR; SEYMOUR, SKOKORAT, 83, CECILIA NM: 27 LONDON LN, STM/ UPGRADE 15KV Chippen Hill 15U-Replace Failed 15U E.P.- 4/6-2 FAIRLAWN ST, WATERFORD DG P#465 COVE LAKE RD EASTFORD RPLC MV - STONINGTON - 421 AL HARVEY RD WRITTEN 62::NEW LONDON:RD::COLCHEST E.P.- 4/7- 539 COLONEL LEDYARD HWY Ran New OH svc -COMPLETED- 4/7 FILL 171 WEBSTER HILL BLVD, WEST HARTFOR 4/7 MAPLE HILL ( 553) RD -- 8069 R 4/7 W MAIN ( 68) ST -- 6379, STAF WQ; 4/8/22 KTI TURNOVER 15 BAYBER 4/7 PROSPECT ( 42) ST -- 230, STA (*)JTR, 35 COLD SPRING RD, R.H - Po 4/8/22 TURNOVER 5 ARTHUR ST DANBUR 4/6/22 (RSO-STROM) DEER RUN RD -- R Branford, 3 s montowese st/relocate MCB - 63 IVES ST, WATERBURY, REMOVE 4/8/22 88 CLARK RD WASHINGTON CT E.P.- 357 GLENWOOD AVE -- 7868, NEW ***WRITTEN***ALL WORK COMPLETED***E RSO/AWC--04/28/22--REPLCD STEP XF, 4/8/22 73 SOUTHERN BLVD DANBURY CT Forestville 12A-Replace Failed12A-1 4/8/22 222 SPRING VALLEY RD RDIGEF work W/ WO#8731866 - Assist Tel wit ***WRITTEN***ALL WORK COMPLETED***R MATERIAL - KD-EVENT #4733115 SET NE WRM - Post Const - 4/6 LANOUETTE ( 4/8 TURNOVER P#23162 BROADBROOK ( WOODLAND ST HARTFORD VAULT 5906 DONE NYPERT I PAD EVW - 342 Millert MARKET ST HARTFORD MH572 TO 574 Asset Location 1937 : CN : MANCHESTER : 1937 1152 : CN : CHAPLIN : 1152 1152 : CN : CHAPLIN : 1152 1034 : CN : SOUTHINGTON : 1034 1052 : CN : NORWALK : 1052 1055 : CN : WESTON : 1055 1016 : CN : SEYMOUR : 1016 1066 : CN : STAMFORD : 1066 J15U : CL&P CHIPPEN HILL BRISTOL : 1070 1100 : CN : WATERFORD : 1100 1077 : CN : EASTFORD : 1077 1177 : CN : STONINGTON : 1177 1153 : CN : COLCHESTER : 1153 1164 : CN : LEDYARD : 1164 1094 : CN : HADDAM : 1094 1943 : CN : WEST HARTFORD : 1943 1103 : CN : GUILFORD : 1103 1116 : CN : STAFFORD : 1116 1136 : CN : ROXBURY : 1136 1116 : CN : STAFFORD : 1116 1941 : CN : ROCKY HILL : 1941 1008 : CN : DANBURY : 1008 1098 : CN : OLD SAYBROOK : 1098 1102 : CN : BRANFORD : 1102 1002 : CN : WATERBURY : 1002 1140 : CN : WASHINGTON : 1140 1169 : CN : NEW LONDON : 1169 1102 : CN : BRANFORD : 1102 1159 : CN : GLASTONBURY : 1159 1008 : CN : DANBURY : 1008 J12A : CL&P FORESTVILLE BRISTOL : 1070 1054 : CN : RIDGEFIELD : 1054 1103 : CN : GUILFORD : 1103 1033 : CN : MIDDLETOWN : 1033 1032 : CN : MERIDEN : 1032 1032 : CN : MERIDEN : 1032 1112 : CN : ENFIELD : 1112 1113 : CN : HARTFORD : 1113 1928 : CN : SALISBURY : 1928 1113 : CN : HARTFORD : 1113 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 163 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202204 $207.35 Emergent Equipment Failures - Line 202204 $5,344.39 Emergent Equipment Failures - Line 202204 $9,705.80 Emergent Equipment Failures - Line 202204 $1,385.87 Emergent Equipment Failures - Line 202204 $40,607.76 Emergent Equipment Failures - Line 202204 $161.87 Emergent Equipment Failures - Line 202204 $2,230.57 Emergent Equipment Failures - Line 202204 $643.61 Emergent Equipment Failures - Substation 202204 $22,680.33 Emergent Equipment Failures - Line 202204 $4,919.52 Emergent Equipment Failures - Line 202204 $239.48 Emergent Equipment Failures - Line 202204 $930.09 Emergent Equipment Failures - Line 202204 $922.32 Emergent Equipment Failures - Line 202204 $69.29 Emergent Equipment Failures - Line 202204 $826.96 Emergent Equipment Failures - Line 202204 $345.49 Emergent Equipment Failures - Line 202204 $484.28 Emergent Equipment Failures - Line 202204 $159.57 Emergent Equipment Failures - Line 202204 $20,212.58 202204 $1,034.55 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202204 $276.72 Emergent Equipment Failures - Line 202204 $5,014.76 Emergent Equipment Failures - Line 202204 $674.58 Emergent Equipment Failures - Line 202204 $207.58 Emergent Equipment Failures - Line 202204 $199.35 Emergent Equipment Failures - Line 202204 $108.25 Emergent Equipment Failures - Line 202204 $721.68 Emergent Equipment Failures - Line 202204 $1,805.78 Emergent Equipment Failures - Line 202204 $10,542.53 Emergent Equipment Failures - Line 202204 $172.76 Emergent Equipment Failures - Substation 202204 $86,130.08 Emergent Equipment Failures - Line 202204 $5,993.63 Emergent Equipment Failures - Line 202204 $207.58 Emergent Equipment Failures - Line 202204 $10,321.54 Emergent Equipment Failures - Line 202204 $69.16 Emergent Equipment Failures - Line 202204 $614.20 Emergent Equipment Failures - Line 202204 $1,881.43 Emergent Equipment Failures - Line 202204 $9,450.93 Emergent Equipment Failures - Line 202204 $4,469.50 Emergent Equipment Failures - Line 202204 $42,694.15
