Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 219 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 4E821864 4E920133 4E920946 4M910613 4N030005 4N031081 4N031570 4N031759 4N920742 4N921631 5T031205 CS003371 CS003611 DSQ03026 DSQ03032 DSQ82029 DSQ82047 DSQ92054 TMPCPCHE TMPCPDAN TMPCPEHM TMPCPHAR TMPCPHAU TMPCPMAD TMPCPNEW TMPCPNLN TMPCPNOR TMPCPSGI TMPCPSTM TMPCPTOL TMPCPTOR 80004233 80004620 80005296 80005377 80005461 80005559 80006037 80006617 80006806 Accounting Work Order Descript 11/28 Poplar Rd, Middletown P-1989 invalid 6/24 WASHINGTON ST MDTN - REPLACE G NEW SILO &TRENCHING SEE COMMENTS--s 12/31/19ROOSEVELT AVE PRESTON P1460 KIDDS WAY STNGTN - NEED TO UPGRD XF (30): 09/22/20 MORGAN PT GROTON POL DB- replace yellow tagged 11Y8-80M, asbuilt work as a result of a oil s GCC / EVER. I&R POLE AND SHIFT ALL 10L43-30T WL, RAINBOW ROW - Install Replace Failed 3X Transformer Replace the 1G-2X LTC control relay (40): Replace Failed 27H-1X3-4 Swit (30): Replace Failed 12M-2X3-4 Swit Rebuild Failed 1A-5X Load Tap Chang (60): Replace Failed 21J-10T-6 Swit (50): Replace Failed 3B-2H Potentia WAM Adjustments WAM Adjustments Danielson 2BC WAM Adjustments East Hampton 2AY WAM Adjustments - Hartford OH WAM Adjustments - Hartford UG WAM Adjustments Madison 2AX WAM Adjustments WAM Adjustments New London 3H2 WAM Adjustments WAM Adjustments WAM Adjustments WAM Adjustments WAM Adjustments MDB;priority reject pole# xz 41 Gilbert Hill, Chester Elec Jt Po * 469 Main St, Newington - Frontier Sheldon St 158, Berlin. Replace OH Reservoir Rd, Newington - replace 3 ASPLUNDH PR 7/7 pole reject 1326 PR 7/7 priority pole reject 1325 Tu OLD STAGECOACH RD REDDING Central Ave, HH#441A Niantic/TL- 10 Asset Location 1033 : CN : MIDDLETOWN : 1033 1162 : CN : HEBRON : 1162 1033 : CN : MIDDLETOWN : 1033 1033 : CN : MIDDLETOWN : 1033 1173 : CN : PRESTON : 1173 1177 : CN : STONINGTON : 1177 1161 : CN : GROTON : 1161 1092 : CN : EAST LYME : 1092 1092 : CN : EAST LYME : 1092 1164 : CN : LEDYARD : 1164 1122 : CN : WINDSOR LOCKS : 1122 G02A : CL&P NORTH BLOOMFIELD BLOOMFIELD G01G : CL&P SOUTH END STAMFORD J27H : CL&P SCITICO ENFIELD : 1112 1013 : CN : NEWTOWN : 1013 G01A : CL&P SOUTH MEADOW HARTFORD J21J : CL&P SALISBURY SALISBURY : 1928 G03B : CL&P BLOOMFIELD BLOOMFIELD WCHSB : CHESHIRE SERVICE BUILDING : CHESHIRE Funding Project ML: Distribution Line - Connecticut Funding Project ML: Distribution Line - Connecticut WHSS : HARTFORD SERVICE CENTER,400-410 SHELDON STREET : HARTFORD WHSS : HARTFORD SERVICE CENTER,400-410 SHELDON STREET : HARTFORD Funding Project ML: Distribution Line - Connecticut WNTSB : NEWTOWN SERVICE BUILDING : NEWTOWN Funding Project ML: Distribution Line - Connecticut WNORSB : NORWALK SERVICE BUILDING : NORWALK NGRCO : GREENWICH SERVICE BUILDING : GREENWICH WSGR : STAMFORD SERVICE CENTER, GLENBROOK RD. : STAMFORD WTSB : TOLLAND SERVICE BUILDING : TOLLAND WTFS : TORRINGTON SERVICE CENTER, FRANKLIN ST. : TORRINGTON 1938 : CN : NEW HARTFORD : 1938 1090 : CN : CHESTER : 1090 1043 : CN : NEWINGTON : 1043 1040 : CN : BERLIN : 1040 1043 : CN : NEWINGTON : 1043 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1053 : CN : REDDING : 1053 1092 : CN : EAST LYME : 1092 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 219 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202205 ($3,754.09) Emergent Equipment Failures - Line 202205 ($352.38) Emergent Equipment Failures - Line 202205 ($399.29) Emergent Equipment Failures - Line 202205 ($1,595.03) Emergent Equipment Failures - Line 202205 ($6,587.15) Emergent Equipment Failures - Line 202205 ($13.35) Emergent Equipment Failures - Line 202205 $0.24 Emergent Equipment Failures - Line 202205 ($10.64) Emergent Equipment Failures - Line 202205 $0.42 Emergent Equipment Failures - Line 202205 $1,807.07 Emergent Equipment Failures - Line 202205 ($32.71) Emergent Equipment Failures - Substation 202205 $568.65 Emergent Equipment Failures - Substation 202205 $1,381.20 Emergent Equipment Failures - Substation 202205 ($199,093.54) Emergent Equipment Failures - Substation 202205 $618.25 Emergent Equipment Failures - Substation 202205 $651.47 Emergent Equipment Failures - Substation 202205 $614.61 Emergent Equipment Failures - Substation 202205 $916.05 Emergent Equipment Failures - Line 202205 ($34,064.41) 202205 $277.49 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202205 $19,799.99 Emergent Equipment Failures - Line 202205 $273,150.63 Emergent Equipment Failures - Line 202205 ($12,060.24) Emergent Equipment Failures - Line 202205 $12,904.41 Emergent Equipment Failures - Line 202205 $53,204.74 Emergent Equipment Failures - Line 202205 $70,957.83 Emergent Equipment Failures - Line 202205 ($117,486.17) Emergent Equipment Failures - Line 202205 $40,000.00 Emergent Equipment Failures - Line 202205 $33,062.44 Emergent Equipment Failures - Line 202205 $62,164.49 Emergent Equipment Failures - Line 202205 ($24,449.30) Emergent Equipment Failures - Line 202206 $6.99 Emergent Equipment Failures - Line 202206 $147.79 Emergent Equipment Failures - Line 202206 $253.34 Emergent Equipment Failures - Line 202206 $119.69 Emergent Equipment Failures - Line 202206 $23.04 Emergent Equipment Failures - Line 202206 $151.88 Emergent Equipment Failures - Line 202206 $155.64 Emergent Equipment Failures - Line 202206 $318.74 Emergent Equipment Failures - Line 202206 $168.24
