Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 782

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages
Words on different pages
  1. Page 569 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80165976 80166853 80166883 80166904 80166986 80167761 80168399 80168449 80171045 80171098 80171963 80172187 80172258 80172288 80175592 80176352 80176356 80177446 80177448 80177458 80177586 80177871 80178349 80178564 80178599 80178666 80178697 80178826 80179186 80179397 80179831 80180214 80180359 80180624 80180896 80181135 80181144 80181436 80181645 80181710 Accounting Work Order Descript RSO--01/30/22--JK>P-775--REPLCD 3PH Jpt-24 Inwood Ln Bristol Pad 287 JFC - 01.29.22 - 375 WESTSIDE LN, T VJT - MEADOW ( 37) ST -- 297, THO VJT - 7 LAKE PLYMOUTH BLVD PLYMOUTH Frybrook 13B-Replace Failed ATS. 02/05 HIGHLAND ST EAST HARTFORD 7/18 WAITING ON FRONTIER POLE IN DR JSG - CENTER ( 241) ST -- 4166, WES (*)RH--2/14/22--35 New Rd---Replace DG P#1182 RIVER RD PUTNAM RPLC'D 10 MJ 2/28 - JAM - 2 MAIN ST, MERIDEN 7/13/22 ON HOLD MR; ***WRITTEN***BR * KD-EVENT #4703329 REPLC P 3024, U Norwalk 9S-Replace #2-SWGR Battery. CANCEL TC 129 FAIRFIELD AVE, STM; I MATERIAL JS; 8/25/21 133 HOLMES RD Berlin 6A- Septic System 23KV Distr JES; 430 Nod HIll Road, Wilton; RPL Berlin 6A- Septic System 115KV Dist HEL CHARLES RD SEYMOUR MJ YT Jpt-333 East St Plainville (F MJ-JAM - 24 Tanglewood Rd Farmingto * MAR - Per RSO - Replace HH and 35 HEL KD-SHIFT P F7001 TILQUIST (7) R MJP / 107 Bruce Park Ave / GRN / In REPLACE POLES, OPEN WIRE SECONDARY, (E)KD - AVON, 4 HICKORY HILL RD - R done PR 8/30 JFC - KENT (78) RD -VJT - 16 MOUNT FAIR DR WATERTOWN KTI RC REPLACE POLE 1535 APPRENTICES KD-EVENT #4716513 REPLC JSG - N MAIN ST, THOMASTON CT P#27 REPLACE 5 POLES, 2 TRANSFORMERS, AN LD Prospect St Ridgefield VLT#9 RP (ASP)NEW RD AVON POLE# 906 (ASP)BURNSIDE AVE EAST HARTFORD Southington 4C-115KV Control House MR; ***WRITTEN***REPLACE H FRAME #3 HEL: KTI 3/16/22 330 BERKSHIRE RD Asset Location 1159 : CN : GLASTONBURY : 1159 1070 : CN : BRISTOL : 1070 1194 : CN : TORRINGTON : 1194 1019 : CN : THOMASTON : 1019 1071 : CN : PLYMOUTH : 1071 J13B : CL&P FRY BROOK PLAINFIELD : 1080 1934 : CN : EAST HARTFORD : 1934 1133 : CN : KENT : 1133 1193 : CN : HARTLAND : 1193 1941 : CN : ROCKY HILL : 1941 1082 : CN : PUTNAM : 1082 1032 : CN : MERIDEN : 1032 1033 : CN : MIDDLETOWN : 1033 1042 : CN : NEW BRITAIN : 1042 G09S : CL&P NORWALK NORWALK 1066 : CN : STAMFORD : 1066 1054 : CN : RIDGEFIELD : 1054 G06A : CL&P BERLIN BERLIN 1057 : CN : WILTON : 1057 G06A : CL&P BERLIN BERLIN 1016 : CN : SEYMOUR : 1016 1044 : CN : PLAINVILLE : 1044 1041 : CN : FARMINGTON : 1041 1032 : CN : MERIDEN : 1032 1014 : CN : OXFORD : 1014 1065 : CN : GREENWICH : 1065 1098 : CN : OLD SAYBROOK : 1098 1931 : CN : AVON : 1931 1132 : CN : CORNWALL : 1132 1004 : CN : WATERTOWN : 1004 1135 : CN : NEW MILFORD : 1135 1054 : CN : RIDGEFIELD : 1054 1019 : CN : THOMASTON : 1019 1101 : CN : WESTBROOK : 1101 1054 : CN : RIDGEFIELD : 1054 1931 : CN : AVON : 1931 1934 : CN : EAST HARTFORD : 1934 G04C : CL&P SOUTHINGTON SOUTHINGTON 1153 : CN : COLCHESTER : 1153 1013 : CN : NEWTOWN : 1013 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 569 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202212 $16.09 Emergent Equipment Failures - Line 202212 $1,843.12 Emergent Equipment Failures - Line 202212 $623.29 Emergent Equipment Failures - Line 202212 $9.03 Emergent Equipment Failures - Line 202212 $11.99 Emergent Equipment Failures - Substation 202212 $433.11 Emergent Equipment Failures - Line 202212 $16.62 Emergent Equipment Failures - Line 202212 ($3,774.23) Emergent Equipment Failures - Line 202212 $31.53 Emergent Equipment Failures - Line 202212 $48.63 Emergent Equipment Failures - Line 202212 $35.67 Emergent Equipment Failures - Line 202212 $792.36 Emergent Equipment Failures - Line 202212 $36.47 Emergent Equipment Failures - Line 202212 $3.26 Emergent Equipment Failures - Substation 202212 $41.42 Emergent Equipment Failures - Line 202212 $73.98 Emergent Equipment Failures - Line 202212 $71.39 Emergent Equipment Failures - Substation 202212 $7.73 Emergent Equipment Failures - Line 202212 $4.57 202212 $209.59 Emergent Equipment Failures - Substation Emergent Equipment Failures - Line 202212 $1,361.98 Emergent Equipment Failures - Line 202212 $258.74 Emergent Equipment Failures - Line 202212 $4.72 Emergent Equipment Failures - Line 202212 $2,125.36 Emergent Equipment Failures - Line 202212 $680.57 Emergent Equipment Failures - Line 202212 $205.79 Emergent Equipment Failures - Line 202212 $0.02 Emergent Equipment Failures - Line 202212 $2,464.02 Emergent Equipment Failures - Line 202212 $3,628.23 Emergent Equipment Failures - Line 202212 ($2,784.85) Emergent Equipment Failures - Line 202212 $3,326.55 Emergent Equipment Failures - Line 202212 $175.12 Emergent Equipment Failures - Line 202212 ($1,238.26) Emergent Equipment Failures - Line 202212 $33.32 Emergent Equipment Failures - Line 202212 $8,069.35 Emergent Equipment Failures - Line 202212 $4.57 Emergent Equipment Failures - Line 202212 $2,097.67 Emergent Equipment Failures - Substation 202212 $458.36 Emergent Equipment Failures - Line 202212 $2,359.21 Emergent Equipment Failures - Line 202212 $22.25
  2. Page 570 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80182194 80182233 80182462 80182655 80182895 80182906 80182973 80183019 80183644 80184287 80184595 80186187 80187026 80195039 80205612 80206957 80209557 80210826 80210839 80217526 80217576 80217975 80220121 80222320 80222400 80222503 80223897 80223999 80224150 80224998 80225097 80225317 80225368 80226047 80226659 80226663 80226694 80227405 80227441 80227529 Accounting Work Order Descript JTR, 593 Pondview Dr, Cromwell, rp MF - 3/16 QUARRY (6) RD MYSTIC JTR, 205 GARDEN ST, HARTFORD - REPL Brooklyn 30Y-Replace Failed 1X LTC MM yellow tag Cap Bank p#73 Day St ALL WORK COMPLETE 3/19 GATES WAY HA UG ALBANY AVE & BLUE HILLS AVE SWIT TO STORES 4/6/23--WRITTEN CREEK ( 3 COMP (ASP) JMS-WEST HARTFORD NORTH Peaceable 12N-Replace Failed MFM/8F 7/3/21 469 RUBBER AVE, NAUGATUCK REPLACE CUTOUT FOR TAP, FUSE TRANSF Todd 30L-Replace 30L-91T-2 Breaker * 03.25.22 - 148 FARMINGTON AVE, BE 3/29: 103 LLEWELLYN DR, NEW CANAAN/ WBY-WQ-OLD ROXBURY RD. RXBY-REMOVE ASP