ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 274 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 2M130054 2M130060 2M220056 2M220725 2M222028 2M321074 2M721150 2M721569 2M722092 2M724380 2M724523 2M821176 2M821340 2M821341 2M821359 2M821675 2M822026 2M822412 2M822991 2M823019 2M920222 2M920532 2M921818 2M921976 2M922414 2M922423 2M922998 2M923474 2M923742 2M923931 2M924050 2M924897 3H030994 3H031005 3H031043 3H031095 3H031167 3H031293 3H031479 3H031493 Accounting Work Order Descript 01/02: NEW BRITAIN AVE NEWINGTON:PO JAM - 76 Howd Rd. Durham Replaced cancel - 96 Bradley St Brstl - Rplc EJC Various Locations, NB - 23L2 Wo CANCEL TO MAXIMO 5210599 480/490 Co ELEC MAINT DIST INFRARED REPAIRS WC-107 Selden St,Berlin. Replace pr WC-3/27/17 ESO 213 Spring St Southi AMM 86 CHERRY ST,WTBY. GUY POLE 10 (50): Jpt-19 Coral Dr Plymth STL134 AMM 16 ASHLEY ST,WTBY. UPGRADED XFM EJC 291 Glen St, New Britain P#5663 cancel to expense - 355 Richard St, WORK COMPLETE EJC/JJH Matthew Stre WF-429 Research Pkwy-Meriden-@ pole EJC 432 Alcott Rd Wolcott P#665 Rep WC-209 PARTRIDGE DR SOUTHINGTON - N EJC 421 Commonwealth Ave, New Brita WC-291 FARMINGBERRY DR SOUTHINGTON. AMM KNOLLWOOD RD, FARM. REPLACE XA Jpt/JRP - 128 Ledge Rd Plainville P JRP - Welton St. WTBY Repl Pole Top JRP - EUCLID AVE, WTBY NEED NEW PO RTM-409 Beckley Rd, Ber. T.Ticket. EVW 163 Elton Rd BER P#1901 RPLC PR 391 Four Rod Rd, Ber. Elec Maint Po WC DOE MEADOW CT SOUTHINGTON, XFMR EJC Ella Grasso Rd, New Britain P#2 JRP - South St BRISTOL Repl Leaning CANCEL TO MAXIMO WO 6254632 / FWO 8 cancel 159R GREEN LN, DURHAM PAD10 Cancel to Expense - Chapman St SOG CANCEL - 506 Hayden Station Rd-Wind CR-MAIN ST.EXT. SIMSBURY, REPLACED BOLTON, CIDERMILL RD frontier pole HTFD, BLOOMFIELD AVE P20 REPL CAP B WEST HARTFORD, LINNARD RD - OIL SPI zCROM---TC---5/1---Main St---P282 B 5/25 W HARTFORD, BANBURY LN -UPGRAD BLOOMFIELD WEST DUDLEY TOWN RD 3B Asset Location 1043 : CN : NEWINGTON : 1043 1910 : CN : DURHAM : 1910 1070 : CN : BRISTOL : 1070 1042 : CN : NEW BRITAIN : 1042 1030 : CN : CHESHIRE : 1030 1032 : CN : MERIDEN : 1032 1040 : CN : BERLIN : 1040 1034 : CN : SOUTHINGTON : 1034 1002 : CN : WATERBURY : 1002 1071 : CN : PLYMOUTH : 1071 1002 : CN : WATERBURY : 1002 1042 : CN : NEW BRITAIN : 1042 1043 : CN : NEWINGTON : 1043 1070 : CN : BRISTOL : 1070 1032 : CN : MERIDEN : 1032 1020 : CN : WOLCOTT : 1020 1034 : CN : SOUTHINGTON : 1034 1042 : CN : NEW BRITAIN : 1042 1034 : CN : SOUTHINGTON : 1034 1041 : CN : FARMINGTON : 1041 1044 : CN : PLAINVILLE : 1044 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1040 : CN : BERLIN : 1040 1040 : CN : BERLIN : 1040 1040 : CN : BERLIN : 1040 1034 : CN : SOUTHINGTON : 1034 1042 : CN : NEW BRITAIN : 1042 1070 : CN : BRISTOL : 1070 1037 : CN : MIDDLEFIELD : 1037 1910 : CN : DURHAM : 1910 1034 : CN : SOUTHINGTON : 1034 1121 : CN : WINDSOR : 1121 1942 : CN : SIMSBURY : 1942 1903 : CN : BOLTON : 1903 1113 : CN : HARTFORD : 1113 1943 : CN : WEST HARTFORD : 1943 1031 : CN : CROMWELL : 1031 1943 : CN : WEST HARTFORD : 1943 1932 : CN : BLOOMFIELD : 1932 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 274 of 616 Month Number Amount 202206 $57.65 202206 $57.96 202206 ($1,483.82) 202206 $1.62 202206 ($29.86) 202206 ($0.19) 202206 ($1,951.51) 202206 ($2,404.30) 202206 ($19.81) 202206 $421.86 202206 $57.96 202206 $709.37 202206 ($86.63) 202206 $7,674.96 202206 $946.95 202206 ($143.62) 202206 $63.67 202206 $57.66 202206 $73.79 202206 ($220.50) 202206 $160.65 202206 $213.33 202206 $165.16 202206 ($2,768.14) 202206 $199.68 202206 $14,873.61 202206 $20.79 202206 $182.75 202206 ($2,304.69) 202206 ($218.23) 202206 ($2,121.93) 202206 ($743.85) 202206 ($338.80) 202206 $32.43 202206 $64.86 202206 $3,947.16 202206 $32.43 202206 $9,882.01 202206 $32.43 202206 $1,272.02
  2. Page 275 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 3H031554 3H032213 3H032679 3H032742 3H032869 3H032959 3H033022 3H033182 3H033502 3H033759 3H033809 3H621311 3H621832 3H822625 3H920708 3H922794 3H923002 3H923517 4D031462 4D031536 4D720228 4D920752 4E030452 4E031133 4E031370 4E031544 4E031554 4E031678 4E031926 4E031981 4E520011 4E821106 4E920349 4E920663 4E920675 4E921006 4E921823 4M910613 4N030231 4N030993 Accounting Work Order Descript 05/27 WINDSOR, LIGHTHOUSE HILL RD RSO 7/24 BLOOMFIELD, BOYSEN RD - [B CROMWEL, WEST ST YELLOW TAG- 24096Defect pole replace 6196 and 3 phas P. 3025 Prio. Rplc. Reject Pole Aff remove newly set pole. raise servic 10/04 wethersfield p#2033 128-70s HARTFORD, BLUE HILLS AVE, REPL POLE JTR, Drummer Trl, Bloomfield, Sq FG HARTFORD, TOWER AVE - REPL NEW REC CANCEL TO MAXIMO WO 10985152/FWO 80 Middle TPKE,East Manchester, instal W. Main St., Avon - Upgrade 37.5 kV RSO,11/5,Manchester,New State Rd,Ne WF-Huyshope Ave-Htfd-@ MH-3500, cha 9/19 BREAKWATER LANE, WINDSOR, NEED BLOOM---TC---10/7---Prospect St---X WINDSOR, WILLOWCREST DR - REPL HAND P-381 replace priority reject with 11/24 MONTOWESE AVE BRANFORD - INST CANCELING-(50): TS WALL ST RPL PAD CANCEL-transfer $ to MAX #5213354OK TO CANCEL complete as a response CANCEL RIDGE PINS ALL LEANING, RE JK>POLE 4637--REPL POLE, INSTL 2 TE OK TO CANCEL 9/15 - RSO - INSTALLED AUTO TRANSFO cancel CUSTOMER REQUESTS RUSTED PA Field complete - 2020 POLE INSP -CANCELING(50): (CH) P#3134: SHIFT T OK TO CANCEL CANCELING-(30): 1 QUIET WOODS RD E cancel per tech CANCELING(50): (CH) P#2183-S: ATTAC Cancel to Expense - Middletown-Ridg canceling-(30): JK>PAD 1694--SEE RE NEW SILO &TRENCHING SEE COMMENTS--s CANCEL--Ina Blvd Wtfd/Test & energi 6/5 RSO LEDYARD -WHALEHEAD