Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 263 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80260098 80260101 80260133 80260151 80260162 80260167 80260188 80260199 80260200 80260203 80260309 80260313 80260340 80260401 80260410 80261196 80261199 80261201 80261214 80261222 80261223 80261225 80261228 80261233 80261236 80261252 80261266 80261270 80261272 80261278 80261286 80261292 80261299 80261308 80261329 80261369 80261387 80261434 80261438 80261442 Accounting Work Order Descript DG P#2035 117 THOMAS RD LEDYARD RPL 6/9 LONG COVE RD LEDYARD JRP - 335 Atwater St SOG Rex Forge 6/9/22 63 HARDING DR RIDGEFIELD 6/9/22 GRIFFIN HILL RD RIDGEFIELD 6/9/22 MAIN ST RIDGEFIELD written complete follow up under 93 CUST APPT 6/20/22; JK>POLES 2579 & Jpt-132 East Main St Waterbury MH13 complete OMS-DISPATCHED (EDS)-OH-A TL - UPPER KENSINGTON DR, REF. #3 E LD WARNCKE RD WILTON POLE#7246 RPL 06/10 *TURNOVER* 51 RICHARD ST AVON PR 9/26 CRP - 121 BAHRE CORNER RD C REPRINT 5/12 EVW - 726 LAKE DR, Wi 6/12 P#16782 FIRST ST, SUFFIELD Abel - 6/11 S ELLINGTON RD, SOUTH W *CANCELLED* MR; **NOTIFIED FTR & CO ASP-6/10/22 23 COOLIDGE ST NEW BRIT MATHEWSON MILL WRTN--JK>POLE 430--P 6/10/22 90 APPLE GATE SOUTHINGTON ALL WORK COMPLETED-WILDWOOD( 80) RD REPLACE POLE 577- 35' CLASS 2, SHIF REPLACE 2 POLES AND TRANSFORMER BL WRITTEN COMPLETE IN FIELD ELI CHAPM 06-10-22 TURNOVER PARK 10 ST APT 2/ COMP 06/09 WINDSOR AVE WINDSOR POLE 6/12 GORDON ST SIMSBURY ***ALL WORK COMPLETED***TURNOVER 6/ 6/12 P#7276 W SERVICE RD, HARTFORD CANCEL--SEE 9678475 Jpt-29 E Main St WTBRY MH132 - POST 6/9/22 Follow up work srv replcment ***ALL WORK COMPLETED*** 6/11/22 CO 6/10 NEED NEW SERV ASAP DAMASCUS 2 PR 6/13 EVW - Careys Pt - X of E Wa 6/11/22 171 BELRIDGE RD NEW BRITAIN !!! TT TC 61 LONG MEADOW RD, GRN: (E) GDK SIMSBURY 3 OVERLOOK TER. SV TT TC COVE RD, STM: P#7092 REPL'D 2 Asset Location 1164 : CN : LEDYARD : 1164 1164 : CN : LEDYARD : 1164 1034 : CN : SOUTHINGTON : 1034 1054 : CN : RIDGEFIELD : 1054 1054 : CN : RIDGEFIELD : 1054 1054 : CN : RIDGEFIELD : 1054 1163 : CN : LEBANON : 1163 1159 : CN : GLASTONBURY : 1159 1002 : CN : WATERBURY : 1002 1931 : CN : AVON : 1931 1092 : CN : EAST LYME : 1092 1057 : CN : WILTON : 1057 1931 : CN : AVON : 1931 1933 : CN : CANTON : 1933 1195 : CN : WINCHESTER : 1195 1117 : CN : SUFFIELD : 1117 1115 : CN : SOUTH WINDSOR : 1115 1033 : CN : MIDDLETOWN : 1033 1042 : CN : NEW BRITAIN : 1042 1164 : CN : LEDYARD : 1164 1034 : CN : SOUTHINGTON : 1034 1045 : CN : WETHERSFIELD : 1045 1101 : CN : WESTBROOK : 1101 1096 : CN : LYME : 1096 1156 : CN : EAST HADDAM : 1156 1169 : CN : NEW LONDON : 1169 1121 : CN : WINDSOR : 1121 1942 : CN : SIMSBURY : 1942 1096 : CN : LYME : 1096 1113 : CN : HARTFORD : 1113 1159 : CN : GLASTONBURY : 1159 1002 : CN : WATERBURY : 1002 1098 : CN : OLD SAYBROOK : 1098 1089 : CN : MADISON : 1089 1102 : CN : BRANFORD : 1102 1195 : CN : WINCHESTER : 1195 1042 : CN : NEW BRITAIN : 1042 1065 : CN : GREENWICH : 1065 1942 : CN : SIMSBURY : 1942 1066 : CN : STAMFORD : 1066 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 263 of 616 Month Number Amount 202206 $224.22 202206 $275.46 202206 $49,011.55 202206 $366.46 202206 $81.51 202206 $366.77 202206 $330.20 202206 $2,075.83 202206 $40,430.72 202206 $2,787.45 202206 $194.60 202206 $1,508.00 202206 $2,967.09 202206 $812.65 202206 $551.42 202206 $11,531.92 202206 $28,983.51 202206 $299.45 202206 $476.57 202206 $850.83 202206 $220.37 202206 $3,649.60 202206 $782.14 202206 $3,231.85 202206 $10,300.25 202206 $8,171.80 202206 $285.24 202206 $2,547.90 202206 $22,728.59 202206 $1,368.11 202206 $209.27 202206 $23,311.39 202206 $2,086.44 202206 $1,965.88 202206 $652.93 202206 $776.26 202206 $2,318.43 202206 $587.60 202206 $298.34 202206 $2,749.14
  2. Page 264 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80261567 80261572 80261574 80261590 80261596 80261607 80261608 80261898 80261904 80261905 80261908 80261919 80261945 80261948 80261973 80261975 80262013 80262032 80262035 80262044 80262059 80262068 80262087 80262132 80262133 80262134 80262138 80262821 80262831 80262840 80262845 80262851 80262858 80262892 80262898 80262910 80262918 80262919 80262934 80262955 Accounting Work Order Descript JFC - MUDGETOWN RD SHARON CT DJM - COMPO RD S, WESTPORT POLE 257 SD; 6/11/22 25 CORNELL RD DANBURY ( DJM. 06.11.22 - BONNIE BROOK RD, WE LD!!! 56 OLD KINGS HWY WILTON STRA DJM!!! 06.11.22 - 2 FIELDCREST RD, 6/13/22 YELLOW TAG P.9364 SHELTON S written (complete?) 