Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 239 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80209496 80209512 80209557 80209585 80209590 80209592 80209593 80209602 80210060 80210156 80210658 80210826 80210839 80210856 80217153 80217455 80217456 80217457 80217462 80217471 80217479 80217491 80217526 80217544 80217607 80217975 80218004 80218077 80218086 80218116 80218893 80218921 80218936 80218940 80218965 80218974 80219001 80219003 80219012 80219015 Accounting Work Order Descript MANCH, 324 WOODLAND - REPL C/O'S P4 DG PAD#D/HH #D1 HIGHLAND DR THOMPSO ASP BWG- Rehab pole line structure (ASP) JTR, SUNSET FARMS RD, WEST HA 0/31 (PLOURDE) FORBES ( 1404) ST -E.P. - 35 HICKORY LN, WATERFORD, CT 04.01.22 - CHASE ST, MERIDEN WRITTEN COMPLETE WOPOWOG ( 163) RD 3/31/22 (RSO-KNAPP) LONG HILL ( 7 DG P#2994 134 RED BRIDGE RD THOMPSO POST CONSTR - 04.01.22 - 15 MICA HI TURNOVER MENDINGWALL ( 45) CIR LO JTR, 1003 FARMINGTON AVE WEST HART, E.P. - 3/30-103 BOSTON POST RD UNIT E.P - 39 Quailcrest Rd East Lyme- R DONE PR 8/30 JFC - GREAT HOLLOW ( GCC / 151 MAPLE AVE, MONTVILLE TOLLAND ( 1414) TPKE -- PAD1553, MA DG P#2463 FIVE MILE RIVER RD PUTNAM TO STORES 4/6/23-- ***WRITTEN***HIG 4/1/22 (RSO-PUNZALAN) CENTER RD, CL TBC 4/2 PETERS ( 12) TRL -- 393B, MJP / 90 Harding Rd / GRN / Relocat . 04/02 BELLVIEW RD BRANFORD 4/01: 259 COUNTRY CLUB RD, NEW CANA MF 4/3 REPLACE BLOWN ARRESTERS WATE NM: 4/01: 51 OLD KINGS HWY, OLD GRN EM RF:385 TACONIC RD, GREENWICH:REF ASP BWG-Frontier pole#2533 shift Po WRTN--JK>POLE 2672--REPLACE SVC RIS 4/4/22 FOX HILL DR , RIDGEFIELD, C BM; 4/5/22 WHEELER ( 55) RD -- 2 REPLACE POLES AND OPEN WIRE SECONDA PARKWOOD ( 17) DR -- 1452, GALES 3/24 FUEG SAINT RONAN (39) RD, AMST 4/5/22 155 WHEELER RD MONROE CT 04.01.22 - 10 KNOLLWOOD RD, FARMIN 4/5/22 HILLSIDE ( 4) RD -- 385 4/5/22 9 OLD NEVERSINK RD DANBURY C (NO CU ESTIMATE) 4/04: 2 KNOWALOT L Asset Location 1937 : CN : MANCHESTER : 1937 1084 : CN : THOMPSON : 1084 1121 : CN : WINDSOR : 1121 1943 : CN : WEST HARTFORD : 1943 1934 : CN : EAST HARTFORD : 1934 1100 : CN : WATERFORD : 1100 1032 : CN : MERIDEN : 1032 1157 : CN : EAST HAMPTON : 1157 1091 : CN : CLINTON : 1091 1084 : CN : THOMPSON : 1084 1910 : CN : DURHAM : 1910 1089 : CN : MADISON : 1089 1943 : CN : WEST HARTFORD : 1943 1097 : CN : OLD LYME : 1097 1092 : CN : EAST LYME : 1092 1132 : CN : CORNWALL : 1132 1168 : CN : MONTVILLE : 1168 1937 : CN : MANCHESTER : 1937 1082 : CN : PUTNAM : 1082 1033 : CN : MIDDLETOWN : 1033 1091 : CN : CLINTON : 1091 1101 : CN : WESTBROOK : 1101 1065 : CN : GREENWICH : 1065 1102 : CN : BRANFORD : 1102 1051 : CN : NEW CANAAN : 1051 1177 : CN : STONINGTON : 1177 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1121 : CN : WINDSOR : 1121 1159 : CN : GLASTONBURY : 1159 1054 : CN : RIDGEFIELD : 1054 1012 : CN : MONROE : 1012 1089 : CN : MADISON : 1089 1164 : CN : LEDYARD : 1164 1162 : CN : HEBRON : 1162 1012 : CN : MONROE : 1012 1041 : CN : FARMINGTON : 1041 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1052 : CN : NORWALK : 1052 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 239 of 616 Month Number Amount 202206 $2.27 202206 $15,975.48 202206 $1,368.07 202206 $4,182.02 202206 $0.04 202206 ($134.71) 202206 $2,187.75 202206 $447.35 202206 $340.69 202206 $49.82 202206 ($1.57) 202206 $0.70 202206 $4,583.74 202206 $1,612.04 202206 $72.04 202206 $9.38 202206 $159.07 202206 $78.25 202206 $0.82 202206 $11.01 202206 $15.17 202206 $9.67 202206 $5,881.79 202206 $4.67 202206 $1.38 202206 $2.07 202206 $0.03 202206 $21,834.27 202206 $186.14 202206 $5,846.96 202206 $16,234.85 202206 $0.12 202206 $4,843.83 202206 $90.31 202206 $3,943.80 202206 $6,058.59 202206 $1,797.30 202206 $3.38 202206 $0.94 202206 $376.45
  2. Page 240 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80219151 80219189 80219193 80219203 80219237 80219254 80219263 80219286 80220084 80220098 80220102 80220104 80220119 80220121 80220254 80220474 80220512 80220572 80220593 80220625 80221403 80221417 80221449 80221560 80221823 80222297 80222308 80222314 80222316 80222320 80222325 80222338 80222358 80222362 80222375 80222391 80222400 80222491 80222503 80222676 Accounting Work Order Descript 4/5/22 Y-26435-2022 10 WINTON FARM 04.05.22 / Y26431-2022 / WEST ST, S 4/5/22 Y-26367-2022 AUGUSTA DR DAN 4/5/22 67 DODGINGTOWN RD NEWTOWN ( 04.03.22 - 29 ALLING CT, BERLIN CANX 4/5/22 31 WYANT RD OXFORD C 4/5/22 159 EDEN DR (APT F11) DAN P6794 REPLACE CAN WITH 50KVA 275 MI WRITTEN COMPLETE CLARK HILL ( 166) HEL WQ 4/6/22 MAIN ( 218) ST S -4/04: TACONIC ( 355), GRN/ INSTALL WM; 4/6/22 NETTLETON HOLLOW ( 378) Lamberton Rd 99, Windsor. ROW cross BURRITT ( 150) ST UNIT 1A -- UG, P TL - MAIN ST, #153-#159 NIANTIC // JTR, 104 SHARON LN (APTS) ,WETHERS, Infrared hot spot (serious ) MM-11F14 patrol . Poles 1020,5218 & (E) 04/06 FLAGG RD WEST HARTFORD MATERIAL LD FILLOW ST NORWALK REPL 4/06: 10 DOGWOOD LN -- 20750, WESTO RR; SEYMOUR, SKOKORAT, 83, CECILIA NM: 27 LONDON LN, STM/ UPGRADE 15KV Chippen Hill 15U-Replace Failed 15U MM Old Kimball Rd Brklyn replace 2 E.P.- 4/6-2 FAIRLAWN ST, WATERFORD DG P#465 COVE LAKE RD EASTFORD RPLC MV - STONINGTON - 421 AL HARVEY RD DG P#2546 QUADICK RD THOMPSON FRNTR WRITTEN 62::NEW LONDON:RD::COLCHEST E.P.