RD LEDY Asset Location 1121 : CN : WINDSOR : 1121 1932 : CN : BLOOMFIELD : 1932 1031 : CN : CROMWELL : 1031 1113 : CN : HARTFORD : 1113 1113 : CN : HARTFORD : 1113 1113 : CN : HARTFORD : 1113 1045 : CN : WETHERSFIELD : 1045 1113 : CN : HARTFORD : 1113 1932 : CN : BLOOMFIELD : 1932 1113 : CN : HARTFORD : 1113 1943 : CN : WEST HARTFORD : 1943 1937 : CN : MANCHESTER : 1937 1931 : CN : AVON : 1931 1937 : CN : MANCHESTER : 1937 1113 : CN : HARTFORD : 1113 1121 : CN : WINDSOR : 1121 1932 : CN : BLOOMFIELD : 1932 1121 : CN : WINDSOR : 1121 1101 : CN : WESTBROOK : 1101 1102 : CN : BRANFORD : 1102 1089 : CN : MADISON : 1089 1095 : CN : KILLINGWORTH : 1095 1154 : CN : COLUMBIA : 1154 1159 : CN : GLASTONBURY : 1159 1159 : CN : GLASTONBURY : 1159 1159 : CN : GLASTONBURY : 1159 1159 : CN : GLASTONBURY : 1159 1033 : CN : MIDDLETOWN : 1033 1154 : CN : COLUMBIA : 1154 1167 : CN : MARLBOROUGH : 1167 1033 : CN : MIDDLETOWN : 1033 1159 : CN : GLASTONBURY : 1159 1157 : CN : EAST HAMPTON : 1157 1033 : CN : MIDDLETOWN : 1033 1033 : CN : MIDDLETOWN : 1033 1033 : CN : MIDDLETOWN : 1033 1159 : CN : GLASTONBURY : 1159 1033 : CN : MIDDLETOWN : 1033 1100 : CN : WATERFORD : 1100 1164 : CN : LEDYARD : 1164 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 275 of 616 Month Number Amount 202206 $142.50 202206 $42.95 202206 $10,719.17 202206 $251.66 202206 $161.27 202206 ($13.25) 202206 $289.72 202206 $124.73 202206 $8.13 202206 $1,273.71 202206 $269.51 202206 $149.80 202206 $49.69 202206 ($92.63) 202206 $1,000.00 202206 ($0.36) 202206 ($135.38) 202206 $54.10 202206 $1,259.69 202206 ($26.40) 202206 ($94.96) 202206 $166.01 202206 ($88.12) 202206 ($991.51) 202206 ($256.19) 202206 ($20,288.80) 202206 ($2,202.31) 202206 $74.27 202206 ($1.76) 202206 $166.58 202206 ($170.69) 202206 ($203.60) 202206 ($201.32) 202206 ($292.16) 202206 ($178.63) 202206 ($85.88) 202206 ($161.41) 202206 ($49.51) 202206 ($179.58) 202206 ($25.10)
  3. Page 276 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 4N031240 4N031344 4N031398 4N031435 4N031497 4N031555 4N031570 4N031699 4N821197 4N920416 4N920463 4N920528 4N920741 4N920742 4N921460 5D030977 5T030659 5T032258 CS003371 DSQ03026 DSQ03032 DSQ72019 DSQ82029 DSQ92014 DSQ92054 EXCVT101 TMPCPCHE TMPCPDAN TMPCPEHM TMPCPHAR TMPCPHAU TMPCPMAD TMPCPNEW TMPCPNLN TMPCPNOR TMPCPSGI TMPCPSTM TMPCPTOL TMPCPTOR 80004188 Accounting Work Order Descript cancel I&R CUT-OUT / POLE/W/ANC & 7/31/20 BOBWHITE TRAIL LEDYARD RAN SM- ELM ST, STGN (BOROUGH)- RPLC EV TL - (30) 08/20/20 17 SEASIDE LN OL CANCEL TO MAXIMO WO 6762298/FWO 801 AWC FLWUP 9/21/20 WATER ST STNGTN T (30): 09/22/20 MORGAN PT GROTON POL 10/20: PRODELL RD PRESTON:P#1546 NE CANCEL TO EXPENSE P1608 NANTUCKET CANCEL TO MAXIMO WO 6703839, FWO 80 MM RPLC LIVE FRONT PAD# 3706 DUE TO Cancel to Expense - Waterford - Lam PD-REPAIR/REPLACE LEAKY SPLICE/CABL asbuilt work as a result of a oil s (50): PD-34 Riverside Dr WTFD/Front DG P#1405 ANDERSON RD THOMPSON - RP cancel to maximo wo 9488167/fwo 802 11/7 - RSO - JUMPERED PRIMARY METER Replace Failed 3X Transformer (40): Replace Failed 27H-1X3-4 Swit (30): Replace Failed 12M-2X3-4 Swit Bloomfield 3B Replacement Leaching Rebuild Failed 1A-5X Load Tap Chang (30): Replace Failed Auto Throwover (50): Replace Failed 3B-2H Potentia 2001 CL&P EXCAVATING CONTRACTOR ARE WAM Adjustments WAM Adjustments Danielson 2BC WAM Adjustments East Hampton 2AY WAM Adjustments - Hartford OH WAM Adjustments - Hartford UG WAM Adjustments Madison 2AX WAM Adjustments WAM Adjustments New London 3H2 WAM Adjustments WAM Adjustments WAM Adjustments WAM Adjustments WAM Adjustments MDB;priority reject pole# xz Asset Location 1164 : CN : LEDYARD : 1164 1164 : CN : LEDYARD : 1164 1177 : CN : STONINGTON : 1177 1097 : CN : OLD LYME : 1097 1092 : CN : EAST LYME : 1092 1177 : CN : STONINGTON : 1177 1161 : CN : GROTON : 1161 1173 : CN : PRESTON : 1173 1161 : CN : GROTON : 1161 1169 : CN : NEW LONDON : 1169 1169 : CN : NEW LONDON : 1169 1100 : CN : WATERFORD : 1100 1169 : CN : NEW LONDON : 1169 1092 : CN : EAST LYME : 1092 1100 : CN : WATERFORD : 1100 1084 : CN : THOMPSON : 1084 1118 : CN : TOLLAND : 1118 1117 : CN : SUFFIELD : 1117 G02A : CL&P NORTH BLOOMFIELD BLOOMFIELD J27H : CL&P SCITICO ENFIELD : 1112 1013 : CN : NEWTOWN : 1013 1932 : CN : BLOOMFIELD : 1932 G01A : CL&P SOUTH MEADOW HARTFORD G02A : CL&P NORTH BLOOMFIELD BLOOMFIELD G03B : CL&P BLOOMFIELD BLOOMFIELD 1002 : CN : WATERBURY : 1002 WCHSB : CHESHIRE SERVICE BUILDING : CHESHIRE Funding Project ML: Distribution Line - Connecticut Funding Project ML: Distribution Line - Connecticut WHSS : HARTFORD SERVICE CENTER,400-410 SHELDON STREET : HARTFORD WHSS : HARTFORD SERVICE CENTER,400-410 SHELDON STREET : HARTFORD Funding Project ML: Distribution Line - Connecticut WNTSB : NEWTOWN SERVICE BUILDING : NEWTOWN Funding Project ML: Distribution Line - Connecticut WNORSB : NORWALK SERVICE BUILDING : NORWALK NGRCO : GREENWICH SERVICE BUILDING : GREENWICH WSGR : STAMFORD SERVICE CENTER, GLENBROOK RD. : STAMFORD WTSB : TOLLAND SERVICE BUILDING : TOLLAND WTFS : TORRINGTON SERVICE CENTER, FRANKLIN ST. : TORRINGTON 1938 : CN : NEW HARTFORD : 1938 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 276 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202206 ($834.85) Emergent Equipment Failures - Line 202206 $5.78 Emergent Equipment Failures - Line 202206 $403.00 Emergent Equipment Failures - Line 202206 ($1.38) Emergent Equipment Failures - Line 202206 ($290.15) Emergent Equipment Failures - Line 202206 $0.29 Emergent Equipment Failures - Line 202206 $0.24 Emergent Equipment