Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 248 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80235146 80235171 80235195 80235218 80235249 80235275 80235277 80235424 80235429 80235447 80235506 80235509 80235781 80236388 80236404 80236409 80236411 80236424 80236447 80236468 80236482 80236488 80236494 80236497 80236516 80236532 80236575 80236617 80236710 80236758 80236773 80237047 80237049 80237050 80237053 80237054 80237064 80237079 80237094 80237116 Accounting Work Order Descript 1657 Boston Turnpike Coventry, Guy INVALID SD; 17 CONNELLY RD NEW MILF JFC - TURNOVER*** 146 HEADQUARTERS 04/28 (DURKEE) IRVING ( 98) ST -P-2377 REPLACE BLOWN ARRESTER 151 W 04/28 18 W FORREST ST ENFIELD WRM - Post Const - 78 John St, New ASP-MCB - 1636 Highland Ave Waterbu MCB - 36 HILLCREST AVE, WATERBURY, WRM - 116 Farmingberry Dr, Sthgtn *PL: FLICKER ISSUE, CLOSE IN SEC @ JDB 04.28.22 - MAYWOOD RD, NORWALK COMP UNDER 17108458 04.26.22 - 6 D complete 05/02 *TURNOVER* DOANE ( POST CONSTR - COLUMBUS BLVD HARTFOR E.P.- 4/29- DEAN RD, EAST LYME- REP WAITING ON MATERIAL TO SHOW UP FROM MF 4/30 VINEGAR HILL RD LEDYARD MRP - Emergent - Cap Bank Control R WRITTEN COMPLETE IN FIELD 05/01 BOU 5/1 (RSO STILWKD) CROSS ( 22) RD E HTFD, 24 STANLEY ST -NEEDS NEW SR Y-26530-2022 SHELDON RD, GRISWOLD 5/1/22 (RSO LEACH) GREEN HILL ( 21 WRTN--JK>PAD 540--REPLACE ELBOW, RS 4/29 (PETERCL & PASCAKJ) N RIVER ( LD 4/29: 292 BRISCOE RD, NEW CANAAN install new pole, anchor, and 50kVA print 2/8 VJT - HOSIER ( 4) RD Mallory Brook Rd Washington poles MDB - N MAIN ( 27) ST UNIT 1-1 -Priority Pole P#300 REPLACE WITH 45 5/02: 161 BOWERY RD, NEW CANAAN/ NE Priority Pole P#2097 replace with 4 Priority Pole P#2171 shift to alrea 5/3/22 CHESTNUT TREE HILL ( 18) 05/02 (KELLEHER) SPRING ( 208) ST LD 48 NEW CANAAN RD, WILTON/ REPLAC 5/2/22 (RSO-LEACH) LANPHIERS COVE ( EM RF:24 LIA FAIL WAY, COS COB:TRAN Asset Location 1155 : CN : COVENTRY : 1155 1135 : CN : NEW MILFORD : 1135 1406 : CN : LITCHFIELD : 1406 1937 : CN : MANCHESTER : 1937 1103 : CN : GUILFORD : 1103 1112 : CN : ENFIELD : 1112 1042 : CN : NEW BRITAIN : 1042 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1034 : CN : SOUTHINGTON : 1034 1044 : CN : PLAINVILLE : 1044 1052 : CN : NORWALK : 1052 1071 : CN : PLYMOUTH : 1071 1937 : CN : MANCHESTER : 1937 1113 : CN : HARTFORD : 1113 1092 : CN : EAST LYME : 1092 1164 : CN : LEDYARD : 1164 1164 : CN : LEDYARD : 1164 1002 : CN : WATERBURY : 1002 1153 : CN : COLCHESTER : 1153 1160 : CN : GRISWOLD : 1160 1934 : CN : EAST HARTFORD : 1934 1160 : CN : GRISWOLD : 1160 1089 : CN : MADISON : 1089 1159 : CN : GLASTONBURY : 1159 1155 : CN : COVENTRY : 1155 1051 : CN : NEW CANAAN : 1051 1098 : CN : OLD SAYBROOK : 1098 1071 : CN : PLYMOUTH : 1071 1140 : CN : WASHINGTON : 1140 1133 : CN : KENT : 1133 1098 : CN : OLD SAYBROOK : 1098 1051 : CN : NEW CANAAN : 1051 1098 : CN : OLD SAYBROOK : 1098 1098 : CN : OLD SAYBROOK : 1098 1014 : CN : OXFORD : 1014 1937 : CN : MANCHESTER : 1937 1057 : CN : WILTON : 1057 1102 : CN : BRANFORD : 1102 1065 : CN : GREENWICH : 1065 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 248 of 616 Month Number Amount 202206 $13.48 202206 $6.00 202206 $15,449.82 202206 $44.96 202206 $2,144.23 202206 $63.96 202206 $110.44 202206 $2,419.92 202206 ($245.78) 202206 $4,209.09 202206 $1,632.60 202206 $51.36 202206 $3,513.11 202206 $28.57 202206 $3,014.71 202206 $5,847.12 202206 $51.35 202206 $50.94 202206 $1,796.32 202206 ($13.99) 202206 $21,237.43 202206 $3.33 202206 $27.52 202206 $6.83 202206 $1,982.92 202206 $58.25 202206 $62.84 202206 $1.26 202206 $1.57 202206 $23.14 202206 $1.69 202206 $4,958.90 202206 ($42.33) 202206 $351.45 202206 $3,813.07 202206 $15.23 202206 $2,014.57 202206 ($56.39) 202206 $1.26 202206 $12,179.67
  2. Page 249 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80237125 80237144 80237175 80237266 80237303 80237316 80237400 80237404 80237406 80237411 80237414 80237759 80237763 80237767 80237775 80237780 80237891 80237908 80238001 80238010 80238048 80238051 80238059 80238442 80238452 80238454 80238463 80238495 80238509 80238516 80238522 80238569 80238659 80238750 80238754 80238814 80238838 80239093 80239105 80239117 Accounting Work Order Descript JTR,75 MAXIM RD HART, Replace POLE E.P.- 5/3/22- 309 FLANDERS RD REAR 7/13/22 FTR pole not set 04.28.22 E.P.-5/2/22- 8 MECHANIC ST -- 296-1 5/2 Followup work P#1025 Roast Meat SIGOURNEY ST HARTFORD -2N08 FAULT. Priority Pole P#2249 REPLACE WITH 3 Priority Pole P#461 replace with 4 Priority Pole P#123 REPLACE WITH 40 Replace Priority Pole P#526 with 40 Replace Priority Pole P#1501 replac PARK ( 6) ST -- M, ENFIELD, CT 0 done?? CP-High ST NC pole 793 chang NM: 2/20: ENGINEERING FU - ROCKY RA Rep 100kVA pad-5/3/22 (RSO-LEACH) E MV 5/3 N MAIN ( 435) ST -- 234-U/G PD-74 WEST COIT ST N. LONDON/SHIFT WEBSTER ST HARTFORD #(*)05/03 ADDISON ( 149) RD -- , CRP -(TURNOVER) ARROWHEAD ( 81) D MDB - KENT GREEN () BLVD BLDG 9 -E.P.