BWG- Rehab pole line structure TURNOVER MENDINGWALL ( 45) CIR LO JTR, 1003 FARMINGTON AVE WEST HART, MJP / 90 Harding Rd / GRN / Relocat 4/4/22 KTI 166 MAPLE TREE HILL RD MF 4/3 REPLACE BLOWN ARRESTERS WATE BURRITT ( 150) ST UNIT 1A -- UG, P WRITTEN 62::NEW LONDON:RD::COLCHEST Branford, 3 s montowese st/relocate Forestville 12A-Replace Failed12A-1 CO 08/03 E HTFD, 33 CHIPPER DR - HH LD 79 DEER RUN RD WILTON RPL DB SVC HEL KTI BM; 4/11/22 NEW LEBBON ( APPRENTICES BM; Southbury, Strongto COMP JMS- 26 MOHEGAN DR, WEST HARTF PAD 321--REPLACE PAD XF W/167 KVA P 130 NUTMEG LN EAST HARTFORD, Replac Follow-up xfmr replace 4/12 (RSO PA JSG - BUNNELL ST, COLEBROOK CT INVALID 4/14/22 TAYLOR () ST DANBU (CO 5/26) RH 52 CORNCRIB LN -- U?, MJ-MAR - Replace Leaking 50KVA Pad Weston 21M-Replace 21M1-2 Breaker Prospect 22E-Replace 22E36-5 Switch Asset Location 1031 : CN : CROMWELL : 1031 1177 : CN : STONINGTON : 1177 1113 : CN : HARTFORD : 1113 J30Y : CL&P BROOKLYN SUBSTATION BROOKLYN : 1075 1075 : CN : BROOKLYN : 1075 1094 : CN : HADDAM : 1094 1113 : CN : HARTFORD : 1113 1156 : CN : EAST HADDAM : 1156 1943 : CN : WEST HARTFORD : 1943 J12N : CL&P PEACEABLE STREET REDDING : 1053 1003 : CN : NAUGATUCK : 1003 1102 : CN : BRANFORD : 1102 J30L : CL&P TODD RD SUBSTATION WOLCOTT : 1002 1040 : CN : BERLIN : 1040 1051 : CN : NEW CANAAN : 1051 1136 : CN : ROXBURY : 1136 1121 : CN : WINDSOR : 1121 1089 : CN : MADISON : 1089 1943 : CN : WEST HARTFORD : 1943 1065 : CN : GREENWICH : 1065 1014 : CN : OXFORD : 1014 1177 : CN : STONINGTON : 1177 1034 : CN : SOUTHINGTON : 1034 1153 : CN : COLCHESTER : 1153 1102 : CN : BRANFORD : 1102 J12A : CL&P FORESTVILLE BRISTOL : 1070 1934 : CN : EAST HARTFORD : 1934 1057 : CN : WILTON : 1057 1013 : CN : NEWTOWN : 1013 1018 : CN : SOUTHBURY : 1018 1943 : CN : WEST HARTFORD : 1943 1103 : CN : GUILFORD : 1103 1934 : CN : EAST HARTFORD : 1934 1091 : CN : CLINTON : 1091 1192 : CN : COLEBROOK : 1192 1008 : CN : DANBURY : 1008 1941 : CN : ROCKY HILL : 1941 1030 : CN : CHESHIRE : 1030 J21M : CL&P WESTON WESTON : 1055 J22E : CL&P PROSPECT STREET GREENWICH : 1065 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 570 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202212 $43.42 Emergent Equipment Failures - Line 202212 ($112.48) Emergent Equipment Failures - Line 202212 $7.90 Emergent Equipment Failures - Substation 202212 $41,396.69 Emergent Equipment Failures - Line 202212 $2,147.95 Emergent Equipment Failures - Line 202212 ($7,768.81) Emergent Equipment Failures - Line 202212 $254.49 Emergent Equipment Failures - Line 202212 ($27.64) Emergent Equipment Failures - Line 202212 $50.29 Emergent Equipment Failures - Substation 202212 $4.95 Emergent Equipment Failures - Line 202212 $24.20 Emergent Equipment Failures - Line 202212 $88.47 Emergent Equipment Failures - Substation 202212 $1,979.21 Emergent Equipment Failures - Line 202212 $8.60 Emergent Equipment Failures - Line 202212 $181.00 Emergent Equipment Failures - Line 202212 $521.68 Emergent Equipment Failures - Line 202212 $52,659.94 Emergent Equipment Failures - Line 202212 $21.46 Emergent Equipment Failures - Line 202212 $216.66 202212 $18,230.82 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 $0.08 Emergent Equipment Failures - Line 202212 $27.10 Emergent Equipment Failures - Line 202212 $43.47 Emergent Equipment Failures - Line 202212 $14,037.81 Emergent Equipment Failures - Line 202212 $1.26 Emergent Equipment Failures - Substation 202212 $3,452.88 Emergent Equipment Failures - Line 202212 $15.32 Emergent Equipment Failures - Line 202212 $420.10 Emergent Equipment Failures - Line 202212 $84.31 Emergent Equipment Failures - Line 202212 $84.31 Emergent Equipment Failures - Line 202212 $44.85 Emergent Equipment Failures - Line 202212 $717.20 Emergent Equipment Failures - Line 202212 $383.00 Emergent Equipment Failures - Line 202212 $560.34 Emergent Equipment Failures - Line 202212 $5.24 Emergent Equipment Failures - Line 202212 ($1,381.59) Emergent Equipment Failures - Line 202212 $11.87 Emergent Equipment Failures - Line 202212 $2,397.33 Emergent Equipment Failures - Substation 202212 $4,675.58 Emergent Equipment Failures - Substation 202212 $4,550.69
  3. Page 571 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80227583 80228547 80229218 80229239 80229899 80229902 80230566 80230693 80230960 80230963 80231196 80231350 80232394 80232537 80233087 80233116 80233137 80233144 80234470 80235424 80236575 80237094 80237106 80237316 80237414 80237775 80238659 80238754 80238757 80239121 80239133 80240299 80240347 80240460 80240519 80240549 80241161 80241189 80241294 80241297 Accounting Work Order Descript Asplundh - Yellow Tag Y-26466-2022 AVON, 3 GARNET HILL LN - REPL ST LG Priority Pole P#1275 Sunset Lane Cl KTI BM; 4/19/22 WILLS ( 3) RD P-2393 REPLACE REGULATOR Yellow Tag 4/19/22 (RSO TUCKER) HORSE POND RD DG P#624 KOZEY RD EASTFORD FRNTR PO Noera 13H-Replace Control House Lig MATERIAL MJP / 504 North St / GRN MATERIAL MJP/75 Mansfield Ave / DRN P#337 BUSHY HILL RD DEEP RIVER PRIO TL - LONG COVE RD, REF. #961+#906 G MATERIAL HOSPICE WATER ISSUE MILEST MATERIAL 51 RICHMOND HILL RD, NEW C print 9/27 JSG/Warren--Lake Rd. 31C PRINT 9/27 JSG/Winchester--Winchest mj-JRP - Scott Rd PROSPECT Cut & Ki PRINTED--04/25 RED OAK ( 82) DR Priority Pole P#342-S REPLACE WITH ASP-MCB - 1636 Highland Ave Waterbu LD 4/29: 292 BRISCOE RD, NEW CANAAN 5/2/22 (RSO-LEACH) LANPHIERS COVE ( MM 478 Hartford Tnpke P# 759 REPLAC SIGOURNEY ST HARTFORD -2N08 FAULT. Replace Priority Pole P#1501 replac Rep 100kVA pad-5/3/22 (RSO-LEACH) E Priority Pole P#2134 replace with 4 MV 5/5 LINCOLN PARK RD PRESTON TURN DONE 5/23 EVW - 127 South Rd, Winst Followup work to replac P#7 -5/5 S KTI 5/6/22 RIMMON HILL RD, BEACON 05/05 *TURNOVER* LAKE ( 245) ST -MR;***WRITTEN***REPLACE REGULATORS Followup 4/29 5TH ( 10) ST -- L*05.06.22 - 26 MAPLE LN, WOLCOTT. 