  3. Page 164 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80223883 80223889 80223897 80223901 80223902 80223903 80223906 80223908 80223911 80223920 80223934 80223938 80223941 80223961 80223978 80223991 80223999 80224023 80224024 80224028 80224047 80224060 80224063 80224082 80224097 80224101 80224102 80224107 80224129 80224150 80224157 80224261 80224289 80224295 80224321 80224344 80224348 80224417 80225012 80225052 Accounting Work Order Descript MI 4/11 Pole 16970-TALCOTTVILLE RD, VOLUNTOWN RD/OLD BETHEL (34) RD, GR CO 08/03 E HTFD, 33 CHIPPER DR - HH E.P,- 4/9/22- 175 MILLER RD -- 2103 Canceling to wo 10195234 HOTCHKISS CR-TERRYS PLAIN RD. SIMS, P# 1266, WINDSOR, 97 Pine Ln - REPL streetli E.P.- 4/9/22- 12 HARVARD TER, P. 75 #ASP? CR-WINTERSET LN. SIMS, REPL A 4/8/22-BOSTON POST RD, GUILFORD DF-- COMPLETED IN FIELD-- 4/8 HIDDE 363::OLD PLAINFIELD:RD::PLAINFIELD: MR; ***WRITTEN***ALL WORK COMPLETED MV - STONINGTON, 302 FLANDERS RD, I CRP - 661::CLEARVIEW:AVE::HARWINTON PD-15 NORWOOD AVE N. LONDON/RSO FOL LD 79 DEER RUN RD WILTON RPL DB SVC 4/10 GRISWOLD:RD::ELLINGTON:CT Cros JDB 4/08: 52 WINDING LN, NORWALK/ I PR 6/16 MDB - MELIUS ( 151) RD -Jpt-31 Brightwood Rd Bristol (Frnt) RL: RIGGS :214 WEAVER ST, GRN/ REPL JFC - CEMETERY HILL:RD::CORNWALL:CT 4/08: 8 SINAWOY RD, COS COB/ REPLAC PCC-4/11 SILVER ( 259) ST -- S3421 TT TC 18 DEEP SPRING LN, STM; P#102 POST CONSTR - 04.07.22 - RESEARCH P SD; 285 NEWTOWN TPKE REDDING INSTAL TO STORES 3/7/23--REPLACE HH #277A HEL KTI BM; 4/11/22 NEW LEBBON ( BM; 4/11/22 CHARTER RIDGE ( 55) RC; 4/11/22 HIDEAWAY ( 24) LN -SD; 94 CROSS HWY REDDING SHIFT 1 PH 4/11/22 FANTON ( 10) RD -- 3629, 4/11/22 1 FALLS LN BETHEL (JAN) (H RC; 4/11/22 14 MOUNTAIN DR NEW MIL Install handhole from Storms WR#341 AMM PERRY ST, FARMINGTON (UNIONVILL 4/8/22 109 FEDERAL RD DANBURY CT 0 MF - Kidds Way Stonington Replace p Asset Location 1120 : CN : VERNON : 1120 1160 : CN : GRISWOLD : 1160 1934 : CN : EAST HARTFORD : 1934 1173 : CN : PRESTON : 1173 1089 : CN : MADISON : 1089 1942 : CN : SIMSBURY : 1942 1121 : CN : WINDSOR : 1121 1164 : CN : LEDYARD : 1164 1942 : CN : SIMSBURY : 1942 1103 : CN : GUILFORD : 1103 1094 : CN : HADDAM : 1094 1080 : CN : PLAINFIELD : 1080 1172 : CN : PORTLAND : 1172 1177 : CN : STONINGTON : 1177 1405 : CN : HARWINTON : 1405 1169 : CN : NEW LONDON : 1169 1057 : CN : WILTON : 1057 1111 : CN : ELLINGTON : 1111 1052 : CN : NORWALK : 1052 1139 : CN : WARREN : 1139 1070 : CN : BRISTOL : 1070 1065 : CN : GREENWICH : 1065 1132 : CN : CORNWALL : 1132 1065 : CN : GREENWICH : 1065 1936 : CN : GRANBY : 1936 1066 : CN : STAMFORD : 1066 1032 : CN : MERIDEN : 1032 1053 : CN : REDDING : 1053 1102 : CN : BRANFORD : 1102 1013 : CN : NEWTOWN : 1013 1013 : CN : NEWTOWN : 1013 1135 : CN : NEW MILFORD : 1135 1053 : CN : REDDING : 1053 1008 : CN : DANBURY : 1008 1007 : CN : BETHEL : 1007 1135 : CN : NEW MILFORD : 1135 1098 : CN : OLD SAYBROOK : 1098 1041 : CN : FARMINGTON : 1041 1008 : CN : DANBURY : 1008 1177 : CN : STONINGTON : 1177 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 164 of 616 Month Number Amount 202204 $21,124.89 202204 $146.98 202204 $230.61 202204 $1,451.29 202204 $6,127.55 202204 $1,923.51 202204 $207.54 202204 $2,140.37 202204 $384.25 202204 $1,072.33 202204 $350.98 202204 $4,309.77 202204 $4,895.87 202204 $2,357.62 202204 $967.45 202204 $18,161.17 202204 $6,009.85 202204 $944.42 202204 $505.47 202204 $1,679.31 202204 $379.24 202204 $1,187.00 202204 $3,071.07 202204 $121.57 202204 $1,985.95 202204 $2,629.59 202204 $1,591.20 202204 $415.10 202204 $1,710.21 202204 $101.22 202204 $225.08 202204 $138.37 202204 $158.40 202204 $8,141.55 202204 $33,310.91 202204 $380.45 202204 $239.27 202204 $72,398.94 202204 $8,762.57 202204 $31,816.98
  4. Page 165 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80225054 80225084 80225095 80225097 80225103 80225127 80225163 80225203 80225317 80225329 80225331 80225358 80225360 80225368 80225375 80225432 80225924 80225933 80225938 80225953 80225979 80226044 80226047 80226065 80226077 80226118 80226122 80226255 80226277 80226286 80226329 80226340 80226627 80226636 80226653 80226659 80226663 80226664 80226675 80226677 Accounting Work Order Descript SPRING ( 251) ST -- 7144, MANCHEST 4/12/22 ROOSEVELT ( 644) DR -- 623 JK>POLE 4340--RSO REBUILT POLE TOP, COMP JMS- 26 MOHEGAN DR, WEST HARTF 4/11 SHAKER (285) RD, ENFIELD, CT 0 COMPLETED IN FIELD 4/11/22 (RSO STR going 6/16 PR 6/6 JFC - 599 OLD MID JFC - 86 HEADQUARTERS RD LITCHFIELD PAD 321--REPLACE PAD XF W/167 KVA P 4/11 TURNOVER Y-26460 -2022 MEADOW KD-EVENT #4735005/4734806 UPGRADE X JDB 11 HARBOR AVE NORWALK P 7342 OP MR; ***WRITTEN*** FOAM CONDUITS AT 130 NUTMEG LN EAST HARTFORD, Replac 04.08.22 - 27 MAIN ST, FARMINGTON MATERIAL MCB - 04.08.22 - 55 STONEF RL:NORIAS RD, GRN/ REPLACE