Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 257 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80251843 80251848 80251890 80252131 80252134 80252148 80252151 80252157 80252165 80252199 80252200 80252209 80252219 80252258 80252458 80253608 80253609 80253614 80253618 80253625 80253627 80253629 80253630 80253633 80253634 80253639 80253652 80253655 80253671 80253673 80253674 80253676 80253736 80253743 80253745 80253756 80253765 80253777 80253787 80253800 Accounting Work Order Descript P-126 written REPLACE RECLOSER 36F LD WILTON WOODS RD WILTON P#15006 R print 2/9 MDB - N:KENT:RD::KENT:CT WRM - 94 Pane Rd, Newington - P#357 05.16.22 / Y-26581-2022 / 654 MOUNT 321 PROGRESS DR, MANCHESTER CT - PR GCC / SPICER HILL ROAD, LEDYARD POST CONSTR - 05.23.22 - 28 GRAVEL 05.23.22 - 20 FATIMA DR, BETHANY PR 10/3 JFC - SUNCREST( 70) CT -- P 5/26/22 (RSO PUNZALAN) LINDBERG RD POST CONSTR - 05.25.22 - 15 DICKMAN 05.25.22 - 282 SOUTHINGTON RD, BERL Post Construction 05.18.22 - MUSSO East Meriden 21P - Pole work for Mo 5/27 MOUNTAIN SPRNG RD, TOLLAND Barkhamsted, 21 Chiswick Ln - repla SC-P#2719 WATER ST GUILFORD INST/RM DG P#1784 ALLEN RD POMFRET LOWER 1P Written 64 OLD BROOKLYN TPKE, WINDH ***followup work 5/27/22 (RSO-LEACH Vernon, Hartford, 384, INT#146-230 TO STORES 4/6/23--/29 *TURONVER* 3 931 written complete CHURCH ST, AMS DL; TT; 05.29.22 - 83 MORGAN ST; BU WRITTEN COMPLETE IN FIELD 62 COLCHE VINEYARD( 90) RD -- 6064, BURLINGTO Cancel Work Order P-1517 REPLACE CUTOUTS RATTLESNAKE WRTN--JK>P-5090--PER RSO, REPL POLE COMP GDK- AVON 156 WEST MAIN ST REP RL:1141 KING ST, GRN:Replaced 35/2 SC-P#752 RIDGE RD CHESTER INST/RMV zCAPITOL BLVD / 1 HENKEL WAY ROCKY 05/27 20 TRACY DR MANCHESTER POLE# TT TC 77 VAN RENSSELAER AVE, STM; P DG P#D1126A BEHIND TRACY ROW FEEDIN STEEL POLES PR 6/9 EVW - 280 Salisb WORK COMPLETED - MJG - 5/30/22 FER DG RSR P#2321 PAD #72/75 124 KENNER Asset Location 1100 : CN : WATERFORD : 1100 1057 : CN : WILTON : 1057 1194 : CN : TORRINGTON : 1194 1043 : CN : NEWINGTON : 1043 1030 : CN : CHESHIRE : 1030 1937 : CN : MANCHESTER : 1937 1164 : CN : LEDYARD : 1164 1032 : CN : MERIDEN : 1032 1006 : CN : BETHANY : 1006 1194 : CN : TORRINGTON : 1194 1177 : CN : STONINGTON : 1177 1044 : CN : PLAINVILLE : 1044 1040 : CN : BERLIN : 1040 1030 : CN : CHESHIRE : 1030 1032 : CN : MERIDEN : 1032 1118 : CN : TOLLAND : 1118 1190 : CN : BARKHAMSTED : 1190 1103 : CN : GUILFORD : 1103 1081 : CN : POMFRET : 1081 1180 : CN : WINDHAM : 1180 1101 : CN : WESTBROOK : 1101 1120 : CN : VERNON : 1120 1180 : CN : WINDHAM : 1180 1162 : CN : HEBRON : 1162 1066 : CN : STAMFORD : 1066 1153 : CN : COLCHESTER : 1153 1191 : CN : BURLINGTON : 1191 1121 : CN : WINDSOR : 1121 1174 : CN : SALEM : 1174 1169 : CN : NEW LONDON : 1169 1931 : CN : AVON : 1931 1065 : CN : GREENWICH : 1065 1090 : CN : CHESTER : 1090 1941 : CN : ROCKY HILL : 1941 1937 : CN : MANCHESTER : 1937 1066 : CN : STAMFORD : 1066 1082 : CN : PUTNAM : 1082 1930 : CN : NORTH CANAAN : 1930 1092 : CN : EAST LYME : 1092 1077 : CN : EASTFORD : 1077 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 257 of 616 Month Number Amount 202206 $3,828.56 202206 $38.21 202206 $3.93 202206 $2,182.68 202206 $4,391.57 202206 $1,007.35 202206 $10,848.97 202206 $87.05 202206 $24.32 202206 $1.57 202206 $1.73 202206 $1.26 202206 ($31.24) 202206 $0.94 202206 $1,811.07 202206 ($79.96) 202206 $51.62 202206 $15.77 202206 $1,450.99 202206 $1.88 202206 $1,007.12 202206 $1,259.61 202206 $8,288.46 202206 $6,674.02 202206 $10,578.16 202206 $1,366.15 202206 $415.82 202206 ($1,848.46) 202206 $2,648.89 202206 $656.08 202206 $5,177.15 202206 $6,111.45 202206 $315.14 202206 $5,604.80 202206 $22.03 202206 $0.63 202206 $363.12 202206 $718.00 202206 $1,217.19 202206 $663.84
  2. Page 258 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80253805 80253810 80253821 80253824 80253828 80253834 80253840 80253855 80253859 80253981 80254005 80254009 80254012 80254024 80254058 80254069 80254079 80254389 80254397 80254400 80254404 80254408 80254414 80254417 80254419 80254438 80254442 80254444 80254455 80254463 80254464 80254471 80254475 80254486 80254504 80254514 80254516 80254522 80254529 80254536 Accounting Work Order Descript ***5/29 PAWSON RD BRANFORD EVW - 118 Mountain Rd, Winsted P#15 EM RF:103 SHEEP HILL RD, GREENWICH: MPB; 221 DANBURY RD, NEW MILFORD 05.23.22 - 70 LADDINS ROCK RD, GREE 5/16 HILLSIDE RD, ASHFORD 5/30/22 written complete NORWICH WE TT TC 7 ROBIN HOOD RD, STM: P#9350 TT; NM 05.24.22 - 114 JUNE RD, STAM 05.13.22 - W BRANCH RD, WESTON MPB; 41 OLD MUSKET LN, RIDGEFIELD KD-EVENT #4761619 REPLC XARM BRACES DJM. 05.22.22 - MILLS ST, WESTPORT EVW - FALLS MOUNTAIN( 38) RD -- H31 POST CONSTR - 05.28.22 - 517 W MAIN 5/31 P#22825 BROKE BY TREE N STONE DL; TT; SUMMER ST; SECONDARY MH FIR RSO--05/31/22--JK>POLE 39--REPL OH POST CONSTRUCTION - 05.29.22 - 168 **5/31 HAMMOCK (12) PKWY CLINTON 5/29 (MIGLIA) 8 Crestwood Dr, ENFIE canceling to fwo#80284024-5/31 CENT 05.18.22 - 1 RICCIO WAY, SOUTHINGTO WORK COMPLETE - MJG - 5/31 CRYSTAL COMP IN FIELD 5/21/22 05.19.22 - 21 KD-HTFD FAULT IN MH 4534 TO HEX 647 KD-EVENT #4761991 FAILED CABLE P 10 KD-REPAIRED CABLE BTWN HEX#5702 & P POST CONSTR - 05.27.22 / YDT 26630*CHARTER OAK * 05.27.22 - 50 CYNRO DG P#744 ENGLISH NEIGHBORHOOD RD / 5/17 892 BUCKLEY HWY, UNION WRITTEN COMPLETE IN FIELD - 5/31/22 5/17 71 BAUSOLA RD, ANDOVER RPL SVC P#13940 WATCHAUG RD (344), KD-EVENT #4762691 REPLC ELBOW AT PA Post Construction 04.24.22 - WOODTI MR; ***WRITTEN***ALL WORK COMPLETED Rplc Oh Svc- P 3990- FOLLOW UP WORK JK>POLE 1428--REPLACE 3PH BANK (120 Asset Location 1102 : CN : BRANFORD : 1102 1195 : CN : WINCHESTER : 1195 1065 : CN : GREENWICH : 1065 1135 : CN : NEW MILFORD : 1135 1065 : CN : GREENWICH : 1065 1151 : CN : ASHFORD : 1151 1173 : CN : PRESTON : 1173 1066 : CN : STAMFORD : 1066 1066 : CN : STAMFORD : 1066 1055 : CN : WESTON : 1055 1054 : CN : RIDGEFIELD : 1054 1934 : CN : EAST HARTFORD : 1934 1056 : CN : WESTPORT : 1056 1928 : CN : SALISBURY : 1928 1032 : CN : MERIDEN : 1032 1117 : CN : SUFFIELD : 1117 1066 : CN : STAMFORD : 1066 1098 : CN : OLD SAYBROOK : 1098 1041 : CN : FARMINGTON : 1041 1091 : CN : CLINTON : 1091 1112 : CN : ENFIELD : 1112 1089 : CN : MADISON : 1089 1034 : CN : SOUTHINGTON : 1034 1169 : CN : NEW LONDON : 1169 1043 : CN : NEWINGTON : 1043 1113 : CN : HARTFORD : 1113 1113 : CN : HARTFORD : 1113 1113 : CN : HARTFORD : 1113 1032 : CN : MERIDEN : 1032 1032 : CN : MERIDEN : 1032 1085 : CN : WOODSTOCK : 1085 1119 : CN : UNION : 1119 1168 : CN : MONTVILLE : 1168 1150 : CN : ANDOVER : 1150 1114 : CN : SOMERS : 1114 1932 : CN : BLOOMFIELD : 1932 1002 : CN : WATERBURY : 1002 1033 : CN : MIDDLETOWN : 1033 1103 : CN : GUILFORD : 1103 1159 : CN : GLASTONBURY : 1159 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 258 of 616 Month Number Amount 202206 $3,969.40 202206 $587.30 202206 $212.64 202206 $149.38 202206 $177.39 202206 $1,896.15 202206 $13,955.99 202206 $268.81 202206 $259.19 202206 $315.31 202206 $408.44 202206 $425.30 202206 $3,635.55 202206 $1,623.93 202206 $1,626.79 202206 $12,970.22 202206 $108,335.20 202206 $1,043.92 202206 $2,170.40 202206 $1,109.72 202206 $1,908.31 202206 $8,766.52 202206 $106.32 202206 $3,056.29 202206 $2,128.84 202206 $13,583.79 202206 $18,201.80 202206 $25,034.93 202206 $638.70 202206 $709.60 202206 $6,264.22 202206 $2,927.49 202206 $10,571.13 202206 $559.86 202206 $487.71 202206 $3,331.57 202206 $4,377.32 202206 $4,489.09 202206 $283.85 202206 $8,611.54
  3. Page 259 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80254543 80254589 80254698 80254699 80254729 80255204 80255208 80255213 80255216 80255226 80255229 80255232 80255239 80255249 80255283 80255288 80255290 80255321 80255337 80255398 80255403 80255415 80255417 80255463 80255532 80255542 80255608 80255617 80255620 80255901 80255908 80255913 80255914 80255921 80255925 80255949 80255953 80255954 80255994 80256020 Accounting Work Order Descript 5/31/22 (RSO-STROM) FLAT ROCK RD, B COMP 05/31 LONGVIEW DR WINDSOR - ca 6/1/22 GREY ROCK( 65) RD PAD 663, JDB 95 NEW CANAAN AVE NORWALK, SHIF APPRENTICES WQ; 6/1/22 TOWER( 30) KD-2N08 FAILURE ALBANY (519) AVE, H (ASP) 06/27 KD-NEW CAP BANK P 2541 MR;***WRITTEN***ALL WORK COMPLETED* WRTN--JK>POLE 3671--PER RSO: 9L02POST CONSTR - 06.01.22 - 126 NEW BR work completed - MJG - 5/31 (RSO-LE 240 Clover Mill Rd Mansfield, Guy r 6/1/22 (RSO-LEACH) HILL CREST RD ( (E)KD-REBUILD RISER P 1279, WEST ST Asplundh - TALLWOOD DR, VERNON - RE written complete OMS-NONDISPATCHED Post Const - 1055 Old Colony Rd, Me SL KD-EVENT #4763610 REPLC SL P 447 6/1/22 Y-26639-2022 SUNDANCE( 7) R Asplundh - TALLWOOD DR, VERNON - RE Asplundh - TALLWOOD DR, VERNON - RE RC; *POST CONSTRUCTION* 6/2/22 200 DJM. 05.28.22 - OLD RD, WESTPORT. GCC / 25 CENTER DRIVE, STONINGTON LD 78 LONGMEADOW RD WILTON P#18098 05.17.22 - 17 BROOKWOOD LN, WESTON WQ; 6/2/22 CANDLEWOOD LAKE( 575) R MJG - Install Push Brace at Pole 41 BM; 6/2/22 1309::RIDGE:DR::NEWTOWN KD-EVENT #4764400 REPLC SVC, TRIM T 6/2 COLORADO( 24) DR -- 23811, SOME ***ALL WORK COMPLETED***6/2 SAGAMOR MM broken ES pole #564 Bennett Pond TL - ACORN DR, #4 NIANTIC // REPL E written complete 6/2/22 MINER PENTW ***REPLACE OH TPX SERVICE- 100' Rit 05.16.22 - 18 HIGH ST, FARMINGT 6/2 all complete JACOBY (27) RD HAD REQ TO CANC - 05.28.22 - 1406 SPIND Post Construction 05.17.22 - NORTHR Asset Location 1102 : CN : BRANFORD : 1102 1121 : CN : WINDSOR : 1121 1018 : CN : SOUTHBURY : 1018 1052 : CN : NORWALK : 1052 1131 : CN : BROOKFIELD : 1131 1113 : CN : HARTFORD : 1113 1943 : CN : WEST HARTFORD : 1943 1162 : CN : HEBRON : 1162 1169 : CN : NEW LONDON : 1169 1044 : CN : PLAINVILLE : 1044 1097 : CN : OLD LYME : 1097 1166 : CN : MANSFIELD : 1166 1097 : CN : OLD LYME : 1097 1031 : CN : CROMWELL : 1031 1120 : CN : VERNON : 1120 1180 : CN : WINDHAM : 1180 1032 : CN : MERIDEN : 1032 1121 : CN : WINDSOR : 1121 1135 : CN : NEW MILFORD : 1135 1120 : CN : VERNON : 1120 1120 : CN : VERNON : 1120 1134 : CN : NEW FAIRFIELD : 1134 1056 : CN : WESTPORT : 1056 1177 : CN : STONINGTON : 1177 1057 : CN : WILTON : 1057 1055 : CN : WESTON : 1055 1131 : CN : BROOKFIELD : 1131 1092 : CN : EAST LYME : 1092 1013 : CN : NEWTOWN : 1013 1931 : CN : AVON : 1931 1114 : CN : SOMERS : 1114 1101 : CN : WESTBROOK : 1101 1076 : CN : CANTERBURY : 1076 1092 : CN : EAST LYME : 1092 1177 : CN : STONINGTON : 1177 1089 : CN : MADISON : 1089 1041 : CN : FARMINGTON : 1041 1094 : CN : HADDAM : 1094 1020 : CN : WOLCOTT : 1020 1006 : CN : BETHANY : 1006 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 259 of 616 Month Number Amount 202206 $141.77 202206 $425.77 202206 $28,656.49 202206 $642.83 202206 $567.73 202206 $168,606.45 202206 $21,261.84 202206 $1,278.52 202206 $34,526.11 202206 $1,889.41 202206 $570.67 202206 $1,609.55 202206 $244.53 202206 $2,460.79 202206 $570.05 202206 $28.85 202206 $106.43 202206 $110.88 202206 $21,382.62 202206 $570.05 202206 $570.05 202206 $3,849.46 202206 $3,728.75 202206 $3,791.44 202206 $945.42 202206 $320.24 202206 $496.74 202206 $145.78 202206 $2,039.34 202206 $1,762.82 202206 $775.81 202206 $326.09 202206 $2,922.27 202206 $2,595.27 202206 $404.02 202206 $651.10 202206 $106.43 202206 $16,227.69 202206 $1,277.33 202206 $177.39
  4. Page 260 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80256042 80256061 80256072 80256114 80256241 80256281 80256286 80256287 80256292 80256301 80257045 80257144 80257151 80257163 80257172 80257174 80257253 80257261 80257296 80257367 80257372 80257406 80257423 80257562 80257864 80257882 80257888 80257894 80257897 80257918 80257923 80257935 80257941 80257946 80257969 80258001 80258019 80258026 80258039 80258045 Accounting Work Order Descript 05.30.22 - 141 SOUTHBOROUGH RD, SOU POST CONSTR - 05.31.22 - 106 HILLCR DONE reprint 1/19 JFC - MILLERTON( POST CONSTR - 6/1/22 PEQUOT AVE., N CP - INDIAN HILL RD CANTON CT Y-26643-2022 POL 14 STATION RD SCOT Waterside 22M - Refurbish cubicle a Y-26656-2022 POL 8 STATION RD SCOTL DG P#1076 59 WALKER LN WOODSTOCK CL MM 9A Rukstella dr Pole #2257 3 sp PD-139 N. ANGUILLA RD STONINGTON/RE 06/03 * TURNOVER* OLCOTT ST MANCHES WRITTEN COMPLETE IN FIELD 06/05 *TU ***ALL WORK COMPLETED***6/3 OLD SHO ***ALL WORK COMPLETED***6/4 HARTUNG TO STORES 4/6/23---JK>POLE 816--REP all work complete EVENT # 4765484 B 6/3/22 (CASTELLAN/TUCKER) BRUSHY HI DL; 6/2; BROAD ST, STAMFORD; LANDMA ***ALL WORK COMPLETED***6/5 SHORE ( MJ 10/12 05.31.22 - 328 TOWN HILL R 06.01.22 - JOHN DOWNEY DR, NEW BRIT KD-EVENT #4764211 repair oh feed fo POST CONSTR - 05//03 POQUONOCK AVE YELLOW TAG Y-26664-2022 407 S BRITA ***ALL WORK COMPLETED***6/6 166 UPP RR; 6/6/22 14 CHARLES RD OXFORD 6/6 (23) written POND WAY WINDHAM 6/3/22 OLD NEWTOWN( 4) RD -- 2462, RSO 6/6 HAMILTON (8) AVE SOUTHINGTO Post Const ASP-06.06.22 - 17 LEWIS 06.03.22 - 32 BLANSFIELD LN, WOLCOT RC POLE A8721 RESAG PRIMARY WIRE 77 6/3/22 520 BERKSHIRE RD SOUTHBURY 06.03.22 - 232 HIGH ST, BRISTOL BM; 6/6/22 9 MOUNTAIN VIEW DR BROOK WM; 6/6/22 30 CARLSON RD NEW MILFOR 06.03.22 - THORNTON DR, NEWINGTON JSG - 77 DEER HILL RD COLEBROOK CT RR; 6/3/22 SKOKORAT ST SEYMOUR Asset Location 1034 : CN : SOUTHINGTON : 1034 1032 : CN : MERIDEN : 1032 1137 : CN : SHARON : 1137 1169 : CN : NEW LONDON : 1169 1933 : CN : CANTON : 1933 1175 : CN : SCOTLAND : 1175 J22M : CL&P WATERSIDE STAMFORD : 1066 1175 : CN : SCOTLAND : 1175 1077 : CN : EASTFORD : 1077 1075 : CN : BROOKLYN : 1075 1177 : CN : STONINGTON : 1177 1937 : CN : MANCHESTER : 1937 1157 : CN : EAST HAMPTON : 1157 1097 : CN : OLD LYME : 1097 1097 : CN : OLD LYME : 1097 1167 : CN : MARLBOROUGH : 1167 1103 : CN : GUILFORD : 1103 1013 : CN : NEWTOWN : 1013 1066 : CN : STAMFORD : 1066 1102 : CN : BRANFORD : 1102 1071 : CN : PLYMOUTH : 1071 1042 : CN : NEW BRITAIN : 1042 1043 : CN : NEWINGTON : 1043 1121 : CN : WINDSOR : 1121 1018 : CN : SOUTHBURY : 1018 1092 : CN : EAST LYME : 1092 1014 : CN : OXFORD : 1014 1180 : CN : WINDHAM : 1180 1008 : CN : DANBURY : 1008 1034 : CN : SOUTHINGTON : 1034 1070 : CN : BRISTOL : 1070 1020 : CN : WOLCOTT : 1020 1134 : CN : NEW FAIRFIELD : 1134 1018 : CN : SOUTHBURY : 1018 1070 : CN : BRISTOL : 1070 1131 : CN : BROOKFIELD : 1131 1135 : CN : NEW MILFORD : 1135 1043 : CN : NEWINGTON : 1043 1192 : CN : COLEBROOK : 1192 1016 : CN : SEYMOUR : 1016 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 260 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $727.06 Emergent Equipment Failures - Line 202206 $851.55 Emergent Equipment Failures - Line 202206 $146.91 Emergent Equipment Failures - Line 202206 $1,727.83 Emergent Equipment