5/8/22 FOLLOWUP REPLC SRV (RSO-STRO APPRENTICES 5/10/22 CALHOUN ( 2 MRP - Emergent - Cap Bank Replaceme Replace Priority Pole P#2016 with 4 MRP - Emergent - Cap Bank Replaceme Asset Location 1112 : CN : ENFIELD : 1112 1931 : CN : AVON : 1931 1091 : CN : CLINTON : 1091 1013 : CN : NEWTOWN : 1013 1094 : CN : HADDAM : 1094 1089 : CN : MADISON : 1089 1077 : CN : EASTFORD : 1077 J13H : CL&P NOERA STREET WATERBURY : 1002 1065 : CN : GREENWICH : 1065 1908 : CN : DARIEN : 1908 1089 : CN : MADISON : 1089 1164 : CN : LEDYARD : 1164 1008 : CN : DANBURY : 1008 1051 : CN : NEW CANAAN : 1051 1139 : CN : WARREN : 1139 1195 : CN : WINCHESTER : 1195 1015 : CN : PROSPECT : 1015 1080 : CN : PLAINFIELD : 1080 1098 : CN : OLD SAYBROOK : 1098 1002 : CN : WATERBURY : 1002 1051 : CN : NEW CANAAN : 1051 1102 : CN : BRANFORD : 1102 1078 : CN : HAMPTON : 1078 1113 : CN : HARTFORD : 1113 1098 : CN : OLD SAYBROOK : 1098 1102 : CN : BRANFORD : 1102 1091 : CN : CLINTON : 1091 1173 : CN : PRESTON : 1173 1195 : CN : WINCHESTER : 1195 1098 : CN : OLD SAYBROOK : 1098 1005 : CN : BEACON FALLS : 1005 1080 : CN : PLAINFIELD : 1080 1033 : CN : MIDDLETOWN : 1033 1089 : CN : MADISON : 1089 1020 : CN : WOLCOTT : 1020 1101 : CN : WESTBROOK : 1101 1140 : CN : WASHINGTON : 1140 1070 : CN : BRISTOL : 1070 1091 : CN : CLINTON : 1091 1044 : CN : PLAINVILLE : 1044 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 571 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202212 $87.98 Emergent Equipment Failures - Line 202212 $132.02 Emergent Equipment Failures - Line 202212 $65.45 Emergent Equipment Failures - Line 202212 $4,485.47 Emergent Equipment Failures - Line 202212 $434.33 Emergent Equipment Failures - Line 202212 $282.37 Emergent Equipment Failures - Line 202212 $5.57 Emergent Equipment Failures - Substation 202212 $600.49 Emergent Equipment Failures - Line 202212 $4,458.18 Emergent Equipment Failures - Line 202212 $4,458.18 Emergent Equipment Failures - Line 202212 $65.45 Emergent Equipment Failures - Line 202212 $0.01 Emergent Equipment Failures - Line 202212 $685.32 Emergent Equipment Failures - Line 202212 $3,145.64 Emergent Equipment Failures - Line 202212 ($70,240.74) Emergent Equipment Failures - Line 202212 ($101,968.93) Emergent Equipment Failures - Line 202212 $2,747.83 Emergent Equipment Failures - Line 202212 ($110.70) Emergent Equipment Failures - Line 202212 ($138.93) 202212 ($1,222.28) Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 $55.96 Emergent Equipment Failures - Line 202212 $0.75 Emergent Equipment Failures - Line 202212 $67.05 Emergent Equipment Failures - Line 202212 $1,000.68 Emergent Equipment Failures - Line 202212 $65.45 Emergent Equipment Failures - Line 202212 $0.51 Emergent Equipment Failures - Line 202212 $82.72 Emergent Equipment Failures - Line 202212 $93.83 Emergent Equipment Failures - Line 202212 ($82.55) Emergent Equipment Failures - Line 202212 $4.72 Emergent Equipment Failures - Line 202212 $99.49 Emergent Equipment Failures - Line 202212 $85.00 Emergent Equipment Failures - Line 202212 $0.28 Emergent Equipment Failures - Line 202212 $292.97 Emergent Equipment Failures - Line 202212 $14.82 Emergent Equipment Failures - Line 202212 $12.69 Emergent Equipment Failures - Line 202212 $31.43 Emergent Equipment Failures - Line 202212 $520.62 Emergent Equipment Failures - Line 202212 $82.72 Emergent Equipment Failures - Line 202212 $572.63
  4. Page 572 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80241361 80241560 80241572 80241655 80242113 80242134 80243608 80243899 80245767 80245822 80246192 80246832 80247319 80249153 80249325 80249519 80250171 80250186 80251019 80251127 80251575 80251762 80252152 80252199 80252458 80253614 80254374 80254463 80254788 80255249 80255359 80255398 80255598 80255602 80255604 80255615 80255914 80256286 80257045 80257180 Accounting Work Order Descript MJ 49S2 Circuit based WO-Tolland COMP CCC 11/17/22 - STLT 04.19.22 RIGGS 5/23 WRM - 408 Glen St, New B PRINTED 8/30 CRP - PLYMOUTH ( 526) NEW GC 5/10 RIVER ( 430) RD -- 43 TT TC 62 ELMCROFT RD, STM: P#4928S H&M only - BRANDY WINE ( 8) LN 05-13-2022 Pole 319 Woodward Rd Col PR 6/1 JSG/Burlington--Milford St. TT - NM;5/12: NORTHWOOD LN, STAMFOR DG P#119 21 CENTER ST PUTNAM CLP TO JES; AIKEN ST. NORWALK; ROLLING RID DG P#1253/2372-1/2 LABBY RD THOMPSO BRANFORD, 37 ISLAND VIEW AVE/REPLAC Lakeview 31A-Replace Failed Breaker Bokum 15L-Replace Failed 26T/2X Rel Berlin 6A-Rebuild Failed 6A-1X LTC Windsor Locks 14K-Rplc 14K-3X LTC C AMM COPPERMINE RD FARMINGTON. REPLA JFC - LITCHFIELD PONDS DR-- SE, LIT wait for cust MDB - LAUREL MOUNTAIN Helpers to Do - 05.23.22 / Y-26620AldenOne -PCC - 05/23 TO ENG 100 SO PR 10/3 JFC - SUNCREST( 70) CT -- P East Meriden 21P - Pole work for Mo SC-P#2719 WATER ST GUILFORD INST/RM MR;***ALL WORK COMPLETED*** CCC 5/1 *CHARTER OAK * 05.27.22 - 50 CYNRO (See Notes Below), KD-PAINT RUSTED (E)KD-REBUILD RISER P 1279, WEST ST TO STORES 2/2-- Deep River-Replace Asplundh - TALLWOOD DR, VERNON - RE P#31 Richard St, Newington P#42 Richard St, Newington P#6339 Fenn Rd, Newington P#3654 Fenn Rd, Newington MM broken ES pole #564 Bennett Pond Waterside 22M - Refurbish cubicle a PD-139 N. ANGUILLA RD STONINGTON/RE 235 HARTLAND RD, GRANBY-Install new Asset Location 1118 : CN : TOLLAND : 1118 1032 : CN : MERIDEN : 1032 1042 : CN : NEW BRITAIN : 1042 1405 : CN : HARWINTON : 1405 1177 : CN : STONINGTON : 1177 1066 : CN : STAMFORD : 1066 1117 : CN : SUFFIELD : 1117 1154 : CN : COLUMBIA : 1154 1191 : CN : BURLINGTON : 1191 1066 : CN : STAMFORD : 1066 1082 : CN : PUTNAM : 1082 1052 : CN : NORWALK : 1052 1084 : CN : THOMPSON : 1084 1102 : CN : BRANFORD : 1102 J31A : CL&P LAKEVIEW (FUTURE) NEW CANAAN : 1051 G15L : CL&P BOKUM OLD SAYBROOK G06A : CL&P BERLIN BERLIN J14K : CL&P WINDSOR LOCKS WINDSOR LOCKS : 1122 1041 : CN : FARMINGTON : 1041 1406 : CN : LITCHFIELD : 1406 1139 : CN : WARREN : 1139 1040 : CN : BERLIN : 1040 1114 : CN : SOMERS : 1114 1194 : CN : TORRINGTON : 1194 1032 : CN : MERIDEN : 1032 1103 : CN : GUILFORD : 1103 1159 : CN : GLASTONBURY : 1159 1032 : CN : MERIDEN : 1032 1941 : CN : ROCKY HILL : 1941 1031 : CN : CROMWELL : 1031 1099 : CN : DEEP RIVER : 1099 1120 : CN : VERNON : 1120 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1043 : CN : NEWINGTON : 1043 1076 : CN : CANTERBURY : 1076 J22M : CL&P WATERSIDE STAMFORD : 1066 1177 : CN : STONINGTON : 1177 1936 : CN : GRANBY : 1936 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 572 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202212 $274.03 Emergent Equipment Failures - Line 202212 $6,971.71 Emergent Equipment Failures - Line 202212 $1,411.20 Emergent Equipment Failures - Line 202212 $65.97 