Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 210 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80241305 80241307 80241308 80241311 80241357 80241359 80241361 80241363 80241370 80241394 80241491 80241560 80241588 80241594 80241655 80242058 80242091 80242095 80242097 80242103 80242108 80242109 80242117 80242120 80242134 80242165 80242180 80242197 80242202 80242363 80242399 80242437 80242443 80242468 80242495 80242726 80242743 80242774 80242788 80242798 Accounting Work Order Descript MM pole 1922 ,1923 and 2151 Deerfi PD- P1465 CLARK LN WTFD/REPLC XARM Priority Pole P#429 replace with 40 NEW GC 5/9 NORWICH SALEM (752) TPKE MJ 49S2 Circuit based WO-Coventry #203::written complete DARS DUP ROU MJ 49S2 Circuit based WO-Tolland MCB - 05.09.22 - 184 CHASE AVE, WAT WRM - Post Const - 18 Greenmont Ter MM P#2357 replc 10' crossarm and sh MR;***WRITTEN***ALL WORK COMPLETED* COMP CCC 11/17/22 - STLT 04.19.22 PRIORITY REJECT P-471 REPLACE WITH P-2111 REPLACE PRIORITY REJECT WITH PRINTED 8/30 CRP - PLYMOUTH ( 526) EM RF:70 COACHLAMP LN, DARIEN:REMOV 5/10STONE HEDGE 55 RD PAD 23 WESTBR SC-P#4531 PRSPECT AVE GUILFORD I/RPD-432 NORWICH WESTERLY RD N. STON 5/11/22 BARKER:RD::NEW MILFORD:CT MV 5/10 OLD NORWICH ( 153) RD FL 2 NEW GC 5/10 ROUTE 165 ( 282) -- 1 PD-10 SUNNIECREST DR WATERFORD/RPLC NEW GC 5/10 Y-26558-2022 - N ANGUI TT TC 62 ELMCROFT RD, STM: P#4928S TT TC 96 DANN DR, STM/ INSTALLED 75 East Meriden 21P - 21P-1X Transform 05/10 (RIVERA) BEDFORD ( 15) AVE MR; ***WRITTEN***ALL WORK COMPLETED EVW - ROCKWELL ( 224) ST -- 2702, MCB - 05.10.22 - 141 SHERIDAN DR, N MJ-* 05.10.22 - 138 WARREN ST, MER BIRCH ST MANCHESTER, Pole#985, Repl Jpt-276 S Washington St Plainville VJT - LAKE PLYMOUTH ( 56) BLVD -JDB5/11: 151 WOODWARD AVE, NORWALK/ CANX 5/12/22 RABBIT HILL ( 15) 5/11 PEPPERIDGE ( 39) AVE -- 82-5 MR; ***WRITTEN***ALL WORK COMPLETED TL - HAMBURG RD, #346-1 LYME // TBC Asset Location 1091 : CN : CLINTON : 1091 1100 : CN : WATERFORD : 1100 1091 : CN : CLINTON : 1091 1168 : CN : MONTVILLE : 1168 1155 : CN : COVENTRY : 1155 1180 : CN : WINDHAM : 1180 1118 : CN : TOLLAND : 1118 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1089 : CN : MADISON : 1089 1154 : CN : COLUMBIA : 1154 1032 : CN : MERIDEN : 1032 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1405 : CN : HARWINTON : 1405 1908 : CN : DARIEN : 1908 1101 : CN : WESTBROOK : 1101 1103 : CN : GUILFORD : 1103 1170 : CN : NORTH STONINGTON : 1170 1135 : CN : NEW MILFORD : 1135 1100 : CN : WATERFORD : 1100 1169 : CN : NEW LONDON : 1169 1100 : CN : WATERFORD : 1100 1177 : CN : STONINGTON : 1177 1066 : CN : STAMFORD : 1066 1066 : CN : STAMFORD : 1066 J21P : CL&P EAST MERIDEN MERIDEN : 1032 1934 : CN : EAST HARTFORD : 1934 1033 : CN : MIDDLETOWN : 1033 1195 : CN : WINCHESTER : 1195 1003 : CN : NAUGATUCK : 1003 1032 : CN : MERIDEN : 1032 1937 : CN : MANCHESTER : 1937 1044 : CN : PLAINVILLE : 1044 1071 : CN : PLYMOUTH : 1071 1052 : CN : NORWALK : 1052 1140 : CN : WASHINGTON : 1140 1101 : CN : WESTBROOK : 1101 1172 : CN : PORTLAND : 1172 1096 : CN : LYME : 1096 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 210 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202205 $8,851.03 Emergent Equipment Failures - Line 202205 $153.99 Emergent Equipment Failures - Line 202205 $766.75 Emergent Equipment Failures - Line 202205 $285.47 Emergent Equipment Failures - Line 202205 $93,814.33 Emergent Equipment Failures - Line 202205 $265.13 Emergent Equipment Failures - Line 202205 $2,691.99 Emergent Equipment Failures - Line 202205 $475.44 Emergent Equipment Failures - Line 202205 $475.52 Emergent Equipment Failures - Line 202205 $4,521.03 Emergent Equipment Failures - Line 202205 $609.39 Emergent Equipment Failures - Line 202205 $1,138.11 Emergent Equipment Failures - Line 202205 $616.92 Emergent Equipment Failures - Line 202205 $577.06 Emergent Equipment Failures - Line 202205 $35.68 Emergent Equipment Failures - Line 202205 $5,983.72 Emergent Equipment Failures - Line 202205 $975.76 Emergent Equipment Failures - Line 202205 $999.66 Emergent Equipment Failures - Line 202205 $249.92 202205 $321.32 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202205 $356.62 Emergent Equipment Failures - Line 202205 $106.99 Emergent Equipment Failures - Line 202205 $502.80 Emergent Equipment Failures - Line 202205 $32,600.79 Emergent Equipment Failures - Line 202205 $79.32 Emergent Equipment Failures - Line 202205 $756.82 Emergent Equipment Failures - Substation 202205 $171,871.20 Emergent Equipment Failures - Line 202205 $554.60 Emergent Equipment Failures - Line 202205 $1,780.38 Emergent Equipment Failures - Line 202205 $107.11 Emergent Equipment Failures - Line 202205 $428.08 Emergent Equipment Failures - Line 202205 $357.04 Emergent Equipment Failures - Line 202205 $6,143.21 Emergent Equipment Failures - Line 202205 $1,291.53 Emergent Equipment Failures - Line 202205 $920.41 Emergent Equipment Failures - Line 202205 $280.91 Emergent Equipment Failures - Line 202205 $392.73 Emergent Equipment Failures - Line 202205 $1,069.11 Emergent Equipment Failures - Line 202205 $158.48 Emergent Equipment Failures - Line 202205 $597.12