- 4/7- 539 COLONEL LEDYARD HWY 4/7 MAPLE HILL ( 553) RD -- 8069 R WQ; 4/8/22 KTI TURNOVER 15 BAYBER (*)JTR, 35 COLD SPRING RD, R.H - Po 4/8/22 TURNOVER 5 ARTHUR ST DANBUR 4/6/22 (RSO-STROM) DEER RUN RD -- R Branford, 3 s montowese st/relocate RSO/AWC--04/28/22--REPLCD STEP XF, Forestville 12A-Replace Failed12A-1 work W/ WO#8731866 - Assist Tel wit Asset Location 1013 : CN : NEWTOWN : 1013 1034 : CN : SOUTHINGTON : 1034 1008 : CN : DANBURY : 1008 1013 : CN : NEWTOWN : 1013 1040 : CN : BERLIN : 1040 1014 : CN : OXFORD : 1014 1008 : CN : DANBURY : 1008 1103 : CN : GUILFORD : 1103 1157 : CN : EAST HAMPTON : 1157 1022 : CN : WOODBURY : 1022 1065 : CN : GREENWICH : 1065 1140 : CN : WASHINGTON : 1140 1121 : CN : WINDSOR : 1121 1034 : CN : SOUTHINGTON : 1034 1092 : CN : EAST LYME : 1092 1045 : CN : WETHERSFIELD : 1045 1152 : CN : CHAPLIN : 1152 1152 : CN : CHAPLIN : 1152 1943 : CN : WEST HARTFORD : 1943 1052 : CN : NORWALK : 1052 1055 : CN : WESTON : 1055 1016 : CN : SEYMOUR : 1016 1066 : CN : STAMFORD : 1066 J15U : CL&P CHIPPEN HILL BRISTOL : 1070 1075 : CN : BROOKLYN : 1075 1100 : CN : WATERFORD : 1100 1077 : CN : EASTFORD : 1077 1177 : CN : STONINGTON : 1177 1084 : CN : THOMPSON : 1084 1153 : CN : COLCHESTER : 1153 1164 : CN : LEDYARD : 1164 1103 : CN : GUILFORD : 1103 1136 : CN : ROXBURY : 1136 1941 : CN : ROCKY HILL : 1941 1008 : CN : DANBURY : 1008 1098 : CN : OLD SAYBROOK : 1098 1102 : CN : BRANFORD : 1102 1159 : CN : GLASTONBURY : 1159 J12A : CL&P FORESTVILLE BRISTOL : 1070 1103 : CN : GUILFORD : 1103 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 240 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $3,004.55 Emergent Equipment Failures - Line 202206 $15,125.26 Emergent Equipment Failures - Line 202206 $5,543.79 Emergent Equipment Failures - Line 202206 $5,392.74 Emergent Equipment Failures - Line 202206 $26.07 Emergent Equipment Failures - Line 202206 $5.18 Emergent Equipment Failures - Line 202206 $1.15 Emergent Equipment Failures - Line 202206 $932.93 Emergent Equipment Failures - Line 202206 $19,591.99 Emergent Equipment Failures - Line 202206 $1.48 Emergent Equipment Failures - Line 202206 $345.77 Emergent Equipment Failures - Line 202206 $1.37 Emergent Equipment Failures - Line 202206 $16,610.01 Emergent Equipment Failures - Line 202206 $5,170.62 Emergent Equipment Failures - Line 202206 $385.35 Emergent Equipment Failures - Line 202206 $106,596.39 Emergent Equipment Failures - Line 202206 $19.99 Emergent Equipment Failures - Line 202206 $179.88 Emergent Equipment Failures - Line 202206 $2,342.32 202206 $9,972.59 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $7,105.52 Emergent Equipment Failures - Line 202206 $4.91 Emergent Equipment Failures - Line 202206 $1.87 Emergent Equipment Failures - Substation 202206 ($163.99) Emergent Equipment Failures - Line 202206 $379.51 Emergent Equipment Failures - Line 202206 $119.36 Emergent Equipment Failures - Line 202206 $65.34 Emergent Equipment Failures - Line 202206 $180.17 Emergent Equipment Failures - Line 202206 $52.79 Emergent Equipment Failures - Line 202206 $3.77 Emergent Equipment Failures - Line 202206 $791.17 Emergent Equipment Failures - Line 202206 $6,533.15 Emergent Equipment Failures - Line 202206 $16,741.83 Emergent Equipment Failures - Line 202206 $1.22 Emergent Equipment Failures - Line 202206 $146.66 Emergent Equipment Failures - Line 202206 $2.96 Emergent Equipment Failures - Line 202206 $0.91 Emergent Equipment Failures - Line 202206 $4,034.71 Emergent Equipment Failures - Substation 202206 $2,343.68 Emergent Equipment Failures - Line 202206 $0.91
  3. Page 241 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80222719 80222723 80222747 80222776 80223877 80223878 80223882 80223883 80223889 80223892 80223897 80223901 80223902 80223906 80223908 80223911 80223938 80223941 80223961 80223991 80223999 80224024 80224028 80224047 80224060 80224063 80224064 80224067 80224075 80224082 80224083 80224097 80224101 80224102 80224107 80224129 80224150 80224261 80224289 80224321 Accounting Work Order Descript DG P#2431 WILSONVILLE RD THOMPSON F ***WRITTEN***ALL WORK COMPLETED***R MATERIAL - KD-EVENT #4733115 SET NE 4/8 TURNOVER P#23162 BROADBROOK ( WOODLAND ST HARTFORD VAULT 5906 DONE NYPERT I PAD EVW - 342 Millert MARKET ST HARTFORD MH572 TO 574 MI 4/11 Pole 16970-TALCOTTVILLE RD, VOLUNTOWN RD/OLD BETHEL (34) RD, GR W MAIN (480) written complete ST, H CO 08/03 E HTFD, 33 CHIPPER DR - HH E.P,- 4/9/22- 175 MILLER RD -- 2103 Canceling to wo 10195234 HOTCHKISS WINDSOR, 97 Pine Ln - REPL streetli E.P.