  2. Page 220 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80006839 80007418 80007422 80011070 80013787 80020159 80025889 80026304 80026419 80026894 80028289 80032367 80033699 80034068 80035508 80036469 80037788 80037980 80038165 80040826 80044149 80044749 80049474 80051029 80051131 80051752 80054593 80055511 80055670 80055744 80056632 80056887 80057451 80057591 80057925 80058521 80059172 80059926 80061144 80061422 Accounting Work Order Descript *JRP - 75 Main St, Southington - re RF:17 SEARLES RD STAMFORD TT:FRONTI Elec Maint Pole Reject - PRIORITY D Main St 771, SW - replace OH servic Asplundh - 765 Sullivan Ave, S Wind 1/15 MAIN ST, NEW BRITAIN U199 FEEDER FAULT TRUMBULL ST HTFD AIRLINE ( 304) AVE -- 2067, PORTLA DB - 1/25/21 Waller Ct, New London, Dodd Rd 41, Mansfield - replace OH AJC; OLD ORCHARD ( 23) RD LOT 4 MPB; 1/29/21 SOUTH ST BETHEL - REPL zzDONE---CROM--TC--1/31/21--7 River WRTN--SC-P#3306 COOK HILL RD KILLIN RC POLE 4002 REPLACE SR RECLOSER. PRIORITY REJECT P#849 PD-STARR ST N. LONDON/WATERPROOF AN WRTN-SC BEDARD RD PLAINFIELD P 944 E Rocks 17R Repl Failed Xformer JAM - 23 BLACKSTONE ST (FRNT)Pole 4 * JAM - 109 WOODLAND ST - 1750, ME WRTN-RSO 12/16 CHAPPELL ST, CHAPLIN DB-Cutler St, Stonington, replace 2 DG P#3384 101 HOLMES RD POMFRET FRN MJ - Pleasant Valley Rd, SW Y-24329 DG P#4774 22 BARBER RD WOODSTOCK RP 7883 MDB - 3/22 (Cleaves) EAST ( 81) ASP 5/20/22-PL: XFER POLES #3086 & (ASP)JTR, 41 ROBIN RD, W. HART, P# MJ Jpt - 114 E Main St Plainville ( ALL WORK COMPLETE3/27 BARKER HILL ( *RIGGS zWETH---261 Garden St--Remov MJ-Tolland, 112 Reed Rd - P-478 rep JLB 113 INDIAN HILL RD, WILTON/NEED PRE CP - BURLINGTON ( 19) RD -- 1 MJ 5/24 - KD-EVENT #4497507 REPLC P EB; 4/5 MIGLIA - Need new stub/anch RIGGS WASHINGTON ( 92) ST ,MANCHE Serious Level Hot Spot #2_49 in Mon Asset Location 1034 : CN : SOUTHINGTON : 1034 1908 : CN : DARIEN : 1908 1014 : CN : OXFORD : 1014 1115 : CN : SOUTH WINDSOR : 1115 1115 : CN : SOUTH WINDSOR : 1115 1042 : CN : NEW BRITAIN : 1042 1113 : CN : HARTFORD : 1113 1172 : CN : PORTLAND : 1172 1169 : CN : NEW LONDON : 1169 1166 : CN : MANSFIELD : 1166 1065 : CN : GREENWICH : 1065 1007 : CN : BETHEL : 1007 1031 : CN : CROMWELL : 1031 1079 : CN : KILLINGLY : 1079 1135 : CN : NEW MILFORD : 1135 1938 : CN : NEW HARTFORD : 1938 1169 : CN : NEW LONDON : 1169 1080 : CN : PLAINFIELD : 1080 J17R : CL&P EAST ROCKS NORWALK : 1052 1032 : CN : MERIDEN : 1032 1032 : CN : MERIDEN : 1032 1152 : CN : CHAPLIN : 1152 1177 : CN : STONINGTON : 1177 1081 : CN : POMFRET : 1081 1115 : CN : SOUTH WINDSOR : 1115 1085 : CN : WOODSTOCK : 1085 1137 : CN : SHARON : 1137 1407 : CN : MORRIS : 1407 1003 : CN : NAUGATUCK : 1003 1943 : CN : WEST HARTFORD : 1943 1044 : CN : PLAINVILLE : 1044 1103 : CN : GUILFORD : 1103 1045 : CN : WETHERSFIELD : 1045 1118 : CN : TOLLAND : 1118 1057 : CN : WILTON : 1057 1405 : CN : HARWINTON : 1405 1070 : CN : BRISTOL : 1070 1162 : CN : HEBRON : 1162 1937 : CN : MANCHESTER : 1937 1168 : CN : MONTVILLE : 1168 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 220 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $839.22 Emergent Equipment Failures - Line 202206 ($2,666.93) Emergent Equipment Failures - Line 202206 $6,944.63 Emergent Equipment Failures - Line 202206 $119.69 Emergent Equipment Failures - Line 202206 $9,432.27 Emergent Equipment Failures - Line 202206 $188,479.97 Emergent Equipment Failures - Line 202206 $67,934.69 Emergent Equipment Failures - Line 202206 $394.57 Emergent Equipment Failures - Line 202206 ($79,032.81) Emergent Equipment Failures - Line 202206 $239.05 Emergent Equipment Failures - Line 202206 $267.57 Emergent Equipment Failures - Line 202206 $5.82 Emergent Equipment Failures - Line 202206 $12,447.15 Emergent Equipment Failures - Line 202206 $3,531.67 Emergent Equipment Failures - Line 202206 $5.82 Emergent Equipment Failures - Line 202206 $298.78 Emergent Equipment Failures - Line 202206 $2,253.66 Emergent Equipment Failures - Line 202206 $1,467.60 Emergent Equipment Failures - Substation 202206 $10,684.58 202206 $239.94 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $211.61 Emergent Equipment Failures - Line 202206 $1,170.99 Emergent Equipment Failures - Line 202206 ($3,683.66) Emergent Equipment Failures - Line 202206 $116.89 Emergent Equipment Failures - Line 202206 $24,741.18 Emergent Equipment Failures - Line 202206 $1,151.19 Emergent Equipment Failures - Line 202206 $485.37 Emergent Equipment Failures - Line 202206 $189.25 Emergent Equipment Failures - Line 202206 $3,306.83 Emergent Equipment Failures - Line 202206 $12,265.96 Emergent Equipment Failures - Line 202206 $4,886.19 Emergent Equipment Failures - Line 202206 $1.15 Emergent Equipment Failures - Line 202206 ($61.20) Emergent Equipment Failures - Line 202206 $199.47 Emergent Equipment Failures - Line 202206 $11.64 Emergent Equipment Failures - Line 202206 ($122.87) Emergent Equipment Failures - Line 202206 $921.74 Emergent Equipment Failures - Line 202206 $994.14 Emergent Equipment Failures - Line 202206 ($61.19) Emergent Equipment Failures - Line 202206 ($2,405.05)
  3. Page 221 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80061970 80063226 80065956 80066602 80067211 80067285 80069059 80069117 80069606 80070843 80071110 80071307 80071577 80071983 80072199 80072428 80072708 80073014 80073091 80073986 80074142 80075504 80075756 80077388 80078273 80078538 80079316 80079858 80080165 80080461 80080495 80080807 80080871 80081795 80081817 80082301 80082473 80082928 80083135 80083437 Accounting Work Order Descript 04/10 Scarborough HTFD 2NO4 FEEDER 04/09/2021 WILTON RD, WESTPORT MATERIAL MPB; 31 BIRCH ST, NEWINGT MM FRNTR POLE 167 RT97 TRANSFER AND CRP - POLE-PRIORITY REJECT-INSPECTCP-70 Locust Rd Harwinton, bad tran GC - TAUGWONK ( 595) RD -- P6660R1 4/11 EW - 301 Twin Lakes Rd, Salisb cancel to 80264265 05/03 (WHENER) JONATHAN (19) PL -Pudding Hill Rd E Hampton Repl P176 PCC - Tolland, 314 Plains Rd - shif 05.04.21 - 15 NEWBURY ST, NEW BRITA Simsbury, 6 Davey St - replace 80' MPB; 47 GREAT PASTURE RD, REDDING NEED MATERIAL printed 4/29 EW - 53 JS - Wooster Heights Rd, Danb, Shif MJ 5/24 -(PR) (20): Jpt-248 S Eagle 5/10: 8 STONEBOAT RD, WESTPORT/LEAN Country Way Madison work on PADS re MM replce rotted pole #95 instal 40 MJP/216 High Ridge Rd/STM/Misc. fol EVW - 62 Castlewood Ln, Torrington MM TRANSFER FRONTIER POLE 369 GLASG RL:353 & 605 NORTH ST, TT :GRN/NEED