P#68355 COVENTRY, 1104 FLANDERS RD, Transfo 4/13/22 LANTERN PARK ( 71) LN N -WRM - 14 HUNTERS RDG, FARMINGTON JMS-S MAIN ( 339) ST -- 3008, WEST WRITTEN (RSO BURDIJA) MOUNT PARNAS Follow-up xfmr replace 4/12 (RSO PA 04.12.22 / Y-26462-2022 / 5 HOMESTE CP-23 COLONY RD COLLINSVILLE CT, re Windsor Ave 1147, Windsor. P-323 Re CRP - 100 CHERRY BROOK RD CANTON CT DONE IN FRONTIER DRAWER 6/8..5/23 C ALDEN ONE (E) KD-EVENT #4698536 ADD MR; ***WRITTEN***FOAM/SEAL CONDUIT WRM -JPT-12 Powder Hill Rd Middlefi KD-HTFD, AIRPORT RD - EVENT #469999 WRITTEN COMPLETE HOG HILL ( 110) R NEW RD/PEQUOT (98) RD , AVON, CT LONG HILL ( 10) RD -- 989, SOUTH JSG - BUNNELL ST, COLEBROOK CT INVALID 4/14/22 TAYLOR () ST DANBU WRM - Post Const - 04.10.22 - 337 H MDB - #456::ALLREAD:ST::PLYMOUTH:CT (CO 5/26) RH 38 PELICAN CT - REPL H Asset Location 1937 : CN : MANCHESTER : 1937 1014 : CN : OXFORD : 1014 1089 : CN : MADISON : 1089 1943 : CN : WEST HARTFORD : 1943 1112 : CN : ENFIELD : 1112 1099 : CN : DEEP RIVER : 1099 1141 : CN : GOSHEN : 1141 1406 : CN : LITCHFIELD : 1406 1103 : CN : GUILFORD : 1103 1103 : CN : GUILFORD : 1103 1041 : CN : FARMINGTON : 1041 1052 : CN : NORWALK : 1052 1154 : CN : COLUMBIA : 1154 1934 : CN : EAST HARTFORD : 1934 1041 : CN : FARMINGTON : 1041 1002 : CN : WATERBURY : 1002 1065 : CN : GREENWICH : 1065 1155 : CN : COVENTRY : 1155 1018 : CN : SOUTHBURY : 1018 1041 : CN : FARMINGTON : 1041 1943 : CN : WEST HARTFORD : 1943 1156 : CN : EAST HADDAM : 1156 1091 : CN : CLINTON : 1091 1030 : CN : CHESHIRE : 1030 1933 : CN : CANTON : 1933 1121 : CN : WINDSOR : 1121 1933 : CN : CANTON : 1933 1405 : CN : HARWINTON : 1405 1931 : CN : AVON : 1931 1033 : CN : MIDDLETOWN : 1033 1037 : CN : MIDDLEFIELD : 1037 1113 : CN : HARTFORD : 1113 1157 : CN : EAST HAMPTON : 1157 1931 : CN : AVON : 1931 1115 : CN : SOUTH WINDSOR : 1115 1192 : CN : COLEBROOK : 1192 1008 : CN : DANBURY : 1008 1910 : CN : DURHAM : 1910 1071 : CN : PLYMOUTH : 1071 1941 : CN : ROCKY HILL : 1941 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 165 of 616 Month Number Amount 202204 $192.09 202204 $9,319.55 202204 $1,205.16 202204 $207.54 202204 $1,600.95 202204 $138.21 202204 $172.95 202204 $8,774.22 202204 $2,251.05 202204 $1,425.58 202204 $172.95 202204 $2,949.48 202204 $407.63 202204 $30,619.22 202204 $5,119.62 202204 $3,132.29 202204 $216.15 202204 $230.45 202204 $6,113.65 202204 $20.61 202204 $2,927.20 202204 $159.64 202204 $449.69 202204 $1,729.57 202204 $252.89 202204 $69.16 202204 $242.14 202204 $172.95 202204 $323.81 202204 $415.10 202204 $1,845.85 202204 $212.76 202204 $4,856.45 202204 $276.72 202204 $2,835.76 202204 $1,956.72 202204 $1,080.03 202204 $10,834.82 202204 $19,990.07 202204 $1,283.32
  5. Page 166 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80226694 80226697 80226705 80226711 80226720 80226724 80226730 80226732 80226786 80226823 80226825 80226883 80226941 80226969 80226984 80226997 80227250 80227286 80227292 80227299 80227306 80227316 80227328 80227405 80227440 80227441 80227521 80227529 80227538 80227587 80228462 80228472 80228474 80228481 80228517 80228580 80228626 80228641 80228700 80228719 Accounting Work Order Descript (CO 5/26) RH 52 CORNCRIB LN -- U?, 4/14/22 S MAIN ( 397) ST -- 76, SE WRM - Post Constr - Riser /cable re JTR, WOOSTER ST, HART, Replaced xar WAITING ON FRONTIER POLE SET IN DRA RL:65 RIVERDALE AVE, GRN/ REPLACED MF 04-13-22 EVENT 4736819 68 HOLLY KD-EVENT #4735701 RECONNECT SVC P 1 4/13 E MAIN (215) ST CLINTON TURNOV PD-36 STARR ST N. LONDON/RPLC MH FR KTI 4/14/22 *TURNOVER* 35 OLD STA POST CONSTR - 04.03.22 - 1439 BALDW POST CONSTR - 04.08.22 - 197 TRANQU Priority Reject Pole Rivers Edge P# 82 OLD WINDSOR RD BLOOMFIELD 97 Spring St, windsor locks WRM - Post Const - 03.31.22 - 94 GA LD 30 MERRY LN, WESTON/ TREE VS P# 4/14: CLINTON AVE, WESTPORT/ INSTAL 4/14/22 (RSO-LEACH) BEECH TREE ( P-3234 INSTALL ANCHOR AND DG N CHES E.P.- 4/14/22- 979 PEQUOT AVE, NEW 04/14/22--RSO--REPLACED 25 KVA PAD MJ-MAR - Replace Leaking 50KVA Pad JFC - 04.12.22 / y-26463-2022; TURN Weston 21M-Replace 21M1-2 Breaker waiting on mat 7/5 - 260 Grantvill Prospect 22E-Replace 22E36-5 Switch VJT - (22-E-0521 ) DEERWOOD ( 101) (ASP) 07/20 JTR, NAHUM (Berkeley) D GROVE ( 59) ST -- 191, WINDSOR LOCK MATERIAL EVW - 292 Mountain Rd, Nor DEMING RD., SOUTH WINDSOR - RPLC'D CR-7 TOWPATH LN. AVON, REPLACED OPE JFC - 46 FAIRCHILD RD SHARON CT 060 COMPLETE -JEFFERSON DR GUILFORD-pol Priority Reject P#593 REPLACE WITH 4/7 p#534 TARKLIN HILL RD, VOLUNTOW JDB 4/16/22 (RSO-PALOMO/GREENE/HARR 4/17 JOHNSONS POINT RD BRANFORD Asset Location 1941 : CN : ROCKY HILL : 1941 1016 : CN : SEYMOUR : 1016 1040 : CN : BERLIN : 1040 1113 : CN : HARTFORD : 1113 1406 : CN : LITCHFIELD : 1406 1065 : CN : GREENWICH : 1065 1170 : CN : NORTH STONINGTON : 1170 1032 : CN : MERIDEN : 1032 1091 : CN : CLINTON : 1091 1169 : CN : NEW LONDON : 1169 1014 : CN : OXFORD : 1014 1002 : CN : WATERBURY : 1002 1010 : CN : MIDDLEBURY : 1010 1098 : CN : OLD SAYBROOK : 1098 1932 : CN : BLOOMFIELD : 1932 1122 : CN : WINDSOR LOCKS : 1122 1070 : CN : BRISTOL : 1070 1055 : CN : WESTON : 1055 1056 : CN : WESTPORT : 1056 1095 : CN : KILLINGWORTH : 1095 1095 : CN : KILLINGWORTH : 1095 1169 : CN : NEW LONDON : 1169 1159 : CN : GLASTONBURY : 1159 1030 : CN : CHESHIRE : 1030 1406 : CN : LITCHFIELD : 1406 J21M : CL&P WESTON WESTON : 1055 1195 : CN : WINCHESTER : 1195 J22E : CL&P PROSPECT STREET GREENWICH : 1065 1023 : CN : BETHLEHEM : 1023 1113 : CN : HARTFORD : 1113 1122 : CN : WINDSOR LOCKS : 1122 1196 : CN : NORFOLK : 1196 1115 : CN : SOUTH WINDSOR : 1115 1931 : CN : AVON : 1931 1137 : CN : SHARON : 1137 1103 : CN : GUILFORD : 1103 1093 : CN : ESSEX : 1093 1178 : CN : VOLUNTOWN : 1178 1052 : CN : NORWALK : 1052 1102 : CN : BRANFORD : 1102 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 166 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202204 $423.74 Emergent Equipment Failures - Line 202204 $588.04 Emergent Equipment Failures - Line 202204 $4,671.29 Emergent Equipment Failures - Line 202204 $174.37 Emergent Equipment Failures - Line 202204 $433.41 Emergent Equipment Failures - Line 202204 $1,587.46 Emergent Equipment Failures - Line 202204 $553.48 Emergent Equipment Failures - Line 202204 $1,591.60 Emergent Equipment Failures - Line 202204 $1,899.32 Emergent Equipment Failures - Line 202204 $1,365.84 Emergent Equipment Failures - Line 202204 $384.20 Emergent Equipment Failures - Line 202204 $7,607.56 Emergent Equipment Failures - Line 202204 $10,553.75 Emergent Equipment Failures - Line 202204 $3,748.57 Emergent Equipment Failures - Line 202204 $41,138.56 Emergent Equipment Failures - Line 202204 $635.97 Emergent Equipment Failures - Line 202204 $691.04 Emergent Equipment Failures - Line 202204 $2,354.38 Emergent Equipment Failures - Line 202204 $800.87 202204 $415.10 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202204 $1,293.86 Emergent Equipment Failures - Line 202204 $230.34 Emergent Equipment Failures - Line 202204 $1,127.39 Emergent Equipment Failures - Line 202204 $497.53 Emergent Equipment Failures - Line 202204 $1,823.55 Emergent Equipment Failures - Substation 202204 $11,310.02 Emergent Equipment Failures - Line 202204 $670.80 Emergent Equipment Failures - Substation 202204 $230.30 Emergent Equipment Failures - Line 202204 $2,424.27 Emergent Equipment Failures - Line 202204 $230.12 Emergent Equipment Failures - Line 202204 $4,480.28 Emergent Equipment Failures - Line 202204 $13,607.52 Emergent Equipment Failures - Line 202204 $5,965.19 Emergent Equipment Failures - Line 202204 $3,473.83 Emergent Equipment Failures - Line 202204 $360.88 Emergent Equipment Failures - Line 202204 $5,888.86 Emergent Equipment Failures - Line 202204 $5,493.13 Emergent Equipment Failures - Line 202204 $1,049.52 Emergent Equipment Failures - Line 202204 $1,478.03 Emergent Equipment Failures - Line 202204 $1,355.87
  6. Page 167 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80228824 80228827 80229166 80229169 80229189 80229214 80229218 80229220 80229222 80229237 80229239 80229243 80229246 80229263 80229296 80229301 80229421 80229458 80229862 80229871 80229893 80229899 80229901 80229902 80229909 80229912 80229918 80229921 80229941 80229942 80229944 80229953 80229990 80229993 80230106 80230128 80230166 80230195 80230550 80230558 Accounting Work Order Descript JK>POLE 3383, YELLOW TAG--Y-26475-2 JDB 4/17/22 (RSO-HARRIS) MCINTOSH R PD-PATTAGANSETT CT E. LYME/CAP BANK PD-329 BOSTON POST RD E. LYME/REPLA Jpt-131 Jacobs St Bristol - TT Post JDB 4/16: 377 MAIN AVE, NORWALK/ RE Priority Pole P#1275 Sunset Lane Cl Priority Pole P#1682 replace with 4 MR; ***ALL WORK COMPLETED***04/18 MCB - 191 GRASSY HILL RD, WATERBURY KTI BM; 4/19/22 WILLS ( 3) RD **WRM - 04.18.22 - 179 PATTON DR, C POST CONST - SPRINGBROOK RD, AVON C 04.11.22 - BRONSON RD, PROSPECT TT TC COVE RD, STM:P#4661 REPL'D 14 EM RF:24 GEORGIAN LN, DARIEN:REMOVE OLYMPIC 12 AVE 1012 STAFFORD SPGS, MDB - (Y-26480-2022) TURNOVER: STOD BM; 4/20/22 BENNETTS BRIDGE ( 75 Priority Pole P#1045 replace with 4 RL:BUCKFIELD LN, GRN/ NEEDS CUTOUT/ P-2393 REPLACE REGULATOR Yellow Tag 4/20/22 NEW MILFORD LITCHFIELD:RD: 4/19/22 (RSO TUCKER) HORSE POND RD WRITTEN COMPLETE 4/19 GOSHEN (22) R ACC WM; 4/20/22 SOUTH ( 23) ST -EM RF:9 INDIAN TRL, DARIEN:REMOVE/I