Interrogatory responses
Answers to questions 960
Filed by Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Files3
OCC-960_Final.pdf
PDF · 165 KB · 3 pagesText searchable
Download OCC-960_Final.pdfRead the text of OCC-960_Final.pdf
OCC-960 Attachment 1.pdf
PDF · 518 KB · 1 pageText searchable
Download OCC-960 Attachment 1.pdfRead the text of OCC-960 Attachment 1.pdf
OCC-960 Attachment 1.xlsx
Excel · 35 KBText searchable
Download OCC-960 Attachment 1.xlsxRead the text of OCC-960 Attachment 1.xlsx
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-28
Date Issued October 08, 2026
OCC-960
Page 1 of 3
Date Filed: October 27, 2026
Witness:
David L. Gladey, John P. Dipaola-Tromba, Leanne M. Landry and Jeffrey D.
Turano
Request from: Office of Consumer Counsel
Question:
Refer to Docket No. 19-03-01 12/30/2024 Compliance Filing, Attachment A. The filing illustrates
that in the revised 2025 Capital Plan plans to decrease the total capital expenditures by $82.9
Million from the Company’s original plan’s stated expenditures of 557.9M to 475.0M. Provide an
unlocked, workable excel spreadsheet that illustrates:
a. The actual expenditure for 2025 by Major Program Category.
b. A comparison by category of the actual to revised 2025 Plan contained in the compliance
filing.
c. An explanation for each category’s actual to revised budgeted expenditure variance.
d. A breakdown by Major Program category of the original plan, revised plan and the actual
2025 expenditures into Aging Infrastructure and other expenditures.
e. Provide the Aging infrastructure amounts from the Eversource 10-Ks for 2020 – 2025.
f. Provide Aging Infrastructure amounts historical applicable and contained within the
current rate case exhibits.
g. Provide an explanation for any differences/delta between the amounts filed in the ES 10Ks and the company’s rate case application.
h. Provide the definition of ‘aging infrastructure’ on the Eversource 10-K.
Response:
a. Please refer to the Company’s response to CIEC-008 i for capital distribution expenditures
by year from 2018 through 2025, as annually filed in compliance with Docket No. 17-1046.
b. Please refer to the Company’s response to subpart (a.) above.
c. Please refer to OCC-266, Attachment 7, for a summary of explanations of the variances
between the Company’s actual distribution capital expenditures compared to the original
estimates for 2025, as annually filed in compliance with Docket No. 17-10-46.
d. Please refer to OCC-960, Attachment 1, for a comparison of the 2025 Revised Plan versus
the Original 2025 Plan as provided as part of the November 30, 2024 Compliance Filings
associated with Docket number 19-03-01.
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-28
Date Issued October 08, 2026
OCC-960
Page 2 of 3
e. Please refer to Table 1 which shows the Aging Infrastructure amounts from the 10Ks from
2020 to 2025:
$ in Millions
2020
Aging
$ 179.9
Infrastructure
2021
Table 1
2022
2023
2024
2025
$ 178.0
$ 199.9
$ 161.3
$ 132.5
$ 260.7
f. Please refer to a. above and note that Aging Infrastructure as filed annually in compliance
with Docket No. 17-10-46 are based on the Reliability, System Resiliency/Expanded
Reliability and Regulatory Commitment - Other categories.
g. Variances are noted between the filed amounts on the Company’s 10Ks and submitted
amounts as part of the Company’s capital expenditures annually filed in compliance with
Docket No. 17-10-46. These differences are associated with the different levels in which
this information is pulled for SEC versus regulatory reporting. Aging Infrastructure on the
10Ks includes Reliability, System Resiliency/Expanded Reliability and Regulatory
Commitments under the CT Electric Operations organization. In the annual compliance
filings, those categories also include capital under the Engineering organization, including
enhanced tree removal, customer focused trimming, UConn Resilient Energy Center,
DSCADA-Radio Expansion, and other Engineering projects.
h. The Aging Infrastructure category is defined on page 37 of the 2025 10K:
a. Aging Infrastructure relates to reliability and the replacement of overhead lines,
plant substations, underground cable replacement, and equipment failures.
Prior Referenced Response:
i
CIEC-008 Question:
(Capital Additions Panel) For each of the past 10 calendar years, specify:
a.
b.
the capital expenditure budget broken down by investment in the transmission, sub-transmission, primary,
and secondary systems; and
the amount of actual capital expenditures, broken down by investment in the transmission, sub-transmission,
primary, and secondary systems.
CIEC-008 Response:
For purposes of the capital expenditure budget in this distribution rate proceeding, the Company does not track
investment by the categories of “transmission, sub-transmission, primary, and secondary systems.”
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set OCC-28
Date Issued October 08, 2026
OCC-960
Page 3 of 3
a.
Please refer to CIEC-008, Attachment 1, for a summary of actual and forecast distribution capital
expenditures for the years 2018-2025 as filed in compliance with Docket No. 17-10-46 each year.
b.
Please refer to subpart a. Please also refer to Exhibit CLP-ADDITIONS-4 which summarizes the cumulative
capital spending to date for each project put in service from 2017-2025 greater than $100K and Exhibit CLPADDITIONS 6 which includes the associated capital project documentation. Also for reference, although not
capital spending, Exhibit CLP-ADDITIONS-2 and 3 provide a summary of plant additions (both distribution
and transmission) by year and is reconciled to the Company’s FERC Form 1.
As listed on the current system
Question(s) Answered 960 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/27/2026