Emergent Equipment Failures - Line 202212 ($0.02) Emergent Equipment Failures - Line 202212 $77.82 Emergent Equipment Failures - Line 202212 $8,183.33 Emergent Equipment Failures - Line 202212 $383.68 Emergent Equipment Failures - Line 202212 $4,999.67 Emergent Equipment Failures - Line 202212 $77.18 Emergent Equipment Failures - Line 202212 $54.32 Emergent Equipment Failures - Line 202212 $8,996.38 Emergent Equipment Failures - Line 202212 $114.46 Emergent Equipment Failures - Line 202212 $3,592.96 Emergent Equipment Failures - Substation 202212 $3,037.04 Emergent Equipment Failures - Substation 202212 $104.65 Emergent Equipment Failures - Substation 202212 $3,998.00 Emergent Equipment Failures - Substation 202212 $29,958.26 Emergent Equipment Failures - Line 202212 $618.16 202212 ($14,465.79) Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 $1,361.62 Emergent Equipment Failures - Line 202212 $3,647.13 Emergent Equipment Failures - Line 202212 $2,121.97 Emergent Equipment Failures - Line 202212 $43.04 Emergent Equipment Failures - Line 202212 ($237.84) Emergent Equipment Failures - Line 202212 $2,289.74 Emergent Equipment Failures - Line 202212 $487.05 Emergent Equipment Failures - Line 202212 $8.71 Emergent Equipment Failures - Line 202212 $106.59 Emergent Equipment Failures - Line 202212 $27.51 Emergent Equipment Failures - Line 202212 $56.33 Emergent Equipment Failures - Line 202212 $4.73 Emergent Equipment Failures - Line 202212 ($8,080.69) Emergent Equipment Failures - Line 202212 ($6,895.23) Emergent Equipment Failures - Line 202212 ($1,930.18) Emergent Equipment Failures - Line 202212 ($991.17) Emergent Equipment Failures - Line 202212 $114.46 Emergent Equipment Failures - Substation 202212 $22,799.09 Emergent Equipment Failures - Line 202212 $1,115.71 Emergent Equipment Failures - Line 202212 $63.28
  5. Page 573 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80257372 80257894 80257918 80258801 80258883 80258959 80259355 80259371 80260101 80260337 80260362 80261214 80261233 80261292 80261321 80261563 80261993 80262070 80263230 80263566 80263592 80263817 80264183 80264190 80264406 80264507 80265550 80265579 80265595 80265647 80265648 80265658 80265669 80265702 80265733 80265830 80265998 80266318 80266436 80266440 Accounting Work Order Descript MJ 10/12 05.31.22 - 328 TOWN HILL R 6/6 (23) written POND WAY WINDHAM RSO 6/6 HAMILTON (8) AVE SOUTHINGTO Old Saybrook, 11 Maynard Cirlce/Shi MJ-339 CLARK ST SOUTHINGTON (MILLDA AJC TT HICKORY DR, GREENWICH REPLAC DG P#2564 WILSONVILLE RD THOMPSON F ***WRITTEN**INSTALL 18KV ARRESTER, 6/9 LONG COVE RD LEDYARD 6/9/22 JEREMY HILL RD, NORTH STONIN POST CONSTR - 6/6 ROPE FERRY RD WA ASP-6/10/22 23 COOLIDGE ST NEW BRIT REPLACE 2 POLES AND TRANSFORMER BL Jpt-29 E Main St WTBRY MH132 - POST HEL KTI CHESTNUT TREE HILL ROAD EXT ACC KTI WQ, SOUTHBURY, PLACE MIDSPA APPRENTICES 6/2/22 29 CARRIAGE DR O DG P#527 BROOKLYN RD CANTERBURY CLP UG HTFD, WINDSOR ST - REM/REPL BURN VJT - Y-26691-2022; SUNSET(39) RD LD 430 MAIN AVE NORWALK PAD#758 LEA ABEL Granby, 15 Allen Dr, shift to DB-CD01964, Great Wolf, MH inspecti 6/16/22 TURNOVER REPLC P 1896, HAMI PRINTED 7/28 CRP - MILFORD ( 456) Post Construction 6/15/22 DUNN HIL GDK BOLTON, GOODWIN RD REPLACE SECO MONROE( 45) RD -- HH "R1", ENFIEL Follow-up work 6/19 STONE HOUSE( RSO--06/15/22--REPLACED OH SERVICEfollowup work ligtnign need written Shift to New Pole- P 4707- Follow U **6/18/22 BALDWIN( 179) AVE FL 3-FTR POLE NOT SET-6/18/22 SCHAFFER( 6/19/22 MERIDEN( 1400) RD APT 3-2-6/19/22 AMITY RD BETHANY 6/18/22 20 BLACKMAN AVE BETHEL Jpt-90 Church Ave Bristol P2387 - R POST CONSTR - 6/20 PIERCE( 42) RD POST CONSTR - 6/19 MAGNOLIA DR MADI Asset Location 1071 : CN : PLYMOUTH : 1071 1180 : CN : WINDHAM : 1180 1034 : CN : SOUTHINGTON : 1034 1098 : CN : OLD SAYBROOK : 1098 1034 : CN : SOUTHINGTON : 1034 1065 : CN : GREENWICH : 1065 1084 : CN : THOMPSON : 1084 1098 : CN : OLD SAYBROOK : 1098 1164 : CN : LEDYARD : 1164 1170 : CN : NORTH STONINGTON : 1170 1100 : CN : WATERFORD : 1100 1042 : CN : NEW BRITAIN : 1042 1096 : CN : LYME : 1096 1002 : CN : WATERBURY : 1002 1014 : CN : OXFORD : 1014 1018 : CN : SOUTHBURY : 1018 1014 : CN : OXFORD : 1014 1076 : CN : CANTERBURY : 1076 1113 : CN : HARTFORD : 1113 1023 : CN : BETHLEHEM : 1023 1052 : CN : NORWALK : 1052 1936 : CN : GRANBY : 1936 1164 : CN : LEDYARD : 1164 1006 : CN : BETHANY : 1006 1191 : CN : BURLINGTON : 1191 1910 : CN : DURHAM : 1910 1903 : CN : BOLTON : 1903 1112 : CN : ENFIELD : 1112 1103 : CN : GUILFORD : 1103 1159 : CN : GLASTONBURY : 1159 1089 : CN : MADISON : 1089 1103 : CN : GUILFORD : 1103 1002 : CN : WATERBURY : 1002 1006 : CN : BETHANY : 1006 1002 : CN : WATERBURY : 1002 1006 : CN : BETHANY : 1006 1007 : CN : BETHEL : 1007 1070 : CN : BRISTOL : 1070 1173 : CN : PRESTON : 1173 1089 : CN : MADISON : 1089 Parent Project Hierarchy L4 Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line Emergent Equipment Failures - Line The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 573 of 616 Month Number Amount 202212 $419.83 202212 $68.11 202212 $94.63 202212 $656.20 202212 $113.78 202212 ($730.72) 202212 $75.09 202212 $515.29 202212 $1,102.97 202212 $3.11 202212 ($639.92) 202212 $9,438.82 202212 $15.99 202212 ($2,453.04) 202212 $26.93 202212 $6,533.26 202212 $1.74 202212 $114.46 202212 $166.36 202212 $2.13 202212 $45.26 202212 $353.87 202212 ($9,128.69) 202212 $231.56 202212 $2,133.83 202212 $22.35 202212 $30.29 202212 $59.32 202212 ($52.23) 202212 $89.26 202212 $12.32 202212 $276.05 202212 ($17.34) 202212 $5.24 202212 $1.22 202212 $5.31 202212 ($7,627.35) 202212 $1,588.27 202212 ($21,858.05) 202212 ($213.78)