RR; 4/20/22 PARK ( 225) RD -- 2395 4/19 Y-26489-2022 P#22 BRIDGE ST, E EM RF:8 STEPHANIE LN, DARIEN:REMOVE NORTH ( 91) written complete ST 4/19 P#3597 NEEDS ANCHOR & GUY THOR 04.19.22 - 882 N COLONY RD, MERIDEN 4/20/22 OLD ZOAR ( 259) RD -- 1928 Reconductor service wire - 24 Malla JSG - 113 SOUTH RD EAST HARLAND CT 04.18.22 / Y-26486-2022 / GREEN RD, MM 18 Westminster Rd Canterbury P#1 MDB - MARSH POINT RD, MORRIS, CT POST CONSTR - COMP EASTVIEW (190) D Asset Location 1159 : CN : GLASTONBURY : 1159 1052 : CN : NORWALK : 1052 1092 : CN : EAST LYME : 1092 1092 : CN : EAST LYME : 1092 1070 : CN : BRISTOL : 1070 1052 : CN : NORWALK : 1052 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1172 : CN : PORTLAND : 1172 1002 : CN : WATERBURY : 1002 1013 : CN : NEWTOWN : 1013 1030 : CN : CHESHIRE : 1030 1931 : CN : AVON : 1931 1015 : CN : PROSPECT : 1015 1066 : CN : STAMFORD : 1066 1908 : CN : DARIEN : 1908 1116 : CN : STAFFORD : 1116 1407 : CN : MORRIS : 1407 1013 : CN : NEWTOWN : 1013 1099 : CN : DEEP RIVER : 1099 1065 : CN : GREENWICH : 1065 1094 : CN : HADDAM : 1094 1140 : CN : WASHINGTON : 1140 1089 : CN : MADISON : 1089 1100 : CN : WATERFORD : 1100 1140 : CN : WASHINGTON : 1140 1908 : CN : DARIEN : 1908 1014 : CN : OXFORD : 1014 1110 : CN : EAST WINDSOR : 1110 1908 : CN : DARIEN : 1908 1162 : CN : HEBRON : 1162 1166 : CN : MANSFIELD : 1166 1032 : CN : MERIDEN : 1032 1012 : CN : MONROE : 1012 1931 : CN : AVON : 1931 1193 : CN : HARTLAND : 1193 1032 : CN : MERIDEN : 1032 1076 : CN : CANTERBURY : 1076 1407 : CN : MORRIS : 1407 1121 : CN : WINDSOR : 1121 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 167 of 616 Month Number Amount 202204 $2,128.19 202204 $897.80 202204 $275.68 202204 $102.39 202204 $232.71 202204 $103.77 202204 $1,716.18 202204 $4,365.70 202204 $767.89 202204 $58.84 202204 $708.73 202204 $484.26 202204 $998.92 202204 $2,858.14 202204 $414.65 202204 $1,615.02 202204 $415.10 202204 $466.76 202204 $1,174.80 202204 $1,611.14 202204 $2,136.81 202204 $531.99 202204 $890.99 202204 $172.95 202204 $1,245.28 202204 $631.55 202204 $7,440.18 202204 $636.09 202204 $2,869.85 202204 $8,795.88 202204 $693.19 202204 $469.12 202204 $614.21 202204 $1,918.36 202204 $17,918.38 202204 $1,480.01 202204 $49,343.47 202204 $4,021.20 202204 $505.24 202204 $830.15
  7. Page 168 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80230565 80230567 80230569 80230594 80230601 80230612 80230615 80230633 80230638 80230649 80230654 80230661 80230676 80230693 80230698 80230715 80230865 80230872 80230899 80230913 80230928 80230963 80231196 80231200 80231204 80231305 80231324 80231350 80231371 80231398 80231432 80231504 80232252 80232311 80232314 80232322 80232327 80232336 80232341 80232346 Accounting Work Order Descript TC 21 GREENS CIR, STM: PAD4155 INST HOLD FOR POLE EVW - 23 Union St, Wi Noera 13H-Replace Deteriorated Roof E.P.-4/20- 43 W PATTAGANSETT RD, NI 04-19-22 SAGAL LOU RD BRANFORD CT 0 WC-677 MIXVILLE RD, CHESHIRE. RPL P RL: 46 RICHLAND RD, GRN: ES REPLACE PD-102 MONTAUK AVE N. LONDON/RSO FO SD; *POST CONSTRUCTION* *TURNOVER E.P.- 4/19- PHILLIPS, 3RD AVE, N. P EM RF:16 TACONIC RD, GREENWICH:REMO TT TC 360 MAYAPPLE RD, STM;P# 5507 RL:742 LAKE AVE, GRN/ TREE VS POLE# Noera 13H-Replace Control House Lig DJM: ARROWHEAD RD WESTPORT/ TREE VS 4/19: 30 COPPER BEECH RD, GRN/ TREE DG P#168 Y-26494-2022 SOMERS TPKE MF Y-26318-2022 remove from pole 27 E.P.-4/20- 5 HIGHWAY PT, WATERFORD* WRM - 968 Hanover Rd, MERIDEN MJ -04.20.22 - 55 MELBOURNE ST, NAU MATERIAL MJP/75 Mansfield Ave / DRN P#337 BUSHY HILL RD DEEP RIVER PRIO ****Cancel Work Order******75 MAXIM POST CONSTRUCTION - CEDAR RIDGE RD, E.P.- 4/21- 268 LANTERN HILL RD, ST do not take-4/21/22 (RSO-LEACH) SEA TL - LONG COVE RD, REF. #961+#906 G WINDSOR, 1046 WINDSOR AV - P323 REP PD-WTFD PKWY N.WATERFORD /RPLC RECL WRM - Post Const - 444 ANDREW AVE, EVW - HORNE ( 418) AVE -- 7199, WIN MR; ***WRITTEN***ALL WORK COMPLETED E.P.- 4/22- 70-1 ROWLAND RD -2523, POST CONST - FOX MEADOW ( 6) LN -TL - ELIHUE ISLAND RD, ELIHUE ISLAN MF 4/23 N MAIN ( 435) ST -- 234-U/ MF 4/22 PROVIDENCE NEW LONDON TPKE WRITTEN COMPLETE 4/22 SQUIRES ( 12 TO STORES 2/2/23- (RSO-DONNELLY) PO Asset Location 1066 : CN : STAMFORD : 1066 1195 : CN : WINCHESTER : 1195 J13H : CL&P NOERA STREET WATERBURY : 1002 1092 : CN : EAST LYME : 1092 1102 : CN : BRANFORD : 1102 1030 : CN : CHESHIRE : 1030 1065 : CN : GREENWICH : 1065 1169 : CN : NEW LONDON : 1169 1008 : CN : DANBURY : 1008 1169 : CN : NEW LONDON : 1169 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 J13H : CL&P NOERA STREET WATERBURY : 1002 1056 : CN : WESTPORT : 1056 1065 : CN : GREENWICH : 1065 