  2. Page 211 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80242805 80242813 80242816 80242840 80242948 80243079 80243082 80243089 80243092 80243095 80243143 80243564 80243580 80243608 80243628 80243629 80243667 80243719 80243733 80243753 80243902 80243913 80244510 80244511 80244512 80244824 80244839 80244847 80244857 80244872 80244874 80244886 80245058 80245310 80245429 80245722 80245739 80245768 80245777 80245798 Accounting Work Order Descript ***ALL WORK COMPLETED*** 05-12-2022 DAN-5/12 VALLEY BROOK ( 26) RD S 05/11 PARKER ST MANCHESTER NEED NE MCB - 05.11.22 / Y-26565-2022 / 290 JFC - 142 SHARON GOSHEN TPKE WEST C TO STORES 2/2--Priority Pole P#2119 Priority Pole P#2126 replace with 4 Priority Pole P#1949 replace with Priority Pole P#2218 REPLACE WITH 3 Priority Pole P#1427 replace with 4 EVW - MEADOW ( 22) ST -- HH1143/1 NW Hartford 2N-Replace Failed Relay 5/13/22 *Y-26524-2022* P.60391 240 H&M only - BRANDY WINE ( 8) LN (DF) RECONNECT SECONDARY POLE 526 MM pole #521 menunketesuck ave west EM RF:196 OLD KINGS HWY N, DARIEN:R MF 05-12-22 TURNOVER 189 AVERY HILL Y-26569 NEED TO RPLC SWITCH 600, SU East Granby-69 Brighton-SV#705 DAMA 05-13-2022 Pole 731 Hunt Rd Columbi 05-13-2022 Pole 651 Jonathan Trumbu P-1985 REPLACE PRIORITY REJECT WITH P-1993 REPLACE PRIORITY REJECT WITH P-1632 REPLACE PRIORITY REJECT WITH SC-P#2042 BOSTON POST RD WESTBROOK E.P.-5/14- 71 LONGVIEW ST, NEW LOND ***5/14 (RSO PENFIELD/PATINELLA) LI Fairway Drive-East Windsor-repair S CANCELING TO WO9748917 TO ADD POLE ***5/13/22 (RSO-STROM) SNYDER ( 1 5/14 PAD 1172 TAMARACK AVE, SOUTH W all complete 5/15 SPENCER HILL RD K (DF)UPGD POLE 552 INSTALL 2 ANCS & TL - STERLING CITY RD, #35-1 LYME / EM RF:326 ROUND HILL RD, GREENWICH: E.P.- 5/16-273 FARMHOLME RD STONING 05/16 *TUNOVER* 750 OLD MAIN ST ROC WRITTEN COMPLETE IN FIELD 05/14 (HI Y-26441-2022 REPLACE NETWORK PROTEC Asset Location 1154 : CN : COLUMBIA : 1154 1102 : CN : BRANFORD : 1102 1937 : CN : MANCHESTER : 1937 1030 : CN : CHESHIRE : 1030 1132 : CN : CORNWALL : 1132 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1928 : CN : SALISBURY : 1928 G02N : CL&P NORTHWEST HARTFORD HARTFORD 1014 : CN : OXFORD : 1014 1117 : CN : SUFFIELD : 1117 1101 : CN : WESTBROOK : 1101 1101 : CN : WESTBROOK : 1101 1908 : CN : DARIEN : 1908 1164 : CN : LEDYARD : 1164 1089 : CN : MADISON : 1089 1123 : CN : EAST GRANBY : 1123 1154 : CN : COLUMBIA : 1154 1154 : CN : COLUMBIA : 1154 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1101 : CN : WESTBROOK : 1101 1169 : CN : NEW LONDON : 1169 1102 : CN : BRANFORD : 1102 1110 : CN : EAST WINDSOR : 1110 1091 : CN : CLINTON : 1091 1094 : CN : HADDAM : 1094 1115 : CN : SOUTH WINDSOR : 1115 1095 : CN : KILLINGWORTH : 1095 1099 : CN : DEEP RIVER : 1099 1096 : CN : LYME : 1096 1065 : CN : GREENWICH : 1065 1177 : CN : STONINGTON : 1177 1941 : CN : ROCKY HILL : 1941 1156 : CN : EAST HADDAM : 1156 1169 : CN : NEW LONDON : 1169 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 211 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202205 $20,015.61 Emergent Equipment Failures - Line 202205 $3,479.00 Emergent Equipment Failures - Line 202205 $13,094.88 Emergent Equipment Failures - Line 202205 $594.34 Emergent Equipment Failures - Line 202205 $4,571.77 Emergent Equipment Failures - Line 202205 $525.97 Emergent Equipment Failures - Line 202205 $525.97 Emergent Equipment Failures - Line 202205 $467.99 Emergent Equipment Failures - Line 202205 $162,929.00 Emergent Equipment Failures - Line 202205 $525.97 Emergent Equipment Failures - Line 202205 $1,627.73 Emergent Equipment Failures - Substation 202205 $830.31 Emergent Equipment Failures - Line 202205 $7,106.71 Emergent Equipment Failures - Line 202205 $79.35 Emergent Equipment Failures - Line 202205 $954.43 Emergent Equipment Failures - Line 202205 $3,275.64 Emergent Equipment Failures - Line 202205 $1,266.00 Emergent Equipment Failures - Line 202205 $428.42 Emergent Equipment Failures - Line 202205 $6,151.60 202205 $1,430.92 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202205 $11,377.05 Emergent Equipment Failures - Line 202205 $2,128.01 Emergent Equipment Failures - Line 202205 $525.97 Emergent Equipment Failures - Line 202205 $468.66 Emergent Equipment Failures - Line 202205 $577.06 Emergent Equipment Failures - Line 202205 $714.02 Emergent Equipment Failures - Line 202205 $1,361.51 Emergent Equipment Failures - Line 202205 $5,465.53 Emergent Equipment Failures - Line 202205 $14,399.36 Emergent Equipment Failures - Line 202205 $322.62 Emergent Equipment Failures - Line 202205 $321.32 Emergent Equipment Failures - Line 202205 $7,862.66 Emergent Equipment Failures - Line 202205 $3,732.24 Emergent Equipment Failures - Line 202205 $537.18 Emergent Equipment Failures - Line 202205 $112.89 Emergent Equipment Failures - Line 202205 $14,519.58 Emergent Equipment Failures - Line 202205 $1,368.85 Emergent Equipment Failures - Line 202205 $22,181.95 Emergent Equipment Failures - Line 202205 $2,200.10 Emergent Equipment Failures - Line 202205 $2,097.76
  3. Page 212 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80245803 80245846 80245882 80245943 80246047 80246076 80246093 80246101 80246102 80246105 80246111 80246121 80246126 80246168 80246178 80246192 80246195 80246196 80246198 80246568 80246573 80246576 80246588 80246616 80246618 80247274 80247319 80247328 80247345 80247376 80247385 80247400 80247552 80247601 80247636 80247645 80247923 80247970 80247977 80248214 Accounting Work Order Descript 05/15 55 DEER RUN TRL,MANCHESTER Ha MM 104 Kingfisher ln repair conduit 5/23 APPRENTICES MDB-REPLACE-OH-ANN CANCEL 2022 Pole Inspection - Prior 5/14 (ZALEWA) rpl'd HH PILGRIM CIR, 5/17/22 PARADISE (15) CT -- #55A, Priority Pole P#2092 replace with 4 Priority Pole P#726 replace with 45 PCC - Snow Lane-Ashford-Remove tree COMPLETED 2022 Pole Inspection - Pr COMPLETED 2022 Pole Inspection - Pr COMPLETED - 2022 Pole Inspection COMPLETED 