- 3 BALDWIN COURT, UNCASVILLEWORK COMPLETE? SIMS, HOPMEADOW ST, RIGGSSIMPLE,5/5/22 TODDY HILL ( 1 TL -ASHER AVE, REF. #55 PAWCATUCK / TL - JEAN DR, #6 EAST LYME // PER T 286 OLD FARMS RD, SIMSBURY CT - INS *MAR - Per RSO TT Replace FieldSide TL - ROUTE 2A, #258 PRESTON // PER westbrook, 164 hammock rd n/uncover DG P#430 60 RAWSON RD WOODSTOCK LOW printed-4/14 OMS ATTACHED /pole lea Priority Pole P#2134 replace with 4 ****Cancel WO and transfer to WO# 9 MV 5/5 LINCOLN PARK RD PRESTON TURN POST CONSTR - COMP (ASP) 60 WEST ST Priority Pole P#2173 REPLACE WITH 3 POST CONSTR - 05/05 (KELLEHER) SAND canceling 5/5 ROCKY POINT ( 9) R EH-5/5/22 (RSO-STROM) HEMLOCK ( 2 Asset Location 1113 : CN : HARTFORD : 1113 1092 : CN : EAST LYME : 1092 1030 : CN : CHESHIRE : 1030 1177 : CN : STONINGTON : 1177 1095 : CN : KILLINGWORTH : 1095 1113 : CN : HARTFORD : 1113 1098 : CN : OLD SAYBROOK : 1098 1098 : CN : OLD SAYBROOK : 1098 1098 : CN : OLD SAYBROOK : 1098 1098 : CN : OLD SAYBROOK : 1098 1098 : CN : OLD SAYBROOK : 1098 1112 : CN : ENFIELD : 1112 1930 : CN : NORTH CANAAN : 1930 1066 : CN : STAMFORD : 1066 1102 : CN : BRANFORD : 1102 1177 : CN : STONINGTON : 1177 1169 : CN : NEW LONDON : 1169 1113 : CN : HARTFORD : 1113 1121 : CN : WINDSOR : 1121 1938 : CN : NEW HARTFORD : 1938 1133 : CN : KENT : 1133 1168 : CN : MONTVILLE : 1168 1942 : CN : SIMSBURY : 1942 1013 : CN : NEWTOWN : 1013 1177 : CN : STONINGTON : 1177 1092 : CN : EAST LYME : 1092 1942 : CN : SIMSBURY : 1942 1034 : CN : SOUTHINGTON : 1034 1173 : CN : PRESTON : 1173 1101 : CN : WESTBROOK : 1101 1085 : CN : WOODSTOCK : 1085 1083 : CN : STERLING : 1083 1091 : CN : CLINTON : 1091 1121 : CN : WINDSOR : 1121 1173 : CN : PRESTON : 1173 1941 : CN : ROCKY HILL : 1941 1098 : CN : OLD SAYBROOK : 1098 1932 : CN : BLOOMFIELD : 1932 1098 : CN : OLD SAYBROOK : 1098 1095 : CN : KILLINGWORTH : 1095 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 249 of 616 Month Number Amount 202206 $8,912.58 202206 $6.91 202206 $0.94 202206 $41.61 202206 $15.09 202206 $52,182.69 202206 $114.96 202206 $2,073.31 202206 $173.36 202206 $5.04 202206 $2,644.01 202206 $999.19 202206 $3,269.89 202206 $6,260.75 202206 $1.88 202206 $4,564.44 202206 $2,524.12 202206 $4,493.72 202206 ($100.53) 202206 $1,023.96 202206 $3.77 202206 ($27.91) 202206 $14,871.89 202206 $1,828.10 202206 $1.43 202206 $213.90 202206 $2,645.39 202206 $1.15 202206 $1.88 202206 $1,535.88 202206 $1.45 202206 $1,472.79 202206 $57.38 202206 ($5,303.40) 202206 $5.42 202206 $16,634.45 202206 $4,629.72 202206 $7.26 202206 $1.81 202206 $0.31
  3. Page 250 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80239121 80239124 80239151 80239153 80239156 80239158 80239174 80239234 80240304 80240314 80240322 80240338 80240339 80240351 80240355 80240363 80240399 80240460 80240464 80240480 80240482 80240517 80240519 80240534 80240549 80240679 80240762 80240765 80240773 80240777 80241038 80241134 80241143 80241146 80241161 80241167 80241172 80241181 80241190 80241214 Accounting Work Order Descript Followup work to replac P#7 -5/5 S ASP_05.05.22 - MAPLE RIDGE DR, FARM POST CONSTR - 9 CARRIAGE HILL DR, W 5/6/22 LASKY ( 175) RD -- G2915, Jpt-202 Garden St Bristol P9048 - T 5/5 JUNIPER (44) DR COVENTRY POST CONSTR - COLONY STREET MERIDEN DG P#3752 Y-26535-2022 BIGELOW HOLL 05/07 *TURNOVER* PORTER ( 646) ST WRITTEN COMPLETED 05/08 * TURNOVER* WRITTEN COMPLETE IN FIELD 05/08 *TU POST CONSTR - 1 MAXIM RD HARTFORD MV 5/7 PINK (46) ROW UNCASVILLE, FO MV - RSOTT - FORT HILL ( 246) RD, POST CONSTR - (COMP)PONDVIEW/WEST ( POST CONSTR - SURRY ( 4) CIR -05/06 WINDSORVILLE ( 178) RD -- 18 Followup 4/29 5TH ( 10) ST -- L4/29 ABNER ( 12) LN -- 3409, KILL ***5/8 DEEP RIVER ( 70) RD -- 71 EM RF:207 SHORE RD, OLD GREENWICH:R 5/9/22 TURNOVER - S DURKEE HILL SO *05.06.22 - 26 MAPLE LN, WOLCOTT. CHAROAK 5/24 - WRM - Bridgehampton 5/8/22 FOLLOWUP REPLC SRV (RSO-STRO DONE REPRINT 8/30 JFC - N FORTY ( WRM - Preston Ave and Old E Main St MRP - Emergent - Cap Bank Control R MV Y-26553-2022 HAMBURG RD LYME, I/ 5/9/22 G1532::PETER:RD::SOUTHBURY: P-1408 YELLOW TAG 26460-2022 MEADOW *Do With WO#899435*- MAR - Replace GCC / RAYMOND HILL ROAD, MONTVILLE POST CONSTR - 05/09 **TURNOVER** WA APPRENTICES 5/10/22 CALHOUN ( 2 WRITTEN NEEDS TO BE DONE 05/10 *TUR (*)PRESTON ( 120) ST APT C1 -- H22 MR;***WRITTEN***LAKE HAYWARD TOWN:R 12 MERRILL ST HARTFORD dAN- 5/9 TOWER HILL RD CLINTON Asset Location 1098 : CN : OLD SAYBROOK : 1098 1041 : CN : FARMINGTON : 1041 1045 : CN : WETHERSFIELD : 1045 1005 : CN : BEACON FALLS : 1005 1070 : CN : BRISTOL : 1070 1155 : CN : COVENTRY : 1155 1032 : CN : MERIDEN : 1032 1085 : CN : WOODSTOCK : 1085 1937 : CN : MANCHESTER : 1937 1157 : CN : EAST HAMPTON : 1157 1167 : CN : MARLBOROUGH : 1167 1113 : CN : HARTFORD : 1113 1168 : CN : MONTVILLE : 1168 1161 : CN : GROTON : 1161 1031 : CN : CROMWELL : 1031 1942 : CN : SIMSBURY : 1942 1110 : CN : EAST WINDSOR : 1110 1089 : CN : MADISON : 1089 1095 : CN : KILLINGWORTH : 1095 1093 : CN : ESSEX : 1093 1065 : CN : GREENWICH : 1065 1018 : CN : SOUTHBURY : 1018 1020 : CN : WOLCOTT : 1020 1041 : CN : FARMINGTON : 1041 1101 : CN : WESTBROOK : 1101 1405 : CN : HARWINTON : 1405 1032 : CN : MERIDEN : 1032 1044 : CN : PLAINVILLE : 1044 1096 : CN : LYME : 1096 1018 : CN : SOUTHBURY : 1018 1103 : CN : GUILFORD : 1103 1002 : CN : WATERBURY : 1002 1168 : CN : MONTVILLE : 1168 1041 : CN : FARMINGTON : 