1085 : CN : WOODSTOCK : 1085 1100 : CN : WATERFORD : 1100 1100 : CN : WATERFORD : 1100 1032 : CN : MERIDEN : 1032 1003 : CN : NAUGATUCK : 1003 1908 : CN : DARIEN : 1908 1089 : CN : MADISON : 1089 1113 : CN : HARTFORD : 1113 1043 : CN : NEWINGTON : 1043 1177 : CN : STONINGTON : 1177 1103 : CN : GUILFORD : 1103 1164 : CN : LEDYARD : 1164 1121 : CN : WINDSOR : 1121 1100 : CN : WATERFORD : 1100 1003 : CN : NAUGATUCK : 1003 1195 : CN : WINCHESTER : 1195 1033 : CN : MIDDLETOWN : 1033 1097 : CN : OLD LYME : 1097 1943 : CN : WEST HARTFORD : 1943 1177 : CN : STONINGTON : 1177 1177 : CN : STONINGTON : 1177 1169 : CN : NEW LONDON : 1169 1089 : CN : MADISON : 1089 1095 : CN : KILLINGWORTH : 1095 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 168 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202204 $30,409.99 Emergent Equipment Failures - Line 202204 $211.27 Emergent Equipment Failures - Substation 202204 $230.34 Emergent Equipment Failures - Line 202204 $415.10 Emergent Equipment Failures - Line 202204 $419.85 Emergent Equipment Failures - Line 202204 $760.99 Emergent Equipment Failures - Line 202204 $3,231.48 Emergent Equipment Failures - Line 202204 $553.50 Emergent Equipment Failures - Line 202204 $6,958.43 Emergent Equipment Failures - Line 202204 $553.50 Emergent Equipment Failures - Line 202204 $7,312.94 Emergent Equipment Failures - Line 202204 $2,631.92 Emergent Equipment Failures - Line 202204 $1,846.78 Emergent Equipment Failures - Substation 202204 $230.34 Emergent Equipment Failures - Line 202204 $4,105.80 Emergent Equipment Failures - Line 202204 $4,443.85 Emergent Equipment Failures - Line 202204 $2,594.06 Emergent Equipment Failures - Line 202204 $194.99 Emergent Equipment Failures - Line 202204 $553.50 202204 $227.63 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202204 $1,245.32 Emergent Equipment Failures - Line 202204 $3,104.91 Emergent Equipment Failures - Line 202204 $1,732.78 Emergent Equipment Failures - Line 202204 $1,461.47 Emergent Equipment Failures - Line 202204 $242.15 Emergent Equipment Failures - Line 202204 $1,274.68 Emergent Equipment Failures - Line 202204 $416.97 Emergent Equipment Failures - Line 202204 $3,273.80 Emergent Equipment Failures - Line 202204 $259.51 Emergent Equipment Failures - Line 202204 $2,734.02 Emergent Equipment Failures - Line 202204 $315.11 Emergent Equipment Failures - Line 202204 $518.32 Emergent Equipment Failures - Line 202204 $23,749.03 Emergent Equipment Failures - Line 202204 $345.51 Emergent Equipment Failures - Line 202204 $899.37 Emergent Equipment Failures - Line 202204 $172.95 Emergent Equipment Failures - Line 202204 $956.86 Emergent Equipment Failures - Line 202204 $622.65 Emergent Equipment Failures - Line 202204 $588.04 Emergent Equipment Failures - Line 202204 $7,814.09
  8. Page 169 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80232350 80232351 80232357 80232374 80232380 80232389 80232395 80232398 80232400 80232447 80232454 80232466 80232479 80232500 80232551 80232684 80232707 80232715 80232770 80233082 80233087 80233110 80233116 80233122 80233128 80233133 80233135 80233143 80233153 80233179 80233246 80233272 80233279 80233287 80233753 80233770 80233771 80233810 80234026 80234410 Accounting Work Order Descript *CANCELLED* MR;***WRITTEN***LONG H COMPLETE IN FIELD EH-4/23 BOKUM (17 4/23/22 (RSO-DONNELLY) LONG HILL RD 04-22-2022 written P 492-487 Cook POST CONST - DUNFEY ( 336) LN APT MDB - 4/23/22 (KINNEMB & HERMASA) W WM; 04/25/22 MIDDLE RIVER ( 20) 806 HILLSTOWN RD ,Pole#4696, MANCHE WRITTEN COMPLETED EH-4/23/22 (RSO-D COMP (*)WETHERSFIELD, 20 SETTLER C ALL WORK COMPLETE 4/25/22 (RSO-TUCK MATERIAL DJM!!! 04.23.22 - N RIDGE DG P#2603 WOODSTOCK AVE THOMPSON RP LD BELDEN HILL RD, WILTON POLE#1297 4/24 OLD NEW ENGLAND ( 31) RD -WRTN--JK>P-2569 1/2 *YELLOW TAG Y-2 -04-08-2022 Rolling Meadow Madiso ALL WORK COMPLETE 04-08-2022 P451 F *TELCO AMM 17 BUENA VISTA AVE,NEW B WQ 4/26/22 26 EASTVIEW DR, NEW MI print 9/27 JSG/Warren--Lake Rd. 31C RR; 4/26/22 LOLLY ( 2) LN LOT 3 PRINT 9/27 JSG/Winchester--Winchest 4/26/22 263::SUNSET HILL:RD::REDDI EH-WRITTEN COMPLETE IN FIELD 4/25 J P-617 REPLACE 3 ARRESTERS. 155 WHIT RSO--04/25/22--JK>POLE 6695--1 PHAS PRINTED-4/24/22 (RSO-PASCARELLI/PUN P-6768 REPLACE SVCGLENWOOD ( 44) *WETH, 184 HIGHLAND ST -- SHIFT FRO E.P.- 4/25/22- 117 NORWICH SALEM RD (ASP 6/24) 65 NOD RD, AVON - REM OH POST CONSTR - 166 FIRETOWN RD, SIMS MR; ***SEE WO 9057351 FOR ADDITIONA ******Cancel Work Order*******W NEW E.P.