Interrogatory responses
Answers to questions 812
Filed by The Connecticut Light and Power Company1 file
Part of docket 26-05-10Files1
OCC-812_Final.pdf
PDF · 115 KB · 2 pagesText searchable
Download OCC-812_Final.pdfRead the text of OCC-812_Final.pdf
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-812 Page 1 of 2 Date Filed: October 05, 2026 Witness: Lavelle A. Freeman and Gerhard Walker Request from: Office of Consumer Counsel Question: Refer to Exhibit CLP-TSP-1, at 49. a. Provide hourly load forecast in MW and MWh for next 10 years for each proposed capacity project. b. Provide the contingency standard applied to the proposed stations including the normal and emergency ratings at feeder and substation level. Response: a. The Company does not currently generate an hourly load forecast. b. Please refer to CLF-SC-023, Attachment 1, for the Distribution System Planning Guide (“DSPG”). All substation contingency limits are defined by the Load Carrying Capability, or “LCC.” Specifically, substation ratings are defined starting on page 22, of the DSPG. For substation capacity projects referenced in the Sustained performance plan, the LCC ratings are provided in the individual tables in OCC-591, Attachment 1. For Feeders, the contingency standard per the DSPG is as follows: Contingent Operation (N-1) Cables During contingent system conditions of the electric system, load levels may not exceed Normal Ratings for Cables. System changes are developed when cable limits are expected to exceed 100% of Normal rating during contingency operations. Operating above the Normal rating may involve loss of life or loss of tensile strength for conductors, loading must be reduced after one load cycle (24hour period). Wires During contingency system conditions of the electric system, load levels may not exceed the following criteria:Page 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-19 Date Issued September 21, 2026 OCC-812 Page 2 of 2 • • NH – Wires shall not exceed emergency rating, as per Distribution System Planning and Design Criteria Guidelines (ED-3002) CT/MA – Wires shall not exceed normal rating For feeder capacity projects, the normal ratings are provided in OCC-594, Attachment 1.
As listed on the current system
Question(s) Answered 812 (The Connecticut Light and Power Company) Date Filed: 10/05/2026