Failures - Line 202206 $571.74 Emergent Equipment Failures - Line 202206 $31,797.64 Emergent Equipment Failures - Substation 202206 $83,803.15 Emergent Equipment Failures - Line 202206 $9,795.04 Emergent Equipment Failures - Line 202206 $7,376.74 Emergent Equipment Failures - Line 202206 $1,435.93 Emergent Equipment Failures - Line 202206 $165.59 Emergent Equipment Failures - Line 202206 $435.95 Emergent Equipment Failures - Line 202206 $21,365.85 Emergent Equipment Failures - Line 202206 $98.97 Emergent Equipment Failures - Line 202206 $770.29 Emergent Equipment Failures - Line 202206 $12,940.68 Emergent Equipment Failures - Line 202206 $2,219.79 Emergent Equipment Failures - Line 202206 $3,055.80 Emergent Equipment Failures - Line 202206 $14,064.12 202206 $597.26 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $141.92 Emergent Equipment Failures - Line 202206 $221.91 Emergent Equipment Failures - Line 202206 $183.59 Emergent Equipment Failures - Line 202206 $49,508.25 Emergent Equipment Failures - Line 202206 $102,901.87 Emergent Equipment Failures - Line 202206 $3,926.83 Emergent Equipment Failures - Line 202206 $183.59 Emergent Equipment Failures - Line 202206 $1,285.15 Emergent Equipment Failures - Line 202206 $14,304.07 Emergent Equipment Failures - Line 202206 $3,349.93 Emergent Equipment Failures - Line 202206 $874.84 Emergent Equipment Failures - Line 202206 $220.37 Emergent Equipment Failures - Line 202206 $440.72 Emergent Equipment Failures - Line 202206 $1,061.93 Emergent Equipment Failures - Line 202206 $309.24 Emergent Equipment Failures - Line 202206 $795.17 Emergent Equipment Failures - Line 202206 $220.37 Emergent Equipment Failures - Line 202206 $3,396.13 Emergent Equipment Failures - Line 202206 $319.32 Emergent Equipment Failures - Line 202206 $367.29
  5. Page 261 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80258050 80258054 80258067 80258092 80258198 80258215 80258225 80258292 80258304 80258312 80258679 80258680 80258696 80258700 80258702 80258703 80258709 80258712 80258717 80258739 80258766 80258775 80258779 80258789 80258793 80258801 80258824 80258831 80258874 80258896 80258898 80258959 80259012 80259031 80259049 80259050 80259052 80259055 80259069 80259342 Accounting Work Order Descript ACC WQ; 6/3/22 69 NEW MILFORD RD E. ***WRITTEN*** REPLACE OH SVC-80' RR; 6/2/22 11 TRAM DR OXFORD *FIELD WORK COMPLETE* MPB; 6/4/22 3 Post 06/06 SPRUCE BROOK RD EAST BER 6/2/22 29 CARRIAGE DR OXFORD 6/4/22 18 BUTTERFIELD RD NEWTOWN 6/2/22 TURNOVER 68 MARCHANT RD REDD complete Pole 1158 Hillside St, Eas EVW - WEATOGUE RD(SALISBURY:RD)::NO WQ; 6/7/22 81 ROCKY MOUNTAIN RD ROX ***ALL WORK COMPLETED***05/08 PLEAS OAC REPLACE P5989 NORWOOD RD WEST H canceling duplicate JF-379 P#6475 P SD; 6/7/22 14 HAWTHORNE COVE RD DAN EM RF:5 WARNER DR, DARIEN:REMOVE/IN 6/7 JAIL HILL RD HADDAM TT TC 193 STRAWBERRY HILL AVE, STM: 6/7/22 187 HATTERTOWN RD MONROE 6/6/22 1068 OLD COLONY RD MERIDEN 6/8 P#805S BROKE BY TREE HAMILTON ( 05.31.22 - 88 INDIAN HARBOR DR, GRE 6/6/22 43 BINGHAM ST NEW BRITAIN CANCELED TT TC 205 FRANKLIN ST: P#7 REPLACE OH SVC W/ #2 TPX- 40' ***6 Old Saybrook, 11 Maynard Cirlce/Shi 6/7/22 4 HILLSIDE AVE BRISTOL !!! TT TC 107 MAPLE AVE, GRN: P#98 6/6/22 135 JEWEL ST BRISTOL TT TC 2251 HIGH RIDGE RD, STM: P#10 6/7/22 16 KITTS LN NEWINGTON AJC TT HICKORY DR, GREENWICH REPLAC 6/5/22 CATHERINE DR MERIDEN 6/8 (WEHNEJR) EVERETT AVE WEST HART VJT - (GIARNESE6/8)..)TOWN LINE HWY 6/2/22 TURNOVER BAD DB SVC 55 WILDM LD 599 WEST AVE NORWALK P#28867 REP 6/8 16 LEBANON ST HARTFORD MI 6/7/22 (DURKERC) MAIN ST, COVENT 6/8/22 128 GOVERNOR ST NEW BRITAIN Asset Location 1130 : CN : BRIDGEWATER : 1130 1103 : CN : GUILFORD : 1103 1014 : CN : OXFORD : 1014 1053 : CN : REDDING : 1053 1040 : CN : BERLIN : 1040 1014 : CN : OXFORD : 1014 1013 : CN : NEWTOWN : 1013 1053 : CN : REDDING : 1053 1934 : CN : EAST HARTFORD : 1934 1930 : CN : NORTH CANAAN : 1930 1136 : CN : ROXBURY : 1136 1158 : CN : FRANKLIN : 1158 1943 : CN : WEST HARTFORD : 1943 1103 : CN : GUILFORD : 1103 1008 : CN : DANBURY : 1008 1908 : CN : DARIEN : 1908 1094 : CN : HADDAM : 1094 1066 : CN : STAMFORD : 1066 1012 : CN : MONROE : 1012 1032 : CN : MERIDEN : 1032 1123 : CN : EAST GRANBY : 1123 1065 : CN : GREENWICH : 1065 1042 : CN : NEW BRITAIN : 1042 1066 : CN : STAMFORD : 1066 1103 : CN : GUILFORD : 1103 1098 : CN : OLD SAYBROOK : 1098 1070 : CN : BRISTOL : 1070 1065 : CN : GREENWICH : 1065 1070 : CN : BRISTOL : 1070 1066 : CN : STAMFORD : 1066 1043 : CN : NEWINGTON : 1043 1065 : CN : GREENWICH : 1065 1032 : CN : MERIDEN : 1032 1943 : CN : WEST HARTFORD : 1943 1023 : CN : BETHLEHEM : 1023 1008 : CN : DANBURY : 1008 1052 : CN : NORWALK : 1052 1113 : CN : HARTFORD : 1113 1155 : CN : COVENTRY : 1155 1042 : CN : NEW BRITAIN : 1042 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 261 of 616 Month Number Amount 202206 $309.55 202206 $1,021.47 202206 $224.95 202206 $440.72 202206 $215.39 202206 $880.41 202206 $3,947.14 202206 $799.71 202206 $3,433.97 202206 $1,821.02 202206 $1,528.63 202206 $317.99 202206 $12,253.83 202206 $703.20 202206 $309.57 202206 $315.02 202206 $4,644.99 202206 $1,496.38 202206 $488.98 202206 $425.22 202206 $840.46 202206 $3,469.48 202206 $175.35 202206 $241.02 202206 $603.01 202206 $446.35 202206 $163.02 202206 $2,385.46 202206 $73.44 202206 $415.58 202206 $2,028.31 202206 $385.64 202206 $1,061.64 202206 $163.01 202206 $2,968.54 202206 $22,109.98 202206 $590.69 202206 $1,043.13 202206 $209.89 202206 $387.22