ELIZEBETH GEORGE, LEDYARD 4/19/21 GOOD HILL RD ROXBURY, CT 06 ASP JTR, 80 Prospect St, Bloom, Ins WORK COMPLETE MG; MCCORMICK ( 133) MJ 2/4 MAR-Update poles to 45/2's n RIGGS - AMM 11 TRUMBULL ST, NEWINGT MM Frtr to rplce pole #1981 eversou COMPLETED Y-25238-2021 12Y9-4000 cancel to duplicate to 6032392 GC - install new anchor 1691R Cente CR-RICHMOND LN. WHTFD, P# 5401, RMV PD-30 DOUGLAS LN WTFD/RPLC P# 3323 (ASP) CR-38 ANVIL DR, AVON, P# 3633 RIVERSIDE AVE BRISTOL, CT 06010 P-1148 replace capacitor controls. Asset Location 1113 : CN : HARTFORD : 1113 1056 : CN : WESTPORT : 1056 1043 : CN : NEWINGTON : 1043 1175 : CN : SCOTLAND : 1175 1933 : CN : CANTON : 1933 1405 : CN : HARWINTON : 1405 1177 : CN : STONINGTON : 1177 1928 : CN : SALISBURY : 1928 1066 : CN : STAMFORD : 1066 1932 : CN : BLOOMFIELD : 1932 1078 : CN : HAMPTON : 1078 1118 : CN : TOLLAND : 1118 1042 : CN : NEW BRITAIN : 1042 1942 : CN : SIMSBURY : 1942 1053 : CN : REDDING : 1053 1928 : CN : SALISBURY : 1928 1008 : CN : DANBURY : 1008 1071 : CN : PLYMOUTH : 1071 1056 : CN : WESTPORT : 1056 1089 : CN : MADISON : 1089 1078 : CN : HAMPTON : 1078 1066 : CN : STAMFORD : 1066 1194 : CN : TORRINGTON : 1194 1160 : CN : GRISWOLD : 1160 1065 : CN : GREENWICH : 1065 1164 : CN : LEDYARD : 1164 1136 : CN : ROXBURY : 1136 1932 : CN : BLOOMFIELD : 1932 1033 : CN : MIDDLETOWN : 1033 1070 : CN : BRISTOL : 1070 1043 : CN : NEWINGTON : 1043 1160 : CN : GRISWOLD : 1160 1135 : CN : NEW MILFORD : 1135 1095 : CN : KILLINGWORTH : 1095 1164 : CN : LEDYARD : 1164 1943 : CN : WEST HARTFORD : 1943 1100 : CN : WATERFORD : 1100 1931 : CN : AVON : 1931 1070 : CN : BRISTOL : 1070 1089 : CN : MADISON : 1089 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 221 of 616 Month Number Amount 202206 $87,552.11 202206 $944.51 202206 $1,283.08 202206 $64.28 202206 $145.50 202206 ($41.50) 202206 $1,305.08 202206 $2,119.26 202206 ($5,893.12) 202206 $2,590.95 202206 $3,092.73 202206 $134.67 202206 $23.12 202206 $32.29 202206 $1,646.86 202206 $95.88 202206 $309.92 202206 $2,007.16 202206 $64.06 202206 $3,411.36 202206 $4,596.37 202206 ($125.63) 202206 ($21.33) 202206 $1,259.93 202206 $5,037.29 202206 $110.75 202206 ($3,581.26) 202206 $13.80 202206 $1,623.95 202206 $1,824.60 202206 ($57.51) 202206 $1,471.24 202206 $5.82 202206 ($967.81) 202206 $39.33 202206 ($2,713.61) 202206 $82.82 202206 $58.00 202206 $54,893.39 202206 $6,143.65
  4. Page 222 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80083468 80084211 80084627 80084661 80085570 80085576 80085580 80085816 80086140 80086210 80086842 80086843 80086852 80087343 80087977 80088158 80088493 80088609 80089790 80089900 80089988 80090212 80090756 80091462 80091671 80092372 80092397 80092472 80093065 80093693 80093918 80096073 80096145 80096260 80096672 80097231 80098855 80098937 80098998 80099055 Accounting Work Order Descript P-3765 REPLACE YELLOW TAGGED CAP BA Dock Crew? JS - Main St, Danb, Repl (ASP)CR-377 COUNTRY CLUB RD. AVON, 6/10 HOP RIVER RD, COVENTRY CKT. 151 lockout. Rplcd. 350 p+l w/ * MAR - P#6246 Rplc Blown Arrestor PLANNED RC POLE 1202 REPLACE CAP BA MF - INSTALL ANCHOR STANHOPE ( JV; 409 WINDHAM RD, WILLIMANTIC/WIN prechecked REPLACE-OH-ANNUAL-DESG YT / MG; 124 SLOCUM RD HEBRON - REC (PR) 5/24 22-B3478= EVW - 47 Trestl ASP - PL:REPL JNCTN P#61386 & P# 61 JRP - 197 Potuccos Ring Rd WOLCOTT 6/20/21 KENT RD NEW MILFORD, 12Y12 JDB 6/20: 330 CONNECTICUT AVE, NORW *WF-AMAZON-KENNEDY RD-WINDSOR-@ POL P-416 Replace 1200KVAR capacitor ba TO STORES 2/15/23--RIVER RD, KILLIN MDB - 6/24 Farnham Rd, Morris - Nee SAYBROOK RD ESSEX-PLE35-(R/I)1200KV MM 6 Pinecrest Ln Sprague upgrade x * MCB - 99 TRUMBULL ST -- 91591, M MR; GREAT HILL POND (90) RD -18, IN JMS- 6/30 WEST HARTFORD,5 HIGH GATE * AMM 71 CLARENDON TER, NEWINGTON. AMM 8 BROOKSHIRE LN,FARM. RAISE XFM * COMP * AMM 135 MEADOW ST,NEWINGT SENT TO ED 5/31 - (*) zCROM--7/6/21 Byram 13C-Replace 13C-22E36-2 Reclo MJ - MRP - Cap Bank Replacement - P MATERIAL DONE APPT 6/28@ PONS EVW CST NOT READY EVW - 65 Kenmont Rd, ALBANY AVE HARTFORD JLB 378 GOOD HILL RD, WESTON/INST'D GC - 7/10 ATTN NSS COLONEL LEDYARD MAR - Replace leaning/rotten pole # Berlin 6A - Replace 1S Station Serv ASP 5/20/22 -MAR - Rplc PCB Xfmr ASP-KD-EVENT #4573345/ REPLC P 2016 Asset Location 1089 : CN : MADISON : 1089 1008 : CN : DANBURY : 1008 1931 : CN : AVON : 1931 1155 : CN : COVENTRY : 1155 1113 : CN : HARTFORD : 1113 1043 : CN : NEWINGTON : 1043 1135 : CN : NEW MILFORD : 1135 1097 : CN : OLD LYME : 1097 1180 : CN : WINDHAM : 1180 1406 : CN : LITCHFIELD : 1406 1162 : CN : HEBRON : 1162 1019 : CN : THOMASTON : 1019 1010 : CN : MIDDLEBURY : 1010 1020 : CN : WOLCOTT : 1020 1135 : CN : NEW MILFORD : 1135 1052 : CN : NORWALK : 1052 1121 : CN : WINDSOR : 1121 1098 : CN : OLD SAYBROOK : 1098 1095 : CN : KILLINGWORTH : 1095 1407 : CN : MORRIS : 1407 1093 : CN : ESSEX : 1093 1176 : CN : SPRAGUE : 1176 1032 : CN : MERIDEN : 1032 1172 : CN : PORTLAND : 1172 1943 : CN : WEST HARTFORD : 1943 1043 : CN : NEWINGTON : 1043 1041 : CN : FARMINGTON : 1041 1043 : CN : NEWINGTON : 1043 1031 : CN : CROMWELL : 1031 J13C : CL&P BYRAM GREENWICH : 1065 1030 : CN : CHESHIRE : 1030 1195 : CN : WINCHESTER : 1195 1133 : CN : KENT : 1133 1113 : CN : HARTFORD : 1113 1055 : CN : WESTON : 1055 1164 : CN : LEDYARD : 1164 1070 : CN : BRISTOL : 1070 G06A : CL&P BERLIN BERLIN 1020 : CN : WOLCOTT : 1020 1010 : CN : MIDDLEBURY : 1010 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 222 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $6,062.25 Emergent Equipment Failures - Line 202206 $8,281.24 Emergent Equipment Failures - Line 202206 $6,551.21 Emergent Equipment Failures - Line 202206 $36,643.62 Emergent Equipment Failures - Line 202206 $34,337.80 Emergent Equipment Failures - Line 202206 $67.33 Emergent Equipment Failures - Line 202206 $79.31 Emergent Equipment Failures - Line 202206 $78.59 Emergent Equipment Failures - Line 