- 4/9/22- 12 HARVARD TER, P. 75 #ASP? CR-WINTERSET LN. SIMS, REPL A 363::OLD PLAINFIELD:RD::PLAINFIELD: MR; ***WRITTEN***ALL WORK COMPLETED MV - STONINGTON, 302 FLANDERS RD, I PD-15 NORWOOD AVE N. LONDON/RSO FOL LD 79 DEER RUN RD WILTON RPL DB SVC JDB 4/08: 52 WINDING LN, NORWALK/ I PR 6/16 MDB - MELIUS ( 151) RD -Jpt-31 Brightwood Rd Bristol (Frnt) RL: RIGGS :214 WEAVER ST, GRN/ REPL JFC - CEMETERY HILL:RD::CORNWALL:CT CHAROAK 5/24-WRM - RPLC Pri Silo C 4/11/22 Y-26386-2022 - ROSE ST DAN 4/11/22 Y-26368-2022 GREAT PASTUR 4/08: 8 SINAWOY RD, COS COB/ REPLAC 4/11/22 Y-26378-2022 220 BLACK RO PCC-4/11 SILVER ( 259) ST -- S3421 TT TC 18 DEEP SPRING LN, STM; P#102 POST CONSTR - 04.07.22 - RESEARCH P SD; 285 NEWTOWN TPKE REDDING INSTAL TO STORES 3/7/23--REPLACE HH #277A HEL KTI BM; 4/11/22 NEW LEBBON ( RC; 4/11/22 HIDEAWAY ( 24) LN -SD; 94 CROSS HWY REDDING SHIFT 1 PH 4/11/22 1 FALLS LN BETHEL (JAN) (H Asset Location 1084 : CN : THOMPSON : 1084 1033 : CN : MIDDLETOWN : 1033 1032 : CN : MERIDEN : 1032 1112 : CN : ENFIELD : 1112 1113 : CN : HARTFORD : 1113 1928 : CN : SALISBURY : 1928 1113 : CN : HARTFORD : 1113 1120 : CN : VERNON : 1120 1160 : CN : GRISWOLD : 1160 1162 : CN : HEBRON : 1162 1934 : CN : EAST HARTFORD : 1934 1173 : CN : PRESTON : 1173 1089 : CN : MADISON : 1089 1121 : CN : WINDSOR : 1121 1164 : CN : LEDYARD : 1164 1942 : CN : SIMSBURY : 1942 1080 : CN : PLAINFIELD : 1080 1172 : CN : PORTLAND : 1172 1177 : CN : STONINGTON : 1177 1169 : CN : NEW LONDON : 1169 1057 : CN : WILTON : 1057 1052 : CN : NORWALK : 1052 1139 : CN : WARREN : 1139 1070 : CN : BRISTOL : 1070 1065 : CN : GREENWICH : 1065 1132 : CN : CORNWALL : 1132 1041 : CN : FARMINGTON : 1041 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1065 : CN : GREENWICH : 1065 1053 : CN : REDDING : 1053 1936 : CN : GRANBY : 1936 1066 : CN : STAMFORD : 1066 1032 : CN : MERIDEN : 1032 1053 : CN : REDDING : 1053 1102 : CN : BRANFORD : 1102 1013 : CN : NEWTOWN : 1013 1135 : CN : NEW MILFORD : 1135 1053 : CN : REDDING : 1053 1007 : CN : BETHEL : 1007 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 241 of 616 Month Number Amount 202206 $105.09 202206 $9,728.94 202206 $0.42 202206 $157.30 202206 $17.37 202206 $10.34 202206 $2,145.47 202206 $30,065.97 202206 $2,959.23 202206 $191.52 202206 $1.03 202206 $43.70 202206 ($73.28) 202206 $0.91 202206 $4,701.32 202206 $1.49 202206 $36.30 202206 $9,686.87 202206 ($18.19) 202206 $3,093.83 202206 $12,531.16 202206 $2.20 202206 $1,203.21 202206 $8,422.96 202206 $1,956.03 202206 $146.83 202206 $148.34 202206 $4,975.67 202206 $35,393.59 202206 $4,051.79 202206 $195.31 202206 $4,417.57 202206 $11,505.98 202206 $2.00 202206 $1.82 202206 $7,770.74 202206 $0.39 202206 $0.60 202206 $0.69 202206 $68,737.18
  4. Page 242 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80224328 80224344 80224348 80224417 80225052 80225084 80225095 80225097 80225103 80225163 80225203 80225317 80225329 80225331 80225358 80225360 80225368 80225375 80225432 80225909 80225924 80225933 80225938 80225953 80225979 80226047 80226065 80226118 80226255 80226277 80226286 80226329 80226340 80226615 80226627 80226659 80226663 80226664 80226674 80226675 Accounting Work Order Descript 3/15 350 MOUNTAIN RD, SUFFIELD CT RC; 4/11/22 14 MOUNTAIN DR NEW MIL Install handhole from Storms WR#341 AMM PERRY ST, FARMINGTON (UNIONVILL MF - Kidds Way Stonington Replace p 4/12/22 ROOSEVELT ( 644) DR -- 623 JK>POLE 4340--RSO REBUILT POLE TOP, COMP JMS- 26 MOHEGAN DR, WEST HARTF 4/11 SHAKER (285) RD, ENFIELD, CT 0 going 6/16 PR 6/6 JFC - 599 OLD MID JFC - 86 HEADQUARTERS RD LITCHFIELD PAD 321--REPLACE PAD XF W/167 KVA P 4/11 TURNOVER Y-26460 -2022 MEADOW KD-EVENT #4735005/4734806 UPGRADE X JDB 11 HARBOR AVE NORWALK P 7342 OP MR; ***WRITTEN*** FOAM CONDUITS AT 130 NUTMEG LN EAST HARTFORD, Replac 04.08.22 - 27 MAIN ST, FARMINGTON MATERIAL MCB - 04.08.22 - 55 STONEF POST CONSTR - COMP 205R LAUREL ST H RL:NORIAS RD, GRN/ REPLACE P#68355 COVENTRY, 1104 FLANDERS RD, Transfo 4/13/22 LANTERN PARK ( 71) LN N -WRM - 14 HUNTERS RDG, FARMINGTON JMS-S MAIN ( 339) ST -- 3008, WEST Follow-up xfmr replace 4/12 (RSO PA 04.12.22 / Y-26462-2022 / 5 HOMESTE Windsor Ave 1147, Windsor. P-323 Re DONE IN FRONTIER DRAWER 6/8..5/23 C ALDEN ONE (E) KD-EVENT #4698536 ADD MR; ***WRITTEN***FOAM/SEAL CONDUIT WRM -JPT-12 Powder Hill Rd Middlefi KD-HTFD, AIRPORT RD - EVENT #469999 SD; 333 MAIN ST DANBURY REMOVE 3PH WRITTEN COMPLETE HOG HILL ( 110) R JSG - BUNNELL ST, COLEBROOK CT INVALID 4/14/22 TAYLOR () ST DANBU WRM - Post Const - 04.10.22 - 337 H (E) HOPMEADOW ST SIMSBURY POLE#200 MDB - #456::ALLREAD:ST::PLYMOUTH:CT Asset Location 1117 : CN : SUFFIELD : 1117 1135 : CN : NEW MILFORD : 1135 1098 : CN : OLD SAYBROOK : 1098 1041 : CN : FARMINGTON : 1041 1177 : CN : STONINGTON : 1177 1014 : CN : OXFORD : 1014 1089 : CN : MADISON : 1089 1943 : CN : WEST HARTFORD : 1943 1112 : CN : ENFIELD : 1112 1141 : CN : GOSHEN : 1141 1406 : CN : LITCHFIELD : 1406 1103 : CN : GUILFORD : 1103 1103 : CN : GUILFORD : 1103 1041 : CN : FARMINGTON : 1041 1052 : CN : NORWALK : 1052 1154 : CN : COLUMBIA : 1154 1934 : CN : EAST HARTFORD : 1934 1041 : CN : FARMINGTON : 1041 1002 : CN : WATERBURY : 1002 1113 : CN : HARTFORD : 1113 1065 : CN : GREENWICH : 1065 1155 : CN : COVENTRY : 1155 1018 : CN : SOUTHBURY : 1018 1041 : CN : FARMINGTON : 1041 1943 : CN : WEST HARTFORD : 1943 1091 : CN : CLINTON : 1091 1030 : CN : CHESHIRE : 1030 1121 : CN : WINDSOR : 1121 1405 : CN : HARWINTON : 1405 1931 : CN : AVON : 1931 1033 : CN : MIDDLETOWN : 1033 1037 : CN : MIDDLEFIELD : 1037 1113 : CN : HARTFORD : 1113 1008 : CN : DANBURY : 1008 1157 : CN : EAST HAMPTON : 1157 1192 : CN : COLEBROOK : 1192 1008 : CN : DANBURY : 1008 1910 : CN : DURHAM : 1910 1942 : CN : SIMSBURY : 1942 1071 : CN : PLYMOUTH : 1071 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 242 of 616 Month Number Amount 202206 $3,112.51 202206 $1.68 202206 $1,299.12 202206 $14,453.07 202206 $231.05 202206 $21.54 202206 ($647.05) 202206 $14.00 202206 $63.53 202206 $2,396.42 202206 $747.35 202206 $12,299.93 202206 ($1,431.85) 202206 ($14.71) 202206 $12.97 202206 $42.52 202206 $40,692.77 202206 $15,864.15 202206 $22,721.99 202206 $5,089.76 202206 $5,874.05 202206 $50.56 202206 $38.06 202206 $138.72 202206 $23,840.93 202206 $1.97 202206 $289.12 202206 $0.31 202206 $0.52 202206 $1.06 202206 $1.82 202206 $81.26 202206 $0.48 202206 $2,964.08 202206 $129.37 202206 $436.77 202206 $3.94 202206 $3,604.34 202206 $2,817.87 202206 $23,070.15
