Interrogatory responses

Answers to questions 949, 951, 952

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set OCC-27 Date Issued October 07, 2026 OCC-949 Page 1 of 1 Date Filed: October 19, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Consumer Counsel Question: (MS24E) Please refer to the Response to OCC-627, Attachment 1. Please explain who created Attachment 1, when it was created, and why it was not included with the timesheet. Response: The engineering department creates the circuit sweep forms after each storm event to capture the follow up work needed to be completed. This form was created during the MS24E storm event. The crews most likely don’t include them in their timesheet because they are given the work package as “circuit sweeps” with all the damage and locations on the work package. They are in constant communication with the AWC when each and every location is repaired.

As listed on the current system

Question(s) Answered 949, 951, 952 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/19/2026