  6. Page 262 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80259355 80259358 80259363 80259367 80259371 80259385 80259394 80259403 80259404 80259409 80259412 80259439 80259460 80259464 80259470 80259484 80259530 80259633 80259723 80259736 80259739 80259987 80259999 80260006 80260015 80260027 80260045 80260057 80260059 80260062 80260067 80260070 80260072 80260078 80260081 80260085 80260090 80260093 80260094 80260095 Accounting Work Order Descript DG P#2564 WILSONVILLE RD THOMPSON F 6/8/22 306 COOKE ST PLAINVILLE 6/8/22 291 MORAN ST WATERBURY.... FRNTR 6/8/22 862 MOSS FARM RD CHESH ***WRITTEN**INSTALL 18KV ARRESTER, 6/8/22 54 FORDYCE RD NEW MILFORD LD 37 OREMS LN,WILTON RPL OH SERVIC Cancel-6/8/22 (RSO-MCDERMOTT) RIVER WRTN--JK>HHG2 (LAWN BOX)--LAWN BOX 6/8/22 All work complete (**WIRE CR 85 MOHAWK DR, WEST HARTFORD CT - SE LD 43 MCFADDEN DR, WILTON REPLACED LD LANTERN RIDGE RD, NEW CANAAN IN 6/8/22 173 PUMPKIN HILL RD NEW MILF 6/8/22 32 SACHEM RD SEYMOUR MJP / 350 Delavan Ave / GRN / Repla (E)(ASP) Granby St 95, Bloomfield. TT TC 15 DRYDEN ST, STM: P#4287 REP 6/8 all work completed by asplundh 6/8/22 SOUTH SALEM RIDGEFIELD MATERIAL JDB 06.09.22 - 25 COMMERCE PAD#296 REPLACE 500KVA WITH 750KVA MM depot rd Canterbury poles 751 & written broken pole 06/09 *TURNOVER MATERIAL 6/9/22 TURNOVER 54 PEACEAB 6/10/22 23 PUTNAM ST WATERBURY written (complete??) 6/9 SALEM (131 JES; 311 MARIOMI RD. NEW CANAAN. RM *SL 95 LIGHTHOUSE HILL RD, WINDSOR * 6/9/22 321 SOUTHINGTON RD BERLIN. written complete 6/10 CHURCH HILL R 6/8/22 EKONK HILL RD, VOLUNTOWN - R 2 BAILEY RD - WRTN--JK>POLE 515--RE RSO, 06/09/22--JK>P-515, RMV TREE, 6/9/22 WEST END DR, OLD LYME done EVW - 30 TOBEY HILL RD NORTH 6/9/22 BROAD ST., NEW LONDON TT TC 80 WAKE ROBIN LN, STM: P#1074 Post Construction 6/9/22 ARCADIA AV WRTN-JK>68 TWIN LAKES DR - POLE 505 Asset Location 1084 : CN : THOMPSON : 1084 1044 : CN : PLAINVILLE : 1044 1002 : CN : WATERBURY : 1002 1030 : CN : CHESHIRE : 1030 1098 : CN : OLD SAYBROOK : 1098 1135 : CN : NEW MILFORD : 1135 1057 : CN : WILTON : 1057 1099 : CN : DEEP RIVER : 1099 1159 : CN : GLASTONBURY : 1159 1102 : CN : BRANFORD : 1102 1943 : CN : WEST HARTFORD : 1943 1057 : CN : WILTON : 1057 1051 : CN : NEW CANAAN : 1051 1135 : CN : NEW MILFORD : 1135 1016 : CN : SEYMOUR : 1016 1065 : CN : GREENWICH : 1065 1932 : CN : BLOOMFIELD : 1932 1066 : CN : STAMFORD : 1066 1102 : CN : BRANFORD : 1102 1054 : CN : RIDGEFIELD : 1054 1052 : CN : NORWALK : 1052 1103 : CN : GUILFORD : 1103 1076 : CN : CANTERBURY : 1076 1163 : CN : LEBANON : 1163 1054 : CN : RIDGEFIELD : 1054 1002 : CN : WATERBURY : 1002 1096 : CN : LYME : 1096 1051 : CN : NEW CANAAN : 1051 1121 : CN : WINDSOR : 1121 1040 : CN : BERLIN : 1040 1164 : CN : LEDYARD : 1164 1178 : CN : VOLUNTOWN : 1178 1097 : CN : OLD LYME : 1097 1164 : CN : LEDYARD : 1164 1097 : CN : OLD LYME : 1097 1930 : CN : NORTH CANAAN : 1930 1169 : CN : NEW LONDON : 1169 1066 : CN : STAMFORD : 1066 1044 : CN : PLAINVILLE : 1044 1100 : CN : WATERFORD : 1100 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 262 of 616 Month Number Amount 202206 $197.00 202206 $707.04 202206 $221.51 202206 $223.92 202206 $373.51 202206 $927.46 202206 $1,341.61 202206 $293.80 202206 $2,681.19 202206 $734.48 202206 $1,140.91 202206 $733.54 202206 $681.72 202206 $3,140.55 202206 $621.53 202206 $4,626.09 202206 $844.68 202206 $5,275.00 202206 $293.81 202206 $57.51 202206 $36,024.06 202206 $4,609.19 202206 $363.06 202206 $2,850.46 202206 $513.62 202206 $463.88 202206 $7,762.91 202206 $2,100.16 202206 $110.19 202206 $2,135.00 202206 $537.95 202206 $1,366.75 202206 $709.25 202206 $1,021.04 202206 $257.12 202206 $1,310.11 202206 $333.35 202206 $407.22 202206 $86.14 202206 $370.37