  5. Page 243 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80226677 80226694 80226697 80226705 80226720 80226724 80226730 80226732 80226786 80226823 80226825 80226883 80226941 80226959 80226969 80226972 80226984 80227020 80227043 80227250 80227286 80227292 80227299 80227306 80227328 80227405 80227414 80227440 80227441 80227521 80227529 80227538 80227583 80228462 80228472 80228481 80228580 80228626 80228629 80228641 Accounting Work Order Descript (CO 5/26) RH 38 PELICAN CT - REPL H (CO 5/26) RH 52 CORNCRIB LN -- U?, 4/14/22 S MAIN ( 397) ST -- 76, SE WRM - Post Constr - Riser /cable re WAITING ON FRONTIER POLE SET IN DRA RL:65 RIVERDALE AVE, GRN/ REPLACED MF 04-13-22 EVENT 4736819 68 HOLLY KD-EVENT #4735701 RECONNECT SVC P 1 4/13 E MAIN (215) ST CLINTON TURNOV PD-36 STARR ST N. LONDON/RPLC MH FR KTI 4/14/22 *TURNOVER* 35 OLD STA POST CONSTR - 04.03.22 - 1439 BALDW POST CONSTR - 04.08.22 - 197 TRANQU (ASP) 3A02 Lateral Upgrade, Church Priority Reject Pole Rivers Edge P# MJ -1261 N Colony Rd 82 OLD WINDSOR RD BLOOMFIELD 4/7 STRAY VOLTAGE SALMON BROOK ( 2 MATERIAL MCB - 557 3 MILE HILL RD M WRM - Post Const - 03.31.22 - 94 GA LD 30 MERRY LN, WESTON/ TREE VS P# 4/14: CLINTON AVE, WESTPORT/ INSTAL 4/14/22 (RSO-LEACH) BEECH TREE ( P-3234 INSTALL ANCHOR AND DG N CHES 04/14/22--RSO--REPLACED 25 KVA PAD MJ-MAR - Replace Leaking 50KVA Pad E.P.-135 WATER STREET, STONINGTONJFC - 04.12.22 / y-26463-2022; TURN Weston 21M-Replace 21M1-2 Breaker waiting on mat 7/5 - 260 Grantvill Prospect 22E-Replace 22E36-5 Switch VJT - (22-E-0521 ) DEERWOOD ( 101) Asplundh - Yellow Tag Y-26466-2022 GROVE ( 59) ST -- 191, WINDSOR LOCK MATERIAL EVW - 292 Mountain Rd, Nor CR-7 TOWPATH LN. AVON, REPLACED OPE COMPLETE -JEFFERSON DR GUILFORD-pol Priority Reject P#593 REPLACE WITH Asplundh - 3/24 WELLS ( 127) RD -4/7 p#534 TARKLIN HILL RD, VOLUNTOW Asset Location 1941 : CN : ROCKY HILL : 1941 1941 : CN : ROCKY HILL : 1941 1016 : CN : SEYMOUR : 1016 1040 : CN : BERLIN : 1040 1406 : CN : LITCHFIELD : 1406 1065 : CN : GREENWICH : 1065 1170 : CN : NORTH STONINGTON : 1170 1032 : CN : MERIDEN : 1032 1091 : CN : CLINTON : 1091 1169 : CN : NEW LONDON : 1169 1014 : CN : OXFORD : 1014 1002 : CN : WATERBURY : 1002 1010 : CN : MIDDLEBURY : 1010 1937 : CN : MANCHESTER : 1937 1098 : CN : OLD SAYBROOK : 1098 1032 : CN : MERIDEN : 1032 1932 : CN : BLOOMFIELD : 1932 1936 : CN : GRANBY : 1936 1010 : CN : MIDDLEBURY : 1010 1070 : CN : BRISTOL : 1070 1055 : CN : WESTON : 1055 1056 : CN : WESTPORT : 1056 1095 : CN : KILLINGWORTH : 1095 1095 : CN : KILLINGWORTH : 1095 1159 : CN : GLASTONBURY : 1159 1030 : CN : CHESHIRE : 1030 1177 : CN : STONINGTON : 1177 1406 : CN : LITCHFIELD : 1406 J21M : CL&P WESTON WESTON : 1055 1195 : CN : WINCHESTER : 1195 J22E : CL&P PROSPECT STREET GREENWICH : 1065 1023 : CN : BETHLEHEM : 1023 1112 : CN : ENFIELD : 1112 1122 : CN : WINDSOR LOCKS : 1122 1196 : CN : NORFOLK : 1196 1931 : CN : AVON : 1931 1103 : CN : GUILFORD : 1103 1093 : CN : ESSEX : 1093 1110 : CN : EAST WINDSOR : 1110 1178 : CN : VOLUNTOWN : 1178 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 243 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $1,872.11 Emergent Equipment Failures - Line 202206 $1.68 Emergent Equipment Failures - Line 202206 $5,406.80 Emergent Equipment Failures - Line 202206 $9,674.08 Emergent Equipment Failures - Line 202206 $1.62 Emergent Equipment Failures - Line 202206 $114.92 Emergent Equipment Failures - Line 202206 $7,213.83 Emergent Equipment Failures - Line 202206 ($13.34) Emergent Equipment Failures - Line 202206 $4,551.13 Emergent Equipment Failures - Line 202206 $12,088.31 Emergent Equipment Failures - Line 202206 $41,993.13 Emergent Equipment Failures - Line 202206 $8,628.57 Emergent Equipment Failures - Line 202206 $116.21 Emergent Equipment Failures - Line 202206 $44,071.11 Emergent Equipment Failures - Line 202206 $409.52 Emergent Equipment Failures - Line 202206 $240.82 Emergent Equipment Failures - Line 202206 $133,495.54 Emergent Equipment Failures - Line 202206 $22.42 Emergent Equipment Failures - Line 202206 $1,776.61 202206 $0.02 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $324.31 Emergent Equipment Failures - Line 202206 $33.47 Emergent Equipment Failures - Line 202206 $0.91 Emergent Equipment Failures - Line 202206 $7,671.00 Emergent Equipment Failures - Line 202206 $14.04 Emergent Equipment Failures - Line 202206 $1.18 Emergent Equipment Failures - Line 202206 $1,246.50 Emergent Equipment Failures - Line 202206 $6,125.68 Emergent Equipment Failures - Substation 202206 $58.60 Emergent Equipment Failures - Line 202206 $1.81 Emergent Equipment Failures - Substation 202206 $736.47 Emergent Equipment Failures - Line 202206 $7,860.01 Emergent Equipment Failures - Line 202206 $4,273.65 Emergent Equipment Failures - Line 202206 $2,892.36 Emergent Equipment Failures - Line 202206 $10,881.21 Emergent Equipment Failures - Line 202206 $21,136.84 Emergent Equipment Failures - Line 202206 $12,519.04 Emergent Equipment Failures - Line 202206 $208.37 Emergent Equipment Failures - Line 202206 $133.26 Emergent Equipment Failures - Line 202206 $99.61