Failures - Line 202206 $796.90 Emergent Equipment Failures - Line 202206 ($289.68) Emergent Equipment Failures - Line 202206 $18,545.44 Emergent Equipment Failures - Line 202206 ($442.19) Emergent Equipment Failures - Line 202206 ($157.22) Emergent Equipment Failures - Line 202206 ($267.96) Emergent Equipment Failures - Line 202206 $31.06 Emergent Equipment Failures - Line 202206 ($43.14) Emergent Equipment Failures - Line 202206 ($43.29) Emergent Equipment Failures - Line 202206 ($3,444.58) Emergent Equipment Failures - Line 202206 ($50.77) Emergent Equipment Failures - Substation 202206 ($568.65) 202206 ($252,473.22) Emergent Equipment Failures - Substation Emergent Equipment Failures - Substation 202206 $618.25 Emergent Equipment Failures - Substation 202206 $70.83 Emergent Equipment Failures - Substation 202206 $283.96 Emergent Equipment Failures - Substation 202206 $585.67 Emergent Equipment Failures - Substation 202206 $2,720.61 Emergent Equipment Failures - Line 202206 $11,075.10 Emergent Equipment Failures - Line 202206 ($59,332.48) Emergent Equipment Failures - Line 202206 $110,412.79 Emergent Equipment Failures - Line 202206 $130,954.84 Emergent Equipment Failures - Line 202206 ($504,417.74) Emergent Equipment Failures - Line 202206 ($137,973.91) Emergent Equipment Failures - Line 202206 $71,052.89 Emergent Equipment Failures - Line 202206 ($43,448.09) Emergent Equipment Failures - Line 202206 $142,626.12 Emergent Equipment Failures - Line 202206 $88,924.01 Emergent Equipment Failures - Line 202206 $15,000.00 Emergent Equipment Failures - Line 202206 ($122,948.59) Emergent Equipment Failures - Line 202206 ($117,397.18) Emergent Equipment Failures - Line 202206 ($96,101.85) Emergent Equipment Failures - Line 202207 $155.12
  4. Page 277 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80004233 80005559 80005711 80005721 80005814 80005818 80006037 80006523 80006661 80006834 80007011 80007035 80007071 80007256 80007418 80007422 80007550 80007686 80011830 80011866 80011870 80011914 80012825 80014199 80025225 80026419 80026454 80027099 80028289 80032268 80035699 80036125 80036157 80036198 80036414 80036469 80037779 80037788 80038165 80038863 Accounting Work Order Descript MDB;priority reject pole# xz ASPLUNDH PR 7/7 pole reject 1326 POLE-PRIORITY REJECT-INSPECT-OBS-AN POLE-PRIORITY REJECT-INSPECT-OBS-AN POLE-PRIORITY REJECT-INSPECT-OBS-AN POLE-PRIORITY REJECT-INSPECT-OBS-AN PR 7/7 priority pole reject 1325 Tu ELM CREST DANBURY Elec Maint Pole Reject - PRIORITY D MCB - 70 E Washington Rd, Plymouth Elec Maint Pole Reject - PRIORITY D Elec Maint Pole Reject - PRIORITY D PR 7/7 MDB;POLE-PRIORITY REJECT-INS 7/13/22 *NEED TO CANCEL* B / SHEEPS RF:17 SEARLES RD STAMFORD TT:FRONTI Elec Maint Pole Reject - PRIORITY D DONE PR 3/1 JG/2202 Satans Kingdom, PR 7/7 Ramstein Rd. NH 1871 reject Elec Maint Pole Reject - PRIORITY D Elec Maint Pole Reject - PRIORITY D Elec Maint Pole Reject - PRIORITY D Asplundh - Ellington Rd, SW - repla Elec Maint Pole Reject - PRIORITY D PR 3/1 New Hartford--Wickett St. 1 *JRP -1615 West St SOG Repl Undersi DB - 1/25/21 Waller Ct, New London, DONE asplundh EW/PRIORITY REJECT P# JTR - 1275 Prospect Ave - HTFD - Re AJC; OLD ORCHARD ( 23) RD LOT 4 EW/PRIORITY REJECT P#899 ASPLUNDH PR 7/7 PRIORITY REJECT POL reprint 3/1 Elec. Maint. pole rejec done ASPLUNDH PR 7/7 PRIORITY REJEC done ASPLUNDH PRIORITY REJECT P#201 PR 3/1 CP- Priority pole reject po PRIORITY REJECT P#849 PL:XFER POLE #2195 (PT SET), REPL X PD-STARR ST N. LONDON/WATERPROOF AN E Rocks 17R Repl Failed Xformer N. Bloomfield 2A Replace ATS in 23K Asset Location 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1018 : CN : SOUTHBURY : 1018 1018 : CN : SOUTHBURY : 1018 1014 : CN : OXFORD : 1014 1014 : CN : OXFORD : 1014 1938 : CN : NEW HARTFORD : 1938 1008 : CN : DANBURY : 1008 1014 : CN : OXFORD : 1014 1071 : CN : PLYMOUTH : 1071 1014 : CN : OXFORD : 1014 1014 : CN : OXFORD : 1014 1938 : CN : NEW HARTFORD : 1938 1156 : CN : EAST HADDAM : 1156 1908 : CN : DARIEN : 1908 1014 : CN : OXFORD : 1014 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1014 : CN : OXFORD : 1014 1014 : CN : OXFORD : 1014 1014 : CN : OXFORD : 1014 1115 : CN : SOUTH WINDSOR : 1115 1014 : CN : OXFORD : 1014 1938 : CN : NEW HARTFORD : 1938 1034 : CN : SOUTHINGTON : 1034 1169 : CN : NEW LONDON : 1169 1938 : CN : NEW HARTFORD : 1938 1943 : CN : WEST HARTFORD : 1943 1065 : CN : GREENWICH : 1065 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1938 : CN : NEW HARTFORD : 1938 1006 : CN : BETHANY : 1006 1169 : CN : NEW LONDON : 1169 J17R : CL&P EAST ROCKS NORWALK : 1052 G02A : CL&P NORTH BLOOMFIELD BLOOMFIELD The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 277 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202207 $7.06 Emergent Equipment Failures - Line 202207 $131.31 Emergent Equipment Failures - Line 202207 ($469.35) Emergent Equipment Failures - Line 202207 ($2,994.10) Emergent Equipment Failures - Line 202207 ($458.44) Emergent Equipment Failures - Line 202207 ($289.92) Emergent Equipment Failures - Line 202207 ($43.24) Emergent Equipment Failures - Line 202207 $601.09 Emergent Equipment Failures - Line 202207 ($119.72) Emergent Equipment Failures - Line 202207 $2,164.11 Emergent Equipment Failures - Line 202207 ($0.33) Emergent Equipment Failures - Line 202207 ($0.74) Emergent Equipment Failures - Line 202207 $37.86 Emergent Equipment Failures - Line 202207 ($154.18) Emergent Equipment Failures - Line 202207 $2,644.88 Emergent Equipment Failures - Line 202207 $7,653.51 Emergent Equipment Failures - Line 202207 ($167.42) Emergent Equipment Failures - Line 202207 ($52.83) Emergent Equipment Failures - Line 202207 ($195.87) 202207 ($1,252.33) Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202207 ($367.54) Emergent Equipment Failures - Line 202207 $7,082.41 Emergent Equipment Failures - Line 202207 ($288.48) Emergent Equipment Failures - Line 202207 ($48.40) Emergent Equipment Failures - Line 202207 $76.67 Emergent Equipment Failures - Line 202207 ($29,453.22) Emergent Equipment Failures - Line 202207 ($12.06) Emergent Equipment Failures - Line 202207 $1,579.19 Emergent Equipment Failures - Line 202207 $21.45 Emergent Equipment Failures - Line 202207 ($251.76) Emergent Equipment Failures - Line 202207 ($11.83) Emergent Equipment Failures - Line 202207 ($42.05) Emergent Equipment Failures - Line 202207 $646.96 Emergent Equipment Failures - Line 202207 $687.82 Emergent Equipment Failures - Line 202207 ($63.69) Emergent Equipment Failures - Line 202207 $7,949.99 Emergent Equipment Failures - Line 202207 $212.29 Emergent Equipment Failures - Line 202207 $18,548.14 Emergent Equipment Failures - Substation 202207 $4,746.46 Emergent Equipment Failures - Substation 202207 $7,241.78
  5. Page 278 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80048435 80048452 80048461 80050246 80052889 80053289 80055352 80055557 80055670 80055708 80057268 80057959 80058934 80059172 80059322 80059926 80062257 80065001 80065956 80067187 80067211 80067308 80067921 80068213 80068504 80069117 80070471 80071110 80072082 80072708 80073014 80074142 80075756 80075783 80076154 80076580 80077451 80077557 80079732 80079858 Accounting Work Order Descript PRIORITY REJECT 2021 POLE INTEGRITY PRORITY REJECT 2021 POLE INTEGRITY PRIORITY REJECT 2021 POLE INTEGRITY TC 695 WESTOVER RD STM STRAIGTH POL WAITING ON STORES---SC-WESTCOTT RD 6/1 ASPLUNDH JFC - 9A 3/15 CAR V. --SC-P#1385 1/2 COMMUNITY AVE PLAIN DG P#104/105/107/123 RT 97 POMFRET ASP 5/20/22-PL: XFER POLES #3086 & COMPLETE BM; 3/25/21 PURDY HILL RD BQ; 3/27/21 N FORTY ( 28) RD -- W WIATING ON STORES 7/8--DG P#D1357 Y POLE HOLD 5/16 EVW - 9A - GRANTVILL MJ 5/24 - KD-EVENT #4497507 REPLC P RF: TT - 14 MCCREA LN, DARIEN:REPLA EB; 4/5 MIGLIA - Need new stub/anch AMM 51 BRODERICK RD,BRISTOL. REPLAC 156 CREEK ROW, EAST HADDAM MATERIAL MPB; 31 BIRCH ST, NEWINGT AVON, BLANCHARD - PRI REJECT P524 & CRP - POLE-PRIORITY REJECT-INSPECT6/27 CRP- RSO NORTH RD, HARWINTON-K DONE PR 7/7 MDB - POLE-PRIORITY REJ (B OH 7/26) HTFD, RESERVE RD - REPL TL - PENNSYLVANIA AVE, #94 NIANTIC 4/11 EW - 301 Twin Lakes Rd, Salisb DG P#882-S THOMPSON RD THOMPSON CLP Pudding Hill Rd E Hampton Repl P176 PR 7/7 CP- 115 Indian Hill rd Canto JS - Wooster Heights Rd, Danb, Shif MJ 5/24 -(PR) (20): Jpt-248 S Eagle MM replce rotted pole #95 instal 40 EVW - 62 Castlewood Ln, Torrington MM Bedlam Rd & Hall Rd Chaplin pol JLB 30 LANGNER LN, WSTN NEW STUB PO Asplundh - Y-24877-2021, P#44, Salm PR 7/7 CP-292 Locust Rd Harwinton, #(B 7/18) JTR, 190 HOMESTEAD AVE, H DG P#3305 RIVERSIDE DR THOMPSON YEL ASP JTR, 80 Prospect St, Bloom, Ins Asset Location 1018 : CN : SOUTHBURY : 1018 1014 : CN : OXFORD : 1014 1014 : CN : OXFORD : 1014 1066 : CN : STAMFORD : 1066 1079 : CN : KILLINGLY : 1079 1194 : CN : TORRINGTON : 1194 1080 : CN : PLAINFIELD : 1080 1081 : CN : POMFRET : 1081 1003 : CN : NAUGATUCK : 1003 1012 : CN : MONROE : 1012 1022 : CN : WOODBURY : 1022 1085 : CN : WOODSTOCK : 1085 1196 : CN : NORFOLK : 1196 1070 : CN : BRISTOL : 1070 1908 : CN : DARIEN : 1908 1162 : CN : HEBRON : 1162 1070 : CN : BRISTOL : 1070 1156 : CN : EAST HADDAM : 1156 1043 : CN : NEWINGTON : 1043 1931 : CN : AVON : 1931 1933 : CN : CANTON : 1933 1405 : CN : HARWINTON : 1405 1133 : CN : KENT : 1133 1113 : CN : HARTFORD : 1113 1092 : CN : EAST LYME : 1092 1928 : CN : SALISBURY : 1928 1084 : CN : THOMPSON : 1084 1078 : CN : HAMPTON : 1078 1933 : CN : CANTON : 1933 1008 : CN : DANBURY : 1008 1071 : CN : PLYMOUTH : 1071 1078 : CN : HAMPTON : 1078 1194 : CN : TORRINGTON : 1194 1152 : CN : CHAPLIN : 1152 1055 : CN : WESTON : 1055 1936 : CN : GRANBY : 1936 1405 : CN : HARWINTON : 1405 1113 : CN : HARTFORD : 1113 1084 : CN : THOMPSON : 1084 1932 : CN : BLOOMFIELD : 1932 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 278 of 616 Month Number Amount 202207 ($313.60) 202207 ($510.54) 202207 ($1,123.59) 202207 $3,885.38 202207 $1,256.12 202207 $3,076.04 202207 $1,256.12 202207 ($431.09) 202207 $8,213.48 202207 $2,840.61 202207 ($169.72) 202207 $1,256.12 202207 $1,367.63 202207 $7,271.40 202207 $46.40 202207 $2,596.58 202207 $4,571.33 202207 $330.51 202207 $2,091.87 202207 $1,548.37 202207 $2,386.50 202207 $575.14 202207 $855.11 202207 $2,452.08 202207 $156.55 202207 $436.24 202207 ($393.96) 202207 ($92.14) 202207 $70.95 202207 $308.15 202207 $16,782.25 202207 $947.74 202207 $57.47 202207 ($55.12) 202207 $96.89 202207 ($41.45) 202207 $962.27 202207 $297.41 202207 $4,508.24 202207 $14.06