1041 1140 : CN : WASHINGTON : 1140 1156 : CN : EAST HADDAM : 1156 1113 : CN : HARTFORD : 1113 1156 : CN : EAST HADDAM : 1156 1113 : CN : HARTFORD : 1113 1091 : CN : CLINTON : 1091 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 250 of 616 Month Number Amount 202206 $2.36 202206 $10.83 202206 $368.65 202206 $48.03 202206 $412.30 202206 $86.31 202206 $20,613.82 202206 $1,158.71 202206 $250.91 202206 $171.98 202206 $189.58 202206 $2,926.80 202206 $1.89 202206 $42.21 202206 $6,369.56 202206 ($314.56) 202206 $38.75 202206 $0.63 202206 $1.26 202206 $86.21 202206 $16,498.27 202206 $38,617.89 202206 $0.47 202206 $2,471.27 202206 $1.92 202206 $2.00 202206 $22.63 202206 $3,582.19 202206 ($14,693.13) 202206 $522.07 202206 $2,449.53 202206 $2,468.04 202206 $2,140.34 202206 ($5,037.87) 202206 $3.42 202206 $3,967.69 202206 $6.95 202206 $3,314.29 202206 $2,002.76 202206 $106.31
  4. Page 251 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80241215 80241230 80241253 80241268 80241270 80241273 80241278 80241281 80241288 80241294 80241298 80241299 80241304 80241305 80241307 80241308 80241357 80241359 80241361 80241394 80241540 80241560 80241572 80241588 80241594 80241655 80242058 80242091 80242095 80242097 80242103 80242108 80242117 80242120 80242134 80242180 80242363 80242399 80242429 80242432 Accounting Work Order Descript WRITTEN BUT NOT COMPLETE ED WILLIAM 5/09: SCARLET OAK DR, WILTON/ REPLA RSO--05/09/22--JK>POLE 794--SPLICED Priority Pole P#1774 replace with 4 Asbuilt done MM pole 44164 S Montow Replace Priority Pole replace with COMP 05/09 (PETERSON) CANDLELITE ( Priority Pole P#1857 replace with 4 DF -(R/I) POLE 37- 93 WATER ST CHES Replace Priority Pole P#2016 with 4 TO STORES 2/2/23-- Pole P#2017 with #WINDSOR, 10 BUCKLAND WAY - REPL FG Replace Priority Pole P#1723 replac MM pole 1922 ,1923 and 2151 Deerfi PD- P1465 CLARK LN WTFD/REPLC XARM Priority Pole P#429 replace with 40 MJ 49S2 Circuit based WO-Coventry #203::written complete DARS DUP ROU MJ 49S2 Circuit based WO-Tolland MM P#2357 replc 10' crossarm and sh PD-9 JAY ST N. LONDON/GUY WIRE ISSU COMP CCC 11/17/22 - STLT 04.19.22 RIGGS 5/23 WRM - 408 Glen St, New B PRIORITY REJECT P-471 REPLACE WITH P-2111 REPLACE PRIORITY REJECT WITH PRINTED 8/30 CRP - PLYMOUTH ( 526) EM RF:70 COACHLAMP LN, DARIEN:REMOV 5/10STONE HEDGE 55 RD PAD 23 WESTBR SC-P#4531 PRSPECT AVE GUILFORD I/RPD-432 NORWICH WESTERLY RD N. STON 5/11/22 BARKER:RD::NEW MILFORD:CT MV 5/10 OLD NORWICH ( 153) RD FL 2 PD-10 SUNNIECREST DR WATERFORD/RPLC NEW GC 5/10 Y-26558-2022 - N ANGUI TT TC 62 ELMCROFT RD, STM: P#4928S East Meriden 21P - 21P-1X Transform EVW - ROCKWELL ( 224) ST -- 2702, MCB - 05.10.22 - 141 SHERIDAN DR, N Priority Pole P#2175 replace with 3 Priority Pole P#1840 replace with 4 Asset Location 1156 : CN : EAST HADDAM : 1156 1057 : CN : WILTON : 1057 1177 : CN : STONINGTON : 1177 1091 : CN : CLINTON : 1091 1102 : CN : BRANFORD : 1102 1098 : CN : OLD SAYBROOK : 1098 1941 : CN : ROCKY HILL : 1941 1091 : CN : CLINTON : 1091 1090 : CN : CHESTER : 1090 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1121 : CN : WINDSOR : 1121 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1100 : CN : WATERFORD : 1100 1091 : CN : CLINTON : 1091 1155 : CN : COVENTRY : 1155 1180 : CN : WINDHAM : 1180 1118 : CN : TOLLAND : 1118 1089 : CN : MADISON : 1089 1169 : CN : NEW LONDON : 1169 1032 : CN : MERIDEN : 1032 1042 : CN : NEW BRITAIN : 1042 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1405 : CN : HARWINTON : 1405 1908 : CN : DARIEN : 1908 1101 : CN : WESTBROOK : 1101 1103 : CN : GUILFORD : 1103 1170 : CN : NORTH STONINGTON : 1170 1135 : CN : NEW MILFORD : 1135 1100 : CN : WATERFORD : 1100 1100 : CN : WATERFORD : 1100 1177 : CN : STONINGTON : 1177 1066 : CN : STAMFORD : 1066 J21P : CL&P EAST MERIDEN MERIDEN : 1032 1195 : CN : WINCHESTER : 1195 1003 : CN : NAUGATUCK : 1003 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 251 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $3,581.75 Emergent Equipment Failures - Line 202206 $19.68 Emergent Equipment Failures - Line 202206 $7.90 Emergent Equipment Failures - Line 202206 $209.21 Emergent Equipment Failures - Line 202206 $0.31 Emergent Equipment Failures - Line 202206 $1,470.31 Emergent Equipment Failures - Line 202206 $46.84 Emergent Equipment Failures - Line 202206 $182.22 Emergent Equipment Failures - Line 202206 $2,525.42 Emergent Equipment Failures - Line 202206 $15.83 Emergent Equipment Failures - Line 202206 $388.93 Emergent Equipment Failures - Line 202206 $10.13 Emergent Equipment Failures - Line 202206 $24,944.38 Emergent Equipment Failures - Line 202206 ($5,199.42) Emergent Equipment Failures - Line 202206 $7,802.63 Emergent Equipment Failures - Line 202206 $232.22 Emergent Equipment Failures - Line 202206 $4,385.66 Emergent Equipment Failures - Line 202206 $26.31 Emergent Equipment Failures - Line 202206 $3,424.90 202206 $168.16 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $106.33 Emergent Equipment Failures - Line 202206 $825.30 Emergent Equipment Failures - Line 202206 $519.91 Emergent Equipment Failures - Line 202206 $186.85 Emergent Equipment Failures - Line 202206 $500.28 Emergent Equipment Failures - Line 202206 ($3.93) Emergent Equipment Failures - Line 202206 $829.73 Emergent Equipment Failures - Line 202206 $4,665.07 Emergent Equipment Failures - Line 202206 $71.75 Emergent Equipment Failures - Line 202206 $1.10 Emergent Equipment Failures - Line 202206 ($85.81) Emergent Equipment Failures - Line 202206 $153.92 Emergent Equipment Failures - Line 202206 $2.21 Emergent Equipment Failures - Line 202206 $16,766.42 Emergent Equipment Failures - Line 202206 $0.31 Emergent Equipment Failures - Substation 202206 $723,274.62 Emergent Equipment Failures - Line 202206 $0.47 Emergent Equipment Failures - Line 202206 $57.66 Emergent Equipment Failures - Line 202206 $588.38 Emergent Equipment Failures - Line 202206 $190.87