202206 $618.09 Emergent Equipment Failures - Line 202206 $2,395.28 Emergent Equipment Failures - Line 202206 $2,381.28 Emergent Equipment Failures - Line 202206 $27.15 Emergent Equipment Failures - Line 202206 $108.11 Emergent Equipment Failures - Line 202206 $1,600.40 Emergent Equipment Failures - Line 202206 $13,453.21 Emergent Equipment Failures - Line 202206 $199.29 Emergent Equipment Failures - Line 202206 $335.75 Emergent Equipment Failures - Line 202206 $111.34 Emergent Equipment Failures - Line 202206 $11,858.63 202206 ($742.99) Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $25,764.76 Emergent Equipment Failures - Line 202206 $767.29 Emergent Equipment Failures - Line 202206 $22.50 Emergent Equipment Failures - Line 202206 $963.81 Emergent Equipment Failures - Line 202206 ($1,094.10) Emergent Equipment Failures - Line 202206 $160.07 Emergent Equipment Failures - Line 202206 $2,751.71 Emergent Equipment Failures - Line 202206 $191.21 Emergent Equipment Failures - Line 202206 $1,355.25 Emergent Equipment Failures - Substation 202206 $290.56 Emergent Equipment Failures - Line 202206 ($25,407.14) Emergent Equipment Failures - Line 202206 $2,460.02 Emergent Equipment Failures - Line 202206 $20,006.13 Emergent Equipment Failures - Line 202206 $72,027.95 Emergent Equipment Failures - Line 202206 $38.47 Emergent Equipment Failures - Line 202206 ($85.36) Emergent Equipment Failures - Line 202206 $291.26 Emergent Equipment Failures - Substation 202206 $1,292.87 Emergent Equipment Failures - Line 202206 ($19.35) Emergent Equipment Failures - Line 202206 $48,570.70
  5. Page 223 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80099478 80099499 80099582 80099834 80100202 80100368 80100735 80101487 80101885 80101925 80102479 80102490 80102508 80102806 80102983 80104099 80104258 80104314 80105023 80105109 80105180 80105236 80105816 80105851 80105873 80106147 80106436 80106984 80107052 80107808 80108436 80108532 80108763 80108847 80108932 80108996 80109073 80109705 80109783 80109992 Accounting Work Order Descript TL - PENNSYLVANIA AVE, NIANTIC // P COMP HAR 07/07/22 - POLE INSTALL MRP - STEINMANN AVE, MIDDLBURY / EV JRP - Twin Ponds Dr FARMINGTON Repl P-2066 shift to FTR 40/2 164 Grapev Asplundh - PCC - CB install new 333 MV - 7/23 PHILLIPS (99) ST WATERFOR SD 218 JACKSON HILL RD, MIDDLEFIELD DB- MISTUXET AVE STONINGTON , repla MAR - Rplc Sec&SVC to 311 WOODLAND BC - MANCHESTER, TOLLAND TPKE, REPL 7/28: 28 BUXTON LN, RIVERSIDE/ CHAN MF- MILLER RD--P249, PRESTON,CT BLO *RIGGS* JAM - 624 LOWER LN, BERLIN LD !!! 512 MAIN AVE NORWALK RMV OH Asplundh - Troy Rd. S. WINDSOR Shif JDB 8/03: 201 HIGHLAND AVE, NORWALK COMPLETED WQ; 8/4/21 P. 597 FRANKLI *Telco JAM - 1381 Stanley Street JSG - 55 DOWD AVE CANTON CT MJ 3/17 Jpt-306 Queen St Bristol P **COMP CHE 07/21/2022 **STLT 5/13 S * ASP JRP - Woodruff St SOG P#84892 (PR) 5/23 JSG/West Hartland--Old F KD-EVENT #4584456 REPLC SEC TO SL P DG P#272 OLD COLONY RD EASTFORD FRN PD-5 HUNTINGTON COURT WTFD/REPLACE * SD 78 ARLINGTON ST MERIDEN PRIMAR P-701 REPLACE FTR POLE WITH 40/2. 1 DG P#767 HILL RD THOMPSON FRNTR POL ASP 5/20/22-MCB - 08.13.21 - 601 HI Asplundh - 20Q-1X Transformer repla ASP 5/20/22 - MCB - BERKSHIRE DR, W DG P#2005 100 KOZEY RD EASTFORD CLP Scitico Replace 27H-24T-6 & 27H-25T Replace 4 sections of open wire and MJP / 229 Hoyt St / DAR/ Shift to F MCALLEN PAINT TRANSFORMER VALLEY BR Jpt-53 North St Bristol P441-S - Rp CT 2021 July Circuit Patrol ~ p326 Asset Location 1092 : CN : EAST LYME : 1092 1041 : CN : FARMINGTON : 1041 1010 : CN : MIDDLEBURY : 1010 1041 : CN : FARMINGTON : 1041 1094 : CN : HADDAM : 1094 1111 : CN : ELLINGTON : 1111 1100 : CN : WATERFORD : 1100 1037 : CN : MIDDLEFIELD : 1037 1177 : CN : STONINGTON : 1177 1070 : CN : BRISTOL : 1070 1937 : CN : MANCHESTER : 1937 1065 : CN : GREENWICH : 1065 1173 : CN : PRESTON : 1173 1040 : CN : BERLIN : 1040 1052 : CN : NORWALK : 1052 1115 : CN : SOUTH WINDSOR : 1115 1052 : CN : NORWALK : 1052 1008 : CN : DANBURY : 1008 1042 : CN : NEW BRITAIN : 1042 1933 : CN : CANTON : 1933 1070 : CN : BRISTOL : 1070 1030 : CN : CHESHIRE : 1030 1034 : CN : SOUTHINGTON : 1034 1193 : CN : HARTLAND : 1193 1040 : CN : BERLIN : 1040 1077 : CN : EASTFORD : 1077 1100 : CN : WATERFORD : 1100 1032 : CN : MERIDEN : 1032 1094 : CN : HADDAM : 1094 1084 : CN : THOMPSON : 1084 1002 : CN : WATERBURY : 1002 1118 : CN : TOLLAND : 1118 1002 : CN : WATERBURY : 1002 1077 : CN : EASTFORD : 1077 J27H : CL&P SCITICO ENFIELD : 1112 1080 : CN : PLAINFIELD : 1080 1908 : CN : DARIEN : 1908 1102 : CN : BRANFORD : 1102 1070 : CN : BRISTOL : 1070 1158 : CN : FRANKLIN : 1158 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 223 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $1,289.15 Emergent Equipment Failures - Line 202206 $156.14 Emergent Equipment Failures - Line 202206 $162.43 Emergent Equipment Failures - Line 202206 $111.76 Emergent Equipment Failures - Line 202206 $41.93 Emergent Equipment Failures - Line 202206 ($316.65) Emergent Equipment Failures - Line 202206 $289.72 Emergent Equipment Failures - Line 202206 $113.29 Emergent Equipment Failures - Line 202206 $289.72 Emergent Equipment Failures - Line 202206 $2,818.74 Emergent Equipment Failures - Line 202206 $5,268.74 Emergent Equipment Failures - Line 202206 $1,419.94 Emergent Equipment Failures - Line 202206 $60.31 Emergent Equipment Failures - Line 202206 $1,828.10 Emergent Equipment Failures - Line 202206 $296.90 Emergent Equipment Failures - Line 202206 $64.91 Emergent Equipment Failures - Line 202206 $11.64 Emergent Equipment Failures - Line 202206 $704.78 Emergent Equipment Failures - Line 202206 $2,552.15 202206 $0.02 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $406.48 Emergent Equipment Failures - Line 202206 $1,846.34 Emergent Equipment Failures - Line 202206 ($5.58) Emergent Equipment Failures - Line 202206 $3,163.45 Emergent Equipment Failures - Line 202206 ($265.99) Emergent Equipment Failures - Line 202206 $556.76 Emergent Equipment Failures - Line 202206 $87.00 Emergent Equipment Failures - Line 202206 $234.96 Emergent Equipment Failures - Line 202206 $243.99 Emergent Equipment Failures - Line 202206 $147.14 Emergent Equipment Failures - Line 202206 $24.51 Emergent Equipment Failures - Line 202206 $54,430.57 Emergent Equipment Failures - Line 202206 $2,590.72 Emergent Equipment Failures - Line 202206 $150.26 Emergent Equipment Failures - Substation 202206 $1,956.06 Emergent Equipment Failures - Line 202206 ($4,201.98) Emergent Equipment Failures - Line 202206 $3,075.87 Emergent Equipment Failures - Line 202206 ($115.71) Emergent Equipment Failures - Line 202206 $7.50 Emergent Equipment Failures - Line 202206 $177.49
