Interrogatory responses
Answers to questions 13
Filed by The Connecticut Light and Power Company dba Eversource Energy3 files
Part of docket 26-05-10Files3
EOE-013_final.pdf
PDF · 83 KB · 1 pageText searchable
Download EOE-013_final.pdfRead the text of EOE-013_final.pdf
EOE-013 Attachment 1.pdf
PDF · 185 KB · 3 pagesText searchable
Download EOE-013 Attachment 1.pdfRead the text of EOE-013 Attachment 1.pdf
EOE-013 Attachment 1.xlsx
Excel · 40 KBText searchable
Download EOE-013 Attachment 1.xlsxRead the text of EOE-013 Attachment 1.xlsx
The Connecticut Light and Power Company
d/b/a Eversource Energy
Docket No. 26-05-10
Set EOE-01
Date Issued July 31, 2026
EOE-013
Page 1 of 1
Date Filed: August 13, 2026
Witness:
Leanne M. Landry and John G. Griffin
Request from: Office of Education, Outreach, and Enforcement
Question:
(NON-CATASTROPHIC STORM EVENTS) Provide a listing of all storm events subject to a
Storm Work Order for the years 2024 through present that did not exceed the $4 million
catastrophic storm eligibility threshold. Additionally, provide a breakdown of the associated costs
and the specific date range for each event (i.e., beginning and ending).
Response:
Please refer to EOE-013, Attachment 1, for a listing of total cost for non-catastrophic storm events
for 2024, 2025, and 2026. Storm Work Order SCMN2411 reflects multiple dates associated with
the costs incurred. At the time, the Company maintained a single work order for non-catastrophic
storm work, resulting in all related charges being captured under a single work order. More
recently, the Company has changed that practice to initiate separate work orders.
All 2026 costs remain preliminary, as the year is still in progress. The dollar amount reflected
represents charges recorded through June 30, 2026, and does not constitute final year-end total.
As listed on the current system
Question(s) Answered 13 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/13/2026