  6. Page 574 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80266479 80266500 80267082 80267282 80267443 80267469 80267827 80267879 80267978 80268195 80268599 80268894 80268908 80268911 80269786 80269836 80269842 80269897 80269927 80269954 80269979 80270114 80270312 80270322 80270691 80270707 80270725 80270743 80270763 80270773 80270804 80270866 80271593 80271906 80272240 80272325 80272405 80273008 80273029 80273031 Accounting Work Order Descript TT - NM: 06.18.22 - ROUND HILL RD, EM RF:96 FLORENCE RD, RIVERSIDE:REM **COMP**MAPLE( 167) ST -- 266, KIL BRIGHTON PARK (20) WAY, BLOOMFIELD TO STORES 11/28/222 6/22 DOCK RD C MM 104 Ross Hill Rd Lisbon replace ***ALL WORK COMPLETED***6/22 TWILIG MJ** NACHILLY DR, NEW BRITAIN Upgrade Steps 1254kva 23/13.8 to 15 ***REMOVE RISER FROM OLD FTR POLE, MJ-06.23.22 - 565 MAIN ST, SOUTHING Abel - 2022 Circuit Patrol Finding, 2022 Circuit Patrol Finding, 15M3 PRINT 11/14 MDB - 6/23 [CLEAVJJ] LI 6/24/22 (RSO-ZAHACEFSKI) ROXBURY CT WRITTEN NEEDS TO BE DONE WILKES RD 6/25/22 TURNOVER THORPE( 367) AVE **field ck needed pole stragtn frtr HEL RR; 6/24/22 PEACH FARM( 77) R TO STORES--6/25 (RSO-STROM/PATINELL KTI BM; CANDLEWOOD ACRES RD,BRK OMS MATERIAL JDB 6/24/22 215 DR MARTIN MJ 6/27 CHESHIRE ST CHESHIRE CT, PO ACC-KTI RC INSTALL NEW POLE 917 AND Essex 16M-Replace Failed 2X3-4 Swit Southview St, Enfield 27H11-70S rep WILBURS (RSO - WESKE) LN -- 1767 6, Chestnut St Essex Pole 283 Replace ***MAY STILL NEED TREE TRIMMING***W WRITTEN NEEDS TO BE DONE (7) RESERV WRIGHTRD CANTERBURY Replace Pole 11 Byram 13C-2X LTC Control Replacemen APPRENTICES KTI BM; 6/28/22 S MAIN( CUST APPT 9/29/22; WRTN--JK>POLE 86 6/29/22 WOLCOTT( 642) ST -- 0, BRI JF-379 Whitfield St- rep c/o's and SW APPT 10/26/22; ***WRITTEN***REPL 656 MAIN ST MONROE, SHIFT FTR P.501 APPRENTICES 427 OLD FIELD RD SOUTHB GCC / GLASGO ROAD, STONINGTON Asset Location 1065 : CN : GREENWICH : 1065 1065 : CN : GREENWICH : 1065 1079 : CN : KILLINGLY : 1079 1932 : CN : BLOOMFIELD : 1932 1090 : CN : CHESTER : 1090 1165 : CN : LISBON : 1165 1089 : CN : MADISON : 1089 1042 : CN : NEW BRITAIN : 1042 1091 : CN : CLINTON : 1091 1102 : CN : BRANFORD : 1102 1034 : CN : SOUTHINGTON : 1034 1122 : CN : WINDSOR LOCKS : 1122 1179 : CN : WILLINGTON : 1179 1407 : CN : MORRIS : 1407 1092 : CN : EAST LYME : 1092 1157 : CN : EAST HAMPTON : 1157 1032 : CN : MERIDEN : 1032 1102 : CN : BRANFORD : 1102 1014 : CN : OXFORD : 1014 1102 : CN : BRANFORD : 1102 1013 : CN : NEWTOWN : 1013 1052 : CN : NORWALK : 1052 1030 : CN : CHESHIRE : 1030 1135 : CN : NEW MILFORD : 1135 J16M : CL&P ESSEX ESSEX : 1093 1112 : CN : ENFIELD : 1112 1103 : CN : GUILFORD : 1103 1093 : CN : ESSEX : 1093 1090 : CN : CHESTER : 1090 1153 : CN : COLCHESTER : 1153 1076 : CN : CANTERBURY : 1076 J13C : CL&P BYRAM GREENWICH : 1065 1013 : CN : NEWTOWN : 1013 1159 : CN : GLASTONBURY : 1159 1070 : CN : BRISTOL : 1070 1103 : CN : GUILFORD : 1103 1172 : CN : PORTLAND : 1172 1012 : CN : MONROE : 1012 1018 : CN : SOUTHBURY : 1018 1177 : CN : STONINGTON : 1177 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 574 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202212 $149.83 Emergent Equipment Failures - Line 202212 $55.95 Emergent Equipment Failures - Line 202212 $32.86 Emergent Equipment Failures - Line 202212 $65.91 Emergent Equipment Failures - Line 202212 ($481.08) Emergent Equipment Failures - Line 202212 $63.45 Emergent Equipment Failures - Line 202212 ($13.66) Emergent Equipment Failures - Line 202212 $2.88 Emergent Equipment Failures - Line 202212 $31.57 Emergent Equipment Failures - Line 202212 ($0.01) Emergent Equipment Failures - Line 202212 $260.65 Emergent Equipment Failures - Line 202212 $110.16 Emergent Equipment Failures - Line 202212 $25,506.55 Emergent Equipment Failures - Line 202212 $1,936.65 Emergent Equipment Failures - Line 202212 $1,376.91 Emergent Equipment Failures - Line 202212 $38.10 Emergent Equipment Failures - Line 202212 ($18,509.31) Emergent Equipment Failures - Line 202212 $574.10 Emergent Equipment Failures - Line 202212 ($1,165.22) 202212 $53.21 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 $2,085.49 Emergent Equipment Failures - Line 202212 $72.43 Emergent Equipment Failures - Line 202212 ($2,729.61) Emergent Equipment Failures - Line 202212 $3,781.58 Emergent Equipment Failures - Substation 202212 $325.66 Emergent Equipment Failures - Line 202212 $2,037.58 Emergent Equipment Failures - Line 202212 $2.36 Emergent Equipment Failures - Line 202212 ($64.04) Emergent Equipment Failures - Line 202212 ($28.00) Emergent Equipment Failures - Line 202212 $78.72 Emergent Equipment Failures - Line 202212 $74.37 Emergent Equipment Failures - Substation 202212 $101.16 Emergent Equipment Failures - Line 202212 $1.93 Emergent Equipment Failures - Line 202212 ($142.09) Emergent Equipment Failures - Line 202212 $2.90 Emergent Equipment Failures - Line 202212 $4.84 Emergent Equipment Failures - Line 202212 ($14.03) Emergent Equipment Failures - Line 202212 ($486.12) Emergent Equipment Failures - Line 202212 $4,770.39 Emergent Equipment Failures - Line 202212 $13.56
  7. Page 575 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80273069 80273081 80273308 80274456 80274504 80274516 80274619 80274622 80274642 80274701 80274718 80274735 80275292 80275318 80275323 80275341 80275357 80275371 80275383 80275466 80275511 80276004 80276040 80276107 80276139 80276144 80276285 80277069 80278284 80278289 80278316 80278363 80278433 80278545 80280113 80280115 80280129 80280177 80280229 80280235 Accounting Work Order Descript Lakeview 31A- Replace Failed 87&51N Charter Oak-6/30/22 WHEELER VILLAGE ON LD 7/25 EVW - RR Cross - Walgre TO STORES 11/22--JK>POLE 1249--REPL 7/5/22 MILLVILLE AVE NAGUATUCK 7/3/22 MADISON RD DURHAM MATERIAL TT - NM; 07.02.22 - RAYMON Replace 3 phase 25kva bank-7/3 (RSO #W HTFD, 1115 BOULEVARD - H610 REPL HEL 7/2/22 TURNOVER 20 YALE DR NEW APPRENTICES 7/2/22 7FOREST RD -- F7 APPRENTICES KTI 7/3/22 OLD FARM( JK/DM>HH1089A--C-OAK LOCATED AND RE MJ-Ellington, ROW P252, Mountain,14 cancel to fwo 80207243 **7/5/22 BUNKER HILL( 206) AVE -8/19 /5/22 FIELDSTONE( 25) RUN AJC !!! TT 2 GROVE LN, GREENWICH VJT - WATERTOWN( 435) RD SIDE LEFT Alden One pending (FTR POLE TO BE S POST CONSTR - 7/1 261 N MAIN ST BR 7/5/22 TURNOVER 76 GREAT RING RD NE 7/6/22 PEACH FARM( 77) RD -- F401 MJ-*7/6/22 MARION( 496) AVE -- 810 MJ-7/6/22 BERLIN ST SOUTHINGTON 7/6/22 JEFFREY( 13) DR -- H-8008, Abel Jeff 07/06 silver st coventry WRITTEN NEEDS WORK RSO Plourde LAKE 07/10/22--RSO--JK>POLE 1669--SQUIRR POST CONSTR - 7/8/22 (RSO-LEACH) SH IS WORK COMPLETE? HTFD, MAXIM RD OA CANC 7/8/22 S MAIN( 905) ST STR 0 7/10/22 HATTERTOWN( 251) RD -- 393 7/5/22 PRI DB TURNOVER 17 STARR RD 07.11.22 - OENOKE RDG, NEW CANAAN TO STORES 11/22-***ALL WORK COMPLET 7/11/22 SOUTH END RD SOUTHINGTON **WRITTEN**REPLACE 8' XARM & SHIFT* Pepperidge 28A-Battery Charger Repl WALDO RD