  6. Page 224 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80109993 80110203 80110353 80110439 80111069 80112289 80112908 80113279 80113334 80113756 80113796 80114213 80114409 80114657 80115373 80115765 80115959 80116283 80116796 80117267 80117428 80117487 80118511 80118617 80118858 80119536 80119599 80119741 80120051 80120290 80120916 80120992 80121097 80121284 80121360 80121628 80121970 80122254 80122352 80122661 Accounting Work Order Descript 5/23 CRP - WICKETT ( 64) ST -- H1 DOA HAR 04/26/22 - SUFFIELD-14 BRAI JDB 8/20: 179 1/2 W NORWALK RD, NOR GC - 8/21-2021 NATURAL TREE VS P44 1/4 CRP - TOWN HILL ( 720) RD -PD-49 LAUREL HILL DR, EAST LYME/RPL Jpt-1116 New Britain Ave Farmington MJ 3/8 - PMV - New RR12F51-61R Grac 1/4 CP - pole 3577 E River Rd BARKH MI DOA HAR 04/26/22 - SUFFIELD-BRAN MJ-St Lt Group - Mansfield, Heritag GC - 8/31 HINCKLEY HILL (7) RD -- 1 SHORE RD DANBURY #10 BUSHY HILL RD SIMSBURY Shifted MI 9/1 (FONTAKA) Ellington, Ardsley SD 541 NEW HAVEN AVE, DURHAM / EVE PD-FEDERAL STREET N. LONDON/INST XF GC - 9/8 OAKWOOD DR LEDYARD 9/9 MATTHEW RD BRANFORD TT TC TURNOVER 18 SHADOW RIDGE STM; SD 90 WEST ST, MIDDLEFIELD INSTALL SD *RIGGS* 26 BRENTWOOD RD NEWINGT FORT RACHEL PLACE, GROTON MPB; 195 FEDERAL RD BROOKFIELD, PAD MCB - 912 LONG MEADOW RD, RELOCATE MPB; 6/10/21 27 RIDGEDALE RD, BETHE * PMV - Install Crossarms TIMBERLIN (PR) CRP - WARNER ( 32) RD -- S23 completed in field CRP - ARROWHEAD GC - 9/20/21 (RSO - LEAC) HOMESTEAD (PR) CRP - SCOVILLE HILL ( 386) RD EVW - 57 Barnes Rd, Watertown P#F61 PCC - Vernon, Maple Ave - replace 1 TT TC 2 S LAKE DR, STM; P#16448 REP * MAR - Per RSO/Rplc Svc with 4/0tp MJP / 10 Vincent Court / STM / Inst 12/27 EVW - 502 E Wakefield Blvd, W MJP / 1549 Newfield Ave / STM / Shi RF:405 HOYT ST, DARIEN TT:P #2247 R APPRENTICES KTI WQ; 9/27/21 CREST ( Asset Location 1938 : CN : NEW HARTFORD : 1938 1117 : CN : SUFFIELD : 1117 1052 : CN : NORWALK : 1052 1177 : CN : STONINGTON : 1177 1938 : CN : NEW HARTFORD : 1938 1092 : CN : EAST LYME : 1092 1041 : CN : FARMINGTON : 1041 1032 : CN : MERIDEN : 1032 1190 : CN : BARKHAMSTED : 1190 1117 : CN : SUFFIELD : 1117 1166 : CN : MANSFIELD : 1166 1173 : CN : PRESTON : 1173 1008 : CN : DANBURY : 1008 1942 : CN : SIMSBURY : 1942 1111 : CN : ELLINGTON : 1111 1910 : CN : DURHAM : 1910 1169 : CN : NEW LONDON : 1169 1164 : CN : LEDYARD : 1164 1102 : CN : BRANFORD : 1102 1066 : CN : STAMFORD : 1066 1037 : CN : MIDDLEFIELD : 1037 1043 : CN : NEWINGTON : 1043 1161 : CN : GROTON : 1161 1131 : CN : BROOKFIELD : 1131 1010 : CN : MIDDLEBURY : 1010 1007 : CN : BETHEL : 1007 1040 : CN : BERLIN : 1040 1190 : CN : BARKHAMSTED : 1190 1938 : CN : NEW HARTFORD : 1938 1164 : CN : LEDYARD : 1164 1405 : CN : HARWINTON : 1405 1004 : CN : WATERTOWN : 1004 1120 : CN : VERNON : 1120 1066 : CN : STAMFORD : 1066 1042 : CN : NEW BRITAIN : 1042 1066 : CN : STAMFORD : 1066 1195 : CN : WINCHESTER : 1195 1066 : CN : STAMFORD : 1066 1908 : CN : DARIEN : 1908 1054 : CN : RIDGEFIELD : 1054 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 224 of 616 Month Number Amount 202206 $213.64 202206 $740.47 202206 $196.61 202206 $130.56 202206 $236.08 202206 $54.70 202206 $1,974.88 202206 $838.69 202206 $161.79 202206 $173.84 202206 $184.23 202206 $46.31 202206 $507.74 202206 $1,783.99 202206 $0.02 202206 $305.29 202206 $281.91 202206 $827.22 202206 $701.82 202206 $29,348.52 202206 $213.33 202206 ($57.94) 202206 ($121.87) 202206 $0.55 202206 $496.44 202206 $149.46 202206 $118.93 202206 $826.24 202206 $4,021.20 202206 $1,338.20 202206 $858.10 202206 ($20.93) 202206 $813.53 202206 ($0.04) 202206 $2,196.15 202206 $5,908.83 202206 $144.28 202206 $17,773.65 202206 $165.57 202206 $3,122.09
  7. Page 225 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80122975 80123228 80123301 80123317 80123362 80123809 80123976 80123980 80124114 80124363 80124414 80125697 80126205 80126318 80127654 80127900 80128315 80128805 80129580 80129834 80130307 80130621 80130689 80131248 80131458 80131463 80131464 80131569 80132139 80132859 80132964 80132996 80133039 80133154 80133704 80133938 80134428 80134711 80134817 80135201 Accounting Work Order Descript JAM - 171 Mercier Ave Bristol - Rep COMP HAR 09/08/22**CALL ON WAY**DAN (*)JTR, Byron Dr, Avon, Replace Fau GUILFORD/VILLAGE VICTORIA REPAINT X PER ROB COTE CANEL TO WO 7212749 JO ASAP; next week; MR;***WRITTEN*** P PCC - Dunn Hill Rd 19, Tolland. Rep Jpt-1235 Farmington Ave Bristol P13 DUP, SEE WO 6958186 - JAM - 11 KI MATERIAL (PR) JSG - WILLIAMS ( 14 *AMM 16 PROGRESS CIRCLE, NEWINGTON. MATERIAL JLB 152 LAMBERT RD, NEW CA EM RF:777 BOSTON POST RD, DARIEN:PO KTI 150 Freeman Rd Oxford PCC - Old Stafford Rd-Tolland-Pole MATERIAL (PR) JSG/Hartland--South R CR-GREY FOX TRAIL AVON, REPLACE 100 E.P. -10/16- 39 MILLER RD -172-6**, Schoephoester Rd-Windsor Locks-Pad PR CRP - 132 GOOSE GREEN RD PLEASAN DONE VJT - WILTON ( 26) RD -- H14 need to sign off on 6/21 ALBANY ( APPRENTICES 9/3/21 STURGES ( 12) JAM 186 High Road Berlin - Remove T WQ; 4/13/21 HAZEL PLAIN ( 209) RD Appt 11/12 -PCC - Valley View Dr 7, TL - SYLVAN GLEN, #11 EAST LYME // TL - UPPER PATTAGANSETT RD, PAD#898 *** COMP***KD-EVENT #4638894 REPLC 11/1/21 50 FULLING MILL LN RIDGEFIE RL: 40 SAINT ROCH AVE, GRN: REPLACE RL:470 N MAPLE AVE, GRN: REPLACE P DG P#1771 OLD TPKE RD WOODSTOCK FRN E.P. -11/1- 38 INDIAN WOOD RD--3750 EP - 11/2/21-4 SYLVAN GLEN RD EAST 11.02.21 - MEADOW RD, GREENWICH JFC - W HYERDALE (352) DR -- 0464B, KD-TURNOVER EVENT #4650894 TREE V P South Windsor 14L-Replace ATS. TL - 11/5 BROWNS ( 45) LN -- 2197 Asset Location 1070 : CN : BRISTOL : 1070 1008 : CN : DANBURY : 1008 1931 : CN : AVON : 1931 1103 : CN : GUILFORD : 1103 1099 : CN : DEEP RIVER : 1099 1162 : CN : HEBRON : 1162 1118 : CN : TOLLAND : 1118 1070 : CN : BRISTOL : 1070 1043 : CN : NEWINGTON : 1043 1193 : CN : HARTLAND : 1193 1043 : CN : NEWINGTON : 1043 1051 : CN : NEW CANAAN : 1051 1908 : CN : DARIEN : 1908 1014 : CN : OXFORD : 1014 1118 : CN : TOLLAND : 1118 1193 : CN : HARTLAND : 1193 1931 : CN : AVON : 1931 1173 : CN : PRESTON : 1173 1122 : CN : WINDSOR LOCKS : 1122 1190 : CN : BARKHAMSTED : 1190 1071 : CN : PLYMOUTH : 1071 1933 : CN : CANTON : 1933 1013 : CN : NEWTOWN : 1013 1040 : CN : BERLIN : 1040 1022 : CN : WOODBURY : 1022 1166 : CN : MANSFIELD : 1166 1092 : CN : EAST LYME : 1092 1092 : CN : EAST LYME : 1092 1043 : CN : NEWINGTON : 1043 1054 : CN : RIDGEFIELD : 1054 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1085 : CN : WOODSTOCK : 1085 1092 : CN : EAST LYME : 1092 1092 : CN : EAST LYME : 1092 1065 : CN : GREENWICH : 1065 1141 : CN : GOSHEN : 1141 1041 : CN : FARMINGTON : 1041 J14L : CL&P SOUTH WINDSOR SOUTH WINDSOR : 1115 1097 : CN : OLD LYME : 1097 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 225 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $5,796.98 Emergent Equipment Failures - Line 202206 $932.20 Emergent Equipment Failures - Line 202206 $10,521.32 Emergent Equipment Failures - Line 202206 ($52.38) Emergent Equipment Failures - Line 202206 ($208.76) Emergent Equipment Failures - Line 202206 $2,283.10 Emergent Equipment Failures - Line 202206 $239.05 Emergent Equipment Failures - Line 202206 $9,569.67 Emergent Equipment Failures - Line 202206 $184.23 Emergent Equipment Failures - Line 202206 $5,881.44 Emergent Equipment Failures - Line 202206 $17.40 Emergent Equipment Failures - Line 202206 $0.03 Emergent Equipment Failures - Line 202206 $41,459.50 Emergent Equipment Failures - Line 202206 $1,234.02 Emergent Equipment Failures - Line 202206 $18.28 Emergent Equipment Failures - Line 202206 $4,406.96 Emergent Equipment Failures - Line 202206 $13.45 Emergent Equipment Failures - Line 202206 ($0.26) Emergent Equipment Failures - Line 202206 $173.69 202206 $144.28 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 ($0.86) Emergent Equipment Failures - Line 202206 $22,833.31 Emergent Equipment Failures - Line 202206 $19,051.92 Emergent Equipment Failures - Line 202206 $335.61 Emergent Equipment Failures - Line 202206 ($126.76) Emergent Equipment Failures - Line 202206 $3,028.51 Emergent Equipment Failures - Line 202206 $1,832.66 Emergent Equipment Failures - Line 202206 ($154.79) Emergent Equipment Failures - Line 202206 $141.26 Emergent Equipment Failures - Line 202206 $1,119.56 Emergent Equipment Failures - Line 202206 $373.62 Emergent Equipment Failures - Line 202206 ($1,933.82) Emergent Equipment Failures - Line 202206 $4,792.62 Emergent Equipment Failures - Line 202206 $2,707.30 Emergent Equipment Failures - Line 202206 $2,240.38 Emergent Equipment Failures - Line 202206 ($3.96) Emergent Equipment Failures - Line 202206 ($70.00) Emergent Equipment Failures - Line 202206 ($1,325.66) Emergent Equipment Failures - Substation 202206 ($64.85) Emergent Equipment Failures - Line 202206 ($4,498.09)
  8. Page 226 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80135683 80135697 80137065 80137724 80138181 80138705 80138796 80138851 80138931 80139127 80139574 80139576 80139646 80139663 80139674 80139731 80139744 80139810 80140295 80140550 80140858 80140880 80140892 80140956 80141202 80141304 80141467 80141614 80141675 80141708 80141745 80141777 80141808 80141908 80142136 80142213 80143026 80143163 80143277 80143293 Accounting Work Order Descript DB - ROUTE 164, PRESTON replace reg FRONTIER 11/8/21 GRASSY HILL (POLE !!!MJP / 14 Sound Beach Ave / GRN / 11/15/21 COACHMANS ( 161) DR -- PA DB - Stoddards Wharf Rd, Ledyard, r JAM - 131 PFISTER DR, NEWINGTON Rep SD 11.15.21 - 377 PRESTON AVE, MERI MATERIAL 11/15: 344 WELLINGTON DR, WQ, 257-259 HICKORY LN, BETHLEHEM, APPRENTICES BM, CHIPMUNK TRL REPLAC 11/19/21 SHERRY ( 101) LN -- 4094, JMS-HTFD, 55 FARMINGTON AV - BAD MI 11/20/21 APPRENTICE TURNOVER 203 HI PL: (ASBUILT) 11.19.21 - 109 WARNER MV - 11/19/21 (RSO-TUCKER/HAYNES) S Y-25902-2021 - E Granby, Adams Dr ALL WORK COMPLETE ROBIN LANE GUILFO TBCancelled to WO 14185697 when com MV - Y-25882-2021 - COOGAN BLVD ST 11/23/21 51 GREENWOOD AVE BETHEL, R * JAM - 140 Brighton New Britain PCC Windsor Locks, Spring St - Rebu MCB - 11.21.21 - COLLEY ST, WATERBU 11.24.21 - 500 WESTFARMS MALL, FARM 11/27/21 REDDING RD REDDING TAFT (51) ST, DANIELSON, CT - REPLA (DF) R/I) svc riser, Add Lawn Box EVW - 85 Sugar Hill Rd, Salisbury P 11/30/21 GALLOPING HILL ( 5) DR CR- WESTLEDGE RD, SIMS, FIXED SLACK 11/29/21 LARSON DR DANBURY, REPL PA KD-EVENT #4665850 REPLC P 12543, 12 mcb - 11.27.21 - WHITECROFT LN, WAT LAKE SHORE DR, EAST HADDAM UG Dept PMV - Replace Switch S-SW EMP - 11/30/2021- 5 GRISWOLD POINT, E.P. -12/2/21- 51 COLONIAL DR, WATE JAM - LAKE GARDA DR, FARMINGTON / T HEL KTI WQ - DANBURY, 5TH AVE. REPL HEL WQ-DANBURY, OSBORNE ST. SHIFT T Asset Location 1173 : CN : PRESTON : 1173 1022 : CN : WOODBURY : 1022 1065 : CN : GREENWICH : 1065 1018 : CN : SOUTHBURY : 1018 1164 : CN : LEDYARD : 1164 1043 : CN : NEWINGTON : 1043 1032 : CN : MERIDEN : 1032 1050 : CN : FAIRFIELD : 1050 1023 : CN : BETHLEHEM : 1023 1013 : CN : NEWTOWN : 1013 1135 : CN : NEW MILFORD : 1135 1113 : CN : HARTFORD : 1113 1018 : CN : SOUTHBURY : 1018 1040 : CN : BERLIN : 1040 1177 : CN : STONINGTON : 1177 1123 : CN : EAST GRANBY : 1123 1103 : CN : GUILFORD : 1103 1098 : CN : OLD SAYBROOK : 1098 1177 : CN : STONINGTON : 1177 1007 : CN : BETHEL : 1007 1042 : CN : NEW BRITAIN : 1042 1122 : CN : WINDSOR LOCKS : 1122 1002 : CN : WATERBURY : 1002 1041 : CN : FARMINGTON : 1041 1053 : CN : REDDING : 1053 1079 : CN : KILLINGLY : 1079 1099 : CN : DEEP RIVER : 1099 1928 : CN : SALISBURY : 1928 1134 : CN : NEW FAIRFIELD : 1134 1942 : CN : SIMSBURY : 1942 1008 : CN : DANBURY : 1008 1070 : CN : BRISTOL : 1070 1002 : CN : WATERBURY : 1002 1156 : CN : EAST HADDAM : 1156 1041 : CN : FARMINGTON : 1041 1097 : CN : OLD LYME : 1097 1100 : CN : WATERFORD : 1100 1041 : CN : FARMINGTON : 1041 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 226 of 616 Month Number Amount 202206 ($12.90) 202206 ($131.31) 202206 $271.10 202206 $15.25 202206 $15.53 202206 $484.39 202206 $252.64 202206 $6,511.62 202206 $7,530.46 202206 $58.90 202206 ($6.50) 202206 $77.63 202206 $3,850.84 202206 ($126.11) 202206 ($20.92) 202206 $6,831.95 202206 $16.49 202206 $18.66 202206 ($1,113.10) 202206 ($424.42) 202206 $86.31 202206 $719.71 202206 ($154.48) 202206 $28.83 202206 ($31.90) 202206 $503.32 202206 $51,838.06 202206 $65.46 202206 ($5.58) 202206 ($0.30) 202206 $16.19 202206 $2,841.50 202206 ($199.99) 202206 ($191.46) 202206 ($311,830.63) 202206 ($2.44) 202206 ($1,156.33) 202206 $214.72 202206 $359.29 202206 $1,825.60
  9. Page 227 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80143586 80143598 80143792 80144751 80145226 80145348 80145487 80145744 80145785 80146392 80146473 80146503 80146857 80147160 80147289 80147298 80147676 80147805 80147869 80148065 80148084 80149808 80149946 80150218 80150228 80150258 80150297 80153393 80153501 80153556 80153872 80154545 80155818 80155865 80155997 80156138 80156162 80156242 80156291 80156293 Accounting Work Order Descript MF - 12/4 JEREMY ( 19) DR -- HH32 E.P. -12/3- 62 MOTT AVE -- 1573, NE RA P#1409 ANDERSON RD THOMPSON FRNT *COMP BY CHARTER OAK - SD 11.29.21 EVW - 49 Weatouge Rd, Salisbury P#2 CRP - 12.07.21 - BLUBERRY HILL RD, Noera 13H-Replace Failed Heater 12/10/21 CANDLEWOOD LAKE ( 190) RD *MJ PL: RECONDUCTOR SEC, REPL P#63 12/11/21 10 OVERLOOK DR DANBURY (PR) CRP - RESERVOIR ( 110) RD -JFC - 41 APLEY RD GOSHEN/ REP 2 POL Asplundh - 12/13 - Willington, 49 T EVW - Brook St, Lakeville P#3544 RP MR; ***WRITTEN***REPLACE HH COVERS AJC!! RELOCATE BLOWN 1200KVAR CAP P 12/15/21 APPRENTICE TURNOVER CHESTN KD-EVENT #4461405 RECONDUCTOR PAD # E HTFD, 88 LONG HILL - REPL PRI MET LD POST ROAD EAST WESTPORT HH#12a Saybrook 22D-Battery Replacement APPT 7/1 MDB - ANGEVINE RD, WARREN Rmv P 2741, Ins Oh Svc 180' from P 373 TALCOTTVILLE RD., VERNON - RPLC HIG SOUTH VAULT 690 ASYLUM AVE. 371 * Jpt-80 Spring Ln Plainville P1193 276 old clinton rd westbrook/rpl sv PD-91 BRAMAN RD WATERFORD/RSO FOLLO MF - 12/21/21 FARMHOLME ( 243) RD DB - BROAD (475) ST, NEW LONDON, Wh EM RF:19 SUNNYSIDE AVE, DARIEN:POLE MCB - 25 KENT ST, NAUGATUCK, P4268 MV - STONINGTON - P3138, RMV TREE G Abel-Y-22686-2019 - Windsor Locks, 12/23: SECOR ( 43) RD -- 618, BRO * RIGGS *MAR - Replace Old #4Svc pe **COMP** MAR - Replc Rotten Pole an 55 Glass Factory Rd, Willington - r 12/23/21 MIRY BROOK ( 45B) RD -- 3 *COMPLETED* 12/27/21 Asplundh repl Asset Location 1092 : CN : EAST LYME : 1092 1169 : CN : NEW LONDON : 1169 1084 : CN : THOMPSON : 1084 1910 : CN : DURHAM : 1910 1930 : CN : NORTH CANAAN : 1930 1405 : CN : HARWINTON : 1405 J13H : CL&P NOERA STREET WATERBURY : 1002 1131 : CN : BROOKFIELD : 1131 1040 : CN : BERLIN : 1040 1008 : CN : DANBURY : 1008 1190 : CN : BARKHAMSTED : 1190 1141 : CN : GOSHEN : 1141 1179 : CN : WILLINGTON : 1179 1928 : CN : SALISBURY : 1928 1033 : CN : MIDDLETOWN : 1033 1065 : CN : GREENWICH : 1065 1135 : CN : NEW MILFORD : 1135 1031 : CN : CROMWELL : 1031 1934 : CN : EAST HARTFORD : 1934 1056 : CN : WESTPORT : 1056 J22D : CL&P SAYBROOK OLD SAYBROOK : 1098 1139 : CN : WARREN : 1139 1089 : CN : MADISON : 1089 1120 : CN : VERNON : 1120 1113 : CN : HARTFORD : 1113 1044 : CN : PLAINVILLE : 1044 1101 : CN : WESTBROOK : 1101 1100 : CN : WATERFORD : 1100 1177 : CN : STONINGTON : 1177 1169 : CN : NEW LONDON : 1169 1908 : CN : DARIEN : 1908 1003 : CN : NAUGATUCK : 1003 1177 : CN : STONINGTON : 1177 1122 : CN : WINDSOR LOCKS : 1122 1131 : CN : BROOKFIELD : 1131 1044 : CN : PLAINVILLE : 1044 1043 : CN : NEWINGTON : 1043 1179 : CN : WILLINGTON : 1179 1008 : CN : DANBURY : 1008 1943 : CN : WEST HARTFORD : 1943 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 227 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 ($29.06) Emergent Equipment Failures - Line 202206 $90.91 Emergent Equipment Failures - Line 202206 ($19.18) Emergent Equipment Failures - Line 202206 $3,047.86 Emergent Equipment Failures - Line 202206 $36,262.58 Emergent Equipment Failures - Line 202206 $89.30 Emergent Equipment Failures - Substation 202206 $3.37 Emergent Equipment Failures - Line 202206 ($9.72) Emergent Equipment Failures - Line 202206 $20.00 Emergent Equipment Failures - Line 202206 ($5.86) Emergent Equipment Failures - Line 202206 $2,920.71 Emergent Equipment Failures - Line 202206 $161.79 Emergent Equipment Failures - Line 202206 $1,309.19 Emergent Equipment Failures - Line 202206 $9,627.08 Emergent Equipment Failures - Line 202206 $994.94 Emergent Equipment Failures - Line 202206 $2,010.31 Emergent Equipment Failures - Line 202206 $61.83 Emergent Equipment Failures - Line 202206 $403.66 Emergent Equipment Failures - Line 202206 $400.92 202206 $159.08 Emergent Equipment Failures - Line Emergent Equipment Failures - Substation 202206 $22.60 Emergent Equipment Failures - Line 202206 ($64.42) Emergent Equipment Failures - Line 202206 $57.31 Emergent Equipment Failures - Line 202206 ($808.00) Emergent Equipment Failures - Line 202206 ($167.16) Emergent Equipment Failures - Line 202206 $1,900.83 Emergent Equipment Failures - Line 202206 $1,306.05 Emergent Equipment Failures - Line 202206 ($67.70) Emergent Equipment Failures - Line 202206 ($403.10) Emergent Equipment Failures - Line 202206 $98.15 Emergent Equipment Failures - Line 202206 ($1,783.70) Emergent Equipment Failures - Line 202206 ($133.79) Emergent Equipment Failures - Line 202206 ($1,277.46) Emergent Equipment Failures - Line 202206 $668.06 Emergent Equipment Failures - Line 202206 ($0.54) Emergent Equipment Failures - Line 202206 ($61.22) Emergent Equipment Failures - Line 202206 $129.52 Emergent Equipment Failures - Line 202206 ($1,033.83) Emergent Equipment Failures - Line 202206 $10,354.16 Emergent Equipment Failures - Line 202206 ($1.34)
