Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 555 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80353550 80353903 80353911 80353912 80353934 80353955 80353961 80353971 80353992 80353995 80354150 80354182 80354190 80354227 80354239 80354250 80354274 80354309 80354318 80354334 80354395 80354703 80354722 80354732 80354795 80354797 80354800 80354819 80354976 80354995 80355022 80355071 80355094 80355102 80355104 80355149 80355554 80355618 80355643 80355646 Accounting Work Order Descript NH - ***WORK COMPLETE*** NOANK RD G Waterbury, Nottingham Ter - Replace JMS-1061 NEW BRITAIN AVE *FIELD WORK IS REQ* MPB; 11/14/22 G 11/14/22 TURNOVER 11 COVE RD PAD192 -OAC P2-1/2 RPLC 120’ #2 TPX 35 BLO ***ALL WORK COMPLETED***HURD PARK( ***ALL WORK COMPLETED***11/14 - MID 11/8/22 ANNA( 211) AVE -- 24384, W 11/14/22 SIMPAUG (194) TPKE -- 5100 DG P#1971 LOGEE RD THOMPSON RPLC 3 124 BLACKBERRY HILL RD BEACON FALLS AJC 97A NOROTON AVE DARIEN I DOWN G #GDK WINDSOR, 268 CARRIAGE WAY - ST Asplundh 11/14 (ZALEWWJ) 30 Samoset 9/27/22 35 MAUWEEHOO HL SHERMAN Meriden, Corrigan Ave - replace Eve 11/15/22 S KENT RD NEW MILFORD Y-2 Waterbury, Austin Rd - cut & kick F 11/8/22 BAILEYVILLE( 104) RD -- 946 Naugatuck, Wooster St - Shift Front WQ; 11/15/22 RAILTREE HILL (362) RD MM 68 8th st Plain field P#2800 rep MJ 2/16 Plainville, Elbow La, relo *CANCELLED* ***WRITTEN***OLD YOUNG( 11/15/22 827B E HILL RD SOUTHBURY POST CONSTR - 11.15.22 - 781 N WILT JFM-39BEAR HILL RD BETHANY-SHIFT FA ASP-Meriden, Ives Ave - replace P-4 ASPLUNDH print 11/21 - EVW - 70 Bea written complete 11/16 - EAST ST, H [O/H SEEN] #*MI RH, NEW BRITAIN AVE cancel to fwo 80200523 work done 11/16/22 (RSO STROM) Fair 9/19/22 WHITE (146) ST UNIT GUARD S MJ-JRP - 90 Andrews St SOG Inst 35' PD-180 Colman St N. London Pole 338 JFM-*POST CONSTR*6BRONSON RD-P976,P JFM-155 MAIN ST FARMINGTON-(FRNT)P4 11/16/22 151:S:MAIN:ST::CHESHIRE:CT Asset Location 1161 : CN : GROTON : 1161 1002 : CN : WATERBURY : 1002 1943 : CN : WEST HARTFORD : 1943 1054 : CN : RIDGEFIELD : 1054 1131 : CN : BROOKFIELD : 1131 1113 : CN : HARTFORD : 1113 1157 : CN : EAST HAMPTON : 1157 1172 : CN : PORTLAND : 1172 1002 : CN : WATERBURY : 1002 1053 : CN : REDDING : 1053 1084 : CN : THOMPSON : 1084 1005 : CN : BEACON FALLS : 1005 1908 : CN : DARIEN : 1908 1121 : CN : WINDSOR : 1121 1155 : CN : COVENTRY : 1155 1138 : CN : SHERMAN : 1138 1032 : CN : MERIDEN : 1032 1135 : CN : NEW MILFORD : 1135 1002 : CN : WATERBURY : 1002 1037 : CN : MIDDLEFIELD : 1037 1003 : CN : NAUGATUCK : 1003 1022 : CN : WOODBURY : 1022 1080 : CN : PLAINFIELD : 1080 1044 : CN : PLAINVILLE : 1044 1157 : CN : EAST HAMPTON : 1157 1018 : CN : SOUTHBURY : 1018 1051 : CN : NEW CANAAN : 1051 1006 : CN : BETHANY : 1006 1032 : CN : MERIDEN : 1032 1928 : CN : SALISBURY : 1928 1162 : CN : HEBRON : 1162 1941 : CN : ROCKY HILL : 1941 1002 : CN : WATERBURY : 1002 1091 : CN : CLINTON : 1091 1008 : CN : DANBURY : 1008 1034 : CN : SOUTHINGTON : 1034 1169 : CN : NEW LONDON : 1169 1015 : CN : PROSPECT : 1015 1041 : CN : FARMINGTON : 1041 1030 : CN : CHESHIRE : 1030 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 555 of 616 Month Number Amount 202211 $280.91 202211 $972.68 202211 $41,494.11 202211 $126.16 202211 $85.25 202211 $252.28 202211 $795.77 202211 $1,943.23 202211 $682.03 202211 $673.61 202211 $247.69 202211 $1,979.51 202211 $142.10 202211 $255.77 202211 $227.34 202211 $6,087.62 202211 $5,026.50 202211 $3,649.92 202211 $1,874.79 202211 $559.88 202211 $813.86 202211 $189.25 202211 $4,014.38 202211 $1,114.46 202211 $341.04 202211 $1,009.29 202211 $1,331.01 202211 $380.52 202211 $5,378.04 202211 $426.28 202211 $189.23 202211 $483.14 202211 $210.33 202211 $5,289.03 202211 $22,696.78 202211 $479.93 202211 $2,132.71 202211 $887.80 202211 $10,876.44 202211 $767.58
  2. Page 556 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80355652 80355669 80355819 80355865 80355877 80355878 80355950 80355951 80355976 80356063 80356404 80356439 80356448 80356456 80356457 80356470 80356484 80356496 80356501 80356505 80356664 80356715 80356731 80356755 80356760 80356761 80356764 80356777 80356783 80356792 80357073 80357074 80357079 80357169 80357185 80357225 80357549 80357790 80357795 80357797 Accounting Work Order Descript 11/13 PUDDING HILL (539) RD -- 985 Replc Serv 11/16/22 (RSO JOHNNYZ) R ***ALL WORK COMPLETED***11/16 (NORI Bloomfield 3B-Replace Deteriorated COMP CCC 12/20/22 - 11/15 - Autumn Berlin 6A-Replace 115kV Control Hou print 11/17 CP-Case rd BUR pole rep RIVER VIEW AVE POLE 214 AND 215 11/15/22 S GEORGES HILL RD SOUTHBUR on 1/17 NRAPR 12/9 JFC - FROST BRID #COMP TOL 11/21/22 - zROCKY HILL-95 11/17 [FONTAKA] EDGEWOOD ST HARTFOR #zWETH--11/17/22--47 Harmund Pl-(FO written complete 11/17/22 (RSO-LEAC CANX Danbury, Beaver St - shift Eve FCOMP Hart OH ELM ST ROCKY HILL NEW GC 11/17/22 (RSO-KNAPP) BECKWIT Redding, 38 Umpawaug Rd - Shift Fro ERROR IN THE SYSTEM THIS WO IS BALA MDB - GREAT HOLLOW RD CORNWALL CT BM; 11/16/22 TURNOVER WEST LN RIDGE 11.16.22 - GALLOWS HILL RD, REDDING MDB - 73 PRITCHARD RD CORNWALL CT CRP - RTE 72 TERRYVILLE RD HARWINTO WRTN--JK>POLE 3067--FTR TO REPLACE APPRENTICES KTI WQ; 11.17.22 - 56A NEW GC 11/18/22 Highland Dr / Gallu MJ-11/17/22 MIDDLETOWN( 292) RD -New Fairfield, 4 Brookside Dr - Rep written complete 11/18/22 (RSO DONN New Fairfield, Fairfield Dr - shift Naugatuck, Wedgewood Dr - shift Fro Monroe, Shelton Rd - shift Frontier Monroe, Barn Hill Rd - shift Fronti Monroe, Jay La - shift Frontier P-2 Alden One Willard St and Gordon St, Redding, Demichael Rd - shift Front DL; 11.20.22 - #1 & #3 OLD WAGON RD #11/19 BLINN( 19) ST -- 2109, EAS written complete 11/20 [CUMMIGD] HO Asset Location 1078 : CN : HAMPTON : 1078 1089 : CN : MADISON : 1089 