SPRAGUE CT p643 replace gl Asset Location J31A : CL&P LAKEVIEW (FUTURE) NEW CANAAN : 1051 1034 : CN : SOUTHINGTON : 1034 1930 : CN : NORTH CANAAN : 1930 1095 : CN : KILLINGWORTH : 1095 1003 : CN : NAUGATUCK : 1003 1910 : CN : DURHAM : 1910 1908 : CN : DARIEN : 1908 1089 : CN : MADISON : 1089 1943 : CN : WEST HARTFORD : 1943 1134 : CN : NEW FAIRFIELD : 1134 1016 : CN : SEYMOUR : 1016 1134 : CN : NEW FAIRFIELD : 1134 1159 : CN : GLASTONBURY : 1159 1111 : CN : ELLINGTON : 1111 1003 : CN : NAUGATUCK : 1003 1002 : CN : WATERBURY : 1002 1041 : CN : FARMINGTON : 1041 1065 : CN : GREENWICH : 1065 1019 : CN : THOMASTON : 1019 1121 : CN : WINDSOR : 1121 1101 : CN : WESTBROOK : 1101 1013 : CN : NEWTOWN : 1013 1014 : CN : OXFORD : 1014 1034 : CN : SOUTHINGTON : 1034 1034 : CN : SOUTHINGTON : 1034 1041 : CN : FARMINGTON : 1041 1155 : CN : COVENTRY : 1155 1156 : CN : EAST HADDAM : 1156 1161 : CN : GROTON : 1161 1102 : CN : BRANFORD : 1102 1113 : CN : HARTFORD : 1113 1030 : CN : CHESHIRE : 1030 1012 : CN : MONROE : 1012 1008 : CN : DANBURY : 1008 1051 : CN : NEW CANAAN : 1051 1103 : CN : GUILFORD : 1103 1034 : CN : SOUTHINGTON : 1034 1172 : CN : PORTLAND : 1172 J28A : CL&P PEPPERIDGE NORWALK : 1052 1176 : CN : SPRAGUE : 1176 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 575 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Substation 202212 $53,390.39 Emergent Equipment Failures - Line 202212 $2.04 Emergent Equipment Failures - Line 202212 $15.45 Emergent Equipment Failures - Line 202212 ($703.27) Emergent Equipment Failures - Line 202212 $1.56 Emergent Equipment Failures - Line 202212 $40.65 Emergent Equipment Failures - Line 202212 $6.34 Emergent Equipment Failures - Line 202212 ($226.35) Emergent Equipment Failures - Line 202212 $4.22 Emergent Equipment Failures - Line 202212 $95.15 Emergent Equipment Failures - Line 202212 $2,412.95 Emergent Equipment Failures - Line 202212 ($588.53) Emergent Equipment Failures - Line 202212 $4.45 Emergent Equipment Failures - Line 202212 $131.94 Emergent Equipment Failures - Line 202212 $68.81 Emergent Equipment Failures - Line 202212 $618.27 Emergent Equipment Failures - Line 202212 $2.68 Emergent Equipment Failures - Line 202212 ($929.44) Emergent Equipment Failures - Line 202212 ($20,745.00) 202212 $2.58 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 ($280.09) Emergent Equipment Failures - Line 202212 $603.80 Emergent Equipment Failures - Line 202212 $59.89 Emergent Equipment Failures - Line 202212 $1,404.35 Emergent Equipment Failures - Line 202212 $6,848.52 Emergent Equipment Failures - Line 202212 $1.56 Emergent Equipment Failures - Line 202212 ($7,819.72) Emergent Equipment Failures - Line 202212 ($141.22) Emergent Equipment Failures - Line 202212 ($333.03) Emergent Equipment Failures - Line 202212 ($228.68) Emergent Equipment Failures - Line 202212 $2.25 Emergent Equipment Failures - Line 202212 $56.43 Emergent Equipment Failures - Line 202212 ($781.95) Emergent Equipment Failures - Line 202212 $630.06 Emergent Equipment Failures - Line 202212 ($404.12) Emergent Equipment Failures - Line 202212 $16.11 Emergent Equipment Failures - Line 202212 $27.05 Emergent Equipment Failures - Line 202212 ($225.64) Emergent Equipment Failures - Substation 202212 $55.14 Emergent Equipment Failures - Line 202212 $2,961.12
  8. Page 576 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80280316 80280841 80280854 80280860 80280862 80280931 80280987 80281055 80281239 80281649 80281661 80281724 80281758 80281791 80282435 80282470 80283521 80283547 80283550 80283575 80283576 80283579 80283584 80283697 80283782 80283805 80283951 80283953 80284274 80284351 80284399 80284460 80284494 80284696 80284697 80284704 80285153 80285154 80285158 80285231 Accounting Work Order Descript Cos Cob 35K-Replace Failed 35K4 CT' emailed cha 8/29 ASP-1021 BURLINGTO TD - LARSON (76) AVE -- 4914, CHESH Canceled - 7/12/22 UNION( 103) ST Repaired 3 spans of primary and one KTI RR; 7/12/22 10 HEMLOCK TRL OXFO VJT - FLANDERS( 145) RD FL 1-- 203 MJ-Jpt-44 Bank St Plainville P49007 ASP-7/12/22 ELLIS( 706) ST APT 1-JSG - RIVERTON( 82) RD -- 1431, C TO STORES WORK COMPLETE 7/12 (RSO-D Field Ck Possible followup 7/13/22 07/13/22--RSO--JK>POLE 334--REPLCD TO STORES 7/13/22 (RSO-LEACH) CANAD ***ALL WORK COMPLETED***CHERRY VALL ***ALL WORK COMPLETED***7/12/22 (RS 7/17/22 TURNOVER ANDREWS(107-1) RD ***ALL WORK COMPLETED***7/16/22 (RS 7/15/22 (RSO-PATINELLA) RIVER( 17 ***WRITTEN*** REPL P 595, CHANGE PO 7/16/22 BERLIN( 371) ST -- 513, SO WRITTEN NEEDS WORK TOWN( 256) ST * PANE RD NEWINGTON KD-TURNOVER REPLC GOAB HANDLE P 689 ***WRITTEN***CHANGE 3 POLES, (1) 50 Followup to replc xfmr 7/17/22 (RSO POST CONSTR - COMP 07/20 75 MAXIM R COMP GDK Bloomfield, 42 Maple Ave I MCB - 7/18/22 STRAITS( 1252) TPKE TO STORES WORK COMPLETED - MJGw - R FIELD COMPLETE - MPB; 7/18/22 HOWES WRTN--JK>POLE 960--PER RSO: REPL X ***WRITTEN***7/15/22 (RSO-DUBADJ) L WORK COMPLETE - MJGw - 7/19/22 (RSO TL - BROWNS LN, REF. #26 OLD LYME / 7/11 26 Charter Oak Drive, Oxford 7/19/22 TURNOVER - RANDALL( 12) DR RA p679 Packer Rd, Canterbury repla TT TC 31 DANNEL DR, STM: P#2086 REP 07/19 (RSO Herman) N COVE( 132) RD Asset Location J35K : CL&P COS COB RAILROAD SS GREENWICH : 1065 1070 : CN : BRISTOL : 1070 1030 : CN : CHESHIRE : 1030 1070 : CN : BRISTOL : 1070 1090 : CN : CHESTER : 1090 1014 : CN : OXFORD : 1014 1023 : CN : BETHLEHEM : 1023 1044 : CN : PLAINVILLE : 1044 1042 : CN : NEW BRITAIN : 1042 1192 : CN : COLEBROOK : 1192 1091 : CN : CLINTON : 1091 1091 : CN : CLINTON : 1091 1159 : CN : GLASTONBURY : 1159 1089 : CN : MADISON : 1089 1154 : CN : COLUMBIA : 1154 1161 : CN : GROTON : 1161 1020 : CN : WOLCOTT : 1020 1101 : CN : WESTBROOK : 1101 1091 : CN : CLINTON : 1091 1154 : CN : COLUMBIA : 1154 1034 : CN : SOUTHINGTON : 1034 1156 : CN : EAST HADDAM : 1156 1043 : CN : NEWINGTON : 1043 1002 : CN : WATERBURY : 1002 1154 : CN : COLUMBIA : 1154 1101 : CN : WESTBROOK : 1101 1113 : CN : HARTFORD : 1113 1932 : CN : BLOOMFIELD : 1932 1010 : CN : MIDDLEBURY : 1010 1089 : CN : MADISON : 1089 1053 : CN : REDDING : 1053 1089 : CN : MADISON : 1089 1164 : CN : LEDYARD : 1164 1102 : CN : BRANFORD : 1102 1097 : CN : OLD LYME : 1097 1014 : CN : OXFORD : 1014 1005 : CN : BEACON FALLS : 1005 1076 : CN : CANTERBURY : 1076 