06/13 *TURNOVER 6/14 PAD#153 MIDDLE( 574) TPKE -***WRITTEN***ALL WORK COMPLETED***0 06/13 *TURNOVER* 26 GRASSMERE AVE , International Dr 14, East Granby. R ASP-6/13/22 CHAFFEE LN SOUTHINGTON POST CONST 6/13/22 QUINN ST NAUGATU 6/13/22 (RSO-KNAPP/PUNZALAN) GLASGO CD02012 Seg 1. Rplc. 2N08 PILC JDB 06.13.22 - 28 POSSUM LN, NORWAL 6/13 (RSO JOHNNY Z) MULLEN HILL( 6/13/22 11A73-82M OUTAGE KENNEDY AV 6/11/22 11 SUNSET TRL NEW FAIRFIELD RR; 6/13/22 GETTYSBURG( 21) RD -BM; 6/11/22 22 PLEASANT HILL RD NEW *FIELD WORK COMPLETE* MPB; 6/10/22 CRP - FOREST( 35) LN -- 3586, CANTO JES!!!!!; 141 DANBURY RD. WILTON.; APPRENTICES WQ; 6/11/22 424 BARN HI 6/11/22 10 VINING RD NEWTOWN JES; 18 WOODCHUCK LN. WILTON.; RPL. 6/15/22 SAW MILL( 110R) RD -- P1710 6/14 (ZALEWA) TOLLAND( 479) TPKE Jtp-95 Hart St Bristol (Frnt)P626 BASSETTS BRIDGE:RD::MANSFIELD:CT WRITTEN COMPLETE IN FIELD MINNETONK JDB 06.13.22 - 141 FILLOW ST, NORWA Work Complete-27.6KV ROW-Suffield 06.14.22 - 168 LOST DISTRICT DR, NE 06.14.22 - 145 WEED ST, NEW CANAAN Storrs Rd, Willington P-830 12J4-49 MF 6/14 SWANTOWN HILL RD NORTH STON 6/10/22 38 BERKSHIRE RD NEWTOWN Asset Location 1137 : CN : SHARON : 1137 1056 : CN : WESTPORT : 1056 1008 : CN : DANBURY : 1008 1056 : CN : WESTPORT : 1056 1057 : CN : WILTON : 1057 1056 : CN : WESTPORT : 1056 1016 : CN : SEYMOUR : 1016 1163 : CN : LEBANON : 1163 1166 : CN : MANSFIELD : 1166 1172 : CN : PORTLAND : 1172 1943 : CN : WEST HARTFORD : 1943 1123 : CN : EAST GRANBY : 1123 1034 : CN : SOUTHINGTON : 1034 1003 : CN : NAUGATUCK : 1003 1160 : CN : GRISWOLD : 1160 1113 : CN : HARTFORD : 1113 1052 : CN : NORWALK : 1052 1100 : CN : WATERFORD : 1100 1008 : CN : DANBURY : 1008 1134 : CN : NEW FAIRFIELD : 1134 1018 : CN : SOUTHBURY : 1018 1013 : CN : NEWTOWN : 1013 1054 : CN : RIDGEFIELD : 1054 1933 : CN : CANTON : 1933 1057 : CN : WILTON : 1057 1012 : CN : MONROE : 1012 1013 : CN : NEWTOWN : 1013 1057 : CN : WILTON : 1057 1910 : CN : DURHAM : 1910 1179 : CN : WILLINGTON : 1179 1070 : CN : BRISTOL : 1070 1166 : CN : MANSFIELD : 1166 1157 : CN : EAST HAMPTON : 1157 1052 : CN : NORWALK : 1052 1117 : CN : SUFFIELD : 1117 1051 : CN : NEW CANAAN : 1051 1051 : CN : NEW CANAAN : 1051 1179 : CN : WILLINGTON : 1179 1170 : CN : NORTH STONINGTON : 1170 1013 : CN : NEWTOWN : 1013 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 264 of 616 Month Number Amount 202206 $69,841.37 202206 $367.29 202206 $405.63 202206 $2,842.09 202206 $604.99 202206 $450.12 202206 $43,052.14 202206 $21,862.03 202206 $32,446.14 202206 $685.94 202206 $13,550.27 202206 $4,769.28 202206 $110.19 202206 $277.09 202206 $2,739.45 202206 $9,273.13 202206 $549.78 202206 $146.91 202206 $3,517.01 202206 $1,652.64 202206 $2,035.44 202206 $826.30 202206 $587.60 202206 $6,518.43 202206 $1,944.67 202206 $238.69 202206 $937.55 202206 $1,618.99 202206 $2,778.87 202206 $146.91 202206 $244.58 202206 $3,494.61 202206 $1,337.85 202206 $235.37 202206 $9,817.74 202206 $203.77 202206 $700.49 202206 $6,670.81 202206 $477.43 202206 $652.13
  3. Page 265 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80262963 80262975 80262976 80262991 80263224 80263229 80263231 80263483 80263500 80263542 80263561 80263566 80263569 80263580 80263593 80263613 80263636 80263641 80263674 80263714 80263844 80263876 80263885 80263888 80263917 80263944 80264183 80264190 80264205 80264212 80264222 80264241 80264255 80264258 80264283 80264293 80264320 80264374 80264388 80264391 Accounting Work Order Descript TO STORES 4/6/23-- Dekoven Dr Middl WQ; 6/14/22 142 A WOODVALE DR SOUTH MR;***WRITTEN***William St Ext Port DG PAD#193/#246 65 IDE PERRIN RD WO MR;***WRITTEN*** REPLACE OH SVC TO Jeff Abel-6/13 OAKLAND( 382) RD -RC REPLACE 3 POLES AND INSTALL STUB PLANNED 6/30 print 6/22 EVW - TURNO VJT - WATERBURY( 1739) RD -- 857, T DG P#2231 FIVE MILE RIVER RD PUTNAM LD!!!! 45 GLOVER AVE NORWALK PAD#11 VJT - Y-26691-2022; SUNSET(39) RD MF 6/15 MAPLE CORNERS( 5) RD -MF 6/15 LANTERN HILL( 342) RD -CANCEL-WQ; 6/15/22 3238:BENSON RD.B 6/15 SCHOOL HILL( 11) LN -- HH34A WRTN--JK>POLE 2056--FTR TO REPLACE Replc OH xfmrs due to voltage issue POST CONST 6/11/22 PRI DB TURNOVER WINTHROP 94 RD WINDSOR, CT 06095 227 OLNEY RD., WETHERSFIELD - REPL 190 CHASE AVE, WATERBURY - CABLE FA ALL WORK COMPLETED-6/15 [WILLIAP] O MPB; 5 HILLSIDE CT, BETHEL - PM#285 (E ASP 7/28) 47 SUNSET FARM RD., WE 6/15/22 S19 1/2::FLAG SWAMP:RD::S DB-CD01964, Great Wolf, MH inspecti 6/16/22 TURNOVER REPLC P 1896, HAMI SANDRA( 52) DR -- 4176, EAST HART 75 GORDON LN, EAST HARTFORD CT AJC TT - 33 WINDSOR LN, GREENWICH TT TC 12 OLD MILL LN, STM: P#2335 R INVALID Frontier -6/15 ELM( 314) S ***WRITTEN***ALL WORK COMPLETED*** RL: 1165 KING ST, GRN: REPLACE PAD BM; 6/16/22 C6987::RIVERFORD:RD::B EM RF:292 SOUND BEACH AVE, OLD GREE Post Construction 6/14/22 JORDAN( DJM. 06.13.22 - INDIAN HILL RD, WES WRITTEN COMPLETE IN FIELD DANIEL( 1 Asset Location 1033 : CN : MIDDLETOWN : 1033 1018 : CN : SOUTHBURY : 1018 1172 : CN : PORTLAND : 1172 1085 : CN : WOODSTOCK : 1085 1033 : CN : MIDDLETOWN : 1033 1115 : CN : SOUTH WINDSOR : 1115 1134 : CN : NEW FAIRFIELD : 1134 1195 : CN : WINCHESTER : 1195 1019 : CN : THOMASTON : 1019 1082 : CN : PUTNAM : 1082 1052 : CN : NORWALK : 1052 1023 : CN : BETHLEHEM : 1023 1164 : CN : LEDYARD : 1164 1177 : CN : STONINGTON : 1177 1130 : CN : BRIDGEWATER : 1130 1101 : CN : WESTBROOK : 1101 1159 : CN : GLASTONBURY : 1159 1098 : CN : OLD SAYBROOK : 1098 1040 : CN : BERLIN : 1040 1121 : CN : WINDSOR : 1121 1045 : CN : WETHERSFIELD : 1045 1002 : CN : WATERBURY : 1002 1941 : CN : ROCKY HILL : 1941 1007 : CN : BETHEL : 1007 1943 : CN : WEST HARTFORD : 1943 1018 : CN : SOUTHBURY : 1018 1164 : CN : LEDYARD : 1164 1006 : CN : BETHANY : 1006 1934 : CN : EAST HARTFORD : 1934 1934 : CN : EAST HARTFORD : 1934 1065 : CN : GREENWICH : 1065 1066 : CN : STAMFORD : 1066 1122 : CN : WINDSOR LOCKS : 1122 1093 : CN : ESSEX : 1093 1065 : CN : GREENWICH : 1065 1131 : CN : BROOKFIELD : 1131 1065 : CN : GREENWICH : 1065 1034 : CN : SOUTHINGTON : 1034 1056 : CN : WESTPORT : 1056 1157 : CN : EAST HAMPTON : 1157 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 265 of 616 Month Number Amount 202206 $4,281.23 202206 $367.29 202206 $68,588.56 202206 $218.75 202206 $2,123.16 202206 $402.39 202206 $954.87 202206 $82,126.45 202206 $1,490.38 202206 $1,974.46 202206 $3,819.24 202206 $1,175.20 202206 $440.75 202206 $727.80 202206 $550.88 202206 $1,137.06 202206 $5,977.09 202206 $1,478.10 202206 $578.83 202206 $2,416.47 202206 $587.63 202206 $1,852.79 202206 $807.98 202206 $220.37 202206 $293.81 202206 $1,385.51 202206 $5,565.71 202206 $881.38 202206 $183.59 202206 $514.16 202206 $40,598.45 202206 $2,383.20 202206 $1,267.85 202206 $488.70 202206 $786.60 202206 $223.40 202206 $1,468.97 202206 $8,947.84 202206 $1,661.56 202206 $881.36
  4. Page 266 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80264396 80264507 80264513 80264569 80264578 80264593 80265548 80265565 80265578 80265579 80265582 80265590 80265596 80265598 80265600 80265605 80265608 80265612 80265613 80265618 80265628 80265632 80265639 80265641 80265645 80265647 80265648 80265649 80265653 80265658 80265663 80265666 80265669 80265679 80265690 80265697 80265702 80265725 80265727 80265733 Accounting Work Order Descript MR;***WRITTEN*** SET 35' CLASS 2 CR Post Construction 6/15/22 DUNN HIL 06.15.22 / Y-26693-2022 / 57 ICE PO REPLACE LEAKING PAD#40 TURNOVER LIT MJ-6/16/22 TREMONT( 209) ST -- 42 6/16/22 PLAINVILLE( 902) AVE -- H GDK WEST HARTFORD 567 FERN ST FAULT 6/17 CUMBERLAND( 44) RD -- S1071, REPLACE 8' XARM, SHIFT PRIMARIES- 6 MONROE( 45) RD -- HH "R1", ENFIEL GORDON( 75) LN -- U, EAST HARTFOR 6/19 - TURNOVER SUNSET( 15) RD -JOB COMPLETED CRP - TURNOVER - SIL COMP KENNEDY (549) RD, WINDSOR, CT 6/20 All work completed-E MAIN( 32 WM; 6/19/22 TURNOVER 221 DANBURY RD JFC - turnover - GAVELL CABIN( 18) DJM!!! 30 MAPLE LN, WESTPORT POLE 2 RSO--06/18/22--JK>P.2869--TREE V OH 6/19/22 42 PAPER MILL RD WOODBURY ACC KTI RC 9A REPLACE POLE A2590. VJT - BALDWIN( 10) ST -- 5982, WATE 6/18 #1653 NEED NEW XARM BACON RD, 121-123 HUYSHOPE AVE HARTFORD POST CONSTR - 6/18/22 CARMEL( 34) RSO--06/15/22--REPLACED OH SERVICEfollowup work ligtnign need written POST CONSTR - 6/16/22 RED STONE HL MR; ***WRITTEN***6/18 CATHERINE( Shift to New Pole- P 4707- Follow U OLD FARMS( 300) RD -- P, AVON, CT WRITTEN WORK NEEDS TO BE DONE OLD M **6/18/22 BALDWIN( 179) AVE FL 3-6/19 NATHAN HALE RD (196), COVENTRY HTFD, BLUE HILLS AVE - REPL 4 SPANS GDK SIMSBURY 10 BUTTONWOOD DR REPLA FTR POLE NOT SET-6/18/22 SCHAFFER( ELLSWORTH:RD::EAST WINDSOR:CT 06.19.22 - 100 MAHER AVE, GREENWICH 6/19/22 MERIDEN( 1400) RD APT 3-2-- Asset Location 1033 : CN : MIDDLETOWN : 1033 1910 : CN : DURHAM : 1910 1040 : CN : BERLIN : 1040 1094 : CN : HADDAM : 1094 1043 : CN : NEWINGTON : 1043 1041 : CN : FARMINGTON : 1041 1943 : CN : WEST HARTFORD : 1943 1943 : CN : WEST HARTFORD : 1943 1168 : CN : MONTVILLE : 1168 1112 : CN : ENFIELD : 1112 1934 : CN : EAST HARTFORD : 1934 1164 : CN : LEDYARD : 1164 1933 : CN : CANTON : 1933 1121 : CN : WINDSOR : 1121 1102 : CN : BRANFORD : 1102 1135 : CN : NEW MILFORD : 1135 1137 : CN : SHARON : 1137 1056 : CN : WESTPORT : 1056 1159 : CN : GLASTONBURY : 1159 1022 : CN : WOODBURY : 1022 1138 : CN : SHERMAN : 1138 1004 : CN : WATERTOWN : 1004 1112 : CN : ENFIELD : 1112 1113 : CN : HARTFORD : 1113 1006 : CN : BETHANY : 1006 1159 : CN : GLASTONBURY : 1159 1089 : CN : MADISON : 1089 1032 : CN : MERIDEN : 1032 1033 : CN : MIDDLETOWN : 1033 1103 : CN : GUILFORD : 1103 1931 : CN : AVON : 1931 1157 : CN : EAST HAMPTON : 1157 1002 : CN : WATERBURY : 1002 1155 : CN : COVENTRY : 1155 1113 : CN : HARTFORD : 1113 1942 : CN : SIMSBURY : 1942 1006 : CN : BETHANY : 1006 1110 : CN : EAST WINDSOR : 1110 1065 : CN : GREENWICH : 1065 1002 : CN : WATERBURY : 1002 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 266 of 616 Month Number Amount 202206 $1,805.84 202206 $587.60 202206 $2,164.05 202206 $322.46 202206 $183.63 202206 $1,398.24 202206 $7,863.55 202206 $293.81 202206 $6,379.07 202206 $734.49 202206 $587.60 202206 $7,758.60 202206 $298.41 202206 $403.56 202206 $11,997.48 202206 $293.76 202206 $6,266.91 202206 $6,814.11 202206 $3,039.77 202206 $2,251.34 202206 $146.91 202206 $2,350.48 202206 $819.57 202206 $112,546.51 202206 $898.78 202206 $2,523.83 202206 $450.98 202206 $587.60 202206 $434.14 202206 $220.37 202206 $1,623.99 202206 $125.17 202206 $725.73 202206 $8,278.62 202206 $550.89 202206 $1,700.85 202206 $440.72 202206 $9,126.24 202206 $441.66 202206 $1,028.33