  5. Page 252 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80242435 80242437 80242443 80242453 80242468 80242495 80242726 80242743 80242774 80242790 80242798 80242805 80242813 80242816 80242906 80243079 80243082 80243089 80243092 80243095 80243215 80243564 80243580 80243590 80243608 80243659 80243719 80243733 80243753 80243754 80243894 80243899 80243902 80243913 80244510 80244511 80244512 80244797 80244824 80244839 Accounting Work Order Descript Priority Pole P#1340 replace with 4 MJ-* 05.10.22 - 138 WARREN ST, MER BIRCH ST MANCHESTER, Pole#985, Repl SC-P#3754 HUNTINGTON DR PLAINFIELD Jpt-276 S Washington St Plainville VJT - LAKE PLYMOUTH ( 56) BLVD -JDB5/11: 151 WOODWARD AVE, NORWALK/ CANX 5/12/22 RABBIT HILL ( 15) 5/11 PEPPERIDGE ( 39) AVE -- 82-5 AJC ON HOLD 239 GREENWICH AVE, GRN TL - HAMBURG RD, #346-1 LYME // TBC ***ALL WORK COMPLETED*** 05-12-2022 DAN-5/12 VALLEY BROOK ( 26) RD S 05/11 PARKER ST MANCHESTER NEED NE WRTN--JK>PAD 540--REPLACE ELBOW, IN TO STORES 2/2--Priority Pole P#2119 Priority Pole P#2126 replace with 4 Priority Pole P#1949 replace with Priority Pole P#2218 REPLACE WITH 3 Priority Pole P#1427 replace with 4 PRINTED--4/28 HUNTINGTON (74) DR PL NW Hartford 2N-Replace Failed Relay 5/13/22 *Y-26524-2022* P.60391 240 APPRENTICES 105 Wykeham Rd Aquiri H&M only - BRANDY WINE ( 8) LN 3 OR MORE: NM: 9 TODS DRIFTWAY, OLD MF 05-12-22 TURNOVER 189 AVERY HILL Y-26569 NEED TO RPLC SWITCH 600, SU East Granby-69 Brighton-SV#705 DAMA (*) CO zRH--5/12/22--72 N Condor Dr TL - ATLANTIC ST, REF. #20 NIANTIC 05-13-2022 Pole 319 Woodward Rd Col 05-13-2022 Pole 731 Hunt Rd Columbi 05-13-2022 Pole 651 Jonathan Trumbu P-1985 REPLACE PRIORITY REJECT WITH P-1993 REPLACE PRIORITY REJECT WITH P-1632 REPLACE PRIORITY REJECT WITH (*) zRH--5/13/22--236 New Britain A SC-P#2042 BOSTON POST RD WESTBROOK E.P.-5/14- 71 LONGVIEW ST, NEW LOND Asset Location 1091 : CN : CLINTON : 1091 1032 : CN : MERIDEN : 1032 1937 : CN : MANCHESTER : 1937 1080 : CN : PLAINFIELD : 1080 1044 : CN : PLAINVILLE : 1044 1071 : CN : PLYMOUTH : 1071 1052 : CN : NORWALK : 1052 1140 : CN : WASHINGTON : 1140 1101 : CN : WESTBROOK : 1101 1065 : CN : GREENWICH : 1065 1096 : CN : LYME : 1096 1154 : CN : COLUMBIA : 1154 1102 : CN : BRANFORD : 1102 1937 : CN : MANCHESTER : 1937 1159 : CN : GLASTONBURY : 1159 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1080 : CN : PLAINFIELD : 1080 G02N : CL&P NORTHWEST HARTFORD HARTFORD 1014 : CN : OXFORD : 1014 1140 : CN : WASHINGTON : 1140 1117 : CN : SUFFIELD : 1117 1065 : CN : GREENWICH : 1065 1164 : CN : LEDYARD : 1164 1089 : CN : MADISON : 1089 1123 : CN : EAST GRANBY : 1123 1941 : CN : ROCKY HILL : 1941 1092 : CN : EAST LYME : 1092 1154 : CN : COLUMBIA : 1154 1154 : CN : COLUMBIA : 1154 1154 : CN : COLUMBIA : 1154 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1941 : CN : ROCKY HILL : 1941 1101 : CN : WESTBROOK : 1101 1169 : CN : NEW LONDON : 1169 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 252 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $1,097.29 Emergent Equipment Failures - Line 202206 ($26.02) Emergent Equipment Failures - Line 202206 $1,860.62 Emergent Equipment Failures - Line 202206 $1,727.24 Emergent Equipment Failures - Line 202206 $124.87 Emergent Equipment Failures - Line 202206 $4.05 Emergent Equipment Failures - Line 202206 $1.17 Emergent Equipment Failures - Line 202206 $1.73 Emergent Equipment Failures - Line 202206 $45.02 Emergent Equipment Failures - Line 202206 $6,303.10 Emergent Equipment Failures - Line 202206 $782.30 Emergent Equipment Failures - Line 202206 $28,790.53 Emergent Equipment Failures - Line 202206 $406.85 Emergent Equipment Failures - Line 202206 $5,394.73 Emergent Equipment Failures - Line 202206 $1,513.99 Emergent Equipment Failures - Line 202206 $1,278.41 Emergent Equipment Failures - Line 202206 $350.83 Emergent Equipment Failures - Line 202206 $141.74 Emergent Equipment Failures - Line 202206 ($162,359.54) 202206 $350.99 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $8,922.17 Emergent Equipment Failures - Substation 202206 $7,071.01 Emergent Equipment Failures - Line 202206 $9.44 Emergent Equipment Failures - Line 202206 $16,457.36 Emergent Equipment Failures - Line 202206 $2,769.74 Emergent Equipment Failures - Line 202206 $8,785.96 Emergent Equipment Failures - Line 202206 $34,133.45 Emergent Equipment Failures - Line 202206 $537.69 Emergent Equipment Failures - Line 202206 $1,812.11 Emergent Equipment Failures - Line 202206 $1,571.85 Emergent Equipment Failures - Line 202206 $201.79 Emergent Equipment Failures - Line 202206 $6,714.87 Emergent Equipment Failures - Line 202206 $815.99 Emergent Equipment Failures - Line 202206 $9.36 Emergent Equipment Failures - Line 202206 $158.97 Emergent Equipment Failures - Line 202206 $142.35 Emergent Equipment Failures - Line 202206 $178.29 Emergent Equipment Failures - Line 202206 $5,148.42 Emergent Equipment Failures - Line 202206 $50.54 Emergent Equipment Failures - Line 202206 $95.40