2022 Pole Inspection - Pr CANCEL 2022 Pole Inspection - Prior CANCEL 2022 Pole Inspection - Prior DG P#119 21 CENTER ST PUTNAM CLP TO COMPLETED 5/20/22 2022 Pole Inspect 05-17-2022 Yellow Tag # Y-26584-202 Alden One 3/18 pole leaning SOUTHW 5/18/22 155 RICHARDS DR, MONROE (A DG P#1321 OPENING HILL RD MADISON R REPLACE 300KVA PAD ELM ST ( 105 ), 5/18 P#2350 NOTT HIGHWAY, ASHFORD ASP JMS- 05/17 MOUNTAIN RD BLOOMFIE DJM!!! 36 OLD MILL RD WESTPORT. OH WINDSORVILLE( 190) RD -- REF 2076, DG P#1253/2372-1/2 LABBY RD THOMPSO RR; 5/19/22 N GEORGES HILL( 321) R 5/16 CHESTNUT HILL (250), STAFFORD AldenOne-5/14 (GEMBEJC) p#1365 rott CRP - WHITE OAK DR HARWINTON CT. re 05/17 E RIVER DR EAST HARTFORD REPL 5/18/22 (RSO-D'AMICO) WILLIAMS ST ( 5/19/22 (RSO-STROM) EGYPT LANE ( 36 VLT #1 RIVER RD , ADAMEC RD WILLING WRTN--JK>POLE 5076--CUST TO HAVE OH INVALID 5/20/22 146 Umpawaug Rd, R 5/20/22 Y-26498-2022 BREAULT AVE 5/20/22 Y-26499-2022 PINES BRDIGE 5/20/22 Y-26593-2022 P.7839 ROSE Asset Location 1937 : CN : MANCHESTER : 1937 1101 : CN : WESTBROOK : 1101 1071 : CN : PLYMOUTH : 1071 1008 : CN : DANBURY : 1008 1112 : CN : ENFIELD : 1112 1134 : CN : NEW FAIRFIELD : 1134 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1151 : CN : ASHFORD : 1151 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1082 : CN : PUTNAM : 1082 1008 : CN : DANBURY : 1008 1102 : CN : BRANFORD : 1102 1112 : CN : ENFIELD : 1112 1012 : CN : MONROE : 1012 1089 : CN : MADISON : 1089 1098 : CN : OLD SAYBROOK : 1098 1151 : CN : ASHFORD : 1151 1932 : CN : BLOOMFIELD : 1932 1056 : CN : WESTPORT : 1056 1110 : CN : EAST WINDSOR : 1110 1084 : CN : THOMPSON : 1084 1018 : CN : SOUTHBURY : 1018 1116 : CN : STAFFORD : 1116 1155 : CN : COVENTRY : 1155 1405 : CN : HARWINTON : 1405 1934 : CN : EAST HARTFORD : 1934 1169 : CN : NEW LONDON : 1169 1091 : CN : CLINTON : 1091 1179 : CN : WILLINGTON : 1179 1100 : CN : WATERFORD : 1100 1053 : CN : REDDING : 1053 1005 : CN : BEACON FALLS : 1005 1005 : CN : BEACON FALLS : 1005 1008 : CN : DANBURY : 1008 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 212 of 616 Month Number Amount 202205 $214.37 202205 $5,742.78 202205 $1,401.17 202205 $4,695.36 202205 $3,154.02 202205 $7,767.07 202205 $975.01 202205 $832.77 202205 $1,182.83 202205 $5,889.56 202205 $5,444.76 202205 $5,577.57 202205 $4,975.33 202205 $2,860.78 202205 $2,904.75 202205 $192.91 202205 $3,929.21 202205 $787.77 202205 $495.79 202205 $6,974.28 202205 $1,135.78 202205 $3,331.51 202205 $14,399.36 202205 $18,130.39 202205 $1,330.08 202205 $982.48 202205 $131.21 202205 $2,122.37 202205 $29,679.95 202205 $263.87 202205 $297.16 202205 $9,672.93 202205 $2,477.90 202205 $4,666.90 202205 $7,809.03 202205 $163.40 202205 $11,423.34 202205 $3,218.91 202205 $3,612.05 202205 $61,115.38
  4. Page 213 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80248221 80248288 80248493 80249065 80249066 80249072 80249075 80249078 80249080 80249086 80249094 80249098 80249100 80249103 80249107 80249138 80249157 80249173 80249204 80249216 80249233 80249247 80249264 80249280 80249283 80249293 80249318 80249325 80249345 80249449 80249498 80249519 80249527 80249535 80249847 80249882 80249939 80249951 80249956 80249972 Accounting Work Order Descript WRITTEN NEEDS TO BE DONE 05-20-2022 TO STORES 2/28/23--ALL WORK COMPLET MR;***WRITTEN***ALL WORK COMPLETED* POST CONSTR - complete 05/22 *TURNO COMP POST CONSTR - 05/21 *TURNOVER* Replace OH Srv 60 feet MAPLE LN (32 WORK COMPLETE 5/22/22 TURNOVER P147 05/22 *TURNOVER* GARDEN GROVE RD MA 5/21 VLT 113 NORTH ST, WINDSOR LOCK 5/21 P#5434 ROSEMONT ST, HARTFORD #5/21 FARMINGTON AVE (151), HARTFOR WRITTEN COMPLETE IN FIELD 5/20 DANI JK>PER T-TICKET, REPLACE SW VLT 620 WRTN--JK>POLE 107--REPLACE ARRESTER BURR HILL RD, DURHAM RD, RTE 148 KI 05/22/22--RSO--JK>POLE 2907--REPLCD CP-128 TORRINGTON AVE CTN replace S POST CONSTR 5/20 P#3187 LONG VIEW ( ***WRITTEN***ALL WORK COMPLETED***5 written 5/22 RSO PETERCL - BEAVER MJ - 05/18 CAIN ST SUFFIELD POLE 46 APPT 6/29 CP-Old Farm rd Burlingto RL: ROUND HILL,GRN: REPLACED 25KVA EVW - 205 LITCHFIELD RD (OFF RUBEL 5/23 PAD #23PA ALUMNI DR, MANSFIELD 5/23 LAWNACRE RD (20), WINDSOR LOCK 5/23/22 TURNOVER - WEBATUCK:RD::NE Lakeview 31A-Replace Failed Breaker (E OH 7/27) W HTFD, TROUT BROOK DR FC 5/22 (RICE) PINNEY ST, ELLINGTON MPB; 5 MOUNTAIN VIEW LN, RIDGEFIELD Bokum 15L-Replace Failed 26T/2X Rel VEG OH COMP 05/22 (WEHNER) OLD STON BM; 5/23/22 PARK LN E NEW MILFORD: ***WRITTEN***ALL WORK COMPLETED***5 5/24/22 MOUNTAIN( 11) RD -- C7349 5/23 written complete RSO FONTAINE OENOKE RIDGE, NEW CANAAN PAD#392 RE POST CONSTR - 5/23 BUTLER (25) RD M VEG - OH COMP 05/23 (MIGLIORE) RIVE Asset Location 1094 : CN : HADDAM : 1094 1102 : CN : BRANFORD : 1102 1033 : CN : MIDDLETOWN : 1033 1932 : CN : BLOOMFIELD : 1932 1931 : CN : AVON : 1931 1101 : CN : WESTBROOK : 1101 1096 : CN : LYME : 1096 1937 : CN : MANCHESTER : 1937 1122 : CN : WINDSOR LOCKS : 1122 1113 : CN : HARTFORD : 1113 1113 : CN : HARTFORD : 1113 1156 : CN : EAST HADDAM : 1156 1159 : CN : GLASTONBURY : 1159 1100 : CN : WATERFORD : 1100 1095 : CN : KILLINGWORTH : 1095 1159 : CN : GLASTONBURY : 1159 1933 : CN : CANTON : 1933 1942 : CN : SIMSBURY : 1942 1172 : CN : PORTLAND : 1172 1180 : CN : WINDHAM : 1180 1117 : CN : SUFFIELD : 1117 1191 : CN : BURLINGTON : 1191 1065 : CN : GREENWICH : 1065 1196 : CN : NORFOLK : 1196 1166 : CN : MANSFIELD : 1166 1122 : CN : WINDSOR LOCKS : 1122 1135 : CN : NEW MILFORD : 1135 J31A : CL&P LAKEVIEW (FUTURE) NEW CANAAN : 1051 1943 : CN : WEST HARTFORD : 1943 1111 : CN : ELLINGTON : 1111 1054 : CN : RIDGEFIELD : 1054 G15L : CL&P BOKUM OLD SAYBROOK 1942 : CN : SIMSBURY : 1942 1135 : CN : NEW MILFORD : 1135 1169 : CN : NEW LONDON : 1169 1016 : CN : SEYMOUR : 1016 1158 : CN : FRANKLIN : 1158 1051 : CN : NEW CANAAN : 1051 1113 : CN : HARTFORD : 1113 1941 : CN : ROCKY HILL : 1941 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 213 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202205 $408.85 Emergent Equipment Failures - Line 202205 $6,020.85 Emergent Equipment Failures - Line 202205 $239.65 Emergent Equipment Failures - Line 202205 $727.56 Emergent Equipment Failures - Line 202205 $1,076.38 Emergent Equipment Failures - Line 202205 $224.03 Emergent Equipment Failures - Line 202205 $16,593.62 Emergent Equipment Failures - Line 202205 $13,087.87 Emergent Equipment Failures - Line 202205 $1,571.60 Emergent Equipment Failures - Line 202205 $66,325.98 Emergent Equipment Failures - Line 202205 $142.80 Emergent Equipment Failures - Line 202205 $9,089.00 Emergent Equipment Failures - Line 202205 $6,471.05 Emergent Equipment Failures - Line 202205 $198.32 Emergent Equipment Failures - Line 202205 $1,403.39 Emergent Equipment Failures - Line 202205 $1,186.49 Emergent Equipment Failures - Line 202205 $317.01 Emergent Equipment Failures - Line 202205 $321.32 Emergent Equipment Failures - Line 202205 $2,066.62 202205 $772.83 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202205 $3,604.06 Emergent Equipment Failures - Line 202205 $1,537.61 Emergent Equipment Failures - Line 202205 $2,375.85 Emergent Equipment Failures - Line 202205 $320.96 Emergent Equipment Failures - Line 202205 $5,554.32 Emergent Equipment Failures - Line 202205 $1,365.59 Emergent Equipment Failures - Line 202205 $4,139.56 Emergent Equipment Failures - Substation 202205 $3,759.50 Emergent Equipment Failures - Line 202205 $571.27 Emergent Equipment Failures - Line 202205 $6,249.82 Emergent Equipment Failures - Line 202205 $285.62 Emergent Equipment Failures - Substation 202205 $230.93 Emergent Equipment Failures - Line 202205 $1,132.06 Emergent Equipment Failures - Line 202205 $348.37 Emergent Equipment Failures - Line 202205 $3,379.59 Emergent Equipment Failures - Line 202205 $810.77 Emergent Equipment Failures - Line 202205 $1,113.12 Emergent Equipment Failures - Line 202205 $6,807.61 Emergent Equipment Failures - Line 202205 $592.94 Emergent Equipment Failures - Line 202205 $383.03
  5. Page 214 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80249982 80249987 80250022 80250035 80250042 80250055 80250072 80250106 80250158 80250163 80250171 80250172 80250174 80250183 80250186 80250193 80250197 80250198 80250213 80250224 80250232 80250234 80250303 80250324 80250365 80250742 80250748 80250754 80250831 80250859 80250881 80250933 80251005 80251011 80251015 80251019 80251061 80251071 80251103 80251127 Accounting Work Order Descript MATERIAL JDB 78 SPRING HILL AVE, NO WRITTEN COMPLETE IN FIELD 05/23 ROB 05-24-2022 Yellow Tag # Y-26612-202 WRTN--JK>SW VLT 670--YELLOW TAG--RE POST CONSTR 05/23 (HINDLE) BLUE HIL POST CONSTR - A1::MEADOW:ST::NEWING POST CONSTR - 5/24/22 * TURNOVER * POST CONSTR - 05/22 (CHASSEG) BRITT Cancel 05-23-22 OM GENERATION OLD T POST CONSTR - BAILEYVILLE( 362) RD Berlin 6A-Rebuild Failed 6A-1X LTC CP-Clearview ave HW pole 3325 11132::MUSKET RIDGE:RD::NEW FAIRFIE MUSKET RIDGE RD NEW FAIRFIELD, P.11 Windsor Locks 14K-Rplc 14K-3X LTC C POST CONSTR - SCOTT ( 271) RD -- 10 5/24/22 HOUSATONIC( 116A) AVE -5/24/22 E KING( 10) ST -- 6003, DA 05/22 FOUR ROD RD BERLIN - primary 05/23 (LONGOM) LONGMEADOW/BUCKLAND * 05/22 (CHANND) HEATHER LN NEW BR CRP - BIRCH HILL RD HARWINTON CT 5/22: MILLS ST. WESTPORT EVW - 397 Norfolk Rd, Canaan P#461 MDB - ANITA WAY WARREN WORK COMPLETE - MJG - 5/24 SHEWVILL 5/24 (248) SALMON BROOK ST, GRANBY 5/23 SCHOOL ST EAST GRANBY CT - SER 5/23 BEBBINGTON( 513) RD BARN -- 20 5/25/22 LIMEKILN( 92) RD -- 3350, 5/23 (PETERCL) MORRISON ST, VERNON POST CONSTRUCTION - 05/24 TREMONT S ***5-24 BOSTON POST 2545 RD 7513 GU * 05/23 (MAZURLJ) CAMDEN/COOPER ST 05/24 WOODRUFF ST SOUTHINGTON - cab AMM COPPERMINE RD FARMINGTON. REPLA print 3/3 EVW - Norfolk Rd X of Pi PR 9/26 CRP - SABOLCIK:RD::NEW HART REALTY DR, CHESHIRE CT - DOGHOUSE + JFC - LITCHFIELD PONDS DR-- SE, LIT Asset Location 1052 : CN : NORWALK : 1052 1156 : CN : EAST HADDAM : 1156 1090 : CN : CHESTER : 1090 1102 : CN : BRANFORD : 1102 1932 : CN : BLOOMFIELD : 1932 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1042 : CN : NEW BRITAIN : 1042 1089 : CN : MADISON : 1089 1037 : CN : MIDDLEFIELD : 1037 G06A : CL&P BERLIN BERLIN 1405 : CN : HARWINTON : 1405 1013 : CN : NEWTOWN : 1013 1134 : CN : NEW FAIRFIELD : 1134 J14K : CL&P WINDSOR LOCKS WINDSOR LOCKS : 1122 1002 : CN : WATERBURY : 1002 1135 : CN : NEW MILFORD : 1135 1008 : CN : DANBURY : 1008 1040 : CN : BERLIN : 1040 1020 : CN : WOLCOTT : 1020 1042 : CN : NEW BRITAIN : 1042 1405 : CN : HARWINTON : 1405 1056 : CN : WESTPORT : 1056 1929 : CN : CANAAN : 1929 1139 : CN : WARREN : 1139 1164 : CN : LEDYARD : 1164 1936 : CN : GRANBY : 1936 1123 : CN : EAST GRANBY : 1123 1151 : CN : ASHFORD : 1151 1054 : CN : RIDGEFIELD : 1054 1120 : CN : VERNON : 1120 1043 : CN : NEWINGTON : 1043 1103 : CN : GUILFORD : 1103 1042 : CN : NEW BRITAIN : 1042 1034 : CN : SOUTHINGTON : 1034 1041 : CN : FARMINGTON : 1041 1195 : CN : WINCHESTER : 1195 1938 : CN : NEW HARTFORD : 1938 1030 : CN : CHESHIRE : 1030 1406 : CN : LITCHFIELD : 1406 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 214 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202205 $227.16 Emergent Equipment Failures - Line 202205 $357.02 Emergent Equipment Failures - Line 202205 $55,116.09 Emergent Equipment Failures - Line 202205 $4,776.92 Emergent Equipment Failures - Line 202205 $7,264.45 Emergent Equipment Failures - Line 202205 $988.74 Emergent Equipment Failures - Line 202205 $261.21 Emergent Equipment Failures - Line 202205 $6,367.44 Emergent Equipment Failures - Line 202205 $12,507.08 Emergent Equipment Failures - Line 202205 $5,248.68 Emergent Equipment Failures - Substation 202205 $19,878.42 Emergent Equipment Failures - Line 202205 $2,693.17 Emergent Equipment Failures - Line 202205 $1,377.99 Emergent Equipment Failures - Line 202205 $633.68 Emergent Equipment Failures - Substation 202205 $4,203.90 Emergent Equipment Failures - Line 202205 $167.51 Emergent Equipment Failures - Line 202205 $4,156.41 Emergent Equipment Failures - Line 202205 $415.75 Emergent Equipment Failures - Line 202205 $391.86 202205 $484.97 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202205 $3,668.56 Emergent Equipment Failures - Line 202205 $1,455.58 Emergent Equipment Failures - Line 202205 $2,713.11 Emergent Equipment Failures - Line 202205 $285.62 Emergent Equipment Failures - Line 202205 $1,882.00 Emergent Equipment Failures - Line 202205 $214.24 Emergent Equipment Failures - Line 202205 $396.76 Emergent Equipment Failures - Line 202205 $3,558.46 Emergent Equipment Failures - Line 202205 $357.04 Emergent Equipment Failures - Line 202205 $1,584.76 Emergent Equipment Failures - Line 202205 $1,926.21 Emergent Equipment Failures - Line 202205 $5,564.52 Emergent Equipment Failures - Line 202205 $214.21 Emergent Equipment Failures - Line 202205 $766.55 Emergent Equipment Failures - Line 202205 $1,213.88 Emergent Equipment Failures - Line 202205 $2,692.56 Emergent Equipment Failures - Line 202205 $1,277.43 Emergent Equipment Failures - Line 202205 $1,224.96 Emergent Equipment Failures - Line 202205 $2,176.38 Emergent Equipment Failures - Line 202205 $2,400.64
  6. Page 215 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80251451 80251456 80251508 80251513 80251514 80251515 80251522 80251540 80251550 80251575 80251600 80251762 80251768 80251816 80251823 80251827 80251848 80251890 80252134 80252148 80252157 80252165 80252198 80252199 80252200 80252209 80252211 80252219 80252239 80252258 80253608 80253609 80253614 80253625 80253627 80253633 80253639 80253655 80253671 80253673 Accounting Work Order Descript POST CONSTR - WEST MAIN ST MERIDEN RC REPLACE POLE 2017 6 WHITE HALL R 05.12.22 - 69 LINDEN ST, PLAINVILLE WRITTEN COMPLETE IN FIELD E SHORE( POST CONSTRUCTION - HIGHLAND AVE CH MM Pole #2100 Corey Rd Canterbury r VJT - 277::BRIDGE:ST::THOMASTON:CT POST CONSTR - 7L SUBSTATION EAST NE POST CONSTR - TURNOVER)1833 WATERTO wait for cust MDB - LAUREL MOUNTAIN **05.14.22 - 1503 THOMASTON AVE, WA Helpers to Do - 05.23.22 / Y-26620POST CONSTRUCTION - TURNOVER 05.23. CANCELING-5/25/22 Y-26625-2022 V 5/22 364 LAUREL RD, NEW CANAAN PAD LD 116 BORGLUM RD WILTON P#21498 UP LD WILTON WOODS RD WILTON P#15006 R print 2/9 MDB - N:KENT:RD::KENT:CT 05.16.22 / Y-26581-2022 / 654 MOUNT 321 PROGRESS DR, MANCHESTER CT - PR POST CONSTR - 05.23.22 - 28 GRAVEL 05.23.22 - 20 FATIMA DR, BETHANY 5/26 P5248 UPPER MAPLE / GENDREAU D PR 10/3 JFC - SUNCREST( 70) CT -- P 5/26/22 (RSO PUNZALAN) LINDBERG RD POST CONSTR - 05.25.22 - 15 DICKMAN 5/25/22 LAKECREST DR, DANBURY, CT 05.25.22 - 282 SOUTHINGTON RD, BERL CANX 5/27/22 BAD DB PRI 4552::23 P Post Construction 05.18.22 - MUSSO 5/27 MOUNTAIN SPRNG RD, TOLLAND Barkhamsted, 21 Chiswick Ln - repla SC-P#2719 WATER ST GUILFORD INST/RM Written 64 OLD BROOKLYN TPKE, WINDH ***followup work 5/27/22 (RSO-LEACH 931 written complete CHURCH ST, AMS WRITTEN COMPLETE IN FIELD 62 COLCHE Cancel Work Order P-1517 REPLACE CUTOUTS RATTLESNAKE WRTN--JK>P-5090--PER RSO, REPL POLE Asset Location 1032 : CN : MERIDEN : 1032 1134 : CN : NEW FAIRFIELD : 1134 1044 : CN : PLAINVILLE : 1044 1156 : CN : EAST HADDAM : 1156 1002 : CN : WATERBURY : 1002 1076 : CN : CANTERBURY : 1076 1019 : CN : THOMASTON : 1019 1042 : CN : NEW BRITAIN : 1042 1004 : CN : WATERTOWN : 1004 1139 : CN : WARREN : 1139 1002 : CN : WATERBURY : 1002 1040 : CN : BERLIN : 1040 1034 : CN : SOUTHINGTON : 1034 1103 : CN : GUILFORD : 1103 1051 : CN : NEW CANAAN : 1051 1057 : CN : WILTON : 1057 1057 : CN : WILTON : 1057 1194 : CN : TORRINGTON : 1194 1030 : CN : CHESHIRE : 1030 1937 : CN : MANCHESTER : 1937 1032 : CN : MERIDEN : 1032 1006 : CN : BETHANY : 1006 1079 : CN : KILLINGLY : 1079 1194 : CN : TORRINGTON : 1194 1177 : CN : STONINGTON : 1177 1044 : CN : PLAINVILLE : 1044 1008 : CN : DANBURY : 1008 1040 : CN : BERLIN : 1040 1013 : CN : NEWTOWN : 1013 1030 : CN : CHESHIRE : 1030 1118 : CN : TOLLAND : 1118 1190 : CN : BARKHAMSTED : 1190 1103 : CN : GUILFORD : 1103 1180 : CN : WINDHAM : 1180 1101 : CN : WESTBROOK : 1101 1162 : CN : HEBRON : 1162 1153 : CN : COLCHESTER : 1153 1121 : CN : WINDSOR : 1121 1174 : CN : SALEM : 1174 1169 : CN : NEW LONDON : 1169 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 215 of 616 Month Number Amount 202205 $33,399.51 202205 $214.20 202205 $285.62 202205 $1,287.45 202205 $3,617.69 202205 $1,428.10 202205 $1,038.88 202205 $64,833.09 202205 $8,237.40 202205 $214.24 202205 $217.84 202205 $821.15 202205 $1,467.15 202205 $977.94 202205 $3,564.48 202205 $127.09 202205 $92.31 202205 $892.59 202205 $223.30 202205 $4,359.54 202205 $5,550.90 202205 $348.37 202205 $1,901.26 202205 $357.02 202205 $392.73 202205 $571.27 202205 $39.62 202205 $428.42 202205 $938.18 202205 $214.20 202205 $1,415.26 202205 $1,196.39 202205 $285.62 202205 $428.42 202205 $223.43 202205 $142.80 202205 $999.66 202205 $1,848.46 202205 $142.80 202205 $2,470.86