  6. Page 244 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80228700 80228824 80228827 80228831 80229164 80229166 80229169 80229189 80229214 80229220 80229222 80229237 80229239 80229243 80229246 80229263 80229391 80229458 80229862 80229871 80229893 80229899 80229902 80229909 80229912 80229918 80229941 80229942 80229953 80230106 80230109 80230128 80230143 80230156 80230162 80230166 80230195 80230532 80230558 80230565 Accounting Work Order Descript JDB 4/16/22 (RSO-PALOMO/GREENE/HARR JK>POLE 3383, YELLOW TAG--Y-26475-2 JDB 4/17/22 (RSO-HARRIS) MCINTOSH R JTR, 206 ADELAIDE ST, HART, Replace PD-60 DEANS MILL RD STONINGTON/RPLC PD-PATTAGANSETT CT E. LYME/CAP BANK PD-329 BOSTON POST RD E. LYME/REPLA Jpt-131 Jacobs St Bristol - TT Post JDB 4/16: 377 MAIN AVE, NORWALK/ RE Priority Pole P#1682 replace with 4 MR; ***ALL WORK COMPLETED***04/18 MCB - 191 GRASSY HILL RD, WATERBURY KTI BM; 4/19/22 WILLS ( 3) RD **WRM - 04.18.22 - 179 PATTON DR, C POST CONST - SPRINGBROOK RD, AVON C 04.11.22 - BRONSON RD, PROSPECT EVW - LINCOLN CITY RD, SALISBURY CT MDB - (Y-26480-2022) TURNOVER: STOD BM; 4/20/22 BENNETTS BRIDGE ( 75 Priority Pole P#1045 replace with 4 RL:BUCKFIELD LN, GRN/ NEEDS CUTOUT/ P-2393 REPLACE REGULATOR Yellow Tag 4/19/22 (RSO TUCKER) HORSE POND RD WRITTEN COMPLETE 4/19 GOSHEN (22) R ACC WM; 4/20/22 SOUTH ( 23) ST -EM RF:9 INDIAN TRL, DARIEN:REMOVE/I 4/19 Y-26489-2022 P#22 BRIDGE ST, E EM RF:8 STEPHANIE LN, DARIEN:REMOVE 4/19 P#3597 NEEDS ANCHOR & GUY THOR Reconductor service wire - 24 Malla MR; ***WRITTEN***REPLACE POLE & OH JSG - 113 SOUTH RD EAST HARLAND CT MANSFIELD, 7 OLD KENT RD, Spool rac DG P#D1357 N. GATE RD WOODSTOCK RPL JTR, 475 NEW PARK AVE - WEST HART, 04.18.22 / Y-26486-2022 / GREEN RD, MM 18 Westminster Rd Canterbury P#1 RIGGSSIMPLE,; 4/21/22 GAY BOWER ( POST CONSTR - COMP EASTVIEW (190) D TC 21 GREENS CIR, STM: PAD4155 INST Asset Location 1052 : CN : NORWALK : 1052 1159 : CN : GLASTONBURY : 1159 1052 : CN : NORWALK : 1052 1113 : CN : HARTFORD : 1113 1177 : CN : STONINGTON : 1177 1092 : CN : EAST LYME : 1092 1092 : CN : EAST LYME : 1092 1070 : CN : BRISTOL : 1070 1052 : CN : NORWALK : 1052 1091 : CN : CLINTON : 1091 1172 : CN : PORTLAND : 1172 1002 : CN : WATERBURY : 1002 1013 : CN : NEWTOWN : 1013 1030 : CN : CHESHIRE : 1030 1931 : CN : AVON : 1931 1015 : CN : PROSPECT : 1015 1928 : CN : SALISBURY : 1928 1407 : CN : MORRIS : 1407 1013 : CN : NEWTOWN : 1013 1099 : CN : DEEP RIVER : 1099 1065 : CN : GREENWICH : 1065 1094 : CN : HADDAM : 1094 1089 : CN : MADISON : 1089 1100 : CN : WATERFORD : 1100 1140 : CN : WASHINGTON : 1140 1908 : CN : DARIEN : 1908 1110 : CN : EAST WINDSOR : 1110 1908 : CN : DARIEN : 1908 1166 : CN : MANSFIELD : 1166 1931 : CN : AVON : 1931 1172 : CN : PORTLAND : 1172 1193 : CN : HARTLAND : 1193 1166 : CN : MANSFIELD : 1166 1085 : CN : WOODSTOCK : 1085 1943 : CN : WEST HARTFORD : 1943 1032 : CN : MERIDEN : 1032 1076 : CN : CANTERBURY : 1076 1012 : CN : MONROE : 1012 1121 : CN : WINDSOR : 1121 1066 : CN : STAMFORD : 1066 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 244 of 616 Month Number Amount 202206 $6.29 202206 $4,617.16 202206 $3.86 202206 $3,633.27 202206 $5,247.43 202206 $7,413.02 202206 ($181.07) 202206 $0.50 202206 $4,520.65 202206 $452.09 202206 $2,058.70 202206 $0.19 202206 $1.82 202206 $1.53 202206 $2,480.70 202206 $12.64 202206 $55.43 202206 $184.10 202206 $4.95 202206 $1,648.88 202206 $1,621.42 202206 $4,250.84 202206 $0.76 202206 $5.47 202206 $1.22 202206 $3,665.63 202206 $60,575.95 202206 $817.13 202206 $13.48 202206 $412.49 202206 $3,758.70 202206 $6.51 202206 $14.46 202206 $25,755.88 202206 $24,046.22 202206 $14,082.84 202206 $12,397.89 202206 $1,828.10 202206 $3,194.23 202206 $18,958.52
  7. Page 245 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80230566 80230567 80230569 80230594 80230597 80230612 80230615 80230633 80230638 80230640 80230649 80230654 80230659 80230661 80230676 80230688 80230693 80230698 80230715 80230840 80230865 80230872 80230913 80230928 80230960 80230963 80231200 80231305 80231322 80231324 80231350 80231371 80231398 80231407 80231417 80232314 80232322 80232336 80232341 80232346 Accounting Work Order Descript DG P#624 KOZEY RD EASTFORD FRNTR PO HOLD FOR POLE EVW - 23 Union St, Wi Noera 13H-Replace Deteriorated Roof E.P.-4/20- 43 W PATTAGANSETT RD, NI MPB; POST CONST - 4/21/22 REVERE WC-677 MIXVILLE RD, CHESHIRE. RPL P RL: 46 RICHLAND RD, GRN: ES REPLACE PD-102 MONTAUK AVE N. LONDON/RSO FO SD; *POST CONSTRUCTION* *TURNOVER EVW - 107 Ashley Rd, Winsted P#4306 E.P.