  6. Page 253 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80244847 80244857 80244872 80244874 80245307 80245310 80245429 80245722 80245739 80245767 80245768 80245777 80245787 80245798 80245803 80245846 80245876 80245882 80245943 80246072 80246093 80246094 80246101 80246102 80246104 80246105 80246111 80246115 80246121 80246126 80246159 80246168 80246178 80246182 80246192 80246195 80246198 80246515 80246528 80246552 Accounting Work Order Descript ***5/14 (RSO PENFIELD/PATINELLA) LI Fairway Drive-East Windsor-repair S CANCELING TO WO9748917 TO ADD POLE ***5/13/22 (RSO-STROM) SNYDER ( 1 JDB 89 WILLIAM ST NORWALK,REPL 1423 (DF)UPGD POLE 552 INSTALL 2 ANCS & TL - STERLING CITY RD, #35-1 LYME / EM RF:326 ROUND HILL RD, GREENWICH: E.P.- 5/16-273 FARMHOLME RD STONING PR 6/1 JSG/Burlington--Milford St. 05/16 *TUNOVER* 750 OLD MAIN ST ROC WRITTEN COMPLETE IN FIELD 05/14 (HI *Do with WO#8817147* MAR - 3ph Prim Y-26441-2022 REPLACE NETWORK PROTEC 05/15 55 DEER RUN TRL,MANCHESTER Ha MM 104 Kingfisher ln repair conduit COMPLETED HEL 2022 Pole Inspection 5/23 APPRENTICES MDB-REPLACE-OH-ANN CANCEL 2022 Pole Inspection - Prior JAM - Hanover St Meriden - Pole 950 Priority Pole P#2092 replace with 4 Priority Pole P#637 replace with 40 Priority Pole P#726 replace with 45 PCC - Snow Lane-Ashford-Remove tree Priority Pole P#836 replace with 40 COMPLETED 2022 Pole Inspection - Pr COMPLETED 2022 Pole Inspection - Pr COMPLETED HEL 2022 Pole Inspection COMPLETED - 2022 Pole Inspection COMPLETED 2022 Pole Inspection - Pr TL - GRASSY HILL RD, #101 OLD LYME CANCEL 2022 Pole Inspection - Prior CANCEL 2022 Pole Inspection - Prior COMPLETED HEL 2022 Pole Inspection DG P#119 21 CENTER ST PUTNAM CLP TO COMPLETED 5/20/22 2022 Pole Inspect Alden One 3/18 pole leaning SOUTHW COMPLETED HEL 2022 Pole Inspection COMPLETED APPRENTICES 2022 Pole Ins ASP 1217 WINDSOR AVE, WINDSOR CT - Asset Location 1102 : CN : BRANFORD : 1102 1110 : CN : EAST WINDSOR : 1110 1091 : CN : CLINTON : 1091 1094 : CN : HADDAM : 1094 1052 : CN : NORWALK : 1052 1099 : CN : DEEP RIVER : 1099 1096 : CN : LYME : 1096 1065 : CN : GREENWICH : 1065 1177 : CN : STONINGTON : 1177 1191 : CN : BURLINGTON : 1191 1941 : CN : ROCKY HILL : 1941 1156 : CN : EAST HADDAM : 1156 1006 : CN : BETHANY : 1006 1169 : CN : NEW LONDON : 1169 1937 : CN : MANCHESTER : 1937 1101 : CN : WESTBROOK : 1101 1008 : CN : DANBURY : 1008 1071 : CN : PLYMOUTH : 1071 1008 : CN : DANBURY : 1008 1032 : CN : MERIDEN : 1032 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1151 : CN : ASHFORD : 1151 1091 : CN : CLINTON : 1091 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1097 : CN : OLD LYME : 1097 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1082 : CN : PUTNAM : 1082 1008 : CN : DANBURY : 1008 1112 : CN : ENFIELD : 1112 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1121 : CN : WINDSOR : 1121 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 253 of 616 Month Number Amount 202206 ($1,235.41) 202206 ($2,503.10) 202206 ($236.99) 202206 $0.71 202206 $7,631.41 202206 $4,106.76 202206 $7,249.79 202206 $75,269.15 202206 ($101.82) 202206 $2,845.04 202206 $7,825.52 202206 $238.06 202206 $42,922.28 202206 $1,124.27 202206 $89.69 202206 $7,607.38 202206 $913.74 202206 $6.16 202206 ($4,695.36) 202206 $1,134.51 202206 $486.97 202206 $738.57 202206 $1,025.72 202206 $13.87 202206 $1,325.54 202206 $628.50 202206 $160.39 202206 $913.74 202206 $797.30 202206 $797.30 202206 $4,602.94 202206 ($2,860.78) 202206 ($2,904.75) 202206 $913.74 202206 $0.81 202206 $164.05 202206 $1,109.70 202206 $3,408.05 202206 $6,297.55 202206 $1,762.56
  7. Page 254 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80246568 80246573 80246576 80246588 80246616 80246658 80246832 80247312 80247319 80247328 80247345 80247361 80247376 80247400 80247552 80247636 80247891 80247893 80247923 80247970 80247977 80247988 80248214 80248221 80248493 80249065 80249066 80249069 80249072 80249075 80249077 80249078 80249080 80249086 80249094 80249098 80249100 80249103 80249107 80249173 Accounting Work Order Descript 5/18/22 155 RICHARDS DR, MONROE (A DG P#1321 OPENING HILL RD MADISON R REPLACE 300KVA PAD ELM ST ( 105 ), 5/18 P#2350 NOTT HIGHWAY, ASHFORD ASP JMS- 05/17 MOUNTAIN RD BLOOMFIE 05/12 great meadows rd wethersfield JES; AIKEN ST. NORWALK; ROLLING RID OXFORD, CHRISTIAN, 288, DG P#1253/2372-1/2 LABBY RD THOMPSO RR; 5/19/22 N GEORGES HILL( 321) R 5/16 CHESTNUT HILL (250), STAFFORD TO STORES 2/2--ASPLUNDH REPLACE 4 F AldenOne-5/14 (GEMBEJC) p#1365 rott 05/17 E RIVER DR EAST HARTFORD REPL 5/18/22 (RSO-D'AMICO) WILLIAMS