  10. Page 228 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80156339 80156379 80156422 80156469 80156699 80156761 80156834 80156841 80156880 80156954 80156958 80156971 80157407 80157408 80157413 80157440 80157447 80157507 80157639 80157716 80157833 80157960 80158287 80158361 80158441 80158460 80158556 80158783 80159028 80159051 80159338 80159726 80159789 80159877 80159886 80159906 80159927 80159977 80160039 80160126 Accounting Work Order Descript RIGGS 5/23 MAR - Replc Svc per RSO KTI 21K3 - Pole B8545 - Reconductor RIGGS 5/23MAR - Replce Svc per RSO TT - NM;12/23: 15 GOLF VIEW CIRCLE, MV - WATERFORD, I/R POLES, RELOCATE MCB - 12.08.21 - 50 ROUND TREE DR, 10 LONG HILL RD., S. WINDSOR - MIDS 12/29/21 TURKEY ROOST ( 8) RD -written under 7510280 - TOLLAND ( 6 Abel-Early Pole set-EAST ( 126) ST 12/29 (RSO STANDISH) BALLAHACK ( 12/26/21 23 DOUBLEDAY LN RIDGEFIELD PCC - Willington, River Rd - Everso 1/1 - Hartland, 543 Granville Rd ASP 3/14 -MCB - 9 ELDRIDGE ST, WAT MRP - GOAB Replacement - Kimberley CP-8 Shingle Mill Dr Canton. replac PD-3 JEROME RD N. LONDON/INST NEW P MATERIAL ASP 3/14 -MCB - 12.04.21 MCALLEN INSTALL HILL HOLDER FOR PAD (DF) POLE 417 (I) ANC & DN GUY SPRI cancel SD 335 N WALL ST MERIDEN, CT RIGGS zWETH--1/4/21--63 Valley Cres EVW - 176 Mountain Rd, Norfolk P#15 JFC - KNOX ( 38) RD -- 2009, LITC ASP 3/14 -MCB - 01.04.22 - 1131 E M MCB - 104 FAIRMONT ST WATERBURY, RE JF-379 New Whitfield St- rep c/o's SD 10 BROOKSIDE DR SOUTHINGTON REPL CP-35 Vineyard rd Burlington. insta LD 77 DANBURY RD ASML EQUIPMENT FAI MF-1/7 MUSIC VALE RD SALEM CT ASP-JRP - 201 Newell St SOG Repl ro ACC KTI RC REPLACE POLE C7604 EP -1/9- 28 KENDALL RD, PRESTON CT, complete 01/05/22 - MOHAWK ( 6) CIR MAR - Change out HH - BERLIN ( 17 Noera 13H - Activate Spare Feeder i CHARTOAK- MCB - 01.08.22 - 42 TAWNY EMP -1/11/22- OLD BLACK POINT ROAD, Asset Location 1041 : CN : FARMINGTON : 1041 1018 : CN : SOUTHBURY : 1018 1070 : CN : BRISTOL : 1070 1066 : CN : STAMFORD : 1066 1100 : CN : WATERFORD : 1100 1003 : CN : NAUGATUCK : 1003 1115 : CN : SOUTH WINDSOR : 1115 1013 : CN : NEWTOWN : 1013 1942 : CN : SIMSBURY : 1942 1936 : CN : GRANBY : 1936 1094 : CN : HADDAM : 1094 1054 : CN : RIDGEFIELD : 1054 1179 : CN : WILLINGTON : 1179 1193 : CN : HARTLAND : 1193 1002 : CN : WATERBURY : 1002 1043 : CN : NEWINGTON : 1043 1933 : CN : CANTON : 1933 1169 : CN : NEW LONDON : 1169 1002 : CN : WATERBURY : 1002 1103 : CN : GUILFORD : 1103 1090 : CN : CHESTER : 1090 1032 : CN : MERIDEN : 1032 1045 : CN : WETHERSFIELD : 1045 1196 : CN : NORFOLK : 1196 1406 : CN : LITCHFIELD : 1406 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1103 : CN : GUILFORD : 1103 1034 : CN : SOUTHINGTON : 1034 1191 : CN : BURLINGTON : 1191 1057 : CN : WILTON : 1057 1174 : CN : SALEM : 1174 1034 : CN : SOUTHINGTON : 1034 1135 : CN : NEW MILFORD : 1135 1173 : CN : PRESTON : 1173 1121 : CN : WINDSOR : 1121 1034 : CN : SOUTHINGTON : 1034 J13H : CL&P NOERA STREET WATERBURY : 1002 1003 : CN : NAUGATUCK : 1003 1092 : CN : EAST LYME : 1092 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 228 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $1,828.10 Emergent Equipment Failures - Line 202206 $5,146.78 Emergent Equipment Failures - Line 202206 $1,828.10 Emergent Equipment Failures - Line 202206 $39.37 Emergent Equipment Failures - Line 202206 ($1,150.11) Emergent Equipment Failures - Line 202206 ($35,150.56) Emergent Equipment Failures - Line 202206 $6.68 Emergent Equipment Failures - Line 202206 ($0.22) Emergent Equipment Failures - Line 202206 $129.58 Emergent Equipment Failures - Line 202206 $5,921.38 Emergent Equipment Failures - Line 202206 $82.86 Emergent Equipment Failures - Line 202206 ($4,622.58) Emergent Equipment Failures - Line 202206 $937.96 Emergent Equipment Failures - Line 202206 $32.21 Emergent Equipment Failures - Line 202206 $146.07 Emergent Equipment Failures - Line 202206 $10,575.07 Emergent Equipment Failures - Line 202206 $2.05 Emergent Equipment Failures - Line 202206 $1,921.67 Emergent Equipment Failures - Line 202206 $882.47 202206 $3,534.90 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 ($8.12) Emergent Equipment Failures - Line 202206 ($215.66) Emergent Equipment Failures - Line 202206 ($61.18) Emergent Equipment Failures - Line 202206 ($1,216.44) Emergent Equipment Failures - Line 202206 $3.57 Emergent Equipment Failures - Line 202206 $7,388.85 Emergent Equipment Failures - Line 202206 $33.77 Emergent Equipment Failures - Line 202206 ($513.16) Emergent Equipment Failures - Line 202206 $81.03 Emergent Equipment Failures - Line 202206 $161.40 Emergent Equipment Failures - Line 202206 $20,373.85 Emergent Equipment Failures - Line 202206 $15,426.73 Emergent Equipment Failures - Line 202206 $710.98 Emergent Equipment Failures - Line 202206 $168.87 Emergent Equipment Failures - Line 202206 $184.11 Emergent Equipment Failures - Line 202206 $202.49 Emergent Equipment Failures - Line 202206 $522.07 Emergent Equipment Failures - Substation 202206 $43,229.66 Emergent Equipment Failures - Line 202206 ($481.06) Emergent Equipment Failures - Line 202206 $24.09