1157 : CN : EAST HAMPTON : 1157 G03B : CL&P BLOOMFIELD BLOOMFIELD 1111 : CN : ELLINGTON : 1111 G06A : CL&P BERLIN BERLIN 1191 : CN : BURLINGTON : 1191 1160 : CN : GRISWOLD : 1160 1018 : CN : SOUTHBURY : 1018 1004 : CN : WATERTOWN : 1004 1941 : CN : ROCKY HILL : 1941 1113 : CN : HARTFORD : 1113 1045 : CN : WETHERSFIELD : 1045 1102 : CN : BRANFORD : 1102 1008 : CN : DANBURY : 1008 1941 : CN : ROCKY HILL : 1941 1168 : CN : MONTVILLE : 1168 1053 : CN : REDDING : 1053 1177 : CN : STONINGTON : 1177 1132 : CN : CORNWALL : 1132 1054 : CN : RIDGEFIELD : 1054 1053 : CN : REDDING : 1053 1132 : CN : CORNWALL : 1132 1405 : CN : HARWINTON : 1405 1020 : CN : WOLCOTT : 1020 1023 : CN : BETHLEHEM : 1023 1164 : CN : LEDYARD : 1164 1040 : CN : BERLIN : 1040 1134 : CN : NEW FAIRFIELD : 1134 1091 : CN : CLINTON : 1091 1134 : CN : NEW FAIRFIELD : 1134 1003 : CN : NAUGATUCK : 1003 1012 : CN : MONROE : 1012 1012 : CN : MONROE : 1012 1012 : CN : MONROE : 1012 1942 : CN : SIMSBURY : 1942 1053 : CN : REDDING : 1053 1066 : CN : STAMFORD : 1066 1934 : CN : EAST HARTFORD : 1934 1163 : CN : LEBANON : 1163 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 556 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202211 $1,163.91 Emergent Equipment Failures - Line 202211 $85.25 Emergent Equipment Failures - Line 202211 $315.43 Emergent Equipment Failures - Substation 202211 $189.18 Emergent Equipment Failures - Line 202211 $1,891.24 Emergent Equipment Failures - Substation 202211 $189.18 Emergent Equipment Failures - Line 202211 $2,613.08 Emergent Equipment Failures - Line 202211 $761.28 Emergent Equipment Failures - Line 202211 $3,297.84 Emergent Equipment Failures - Line 202211 $623.24 Emergent Equipment Failures - Line 202211 $176.52 Emergent Equipment Failures - Line 202211 $901.35 Emergent Equipment Failures - Line 202211 $171.52 Emergent Equipment Failures - Line 202211 $9,114.80 Emergent Equipment Failures - Line 202211 $6,393.83 Emergent Equipment Failures - Line 202211 $2,657.52 Emergent Equipment Failures - Line 202211 $341.04 Emergent Equipment Failures - Line 202211 $5,111.03 Emergent Equipment Failures - Line 202211 $1,591.57 202211 $6,721.96 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202211 $3,172.23 Emergent Equipment Failures - Line 202211 $4,790.76 Emergent Equipment Failures - Line 202211 $2,943.84 Emergent Equipment Failures - Line 202211 $423.06 Emergent Equipment Failures - Line 202211 $173.09 Emergent Equipment Failures - Line 202211 $454.73 Emergent Equipment Failures - Line 202211 $584.96 Emergent Equipment Failures - Line 202211 $227.36 Emergent Equipment Failures - Line 202211 $536.66 Emergent Equipment Failures - Line 202211 $189.24 Emergent Equipment Failures - Line 202211 $7,130.53 Emergent Equipment Failures - Line 202211 $4,416.75 Emergent Equipment Failures - Line 202211 $1,256.16 Emergent Equipment Failures - Line 202211 $1,446.28 Emergent Equipment Failures - Line 202211 $1,152.98 Emergent Equipment Failures - Line 202211 $160.86 Emergent Equipment Failures - Line 202211 $1,766.45 Emergent Equipment Failures - Line 202211 $2,577.80 Emergent Equipment Failures - Line 202211 $283.94 Emergent Equipment Failures - Line 202211 $230.09
  3. Page 557 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80357804 80357805 80357810 80357821 80357828 80357836 80357842 80357847 80357857 80357858 80357866 80357886 80357901 80357909 80357944 80357946 80357986 80358028 80358034 80358093 80358103 80358117 80358125 80358150 80358153 80358158 80358161 80358244 80358261 80358262 80358414 80358434 80358436 80358478 80358483 80358512 80358524 80358638 80358648 80358694 Accounting Work Order Descript written complete 11/20 [CUMMIGD] WA DONE JSG - TURNOVER** Hartland blvd written complete 11/20 [KOZYRMJ] ST written complete 11/19/22 (RSO DAMI JD; 118 WEBBS HILL RD STAMFORD; TT 11/17/22 HOPEWELL (10) RD -- 14696, DL; 11.20.22 - 176 DOLPHIN COVE QUA TL - ARCADIA RD, #12 NIANTIC // REP 11.20.22 - 542 ROCK RIMMON RD, STAM HEL KTI SD; 28 BALL POND RD DANBURY NJB 242 PUTNAM ST HTFD REPLACE XFRM MPB; 11/20/22 N SALEM (237) RD -- M APPRENTICES: SD; 4 OAK ST NEW FAIRF 11/20/22 LIMEKILN RD RIDGEFIELD 11/20/22 KELSEY HILL RD DEEP RIVER/ FCOMP 11/28 9a 532 on N. Prospect 11.18.22 - 32 DRUMLIN RD, WESTPORT 11.18.22 - 148 N SEIR HILL RD, NORW 11.19.22 - 660 WEST RD, NEW CANAAN EVW - TWIN LAKES RD SALISBURY CT * JFM- 130WARREN ST 1FL, MERIDEN,* ***WRITTEN***11/20 - COX (459) RD , MDB - STUDIO HILL RD KENT CT written complete 11/20/252 (RSO-STR NEW GC 11/20/22 (RSO-JOHNNY Z) KRUG Woodbury, Grey Fox Trail - replace Replace 2 Services 11/20/22 (RSO-ST INVALID New Fairfield, Pine Hill Rd INVALID New Milford, Candlewood Mou New Fairfield, Lakeshore Dr S - rep written 228 TOBACCO ST, LEBANON; PE Redding, Old Stagecoach Rd - Fronti P3948 INSTALL 65K FUSE, P2390 INSTA (MATERIAL) TRIPSAVER NOMENCLATURE 4 TL - STERING HILL RD, REF. #77 LYME *JFM- 138 HOLLYBERRY LN -P13976, PL pad #138 westbrook all work complet written complete 11/20 [FONTAKA] TO Monroe, Old Newtown Rd - shift Fron KTI SD; 91 MIRY BROOK RD DANBURY NE Asset Location 1180 : CN : WINDHAM : 1180 1193 : CN : HARTLAND : 1193 1153 : CN : COLCHESTER : 1153 1089 : CN : MADISON : 1089 1066 : CN : STAMFORD : 1066 1134 : CN : NEW FAIRFIELD : 1134 1066 : CN : STAMFORD : 1066 1092 : CN : EAST LYME : 1092 1066 : CN : STAMFORD : 1066 1008 : CN : DANBURY : 1008 1113 : CN : HARTFORD : 1113 1054 : CN : RIDGEFIELD : 1054 1134 : CN : NEW FAIRFIELD : 1134 1054 : CN : RIDGEFIELD : 1054 1099 : CN : DEEP RIVER : 1099 1934 : CN : EAST HARTFORD : 1934 1056 : CN : WESTPORT : 1056 1052 : CN : NORWALK : 1052 1051 : CN : NEW CANAAN : 1051 1928 : CN : SALISBURY : 1928 1032 : CN : MERIDEN : 1032 1172 : CN : PORTLAND : 1172 1133 : CN : KENT : 1133 1099 : CN : DEEP RIVER : 1099 1173 : CN : PRESTON : 1173 1022 : CN : WOODBURY : 1022 1094 : CN : HADDAM : 1094 1134 : CN : NEW FAIRFIELD : 1134 1135 : CN : NEW MILFORD : 1135 1134 : CN : NEW FAIRFIELD : 1134 1163 : CN : LEBANON : 1163 1053 : CN : REDDING : 1053 1089 : CN : MADISON : 1089 1007 : CN : BETHEL : 1007 1096 : CN : LYME : 1096 1044 : CN : PLAINVILLE : 1044 1101 : CN : WESTBROOK : 1101 1163 : CN : LEBANON : 1163 1012 : CN : MONROE : 1012 1008 : CN : DANBURY : 1008 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 557 of 616 Month Number Amount 202211 $153.92 202211 $5,067.38 202211 $485.55 202211 $2,298.35 202211 $2,393.90 202211 $1,524.46 202211 $4,876.14 202211 $460.56 202211 $962.48 202211 $227.36 202211 $3,913.83 202211 $242.81 202211 $1,627.65 202211 $1,813.19 202211 $24,136.98 202211 $956.42 202211 $85.25 202211 $131.29 202211 $198.98 202211 $741.40 202211 $252.58 202211 $283.44 202211 $1,075.22 202211 $230.92 202211 $227.34 202211 $332.70 202211 $624.34 202211 $4,925.50 202211 $790.58 202211 $3,493.03 202211 $1,282.73 202211 $2,327.88 202211 $242.81 202211 $24,984.28 202211 $1,977.81 202211 $170.53 202211 $1,224.50 202211 $6,554.91 202211 $2,849.61 202211 $48.89
  4. Page 558 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80358847 80358849 80359124 80359145 80359151 80359152 80359157 80359163 80359167 80359172 80359207 80359327 80359345 80359346 80359356 80359376 80359394 80359408 80359456 80359984 80359985 80359988 80359991 80359996 80359998 80360005 80360006 80360010 80360012 80360057 80360233 80361397 80361399 80361401 80361412 80361418 80361427 80361434 80361445 80361451 Accounting Work Order Descript written 11/15/22 Y-27259-2022 BEAUM INVALID Newtown, Alpine Cir - Rpl E 11/22 NEED TO RPL HH 893A WINDMILL RC; 11/22/22 EASTVIEW (25) DR -- 52 11/16/22 HIGHLAND AVE WATERBURY CT 11/22/22 10 CIRCLE DR RIDGEFIELD Ridgefield, Ethan Allen Hwy - Evers 11.21.22 - 89 MIDDLEBROOK FARM RD, NEW BF 11/22/22 CLIFF (4) ST -- 276 PD-81 FAIR HARBOUR PL N. LONDON/RPL JFM- 53 DOUGLAS DR BRISTOL CT P#378 (JB) Norwalk, Ridge Farms Rd - shif 11.20.22 - BRIAR BRAE RD, STAMFORD PD-22 HENDERSON RD N. LONDON/TPX ON (JB) Norwalk, West Norwalk Rd - shi (JB) Norwalk, Commerce St - shift F New Canaan, Ponus Ridge - replace 1 (JES) New Canaan, Frogtown Rd - shi DONE - EVW - TURNOVER - 241 Low R **FCOMP 11/25/22 Hartford OH TURNOV 11.24.22 - 39 AMELIA PL, STAMFORD / AJC TT 124 W PUTNAM AVE, GRN REPLA FCOMP ASP 11/28 MANCHESTER, 63 GIR ASP 11/28 - SHODDY MILL RD, BOLTON POST CONSTR - 11.24.22 - 39 SASCO C POST CONSTR - complted by ASP-11/24 MPB; 11/24/22 GAY( 15) RD -- 1844 NEW JD 11/23 WATERFORD S PKWY, WATE COMP GDK 11/24 [JEZOUKM] WALNUT DR 11/24/22 (RSO-DURKEE/JOHNNY Z) HAND 11/14 (HINDLE/CHARRON) BUCK HILL( NEW JD 11/27/22 (RSO-HAYNES) 2342:: DONE PRINT 11/30 MDB - 10 HENDERSON 11/26/22 9RSO-D'AMICO) RESERVOIR( written - TYPE (32) RD , SOUTH WIND 11/25 - SHAILOR HILL RD, COLCHESTER CRP - 11/26 - W WAKEFIELD BLVD, WIN JFC - CONCORD( 224) DR -- G737, WA 11/26/22 (RSO-D'AMICO) BOSTON POST( ALL WORK COMPLETE. P351 ESSEX Asset Location 1163 : CN : LEBANON : 1163 1013 : CN : NEWTOWN : 1013 1936 : CN : GRANBY : 1936 1135 : CN : NEW MILFORD : 1135 1002 : CN : WATERBURY : 1002 1054 : CN : RIDGEFIELD : 1054 1054 : CN : RIDGEFIELD : 1054 1057 : CN : WILTON : 1057 1177 : CN : STONINGTON : 1177 1169 : CN : NEW LONDON : 1169 1070 : CN : BRISTOL : 1070 1052 : CN : NORWALK : 1052 1066 : CN : STAMFORD : 1066 1169 : CN : NEW LONDON : 1169 1052 : CN : NORWALK : 1052 1052 : CN : NORWALK : 1052 1051 : CN : NEW CANAAN : 1051 1051 : CN : NEW CANAAN : 1051 1137 : CN : SHARON : 1137 1931 : CN : AVON : 1931 1066 : CN : STAMFORD : 1066 1065 : CN : GREENWICH : 1065 1937 : CN : MANCHESTER : 1937 1903 : CN : BOLTON : 1903 1056 : CN : WESTPORT : 1056 1034 : CN : SOUTHINGTON : 1034 1054 : CN : RIDGEFIELD : 1054 1100 : CN : WATERFORD : 1100 1121 : CN : WINDSOR : 1121 1116 : CN : STAFFORD : 1116 1076 : CN : CANTERBURY : 1076 1156 : CN : EAST HADDAM : 1156 1133 : CN : KENT : 1133 1098 : CN : OLD SAYBROOK : 1098 1180 : CN : WINDHAM : 1180 1153 : CN : COLCHESTER : 1153 1195 : CN : WINCHESTER : 1195 1004 : CN : WATERTOWN : 1004 1101 : CN : WESTBROOK : 1101 1093 : CN : ESSEX : 1093 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 558 of 616 Month Number Amount 202211 $49,983.04 202211 $6,434.73 202211 $91.17 202211 $142.10 202211 $15,795.05 202211 $946.34 202211 $6,244.80 202211 $142.07 202211 $1,102.18 202211 $596.84 202211 $416.25 202211 $513.28 202211 $851.63 202211 $113.67 202211 $487.56 202211 $798.49 202211 $1,787.72 202211 $434.62 202211 $142.10 202211 $4,081.65 202211 $865.29 202211 $167.16 202211 $493.85 202211 $1,066.37 202211 $1,079.92 202211 $1,136.74 202211 $85.25 202211 $1,335.72 202211 $6,434.88 202211 $2,332.93 202211 $1,450.96 202211 $446.50 202211 $2,216.73 202211 $1,709.20 202211 $227.34 202211 $568.36 202211 $145.26 202211 $625.25 202211 $542.07 202211 $1,695.21