- 4/19- PHILLIPS, 3RD AVE, N. P EM RF:16 TACONIC RD, GREENWICH:REMO EVW - NORTH ST NORFOLK CT TT TC 360 MAYAPPLE RD, STM;P# 5507 RL:742 LAKE AVE, GRN/ TREE VS POLE# EM RF:191 BROOKSIDE RD, DARIENREMOV Noera 13H-Replace Control House Lig DJM: ARROWHEAD RD WESTPORT/ TREE VS 4/19: 30 COPPER BEECH RD, GRN/ TREE MR; ***WRITTEN***Middletown_River R DG P#168 Y-26494-2022 SOMERS TPKE MF Y-26318-2022 remove from pole 27 * WRM - 968 Hanover Rd, MERIDEN MJ -04.20.22 - 55 MELBOURNE ST, NAU MATERIAL MJP / 504 North St / GRN MATERIAL MJP/75 Mansfield Ave / DRN ****Cancel Work Order******75 MAXIM E.P.- 4/21- 268 LANTERN HILL RD, ST 4/22/22 BREAULT ( 105) RD UNIT 1 do not take-4/21/22 (RSO-LEACH) SEA TL - LONG COVE RD, REF. #961+#906 G WINDSOR, 1046 WINDSOR AV - P323 REP PD-WTFD PKWY N.WATERFORD /RPLC RECL JAM - 51 Shore Drive Meriden - Remo LA TELCO NOT SET (E) W HTFD, 664 FE POST CONST - FOX MEADOW ( 6) LN -TL - ELIHUE ISLAND RD, ELIHUE ISLAN MF 4/22 PROVIDENCE NEW LONDON TPKE WRITTEN COMPLETE 4/22 SQUIRES ( 12 TO STORES 2/2/23- (RSO-DONNELLY) PO Asset Location 1077 : CN : EASTFORD : 1077 1195 : CN : WINCHESTER : 1195 J13H : CL&P NOERA STREET WATERBURY : 1002 1092 : CN : EAST LYME : 1092 1135 : CN : NEW MILFORD : 1135 1030 : CN : CHESHIRE : 1030 1065 : CN : GREENWICH : 1065 1169 : CN : NEW LONDON : 1169 1008 : CN : DANBURY : 1008 1195 : CN : WINCHESTER : 1195 1169 : CN : NEW LONDON : 1169 1065 : CN : GREENWICH : 1065 1196 : CN : NORFOLK : 1196 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1908 : CN : DARIEN : 1908 J13H : CL&P NOERA STREET WATERBURY : 1002 1056 : CN : WESTPORT : 1056 1065 : CN : GREENWICH : 1065 1033 : CN : MIDDLETOWN : 1033 1085 : CN : WOODSTOCK : 1085 1100 : CN : WATERFORD : 1100 1032 : CN : MERIDEN : 1032 1003 : CN : NAUGATUCK : 1003 1065 : CN : GREENWICH : 1065 1908 : CN : DARIEN : 1908 1113 : CN : HARTFORD : 1113 1177 : CN : STONINGTON : 1177 1005 : CN : BEACON FALLS : 1005 1103 : CN : GUILFORD : 1103 1164 : CN : LEDYARD : 1164 1121 : CN : WINDSOR : 1121 1100 : CN : WATERFORD : 1100 1032 : CN : MERIDEN : 1032 1943 : CN : WEST HARTFORD : 1943 1943 : CN : WEST HARTFORD : 1943 1177 : CN : STONINGTON : 1177 1169 : CN : NEW LONDON : 1169 1089 : CN : MADISON : 1089 1095 : CN : KILLINGWORTH : 1095 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 245 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $44.70 Emergent Equipment Failures - Line 202206 $0.86 Emergent Equipment Failures - Substation 202206 $168,849.02 Emergent Equipment Failures - Line 202206 ($416.92) Emergent Equipment Failures - Line 202206 $7,810.52 Emergent Equipment Failures - Line 202206 $52.96 Emergent Equipment Failures - Line 202206 $751.72 Emergent Equipment Failures - Line 202206 $2.43 Emergent Equipment Failures - Line 202206 $26.86 Emergent Equipment Failures - Line 202206 $298.71 Emergent Equipment Failures - Line 202206 $27.94 Emergent Equipment Failures - Line 202206 $8,469.61 Emergent Equipment Failures - Line 202206 $3,107.80 Emergent Equipment Failures - Line 202206 $913.44 Emergent Equipment Failures - Line 202206 $1,034.83 Emergent Equipment Failures - Line 202206 $3,873.24 Emergent Equipment Failures - Substation 202206 $88,444.38 Emergent Equipment Failures - Line 202206 $123.63 Emergent Equipment Failures - Line 202206 $683.37 202206 $6,763.20 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 ($31,603.27) Emergent Equipment Failures - Line 202206 $8,884.04 Emergent Equipment Failures - Line 202206 $0.70 Emergent Equipment Failures - Line 202206 ($424.86) Emergent Equipment Failures - Line 202206 $8,807.94 Emergent Equipment Failures - Line 202206 $51,092.58 Emergent Equipment Failures - Line 202206 $29,384.21 Emergent Equipment Failures - Line 202206 ($138.30) Emergent Equipment Failures - Line 202206 $195.30 Emergent Equipment Failures - Line 202206 $1.84 Emergent Equipment Failures - Line 202206 $14.39 Emergent Equipment Failures - Line 202206 $24.83 Emergent Equipment Failures - Line 202206 $14,753.82 Emergent Equipment Failures - Line 202206 $1,229.08 Emergent Equipment Failures - Line 202206 ($6.67) Emergent Equipment Failures - Line 202206 $89.94 Emergent Equipment Failures - Line 202206 $0.76 Emergent Equipment Failures - Line 202206 $2.63 Emergent Equipment Failures - Line 202206 $2.59 Emergent Equipment Failures - Line 202206 $141.01
  8. Page 246 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80232350 80232351 80232357 80232363 80232374 80232380 80232389 80232400 80232447 80232466 80232471 80232474 80232479 80232481 80232500 80232525 80232537 80232684 80232731 80232753 80232770 80232772 80232776 80232777 80232785 80233082 80233087 80233105 80233110 80233111 80233116 80233135 80233137 80233139 80233143 80233178 80233179 80233183 80233195 80233211 Accounting Work Order Descript *CANCELLED* MR;***WRITTEN***LONG H COMPLETE IN FIELD EH-4/23 BOKUM (17 4/23/22 (RSO-DONNELLY) LONG HILL RD ROLAND ( 28) ST -- 27460, ENFIELD 04-22-2022 written P 492-487 Cook POST CONST - DUNFEY ( 336) LN APT MDB - 4/23/22 (KINNEMB & HERMASA) W WRITTEN COMPLETED EH-4/23/22 (RSO-D COMP (*)WETHERSFIELD, 20 SETTLER C MATERIAL DJM!!! 04.23.22 - N RIDGE mat rtn Priority Pole Reject P#1222 