  5. Page 267 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80265759 80265772 80265787 80265798 80265816 80265825 80265830 80265840 80265846 80265983 80265989 80265996 80265998 80266007 80266015 80266025 80266033 80266320 80266325 80266338 80266370 80266380 80266390 80266392 80266396 80266406 80266429 80266436 80266439 80266440 80266445 80266474 80266488 80266500 80266519 80266520 80266525 80266744 80266747 80267082 Accounting Work Order Descript POST 6/15/22 MINE HOLLOW RD SOUTHIN OAC REPLACE 1PH 120/208 1/0 SECONDA ***WRITTEN***6/19 GOSPEL( 136) LN 6/16/22 MACAULEY AVE WATERBURY e Brody 10/12, 2nd 10/19 POST CONS 6/19/22 1751 S MAIN ST CHESHIRE 6/19/22 AMITY RD BETHANY VJT - HIGH( 47) ST -- 173, THOMASTO COMPLETED JSG -turnover - HOGBACK( 6/19 PALMER( 31) ST -- 4350, STON COMPLETED JFC - TURNOVER - KLUG HIL DL; 6/20: FAIRFIELD AVE, STAMFORD 6/18/22 20 BLACKMAN AVE BETHEL WM; 6/18/22 TURNOVER COOK( 18) ST 6/20/22 NEW MILFORD LITCHFIELD RD W DM 418 Farmington Ave NB Fault Loca TO STORES 11/28/22--P-251 REPLACE V 12 CEDAR ST EAST HARTFORD AJC TT 27 GREENWICH HILLS DR, GREEN 6/20/22 RED ROBIN RD NAUGATUCK POST ***ALL WORK COMPLETED***06/20 UNION INSTALL NEW 1/0 SEC TPX& #2 SVC***6 DG P#3155 47 KENYONVILLE RD WOODSTO followup work6/20 FLYING POINT( 5 6/20 HILLSIDE( 22) DR -- 1675-11* ***ALL WORK COMPLETED***6/20 OLD MA 6/20/22 23 METACOMET RD FARMINGTON POST CONSTR - 6/20 PIERCE( 42) RD KINSMAN HILL (86) RD , LISBON, CT 0 POST CONSTR - 6/19 MAGNOLIA DR MADI 6/20 JOB COMPLETED - NEW STATE 375 BM; 6/20/22 TURNOVER PRANGE RD BROO ***ALL WORK COMPLETED***6/20 LITTL EM RF:96 FLORENCE RD, RIVERSIDE:REM CANCEL 6/19/22 HUDSON DR NEW FAIRFI AJC!! 284 BRUCE PARK AVE, GREENWICH LD W HILLS RD, NEW CANAAN P#4520 R 6/12/22 - all work complete EMANU JFC - DOUGLAD RD SHARON CT **COMP**MAPLE( 167) ST -- 266, KIL Asset Location 1034 : CN : SOUTHINGTON : 1034 1113 : CN : HARTFORD : 1113 1172 : CN : PORTLAND : 1172 1002 : CN : WATERBURY : 1002 1030 : CN : CHESHIRE : 1030 1030 : CN : CHESHIRE : 1030 1006 : CN : BETHANY : 1006 1019 : CN : THOMASTON : 1019 1193 : CN : HARTLAND : 1193 1177 : CN : STONINGTON : 1177 1194 : CN : TORRINGTON : 1194 1066 : CN : STAMFORD : 1066 1007 : CN : BETHEL : 1007 1140 : CN : WASHINGTON : 1140 1140 : CN : WASHINGTON : 1140 1042 : CN : NEW BRITAIN : 1042 1101 : CN : WESTBROOK : 1101 1934 : CN : EAST HARTFORD : 1934 1065 : CN : GREENWICH : 1065 1003 : CN : NAUGATUCK : 1003 1033 : CN : MIDDLETOWN : 1033 1101 : CN : WESTBROOK : 1101 1085 : CN : WOODSTOCK : 1085 1102 : CN : BRANFORD : 1102 1164 : CN : LEDYARD : 1164 1101 : CN : WESTBROOK : 1101 1041 : CN : FARMINGTON : 1041 1173 : CN : PRESTON : 1173 1165 : CN : LISBON : 1165 1089 : CN : MADISON : 1089 1937 : CN : MANCHESTER : 1937 1131 : CN : BROOKFIELD : 1131 1103 : CN : GUILFORD : 1103 1065 : CN : GREENWICH : 1065 1134 : CN : NEW FAIRFIELD : 1134 1065 : CN : GREENWICH : 1065 1051 : CN : NEW CANAAN : 1051 1095 : CN : KILLINGWORTH : 1095 1137 : CN : SHARON : 1137 1079 : CN : KILLINGLY : 1079 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 267 of 616 Month Number Amount 202206 $52.45 202206 $146.89 202206 $2,363.29 202206 $146.89 202206 $5,419.43 202206 $543.19 202206 $881.38 202206 $358.70 202206 $538.08 202206 $1,468.97 202206 $343.68 202206 $177,016.92 202206 $7,863.52 202206 $224.11 202206 $5,827.93 202206 $10,516.40 202206 $801.36 202206 $3,218.03 202206 $46,016.16 202206 $1,995.59 202206 $99,921.01 202206 $1,175.18 202206 $578.79 202206 $549.90 202206 $220.37 202206 $448.34 202206 $220.37 202206 $1,983.48 202206 $326.01 202206 $3,231.91 202206 $1,505.71 202206 $570.94 202206 $1,881.70 202206 $990.57 202206 $4,408.18 202206 $73.44 202206 $606.05 202206 $4,555.88 202206 $257.12 202206 $326.07