  5. Page 559 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80361480 80361490 80361522 80361531 80361564 80361736 80361751 80361764 80361771 80361778 80361780 80361787 80362124 80362150 80362301 80362411 80362429 80362455 80362472 80362496 80362504 80362510 80362514 80362564 80362975 80363252 1B030101 1B030398 1B030708 1B030751 1B031158 1B031292 1B031514 1B031597 1B031773 1B032241 1B032351 1B032412 1B032515 1B032685 Accounting Work Order Descript PD-101 LEDGE RD N. LONDON/RPLC P# 9 11/26/22 (RSO-HERMAN) HAMBURG(170-4 PRINT 12/22 CRP - HULL( 30) RD JFC - WILTON( 55) RD -- H140, PLY 11/28/22 (RSO-D'AMICO) PINE( 7) Danbury. 9 East Starrs Plain Rd - s Danbury, 168 Middle River Rd - Shif Southbury, Chain Tr - Relocate 6-S1 INVALID BM; Danbury, Federal Rd - r SD Danbury, Triangle St - replace s Danbury, Keeler St - replace Everso INVALID Monroe, Cambridge Dr - repl cancel to fwo 80200522 MJGw - 11/28/22 W RIDGE( 70) CT MCB Naugatuck, Greenwood St - Shift NEW BF 11/29 WOLF NECK RD, STONINGT MJ-Farmington, Fienemann Rd - Evers NEW BF- ALL WORK COMPLETE SEE TIM F Waterbury, Highland Ave - Pole 7875 Waterbury, Bunker Hill Ave - recond Bristol, North St - rmv facilities Meriden, Miller St - replace 3PH ba AMM PLAINVILLE AVE,FARMINGTON. REP PRINT 11/30 EVW - 621 Winsted Rd, T JFC - DONE TURNOVER - HINMAN( 320) Deep River 13Q-Replace 2 13Q-1X Aux CANCEL TO MAXIMO WO 11283129/FWO 80 CANCEL TO MAXIMO WO 11225373/FWO 80 CANCEL TO MAXIMO WO 11282793/FWO 80 CANCEL TO MAXIMO WO 10425670/FWO 80 CANCEL TO MAXIMO WO 11282545/FWO 80 CP-34 Danbury Rd, Rdgfld, 3PH pole CANCEL TO MAXIMO WO 11218140/FWO 80 CANCEL TO MAXIMO WO 11237507/FWO 80 CANCEL TO MAXIMO WO 7668725/FWO 801 CANCEL TO MAXIMO WO 11224848/FWO 80 60 MAPLE ST SEYMOUR; SHIFT TO FTR P KD-EVENT #4343527 REP INSULTR PF450 CANCEL TO EXPENSE 66 Sunset Hill COMPLETED (50) TURNOVER 10 ROWLEDGE Asset Location 1169 : CN : NEW LONDON : 1169 1096 : CN : LYME : 1096 1191 : CN : BURLINGTON : 1191 1071 : CN : PLYMOUTH : 1071 1090 : CN : CHESTER : 1090 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1018 : CN : SOUTHBURY : 1018 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1008 : CN : DANBURY : 1008 1012 : CN : MONROE : 1012 1003 : CN : NAUGATUCK : 1003 1030 : CN : CHESHIRE : 1030 1003 : CN : NAUGATUCK : 1003 1177 : CN : STONINGTON : 1177 1041 : CN : FARMINGTON : 1041 1177 : CN : STONINGTON : 1177 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1070 : CN : BRISTOL : 1070 1032 : CN : MERIDEN : 1032 1041 : CN : FARMINGTON : 1041 1194 : CN : TORRINGTON : 1194 1004 : CN : WATERTOWN : 1004 J13Q : CL&P DEEP RIVER DEEP RIVER : 1099 1018 : CN : SOUTHBURY : 1018 1012 : CN : MONROE : 1012 1008 : CN : DANBURY : 1008 1136 : CN : ROXBURY : 1136 1008 : CN : DANBURY : 1008 1054 : CN : RIDGEFIELD : 1054 1131 : CN : BROOKFIELD : 1131 1022 : CN : WOODBURY : 1022 1008 : CN : DANBURY : 1008 1134 : CN : NEW FAIRFIELD : 1134 1016 : CN : SEYMOUR : 1016 1014 : CN : OXFORD : 1014 1012 : CN : MONROE : 1012 1013 : CN : NEWTOWN : 1013 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 559 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202211 $656.82 Emergent Equipment Failures - Line 202211 $12,688.65 Emergent Equipment Failures - Line 202211 $511.56 Emergent Equipment Failures - Line 202211 $736.78 Emergent Equipment Failures - Line 202211 $109.73 Emergent Equipment Failures - Line 202211 $10,676.59 Emergent Equipment Failures - Line 202211 $6,349.91 Emergent Equipment Failures - Line 202211 $6,372.80 Emergent Equipment Failures - Line 202211 $4,839.36 Emergent Equipment Failures - Line 202211 $2,154.67 Emergent Equipment Failures - Line 202211 $1,027.89 Emergent Equipment Failures - Line 202211 $913.87 Emergent Equipment Failures - Line 202211 $7,936.75 Emergent Equipment Failures - Line 202211 $431.28 Emergent Equipment Failures - Line 202211 $4,682.95 Emergent Equipment Failures - Line 202211 $1,288.44 Emergent Equipment Failures - Line 202211 $3,120.27 Emergent Equipment Failures - Line 202211 $2,368.31 Emergent Equipment Failures - Line 202211 $666.02 202211 $2,862.11 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202211 $2,464.13 Emergent Equipment Failures - Line 202211 $2,343.88 Emergent Equipment Failures - Line 202211 $205.00 Emergent Equipment Failures - Line 202211 $1,136.71 Emergent Equipment Failures - Line 202211 $952.89 Emergent Equipment Failures - Substation 202211 $8,032.30 Emergent Equipment Failures - Line 202211 ($2,158.72) Emergent Equipment Failures - Line 202211 ($1,003.40) Emergent Equipment Failures - Line 202211 ($5,494.26) Emergent Equipment Failures - Line 202211 ($2,039.45) Emergent Equipment Failures - Line 202211 ($4,913.73) Emergent Equipment Failures - Line 202211 ($789.56) Emergent Equipment Failures - Line 202211 ($2.34) Emergent Equipment Failures - Line 202211 ($336.04) Emergent Equipment Failures - Line 202211 ($1,877.23) Emergent Equipment Failures - Line 202211 ($3,449.66) Emergent Equipment Failures - Line 202211 ($185.69) Emergent Equipment Failures - Line 202211 $623.88 Emergent Equipment Failures - Line 202211 ($396.74) Emergent Equipment Failures - Line 202211 $5.02
  6. Page 560 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 1B032690 1B032728 1B033105 1B130053 1B822148 1B822526 1B921111 1B921534 1B921769 1B922006 1B922097 1B922549 1B922614 1B922708 1B922813 1B922838 1B922880 1B923048 1B923788 1N030737 1N621731 1N920712 1N920840 2C620262 2L030840 2M030048 2M030066 2M030757 2M030778 2M031000 2M031226 2M031268 2M031303 2M031349 2M031350 2M031542 2M031549 2M031788 2M032740 2M033706 Accounting Work Order Descript CANCEL TO MAXIMO WO 11243091/FWO 80 CANCEL TO MAXIMO WO 11213175/FWO 80 CANCEL TO MAXIMO WO 11219221/FWO 80 HEL (50): JS - 8 Beech Trl, Danb, I KD-EVENT #3747468 5 KNOLLWOOD LN NE CANCEL TO MAXIMO WO 11239843/FWO 80 KD-24 Wood Creek Rd New Fairfield; CANCEL TO MAXIMO WO 11283626/FWO 80 CANCEL TO MAXIMO WO 11225314/FWO 80 CANCEL TO MAXIMO WO 11240358/FWO 80 KD-Keeler St Danbury; REPLC POLE 19 CANCEL TO MAXIMO WO 5183827/FWO 800 CANCEL TO MAXIMO WO 11245641/FWO 80 8/19 19 TAPPEN RD BRIDGEWATER, NEED CANCEL TO MAXIMO WO 11225258/FWO 80 CANCEL TO MAXIMO WO 11228111/FWO 80 28 LONG MEADOW LN BETHEL; SHIFT TO CANCEL TO MAXIMO WO 11283289/FWO 80 CANCEL TO MAXIMO WO 11240222/FWO 80 LD UNION PARK NORWALK REPL POLE#18 JS 190 Danbury Rd Wilton CANCEL TO MAXIMO WO 11258303/FWO 80 CANCEL TO MAXIMO WO 11256838/FWO 80 Salisbury, Upland Meadow rd --rpl p JC/BIRDEN ST TORR/ POLE 2218 REP 40 CANCEL TO EXPENSE CANCEL TO MAXIMO