  6. Page 279 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80080115 80080461 80081541 80081795 80082311 80082852 80082928 80084211 80085939 80086587 80087098 80088493 80089790 80089988 80090212 80091462 80092057 80092372 80092397 80092464 80092472 80092476 80092615 80093065 80093918 80096073 80096145 80096198 80096855 80097316 80097564 80098444 80098998 80099055 80099219 80099478 80099679 80101038 80102490 80102602 Accounting Work Order Descript Asplundh - AUSTIN ST, SUFFIELD - RE MJ 2/4 MAR-Update poles to 45/2's n -MM 213 Bingham Rd Canterbury Evers cancel to duplicate to 6032392 BUCKLAND ( 39) ST APT 1421-1 -- P 77 Weston St, Htfd. 250' of 25 kv # (ASP) CR-38 ANVIL DR, AVON, P# 3633 Dock Crew? JS - Main St, Danb, Repl PONS 7/7 EW - 133 Ridge Rd, Winste 6/14 BARBER HILL RD, SOUTH WINDSOR Install guying on P-38744, P-44884 *WF-AMAZON-KENNEDY RD-WINDSOR-@ POL TO STORES 2/15/23--RIVER RD, KILLIN SAYBROOK RD ESSEX-PLE35-(R/I)1200KV MM 6 Pinecrest Ln Sprague upgrade x MR; GREAT HILL POND (90) RD -18, IN RF:10 BIRCH RD, DARIEN TT:STRAIGHTE * AMM 71 CLARENDON TER, NEWINGTON. AMM 8 BROOKSHIRE LN,FARM. RAISE XFM 63MX Mobile XF-Replace Failed LTC C * COMP * AMM 135 MEADOW ST,NEWINGT CRP - YELLOW TAG Y-25355-2021, POLE PR 7/7 CRP - replace reject pole 93 SENT TO ED 5/31 - (*) zCROM--7/6/21 MJ - MRP - Cap Bank Replacement - P MATERIAL DONE APPT 6/28@ PONS EVW CST NOT READY EVW - 65 Kenmont Rd, Enfield, Silver Ln - replace HH's a DJM!!! Big Pines Wprt POLE 7540-PRI POST CONSTRUCTION - OLD MOUNTAIN RD CANCEL - DUPLICATE SEE WO# 6181110 REPLACE-UG-ANNUAL-DESG. ASP 5/20/22 -MAR - Rplc PCB Xfmr ASP-KD-EVENT #4573345/ REPLC P 2016 WM; 07.19.21 - 63 CALHOUN ST, WASHI TL - PENNSYLVANIA AVE, NIANTIC // P Asplundh - 7/19 - Somers, South Rd DONE 3/8 EVW - 39 Cleveland St, Lak 7/28: 28 BUXTON LN, RIVERSIDE/ CHAN PLANNED Upgrade to 500KVA Stepdown Asset Location 1117 : CN : SUFFIELD : 1117 1070 : CN : BRISTOL : 1070 1076 : CN : CANTERBURY : 1076 1095 : CN : KILLINGWORTH : 1095 1937 : CN : MANCHESTER : 1937 1113 : CN : HARTFORD : 1113 1931 : CN : AVON : 1931 1008 : CN : DANBURY : 1008 1195 : CN : WINCHESTER : 1195 1115 : CN : SOUTH WINDSOR : 1115 1102 : CN : BRANFORD : 1102 1121 : CN : WINDSOR : 1121 1095 : CN : KILLINGWORTH : 1095 1093 : CN : ESSEX : 1093 1176 : CN : SPRAGUE : 1176 1172 : CN : PORTLAND : 1172 1908 : CN : DARIEN : 1908 1043 : CN : NEWINGTON : 1043 1041 : CN : FARMINGTON : 1041 J17E : CL&P MOBILE 17E (56902) : 1999 1043 : CN : NEWINGTON : 1043 1405 : CN : HARWINTON : 1405 1938 : CN : NEW HARTFORD : 1938 1031 : CN : CROMWELL : 1031 1030 : CN : CHESHIRE : 1030 1195 : CN : WINCHESTER : 1195 1133 : CN : KENT : 1133 1112 : CN : ENFIELD : 1112 1056 : CN : WESTPORT : 1056 1041 : CN : FARMINGTON : 1041 1113 : CN : HARTFORD : 1113 1005 : CN : BEACON FALLS : 1005 1020 : CN : WOLCOTT : 1020 1010 : CN : MIDDLEBURY : 1010 1140 : CN : WASHINGTON : 1140 1092 : CN : EAST LYME : 1092 1114 : CN : SOMERS : 1114 1928 : CN : SALISBURY : 1928 1065 : CN : GREENWICH : 1065 1016 : CN : SEYMOUR : 1016 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 279 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202207 $4,957.59 Emergent Equipment Failures - Line 202207 $10,347.92 Emergent Equipment Failures - Line 202207 $717.87 Emergent Equipment Failures - Line 202207 ($944.49) Emergent Equipment Failures - Line 202207 $8,634.28 Emergent Equipment Failures - Line 202207 $8,706.26 Emergent Equipment Failures - Line 202207 $4,522.74 Emergent Equipment Failures - Line 202207 ($5,590.29) Emergent Equipment Failures - Line 202207 $1,308.52 Emergent Equipment Failures - Line 202207 $5,615.92 Emergent Equipment Failures - Line 202207 $6,781.10 Emergent Equipment Failures - Line 202207 $341.16 Emergent Equipment Failures - Line 202207 $1,067.37 Emergent Equipment Failures - Line 202207 $9,277.14 Emergent Equipment Failures - Line 202207 ($0.02) Emergent Equipment Failures - Line 202207 $513.38 Emergent Equipment Failures - Line 202207 $15,854.32 Emergent Equipment Failures - Line 202207 ($376.09) Emergent Equipment Failures - Line 202207 $20.42 202207 $7,045.05 Emergent Equipment Failures - Substation Emergent Equipment Failures - Line 202207 ($487.77) Emergent Equipment Failures - Line 202207 $4,881.57 Emergent Equipment Failures - Line 202207 ($170.69) Emergent Equipment Failures - Line 202207 $6,992.19 Emergent Equipment Failures - Line 202207 ($164,513.96) Emergent Equipment Failures - Line 202207 $4,013.60 Emergent Equipment Failures - Line 202207 $780.92 Emergent Equipment Failures - Line 202207 $15,087.46 Emergent Equipment Failures - Line 202207 $243.64 Emergent Equipment Failures - Line 202207 $3,948.45 Emergent Equipment Failures - Line 202207 ($231.84) Emergent Equipment Failures - Line 202207 $2,298.07 Emergent Equipment Failures - Line 202207 $8,171.97 Emergent Equipment Failures - Line 202207 ($36,331.78) Emergent Equipment Failures - Line 202207 $328.89 Emergent Equipment Failures - Line 202207 $83,373.56 Emergent Equipment Failures - Line 202207 $9,733.89 Emergent Equipment Failures - Line 202207 $5,055.46 Emergent Equipment Failures - Line 202207 $103.35 Emergent Equipment Failures - Line 202207 $2,774.97
  7. Page 280 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80103489 80103540 80103943 80104255 80104768 80105023 80105056 80105066 80105392 80105671 80105850 80105861 80107591 80107808 80108331 80108436 80108483 80108763 80108783 80108932 80109073 80109676 80111371 80112228 80113279 80113678 80113999 80114185 80114200 80114225 80114409 80114857 80114930 80115335 80115385 80115777 80115792 80115893 80115960 80116063 Accounting Work Order Descript SD PAD #12 HIGH RD BETHANY RAISE PA * 08.02.21 - 21 LONGVIEW DR, NEWING MM 8 Riverview Dr Canterbury P#1456 MATERIAL 5/19 -15 Chattletown Rd, F DG P#181 THOMPSON RD THOMPSON RPLC *Telco JAM - 1381 Stanley Street MM P#792 Mian St Sprague 3 Phs 120/ MM 50 Sergeants Way Lisbon Pad#20 r PD-30 ROBINSON ST N. LONDON/RPLC P# MATERIAL JES; 78 LEDGEWOOD DR WILT TT TC 28 HOMESTEAD AVE, STM; P#1649 MCB - 8/6/21 FARMWOOD ( 151) RD -CT 2021 July Circuit Patrol ~ p1035 DG P#767 HILL RD THOMPSON FRNTR POL DAISY HILL ( 136) RD -- 829, CANAA ASP 5/20/22-MCB - 08.13.21 - 601 HI CT 2021 