- 4/26/22- 26 Ridge St Groton 4/26 DEER RUN ( 3) RD -- REF P 2 POST CONSTR - MONTEVIDEO ( 81) RD 4/26/22 WARD ( 39) DR S -- 721, 4/28/22 POND VIEW:DR::NEW FAIRFIE Asset Location 1033 : CN : MIDDLETOWN : 1033 1090 : CN : CHESTER : 1090 1103 : CN : GUILFORD : 1103 1163 : CN : LEBANON : 1163 1121 : CN : WINDSOR : 1121 1139 : CN : WARREN : 1139 1008 : CN : DANBURY : 1008 1937 : CN : MANCHESTER : 1937 1089 : CN : MADISON : 1089 1045 : CN : WETHERSFIELD : 1045 1103 : CN : GUILFORD : 1103 1056 : CN : WESTPORT : 1056 1084 : CN : THOMPSON : 1084 1057 : CN : WILTON : 1057 1102 : CN : BRANFORD : 1102 1159 : CN : GLASTONBURY : 1159 1089 : CN : MADISON : 1089 1094 : CN : HADDAM : 1094 1042 : CN : NEW BRITAIN : 1042 1135 : CN : NEW MILFORD : 1135 1139 : CN : WARREN : 1139 1014 : CN : OXFORD : 1014 1195 : CN : WINCHESTER : 1195 1053 : CN : REDDING : 1053 1103 : CN : GUILFORD : 1103 1103 : CN : GUILFORD : 1103 1092 : CN : EAST LYME : 1092 1080 : CN : PLAINFIELD : 1080 1103 : CN : GUILFORD : 1103 1045 : CN : WETHERSFIELD : 1045 1096 : CN : LYME : 1096 1931 : CN : AVON : 1931 1942 : CN : SIMSBURY : 1942 1154 : CN : COLUMBIA : 1154 1932 : CN : BLOOMFIELD : 1932 1161 : CN : GROTON : 1161 1098 : CN : OLD SAYBROOK : 1098 1931 : CN : AVON : 1931 1008 : CN : DANBURY : 1008 1134 : CN : NEW FAIRFIELD : 1134 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 169 of 616 Month Number Amount 202204 $1,076.24 202204 $1,660.41 202204 $417.00 202204 $20,748.43 202204 $4,532.29 202204 $4,278.76 202204 $207.54 202204 $307.40 202204 $3,242.41 202204 $551.64 202204 $1,190.30 202204 $2,489.38 202204 $15,959.12 202204 $242.15 202204 $1,136.40 202204 $2,264.34 202204 $407.50 202204 $353.52 202204 $263.67 202204 $380.52 202204 $32,287.80 202204 $276.72 202204 $50,637.04 202204 $62.14 202204 $553.50 202204 $760.97 202204 $1,928.98 202204 $2,490.56 202204 $276.72 202204 $138.37 202204 $42.71 202204 $276.72 202204 $276.72 202204 $14,518.84 202204 $761.02 202204 $2,335.53 202204 $207.54 202204 $3,478.42 202204 $4,048.19 202204 $2,101.47
  9. Page 170 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80234417 80234426 80234437 80234455 80234468 80234521 80234555 80234568 80234571 80234591 80234711 80234784 80235097 80235118 80235119 80235130 80235136 80235156 80235171 80235182 80235195 80235218 80235275 80235277 80235399 80235423 80235435 80235447 80235509 80235531 80235542 80235781 80236404 80236406 80236409 80236424 80236458 80236482 80236488 80236494 Accounting Work Order Descript MR; ***WRITTEN*** CHANGE BROKEN 40/ SD; *POST CONSTRUCTION* 4/28/22 JE E.P.- 4/27- 26 RIDGE ST, P.1421, GR E.P.- 4/27/22- 36 RIDGE ST, GROTON RSO--04/27/22--REMOVED OSPREY NEST, DONE PR 5/17 CRP - 263 CANTON RD UN Y-26521-2022 / BRICKYARD RD, FARMIN 101395 - Tolland, Crandall Park - r JK>POLE 2133--TREE V POLE, REPL POL DJM!!! 04.25.22 - 17 VALLEY RD, WES PR 8/30 CRP - 52 HARMONY HILL RD HA NM: 04.27.22 - 40 HASSAKE RD, OLD G 04/28 *TURNOVER* MANCHESTER ( 146) 4/28/22 ROUTE 37 ( 146) -- 1277, PD-6 BROAD VIEW CT QUAKER HILL/RSO 4/28 HILLTOP ( 5) DR -- 25077R24 cancel to fwo 80265997 4/29/22 SOUTHFORD ( 1126) RD -- 30 INVALID SD; 17 CONNELLY RD NEW MILF 4/29/22 GELDING HILL ( 38) RD -JFC - TURNOVER*** 146 HEADQUARTERS 04/28 (DURKEE) IRVING ( 98) ST -04/28 18 W FORREST ST ENFIELD WRM - Post Const - 78 John St, New EVW - WEATOGUE ( 49) RD -- S44/29 31981::SLATER:RD::TOLLAND:CT EVW - WATER ST CANAAN CT WRM - 116 Farmingberry Dr, Sthgtn JDB 04.28.22 - MAYWOOD RD, NORWALK 4/28 tree broke p#2952 IRENE ( 6 CRP - CANTON RD BURLINGTON CT 060 COMP UNDER 17108458 04.26.22 - 6 D POST CONSTR - COLUMBUS BLVD HARTFOR MF 4/29 (RSO HAYNES) WILLOW ( 25) E.P.- 4/29- DEAN RD, EAST LYME- REP MF 4/30 VINEGAR HILL RD LEDYARD 4/29 (HINDLAS) written complete IN 5/1 (RSO STILWKD) CROSS ( 22) RD E HTFD, 24 STANLEY ST -NEEDS NEW SR Y-26530-2022 SHELDON RD, GRISWOLD Asset Location 1154 : CN : COLUMBIA : 1154 1014 : CN : OXFORD : 1014 1161 : CN : GROTON : 1161 1161 : CN : GROTON : 1161 1102 : CN : BRANFORD : 1102 1191 : CN : BURLINGTON : 1191 1041 : CN : FARMINGTON : 1041 1118 : CN : TOLLAND : 1118 1098 : CN : OLD SAYBROOK : 1098 1056 : CN : WESTPORT : 1056 1405 : CN : HARWINTON : 1405 1065 : CN : GREENWICH : 1065 1113 : CN : HARTFORD : 1113 1138 : CN : SHERMAN : 1138 1100 : CN : WATERFORD : 1100 1098 : CN : OLD SAYBROOK : 1098 1931 : CN : AVON : 1931 1018 : CN : SOUTHBURY : 1018 1135 : CN : NEW MILFORD : 1135 1013 : CN : NEWTOWN : 1013 1406 : CN : LITCHFIELD : 1406 1937 : CN : MANCHESTER : 1937 1112 : CN : ENFIELD : 1112 1042 : CN : NEW BRITAIN : 1042 1928 : CN : SALISBURY : 1928 1118 : CN : TOLLAND : 1118 1929 : CN : CANAAN : 1929 1034 : CN : SOUTHINGTON : 1034 1052 : CN : NORWALK : 1052 1120 : CN : VERNON : 1120 1191 : CN : BURLINGTON : 1191 1071 : CN : PLYMOUTH : 1071 1113 : CN : HARTFORD : 