WO 11299627/FWO 80 CANCEL TO MAXIMO WO 11190387/FWO 80 CANCEL TO MAXIMO WO 11169143/FWO 80 * MJ * (50): EJC 3334 Berlin Tpke, CANCEL TO MAXIMO WO 11045394/FWO 80 CANCEL TO MAXIMO WO 8639527/FWO 801 CANCEL TO MAXIMO WO 11296905/FWO 80 EVW SOUTHINGTON RD BERLIN, NEED TO CANCEL TO EXPENSE CANCEL TO MAXIMO WO 11291765/FWO 80 CANCEL TO MAXIMO WO 11299957/FWO 80 CANCEL TO EXPENSE AMM 323 HAMPTON CT,NEWINGTON. REPL CANCEL TO MAXIMO WO 6348771/FWO 801 Asset Location 1053 : CN : REDDING : 1053 1008 : CN : DANBURY : 1008 1134 : CN : NEW FAIRFIELD : 1134 1008 : CN : DANBURY : 1008 1134 : CN : NEW FAIRFIELD : 1134 1134 : CN : NEW FAIRFIELD : 1134 1134 : CN : NEW FAIRFIELD : 1134 1008 : CN : DANBURY : 1008 1012 : CN : MONROE : 1012 1134 : CN : NEW FAIRFIELD : 1134 1008 : CN : DANBURY : 1008 1012 : CN : MONROE : 1012 1012 : CN : MONROE : 1012 1130 : CN : BRIDGEWATER : 1130 1012 : CN : MONROE : 1012 1053 : CN : REDDING : 1053 1007 : CN : BETHEL : 1007 1008 : CN : DANBURY : 1008 1135 : CN : NEW MILFORD : 1135 1052 : CN : NORWALK : 1052 1057 : CN : WILTON : 1057 1051 : CN : NEW CANAAN : 1051 1052 : CN : NORWALK : 1052 1928 : CN : SALISBURY : 1928 1194 : CN : TORRINGTON : 1194 1041 : CN : FARMINGTON : 1041 1070 : CN : BRISTOL : 1070 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1043 : CN : NEWINGTON : 1043 1002 : CN : WATERBURY : 1002 1003 : CN : NAUGATUCK : 1003 1041 : CN : FARMINGTON : 1041 1040 : CN : BERLIN : 1040 1070 : CN : BRISTOL : 1070 1003 : CN : NAUGATUCK : 1003 1041 : CN : FARMINGTON : 1041 1003 : CN : NAUGATUCK : 1003 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 560 of 616 Month Number Amount 202211 ($1,381.36) 202211 ($5,908.59) 202211 ($583.53) 202211 $6,382.78 202211 $5,441.64 202211 ($2,473.64) 202211 $28.05 202211 ($2,239.15) 202211 ($857.18) 202211 ($2,750.09) 202211 ($842.34) 202211 ($1,559.80) 202211 ($3,446.74) 202211 ($85.24) 202211 ($675.21) 202211 ($1,040.00) 202211 ($88.05) 202211 ($2,995.08) 202211 ($1,078.14) 202211 $1,589.73 202211 $20,260.95 202211 ($868.36) 202211 ($397.45) 202211 $8,284.17 202211 ($409.68) 202211 ($304.66) 202211 ($2,823.91) 202211 ($306.94) 202211 ($992.47) 202211 $3,830.53 202211 ($231.13) 202211 ($2,717.77) 202211 ($3,276.40) 202211 ($403.00) 202211 ($605.90) 202211 ($2,036.37) 202211 ($232.95) 202211 ($86.23) 202211 $406.67 202211 ($301.72)
  7. Page 561 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 2M033712 2M033798 2M033803 2M033964 2M130058 2M721368 2M724452 2M820039 2M820713 2M821192 2M821676 2M822176 2M822907 2M823000 2M823670 2M920487 2M921003 2M921368 2M921761 2M922297 2M922423 2M923199 2M923211 2M923650 2M923759 3H031945 3H033027 3H721361 3S620621 4D031103 4E031680 4N031057 4N031570 4N920915 DSQ03010 DSQ03020 DSQ03026 DSQ82005 DSQ82029 EXCVT101 Accounting Work Order Descript CANCEL TO MAXIMO WO 6422621/FWO 801 CANCEL TO MAXIMO WO 11299416/FWO 80 Jpt-565 Clark Ave Bristol P12165 CANCEL TO MAXIMO WO 11049409/FWO 80 CANCEL TO MAXIMO WO 11298367/FWO 80 WC-235 SPRING ST SOUTHINGTON. RPL P CANCEL TO MAXIMO WO 11299784/FWO 80 72 WALL ST,WTBY CANCEL TO MAXIMO WO 11177346/FWO 80 CANCEL TO EXPENSE EJC Main St, Southington P#89337 Re cancel to maximo wo#11135476 fwo#80 EJC 120 Liberty St, Newington P#475 AMM GLENEAGLES DR, FARM. REPLACE X CANCEL TO MAXIMO WO 11225027/FWO 80 CANCEL TO MAXIMO WO 11186522/FWO 80 EVW 1217 Arbutus Rd DUR P#2009 RELO JRP - 832 Boyden St. WTBY Repl Pole CANCEL TO MAXIMO WO 11176549/FWO 80 CANCEL TO MAXIMO WO 11184213/FWO 80 391 Four Rod Rd, Ber. Elec Maint Po CANCEL TO MAXIMO WO 11294111/FWO 80 CANCEL TO EXPENSE CANCEL TO MAXIMO WO 11058975/FWO 80 CANCEL TO EXPENSE OH Work FComp 11/4/22(50): MANCH, E NJB 32 MIDLAND ST HTFD RPL P#5460 T RSO 5/26 WINDSOR, PARK AVE - P-3484 WADE AVE, BLFD - NEED TO REPLACE EV (30): 8/14/20 BRADLEY RD, MAD Yello JK>POLE 929---REPLACE TEMPORARY GUY Authorize cancellation to expense ( (30): 09/22/20 MORGAN PT GROTON POL CANCEL TO EXPENSE 150 Waterford P Stepstone 35L Rplc 35L-87P-86P 1X S Windsor 14L Rpcl Faild 14L-2X LTC (40): Replace Failed 27H-1X3-4 Swit Replace Failed Heater Rebuild Failed 1A-5X Load Tap Chang 2001 CL&P EXCAVATING CONTRACTOR ARE Asset Location 1043 : CN : NEWINGTON : 1043 1002 : CN : WATERBURY : 1002 1070 : CN : BRISTOL : 1070 1032 : CN : MERIDEN : 1032 1002 : CN : WATERBURY : 1002 1034 : CN : SOUTHINGTON : 1034 1032 : CN : MERIDEN : 1032 1002 : CN : WATERBURY : 1002 1002 : CN : WATERBURY : 1002 1043 : CN : NEWINGTON : 1043 1034 : CN : SOUTHINGTON : 1034 1042 : CN : NEW BRITAIN : 1042 1043 : CN : NEWINGTON : 1043 1041 : CN : FARMINGTON : 1041 1003 : CN : NAUGATUCK : 1003 1032 : CN : MERIDEN : 1032 1910 : CN : DURHAM : 1910 1002 : CN : WATERBURY : 1002 1032 : CN : MERIDEN : 1032 1044 : CN : PLAINVILLE : 1044 1040 : CN : BERLIN : 1040 1003 : CN : NAUGATUCK : 1003 1032 : CN : MERIDEN : 1032 1015 : CN : PROSPECT : 1015 1032 : CN : MERIDEN : 1032 1937 : CN : MANCHESTER : 1937 1113 : CN : HARTFORD : 1113 1121 : CN : WINDSOR : 1121 1932 : CN : BLOOMFIELD : 1932 1089 : CN : MADISON : 1089 1167 : CN : MARLBOROUGH : 1167 1170 : CN : NORTH STONINGTON : 1170 1161 : CN : GROTON : 1161 1100 : CN : WATERFORD : 1100 1103 : CN : GUILFORD : 1103 1115 : CN : SOUTH WINDSOR : 1115 J27H : CL&P SCITICO ENFIELD : 1112 J36C : CL&P ALBANY WEST HARTFORD : 1943 G01A : CL&P SOUTH MEADOW HARTFORD 1002 : CN : WATERBURY : 1002 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 561 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202211 ($149.81) Emergent Equipment Failures - Line 202211 ($1,996.63) Emergent Equipment Failures - Line 202211 $4,288.47 Emergent Equipment Failures - Line 202211 ($921.75) Emergent Equipment Failures - Line 202211 ($664.79) Emergent Equipment Failures - Line 202211 $627.18 Emergent Equipment Failures - Line 202211 ($710.68) Emergent Equipment Failures - Line 202211 $353.34 Emergent Equipment Failures - Line 202211 ($521.42) Emergent Equipment Failures - Line 202211 ($194.09) Emergent Equipment Failures - Line 202211 $770.35 Emergent Equipment Failures - Line 202211 ($33,004.06) Emergent Equipment Failures - Line 202211 $3,064.99 Emergent Equipment Failures - Line 202211 ($96.17) Emergent Equipment Failures - Line 202211 ($4,427.89) Emergent Equipment Failures - Line 202211 ($5,198.93) Emergent Equipment Failures - Line 202211 $16,527.05 Emergent Equipment Failures - Line 202211 ($317.26) Emergent Equipment Failures - Line 202211 ($3,850.82) 202211 ($1,182.40) Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202211 ($251.49) Emergent Equipment Failures - Line 202211 ($156.62) Emergent Equipment Failures - Line 202211 ($324.16) Emergent Equipment Failures - Line 202211 ($299.50) Emergent Equipment Failures - Line 202211 ($49.87) Emergent Equipment Failures - Line 202211 $3,364.01 Emergent Equipment Failures - Line 202211 ($106.51) Emergent Equipment Failures - Line 202211 ($1,639.49) Emergent Equipment Failures - Line 202211 $555.45 Emergent Equipment Failures - Line 202211 $32,768.46 Emergent Equipment Failures - Line 202211 ($10.11) Emergent Equipment Failures - Line 202211 ($1,959.92) Emergent Equipment Failures - Line 202211 $11.76 Emergent Equipment Failures - Line 202211 ($760.18) Emergent Equipment Failures - Substation 202211 $7.63 Emergent Equipment Failures - Substation 202211 $135.03 Emergent Equipment Failures - Substation 202211 $3,315.82 Emergent Equipment Failures - Substation 202211 $788.21 Emergent Equipment Failures - Substation 202211 $63.73 Emergent Equipment Failures - Line 202211 $565.13
  8. Page 562 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order TMPCPCHE TMPCPDAN TMPCPEHM TMPCPHAR TMPCPHAU TMPCPMAD TMPCPNEW TMPCPNLN TMPCPNOR TMPCPSGI TMPCPSTM TMPCPTOL TMPCPTOR 80004974 80005563 80005679 80006256 80006506 80006565 80006839 80007298 80007300 80007422 80018380 80019935 80019973 80026319 80026832 80033570 80035149 80035280 80035795 80037124 80037861 80038165 80038721 80039112 80039799 80041409 80042460 Accounting Work Order Descript WAM Adjustments WAM Adjustments Danielson 2BC WAM Adjustments East Hampton 2AY WAM Adjustments - Hartford OH WAM Adjustments - Hartford UG WAM Adjustments Madison 2AX WAM Adjustments WAM Adjustments New London 3H2 WAM Adjustments WAM Adjustments WAM Adjustments WAM Adjustments WAM Adjustments P 162 Fort Path Rd, Mad- Rplc Front ICHABOD RD SOUTHBURY POLE-PRIORITY REJECT-INSPECT-CHESTN 36 Brickyard Rd, CL- Shift to P 200 24 TAYLOR RD BETHEL P9714 STILL RD c/o SHELTON RD *JRP - 75 Main St, Southington - re KTI Elec Maint Pole Reject - PRIORI 2020 POLE INSP - POLE #62938 CHESTN Elec Maint Pole Reject - PRIORITY D *ASP 11/17/22 NJB WILLARD ST HTFD R COMPLETED-LOUNSBURY RD OXFORD (MJ Dock Crew) - Remove 10KVA on po Replace priority reject P-607-1/2 JV; WINDHAM ; COMPLETE; ( 725) RD KTI KD-EVENT #4452082/4452050 REPLC BM; 1/21 LUTHER DR SOUTHBURY WRTN--DAN AWC 320 SHETUCKET TPKE VO (AG )WF-1900 DAYHILL RD, WINDSOR-rm 369 GRANBY ST HTFD RPL P#7071 45/2 AJC 44 FRONTIE RD, GRN TT POLE 76 E Rocks 17R Repl Failed Xformer KD-EVENT #4456477 REPLC P 896 OHEHY JK>POLES 1425, 1428--FTR TO REPLACE RL;188 BEDFORD RD, REPLACE POLE/ P# INVALID KTI KD-EVENT #4458825 REPLC MATERIAL MJP/98 Orchard St/GRN/Repl Asset Location WCHSB : CHESHIRE SERVICE BUILDING : CHESHIRE Funding Project ML: Distribution Line - Connecticut Funding Project ML: Distribution Line - Connecticut WHSS : HARTFORD SERVICE CENTER,400-410 SHELDON STREET : HARTFORD WHSS : HARTFORD SERVICE CENTER,400-410 SHELDON STREET : HARTFORD Funding Project ML: Distribution Line - Connecticut WNTSB : NEWTOWN SERVICE BUILDING : NEWTOWN Funding Project ML: Distribution Line - Connecticut WNORSB : NORWALK SERVICE BUILDING : NORWALK NGRCO : GREENWICH SERVICE BUILDING : GREENWICH WSGR : STAMFORD SERVICE CENTER, GLENBROOK RD. : STAMFORD WTSB : TOLLAND SERVICE BUILDING : TOLLAND WTFS : TORRINGTON SERVICE CENTER, FRANKLIN ST. : TORRINGTON 1089 : CN : MADISON : 1089 1018 : CN : SOUTHBURY : 1018 1018 : CN : SOUTHBURY : 1018 1091 : CN : CLINTON : 1091 1007 : CN : BETHEL : 1007 1014 : CN : OXFORD : 1014 1034 : CN : SOUTHINGTON : 1034 1018 : CN : SOUTHBURY : 1018 1014 : CN : OXFORD : 1014 1014 : CN : OXFORD : 1014 1113 : CN : HARTFORD : 1113 1014 : CN : OXFORD : 1014 1030 : CN : CHESHIRE : 1030 1091 : CN : CLINTON : 1091 1180 : CN : WINDHAM : 1180 1012 : CN : MONROE : 1012 1018 : CN : SOUTHBURY : 1018 1178 : CN : VOLUNTOWN : 1178 1121 : CN : WINDSOR : 1121 1113 : CN : HARTFORD : 1113 1065 : CN : GREENWICH : 1065 J17R : CL&P EAST ROCKS NORWALK : 1052 1008 : CN : DANBURY : 1008 1159 : CN : GLASTONBURY : 1159 1065 : CN : GREENWICH : 1065 1054 : CN : RIDGEFIELD : 1054 1065 : CN : GREENWICH : 1065 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 562 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202211 $224,938.00 Emergent Equipment Failures - Line 202211 $78,159.32 Emergent Equipment Failures - Line 202211 ($38,912.44) Emergent Equipment Failures - Line 202211 $217,248.40 Emergent Equipment Failures - Line 202211 ($40,572.72) Emergent Equipment Failures - Line 202211 $51,825.20 Emergent Equipment Failures - Line 202211 $202,176.95 Emergent Equipment Failures - Line 202211 $128,402.53 Emergent Equipment Failures - Line 202211 $45,800.17 Emergent Equipment Failures - Line 202211 $50,000.00 Emergent Equipment Failures - Line 202211 $82,885.73 Emergent Equipment Failures - Line 202211 $105,592.59 Emergent Equipment Failures - Line 202211 ($97,610.46) Emergent Equipment Failures - Line 202212 $12.15 Emergent Equipment Failures - Line 202212 $99.49 