Interrogatory responses
Answers to questions 949, 951, 952
Filed by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Files3
OCC-949_Final.pdf
PDF · 86 KB · 1 pageText searchable
Download OCC-949_Final.pdfRead the text of OCC-949_Final.pdf
OCC-951_Final.pdf
PDF · 115 KB · 1 pageText searchable
Download OCC-951_Final.pdfRead the text of OCC-951_Final.pdf
OCC-952_Final.pdf
PDF · 123 KB · 2 pagesText searchable
Download OCC-952_Final.pdfRead the text of OCC-952_Final.pdf
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-27
Date Issued October 07, 2026
OCC-949
Page 1 of 1
Date Filed: October 19, 2026
Witness:
Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G.
Griffin
Request from: Office of Consumer Counsel
Question:
(MS24E) Please refer to the Response to OCC-627, Attachment 1. Please explain who created
Attachment 1, when it was created, and why it was not included with the timesheet.
Response:
The engineering department creates the circuit sweep forms after each storm event to capture the
follow up work needed to be completed. This form was created during the MS24E storm event.
The crews most likely don’t include them in their timesheet because they are given the work
package as “circuit sweeps” with all the damage and locations on the work package. They are in
constant communication with the AWC when each and every location is repaired.
As listed on the current system
Question(s) Answered 949, 951, 952 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/19/2026