1113 1177 : CN : STONINGTON : 1177 1092 : CN : EAST LYME : 1092 1164 : CN : LEDYARD : 1164 1180 : CN : WINDHAM : 1180 1160 : CN : GRISWOLD : 1160 1934 : CN : EAST HARTFORD : 1934 1160 : CN : GRISWOLD : 1160 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 170 of 616 Month Number Amount 202204 $148.92 202204 $952.56 202204 $345.91 202204 $474.80 202204 $345.91 202204 $276.72 202204 $49,731.88 202204 $3,618.53 202204 $5,372.36 202204 $276.72 202204 $1,037.76 202204 $138.37 202204 $17,643.34 202204 $2,574.97 202204 $9,103.90 202204 $415.10 202204 $1,452.87 202204 $916.64 202204 $2,698.09 202204 $345.91 202204 $992.31 202204 $172.95 202204 $276.72 202204 $2,905.66 202204 $172.95 202204 $1,153.40 202204 $18,865.85 202204 $2,905.63 202204 $3,681.55 202204 $4,966.34 202204 $830.15 202204 $1,003.16 202204 $20,081.70 202204 $1,245.32 202204 $968.52 202204 $1,426.78 202204 $311.31 202204 $933.94 202204 $1,037.77 202204 $660.05
  10. Page 171 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80236500 80236516 80236532 1B030140 1B030183 1B030725 1B032507 1B032630 1B032857 1B032872 1B033167 1B130098 1B130099 1B820461 1B823066 1B920697 1B921206 1B921213 1B923627 1B923670 1N030173 1N030384 1N030526 1N030623 1N030719 1N030769 1N030868 1N030875 1N030954 1N031116 1N031260 1N031312 1N120390 1N130023 1N130045 1N222083 1N322430 1N522338 1N820216 1N920822 Accounting Work Order Descript MJ - 4/29 (CUMMINGS) N MAPLE ( 13 WRTN--JK>PAD 540--REPLACE ELBOW, RS 4/29 (PETERCL & PASCAKJ) N RIVER ( 107 TRIANGLE ST DANBURY, ROTTED/BRK CP-Woodlawn Rd. Monroe - replace op JS - Delay St, Danb, Inst\Rem DB XF KD-EVENT #4353678 REPL BRKN POLE G7 KD 21 Hemlock Trl Oxford; LOW WIRES KD-EVENT OLD POVERTY RD SOUTHBURY # APPRENTICES KTI MPB; 4 OAK RIDGE RD KD-EVENT #4430619/4430588 RPLCD PAD KD-EVENT #4399201 ANC/GUY P 21928 KD-EVENT #4445385 RECLOSER CONTROL RSO; 2/14; ORCHARD DR REDDING BAD S KD-EVENT #3811745 REPLC 3 PH PAD #1 441 Main St, Ridgefield/part power 32 PLUMB BROOK RD, WOODBURY, REPLAC KD-REPLACE BROKEN POLE 2287 CH 11/25 HEATHER CT WOODBURY, 19-EELKINGTON FARM pole 5807 replace 3JDB 2/18: EAST AVE NORWALK: PAD 470 LD!!520 MAIN AVE NOR PAD#991,#631,# CANCEL TO MAXIMO 4717596 JESP# 161/ ADAMS LN NEW CANAAN/20-E JES;.21 GREY ROCKS RD WILTON 7/6: JES; P# 34509 & # 22365/TREE TOOK D DJM!!!! P# 24894/OLD RD WESTPORT/LE JES; P# 18146/WEED ST NEW CANAAN/BR MAX 9/3: P# 33794/137 HARBOR RD WES JES; 10/10: P# 33581/648 NOD HILL M.11/9: RIDGEFIELD RD WILTON: INSTA LD VALLEY RD WESTPORT P#29800 REPLA JES/514 SILVERMINE RD,NC/TO SHIFT 3 LD PAD# 236/VAULT E/KEELERS RIDGE R JES; 30 EVERGREEN AVE. WILTON. REPL RM 10 SPRUCE HILL RD.WESTON, RPLC 3 AC 357 MOUNTAIN RD. WILTON, TO REPL 190 Weston Rd Weston Corr Maintenan CANCEL JDB 107 GRUMMAN AVE JOB COMPLETE JDB 11 Bayne St Nwlk 1 Asset Location 1112 : CN : ENFIELD : 1112 1159 : CN : GLASTONBURY : 1159 1155 : CN : COVENTRY : 1155 1008 : CN : DANBURY : 1008 1012 : CN : MONROE : 1012 1008 : CN : DANBURY : 1008 1018 : CN : SOUTHBURY : 1018 1014 : CN : OXFORD : 1014 1018 : CN : SOUTHBURY : 1018 1007 : CN : BETHEL : 1007 1135 : CN : NEW MILFORD : 1135 1014 : CN : OXFORD : 1014 1013 : CN : NEWTOWN : 1013 1053 : CN : REDDING : 1053 1008 : CN : DANBURY : 1008 1054 : CN : RIDGEFIELD : 1054 1022 : CN : WOODBURY : 1022 1053 : CN : REDDING : 1053 1022 : CN : WOODBURY : 1022 1135 : CN : NEW MILFORD : 1135 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1051 : CN : NEW CANAAN : 1051 1057 : CN : WILTON : 1057 1057 : CN : WILTON : 1057 1056 : CN : WESTPORT : 1056 1051 : CN : NEW CANAAN : 1051 1056 : CN : WESTPORT : 1056 1057 : CN : WILTON : 1057 1057 : CN : WILTON : 1057 1056 : CN : WESTPORT : 1056 1051 : CN : NEW CANAAN : 1051 1057 : CN : WILTON : 1057 1057 : CN : WILTON : 1057 1055 : CN : WESTON : 1055 1057 : CN : WILTON : 1057 1055 : CN : WESTON : 1055 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 171 of 616 Month Number Amount 202204 $172.95 202204 $276.72 202204 $415.10 202204 $545.23 202204 ($627.25) 202204 ($18.36) 202204 $525.33 202204 $5,387.14 202204 ($5,133.71) 202204 ($11.76) 202204 ($53.80) 202204 ($33.67) 202204 $5,882.33 202204 $511.98 202204 $3,424.94 202204 $32,584.45 202204 $107.71 202204 $285.93 202204 ($1,155.43) 202204 ($6,787.32) 202204 $42.14 202204 $289.56 202204 ($519.35) 202204 ($2,263.13) 202204 $1,682.11 202204 $542.44 202204 ($617.66) 202204 $505.49 202204 $64.41 202204 ($10.92) 202204 $310.15 202204 ($58.44) 202204 ($81.26) 202204 ($1,208.48) 202204 $3,441.55 202204 ($633.57) 202204 $5,163.91 202204 $4,588.53 202204 ($7.91) 202204 ($381.04)
Words on different pages

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)