  6. Page 268 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80267095 80267100 80267103 80267111 80267129 80267162 80267175 80267262 80267276 80267282 80267306 80267411 80267443 80267558 80267568 80267811 80267818 80267819 80267820 80267822 80267823 80267825 80267827 80267834 80267859 80267879 80267898 80267899 80267914 80267924 80267972 80267978 80268182 80268567 80268574 80268576 80268599 80268602 80268645 80268646 Accounting Work Order Descript (9A) 06.21.22 - GEAR ST. WATERBURY CANCEL 6/21/22 FRANKLIN STREET( 1 POST CONTSTRUCTION 06.21.22 - 214 O RR; 6/21/22 STODDARD( 5) ST -6/21 FEATHERBED( 56) LN -- 44806JDB GREEN BEACH RD NORWALK P6709 R Y-26461-2022 DG P#3111 14M8-600R 65 DG P#2160 48 JOY RD WOODSTOCK R[PLC #(*) WINDSOR, POQUONOCK AV - P3263 BRIGHTON PARK (20) WAY, BLOOMFIELD TT TC 1520 HOPE ST, STM: P#3444 REP 6/21/22 Y-26711-2022 ANN( 8) TE TO STORES 11/28/222 6/22 DOCK RD C KTI 6/21/22 TURNOVER - HUDSON( 58) BM; 6/22/22 CHURCH HILL( 19) RD 6/22/22 BOTSFORD HILL( 42) RD -WORK COMPLETED IN FIELD - Tolland, COMP JONATHAN( 24) CIR -- S3270, WI JOB IS COMPLETE - TURNOVER - 15 Mou DG P#1881 ARCH ST PUTNAM FRNT RMV'D 4235::THRALL:RD::WINDSOR:CT SHELDON ST HARTFORD ***ALL WORK COMPLETED***6/22 TWILIG ***WRITTEN***INSTALL XFMR GROUND & SD; 6/22/22 HIGH RIDGE( 22) RD -MJ** NACHILLY DR, NEW BRITAIN 06.22.22 - 32 LAKEVIEW RD, PLYMOUTH (ASP) 07/19 6/20 FORD (24) ST, MA POST CONST 06.20.22 - IRIS WAY, BER Post Constr (9A) 06.23.22 - 495 UNI EVW - 230 FLORENCE ST WINCHESTER CT Upgrade Steps 1254kva 23/13.8 to 15 HEL 6/23/22 Y-26720-2022 238 BAKE INVALID 6/23/22 OLD BOSTON POST RD, TURNPIKE RD EXT (12) , WILLINGTON, 06.23.22 - PERCIVAL AVE, BERLIN MJ-06.23.22 - 565 MAIN ST, SOUTHING 06.23.22 - 840 E MAIN ST, MERIDEN 6/23 P#647 BROKE BY TREE CHRISWELL TT TC 125 TURNER RD, STM: P#2930 ST Asset Location 1002 : CN : WATERBURY : 1002 1008 : CN : DANBURY : 1008 1040 : CN : BERLIN : 1040 1016 : CN : SEYMOUR : 1016 1102 : CN : BRANFORD : 1102 1052 : CN : NORWALK : 1052 1084 : CN : THOMPSON : 1084 1085 : CN : WOODSTOCK : 1085 1121 : CN : WINDSOR : 1121 1932 : CN : BLOOMFIELD : 1932 1066 : CN : STAMFORD : 1066 1007 : CN : BETHEL : 1007 1090 : CN : CHESTER : 1090 1134 : CN : NEW FAIRFIELD : 1134 1013 : CN : NEWTOWN : 1013 1013 : CN : NEWTOWN : 1013 1118 : CN : TOLLAND : 1118 1121 : CN : WINDSOR : 1121 1195 : CN : WINCHESTER : 1195 1082 : CN : PUTNAM : 1082 1121 : CN : WINDSOR : 1121 1113 : CN : HARTFORD : 1113 1089 : CN : MADISON : 1089 1102 : CN : BRANFORD : 1102 1008 : CN : DANBURY : 1008 1042 : CN : NEW BRITAIN : 1042 1071 : CN : PLYMOUTH : 1071 1937 : CN : MANCHESTER : 1937 1040 : CN : BERLIN : 1040 1002 : CN : WATERBURY : 1002 1195 : CN : WINCHESTER : 1195 1091 : CN : CLINTON : 1091 1136 : CN : ROXBURY : 1136 1008 : CN : DANBURY : 1008 1179 : CN : WILLINGTON : 1179 1040 : CN : BERLIN : 1040 1034 : CN : SOUTHINGTON : 1034 1032 : CN : MERIDEN : 1032 1942 : CN : SIMSBURY : 1942 1066 : CN : STAMFORD : 1066 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 268 of 616 Month Number Amount 202206 $586.95 202206 $111.57 202206 $514.16 202206 $141.51 202206 $661.06 202206 $396.10 202206 $119.57 202206 $924.14 202206 $293.81 202206 $404.02 202206 $2.66 202206 $990.46 202206 $10,720.18 202206 $3,371.33 202206 $146.89 202206 $985.09 202206 $4,155.34 202206 $440.72 202206 $1,056.27 202206 $27.92 202206 $9,359.48 202206 $147,175.21 202206 $156.85 202206 $1,762.80 202206 $36.77 202206 $168.05 202206 $311.16 202206 $110.19 202206 $260.88 202206 $1,028.31 202206 $1,183.12 202206 $5,816.78 202206 $28,309.31 202206 $2,533.03 202206 $204.70 202206 $293.49 202206 $385.62 202206 $1,909.69 202206 $11,324.21 202206 $146.91
  7. Page 269 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80268657 80268670 80268683 80268911 80268918 80268933 80269776 80269786 80269793 80269798 80269806 80269831 80269833 80269836 80269842 80269843 80269849 80269875 80269897 80269910 80269920 80269927 80269928 80269954 80270061 80270098 80270657 80270781 80270797 80270803 80270988 80271105 80271703 1B030140 1B030353 1B030534 1B030641 1B030824 1B030832 1B031891 Accounting Work Order Descript TT TC 1277 HIGH RIDGE RD, STM: P#21 RIGGS TT TC 619 W HILL RD, STM: P#8 6/23 (MIGLIA) HALLADAY( 1063) AVE W PRINT 11/14 MDB - 6/23 [CLEAVJJ] LI PRINT 10/14 JSG - 6/23 Bunker Hill VJT - 6/23 CROWLCJ]: LITCHFIELD( 15 6/25/22 TURNOVER WEBSTER SQUARE RD 6/24/22 (RSO-ZAHACEFSKI) ROXBURY CT 6/24 P#3386 LENS( 16) AVE -- 3386 DL; 6/20: GROVE ST, STM; CABLE FAUL ***ALL WORK COMPLETED***JEFFERSON ( **ALL WORK COMPLETE**SEE WO 9384535 POST CONSTR - 6/25/22 MAY( 63) ST WRITTEN NEEDS TO BE DONE WILKES RD 6/25/22 TURNOVER THORPE( 367) AVE 101395 - Enfield, Hazard Ave - repl 6/24 SCHOFIELD RD WILLINGTON-Replac WINDSOR, 10 COTTAGE APT REAR-- P746 **field ck needed pole stragtn frtr 06-25-22 EVENT 4776918 520 JEFFERS WM; 6/25/22 KIELWASSER RD WASHINGTO HEL RR; 6/24/22 PEACH FARM( 77) R 6/25/22 Y-26728-2022 INDIAN HILL( TO STORES--6/25 (RSO-STROM/PATINELL 06/27/22--JK>POLE 43--TREE V OH PRI Watertown 25R-Rebuild Failed 1X LTC WRITTEN COMPLETE 6/27 (RSO DAMICO) 06/26/22--JK>POLE 3763--REPLCD OH X WRITTEN COMPLETE IN FIELD BANNER( WRITTEN COMPLETE IN FIELD TOWN( 2 COMPLETED 6/28 CP-Pole 341 Maple av VJT - TARBELL( 270) AVE -- 19314, SC-90 THOMPSON PIKE KILLINGLY P#191 107 TRIANGLE ST DANBURY, ROTTED/BRK KD-EVENT #4082606 REP 40/2 POLE, 8' KD-95 Lounsbury Rd Ridgefield; REPL (50,0): JS - Crane St, Danb, Shift KD-161 Nettletown Hollow Rd Washing RC ROBIN RD NEWTOWN; P.2236 REPL FU KD 1 Patmar Dr Monroe; REPLC TOP P Asset