Interrogatory responses
Answers to questions 815, 817, 826, 833
Files6
OCC-815_Final.pdf
PDF · 135 KB · 1 pageText searchable
Download OCC-815_Final.pdfRead the text of OCC-815_Final.pdf
OCC-817_Final.pdf
PDF · 82 KB · 1 pageText searchable
Download OCC-817_Final.pdfRead the text of OCC-817_Final.pdf
OCC-826_Final.pdf
PDF · 116 KB · 2 pagesText searchable
Download OCC-826_Final.pdfRead the text of OCC-826_Final.pdf
OCC-833_Final.pdf
PDF · 143 KB · 2 pagesText searchable
Download OCC-833_Final.pdfRead the text of OCC-833_Final.pdf
OCC-833 Attachment 1.pdf
PDF · 93 KB · 1 pageText searchable
Download OCC-833 Attachment 1.pdfRead the text of OCC-833 Attachment 1.pdf
OCC-833 Attachment 1.xlsx
Excel · 26 KBText searchable
Download OCC-833 Attachment 1.xlsxRead the text of OCC-833 Attachment 1.xlsx
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-815 Page 1 of 1 Date Filed: October 06, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Office of Consumer Counsel Question: Uncollectibles. Refer to WP C-3.30. a. Explain why the uncollectible expense is calculated including the revenues and uncollectibles for the RAMs and not just distribution revenues. b. Update the schedule to provide the information on a distribution only basis. c. Identify each RAM that recovers uncollectible expense. Response: a. The uncollectible expense in schedule WP C-3.30 reflects only bad-debt cost on customer rates that is not collected in other recovery mechanisms. The only portion of non-hardship bad debt cost that is recovered in other mechanisms is the uncollectible costs on GSC energy supply revenues that are recovered in FMCC rates. Non-hardship bad debt incurred on all other rate revenues, including all RAM components, is recovered in distribution rates consistent with prior rate case proceedings. 1 b. As outlined above, the Company separately tracks non-hardship uncollectible costs on the GSC energy supply portion of customer bills, which is recovered in FMCC rates. As a result, the total non-hardship uncollectible expense reflected within WP C-3.30 represents the total nonhardship distribution or delivery uncollectible expense. c. The Company recovers GSC non-hardship uncollectible costs in the FMCC and hardship uncollectible costs within the System Benefits Charge (“SBC”). These costs are not included in schedule WP C-3.30 and are segregated from the uncollectible costs described above. Distribution rates are designed to collect non-hardship customer uncollectibles only (excluding GSC energy supply revenues). Lastly, please refer to Footnote 1 in this response for additional information regarding the roll in of uncollectible costs previously recovered in RAM rates. Note, there are currently incremental revenue requirements on certain capital recoveries within the System Benefits Charge (“SBC”) and Non-Bypassable Federally Mandated Congestion Charges (“NBFMCC”) that include limited non-hardship uncollectible expense calculations that are incremental to what is included in current base distribution rates. The Company’s proposal is to roll those capital recoveries into base distribution rates and therefore the associated uncollectible expense will also be rolled into base distribution rates. 1
Text of OCC-833 Attachment 1.pdf
Extracted from the file · 1 page · 2,248 characters
Text of OCC-833 Attachment 1.xlsx
Sheet names, column headings and text cells; numbers left out
As listed on the current system
Question(s) Answered 815, 817, 826, 833 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026