ST ( VLT #1 RIVER RD , ADAMEC RD WILLING COMPLETED HEL 2022 Pole Inspection COMPLETED HEL 2022 Pole Inspection INVALID 5/20/22 146 Umpawaug Rd, R 5/20/22 Y-26498-2022 BREAULT AVE 5/20/22 Y-26499-2022 PINES BRDIGE JES; 121 MIDDLEBROOK FARM RD. WILTO 5/20/22 Y-26593-2022 P.7839 ROSE WRITTEN NEEDS TO BE DONE 05-20-2022 MR;***WRITTEN***ALL WORK COMPLETED* POST CONSTR - complete 05/22 *TURNO COMP POST CONSTR - 05/21 *TURNOVER* WRM - 766 Marion Rd, Cheshire - P#2 Replace OH Srv 60 feet MAPLE LN (32 WORK COMPLETE 5/22/22 TURNOVER P147 ASP W HTFD, NEW BRITAIN AV - RELOCA 05/22 *TURNOVER* GARDEN GROVE RD MA 5/21 VLT 113 NORTH ST, WINDSOR LOCK 5/21 P#5434 ROSEMONT ST, HARTFORD #5/21 FARMINGTON AVE (151), HARTFOR WRITTEN COMPLETE IN FIELD 5/20 DANI JK>PER T-TICKET, REPLACE SW VLT 620 WRTN--JK>POLE 107--REPLACE ARRESTER BURR HILL RD, DURHAM RD, RTE 148 KI POST CONSTR 5/20 P#3187 LONG VIEW ( Asset Location 1012 : CN : MONROE : 1012 1089 : CN : MADISON : 1089 1098 : CN : OLD SAYBROOK : 1098 1151 : CN : ASHFORD : 1151 1932 : CN : BLOOMFIELD : 1932 1045 : CN : WETHERSFIELD : 1045 1052 : CN : NORWALK : 1052 1014 : CN : OXFORD : 1014 1084 : CN : THOMPSON : 1084 1018 : CN : SOUTHBURY : 1018 1116 : CN : STAFFORD : 1116 1103 : CN : GUILFORD : 1103 1155 : CN : COVENTRY : 1155 1934 : CN : EAST HARTFORD : 1934 1169 : CN : NEW LONDON : 1169 1179 : CN : WILLINGTON : 1179 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1053 : CN : REDDING : 1053 1005 : CN : BEACON FALLS : 1005 1005 : CN : BEACON FALLS : 1005 1057 : CN : WILTON : 1057 1008 : CN : DANBURY : 1008 1094 : CN : HADDAM : 1094 1033 : CN : MIDDLETOWN : 1033 1932 : CN : BLOOMFIELD : 1932 1931 : CN : AVON : 1931 1030 : CN : CHESHIRE : 1030 1101 : CN : WESTBROOK : 1101 1096 : CN : LYME : 1096 1943 : CN : WEST HARTFORD : 1943 1937 : CN : MANCHESTER : 1937 1122 : CN : WINDSOR LOCKS : 1122 1113 : CN : HARTFORD : 1113 1113 : CN : HARTFORD : 1113 1156 : CN : EAST HADDAM : 1156 1159 : CN : GLASTONBURY : 1159 1100 : CN : WATERFORD : 1100 1095 : CN : KILLINGWORTH : 1095 1942 : CN : SIMSBURY : 1942 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 254 of 616 Month Number Amount 202206 $7,574.73 202206 $1.31 202206 $198.81 202206 ($1,773.86) 202206 $6,524.66 202206 $4,257.24 202206 $15,319.56 202206 $3,781.95 202206 $6,148.28 202206 $144.32 202206 $36,323.22 202206 $173,134.45 202206 $2,434.55 202206 $21.29 202206 ($732.06) 202206 $6,892.03 202206 $2,214.24 202206 $724.68 202206 $1,482.50 202206 $7.08 202206 $7.94 202206 $403.04 202206 $14,783.64 202206 $3,939.08 202206 $73.12 202206 $3.20 202206 $107.80 202206 $1,219.34 202206 $0.94 202206 $49.45 202206 $1,268.36 202206 $2,467.29 202206 $0.07 202206 $36,980.34 202206 $0.63 202206 $923.06 202206 $926.52 202206 $0.77 202206 $123.61 202206 $0.71
  8. Page 255 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80249204 80249216 80249233 80249247 80249274 80249283 80249293 80249318 80249325 80249345 80249457 80249498 80249519 80249527 80249535 80249809 80249833 80249847 80249939 80249951 80249956 80249972 80249982 80249987 80250022 80250035 80250042 80250055 80250072 80250106 80250158 80250163 80250171 80250174 80250177 80250181 80250183 80250186 80250193 80250213 Accounting Work Order Descript ***WRITTEN***ALL WORK COMPLETED***5 written 5/22 RSO PETERCL - BEAVER MJ - 05/18 CAIN ST SUFFIELD POLE 46 APPT 6/29 CP-Old Farm rd Burlingto MR;***WRITTEN***ALL WORK COMPLETED* 5/23 PAD #23PA ALUMNI DR, MANSFIELD 5/23 LAWNACRE RD (20), WINDSOR LOCK 5/23/22 TURNOVER - WEBATUCK:RD::NE Lakeview 31A-Replace Failed Breaker (E OH 7/27) W HTFD, TROUT BROOK DR TL - HICKORY ST, LYME // SUPPORT WO MPB; 5 MOUNTAIN VIEW LN, RIDGEFIELD Bokum 15L-Replace Failed 26T/2X Rel VEG OH COMP 05/22 (WEHNER) OLD STON BM; 5/23/22 PARK LN E NEW MILFORD: RR; SOUTHBURY, Jeremy Swamp 882, Ru PR 6/1 CP-128 TORRINGTON AVE CTN re ***WRITTEN***ALL WORK COMPLETED***5 5/23 written complete RSO FONTAINE OENOKE RIDGE, NEW CANAAN PAD#392 RE POST CONSTR - 5/23 BUTLER (25) RD M VEG - OH COMP 05/23 (MIGLIORE) RIVE MATERIAL JDB 78 SPRING HILL AVE, NO WRITTEN COMPLETE IN FIELD 05/23 ROB 05-24-2022 Yellow Tag # Y-26612-202 WRTN--JK>SW VLT 670--YELLOW TAG--RE POST CONSTR 05/23 (HINDLE) BLUE HIL POST CONSTR - A1::MEADOW:ST::NEWING POST CONSTR - 5/24/22 * TURNOVER * POST CONSTR - 05/22 (CHASSEG) BRITT Cancel 05-23-22 OM GENERATION OLD T POST CONSTR - BAILEYVILLE( 362) RD Berlin 6A-Rebuild Failed 6A-1X LTC 11132::MUSKET RIDGE:RD::NEW FAIRFIE DG P#388 188 CHERRY HILL RD POMFRET WRM - (9A) Post Const - 186 Oak St, MUSKET RIDGE RD NEW FAIRFIELD, P.11 Windsor Locks 14K-Rplc 14K-3X LTC C POST CONSTR - SCOTT ( 271) RD -- 10 05/22 FOUR ROD RD BERLIN - primary Asset Location 1172 : CN : PORTLAND : 1172 1180 : CN : WINDHAM : 1180 1117 : CN : SUFFIELD : 1117 1191 : CN : BURLINGTON : 1191 1033 : CN : MIDDLETOWN : 1033 1166 : CN : MANSFIELD : 1166 1122 : CN : WINDSOR LOCKS : 1122 1135 : CN : NEW MILFORD : 1135 J31A : CL&P LAKEVIEW (FUTURE) NEW CANAAN : 1051 1943 : CN : WEST HARTFORD : 1943 1096 : CN : LYME : 1096 1054 : CN : RIDGEFIELD : 1054 G15L : CL&P BOKUM OLD SAYBROOK 1942 : CN : SIMSBURY : 1942 1135 : CN : NEW MILFORD : 1135 1018 : CN : SOUTHBURY : 1018 1933 : CN : CANTON : 1933 1169 : CN : NEW LONDON : 1169 1158 : CN : FRANKLIN : 1158 1051 : CN : NEW CANAAN : 1051 1113 : CN : HARTFORD : 1113 1941 : CN : ROCKY HILL : 1941 1052 : CN : NORWALK : 1052 1156 : CN : EAST HADDAM : 1156 1090 : CN : CHESTER : 1090 1102 : CN : BRANFORD : 1102 1932 : CN : BLOOMFIELD : 1932 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1042 : CN : NEW BRITAIN : 1042 1089 : CN : MADISON : 1089 1037 : CN : MIDDLEFIELD : 1037 G06A : CL&P BERLIN BERLIN 1013 : CN : NEWTOWN : 1013 1081 : CN : POMFRET : 1081 1042 : CN : NEW BRITAIN : 1042 1134 : CN : NEW FAIRFIELD : 1134 J14K : CL&P WINDSOR LOCKS WINDSOR LOCKS : 1122 1002 : CN : WATERBURY : 1002 1040 : CN : BERLIN : 1040 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 255 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $43.27 Emergent Equipment Failures - Line 202206 $250.31 Emergent Equipment Failures - Line 202206 $2.11 Emergent Equipment Failures - Line 202206 $5,186.84 Emergent Equipment Failures - Line 202206 $158.82 Emergent Equipment Failures - Line 202206 $4,033.65 Emergent Equipment Failures - Line 202206 $10,852.47 Emergent Equipment Failures - Line 202206 $26.86 Emergent Equipment Failures - Substation 202206 $21.25 Emergent Equipment Failures - Line 202206 $2.51 Emergent Equipment Failures - Line 202206 $6,851.26 Emergent Equipment Failures - Line 202206 $20.27 Emergent Equipment Failures - Substation 202206 $1.30 Emergent Equipment Failures - Line 202206 $4.98 Emergent Equipment Failures - Line 202206 ($56.57) Emergent Equipment Failures - Line 202206 $3,333.81 Emergent Equipment Failures - Line 202206 $1,215.19 Emergent Equipment Failures - Line 202206 $41.67 Emergent Equipment Failures - Line 202206 $27.60 202206 $570.59 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $1.30 Emergent Equipment Failures - Line 202206 ($26.02) Emergent Equipment Failures - Line 202206 $7,333.90 Emergent Equipment Failures - Line 202206 ($355.84) Emergent Equipment Failures - Line 202206 $14,470.57 Emergent Equipment Failures - Line 202206 $8,062.10 Emergent Equipment Failures - Line 202206 $579.47 Emergent Equipment Failures - Line 202206 $1,500.82 Emergent Equipment Failures - Line 202206 $80.37 Emergent Equipment Failures - Line 202206 $458.84 Emergent Equipment Failures - Line 202206 $6,692.31 Emergent Equipment Failures - Line 202206 $362.88 Emergent Equipment Failures - Substation 202206 $26,276.59 Emergent Equipment Failures - Line 202206 ($1,377.99) Emergent Equipment Failures - Line 202206 $2,037.93 Emergent Equipment Failures - Line 202206 $245.16 Emergent Equipment Failures - Line 202206 $1,566.77 Emergent Equipment Failures - Substation 202206 $90.08 Emergent Equipment Failures - Line 202206 $69.58 Emergent Equipment Failures - Line 202206 ($391.86)
  9. Page 256 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80250224 80250232 80250300 80250303 80250324 80250742 80250748 80250754 80250831 80250881 80250885 80250933 80251005 80251011 80251015 80251019 80251061 80251071 80251103 80251127 80251451 80251456 80251458 80251501 80251508 80251513 80251514 80251515 80251522 80251540 80251550 80251575 80251600 80251601 80251751 80251762 80251768 80251816 80251823 80251827 Accounting Work Order Descript 05/23 (LONGOM) LONGMEADOW/BUCKLAND * 05/22 (CHANND) HEATHER LN NEW BR MATERIAL DJM!!! 21 JESUP RD,WESTPOR 5/22: MILLS ST. WESTPORT EVW - 397 Norfolk Rd, Canaan P#461 WORK COMPLETE - MJG - 5/24 SHEWVILL 5/24 (248) SALMON BROOK ST, GRANBY 5/23 SCHOOL ST EAST GRANBY CT - SER 5/23 BEBBINGTON( 513) RD BARN -- 20 5/23 (PETERCL) MORRISON ST, VERNON 5/24/22 NEW MILFORD LITCHFIELD RD, POST CONSTRUCTION - 05/24 TREMONT S ***5-24 BOSTON POST 2545 RD 7513 GU * 05/23 (MAZURLJ) CAMDEN/COOPER ST 05/24 WOODRUFF ST SOUTHINGTON - cab AMM COPPERMINE RD FARMINGTON. REPLA print 3/3 EVW - Norfolk Rd X of Pi PR 9/26 CRP - SABOLCIK:RD::NEW HART REALTY DR, CHESHIRE CT - DOGHOUSE + JFC - LITCHFIELD PONDS DR-- SE, LIT POST CONSTR - WEST MAIN ST MERIDEN RC REPLACE POLE 2017 6 WHITE HALL R SP PROJECTS; WRITTEN NEEDS TO BE CO 5/30 REPLACE-OH-ANNUAL-DESG 05.12.22 - 69 LINDEN ST, PLAINVILLE WRITTEN COMPLETE IN FIELD E SHORE( POST CONSTRUCTION - HIGHLAND AVE CH MM Pole #2100 Corey Rd Canterbury r VJT - 277::BRIDGE:ST::THOMASTON:CT POST CONSTR - 7L SUBSTATION EAST NE POST CONSTR - TURNOVER)1833 WATERTO wait for cust MDB - LAUREL MOUNTAIN **05.14.22 - 1503 THOMASTON AVE, WA 2746 SOUTH MAIN ST, WATERBURY CT 5/22 TO ENG 70 OAKLAND RD, SOUTH WI Helpers to Do - 05.23.22 / Y-26620POST CONSTRUCTION - TURNOVER 05.23. CANCELING-5/25/22 Y-26625-2022 V 5/22 364 LAUREL RD, NEW CANAAN PAD LD 116 BORGLUM RD WILTON P#21498 UP Asset Location 1020 : CN : WOLCOTT : 1020 1042 : CN : NEW BRITAIN : 1042 1056 : CN : WESTPORT : 1056 1056 : CN : WESTPORT : 1056 1929 : CN : CANAAN : 1929 1164 : CN : LEDYARD : 1164 1936 : CN : GRANBY : 1936 1123 : CN : EAST GRANBY : 1123 1151 : CN : ASHFORD : 1151 1120 : CN : VERNON : 1120 1140 : CN : WASHINGTON : 1140 1043 : CN : NEWINGTON : 1043 1103 : CN : GUILFORD : 1103 1042 : CN : NEW BRITAIN : 1042 1034 : CN : SOUTHINGTON : 1034 1041 : CN : FARMINGTON : 1041 1195 : CN : WINCHESTER : 1195 