Emergent Equipment Failures - Line 202212 $78.05 Emergent Equipment Failures - Line 202212 $82.72 Emergent Equipment Failures - Line 202212 $67.23 Emergent Equipment Failures - Line 202212 $78.05 202212 $1,411.20 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 ($178.37) Emergent Equipment Failures - Line 202212 $84.31 Emergent Equipment Failures - Line 202212 $78.05 Emergent Equipment Failures - Line 202212 $147.02 Emergent Equipment Failures - Line 202212 $78.05 Emergent Equipment Failures - Line 202212 $27.03 Emergent Equipment Failures - Line 202212 $98.27 Emergent Equipment Failures - Line 202212 $93.76 Emergent Equipment Failures - Line 202212 $2,480.57 Emergent Equipment Failures - Line 202212 $84.31 Emergent Equipment Failures - Line 202212 $104.40 Emergent Equipment Failures - Line 202212 $11,587.12 Emergent Equipment Failures - Line 202212 $98.88 Emergent Equipment Failures - Line 202212 $81.16 Emergent Equipment Failures - Substation 202212 $2,959.83 Emergent Equipment Failures - Line 202212 $84.58 Emergent Equipment Failures - Line 202212 $606.20 Emergent Equipment Failures - Line 202212 $81.16 Emergent Equipment Failures - Line 202212 $193.48 Emergent Equipment Failures - Line 202212 ($8,137.52)
  9. Page 563 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80043875 80044094 80044434 80044872 80045723 80046424 80047885 80048434 80048453 80048456 80048460 80050045 80050628 80051192 80051372 80051393 80052485 80053408 80053894 80053916 80055699 80056011 80056251 80056591 80058856 80058968 80059347 80059636 80059919 80060574 80061015 80063031 80063775 80065770 80066884 80066895 80066916 80067303 80067462 80069002 Accounting Work Order Descript TL - ROGERS LAKE TRL, OLD LYME // S EB; WOODLAND RD, EAST HADDAM REPLAC MR- ALL WORK COMPLETE RSO 11/06 COL MR; ***ALL WORK COMPLETED***EAST HA P-3921 shift to FTR 40/2 after set. P-380 replace priority reject with DL; 3/03 CLOVER HILL DR, STAMFORD/R MATERIAL PRIORITY REJECT 2021 POLE MATERIAL PRIORITY REJECT 2021 POLE MATERIAL PRIORITY REJECT 2021 POLE MATERIAL PRIORITY REJECT 2021 POLE 03/10 htfd forest st replace 1875 WBY-BM; 3/11/21 S FLAT HILL ( 474) KD-EVENT #4481547/4481682 TURNOVER KD-EVENT#4480382 REPLC P 2132 PLEAS MPB; 3/13 - Redding, Sanfordtown Rd 3/14 - Simsbury, Hildurcrest - Fron 03/19 manchester,50 victoria rd po (FIX AS-BUILT & SKETCH) LD EMERGENT RC; 3/19/21 GAYLORDSVILLE RD SHERMA Priority Reject Pole - Pole 1 - Coa RL:260 RIVERSVILLE RD: Replaced HH6 CR-RIVERSIDE RD. SIMS, P# 1814B, RE CR-146 MALLARD DR AVON, PAD 1109, R JSG - 60H DEER HILL RD COLEBROOK RC REPLACE 4 POLES. 04/02/21--HHQ2 (LAWN BOX)--FIXED DB 4/2 ; 32 TURKEY HILL RD S, WESTPORT Yellow Tag Y-24932-2021 Fill Gap on KD-EVENT #4499442 SHIFT P A156 RL; 4/7: 728 LAKE AVE, GRN: REPLACE JMS- 03/20 SOUTH ST WEST HARTFORD P Mansfield 12J-Replace 12J-2X High S P-4399 shift to FTR 40/2 and replac CR-SECRET LAKE RD. AVON, P# 3421, P CR-PARK RD. AVON, P# 3240, PRIORITY CR-SMITH RD. AVON, P# 2163, PRIORIT LD EMERGENT ROW#058 RPL POLE P#6863 MATERIAL 4/25 - Brookfield, Homeste DG P#890 THOMPSON RD, THOMPSON CLP Asset Location 1092 : CN : EAST LYME : 1092 1156 : CN : EAST HADDAM : 1156 1154 : CN : COLUMBIA : 1154 1156 : CN : EAST HADDAM : 1156 1103 : CN : GUILFORD : 1103 1098 : CN : OLD SAYBROOK : 1098 1066 : CN : STAMFORD : 1066 1018 : CN : SOUTHBURY : 1018 1014 : CN : OXFORD : 1014 1014 : CN : OXFORD : 1014 1014 : CN : OXFORD : 1014 1113 : CN : HARTFORD : 1113 1018 : CN : SOUTHBURY : 1018 1054 : CN : RIDGEFIELD : 1054 1135 : CN : NEW MILFORD : 1135 1053 : CN : REDDING : 1053 1942 : CN : SIMSBURY : 1942 1937 : CN : MANCHESTER : 1937 1052 : CN : NORWALK : 1052 1138 : CN : SHERMAN : 1138 1043 : CN : NEWINGTON : 1043 1065 : CN : GREENWICH : 1065 1942 : CN : SIMSBURY : 1942 1931 : CN : AVON : 1931 1192 : CN : COLEBROOK : 1192 1135 : CN : NEW MILFORD : 1135 1159 : CN : GLASTONBURY : 1159 1056 : CN : WESTPORT : 1056 1079 : CN : KILLINGLY : 1079 1135 : CN : NEW MILFORD : 1135 1065 : CN : GREENWICH : 1065 1943 : CN : WEST HARTFORD : 1943 J12J : CL&P MANSFIELD MANSFIELD : 1166 1103 : CN : GUILFORD : 1103 1931 : CN : AVON : 1931 1931 : CN : AVON : 1931 1931 : CN : AVON : 1931 1056 : CN : WESTPORT : 1056 1131 : CN : BROOKFIELD : 1131 1084 : CN : THOMPSON : 1084 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 563 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202212 $302.95 Emergent Equipment Failures - Line 202212 $78.72 Emergent Equipment Failures - Line 202212 $712.20 Emergent Equipment Failures - Line 202212 $712.20 Emergent Equipment Failures - Line 202212 $2,571.90 Emergent Equipment Failures - Line 202212 $98.27 Emergent Equipment Failures - Line 202212 $4,837.14 Emergent Equipment Failures - Line 202212 $99.49 Emergent Equipment Failures - Line 202212 $67.23 Emergent Equipment Failures - Line 202212 $5.72 Emergent Equipment Failures - Line 202212 $67.23 Emergent Equipment Failures - Line 202212 $792.70 Emergent Equipment Failures - Line 202212 $883.01 Emergent Equipment Failures - Line 202212 $99.49 Emergent Equipment Failures - Line 202212 $84.31 Emergent Equipment Failures - Line 202212 $99.49 Emergent Equipment Failures - Line 202212 $148.88 Emergent Equipment Failures - Line 202212 $74.45 Emergent Equipment Failures - Line 202212 $7.02 202212 $120.93 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 $1,271.58 Emergent Equipment Failures - Line 202212 $80.16 Emergent Equipment Failures - Line 202212 $98.88 Emergent Equipment Failures - Line 202212 ($28.57) Emergent Equipment Failures - Line 202212 $14.68 Emergent Equipment Failures - Line 202212 $312.20 Emergent Equipment Failures - Line 202212 $50.36 Emergent Equipment Failures - Line 202212 $11.83 Emergent Equipment Failures - Line 202212 $785.97 Emergent Equipment Failures - Line 202212 $78.05 Emergent Equipment Failures - Line 202212 $62.08 Emergent Equipment Failures - Line 202212 $155.91 Emergent Equipment Failures - Substation 202212 $46.99 Emergent Equipment Failures - Line 202212 $6,586.63 Emergent Equipment Failures - Line 202212 $74.45 Emergent Equipment Failures - Line 202212 $74.45 Emergent Equipment Failures - Line 202212 $74.45 Emergent Equipment Failures - Line 202212 $184.56 Emergent Equipment Failures - Line 202212 $844.98 Emergent Equipment Failures - Line 202212 $92.02
