Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 849

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy1 file
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files1

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-20 Date Issued September 22, 2026 OCC-849 Page 1 of 1 Date Filed: October 06, 2026 Witness: John P. DiPaola-Tromba, Sean D. Redding and Jenna Turner Request from: Office of Consumer Counsel Question: (MS24E) Please refer to Exhibit ACCT-2(CLP-5A-06)(MS24E), p. 1-6. Did these crews perform work at any site or were they on standby at the Cheshire Work Center on March 11 and March 12? If they performed work, please indicate where they worked and how the Company knows about and validated that work. Response: The individual referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 1-3, is providing contractor tree crew supervision and dispatching to support storm restoration. The contractor's supervisory personnel do not maintain records of specific crew dispatch locations during storm events because they are not personally responding to each work site. Their role is to supervise operations and dispatch the tree crews performing the work to locations identified through the Company's restoration process. The tree crew referred to in Exhibit ACCT-2(CLP-5A-06)(MS24E), pages 4-6, worked two 16hour shifts on March 11, 2024, and March 12, 2024, which was billed as work time. There is no standby designation or rate for tree crews. The crew did not record any ticket locations.

As listed on the current system

Question(s) Answered 849 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)