Priority Reject Pole REPLACE WITH 4 DG P#2603 WOODSTOCK AVE THOMPSON RP POST CONSTR - 04/17(AYENAD/DOWNIE) LD BELDEN HILL RD, WILTON POLE#1297 RL:21 CHERRY VALLEY RD:GRN: INSTALL MATERIAL 51 RICHMOND HILL RD, NEW C WRTN--JK>P-2569 1/2 *YELLOW TAG Y-2 DG P#238 DUGG HILL RD WOODSTOCK RPL * MJ * JAM - NEWINGTON/ ROW OUTSIDE *TELCO AMM 17 BUENA VISTA AVE,NEW B SD 177 THORPE AVE MERIDEN INSTALL N * MPB; HARTFORD AVE NEWINGTON RPLC * MPB; HICKORY HILL LN, NEWINGTON; * FRNT MPB; HAWLEY ST NEWINGTON P#1 WQ 4/26/22 26 EASTVIEW DR, NEW MI print 9/27 JSG/Warren--Lake Rd. 31C CHAROAK 5/24-AMM 5 EASTVIEW DR, FAR RR; 4/26/22 LOLLY ( 2) LN LOT 3 - AMM 155 BRICKYARD RD FARM. FRONTI PRINT 9/27 JSG/Winchester--Winchest RSO--04/25/22--JK>POLE 6695--1 PHAS mj-JRP - Scott Rd PROSPECT Cut & Ki MJ * AMM 555 NEW BRITAIN AVE, NEWIN PRINTED-4/24/22 (RSO-PASCARELLI/PUN *(50):Waiting on tel EJC Newington *WETH, 184 HIGHLAND ST -- SHIFT FRO AMM HORSESHOE DR, WATERBURY. REPLA (E) JTR 36 LOSTBROOK RD, WEST HART, 5/24 - AMM 115 OLD WOLOTT RD BRISTO Asset Location 1033 : CN : MIDDLETOWN : 1033 1090 : CN : CHESTER : 1090 1103 : CN : GUILFORD : 1103 1112 : CN : ENFIELD : 1112 1163 : CN : LEBANON : 1163 1121 : CN : WINDSOR : 1121 1139 : CN : WARREN : 1139 1089 : CN : MADISON : 1089 1045 : CN : WETHERSFIELD : 1045 1056 : CN : WESTPORT : 1056 1093 : CN : ESSEX : 1093 1093 : CN : ESSEX : 1093 1084 : CN : THOMPSON : 1084 1941 : CN : ROCKY HILL : 1941 1057 : CN : WILTON : 1057 1065 : CN : GREENWICH : 1065 1051 : CN : NEW CANAAN : 1051 1159 : CN : GLASTONBURY : 1159 1085 : CN : WOODSTOCK : 1085 1043 : CN : NEWINGTON : 1043 1042 : CN : NEW BRITAIN : 1042 1032 : CN : MERIDEN : 1032 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1135 : CN : NEW MILFORD : 1135 1139 : CN : WARREN : 1139 1041 : CN : FARMINGTON : 1041 1014 : CN : OXFORD : 1014 1041 : CN : FARMINGTON : 1041 1195 : CN : WINCHESTER : 1195 1092 : CN : EAST LYME : 1092 1015 : CN : PROSPECT : 1015 1043 : CN : NEWINGTON : 1043 1080 : CN : PLAINFIELD : 1080 1042 : CN : NEW BRITAIN : 1042 1045 : CN : WETHERSFIELD : 1045 1002 : CN : WATERBURY : 1002 1943 : CN : WEST HARTFORD : 1943 1070 : CN : BRISTOL : 1070 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 246 of 616 Month Number Amount 202206 $319.17 202206 $10,336.19 202206 $1.84 202206 $5,550.97 202206 $1,450.65 202206 $13,271.28 202206 $4,582.52 202206 $9,324.83 202206 $7,081.11 202206 $4,250.29 202206 $5,527.47 202206 $3,181.14 202206 $4,054.15 202206 $18,621.65 202206 $54.71 202206 $112.17 202206 $3,893.44 202206 $4.98 202206 $29,306.28 202206 $365.10 202206 $86.20 202206 $14.67 202206 $3.26 202206 $4,786.98 202206 $2.19 202206 $25.68 202206 $64,405.69 202206 $1.81 202206 $0.60 202206 $0.24 202206 $93,103.43 202206 $10.37 202206 $1.42 202206 $0.35 202206 $2,001.94 202206 $0.66 202206 ($13.08) 202206 $0.54 202206 $862.55 202206 $0.59
  9. Page 247 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80233214 80233235 80233236 80233287 80233490 80233750 80233753 80233771 80233795 80233810 80233861 80233866 80233878 80234020 80234026 80234145 80234146 80234147 80234149 80234410 80234417 80234426 80234468 80234470 80234476 80234477 80234521 80234533 80234555 80234568 80234571 80234591 80234711 80234723 80234784 80234792 80235097 80235102 80235119 80235136 Accounting Work Order Descript 3 HICKORY ST,WTBY. FRONTIER TO REPL 4/25 (PETERSON) HAZARD ( 241) AVE * MJ AMM ELLIS ST,NEW BRITAIN. REP MR; ***SEE WO 9057351 FOR ADDITIONA 515 Old Tolland Tpke Coventry, Wate TEMPLE ST HARTFORD ******Cancel Work Order*******W NEW 4/26 DEER RUN ( 3) RD -- REF P 2 MR; ***WRITTEN***QUERCUS (80) AVE, POST CONSTR - MONTEVIDEO ( 81) RD 4/26 p#45 need to rpl xarm HILLSIDE DL; 800 HOPE ST; INSTALL NEW CAP BA JDB 10 SCOTT ST NWLK REPL P20132 & WQ; BRIDGEWATER, REUBEN, 29 , JAMES 4/26/22 WARD ( 39) DR S -- 721, Priority Pole P#981 replace with 45 Priority Pole P#958 replace with 35 Priority Pole P#1209 replace with 4 Priority Pole P#2463 replace with 4 4/28/22 POND VIEW:DR::NEW FAIRFIE MR; ***WRITTEN*** CHANGE BROKEN 40/ SD; *POST CONSTRUCTION* 4/28/22 JE RSO--04/27/22--REMOVED OSPREY NEST, Priority Pole P#342-S REPLACE WITH Priority Pole P#345 REPLACE WITH 45 Priority Pole P#560 REPLACE WITH 40 DONE PR 5/17 CRP - 263 CANTON RD UN EM RF:884 NORTH ST, GREENWICH:REMOV Y-26521-2022 / BRICKYARD RD, FARMIN 101395 - Tolland, Crandall Park - r JK>POLE 2133--TREE V POLE, REPL POL DJM!!! 04.25.22 - 17 VALLEY RD, WES PR 8/30 CRP - 52 HARMONY HILL RD HA MI PCC - South St-Coventry-Poles 13 NM: 04.27.22 - 40 HASSAKE RD, OLD G 3/18 eng SPRING GLEN ( 9) DR -04/28 *TURNOVER* MANCHESTER ( 146) SC--MONTAUK TRAIL, VOLUNTOWN R-10KV PD-6 BROAD VIEW CT QUAKER HILL/RSO cancel to fwo 80265997 Asset Location 1002 : CN : WATERBURY : 1002 1112 : CN : ENFIELD : 1112 1042 : CN : NEW BRITAIN : 1042 1154 : CN : COLUMBIA : 1154 1155 : CN : COVENTRY : 1155 1113 : CN : HARTFORD : 1113 1932 : CN : BLOOMFIELD : 1932 1098 : CN : OLD SAYBROOK : 1098 1180 : CN : WINDHAM : 1180 1931 : CN : AVON : 1931 1119 : CN : UNION : 1119 1066 : CN : STAMFORD : 1066 1052 : CN : NORWALK : 1052 1130 : CN : BRIDGEWATER : 1130 1008 : CN : DANBURY : 1008 1093 : CN : ESSEX : 1093 1093 : CN : ESSEX : 