  7. Page 263 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80260098 80260101 80260133 80260151 80260162 80260167 80260188 80260199 80260200 80260203 80260309 80260313 80260340 80260401 80260410 80261196 80261199 80261201 80261214 80261222 80261223 80261225 80261228 80261233 80261236 80261252 80261266 80261270 80261272 80261278 80261286 80261292 80261299 80261308 80261329 80261369 80261387 80261434 80261438 80261442 Accounting Work Order Descript DG P#2035 117 THOMAS RD LEDYARD RPL 6/9 LONG COVE RD LEDYARD JRP - 335 Atwater St SOG Rex Forge 6/9/22 63 HARDING DR RIDGEFIELD 6/9/22 GRIFFIN HILL RD RIDGEFIELD 6/9/22 MAIN ST RIDGEFIELD written complete follow up under 93 CUST APPT 6/20/22; JK>POLES 2579 & Jpt-132 East Main St Waterbury MH13 complete OMS-DISPATCHED (EDS)-OH-A TL - UPPER KENSINGTON DR, REF. #3 E LD WARNCKE RD WILTON POLE#7246 RPL 06/10 *TURNOVER* 51 RICHARD ST AVON PR 9/26 CRP - 121 BAHRE CORNER RD C REPRINT 5/12 EVW - 726 LAKE DR, Wi 6/12 P#16782 FIRST ST, SUFFIELD Abel - 6/11 S ELLINGTON RD, SOUTH W *CANCELLED* MR; **NOTIFIED FTR & CO ASP-6/10/22 23 COOLIDGE ST NEW BRIT MATHEWSON MILL WRTN--JK>POLE 430--P 6/10/22 90 APPLE GATE SOUTHINGTON ALL WORK COMPLETED-WILDWOOD( 80) RD REPLACE POLE 577- 35' CLASS 2, SHIF REPLACE 2 POLES AND TRANSFORMER BL WRITTEN COMPLETE IN FIELD ELI CHAPM 06-10-22 TURNOVER PARK 10 ST APT 2/ COMP 06/09 WINDSOR AVE WINDSOR POLE 6/12 GORDON ST SIMSBURY ***ALL WORK COMPLETED***TURNOVER 6/ 6/12 P#7276 W SERVICE RD, HARTFORD CANCEL--SEE 9678475 Jpt-29 E Main St WTBRY MH132 - POST 6/9/22 Follow up work srv replcment ***ALL WORK COMPLETED*** 6/11/22 CO 6/10 NEED NEW SERV ASAP DAMASCUS 2 PR 6/13 EVW - Careys Pt - X of E Wa 6/11/22 171 BELRIDGE RD NEW BRITAIN !!! TT TC 61 LONG MEADOW RD, GRN: (E) GDK SIMSBURY 3 OVERLOOK TER. SV TT TC COVE RD, STM: P#7092 REPL'D 2 Asset Location 1164 : CN : LEDYARD : 1164 1164 : CN : LEDYARD : 1164 1034 : CN : SOUTHINGTON : 1034 1054 : CN : RIDGEFIELD : 1054 1054 : CN : RIDGEFIELD : 1054 1054 : CN : RIDGEFIELD : 1054 1163 : CN : LEBANON : 1163 1159 : CN : GLASTONBURY : 1159 1002 : CN : WATERBURY : 1002 1931 : CN : AVON : 1931 1092 : CN : EAST LYME : 1092 1057 : CN : WILTON : 1057 1931 : CN : AVON : 1931 1933 : CN : CANTON : 1933 1195 : CN : WINCHESTER : 1195 1117 : CN : SUFFIELD : 1117 1115 : CN : SOUTH WINDSOR : 1115 1033 : CN : MIDDLETOWN : 1033 1042 : CN : NEW BRITAIN : 1042 1164 : CN : LEDYARD : 1164 1034 : CN : SOUTHINGTON : 1034 1045 : CN : WETHERSFIELD : 1045 1101 : CN : WESTBROOK : 1101 1096 : CN : LYME : 1096 1156 : CN : EAST HADDAM : 1156 1169 : CN : NEW LONDON : 1169 1121 : CN : WINDSOR : 1121 1942 : CN : SIMSBURY : 1942 1096 : CN : LYME : 1096 1113 : CN : HARTFORD : 1113 1159 : CN : GLASTONBURY : 1159 1002 : CN : WATERBURY : 1002 1098 : CN : OLD SAYBROOK : 1098 1089 : CN : MADISON : 1089 1102 : CN : BRANFORD : 1102 1195 : CN : WINCHESTER : 1195 1042 : CN : NEW BRITAIN : 1042 1065 : CN : GREENWICH : 1065 1942 : CN : SIMSBURY : 1942 1066 : CN : STAMFORD : 1066 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 263 of 616 Month Number Amount 202206 $224.22 202206 $275.46 202206 $49,011.55 202206 $366.46 202206 $81.51 202206 $366.77 202206 $330.20 202206 $2,075.83 202206 $40,430.72 202206 $2,787.45 202206 $194.60 202206 $1,508.00 202206 $2,967.09 202206 $812.65 202206 $551.42 202206 $11,531.92 202206 $28,983.51 202206 $299.45 202206 $476.57 202206 $850.83 202206 $220.37 202206 $3,649.60 202206 $782.14 202206 $3,231.85 202206 $10,300.25 202206 $8,171.80 202206 $285.24 202206 $2,547.90 202206 $22,728.59 202206 $1,368.11 202206 $209.27 202206 $23,311.39 202206 $2,086.44 202206 $1,965.88 202206 $652.93 202206 $776.26 202206 $2,318.43 202206 $587.60 202206 $298.34 202206 $2,749.14
  8. Page 264 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80261567 80261572 80261574 80261590 80261596 80261607 80261608 80261898 80261904 80261905 80261908 80261919 80261945 80261948 80261973 80261975 80262013 80262032 80262035 80262044 80262059 80262068 80262087 80262132 80262133 80262134 80262138 80262821 80262831 80262840 80262845 80262851 80262858 80262892 80262898 80262910 80262918 80262919 80262934 80262955 Accounting Work Order Descript JFC - MUDGETOWN RD SHARON CT DJM - COMPO RD S, WESTPORT POLE 257 SD; 6/11/22 25 CORNELL RD DANBURY ( DJM. 06.11.22 - BONNIE BROOK RD, WE LD!!! 56 OLD KINGS HWY WILTON STRA DJM!!! 06.11.22 - 2 FIELDCREST RD, 6/13/22 YELLOW TAG P.9364 SHELTON S written (complete?) 06/13 *TURNOVER 6/14 PAD#153 MIDDLE( 574) TPKE -***WRITTEN***ALL WORK COMPLETED***0 06/13 *TURNOVER* 26 GRASSMERE AVE , International Dr 14, East Granby. R ASP-6/13/22 CHAFFEE LN SOUTHINGTON POST CONST 6/13/22 QUINN ST NAUGATU 6/13/22 (RSO-KNAPP/PUNZALAN) GLASGO CD02012 Seg 1. Rplc. 2N08 PILC JDB 06.13.22 - 28 POSSUM LN, NORWAL 6/13 (RSO JOHNNY Z) MULLEN HILL( 6/13/22 11A73-82M OUTAGE KENNEDY AV 6/11/22 11 SUNSET TRL NEW FAIRFIELD RR; 6/13/22 GETTYSBURG( 21) RD -BM; 6/11/22 22 PLEASANT HILL RD NEW *FIELD WORK COMPLETE* MPB; 6/10/22 CRP - FOREST( 35) LN -- 3586, CANTO JES!!!!!; 141 DANBURY RD. WILTON.; APPRENTICES WQ; 6/11/22 424 BARN HI 6/11/22 10 VINING RD NEWTOWN JES; 18 WOODCHUCK LN. WILTON.; RPL. 6/15/22 SAW MILL( 110R) RD -- P1710 6/14 (ZALEWA) TOLLAND( 479) TPKE Jtp-95 Hart St Bristol (Frnt)P626 BASSETTS BRIDGE:RD::MANSFIELD:CT WRITTEN COMPLETE IN FIELD MINNETONK JDB 06.13.22 - 