  7. Page 216 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80253674 80253676 80253743 80253745 80253756 80253840 1B030021 1B030140 1B030145 1B031103 1B031124 1B031153 1B031963 1B032044 1B032188 1B032658 1B032810 1B032872 1B720408 1B821822 1B922290 1B922769 1B922978 1N030173 1N030526 1N920604 1S030096 1S030178 1S031149 1S031779 1S031782 1S031919 1S032297 1S821031 1S822440 1S921395 1S921396 1S922421 2C030144 2C030274 Accounting Work Order Descript COMP GDK- AVON 156 WEST MAIN ST REP RL:1141 KING ST, GRN:Replaced 35/2 zCAPITOL BLVD / 1 HENKEL WAY ROCKY 05/27 20 TRACY DR MANCHESTER POLE# TT TC 77 VAN RENSSELAER AVE, STM; P 5/30/22 written complete NORWICH WE 619 DANBURY RD, RIDGEFIELD P715 DAM 107 TRIANGLE ST DANBURY, ROTTED/BRK 1/17 CANDLEWOOD LAKE RD BROOKFIELD, CP-5/5 ROXBURY RD SOUTHBURY, NEED T JS - Blueberry La, Danb, Repl Poles CP-5/11 PURDY HILL RD MONROE, NEED 7/21 SKOKORAT ST, SEYMOUR, ISOLATED KD-EVENT #4192890 NEED RECLOSER POL BR 390 Lopus Rd Beacon Falls Repair KD-EVENT #4373183 NEED TO REP POLES Pole 12176 Bucks Hill Rd Southbury APPRENTICES KTI MPB; 4 OAK RIDGE RD JS - Barnum Ct, Danb, Rem Guy, Rem JS - Eagle Rd, Danb, Repl Pole, Cut KD-Work completed 7/15 MAIN ST BRID KD-30 Perry Ln Ridgefield; REPLC PO CARLSON RD NEW MILFORD, NEED TO REP JDB 2/18: EAST AVE NORWALK: PAD 470 CANCEL TO MAXIMO 4717596 JDB 30 Westport Ave Norwalk REPLACE RF:102 OLD KINGS HWY N:REPLACE 4 PO RF:18 NOLEN LN DAR:REPLC (3) POLE,R DL; COVE RD; REPL RECL P# 8706 - YYA; 8A ORCHARD ST; REMOVE PL INSTAL (30): RL 31 QUAIL RD, GRN REPLACE P DL;PULASKI ST/GREENWICH AVE, REPALC LADDINS ROCK RD GREENWICH: PLS 2802 PH; BRACEWOOD LN, STAMFORD: REPLACE DL Pacific St, Stm install Radial R RF:16 MILTON ST; UPGRD BANK OF 25KS YA APACHE PL, GRN Split load from X 12/19: 310 ORCHARD ST GRN - RPLC BR NORTH CANAAN,95 MAIN ST/REMOVE A PH EVW 53 logan rd salisbury tree fell Asset Location 1931 : CN : AVON : 1931 1065 : CN : GREENWICH : 1065 1941 : CN : ROCKY HILL : 1941 1937 : CN : MANCHESTER : 1937 1066 : CN : STAMFORD : 1066 1173 : CN : PRESTON : 1173 1054 : CN : RIDGEFIELD : 1054 1008 : CN : DANBURY : 1008 1131 : CN : BROOKFIELD : 1131 1018 : CN : SOUTHBURY : 1018 1008 : CN : DANBURY : 1008 1012 : CN : MONROE : 1012 1016 : CN : SEYMOUR : 1016 1134 : CN : NEW FAIRFIELD : 1134 1005 : CN : BEACON FALLS : 1005 1135 : CN : NEW MILFORD : 1135 1018 : CN : SOUTHBURY : 1018 1007 : CN : BETHEL : 1007 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1130 : CN : BRIDGEWATER : 1130 1054 : CN : RIDGEFIELD : 1054 1135 : CN : NEW MILFORD : 1135 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1908 : CN : DARIEN : 1908 1908 : CN : DARIEN : 1908 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1066 : CN : STAMFORD : 1066 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1930 : CN : NORTH CANAAN : 1930 1928 : CN : SALISBURY : 1928 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 216 of 616 Month Number Amount 202205 $8,375.33 202205 $379.80 202205 $9,228.27 202205 $321.32 202205 $142.80 202205 $5,716.74 202205 ($3,123.24) 202205 $8.17 202205 ($351.11) 202205 $49.62 202205 ($3,332.28) 202205 ($156.85) 202205 ($2,761.93) 202205 $63.81 202205 ($159.39) 202205 ($3,071.09) 202205 ($3.29) 202205 $1.62 202205 ($344.62) 202205 ($1,264.12) 202205 ($239.74) 202205 $776.03 202205 ($13.87) 202205 $5,577.16 202205 ($4.66) 202205 $150.05 202205 $3,987.31 202205 ($14,684.54) 202205 ($16.52) 202205 ($2,579.05) 202205 $92.52 202205 ($669.79) 202205 ($205.36) 202205 ($6,216.58) 202205 ($335.50) 202205 ($9,915.36) 202205 ($14,758.35) 202205 ($1,153.04) 202205 $57.63 202205 ($0.72)
  8. Page 217 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 2C920177 2L030541 2L030601 2L030701 2L031015 2L031038 2L031216 2L031344 2L031370 2L130111 2L720820 2L721468 2L920642 2L921012 2L921357 2M030064 2M030066 2M030184 2M030499 2M030668 2M030736 2M030817 2M031216 2M031326 2M031552 2M031557 2M031868 2M032051 2M033007 2M033061 2M033472 2M033700 2M033714 2M033715 2M033829 2M033844 2M034082 2M034085 2M034086 2M130039 Accounting Work Order Descript 7/7 CANAAN, SIX ROD RD POLE 1143 printed 1/26/22 JC/ LAUREL HILL TOR COMPLETED DURING STORM. - CLAIMED O JC/97 MAIN ST WINSTED/ DO WITH WR33 CP-9/8 RSO N. CANTON RD, BARKHAMSTE 3/8 VJT - Needs new anchor and down Yellow Tag **1 of 2 ** Harwinton Rd JC/CORNWALL, SCOVILLE RD - NEW P#16 8/27 EVW - 410 Echo Lake Rd, Water 1/4 CP- 8/18 NEW HARTFORD, 4 COUNT P#1278 needs replacement; RSO made Winchester--Colebrook River Rd. 644 JC/ WINCHESTER,PLATT HILL RD POLE 5 7/30 WEST CORNWALL, SCOVILLE RD POL THOMASTON-ELECTRIC AVE / UPGRADE 6 cancel to fwo 80233137 CANCEL TO MAXIMO WO 11299627/FWO 80 cancel to fwo 80233178 EVW GEAR ST WATERBURY, RPLC LEANING EVW Canal St SOUTHINGTON P#93345 RP PL: TEL TO INST LIFT POLE #9386, XF RTM-42 Parker Ave, Mer. T.Ticket. R cancel to fwo 80232785 * JRP - Maryland Dr MIDDLEFIELD Shi cancel to fwo 80232776 EJC Curtis St, New Britain P#8589 R MPB; WILLARD AVE NEWINGTON, P#286-S cancel to fwo 80232777 PV - Repl 15U2-4100 Recloser & Cont Jpt-139 Hepworth St Bristol P8258 Little Brook Dr, Newington STLT P#8 Elec Maint Pole Reject - PRIORITY D PV - Repl Defective St Lt POLE 275 PV - Repl defective ST LT POLE 284 cancel to fwo 80233111 cancel to fwo 80232770 Elec Maint Pole Reject - PRIORITY D Elec Maint Pole Reject - PRIORITY D Elec Maint Pole