July Circuit Patrol ~ p232 ASP 5/20/22 - MCB - BERKSHIRE DR, W DG P#2731 SENEXET RD WOODSTOCK RPLC Scitico Replace 27H-24T-6 & 27H-25T MJP / 229 Hoyt St / DAR/ Shift to F Asplundh - 8/18 NEWELL HILL RD, ELL PR 7/7 CRP - replace reject pole 10 EB; MOUNT PARNASSUS (200) RD, EAST MJ 3/8 - PMV - New RR12F51-61R Grac 8/30/21 TURNOVER COOK CLOSE ( 18) PR 7/1 EVW - 199 Marshal St, Winste DG P#2122 MODDOCK RD PUTNAM FRNTR P MM 34 Tyott Rd Pomfret P#660 replc MR; 130 KNOX BLVD MIDDLETOWN - PAD SHORE RD DANBURY 8/29/21 PINE ORCHARD (278) RD BRANF DG P#1448 177 FRENCH RD EASTFORD FR MM Edwards Rd Hampton RoW replace t 3 Butternut Ln Replace pole S4044 a SC-KENWOOD CIRCLE GRISWOLD REPLACE 9/7/21 PATRICIA TER BEACON FALLS YMPB; *POST CONST* - 9/6/21 11 GLEN BM; 9/5/21 158 LOWER FISH ROCK RD S RDC TD941 Phase Balance - 22N7 Asset Location 1006 : CN : BETHANY : 1006 1043 : CN : NEWINGTON : 1043 1076 : CN : CANTERBURY : 1076 1929 : CN : CANAAN : 1929 1084 : CN : THOMPSON : 1084 1042 : CN : NEW BRITAIN : 1042 1176 : CN : SPRAGUE : 1176 1165 : CN : LISBON : 1165 1169 : CN : NEW LONDON : 1169 1057 : CN : WILTON : 1057 1066 : CN : STAMFORD : 1066 1002 : CN : WATERBURY : 1002 1160 : CN : GRISWOLD : 1160 1084 : CN : THOMPSON : 1084 1929 : CN : CANAAN : 1929 1002 : CN : WATERBURY : 1002 1160 : CN : GRISWOLD : 1160 1002 : CN : WATERBURY : 1002 1085 : CN : WOODSTOCK : 1085 J27H : CL&P SCITICO ENFIELD : 1112 1908 : CN : DARIEN : 1908 1111 : CN : ELLINGTON : 1111 1938 : CN : NEW HARTFORD : 1938 1156 : CN : EAST HADDAM : 1156 1032 : CN : MERIDEN : 1032 1054 : CN : RIDGEFIELD : 1054 1195 : CN : WINCHESTER : 1195 1082 : CN : PUTNAM : 1082 1081 : CN : POMFRET : 1081 1033 : CN : MIDDLETOWN : 1033 1008 : CN : DANBURY : 1008 1102 : CN : BRANFORD : 1102 1077 : CN : EASTFORD : 1077 1078 : CN : HAMPTON : 1078 1942 : CN : SIMSBURY : 1942 1160 : CN : GRISWOLD : 1160 1005 : CN : BEACON FALLS : 1005 1053 : CN : REDDING : 1053 1018 : CN : SOUTHBURY : 1018 1054 : CN : RIDGEFIELD : 1054 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 280 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202207 $1,686.57 Emergent Equipment Failures - Line 202207 $1,333.92 Emergent Equipment Failures - Line 202207 $29.47 Emergent Equipment Failures - Line 202207 $1,785.74 Emergent Equipment Failures - Line 202207 $93.02 Emergent Equipment Failures - Line 202207 $2,497.55 Emergent Equipment Failures - Line 202207 $10,120.23 Emergent Equipment Failures - Line 202207 $118.64 Emergent Equipment Failures - Line 202207 ($169.68) Emergent Equipment Failures - Line 202207 $3,129.82 Emergent Equipment Failures - Line 202207 $63.29 Emergent Equipment Failures - Line 202207 $4,093.04 Emergent Equipment Failures - Line 202207 ($1,213.24) Emergent Equipment Failures - Line 202207 $2,173.11 Emergent Equipment Failures - Line 202207 $12,764.74 Emergent Equipment Failures - Line 202207 $9,639.68 Emergent Equipment Failures - Line 202207 ($590.45) Emergent Equipment Failures - Line 202207 $10,270.06 Emergent Equipment Failures - Line 202207 ($240.21) 202207 $247.25 Emergent Equipment Failures - Substation Emergent Equipment Failures - Line 202207 $31,960.58 Emergent Equipment Failures - Line 202207 $91.20 Emergent Equipment Failures - Line 202207 ($1,676.69) Emergent Equipment Failures - Line 202207 ($1.22) Emergent Equipment Failures - Line 202207 $6.39 Emergent Equipment Failures - Line 202207 $4,709.39 Emergent Equipment Failures - Line 202207 $489.05 Emergent Equipment Failures - Line 202207 ($362.78) Emergent Equipment Failures - Line 202207 $3.54 Emergent Equipment Failures - Line 202207 $1,865.02 Emergent Equipment Failures - Line 202207 $131.14 Emergent Equipment Failures - Line 202207 ($288.18) Emergent Equipment Failures - Line 202207 ($773.54) Emergent Equipment Failures - Line 202207 ($87.84) Emergent Equipment Failures - Line 202207 $1,620.76 Emergent Equipment Failures - Line 202207 ($2,124.20) Emergent Equipment Failures - Line 202207 $344.26 Emergent Equipment Failures - Line 202207 ($2.04) Emergent Equipment Failures - Line 202207 ($187.34) Emergent Equipment Failures - Line 202207 ($718.94)
  8. Page 281 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80116080 80116203 80116269 80116329 80116405 80116463 80116672 80116796 80117160 80117726 80117836 80118389 80118617 80118765 80118829 80118830 80118854 80118903 80118981 80119203 80119349 80119447 80119474 80119547 80119619 80119773 80119778 80120034 80120075 80120420 80120454 80120738 80120775 80120776 80120992 80121138 80121239 80121292 80121395 80121404 Accounting Work Order Descript 9/8/21 CANDLEVIEW DR SHERMAN; REPL JS; 9/9/21 TURNOVER 357 FLORIDA HIL Asplundh - Ashford, 111 Nagy Rd - R ASPLUNDH PRINTED 7/25JFC - HOERLE ( MR; 09/08 WESTFIELD ST MIDDLETOWN DG P#1625 RT 171 WOODSTOCK FRNTR DG P#809 12 HAWKINS RD PUTNAM VOLTA 9/9 MATTHEW RD BRANFORD MM 164 Paradise Dr Brklyn Rplc pol 9/14/21 RABBIT HILL ( 42) RD -- 1 Replcd xarm pins and c/o 09/13 BLAC MI 9/14 - E Granby, 119 Hartford Av MPB; 195 FEDERAL RD BROOKFIELD, PAD TO 8/18 W/EM EVW - 976 Bunker Hill RC; 9/15/21 176 TAYLOR RD NEW MILFO DG P#247 INDUSTRIAL PARK RD PUTNAM BM; 9/15/21 TOWNS END RD NEWTOWN SC-57 ISLAND RD KILLINGLY R-35/4+TR SC-P#D-482 COMMUNITY AVE, PLAINFIEL PR 7/7 CP- New Hartford--Town Hill MM 301 N Bear Hill Rd Chaplin P#498 MM Ennis Rd Brklyn @ P#1828 rplc 10 9/13 Enfield, Steele Rd - replace 3 MM 85 Kitt Rd Canterbury P#1682 REp PD-25 S LEDYARD ST N. LONDON/RPLC 9/19/21 ROUTE 55 ( 57) W -- 1602 KTI COMPLETED. COOK LN BEACON FALLS River Rd Poles 60495 & 60496, SEYMO RC POLE A4279 REPLACE BYPASS