1938 : CN : NEW HARTFORD : 1938 1030 : CN : CHESHIRE : 1030 1406 : CN : LITCHFIELD : 1406 1032 : CN : MERIDEN : 1032 1134 : CN : NEW FAIRFIELD : 1134 1156 : CN : EAST HADDAM : 1156 1004 : CN : WATERTOWN : 1004 1044 : CN : PLAINVILLE : 1044 1156 : CN : EAST HADDAM : 1156 1002 : CN : WATERBURY : 1002 1076 : CN : CANTERBURY : 1076 1019 : CN : THOMASTON : 1019 1042 : CN : NEW BRITAIN : 1042 1004 : CN : WATERTOWN : 1004 1139 : CN : WARREN : 1139 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1115 : CN : SOUTH WINDSOR : 1115 1040 : CN : BERLIN : 1040 1034 : CN : SOUTHINGTON : 1034 1103 : CN : GUILFORD : 1103 1051 : CN : NEW CANAAN : 1051 1057 : CN : WILTON : 1057 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 256 of 616 Month Number Amount 202206 ($89.29) 202206 ($865.93) 202206 $5,776.14 202206 ($2,713.11) 202206 $19.53 202206 $1,456.74 202206 $1.88 202206 $31,798.82 202206 $4,669.40 202206 ($484.80) 202206 $122.14 202206 $12.23 202206 $15.30 202206 $52.80 202206 $2.67 202206 $1,585.19 202206 ($583.71) 202206 $5.39 202206 $7,745.76 202206 $10.56 202206 ($14,715.02) 202206 $0.94 202206 $35,094.44 202206 $1,355.40 202206 $1.26 202206 $88.34 202206 $4,652.35 202206 $2,522.48 202206 $4.57 202206 $1,984.90 202206 $651.45 202206 $0.94 202206 $0.95 202206 $2,820.91 202206 $7,610.74 202206 $545.67 202206 $6.45 202206 $8,383.46 202206 $264.54 202206 $52.74
  10. Page 257 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80251843 80251848 80251890 80252131 80252134 80252148 80252151 80252157 80252165 80252199 80252200 80252209 80252219 80252258 80252458 80253608 80253609 80253614 80253618 80253625 80253627 80253629 80253630 80253633 80253634 80253639 80253652 80253655 80253671 80253673 80253674 80253676 80253736 80253743 80253745 80253756 80253765 80253777 80253787 80253800 Accounting Work Order Descript P-126 written REPLACE RECLOSER 36F LD WILTON WOODS RD WILTON P#15006 R print 2/9 MDB - N:KENT:RD::KENT:CT WRM - 94 Pane Rd, Newington - P#357 05.16.22 / Y-26581-2022 / 654 MOUNT 321 PROGRESS DR, MANCHESTER CT - PR GCC / SPICER HILL ROAD, LEDYARD POST CONSTR - 05.23.22 - 28 GRAVEL 05.23.22 - 20 FATIMA DR, BETHANY PR 10/3 JFC - SUNCREST( 70) CT -- P 5/26/22 (RSO PUNZALAN) LINDBERG RD POST CONSTR - 05.25.22 - 15 DICKMAN 05.25.22 - 282 SOUTHINGTON RD, BERL Post Construction 05.18.22 - MUSSO East Meriden 21P - Pole work for Mo 5/27 MOUNTAIN SPRNG RD, TOLLAND Barkhamsted, 21 Chiswick Ln - repla SC-P#2719 WATER ST GUILFORD INST/RM DG P#1784 ALLEN RD POMFRET LOWER 1P Written 64 OLD BROOKLYN TPKE, WINDH ***followup work 5/27/22 (RSO-LEACH Vernon, Hartford, 384, INT#146-230 TO STORES 4/6/23--/29 *TURONVER* 3 931 written complete CHURCH ST, AMS DL; TT; 05.29.22 - 83 MORGAN ST; BU WRITTEN COMPLETE IN FIELD 62 COLCHE VINEYARD( 90) RD -- 6064, BURLINGTO Cancel Work Order P-1517 REPLACE CUTOUTS RATTLESNAKE WRTN--JK>P-5090--PER RSO, REPL POLE COMP GDK- AVON 156 WEST MAIN ST REP RL:1141 KING ST, GRN:Replaced 35/2 SC-P#752 RIDGE RD CHESTER INST/RMV zCAPITOL BLVD / 1 HENKEL WAY ROCKY 05/27 20 TRACY DR MANCHESTER POLE# TT TC 77 VAN RENSSELAER AVE, STM; P DG P#D1126A BEHIND TRACY ROW FEEDIN STEEL POLES PR 6/9 EVW - 280 Salisb WORK COMPLETED - MJG - 5/30/22 FER DG RSR P#2321 PAD #72/75 124 KENNER Asset Location 1100 : CN : WATERFORD : 1100 1057 : CN : WILTON : 1057 1194 : CN : TORRINGTON : 1194 1043 : CN : NEWINGTON : 1043 1030 : CN : CHESHIRE : 1030 1937 : CN : MANCHESTER : 1937 1164 : CN : LEDYARD : 1164 1032 : CN : MERIDEN : 1032 1006 : CN : BETHANY : 1006 1194 : CN : TORRINGTON : 1194 1177 : CN : STONINGTON : 1177 1044 : CN : PLAINVILLE : 1044 1040 : CN : BERLIN : 1040 1030 : CN : CHESHIRE : 1030 1032 : CN : MERIDEN : 1032 1118 : CN : TOLLAND : 1118 1190 : CN : BARKHAMSTED : 1190 1103 : CN : GUILFORD : 1103 1081 : CN : POMFRET : 1081 1180 : CN : WINDHAM : 1180 1101 : CN : WESTBROOK : 1101 1120 : CN : VERNON : 1120 1180 : CN : WINDHAM : 1180 1162 : CN : HEBRON : 1162 1066 : CN : STAMFORD : 1066 1153 : CN : COLCHESTER : 1153 1191 : CN : BURLINGTON : 1191 1121 : CN : WINDSOR : 1121 1174 : CN : SALEM : 1174 1169 : CN : NEW LONDON : 1169 1931 : CN : AVON : 1931 1065 : CN : GREENWICH : 1065 1090 : CN : CHESTER : 1090 1941 : CN : ROCKY HILL : 1941 1937 : CN : MANCHESTER : 1937 1066 : CN : STAMFORD : 1066 1082 : CN : PUTNAM : 1082 1930 : CN : NORTH CANAAN : 1930 1092 : CN : EAST LYME : 1092 1077 : CN : EASTFORD : 1077 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 257 of 616 Month Number Amount 202206 $3,828.56 202206 $38.21 202206 $3.93 202206 $2,182.68 202206 $4,391.57 202206 $1,007.35 202206 $10,848.97 202206 $87.05 202206 $24.32 202206 $1.57 202206 $1.73 202206 $1.26 202206 ($31.24) 202206 $0.94 202206 $1,811.07 202206 ($79.96) 202206 $51.62 202206 $15.77 202206 $1,450.99 202206 $1.88 202206 $1,007.12 202206 $1,259.61 202206 $8,288.46 202206 $6,674.02 202206 $10,578.16 202206 $1,366.15 202206 $415.82 202206 ($1,848.46) 202206 $2,648.89 202206 $656.08 202206 $5,177.15 202206 $6,111.45 202206 $315.14 202206 $5,604.80 202206 $22.03 202206 $0.63 202206 $363.12 202206 $718.00 202206 $1,217.19 202206 $663.84
Words on different pages

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)