Reject - PRIORITY D 12/31: S MAIN ST CHESHIRE: REPLACED Asset Location 1929 : CN : CANAAN : 1929 1194 : CN : TORRINGTON : 1194 1191 : CN : BURLINGTON : 1191 1195 : CN : WINCHESTER : 1195 1190 : CN : BARKHAMSTED : 1190 1004 : CN : WATERTOWN : 1004 1191 : CN : BURLINGTON : 1191 1132 : CN : CORNWALL : 1132 1004 : CN : WATERTOWN : 1004 1938 : CN : NEW HARTFORD : 1938 1928 : CN : SALISBURY : 1928 1195 : CN : WINCHESTER : 1195 1195 : CN : WINCHESTER : 1195 1132 : CN : CORNWALL : 1132 1019 : CN : THOMASTON : 1019 1015 : CN : PROSPECT : 1015 1070 : CN : BRISTOL : 1070 1042 : CN : NEW BRITAIN : 1042 1002 : CN : WATERBURY : 1002 1034 : CN : SOUTHINGTON : 1034 1006 : CN : BETHANY : 1006 1032 : CN : MERIDEN : 1032 1043 : CN : NEWINGTON : 1043 1037 : CN : MIDDLEFIELD : 1037 1043 : CN : NEWINGTON : 1043 1042 : CN : NEW BRITAIN : 1042 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1070 : CN : BRISTOL : 1070 1070 : CN : BRISTOL : 1070 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1041 : CN : FARMINGTON : 1041 1042 : CN : NEW BRITAIN : 1042 1910 : CN : DURHAM : 1910 1910 : CN : DURHAM : 1910 1910 : CN : DURHAM : 1910 1030 : CN : CHESHIRE : 1030 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 217 of 616 Month Number Amount 202205 $551.51 202205 ($1,057.44) 202205 $969.12 202205 $7,741.62 202205 $426.14 202205 $1,793.64 202205 ($3,148.53) 202205 $2.57 202205 $3,724.41 202205 $654.26 202205 ($428.48) 202205 ($712.88) 202205 $354.99 202205 ($5.28) 202205 ($478.55) 202205 ($52.46) 202205 $11.55 202205 ($56.24) 202205 ($2,045.18) 202205 ($227.81) 202205 $156.24 202205 ($908.15) 202205 ($99.58) 202205 $20,965.52 202205 ($508.42) 202205 ($3,222.98) 202205 ($0.12) 202205 ($302.46) 202205 $955.23 202205 ($1,042.21) 202205 $2,895.87 202205 $457.22 202205 ($403.00) 202205 $2,054.77 202205 ($38.10) 202205 ($577.31) 202205 $854.79 202205 $713.03 202205 $1,462.49 202205 $32,196.57
  9. Page 218 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 2M221173 2M222028 2M321074 2M722513 2M722738 2M724314 2M724380 2M724427 2M820417 2M821176 2M822026 2M920532 2M922404 2M922414 2M922567 2M922998 2M923742 2M924318 3H030227 3H030271 3H030951 3H031043 3H031082 3H031094 3H031728 3H033302 3H033338 3H033537 3H033571 3H033825 3H721548 3H820091 3H923517 3S221107 3S321680 3S421070 4D030283 4D030760 4D030925 4E031981 Accounting Work Order Descript Jpt-81 Grove St Brstl P15007 - Rplc CANCEL TO MAXIMO 5210599 480/490 Co ELEC MAINT DIST INFRARED REPAIRS AMM New Britain Ave,Farm. Replace cancel to fwo 80233182 EJC 81 Colony St, Mer. Replace 3-16 (50): Jpt-19 Coral Dr Plymth STL134 EJC Cherry Hill Substation, New't P cancel to fwo 80233214 EJC 291 Glen St, New Britain P#5663 WC-209 PARTRIDGE DR SOUTHINGTON - N JRP - Welton St. WTBY Repl Pole Top CANCEL TRANSFER TO 2M034037 EVW 163 Elton Rd BER P#1901 RPLC PR EVW TOWN LINE RD PLAIN P#9789 RPLC WC DOE MEADOW CT SOUTHINGTON, XFMR JRP - South St BRISTOL Repl Leaning EVW Farmwood Rd WATERBURY P#59657 R DKH - Olcott St, Manch - Replace fa WOLCOTT HILL RD WTHRFLD. F/U P#850 WETHERSFIELD, WILLOW ST - RPL RECLO BOLTON, CIDERMILL RD frontier pole WETHERSFIELD, HARTFORD AVE, NEED TO Marshall Phelps Rd-Win- @ P5194,rpl RSO 6/1 ROCKY HILL, PELICAN CT - [W 10/27 HTFD,FARMINGTON XFMR NEEDS RE HAR UG - TO REPLACE FAULTED 32G13 P 11/24 htfd,van dyke replaced pmh-5 CANCEL - NEED CREW TO REPLACE WITH 12/26 W. HTFD,FARMINGTON AVE rplcd BLOOMFIELD, WYNFIELD LANE CLUB HOUS 1/11 RSO WINDSOR CAPEN ST P#715 BUR WINDSOR, WILLOWCREST DR - REPL HAND Meadowbrook Rd., W. Htfd - rplc. po Replace below ground switch hole wi Cancel - 126 Brewster Rd., W. Htfd AWC-JF-Currycross Rd, Madison, Corr 6-4 CHESTNUT HILL RD MADISON -Yello 4/14 MEADOW ST BRANFORD-Rep Frontie Field complete - 2020 POLE INSP -- Asset Location 1070 : CN : BRISTOL : 1070 1030 : CN : CHESHIRE : 1030 1032 : CN : MERIDEN : 1032 1041 : CN : FARMINGTON : 1041 1002 : CN : WATERBURY : 1002 1032 : CN : MERIDEN : 1032 1071 : CN : PLYMOUTH : 1071 1043 : CN : NEWINGTON : 1043 1002 : CN : WATERBURY : 1002 1042 : CN : NEW BRITAIN : 1042 1034 : CN : SOUTHINGTON : 1034 1002 : CN : WATERBURY : 1002 1040 : CN : BERLIN : 1040 1040 : CN : BERLIN : 1040 1044 : CN : PLAINVILLE : 1044 1034 : CN : SOUTHINGTON : 1034 1070 : CN : BRISTOL : 1070 1002 : CN : WATERBURY : 1002 1937 : CN : MANCHESTER : 1937 1045 : CN : WETHERSFIELD : 1045 1045 : CN : WETHERSFIELD : 1045 1903 : CN : BOLTON : 1903 1045 : CN : WETHERSFIELD : 1045 1121 : CN : WINDSOR : 1121 1941 : CN : ROCKY HILL : 1941 1113 : CN : HARTFORD : 1113 1934 : CN : EAST HARTFORD : 1934 1113 : CN : HARTFORD : 1113 1121 : CN : WINDSOR : 1121 1943 : CN : WEST HARTFORD : 1943 1932 : CN : BLOOMFIELD : 1932 1121 : CN : WINDSOR : 1121 1121 : CN : WINDSOR : 1121 1943 : CN : WEST HARTFORD : 1943 1932 : CN : BLOOMFIELD : 1932 1943 : CN : WEST HARTFORD : 1943 1089 : CN : MADISON : 1089 1089 : CN : MADISON : 1089 1102 : CN : BRANFORD : 1102 1167 : CN : MARLBOROUGH : 1167 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 218 of 616 Month Number Amount 202205 $20.67 202205 ($1,451.64) 202205 ($1.51) 202205 ($5,146.55) 202205 ($97.81) 202205 ($357.51) 202205 $5,062.08 202205 ($2.80) 202205 ($11.28) 202205 $2,446.78 202205 $49.01 202205 ($1,553.15) 202205 ($1.32) 202205 $661.53 202205 ($0.10) 202205 $94.41 202205 ($69.81) 202205 ($141.17) 202205 ($842.38) 202205 ($698.14) 202205 ($888.60) 202205 ($1,089.53) 202205 ($115.90) 202205 $558.33 202205 ($0.23) 202205 ($419.60) 202205 ($563.56) 202205 ($574.94) 202205 ($538.37) 202205 ($644.86) 202205 ($261.00) 202205 ($0.15) 202205 $991.16 202205 ($716.16) 202205 ($3.06) 202205 ($58.54) 202205 ($3,191.90) 202205 ($562.85) 202205 ($1,914.83) 202205 ($1,363.56)