Location 1066 : CN : STAMFORD : 1066 1066 : CN : STAMFORD : 1066 1117 : CN : SUFFIELD : 1117 1407 : CN : MORRIS : 1407 1004 : CN : WATERTOWN : 1004 1004 : CN : WATERTOWN : 1004 1040 : CN : BERLIN : 1040 1092 : CN : EAST LYME : 1092 1079 : CN : KILLINGLY : 1079 1066 : CN : STAMFORD : 1066 1033 : CN : MIDDLETOWN : 1033 1033 : CN : MIDDLETOWN : 1033 1042 : CN : NEW BRITAIN : 1042 1157 : CN : EAST HAMPTON : 1157 1032 : CN : MERIDEN : 1032 1112 : CN : ENFIELD : 1112 1179 : CN : WILLINGTON : 1179 1121 : CN : WINDSOR : 1121 1102 : CN : BRANFORD : 1102 1169 : CN : NEW LONDON : 1169 1140 : CN : WASHINGTON : 1140 1014 : CN : OXFORD : 1014 1168 : CN : MONTVILLE : 1168 1102 : CN : BRANFORD : 1102 1167 : CN : MARLBOROUGH : 1167 J25R : CL&P WATERTOWN WATERTOWN : 1004 1153 : CN : COLCHESTER : 1153 1159 : CN : GLASTONBURY : 1159 1157 : CN : EAST HAMPTON : 1157 1156 : CN : EAST HADDAM : 1156 1933 : CN : CANTON : 1933 1004 : CN : WATERTOWN : 1004 1079 : CN : KILLINGLY : 1079 1008 : CN : DANBURY : 1008 1054 : CN : RIDGEFIELD : 1054 1054 : CN : RIDGEFIELD : 1054 1008 : CN : DANBURY : 1008 1140 : CN : WASHINGTON : 1140 1013 : CN : NEWTOWN : 1013 1012 : CN : MONROE : 1012 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 269 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 $489.16 Emergent Equipment Failures - Line 202206 $441.86 Emergent Equipment Failures - Line 202206 $800.59 Emergent Equipment Failures - Line 202206 $734.49 Emergent Equipment Failures - Line 202206 $1,469.01 Emergent Equipment Failures - Line 202206 $1,053.23 Emergent Equipment Failures - Line 202206 $1,566.66 Emergent Equipment Failures - Line 202206 $73.48 Emergent Equipment Failures - Line 202206 $1,540.77 Emergent Equipment Failures - Line 202206 $9,230.38 Emergent Equipment Failures - Line 202206 $1,330.63 Emergent Equipment Failures - Line 202206 $55.07 Emergent Equipment Failures - Line 202206 $146.91 Emergent Equipment Failures - Line 202206 $771.22 Emergent Equipment Failures - Line 202206 $293.80 Emergent Equipment Failures - Line 202206 $726.95 Emergent Equipment Failures - Line 202206 $220.37 Emergent Equipment Failures - Line 202206 $589.60 Emergent Equipment Failures - Line 202206 $293.81 202206 $809.10 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202206 $881.38 Emergent Equipment Failures - Line 202206 $514.16 Emergent Equipment Failures - Line 202206 $1,469.00 Emergent Equipment Failures - Line 202206 $3,023.35 Emergent Equipment Failures - Line 202206 $118.32 Emergent Equipment Failures - Substation 202206 $18,569.62 Emergent Equipment Failures - Line 202206 $172.72 Emergent Equipment Failures - Line 202206 $172.76 Emergent Equipment Failures - Line 202206 $172.72 Emergent Equipment Failures - Line 202206 $236.65 Emergent Equipment Failures - Line 202206 $63,834.47 Emergent Equipment Failures - Line 202206 $163.46 Emergent Equipment Failures - Line 202206 $170.69 Emergent Equipment Failures - Line 202206 $1,003.42 Emergent Equipment Failures - Line 202206 ($1,575.29) Emergent Equipment Failures - Line 202206 $1,049.77 Emergent Equipment Failures - Line 202206 ($98.87) Emergent Equipment Failures - Line 202206 $974.32 Emergent Equipment Failures - Line 202206 ($604.04) Emergent Equipment Failures - Line 202206 ($58.14)
  8. Page 270 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 1B032155 1B032507 1B032732 1B032763 1B032858 1B032872 1B130007 1B521355 1B620086 1B822032 1B822537 1B920686 1B922032 1B922727 1B922743 1B922769 1N021367 1N030153 1N030173 1N030350 1N030384 1N030424 1N030769 1N030785 1N030868 1N030875 1N030954 1N031127 1N031260 1N120390 1N130045 1N220352 1N222083 1N322430 1N420399 1N621579 1N720612 1N720786 1N821078 1N821471 Accounting Work Order Descript KD-EVENTSPRING VALLEY RD #4315464 KD-EVENT #4353678 REPL BRKN POLE G7 (50): JS - Pahquioque Ave, Danb, Re (50,0): JS - Rose La, Danb, Repl Po KD-EVENT #4385451 REPL P G4105 APPRENTICES KTI MPB; 4 OAK RIDGE RD (50,0): RC REMOVE STUB POLE 10747S. (50): 17-19 LIBRARY PL Replace/Re PROW GREGORY ST DANBURY; ROW, CLIM Cancel to Maximo WO 6303572/FWO 802 JDB REDDING, REDDING RD- Replace p (50): JS - Great Pasture Rd, Danb, (50): JS - Jefferson Ave, Danb, Rep (20,51575933064): RC POLE 1478 REMO (20,51204933022): RC POLE 1486 REMO KD-30 Perry Ln Ridgefield; REPLC PO JES;37 FOX RUN RD NC INST NEW POLE LD 116 WESTON RD WSPT REPL CAP BANK JDB 2/18: EAST AVE NORWALK: PAD 470 LD 295 WESTPORT AVE NORWALK NORWAL LD!!520 MAIN AVE NOR PAD#991,#631,# JES; 4/25: WESTPORT RD WILTON:POLE# JES; P# 34509 & # 22365/TREE TOOK D JES; P# 22366/MOUNTAIN RD WILTON/LE DJM!!!! P# 24894/OLD RD WESTPORT/LE JES; P# 18146/WEED ST NEW CANAAN/BR MAX 9/3: P# 33794/137 HARBOR RD WES JDB 31 TIERNEY ST NWLK REPL P3034 I M.11/9: RIDGEFIELD RD WILTON: INSTA JES/514 SILVERMINE RD,NC/TO SHIFT 3 JES; 30 EVERGREEN AVE. WILTON. REPL CANCEL THURTON DR NC 2HAVE AT&T SET RM 