SWITCH DG P#1606 PROVIDENCE PIKE FRNTR POL RDC TD941 Phase Balance 22N5 09.21.21 - ROUTE 37 SHERMAN Y-25687 SC-P#1161 LATHROP RD PLAINFIELD REP KTI ICHABOD RD SOUTHBURY EVW - 57 Barnes Rd, Watertown P#F61 MJP / 13 Church St / STM / Pole 318 WAITING ON STORES--MM W. Old Rte 6 MM 108 Cooney Rd Pomfret P#1267 Rep 9/3/21 STORM SPINDLE ( 6) RD -DG P#2591 RT 169 WOODSTOCK RPLC XFM Asset Location 1138 : CN : SHERMAN : 1138 1054 : CN : RIDGEFIELD : 1054 1151 : CN : ASHFORD : 1151 1194 : CN : TORRINGTON : 1194 1033 : CN : MIDDLETOWN : 1033 1085 : CN : WOODSTOCK : 1085 1082 : CN : PUTNAM : 1082 1102 : CN : BRANFORD : 1102 1075 : CN : BROOKLYN : 1075 1140 : CN : WASHINGTON : 1140 1080 : CN : PLAINFIELD : 1080 1123 : CN : EAST GRANBY : 1123 1131 : CN : BROOKFIELD : 1131 1002 : CN : WATERBURY : 1002 1135 : CN : NEW MILFORD : 1135 1082 : CN : PUTNAM : 1082 1013 : CN : NEWTOWN : 1013 1079 : CN : KILLINGLY : 1079 1080 : CN : PLAINFIELD : 1080 1938 : CN : NEW HARTFORD : 1938 1152 : CN : CHAPLIN : 1152 1075 : CN : BROOKLYN : 1075 1112 : CN : ENFIELD : 1112 1076 : CN : CANTERBURY : 1076 1169 : CN : NEW LONDON : 1169 1138 : CN : SHERMAN : 1138 1005 : CN : BEACON FALLS : 1005 1016 : CN : SEYMOUR : 1016 1138 : CN : SHERMAN : 1138 1082 : CN : PUTNAM : 1082 1054 : CN : RIDGEFIELD : 1054 1138 : CN : SHERMAN : 1138 1080 : CN : PLAINFIELD : 1080 1018 : CN : SOUTHBURY : 1018 1004 : CN : WATERTOWN : 1004 1066 : CN : STAMFORD : 1066 1078 : CN : HAMPTON : 1078 1081 : CN : POMFRET : 1081 1016 : CN : SEYMOUR : 1016 1085 : CN : WOODSTOCK : 1085 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 281 of 616 Month Number Amount 202207 $866.03 202207 $633.86 202207 ($189.63) 202207 $2,253.03 202207 ($0.64) 202207 $593.27 202207 $120.97 202207 $5,215.36 202207 $50.62 202207 $131.09 202207 ($10.72) 202207 ($0.54) 202207 $613.86 202207 $3,591.51 202207 $2,125.94 202207 ($217.00) 202207 $395.17 202207 ($17.85) 202207 $4,785.27 202207 $492.32 202207 $238.23 202207 ($0.51) 202207 $128.70 202207 $792.78 202207 $637.14 202207 $0.27 202207 $424.17 202207 $99.11 202207 ($810.28) 202207 $13.91 202207 ($656.73) 202207 ($351.28) 202207 $400.72 202207 $228.57 202207 $30.61 202207 $1,611.75 202207 ($25,873.90) 202207 ($9,364.09) 202207 $1,010.95 202207 $222.49
  9. Page 282 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80121543 80121628 80121946 80121970 80122175 80122179 80122186 80122278 80122320 80122352 80122419 80122467 80122661 80122734 80122975 80123272 80123317 80123349 80123781 80123807 80123974 80123980 80124097 80124125 80124251 80124363 80124533 80124549 80124561 80124703 80124724 80124800 80125090 80125153 80125165 80125358 80125437 80125585 80125890 80126119 Accounting Work Order Descript COMPLETED RC REPLACE PAD 508. MJP / 10 Vincent Court / STM / Inst RR; 9/3/21 SAGAMORE DR SEYMOUR 12/27 EVW - 502 E Wakefield Blvd, W MM 303 Barrett Hill Rd Brkln broken MM 28 Oak Dr Woodstock P#1417 repai EP - 9/24/21- POLE 2511, BROAD ST., 9/26/21 TURNOVER 22 W CHURCH HILL R WM; 9/24/21 CHURCH HILL RD WASHINGT RF:405 HOYT ST, DARIEN TT:P #2247 R JLB BRISCOE RD, NEW CANAAN/ REPLAC MM 147 John Brook Canterbury rplc APPRENTICES KTI WQ; 9/27/21 CREST ( 9/27/21 484 LIMESTONE RD RIDGEFIELD JAM - 171 Mercier Ave Bristol - Rep MM 43 Old Turnpike Rd Thompson P#15 GUILFORD/VILLAGE VICTORIA REPAINT X RF:14 SPRING GROVE ST, DARIEN:REPLC 9/29/21 LITCHFIELD RD NEW MILFORD 9/29/21 31 WINSTON DR WASHINGTON D DG P#1033 CENTRE PIKE EASTFORD FRNT Jpt-1235 Farmington Ave Bristol P13 DG P#1013 PAINE RD WOODSTOCK FRNTR DG P#1451 PROVIDENCE ST PUTNAM BALA MATERIAL JDB 9/10/21 WILTON ( 66) MATERIAL (PR) JSG - WILLIAMS ( 14 10/1/21318 ICHABOD RD SOUTHBURY, SH JDB 10/01: 41 FORBELL DR, NORWALK/R 10/4/21 TURNOVER 59 GREEN HILL RD W DG #826 644 SCHOOL ST PUTNAM CLP P 10/4: 20 CARDINAL RD, GREENWICH POL 7/17/21 YANKEE DR BROOKFIELD MM 772 Phoenixville Rd Chaplin P#82 10/4/21 DANBURY () RD -- 22353, RID DG P#1080 THOMPSON RD THOMPSON RPLC 8/24/21 TURNOVER 200 UNIVERSITY DR 9/5/21 PRI DB TURNOVER POND BROOK R APPRENTICES MIRY BROOK ( 91) RD, RL:747 RIVERSVILLE RD: GRN POLE 780 DG P#800 QUADDICK TOWN FARM RD THOM Asset Location 1135 : CN : NEW MILFORD : 1135 1066 : CN : STAMFORD : 1066 1016 : CN : SEYMOUR : 1016 1195 : CN : WINCHESTER : 1195 1075 : CN : BROOKLYN : 1075 1085 : CN : WOODSTOCK : 1085 1169 : CN : NEW LONDON : 1169 1140 : CN : WASHINGTON : 1140 1140 : CN : WASHINGTON : 1140 1908 : CN : DARIEN : 1908 1051 : CN : NEW CANAAN : 1051 1076 : CN : CANTERBURY : 1076 1054 : CN : RIDGEFIELD : 1054 1054 : CN : RIDGEFIELD : 1054 1070 : CN : BRISTOL : 1070 1084 : CN : THOMPSON : 1084 1103 : CN : GUILFORD : 1103 1908 : CN : DARIEN : 1908 1135 : CN : NEW MILFORD : 1135 1140 : CN : WASHINGTON : 1140 1077 : CN : EASTFORD : 1077 1070 : CN : BRISTOL : 1070 1085 : CN : WOODSTOCK : 1085 1082 : CN : PUTNAM : 1082 1052 : CN : NORWALK : 1052 1193 : CN : HARTLAND : 1193 1018 : CN : SOUTHBURY : 1018 1052 : CN : NORWALK : 1052 1140 : CN : WASHINGTON : 1140 1082 : CN : PUTNAM : 1082 1065 : CN : GREENWICH : 1065 1131 : CN : BROOKFIELD : 1131 1152 : CN : CHAPLIN : 1152 1054 : CN : RIDGEFIELD : 1054 1084 : CN : THOMPSON : 1084 1008 : CN : DANBURY : 1008 1013 : CN : NEWTOWN : 1013 1008 : CN : DANBURY : 1008 1065 : CN : GREENWICH : 1065 1084 : CN : THOMPSON : 1084 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 282 of 616 Month Number Amount 202207 $755.10 202207 $160.45 202207 $100.61 202207 $222.11 202207 $756.19 202207 ($250.80) 202207 ($103.25) 202207 ($1,860.21) 202207 $1,089.57 202207 $40.00 202207 ($5.14) 202207 ($320.33) 202207 ($332.06) 202207 $39.88 202207 $601.57 202207 $1,397.52 202207 $64.56 202207 $3.58 202207 $23.46 202207 $30.96 202207 ($217.72) 202207 $16,897.33 202207 ($0.20) 202207 $382.93 202207 ($63.24) 202207 $1,851.24 202207 ($133.44) 202207 $96.46 202207 ($99.46) 202207 $309.85 202207 $69.62 202207 $706.09 202207 ($84.89) 202207 $13.37 202207 ($391.78) 202207 $363.78 202207 $3,337.32 202207 $25.28 202207 ($915.32) 202207 ($77.15)