141 FILLOW ST, NORWA Work Complete-27.6KV ROW-Suffield 06.14.22 - 168 LOST DISTRICT DR, NE 06.14.22 - 145 WEED ST, NEW CANAAN Storrs Rd, Willington P-830 12J4-49 MF 6/14 SWANTOWN HILL RD NORTH STON 6/10/22 38 BERKSHIRE RD NEWTOWN Asset Location 1137 : CN : SHARON : 1137 1056 : CN : WESTPORT : 1056 1008 : CN : DANBURY : 1008 1056 : CN : WESTPORT : 1056 1057 : CN : WILTON : 1057 1056 : CN : WESTPORT : 1056 1016 : CN : SEYMOUR : 1016 1163 : CN : LEBANON : 1163 1166 : CN : MANSFIELD : 1166 1172 : CN : PORTLAND : 1172 1943 : CN : WEST HARTFORD : 1943 1123 : CN : EAST GRANBY : 1123 1034 : CN : SOUTHINGTON : 1034 1003 : CN : NAUGATUCK : 1003 1160 : CN : GRISWOLD : 1160 1113 : CN : HARTFORD : 1113 1052 : CN : NORWALK : 1052 1100 : CN : WATERFORD : 1100 1008 : CN : DANBURY : 1008 1134 : CN : NEW FAIRFIELD : 1134 1018 : CN : SOUTHBURY : 1018 1013 : CN : NEWTOWN : 1013 1054 : CN : RIDGEFIELD : 1054 1933 : CN : CANTON : 1933 1057 : CN : WILTON : 1057 1012 : CN : MONROE : 1012 1013 : CN : NEWTOWN : 1013 1057 : CN : WILTON : 1057 1910 : CN : DURHAM : 1910 1179 : CN : WILLINGTON : 1179 1070 : CN : BRISTOL : 1070 1166 : CN : MANSFIELD : 1166 1157 : CN : EAST HAMPTON : 1157 1052 : CN : NORWALK : 1052 1117 : CN : SUFFIELD : 1117 1051 : CN : NEW CANAAN : 1051 1051 : CN : NEW CANAAN : 1051 1179 : CN : WILLINGTON : 1179 1170 : CN : NORTH STONINGTON : 1170 1013 : CN : NEWTOWN : 1013 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 264 of 616 Month Number Amount 202206 $69,841.37 202206 $367.29 202206 $405.63 202206 $2,842.09 202206 $604.99 202206 $450.12 202206 $43,052.14 202206 $21,862.03 202206 $32,446.14 202206 $685.94 202206 $13,550.27 202206 $4,769.28 202206 $110.19 202206 $277.09 202206 $2,739.45 202206 $9,273.13 202206 $549.78 202206 $146.91 202206 $3,517.01 202206 $1,652.64 202206 $2,035.44 202206 $826.30 202206 $587.60 202206 $6,518.43 202206 $1,944.67 202206 $238.69 202206 $937.55 202206 $1,618.99 202206 $2,778.87 202206 $146.91 202206 $244.58 202206 $3,494.61 202206 $1,337.85 202206 $235.37 202206 $9,817.74 202206 $203.77 202206 $700.49 202206 $6,670.81 202206 $477.43 202206 $652.13
  9. Page 265 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80262963 80262975 80262976 80262991 80263224 80263229 80263231 80263483 80263500 80263542 80263561 80263566 80263569 80263580 80263593 80263613 80263636 80263641 80263674 80263714 80263844 80263876 80263885 80263888 80263917 80263944 80264183 80264190 80264205 80264212 80264222 80264241 80264255 80264258 80264283 80264293 80264320 80264374 80264388 80264391 Accounting Work Order Descript TO STORES 4/6/23-- Dekoven Dr Middl WQ; 6/14/22 142 A WOODVALE DR SOUTH MR;***WRITTEN***William St Ext Port DG PAD#193/#246 65 IDE PERRIN RD WO MR;***WRITTEN*** REPLACE OH SVC TO Jeff Abel-6/13 OAKLAND( 382) RD -RC REPLACE 3 POLES AND INSTALL STUB PLANNED 6/30 print 6/22 EVW - TURNO VJT - WATERBURY( 1739) RD -- 857, T DG P#2231 FIVE MILE RIVER RD PUTNAM LD!!!! 45 GLOVER AVE NORWALK PAD#11 VJT - Y-26691-2022; SUNSET(39) RD MF 6/15 MAPLE CORNERS( 5) RD -MF 6/15 LANTERN HILL( 342) RD -CANCEL-WQ; 6/15/22 3238:BENSON RD.B 6/15 SCHOOL HILL( 11) LN -- HH34A WRTN--JK>POLE 2056--FTR TO REPLACE Replc OH xfmrs due to voltage issue POST CONST 6/11/22 PRI DB TURNOVER WINTHROP 94 RD WINDSOR, CT 06095 227 OLNEY RD., WETHERSFIELD - REPL 190 CHASE AVE, WATERBURY - CABLE FA ALL WORK COMPLETED-6/15 [WILLIAP] O MPB; 5 HILLSIDE CT, BETHEL - PM#285 (E ASP 7/28) 47 SUNSET FARM RD., WE 6/15/22 S19 1/2::FLAG SWAMP:RD::S DB-CD01964, Great Wolf, MH inspecti 6/16/22 TURNOVER REPLC P 1896, HAMI SANDRA( 52) DR -- 4176, EAST HART 75 GORDON LN, EAST HARTFORD CT AJC TT - 33 WINDSOR LN, GREENWICH TT TC 12 OLD MILL LN, STM: P#2335 R INVALID Frontier -6/15 ELM( 314) S ***WRITTEN***ALL WORK COMPLETED*** RL: 1165 KING ST, GRN: REPLACE PAD BM; 6/16/22 C6987::RIVERFORD:RD::B EM RF:292 SOUND BEACH AVE, OLD GREE Post Construction 6/14/22 JORDAN( DJM. 06.13.22 - INDIAN HILL RD, WES WRITTEN COMPLETE IN FIELD DANIEL( 1 Asset Location 1033 : CN : MIDDLETOWN : 1033 1018 : CN : SOUTHBURY : 1018 1172 : CN : PORTLAND : 1172 1085 : CN : WOODSTOCK : 1085 1033 : CN : MIDDLETOWN : 1033 1115 : CN : SOUTH WINDSOR : 1115 1134 : CN : NEW FAIRFIELD : 1134 1195 : CN : WINCHESTER : 1195 1019 : CN : THOMASTON : 1019 1082 : CN : PUTNAM : 1082 1052 : CN : NORWALK : 1052 1023 : CN : BETHLEHEM : 1023 1164 : CN : LEDYARD : 1164 1177 : CN : STONINGTON : 1177 1130 : CN : BRIDGEWATER : 1130 1101 : CN : WESTBROOK : 1101 1159 : CN : GLASTONBURY : 1159 1098 : CN : OLD SAYBROOK : 1098 1040 : CN : BERLIN : 1040 1121 : CN : WINDSOR : 1121 1045 : CN : WETHERSFIELD : 1045 1002 : CN : WATERBURY : 1002 1941 : CN : ROCKY HILL : 1941 1007 : CN : BETHEL : 1007 1943 : CN : WEST HARTFORD : 1943 1018 : CN : SOUTHBURY : 1018 1164 : CN : LEDYARD : 1164 1006 : CN : BETHANY : 1006 1934 : CN : EAST HARTFORD : 1934 1934 : CN : EAST HARTFORD : 1934 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1122 : CN : WINDSOR LOCKS : 1122 1093 : CN : ESSEX : 1093 1065 : CN : GREENWICH : 1065 1131 : CN : BROOKFIELD : 1131 1065 : CN : GREENWICH : 1065 1034 : CN : SOUTHINGTON : 1034 1056 : CN : WESTPORT : 1056 1157 : CN : EAST HAMPTON : 1157 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 265 of 616 Month Number Amount 202206 $4,281.23 202206 $367.29 202206 $68,588.56 202206 $218.75 202206 $2,123.16 202206 $402.39 202206 $954.87 202206 $82,126.45 202206 $1,490.38 202206 $1,974.46 202206 $3,819.24 202206 $1,175.20 202206 $440.75 202206 $727.80 202206 $550.88 202206 $1,137.06 202206 $5,977.09 202206 $1,478.10 202206 $578.83 202206 $2,416.47 202206 $587.63 202206 $1,852.79 202206 $807.98 202206 $220.37 202206 $293.81 202206 $1,385.51 202206 $5,565.71 202206 $881.38 202206 $183.59 202206 $514.16 202206 $40,598.45 202206 $2,383.20 202206 $1,267.85 202206 $488.70 202206 $786.60 202206 $223.40 202206 $1,468.97 202206 $8,947.84 202206 $1,661.56 202206 $881.36
  10. Page 266 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80264396 80264507 80264513 80264569 80264578 80264593 80265548 80265565 80265578 80265579 80265582 80265590 80265596 80265598 80265600 80265605 80265608 80265612 80265613 80265618 80265628 80265632 80265639 80265641 80265645 80265647 80265648 80265649 80265653 80265658 80265663 80265666 80265669 80265679 80265690 80265697 80265702 80265725 80265727 80265733 Accounting Work Order Descript MR;***WRITTEN*** SET 35' CLASS 2 CR Post Construction 6/15/22 DUNN HIL 06.15.22 / Y-26693-2022 / 57 ICE PO REPLACE LEAKING PAD#40 TURNOVER LIT MJ-6/16/22 TREMONT( 209) ST -- 42 6/16/22 PLAINVILLE( 902) AVE -- H GDK WEST HARTFORD 567 FERN ST FAULT 6/17 CUMBERLAND( 44) RD -- S1071, REPLACE 8' XARM, SHIFT PRIMARIES- 6 MONROE( 45) RD -- HH "R1", ENFIEL GORDON( 75) LN -- U, EAST HARTFOR 6/19 - TURNOVER SUNSET( 15) RD -JOB COMPLETED CRP - TURNOVER - SIL COMP KENNEDY (549) RD, WINDSOR, CT 6/20 All work completed-E MAIN( 32 WM; 6/19/22 TURNOVER 221 DANBURY RD JFC - turnover - GAVELL CABIN( 18) DJM!!! 30 MAPLE LN, WESTPORT POLE 2 RSO--06/18/22--JK>P.2869--TREE V OH 6/19/22 42 PAPER MILL RD WOODBURY ACC KTI RC 9A REPLACE POLE A2590. VJT - BALDWIN( 10) ST -- 5982, WATE 6/18 #1653 NEED NEW XARM BACON RD, 121-123 HUYSHOPE AVE HARTFORD POST CONSTR - 6/18/22 CARMEL( 34) RSO--06/15/22--REPLACED OH SERVICEfollowup work ligtnign need written POST CONSTR - 6/16/22 RED STONE HL MR; ***WRITTEN***6/18 CATHERINE( Shift to New Pole- P 4707- Follow U OLD FARMS( 300) RD -- P, AVON, CT WRITTEN WORK NEEDS TO BE DONE OLD M **6/18/22 BALDWIN( 179) AVE FL 3-6/19 NATHAN HALE RD (196), COVENTRY HTFD, BLUE HILLS AVE - REPL 4 SPANS GDK SIMSBURY 10 BUTTONWOOD DR REPLA FTR POLE NOT SET-6/18/22 SCHAFFER( ELLSWORTH:RD::EAST WINDSOR:CT 06.19.22 - 100 MAHER AVE, GREENWICH 6/19/22 MERIDEN( 1400) RD APT 3-2-- Asset Location 1033 : CN : MIDDLETOWN : 1033 1910 : CN : DURHAM : 1910 1040 : CN : BERLIN : 1040 1094 : CN : HADDAM : 1094 1043 : CN : NEWINGTON : 1043 1041 : CN : FARMINGTON : 1041 1943 : CN : WEST HARTFORD : 1943 1943 : CN : WEST HARTFORD : 1943 1168 : CN : MONTVILLE : 1168 1112 : CN : ENFIELD : 1112 1934 : CN : EAST HARTFORD : 1934 1164 : CN : LEDYARD : 1164 1933 : CN : CANTON : 1933 1121 : CN : WINDSOR : 1121 1102 : CN : BRANFORD : 1102 1135 : CN : NEW MILFORD : 1135 1137 : CN : SHARON : 1137 1056 : CN : WESTPORT : 1056 1159 : CN : GLASTONBURY : 1159 1022 : CN : WOODBURY : 1022 1138 : CN : SHERMAN : 1138 1004 : CN : WATERTOWN : 1004 1112 : CN : ENFIELD : 1112 1113 : CN : HARTFORD : 1113 1006 : CN : BETHANY : 1006 1159 : CN : GLASTONBURY : 1159 1089 : CN : MADISON : 1089 1032 : CN : MERIDEN : 1032 1033 : CN : MIDDLETOWN : 1033 1103 : CN : GUILFORD : 1103 1931 : CN : AVON : 1931 1157 : CN : EAST HAMPTON : 1157 1002 : CN : WATERBURY : 1002 1155 : CN : COVENTRY : 1155 1113 : CN : HARTFORD : 1113 1942 : CN : SIMSBURY : 1942 1006 : CN : BETHANY : 1006 1110 : CN : EAST WINDSOR : 1110 1065 : CN : GREENWICH : 1065 1002 : CN : WATERBURY : 1002 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 266 of 616 Month Number Amount 202206 $1,805.84 202206 $587.60 202206 $2,164.05 202206 $322.46 202206 $183.63 202206 $1,398.24 202206 $7,863.55 202206 $293.81 202206 $6,379.07 202206 $734.49 202206 $587.60 202206 $7,758.60 202206 $298.41 202206 $403.56 202206 $11,997.48 202206 $293.76 202206 $6,266.91 202206 $6,814.11 202206 $3,039.77 202206 $2,251.34 202206 $146.91 202206 $2,350.48 202206 $819.57 202206 $112,546.51 202206 $898.78 202206 $2,523.83 202206 $450.98 202206 $587.60 202206 $434.14 202206 $220.37 202206 $1,623.99 202206 $125.17 202206 $725.73 202206 $8,278.62 202206 $550.89 202206 $1,700.85 202206 $440.72 202206 $9,126.24 202206 $441.66 202206 $1,028.33
Words on different pages

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)