10 SPRUCE HILL RD.WESTON, RPLC 3 AC 357 MOUNTAIN RD. WILTON, TO REPL LD GRUMMAN AVE NORWALK REPLACE POLE JDB ESO 8/26 261 SUNRISE HILL RD N JDB 28 KNIGHT ST NWLK REPL POLES 23 JES; BUTLER LN N.C. 4/18/17 to AWC CANCELED LD SHERWOOD ISLAND CONNECT LD 19 POST RD EAST WESTPORT RPL NET Asset Location 1054 : CN : RIDGEFIELD : 1054 1018 : CN : SOUTHBURY : 1018 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1014 : CN : OXFORD : 1014 1007 : CN : BETHEL : 1007 1134 : CN : NEW FAIRFIELD : 1134 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1013 : CN : NEWTOWN : 1013 1053 : CN : REDDING : 1053 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1012 : CN : MONROE : 1012 1012 : CN : MONROE : 1012 1054 : CN : RIDGEFIELD : 1054 1051 : CN : NEW CANAAN : 1051 1056 : CN : WESTPORT : 1056 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1057 : CN : WILTON : 1057 1057 : CN : WILTON : 1057 1057 : CN : WILTON : 1057 1056 : CN : WESTPORT : 1056 1051 : CN : NEW CANAAN : 1051 1056 : CN : WESTPORT : 1056 1052 : CN : NORWALK : 1052 1057 : CN : WILTON : 1057 1051 : CN : NEW CANAAN : 1051 1057 : CN : WILTON : 1057 1051 : CN : NEW CANAAN : 1051 1055 : CN : WESTON : 1055 1057 : CN : WILTON : 1057 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1051 : CN : NEW CANAAN : 1051 1056 : CN : WESTPORT : 1056 1056 : CN : WESTPORT : 1056 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 270 of 616 Month Number Amount 202206 $1,299.48 202206 $159.33 202206 ($161.52) 202206 ($131.97) 202206 $771.26 202206 $1.62 202206 ($138.42) 202206 ($397.38) 202206 $5,379.26 202206 ($60,549.56) 202206 $849.14 202206 ($625.29) 202206 ($445.30) 202206 ($154.94) 202206 ($154.94) 202206 $16.11 202206 ($168.01) 202206 $1,592.79 202206 $5,649.01 202206 $28,082.06 202206 ($1,992.15) 202206 $120.63 202206 $193.42 202206 ($5.21) 202206 ($205.18) 202206 $156.11 202206 $19.54 202206 ($4,779.47) 202206 $54.45 202206 $33.22 202206 $9.47 202206 ($275.24) 202206 ($171.15) 202206 $587.23 202206 ($9,111.64) 202206 ($3,269.44) 202206 ($192.22) 202206 ($3,884.24) 202206 ($1,554.11) 202206 ($86.84)
  9. Page 271 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 1N920604 1N920822 1N921333 1S030096 1S030118 1S031782 2C030068 2C030118 2C030190 2C030192 2C030218 2C030279 2C820191 2C920035 2C920081 2C920177 2L030312 2L030348 2L030417 2L030438 2L030492 2L030520 2L030540 2L030541 2L030574 2L030598 2L030601 2L030698 2L030701 2L030986 2L031015 2L031038 2L031103 2L031142 2L031216 2L031246 2L031273 2L031344 2L031361 2L031370 Accounting Work Order Descript JDB 30 Westport Ave Norwalk REPLACE JOB COMPLETE JDB 11 Bayne St Nwlk 1 JDB 1/10: Jana Dr Weston: P#20250 RF:102 OLD KINGS HWY N:REPLACE 4 PO RF:524 NORTH ST GREENWICH: REPLC PO (30): RL 31 QUAIL RD, GRN REPLACE P MDB;(50): SHARON,KING HILL RD.//SHI 5/29 RSO NORFOLK, WINCHESTER RD PO (50): JC/76 MAIN ST N CANAAN/ 40/2 (50): JC POLE 3183 MEEKER TOWN NORF (50): EVW 305 Mountain Rd NORFOLK P (50): EVW 48 Covered Bridge Rd SALI High Street N Canaan p # 2213 repla Tree down, broken poles; replaced 1 (50): MS-North Canaan-High St.-Pole 7/7 CANAAN, SIX ROD RD POLE 1143 (30): Canton--Thayer Ave. 621 Repl JC/ WINSTED RD TORR/POLE 137 REPLAC JSG - (50): Colebrook--Old Colebroo (50): JC/ 62 COTTAGE GROVE GOSHEN/ (50): JC POLE A3685 FURNACE BROOL C JSG - (50,0): Canton--Case St. Fron (50,0): JC/ POLE 18 MIGEON AVE TORR printed 1/26/22 JC/ LAUREL HILL TOR RSO WINCHESTER, PECK RD - P#5939 RE Covey Rd, Burlington P#3725 RPLC PO COMPLETED DURING STORM. - CLAIMED O THOMASTON RIVER RD - ROAD WIDENING. JC/97 MAIN ST WINSTED/ DO WITH WR33 Canton--Torrington Ave./ Y24047-202 CP-9/8 RSO N. CANTON RD, BARKHAMSTE 3/8 VJT - Needs new anchor and down Hartland--Riverton Rd. 3971 Repl p (50): EVW 244 SOUTH RD, WINCHESTER Yellow Tag **1 of 2 ** Harwinton Rd JCF - (50): JC/14 5 1/2 MILE RD GOS 12/25 LITCHFIELD, MONTFORD RD - POS JC/CORNWALL, SCOVILLE RD - NEW P#16 (50): JC/18 E LITCHFIELD LA LITCH/ 8/27 EVW - 410 Echo Lake Rd, Water Asset Location 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1055 : CN : WESTON : 1055 1908 : CN : DARIEN : 1908 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1137 : CN : SHARON : 1137 1196 : CN : NORFOLK : 1196 1930 : CN : NORTH CANAAN : 1930 1196 : CN : NORFOLK : 1196 1196 : CN : NORFOLK : 1196 1928 : CN : SALISBURY : 1928 1930 : CN : NORTH CANAAN : 1930 1196 : CN : NORFOLK : 1196 1930 : CN : NORTH CANAAN : 1930 1929 : CN : CANAAN : 1929 1933 : CN : CANTON : 1933 1194 : CN : TORRINGTON : 1194 1192 : CN : COLEBROOK : 1192 1141 : CN : GOSHEN : 1141 1132 : CN : CORNWALL : 1132 1933 : CN : CANTON : 1933 1194 : CN : TORRINGTON : 1194 1194 : CN : TORRINGTON : 1194 1195 : CN : WINCHESTER : 1195 1191 : CN : BURLINGTON : 1191 1191 : CN : BURLINGTON : 1191 1019 : CN : THOMASTON : 1019 1195 : CN : WINCHESTER : 1195 1933 : CN : CANTON : 1933 1190 : CN : BARKHAMSTED : 