1066 : CN : STAMFORD : 1066 1098 : CN : OLD SAYBROOK : 1098 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 576 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Substation 202212 $309.59 Emergent Equipment Failures - Line 202212 ($4,467.30) Emergent Equipment Failures - Line 202212 $24.64 Emergent Equipment Failures - Line 202212 $239.43 Emergent Equipment Failures - Line 202212 $58.14 Emergent Equipment Failures - Line 202212 $35.69 Emergent Equipment Failures - Line 202212 ($101.00) Emergent Equipment Failures - Line 202212 $2,906.43 Emergent Equipment Failures - Line 202212 $4.48 Emergent Equipment Failures - Line 202212 ($15.70) Emergent Equipment Failures - Line 202212 $82.72 Emergent Equipment Failures - Line 202212 $649.79 Emergent Equipment Failures - Line 202212 $443.65 Emergent Equipment Failures - Line 202212 $117.80 Emergent Equipment Failures - Line 202212 ($252.99) Emergent Equipment Failures - Line 202212 ($1,213.94) Emergent Equipment Failures - Line 202212 $126.55 Emergent Equipment Failures - Line 202212 ($14.03) Emergent Equipment Failures - Line 202212 ($31.46) 202212 ($222.97) Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 $48.37 Emergent Equipment Failures - Line 202212 $39.87 Emergent Equipment Failures - Line 202212 $0.76 Emergent Equipment Failures - Line 202212 $81.13 Emergent Equipment Failures - Line 202212 $26.19 Emergent Equipment Failures - Line 202212 $0.11 Emergent Equipment Failures - Line 202212 $162.14 Emergent Equipment Failures - Line 202212 ($7,393.98) Emergent Equipment Failures - Line 202212 ($358.61) Emergent Equipment Failures - Line 202212 $65.45 Emergent Equipment Failures - Line 202212 $48.03 Emergent Equipment Failures - Line 202212 ($55.72) Emergent Equipment Failures - Line 202212 ($118.85) Emergent Equipment Failures - Line 202212 $456.26 Emergent Equipment Failures - Line 202212 $37.84 Emergent Equipment Failures - Line 202212 ($394.68) Emergent Equipment Failures - Line 202212 ($2,182.12) Emergent Equipment Failures - Line 202212 $209.94 Emergent Equipment Failures - Line 202212 $24.57 Emergent Equipment Failures - Line 202212 $325.05
  9. Page 577 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80285234 80285283 80285291 80285300 80285354 80285540 80285869 80286004 80286104 80286247 80286283 80286608 80286638 80286667 80286687 80286689 80286741 80286902 80287200 80287201 80287820 80287889 80287892 80287897 80287918 80287919 80287950 80288027 80288036 80288044 80288161 80288194 80288255 80288269 80288289 80288297 80288312 80288340 80288577 80288863 Accounting Work Order Descript 7/19/22 W MOUNTAIN( 262) RD -- 63 POST CONSTR - 07/20 PARK AVE BLOOMF 07/20 LASALLE RD WEST HTFD FAILED V POST CONSTR - 07/20 WOODLAND ST HAR DG P#4003 35 SENEXET RD WOODSTOCK F ***WRITTEN***Yellow Tag Y-26827-202 Pole top repair and tree trim 07/20 REPL 5' ARM P3773, REPL VISE TOP P3 ***WRITTEN***REPLACE & RELOCATE P27 AJC 33 THE AVE, GRN REPLACE ROTTED KD-EVENT #4793579/4793580 INST. XFM 7/21/22 (RSO-PUNZALAN) PEQUOT( 22 BM; KTI 7/21/22 GARDER( 288) RD -GDK ROCKY HILL, 98 SUNSET RIDGE REP UG 07/21 south meadow htfd leaky sp 07/21/22 (RSO-HERMAN) VINEGAR HILL( Rocky Hill 3R-Rebuild 3R-1X LTC. 07/05/22--YELLOW TAG--JK>P-2309--RE AldenOne SR 49S1-70S from P431 to P Replace MR 49S1-81 p3870 Boston Tpk JK>POLE 708--STRAIGHTEN POLE, RMV T 07/22 BANBURY LN WEST HARTFORD ((E)UTLEY (5) RD , BLOOMFIELD, CT WRITTEN COMPLETE IN FIELD (RSO-LEA NEW GC 7/23/22 (RSO-PUNZALAN) HAWLE WINDSOR, 57 Adam Hill Rd - REPL FG POST CONSTR - 07/23 SOUTH ST HTFD R DG P#2681 56 CROOKED TRAIL WOODSTOC KD-EVENT #4799174/4799117 REPLC XFM 7/24/22 JUBILEE( 215) ST -- 3852, #07/23 (RIVERA) SOUTH( 60) ST FL 07/25 (RIVERA) ENGLEWOOD( 46) DR KD-EVENT #4799935 ADD XFMR 4811 ALE cancel to fwo 80201320 7/22/22 MIDDLE( 785) ST GAR -- 148 * 7/24/22 SLATER( 1385) RD -- 1708, PD 18 DOYLE RD WTFD/RERPAIR STREETL EM RF:16 LIA FAIL WAY, COS COB:REMO 7/22/22 TURNOVER BAGLEY( 113) RD RA EM p877 Lisbon Rd, Canterbury - Asset Location 1054 : CN : RIDGEFIELD : 1054 1932 : CN : BLOOMFIELD : 1932 1943 : CN : WEST HARTFORD : 1943 1113 : CN : HARTFORD : 1113 1085 : CN : WOODSTOCK : 1085 1033 : CN : MIDDLETOWN : 1033 1103 : CN : GUILFORD : 1103 1089 : CN : MADISON : 1089 1033 : CN : MIDDLETOWN : 1033 1065 : CN : GREENWICH : 1065 1042 : CN : NEW BRITAIN : 1042 1177 : CN : STONINGTON : 1177 1012 : CN : MONROE : 1012 1941 : CN : ROCKY HILL : 1941 1113 : CN : HARTFORD : 1113 1164 : CN : LEDYARD : 1164 J03R : CL&P ROCKY HILL ROCKY HILL : 1941 1097 : CN : OLD LYME : 1097 1155 : CN : COVENTRY : 1155 1155 : CN : COVENTRY : 1155 1167 : CN : MARLBOROUGH : 1167 1943 : CN : WEST HARTFORD : 1943 1932 : CN : BLOOMFIELD : 1932 1091 : CN : CLINTON : 1091 1177 : CN : STONINGTON : 1177 1121 : CN : WINDSOR : 1121 1113 : CN : HARTFORD : 1113 1085 : CN : WOODSTOCK : 1085 1070 : CN : BRISTOL : 1070 1042 : CN : NEW BRITAIN : 1042 1031 : CN : CROMWELL : 1031 1937 : CN : MANCHESTER : 1937 1070 : CN : BRISTOL : 1070 1002 : CN : WATERBURY : 1002 1070 : CN : BRISTOL : 1070 1042 : CN : NEW BRITAIN : 1042 1100 : CN : WATERFORD : 1100 1065 : CN : GREENWICH : 1065 1018 : CN : SOUTHBURY : 1018 1076 : CN : CANTERBURY : 1076 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 577 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202212 ($600.28) Emergent Equipment Failures - Line 202212 $1,027.90 Emergent Equipment Failures - Line 202212 $23.97 Emergent Equipment Failures - Line 202212 $37,019.35 Emergent Equipment Failures - Line 202212 $22.39 Emergent Equipment Failures - Line 202212 ($131.75) Emergent Equipment Failures - Line 202212 ($2.12) Emergent Equipment Failures - Line 202212 ($11.13) Emergent Equipment Failures - Line 202212 $6,402.41 Emergent Equipment Failures - Line 202212 $77.82 Emergent Equipment Failures - Line 202212 ($1,221.33) Emergent Equipment Failures - Line 202212 $38.37 Emergent Equipment Failures - Line 202212 $67.23 Emergent Equipment Failures - Line 202212 $78.49 Emergent Equipment Failures - Line 202212 $34.54 Emergent Equipment Failures - Line 202212 $0.01 Emergent Equipment Failures - Substation 202212 $121.39 Emergent Equipment Failures - Line 202212 ($4,621.38) Emergent Equipment Failures - Line 202212 $930.18 202212 $9,195.78 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 $2,376.01 Emergent Equipment Failures - Line 202212 $45.00 Emergent Equipment Failures - Line 202212 $40.42 Emergent Equipment Failures - Line 202212 $26.95 Emergent Equipment Failures - Line 202212 $19.22 Emergent Equipment Failures - Line 202212 $9.90 Emergent Equipment Failures - Line 202212 $1,360.02 Emergent Equipment Failures - Line 202212 $73.15 Emergent Equipment Failures - Line 202212 $60.03 Emergent Equipment Failures - Line 202212 $3.53 Emergent Equipment Failures - Line 202212 $5.22 Emergent Equipment Failures - Line 202212 $22.93 Emergent Equipment Failures - Line 202212 $65.05 Emergent Equipment Failures - Line 202212 $5.85 Emergent Equipment Failures - Line 202212 $1.53 Emergent Equipment Failures - Line 202212 $8.15 Emergent Equipment Failures - Line 202212 $3,249.39 Emergent Equipment Failures - Line 202212 $18,554.49 Emergent Equipment Failures - Line 202212 ($23.89) Emergent Equipment Failures - Line 202212 $4,018.84
  10. Page 578 of 616

    CL&P Distribution 2022 Emergent Work Orders Accounting Work Order 80288966 80288985 80289011 80289046 80289060 80289064 80289217 80289336 80289355 80289365 80289675 80289697 80289704 80289712 80289763 80289929 80289950 80290035 80290403 80290413 80290422 80291351 80291553 80291613 80291800 80292299 80292313 80292359 80292363 80292561 80292689 80292851 80292852 80292853 80292855 80292856 80293129 80293140 80293155 80293191 Accounting Work Order Descript DONE ASPLUNDH JSG - 14R52 and 14R53 7/26/22 N COLONY( 680) ST APT 41-post constr asp-7/26/22 TURNOVER 45 MJ-7/25/22 S EAGLE ST PLYMOUTH MJ-7/25/22 TOWN HILL RD PLYMOUTH ***WRITTEN*** REPLACE ARRESTER- P 1 MATERIAL KTI RR; 7/27/22 HEMLOCK TR 7/24 BLUE HILLS AVE HARTFORD Long Hill Rd Guilford, Rep 3 1ph Re 07/25 RPL SUBMERSIBLE NORTHWOODS( Old saybrook/Plum Bank Rd/Replace a 7/27/22 13 DEBORAH LN FARMINGTON 7/27/22 100 CLYDE AVE WATERBURY MJ-7/27/22 500 BERLIN ST SOUTHINGTO 7/20/22 41 BETHEL ST BRISTOL East Meriden 21P -1X Transformer Re 7/21 (LEFEBMD) HARTFORD( 743) TPKE ASP 5/2/23 WINDSOR, 345 Matianuck A 7/28/22 KNOB HILL (303) RD -- U, ME invalid 11/22/24 WAIT UNTIL FALL PR INVALID 7/28/22 43 OLD LANTERN RD AldenOne South St. Coventry Town ro INVALID SD; 464 MAIN ST DANBURY 3 P COMP? 44 HRS CHARGED Firetown Rd 85 7/28 (WILLIAP) PINE RIDGE( 16) LN MATERIAL 8/1/22 Y-26882-2022 MIRY B TT TC 30 COMMERCE RD, STM: P#5252 R UG 08/01 SOUTH HTFD INSTALLED 500 4 Replace open wire secondaries P#114 NJB 79/81 MAPLETON ST HTFD RPL EXIS RL:690: RIVERSVILLE RD, GRN; Replac WORK COMPLETE: REPLACE 7 SECTIONS O REPLACE 11 SECTIONS OF OPEN WIRE SE NEW JD REPLACE 25 SECTIONS OF OPEN NEW JD ******ALL WORK COMPLETE***** ***ALL WORK COMP**** JD REPL 5 SECT PR 5/9 CRP - CASE( 142) ST -- S315 8/2/22 JUNIPER ST NEWINGTON 8/2/22 RADMERE( 520) RD -- 5436, C ASP COMPLETE 8/3 POLE#3153 21 East Asset Location 1194 : CN : TORRINGTON : 1194 1032 : CN : MERIDEN : 1032 1042 : CN : NEW BRITAIN : 1042 1071 : CN : PLYMOUTH : 1071 1071 : CN : PLYMOUTH : 1071 1154 : CN : COLUMBIA : 1154 1014 : CN : OXFORD : 1014 1113 : CN : HARTFORD : 1113 1103 : CN : GUILFORD : 1103 1936 : CN : GRANBY : 1936 1098 : CN : OLD SAYBROOK : 1098 1041 : CN : FARMINGTON : 1041 1002 : CN : WATERBURY : 1002 1034 : CN : SOUTHINGTON : 1034 1070 : CN : BRISTOL : 1070 J21P : CL&P EAST MERIDEN MERIDEN : 1032 1120 : CN : VERNON : 1120 1121 : CN : WINDSOR : 1121 1032 : CN : MERIDEN : 1032 1405 : CN : HARWINTON : 1405 1008 : CN : DANBURY : 1008 1155 : CN : COVENTRY : 1155 1008 : CN : DANBURY : 1008 1942 : CN : SIMSBURY : 1942 1166 : CN : MANSFIELD : 1166 1008 : CN : DANBURY : 1008 1066 : CN : STAMFORD : 1066 1113 : CN : HARTFORD : 1113 1091 : CN : CLINTON : 1091 1113 : CN : HARTFORD : 1113 1065 : CN : GREENWICH : 1065 1169 : CN : NEW LONDON : 1169 1169 : CN : NEW LONDON : 1169 1100 : CN : WATERFORD : 1100 1169 : CN : NEW LONDON : 1169 1169 : CN : NEW LONDON : 1169 1933 : CN : CANTON : 1933 1043 : CN : NEWINGTON : 1043 1030 : CN : CHESHIRE : 1030 1932 : CN : BLOOMFIELD : 1932 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 21, 2026 OCC-782 Attachment 1 Page 578 of 616 Parent Project Hierarchy L4 Month Number Amount Emergent Equipment Failures - Line 202212 $39,926.37 Emergent Equipment Failures - Line 202212 $2.12 Emergent Equipment Failures - Line 202212 ($7,315.83) Emergent Equipment Failures - Line 202212 $3.84 Emergent Equipment Failures - Line 202212 $4.92 Emergent Equipment Failures - Line 202212 $9.08 Emergent Equipment Failures - Line 202212 $78.05 Emergent Equipment Failures - Line 202212 $34,899.12 Emergent Equipment Failures - Line 202212 $97.08 Emergent Equipment Failures - Line 202212 $6.40 Emergent Equipment Failures - Line 202212 $8.33 Emergent Equipment Failures - Line 202212 $1.80 Emergent Equipment Failures - Line 202212 $2.13 Emergent Equipment Failures - Line 202212 $8,557.59 Emergent Equipment Failures - Line 202212 $17.88 Emergent Equipment Failures - Substation 202212 $22,911.76 Emergent Equipment Failures - Line 202212 $22.65 Emergent Equipment Failures - Line 202212 $2,760.56 Emergent Equipment Failures - Line 202212 $18.02 202212 $4,914.88 Emergent Equipment Failures - Line Emergent Equipment Failures - Line 202212 $8.23 Emergent Equipment Failures - Line 202212 $63.77 Emergent Equipment Failures - Line 202212 $13.98 Emergent Equipment Failures - Line 202212 $168.26 Emergent Equipment Failures - Line 202212 $16.40 Emergent Equipment Failures - Line 202212 $482.66 Emergent Equipment Failures - Line 202212 $250.84 Emergent Equipment Failures - Line 202212 $433.69 Emergent Equipment Failures - Line 202212 $6,735.91 Emergent Equipment Failures - Line 202212 $23.98 Emergent Equipment Failures - Line 202212 $77.82 Emergent Equipment Failures - Line 202212 $6,027.98 Emergent Equipment Failures - Line 202212 $18,136.22 Emergent Equipment Failures - Line 202212 $20,225.63 Emergent Equipment Failures - Line 202212 $16.81 Emergent Equipment Failures - Line 202212 $209.57 Emergent Equipment Failures - Line 202212 ($107.52) Emergent Equipment Failures - Line 202212 $1.33 Emergent Equipment Failures - Line 202212 ($625.07) Emergent Equipment Failures - Line 202212 $28.72
Words on different pages

As listed on the current system

Question(s) Answered 782 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)