  10. Page 283 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80126237 80126318 80126366 80126523 80126944 80126954 80126961 80127189 80128000 80128083 80128821 80130144 80130307 80130660 80130674 80130689 80130716 80131248 80131824 80132139 80132859 80133039 80133154 80133791 80134255 80134711 80134817 80135487 80135499 80135726 80136386 80137518 80138251 80138681 80138705 80138796 80138931 80139127 80139576 80139646 Accounting Work Order Descript MATERIAL JDB 367 CHESTNUT HILL RD P KTI 150 Freeman Rd Oxford 61 REICH RD WOODSTOCK RPLC OVERLOAD MM 717 Allen Hill Rd Brklyn replc 1 REplaced #2 tpx service 10/8 EKONK Replaced xfmr pole#1888 and cutout SC-397 WYLIE SCHOOL RD VOLUNTOWN RASP 1/24 MCB - 10.01.21 - 141 MADE COMPLETED 33 CORNELL RD DANBURY 10/12: 56 BAYBERRY LN, WESTPORT/ RE 10/15/21 APPRENTICE TURNOVER 42 BLA 10/19 THOMPSON (1033) RD THOMPSON DONE VJT - WILTON ( 26) RD -- H14 STORES - VJT - 110 BIDWELL HILL RD DONE-NOWAKOWSKI ( 28) RD -- 227A, G APPRENTICES 9/3/21 STURGES ( 12) 1414 BLUE HILLS AVE, BLOOMFIELD, CT JAM 186 High Road Berlin - Remove T BM; 9.22.21 - 8 WEBSTER PL, NEWTOWN *** COMP***KD-EVENT #4638894 REPLC 11/1/21 50 FULLING MILL LN RIDGEFIE DG P#1771 OLD TPKE RD WOODSTOCK FRN E.P. -11/1- 38 INDIAN WOOD RD--3750 GC - 11/1 -GALLUP HILLS RD/ CLIFF ( MM pole#993 Quebec Square lift stat KD-TURNOVER EVENT #4650894 TREE V P South Windsor 14L-Replace ATS. RL:CHERRY VALLEY RD, GRN:REPLACE 2 !!! RL:123 BEDFORD RD,EM: GRN: Remo 11.06.21 - 67 VALLEYWOOD RD, GREENW 7/11 @ EVW - 154 Marshall St, Winst DG P#1279 RT 169 WOODSTOCK RMV TRE (ASP) 5/27 JMS- HARTFORD 205 WEST E 11/17/21 OLD QUARRY ( 36) RD -- 2 JAM - 131 PFISTER DR, NEWINGTON Rep SD 11.15.21 - 377 PRESTON AVE, MERI WQ, 257-259 HICKORY LN, BETHLEHEM, APPRENTICES BM, CHIPMUNK TRL REPLAC JMS-HTFD, 55 FARMINGTON AV - BAD MI 11/20/21 APPRENTICE TURNOVER 203 HI Asset Location 1052 : CN : NORWALK : 1052 1014 : CN : OXFORD : 1014 1085 : CN : WOODSTOCK : 1085 1075 : CN : BROOKLYN : 1075 1178 : CN : VOLUNTOWN : 1178 1082 : CN : PUTNAM : 1082 1178 : CN : VOLUNTOWN : 1178 1002 : CN : WATERBURY : 1002 1008 : CN : DANBURY : 1008 1056 : CN : WESTPORT : 1056 1140 : CN : WASHINGTON : 1140 1084 : CN : THOMPSON : 1084 1071 : CN : PLYMOUTH : 1071 1004 : CN : WATERTOWN : 1004 1160 : CN : GRISWOLD : 1160 1013 : CN : NEWTOWN : 1013 1121 : CN : WINDSOR : 1121 1040 : CN : BERLIN : 1040 1013 : CN : NEWTOWN : 1013 1043 : CN : NEWINGTON : 1043 1054 : CN : RIDGEFIELD : 1054 1085 : CN : WOODSTOCK : 1085 1092 : CN : EAST LYME : 1092 1164 : CN : LEDYARD : 1164 1075 : CN : BROOKLYN : 1075 1041 : CN : FARMINGTON : 1041 J14L : CL&P SOUTH WINDSOR SOUTH WINDSOR : 1115 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1195 : CN : WINCHESTER : 1195 1085 : CN : WOODSTOCK : 1085 1113 : CN : HARTFORD : 1113 1054 : CN : RIDGEFIELD : 1054 1043 : CN : NEWINGTON : 1043 1032 : CN : MERIDEN : 1032 1023 : CN : BETHLEHEM : 1023 1013 : CN : NEWTOWN : 1013 1113 : CN : HARTFORD : 1113 1018 : CN : SOUTHBURY : 1018 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 283 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202207 $5,593.33 Emergent Equipment Failures - Line 202207 $2,315.10 Emergent Equipment Failures - Line 202207 $935.43 Emergent Equipment Failures - Line 202207 $280.50 Emergent Equipment Failures - Line 202207 $349.41 Emergent Equipment Failures - Line 202207 $1,255.38 Emergent Equipment Failures - Line 202207 $56.48 Emergent Equipment Failures - Line 202207 $426.17 Emergent Equipment Failures - Line 202207 $10.99 Emergent Equipment Failures - Line 202207 ($0.01) Emergent Equipment Failures - Line 202207 $117.44 Emergent Equipment Failures - Line 202207 $1,924.32 Emergent Equipment Failures - Line 202207 ($247.82) Emergent Equipment Failures - Line 202207 $0.35 Emergent Equipment Failures - Line 202207 ($304.22) Emergent Equipment Failures - Line 202207 $2,595.68 Emergent Equipment Failures - Line 202207 $47.73 Emergent Equipment Failures - Line 202207 $279.17 Emergent Equipment Failures - Line 202207 ($5,108.08) 202207 ($335.38) Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202207 $1,156.27 Emergent Equipment Failures - Line 202207 ($154.64) Emergent Equipment Failures - Line 202207 $3,143.14 Emergent Equipment Failures - Line 202207 ($18,025.93) Emergent Equipment Failures - Line 202207 ($483.05) Emergent Equipment Failures - Line 202207 ($923.34) Emergent Equipment Failures - Substation 202207 $775.88 Emergent Equipment Failures - Line 202207 $183.23 Emergent Equipment Failures - Line 202207 ($409.79) Emergent Equipment Failures - Line 202207 $86.05 Emergent Equipment Failures - Line 202207 $3,474.56 Emergent Equipment Failures - Line 202207 ($62.76) Emergent Equipment Failures - Line 202207 $12,873.23 Emergent Equipment Failures - Line 202207 ($70.65) Emergent Equipment Failures - Line 202207 $904.18 Emergent Equipment Failures - Line 202207 $1.41 Emergent Equipment Failures - Line 202207 $48.44 Emergent Equipment Failures - Line 202207 $59.39 Emergent Equipment Failures - Line 202207 $79.20 Emergent Equipment Failures - Line 202207 $118.99
Words on different pages

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026