  10. Page 219 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 4E821864 4E920133 4E920946 4M910613 4N030005 4N031081 4N031570 4N031759 4N920742 4N921631 5T031205 CS003371 CS003611 DSQ03026 DSQ03032 DSQ82029 DSQ82047 DSQ92054 TMPCPCHE TMPCPDAN TMPCPEHM TMPCPHAR TMPCPHAU TMPCPMAD TMPCPNEW TMPCPNLN TMPCPNOR TMPCPSGI TMPCPSTM TMPCPTOL TMPCPTOR 80004233 80004620 80005296 80005377 80005461 80005559 80006037 80006617 80006806 Accounting Work Order Descript 11/28 Poplar Rd, Middletown P-1989 invalid 6/24 WASHINGTON ST MDTN - REPLACE G NEW SILO &TRENCHING SEE COMMENTS--s 12/31/19ROOSEVELT AVE PRESTON P1460 KIDDS WAY STNGTN - NEED TO UPGRD XF (30): 09/22/20 MORGAN PT GROTON POL DB- replace yellow tagged 11Y8-80M, asbuilt work as a result of a oil s GCC / EVER. I&R POLE AND SHIFT ALL 10L43-30T WL, RAINBOW ROW - Install Replace Failed 3X Transformer Replace the 1G-2X LTC control relay (40): Replace Failed 27H-1X3-4 Swit (30): Replace Failed 12M-2X3-4 Swit Rebuild Failed 1A-5X Load Tap Chang (60): Replace Failed 21J-10T-6 Swit (50): Replace Failed 3B-2H Potentia WAM Adjustments WAM Adjustments Danielson 2BC WAM Adjustments East Hampton 2AY WAM Adjustments - Hartford OH WAM Adjustments - Hartford UG WAM Adjustments Madison 2AX WAM Adjustments WAM Adjustments New London 3H2 WAM Adjustments WAM Adjustments WAM Adjustments WAM Adjustments WAM Adjustments MDB;priority reject pole# xz 41 Gilbert Hill, Chester Elec Jt Po * 469 Main St, Newington - Frontier Sheldon St 158, Berlin. Replace OH Reservoir Rd, Newington - replace 3 ASPLUNDH PR 7/7 pole reject 1326 PR 7/7 priority pole reject 1325 Tu OLD STAGECOACH RD REDDING Central Ave, HH#441A Niantic/TL- 10 Asset Location 1033 : CN : MIDDLETOWN : 1033 1162 : CN : HEBRON : 1162 1033 : CN : MIDDLETOWN : 1033 1033 : CN : MIDDLETOWN : 1033 1173 : CN : PRESTON : 1173 1177 : CN : STONINGTON : 1177 1161 : CN : GROTON : 1161 1092 : CN : EAST LYME : 1092 1092 : CN : EAST LYME : 1092 1164 : CN : LEDYARD : 1164 1122 : CN : WINDSOR LOCKS : 1122 G02A : CL&P NORTH BLOOMFIELD BLOOMFIELD G01G : CL&P SOUTH END STAMFORD J27H : CL&P SCITICO ENFIELD : 1112 1013 : CN : NEWTOWN : 1013 G01A : CL&P SOUTH MEADOW HARTFORD J21J : CL&P SALISBURY SALISBURY : 1928 G03B : CL&P BLOOMFIELD BLOOMFIELD WCHSB : CHESHIRE SERVICE BUILDING : CHESHIRE Funding Project ML: Distribution Line - Connecticut Funding Project ML: Distribution Line - Connecticut WHSS : HARTFORD SERVICE CENTER,400-410 SHELDON STREET : HARTFORD WHSS : HARTFORD SERVICE CENTER,400-410 SHELDON STREET : HARTFORD Funding Project ML: Distribution Line - Connecticut WNTSB : NEWTOWN SERVICE BUILDING : NEWTOWN Funding Project ML: Distribution Line - Connecticut WNORSB : NORWALK SERVICE BUILDING : NORWALK NGRCO : GREENWICH SERVICE BUILDING : GREENWICH WSGR : STAMFORD SERVICE CENTER, GLENBROOK RD. : STAMFORD WTSB : TOLLAND SERVICE BUILDING : TOLLAND WTFS : TORRINGTON SERVICE CENTER, FRANKLIN ST. : TORRINGTON 1938 : CN : NEW HARTFORD : 1938 1090 : CN : CHESTER : 1090 1043 : CN : NEWINGTON : 1043 1040 : CN : BERLIN : 1040 1043 : CN : NEWINGTON : 1043 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1053 : CN : REDDING : 1053 1092 : CN : EAST LYME : 1092 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 219 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202205 ($3,754.09) Emergent Equipment Failures - Line 202205 ($352.38) Emergent Equipment Failures - Line 202205 ($399.29) Emergent Equipment Failures - Line 202205 ($1,595.03) Emergent Equipment Failures - Line 202205 ($6,587.15) Emergent Equipment Failures - Line 202205 ($13.35) Emergent Equipment Failures - Line 202205 $0.24 Emergent Equipment Failures - Line 202205 ($10.64) Emergent Equipment Failures - Line 202205 $0.42 Emergent Equipment Failures - Line 202205 $1,807.07 Emergent Equipment Failures - Line 202205 ($32.71) Emergent Equipment Failures - Substation 202205 $568.65 Emergent Equipment Failures - Substation 202205 $1,381.20 Emergent Equipment Failures - Substation 202205 ($199,093.54) Emergent Equipment Failures - Substation 202205 $618.25 Emergent Equipment Failures - Substation 202205 $651.47 Emergent Equipment Failures - Substation 202205 $614.61 Emergent Equipment Failures - Substation 202205 $916.05 Emergent Equipment Failures - Line 202205 ($34,064.41) 202205 $277.49 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202205 $19,799.99 Emergent Equipment Failures - Line 202205 $273,150.63 Emergent Equipment Failures - Line 202205 ($12,060.24) Emergent Equipment Failures - Line 202205 $12,904.41 Emergent Equipment Failures - Line 202205 $53,204.74 Emergent Equipment Failures - Line 202205 $70,957.83 Emergent Equipment Failures - Line 202205 ($117,486.17) Emergent Equipment Failures - Line 202205 $40,000.00 Emergent Equipment Failures - Line 202205 $33,062.44 Emergent Equipment Failures - Line 202205 $62,164.49 Emergent Equipment Failures - Line 202205 ($24,449.30) Emergent Equipment Failures - Line 202206 $6.99 Emergent Equipment Failures - Line 202206 $147.79 Emergent Equipment Failures - Line 202206 $253.34 Emergent Equipment Failures - Line 202206 $119.69 Emergent Equipment Failures - Line 202206 $23.04 Emergent Equipment Failures - Line 202206 $151.88 Emergent Equipment Failures - Line 202206 $155.64 Emergent Equipment Failures - Line 202206 $318.74 Emergent Equipment Failures - Line 202206 $168.24
Words on different pages

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)