1190 1004 : CN : WATERTOWN : 1004 1193 : CN : HARTLAND : 1193 1195 : CN : WINCHESTER : 1195 1191 : CN : BURLINGTON : 1191 1141 : CN : GOSHEN : 1141 1406 : CN : LITCHFIELD : 1406 1132 : CN : CORNWALL : 1132 1406 : CN : LITCHFIELD : 1406 1004 : CN : WATERTOWN : 1004 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 271 of 616 Month Number Amount 202206 ($18,920.92) 202206 $17.04 202206 ($1,393.74) 202206 $4,201.56 202206 ($13.77) 202206 $846.36 202206 ($175.46) 202206 $160.69 202206 ($255.95) 202206 ($223.51) 202206 ($120.32) 202206 ($54.14) 202206 $3,026.09 202206 $185.97 202206 ($147.26) 202206 $191.25 202206 ($439.68) 202206 $289.35 202206 ($222.64) 202206 ($211.34) 202206 ($262.00) 202206 ($365.83) 202206 ($172.29) 202206 ($83.12) 202206 $2,711.82 202206 $185.97 202206 $331.96 202206 $202.76 202206 $3,363.41 202206 ($1,900.95) 202206 $4,166.93 202206 $143.69 202206 $201.05 202206 ($131.12) 202206 ($1,392.47) 202206 ($96.56) 202206 $236.65 202206 $4.76 202206 ($95.70) 202206 $52.76
  10. Page 272 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 2L031408 2L031475 2L031513 2L031523 2L031524 2L130028 2L130111 2L520092 2L520905 2L620328 2L720820 2L820878 2L821218 2L920642 2L920748 2L921012 2L921304 2L921357 2M030499 2M030556 2M030736 2M031326 2M031422 2M031691 2M031697 2M031749 2M031913 2M031985 2M032093 2M032111 2M032220 2M032308 2M032327 2M032583 2M032604 2M032632 2M032637 2M032639 2M032803 2M033007 Accounting Work Order Descript LITCHFIELD,BANTAM RD// P#T94 14R32 (50): JC/POLE 7 MONTFORD RD LITCH/ JC/ 228 SCHOOL HILL RD GOSHEN/ POLE P 12/27 EVW - Hosley Rd WINSTED P#5 (30,51488029034): JC 103 RUGG BROOK (30): BETHLEHEM-MAIN ST / REPLACE A 1/4 CP- 8/18 NEW HARTFORD, 4 COUNT (50): 1B10 - Mountain Rd., Torringt DUPLICATE (50): Torrington--New Lit Cancel to Expense - New Hartford--C P#1278 needs replacement; RSO made (60): TORRINGTON - PINERIDGE RD / S Torrington--Main St. (69) MH24 Repl JC/ WINCHESTER,PLATT HILL RD POLE 5 MATERIAL (PR) JSG - 6/4/20 - W Hart 7/30 WEST CORNWALL, SCOVILLE RD POL WATERTOWN - STRAITS TPK / REPLACE L THOMASTON-ELECTRIC AVE / UPGRADE 6 EVW GEAR ST WATERBURY, RPLC LEANING (DF) Ple 597 (R/I)Hot line clamps ( PL: TEL TO INST LIFT POLE #9386, XF * JRP - Maryland Dr MIDDLEFIELD Shi RJ/JRP - New Haven Rd DURHAM Replac EVW - IN AREA OF 168 Tuttle Rd DURH MPB; VILLAGE SQUARE DR NEW BRITAIN, EVW 68 HOLLY HILL DR SOUTHINGTON HH JRP - Gypsy Ln/Applewood Rd MERIDEN (50): Jpt-43 Rhoda Ln Bristol P1275 MPB; STEELE ST NEW BRITAIN RPLC 35' EVW 485 KENSINGTON RD SOUTHINGTON, JRP - Delaware Ave WTBY Repl P#7356 Jpt-E Plyouth Rd Plymouth P1616 & P PL: REPL 25kV XFMR, POLE #5273, 299 ASP 5/20/22-(30): HUNT HILL RD WTBY Shuttle Meadow Ave, New Britain P#5 WEIGANDS DR NEW BRITAIN: POLE# 7807 RTM-4 Hemlock Rdge, Ber. T.Ticket. MPB; N ROLLING ACRES RD CHESHIRE SOUTH RD,FARM. Rplcd riser cable #1 PV - Repl 15U2-4100 Recloser & Cont Asset Location 1406 : CN : LITCHFIELD : 1406 1406 : CN : LITCHFIELD : 1406 1141 : CN : GOSHEN : 1141 1195 : CN : WINCHESTER : 1195 1195 : CN : WINCHESTER : 1195 1023 : CN : BETHLEHEM : 1023 1938 : CN : NEW HARTFORD : 1938 1194 : CN : TORRINGTON : 1194 1194 : CN : TORRINGTON : 1194 1938 : CN : NEW HARTFORD : 1938 1928 : CN : SALISBURY : 1928 1194 : CN : TORRINGTON : 1194 1194 : CN : TORRINGTON : 1194 1195 : CN : WINCHESTER : 1195 1193 : CN : HARTLAND : 1193 1132 : CN : CORNWALL : 1132 1004 : CN : WATERTOWN : 1004 1019 : CN : THOMASTON : 1019 1002 : CN : WATERBURY : 1002 1910 : CN : DURHAM : 1910 1006 : CN : BETHANY : 1006 1037 : CN : MIDDLEFIELD : 1037 1910 : CN : DURHAM : 1910 1910 : CN : DURHAM : 1910 1042 : CN : NEW BRITAIN : 1042 1034 : CN : SOUTHINGTON : 1034 1032 : CN : MERIDEN : 1032 1070 : CN : BRISTOL : 1070 1042 : CN : NEW BRITAIN : 1042 1034 : CN : SOUTHINGTON : 1034 1002 : CN : WATERBURY : 1002 1071 : CN : PLYMOUTH : 1071 1003 : CN : NAUGATUCK : 1003 1002 : CN : WATERBURY : 1002 1042 : CN : NEW BRITAIN : 1042 1042 : CN : NEW BRITAIN : 1042 1040 : CN : BERLIN : 1040 1030 : CN : CHESHIRE : 1030 1041 : CN : FARMINGTON : 1041 1070 : CN : BRISTOL : 1070 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 272 of 616 Month Number Amount 202206 $214.36 202206 ($257.40) 202206 $1,740.68 202206 $144.28 202206 ($345.98) 202206 ($170.42) 202206 ($15.58) 202206 ($289.96) 202206 ($382.91) 202206 ($236.76) 202206 $548.51 202206 ($92.06) 202206 $42.88 202206 ($44.06) 202206 $2,061.32 202206 $165.98 202206 $720.97 202206 ($208.08) 202206 $162.43 202206 ($0.08) 202206 ($832.04) 202206 $2,633.10 202206 $28.83 202206 $47.85 202206 $73.79 202206 $73.79 202206 $144.15 202206 $1,635.17 202206 ($31.61) 202206 $39.93 202206 ($190.35) 202206 $28.83 202206 $28.83 202206 $900.33 202206 $28.83 202206 $28.83 202206 $28.83 202206 $28.83 202206 $12,743.02 202206 $289.72
Words on different pages

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)