  10. Page 564 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80069150 80069174 80070683 80071751 80072082 80072199 80072495 80072718 80074658 80075780 80076168 80077451 80078448 80080219 80081031 80081126 80082603 80084841 80086155 80086605 80087243 80087518 80087531 80088605 80088769 80088850 80089115 80089266 80089299 80089790 80090920 80091558 80092464 80092511 80092581 80093317 80093525 80094038 80094056 80096052 Accounting Work Order Descript APPRENTICES OLD LITCHFIELD ( 253) KD-EVENT #4508440 REPLC BACKYARD SE MR: 5/3 COMPLETE; BELL ( 301) ST FREEMAN RD OXFORD PR 7/7 CP- 115 Indian Hill rd Canto MPB; 47 GREAT PASTURE RD, REDDING EB; EAST HADDAM, SMITH, 74, CRAIG C (MJ Dock Crew) EVENT #4499027 P 151 (MJ Dock Work) - Replc bad Pole/Fac MV - REMAINING WORK ROTTED/SPLIT PO ALL WORK COMPLETE 5/19/2021 CHECK P PR 7/7 CP-292 Locust Rd Harwinton, East Bantam 19U-Rebuild 19U-1X LTC KD-EVENT #4524578/4525220 TURNOVER TT TC 77 VAN RENSSELAER AVE, STM; R TC 68 ALEXANDRA DR, STM; P#12994 RE (MJ Dock Crew) EVENT #4528062 REPL 6/11 HICKORY HILL RD BRANFORD MR; ***ALL WORK COMPLETED***6/9/21 TT TC 56 HAVILAND RD, STM / TREE VS OMS-REPAIRS/OBSOLESCENCE OH (AROH)MJP / 627 Newfield Ave / Shit Facil KTI MPB; 18 FLEETWOOD AVE, BETHEL FTR pole JFC - 5/29 ROSSI RD, TORRI ***MJP / 249 Valley Rd / GRN / 16Q1 P-43775 shift to ftr 40/2 and repla Hanover 12F- Install Platforms MPB; 74 PORTLAND AVE, REDDING -- FT (E) SVC JTR, 1 CRESTVIEW RD, Simsbu TO STORES 2/15/23--RIVER RD, KILLIN (MJ Dock Work) Reconductor Svc/Repl MR;***WRITTEN***ALL WORK COMPLETED* 63MX Mobile XF-Replace Failed LTC C COPIED FROM WO#5443556 Make repairs COPIED FROM WO# 4895888 Replace bro 07/05 RUTH AVE GRISWOLD - POLE 1069 EB; 7/6 SMITH RD EAST HADDAM 7/8/21 44 PINE ROCK RD SOUTHBURY RD 7/7/21 WHEATON RD NEW MILFORD HTFD, 34 Otis Street - replace pole Asset Location 1140 : CN : WASHINGTON : 1140 1054 : CN : RIDGEFIELD : 1054 1033 : CN : MIDDLETOWN : 1033 1014 : CN : OXFORD : 1014 1933 : CN : CANTON : 1933 1053 : CN : REDDING : 1053 1156 : CN : EAST HADDAM : 1156 1006 : CN : BETHANY : 1006 1003 : CN : NAUGATUCK : 1003 1174 : CN : SALEM : 1174 1095 : CN : KILLINGWORTH : 1095 1405 : CN : HARWINTON : 1405 J19U : CL&P EAST BANTAM LITCHFIELD : 1406 1054 : CN : RIDGEFIELD : 1054 1066 : CN : STAMFORD : 1066 1066 : CN : STAMFORD : 1066 1006 : CN : BETHANY : 1006 1102 : CN : BRANFORD : 1102 1033 : CN : MIDDLETOWN : 1033 1066 : CN : STAMFORD : 1066 1102 : CN : BRANFORD : 1102 1066 : CN : STAMFORD : 1066 1007 : CN : BETHEL : 1007 1194 : CN : TORRINGTON : 1194 1065 : CN : GREENWICH : 1065 1102 : CN : BRANFORD : 1102 J12F : CL&P HANOVER STREET MERIDEN : 1032 1053 : CN : REDDING : 1053 1942 : CN : SIMSBURY : 1942 1095 : CN : KILLINGWORTH : 1095 1015 : CN : PROSPECT : 1015 1180 : CN : WINDHAM : 1180 J17E : CL&P MOBILE 17E (56902) : 1999 1103 : CN : GUILFORD : 1103 1102 : CN : BRANFORD : 1102 1160 : CN : GRISWOLD : 1160 1156 : CN : EAST HADDAM : 1156 1018 : CN : SOUTHBURY : 1018 1135 : CN : NEW MILFORD : 1135 1113 : CN : HARTFORD : 1113 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 564 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202212 $67.23 Emergent Equipment Failures - Line 202212 $52.61 Emergent Equipment Failures - Line 202212 $78.72 Emergent Equipment Failures - Line 202212 $72.78 Emergent Equipment Failures - Line 202212 $63.82 Emergent Equipment Failures - Line 202212 $25.39 Emergent Equipment Failures - Line 202212 ($14.31) Emergent Equipment Failures - Line 202212 $63.42 Emergent Equipment Failures - Line 202212 $63.04 Emergent Equipment Failures - Line 202212 $262.55 Emergent Equipment Failures - Line 202212 $82.72 Emergent Equipment Failures - Line 202212 $570.16 Emergent Equipment Failures - Substation 202212 $20,360.93 Emergent Equipment Failures - Line 202212 $84.31 Emergent Equipment Failures - Line 202212 $78.95 Emergent Equipment Failures - Line 202212 $78.95 Emergent Equipment Failures - Line 202212 $226.07 Emergent Equipment Failures - Line 202212 $46.01 Emergent Equipment Failures - Line 202212 ($32.88) 202212 $62.08 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 ($300.63) Emergent Equipment Failures - Line 202212 ($175.73) Emergent Equipment Failures - Line 202212 $7,381.05 Emergent Equipment Failures - Line 202212 $1,092.96 Emergent Equipment Failures - Line 202212 $1,601.16 Emergent Equipment Failures - Line 202212 $5.92 Emergent Equipment Failures - Substation 202212 $137.64 Emergent Equipment Failures - Line 202212 $84.31 Emergent Equipment Failures - Line 202212 $33.75 Emergent Equipment Failures - Line 202212 $8,202.92 Emergent Equipment Failures - Line 202212 $164.54 Emergent Equipment Failures - Line 202212 $78.72 Emergent Equipment Failures - Substation 202212 $113.50 Emergent Equipment Failures - Line 202212 $9.53 Emergent Equipment Failures - Line 202212 $140.31 Emergent Equipment Failures - Line 202212 $101.83 Emergent Equipment Failures - Line 202212 $712.20 Emergent Equipment Failures - Line 202212 $78.05 Emergent Equipment Failures - Line 202212 $67.23 Emergent Equipment Failures - Line 202212 $74.45
Words on different pages

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)