1093 1093 : CN : ESSEX : 1093 1098 : CN : OLD SAYBROOK : 1098 1134 : CN : NEW FAIRFIELD : 1134 1154 : CN : COLUMBIA : 1154 1014 : CN : OXFORD : 1014 1102 : CN : BRANFORD : 1102 1098 : CN : OLD SAYBROOK : 1098 1098 : CN : OLD SAYBROOK : 1098 1098 : CN : OLD SAYBROOK : 1098 1191 : CN : BURLINGTON : 1191 1065 : CN : GREENWICH : 1065 1041 : CN : FARMINGTON : 1041 1118 : CN : TOLLAND : 1118 1098 : CN : OLD SAYBROOK : 1098 1056 : CN : WESTPORT : 1056 1405 : CN : HARWINTON : 1405 1155 : CN : COVENTRY : 1155 1065 : CN : GREENWICH : 1065 1936 : CN : GRANBY : 1936 1113 : CN : HARTFORD : 1113 1178 : CN : VOLUNTOWN : 1178 1100 : CN : WATERFORD : 1100 1931 : CN : AVON : 1931 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 247 of 616 Month Number Amount 202206 $0.55 202206 $1,485.97 202206 $2,603.21 202206 $438.33 202206 $3.39 202206 $2,309.54 202206 $5,871.96 202206 $0.46 202206 ($317.95) 202206 $420.77 202206 $1,837.27 202206 $18,177.42 202206 $1,226.70 202206 $9.00 202206 $44,744.96 202206 $8,996.98 202206 $1,306.70 202206 $6,636.12 202206 $6,082.97 202206 $24.38 202206 $3,038.79 202206 $572.27 202206 $1.52 202206 $910.49 202206 $8,926.07 202206 $204.80 202206 $1.50 202206 $3,801.30 202206 $18,260.32 202206 $24.93 202206 ($1,644.50) 202206 $1.22 202206 $72.40 202206 $16.94 202206 $0.31 202206 $1,949.54 202206 ($5,998.66) 202206 $49.80 202206 $991.02 202206 $4,120.60
  10. Page 248 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80235146 80235171 80235195 80235218 80235249 80235275 80235277 80235424 80235429 80235447 80235506 80235509 80235781 80236388 80236404 80236409 80236411 80236424 80236447 80236468 80236482 80236488 80236494 80236497 80236516 80236532 80236575 80236617 80236710 80236758 80236773 80237047 80237049 80237050 80237053 80237054 80237064 80237079 80237094 80237116 Accounting Work Order Descript 1657 Boston Turnpike Coventry, Guy INVALID SD; 17 CONNELLY RD NEW MILF JFC - TURNOVER*** 146 HEADQUARTERS 04/28 (DURKEE) IRVING ( 98) ST -P-2377 REPLACE BLOWN ARRESTER 151 W 04/28 18 W FORREST ST ENFIELD WRM - Post Const - 78 John St, New ASP-MCB - 1636 Highland Ave Waterbu MCB - 36 HILLCREST AVE, WATERBURY, WRM - 116 Farmingberry Dr, Sthgtn *PL: FLICKER ISSUE, CLOSE IN SEC @ JDB 04.28.22 - MAYWOOD RD, NORWALK COMP UNDER 17108458 04.26.22 - 6 D complete 05/02 *TURNOVER* DOANE ( POST CONSTR - COLUMBUS BLVD HARTFOR E.P.- 4/29- DEAN RD, EAST LYME- REP WAITING ON MATERIAL TO SHOW UP FROM MF 4/30 VINEGAR HILL RD LEDYARD MRP - Emergent - Cap Bank Control R WRITTEN COMPLETE IN FIELD 05/01 BOU 5/1 (RSO STILWKD) CROSS ( 22) RD E HTFD, 24 STANLEY ST -NEEDS NEW SR Y-26530-2022 SHELDON RD, GRISWOLD 5/1/22 (RSO LEACH) GREEN HILL ( 21 WRTN--JK>PAD 540--REPLACE ELBOW, RS 4/29 (PETERCL & PASCAKJ) N RIVER ( LD 4/29: 292 BRISCOE RD, NEW CANAAN install new pole, anchor, and 50kVA print 2/8 VJT - HOSIER ( 4) RD Mallory Brook Rd Washington poles MDB - N MAIN ( 27) ST UNIT 1-1 -Priority Pole P#300 REPLACE WITH 45 5/02: 161 BOWERY RD, NEW CANAAN/ NE Priority Pole P#2097 replace with 4 Priority Pole P#2171 shift to alrea 5/3/22 CHESTNUT TREE HILL ( 18) 05/02 (KELLEHER) SPRING ( 208) ST LD 48 NEW CANAAN RD, WILTON/ REPLAC 5/2/22 (RSO-LEACH) LANPHIERS COVE ( EM RF:24 LIA FAIL WAY, COS COB:TRAN Asset Location 1155 : CN : COVENTRY : 1155 1135 : CN : NEW MILFORD : 1135 1406 : CN : LITCHFIELD : 1406 1937 : CN : MANCHESTER : 1937 1103 : CN : GUILFORD : 1103 1112 : CN : ENFIELD : 1112 1042 : CN : NEW BRITAIN : 1042 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1034 : CN : SOUTHINGTON : 1034 1044 : CN : PLAINVILLE : 1044 1052 : CN : NORWALK : 1052 1071 : CN : PLYMOUTH : 1071 1937 : CN : MANCHESTER : 1937 1113 : CN : HARTFORD : 1113 1092 : CN : EAST LYME : 1092 1164 : CN : LEDYARD : 1164 1164 : CN : LEDYARD : 1164 1002 : CN : WATERBURY : 1002 1153 : CN : COLCHESTER : 1153 1160 : CN : GRISWOLD : 1160 1934 : CN : EAST HARTFORD : 1934 1160 : CN : GRISWOLD : 1160 1089 : CN : MADISON : 1089 1159 : CN : GLASTONBURY : 1159 1155 : CN : COVENTRY : 1155 1051 : CN : NEW CANAAN : 1051 1098 : CN : OLD SAYBROOK : 1098 1071 : CN : PLYMOUTH : 1071 1140 : CN : WASHINGTON : 1140 1133 : CN : KENT : 1133 1098 : CN : OLD SAYBROOK : 1098 1051 : CN : NEW CANAAN : 1051 1098 : CN : OLD SAYBROOK : 1098 1098 : CN : OLD SAYBROOK : 1098 1014 : CN : OXFORD : 1014 1937 : CN : MANCHESTER : 1937 1057 : CN : WILTON : 1057 1102 : CN : BRANFORD : 1102 1065 : CN : GREENWICH : 1065 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 248 of 616 Month Number Amount 202206 $13.48 202206 $6.00 202206 $15,449.82 202206 $44.96 202206 $2,144.23 202206 $63.96 202206 $110.44 202206 $2,419.92 202206 ($245.78) 202206 $4,209.09 202206 $1,632.60 202206 $51.36 202206 $3,513.11 202206 $28.57 202206 $3,014.71 202206 $5,847.12 202206 $51.35 202206 $50.94 202206 $1,796.32 202206 ($13.99) 202206 $21,237.43 202206 $3.33 202206 $27.52 202206 $6.83 202206 $1,982.92 202206 $58.25 202206 $62.84 202206 $1.26 202206 $1.57 202206 $23.14 202206 $1.69 202206 $4,958.90 202206 ($42.33) 202206 $351.45 202206 $3,813.07 202206 $15.23 202206 $2,014.57 202206 ($56.39) 202206 $1.26 202206 $12,179.67
Words on different pages

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)