Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 807, 808, 809, 810, 811

Files5

Text of OCC-810_Final.pdf

Extracted from the file · 1 page · 2,357 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-811 Page 1 of 2 Date Filed: October 05, 2026 Witness: David L. Gladey, Lavelle Freeman, John P. Dipaola-Tromba, Jennifer A. Schilling, Leanne M. Landry, Elli Ntakou and Jeffrey D. Turano Request from: Office of Consumer Counsel Question: For New Customer, Peak Load and Capacity, and substation transformer replacement, provide the five-year amount in each of the three tiers shown at page 7, of Exhibit CLP-TSP-3. For each category, state the amount already placed in service during 2017 through 2025 as recorded in Exhibit CLP-ADDITIONS-12, and what remains to be built. Response: Below, the table provides the five-year total planned investments in the categories of New Customer, Peak Load & Capacity, and Substation Transformer Asset Health (replacements). The investment values noted are for ongoing or future planned projects. These investments are not included in the 2017-2025 in-service plant addition values. 5-Year Amounts by Tier: Program 2027-2031 Investment ($M) Targeted Sustained System Performance Performance $400.0 $400.0 $393.0 $393.0 New Customer Peak Load / Capacity S/S Transformer Asset $243.3 Health $273.3 Advancing the Grid $447.6 $403.7 $273.3 Please refer to the table below for amounts placed in service from 2017 through 2025 for the New Customer, Peak Load and Capacity, and substation transformer replacement categories.
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-811 Page 2 of 2 CL&P Distribution 2017-2025 In-Service Plant Additions New Customer-ED Peak Load / Capacity-ED S/S TRANSFORMER RELIABILITY 2017-2025 $ 383,195,893 $ 278,911,851 $ 76,997,671 For clarification purposes, Exhibit CLP-ADDITIONS-12, reflects the values of capital expenditures, not the values for in-service plant additions.

As listed on the current system

Question(s) Answered 807, 808, 809, 810, 811 (The Connecticut Light and Power Company) Date Filed: 10/05/2026

This filing on the current system (opens in a new tab)