Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 13

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files3

The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-013 Page 1 of 1 Date Filed: August 13, 2026 Witness: Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (NON-CATASTROPHIC STORM EVENTS) Provide a listing of all storm events subject to a Storm Work Order for the years 2024 through present that did not exceed the $4 million catastrophic storm eligibility threshold. Additionally, provide a breakdown of the associated costs and the specific date range for each event (i.e., beginning and ending). Response: Please refer to EOE-013, Attachment 1, for a listing of total cost for non-catastrophic storm events for 2024, 2025, and 2026. Storm Work Order SCMN2411 reflects multiple dates associated with the costs incurred. At the time, the Company maintained a single work order for non-catastrophic storm work, resulting in all related charges being captured under a single work order. More recently, the Company has changed that practice to initiate separate work orders. All 2026 costs remain preliminary, as the year is still in progress. The dollar amount reflected represents charges recorded through June 30, 2026, and does not constitute final year-end total.

As listed on the current system

Question(s) Answered 13 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/13/2026

This filing on the current system (opens in a new tab)